Quantification method of time scale effect in optimal load allocation of hydropower station units

By determining and applying quantitative indicators in hydropower stations, reconstructing load processes at different time scales and solving optimization models, the problem of insufficient attention to time scale effects in optimal load allocation of hydropower station units is solved, and a scientific basis is provided for optimal dispatch and algorithm reduction. dimension.

CN117878909BActive Publication Date: 2024-10-08XIAN UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410016739.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-10-08
Estimated Expiration
2044-01-05

AI Technical Summary

Technical Problem

Existing research has paid insufficient attention to the time scale effect in the optimal load allocation of hydropower station units, resulting in differences in optimal dispatch results and a certain degree of artificiality in time scale selection, resulting in a lack of quantitative analysis methods.

Method used

By determining the indicators used to quantify the scale effect of the hydropower station, the load reconstruction strategy is used to select different time scales (such as 60min, 30min, 15min), reconstruct the daily load process, and substitute it into the hydropower station unit load optimization distribution model to solve the problem and calculate the power generation. The water consumption, the number of times crossing the vibration zone, the number of starts and stops of the unit and the time taken to solve the problem are analyzed, and spatial optimization and time optimization are carried out.

Benefits of technology

It clarifies the differences in the optimal dispatching results of hydropower stations under different time scales, provides a scientific basis for the selection of time scales for optimal dispatching of hydropower stations and the dimensionality reduction of the optimization solution algorithm, and realizes the quantification of time scale effects in optimal load allocation of hydropower station units.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117878909B_ABST
    Figure CN117878909B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for quantifying the time scale effect in the optimal allocation of loads of hydropower station units, which is specifically implemented according to the following steps: step 1, determining an index for quantifying the scale effect of a hydropower station; step 2, reconstructing the load process at different time scales; step 3, quantifying the scale effect under the optimal allocation of loads of a hydropower station. The present invention makes the selection of the time scale for optimal scheduling of a hydropower station and the dimensionality reduction range of the optimization solution algorithm well-documented, clarifies the difference in the optimal scheduling results of a hydropower station at different time scales, and quantifies the scale effect in the optimal allocation of loads of hydropower station units, providing a quantitative scientific basis for the selection of time scales in the optimal allocation of scale loads of hydropower station units at the practical level and the innovation of the time dimensionality reduction solution algorithm at the scientific research level.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of water conservancy projects and relates to a method for quantifying time scale effects in load optimization distribution of hydropower station units. Background Art

[0002] The optimal allocation of loads for hydropower station units is the key to making the day-ahead plan of the power station and determining the output of the units. Previous studies on the optimal allocation of loads for hydropower station units have mostly focused on improving the solving ability of optimization algorithms and the superiority of scheduling models (such as the selection and establishment of objective functions and constraints). It should be noted that in addition to the optimization algorithm and scheduling model, the choice of time scale is also the key to affecting the solving rate of the optimization scheduling model and the results of the optimal allocation of loads for hydropower station units.

[0003] The spatial scale effect of hydropower stations refers to the phenomenon that when a group of hydropower stations are jointly dispatched, because the regulating capacity of reservoirs is different, such as the joint dispatch of annual or multi-year regulating reservoirs and daily regulating reservoirs, in order to reduce the dimension of the joint dispatch model, the reservoir hydropower station with the same regulating capacity is often selected for the long, medium and short-term joint dispatch, and the operation mode of the reservoir hydropower station with smaller regulating capacity is not considered enough, resulting in the annual or multi-year regulating reservoir dispatch decision exceeding the daily regulating reservoir regulation capacity, unreasonable water abandonment, water supply and demand process mismatch and other problems. The time scale effect of hydropower stations refers to the phenomenon that the long-term joint dispatch ignores the fluctuations of hydrological processes (such as runoff, river evolution, etc.) and power system processes (such as load, wind power, photovoltaic output, etc.) on short time scales, resulting in differences in the dispatch results of hydropower stations in different dimensions (such as water consumption, power generation, unit load distribution plan, crossing vibration zone, etc.).

[0004] In terms of model solution rate, the larger the time scale, the faster the model solution speed. On the contrary, the model complexity increases significantly and the solution time increases significantly. In terms of load optimization and allocation, a small time scale is more conducive to capturing the refined fluctuations of the grid load. A time scale that is too large will flatten the short-term rapid changes in the grid load. Different fluctuation characteristics of the load process at different time scales will inevitably lead to different operating modes such as unit output, start and stop, and thus different results of load optimization allocation of hydropower station units, resulting in the phenomenon of "time scale effect".

[0005] However, existing studies have paid insufficient attention to the time scale effect of the optimal load distribution of hydropower station units, and most studies have a certain degree of artificiality in the choice of time scale. In order to make the selection of the time scale for optimal dispatching of hydropower stations and the dimensionality reduction of the optimization solution algorithm have a basis, it is urgent to clarify the differences in the optimal dispatching results of hydropower stations under different time scales and quantify the time scale effect of the optimal load distribution of hydropower stations. Summary of the invention

[0006] The purpose of the present invention is to provide a method for quantifying the time scale effect in the optimal allocation of load for hydropower station units, which solves the problem of the difference in the optimal dispatching results of hydropower stations under different time scales and how to quantify the time scale effect in the optimal allocation of load for hydropower station units.

[0007] The technical solution adopted by the present invention is a method for quantifying the time scale effect in the optimal load distribution of hydropower station units, which is specifically implemented according to the following steps:

[0008] Step 1: Determine the indicators used to quantify the scale effect of hydropower stations;

[0009] Step 2: Reconstruction of load processes at different time scales;

[0010] In the daily power generation cycle of the hydropower station, multiple time scales with multiple relationships are selected to determine the daily load process of different time scales;

[0011] Step 2 is as follows:

[0012] During the daily power generation cycle of the hydropower station, a load reconstruction strategy is adopted to select multiple time scales with multiple relationships to ensure the total load characteristics on the time scale. Through random simulation, the daily load process of each time scale is generated, and multiple time scales with multiple relationships are selected as 60min, 30min, and 15min.

[0013] Step 3: Quantification of scale effect under optimal load allocation of hydropower stations

[0014] Substitute the daily load process under different time scales into the load optimization allocation model of the hydropower station unit to solve it, and count the water consumption of the hydropower station under different time scales and different load processes, the number of times the vibration zone is crossed, the number of unit start-up and shutdown times, and the time consumption for solving it, so as to optimize the daily load of the hydropower station unit in space and time;

[0015] In step 3,

[0016] The objective function of the load optimization distribution model of hydropower station units is as follows:

[0017]

[0018] In formula (1), W(T) is the total water consumption of the hydropower station during the dispatch period, m 3 ; t is any time period during the dispatch period; T is the total time period length of the dispatch period; L(t,j) is the plant number corresponding to the jth unit that can be put into operation in time period t, L(t,j)∈[1,N], j=1~n(t); n(t) is the number of units that can be put into operation during the dispatch period (n(t)≤N), and N is the total number of units in the hydropower station; Q fd,L(t,j) (t) is the working flow of the L(t,j)th unit in period t, m 3 / s; ΔT(t) is the length of the time period t in seconds, s;

[0019] The constraints of the load optimization distribution model of hydropower station units are as follows:

[0020] 1) Power system constraints:

[0021]

[0022] In formula (2): P s (t), P L(t,j) (t) are the total load of the hydropower station and the output of unit L(t,j) in period t, kW;

[0023] 2) Reservoir characteristic constraints:

[0024] ① Reservoir water balance:

[0025] make:

[0026]

[0027] Then we have:

[0028]

[0029] In formulas (3) and (4), V(t) and V(t+1) are the reservoir water storage at the beginning and end of the time period, m 3 ;Q rk (t), Q ck (t), Q qs (t) are the average inflow, outflow and abandoned water flow in period t, respectively, m 3 / s;

[0030] ② Storage capacity curve constraints:

[0031] Z sy (t+1)=f ZV [V(t+1)](5)

[0032] In formula (5): Z sy (t+1) is the water level upstream of the reservoir at the end of period t, m; f ZV (·) is the storage capacity curve function;

[0033] ③Reservoir water level or storage capacity constraints:

[0034]

[0035] In formula (6): are the lowest and highest water levels allowed upstream of the reservoir at the end of period t, m; V min (t+1), V max(t+1) are the minimum and maximum water storage allowed in the upstream of the reservoir at the end of period t, m 3 ;

[0036] ④Capacity constraints of discharge facilities:

[0037]

[0038] In formula (7): M xie is the number of reservoir discharge facilities; N i is the number of holes of each discharge facility (i=1~Mxie); f xie,i (·) is the maximum discharge capacity function of the ith discharge facility;

[0039] ⑤ Downstream water level and flow relationship constraints:

[0040] Z xy (t) = f ZQ [Q ck (t)](8)

[0041] In formula (8): Z xy (t) is the average downstream water level during period t, m; f ZQ (·) is the downstream water level-discharge relationship function;

[0042] 3) Hydropower station characteristic constraints:

[0043] ① Unit head:

[0044]

[0045] In formula (9): ΔH L(t,j) (t), H L(t,j) (t) are the head loss and unit head of unit L(t,j) in period t, m; are the minimum and maximum permissible heads of unit L(t,j), m;

[0046] f ΔH,L(t,j) (·) is the head loss function of unit L(t,j);

[0047] ②Unit output limit:

[0048]

[0049] In formula (10): are the minimum and maximum output of unit L(t,j) in period t, kW;

[0050] ③ System spare capacity constraints:

[0051]

[0052] In formula (11): It is the system load reserve for period t;

[0053] ④ Unit flow consumption characteristics:

[0054]

[0055] In formula (12): Q L(t,j) [P L(t,j) (t),H L(t,j) (t)] is the flow consumption characteristic curve of unit L(t,j), indicating that the water head of unit L(t,j) in period t is H L(t,j) (t), the load is P L(t,j) (t) The flow rate consumed at time, m 3 / s;

[0056] ⑤Vibration zone constraints:

[0057]

[0058] ⑥Unit status constraints:

[0059] The unit is in a state of fault maintenance or under overhaul, and cannot be arranged to generate electricity at this time;

[0060] 4) Outbound traffic restrictions:

[0061]

[0062] In formula (14): is the minimum downstream discharge required for downstream comprehensive utilization during period t, m 3 / s;

[0063] 5) Initial condition constraints:

[0064]

[0065] In formula (15): is the initial reservoir water level during the dispatch period, m;

[0066] 6) Non-negative variables:

[0067] The various variables must be non-negative values.

[0068] The present invention is also characterized in that:

[0069] The indicators used to quantify the scale effect of hydropower stations include indicators used to quantify spatial scale effects and temporal scale effects, including water consumption, power generation, unit load distribution plan, crossing vibration zones, and number of unit starts and stops.

[0070] Spatial optimization refers to determining the optimal distribution plan of the entire plant load among units at a certain moment based on the number of times the units cross the vibration zone and the output characteristics. Time optimization refers to determining the unit combination plan for all calculation periods within the day based on the number of unit starts and stops and the constraints of the load optimization distribution model of the hydropower station units.

[0071] The beneficial effects of the present invention are:

[0072] The method for quantifying the time scale effect in the optimal allocation of load for hydropower station units of the present invention makes it possible to have a basis for selecting the time scale for optimal scheduling of hydropower stations and the dimensionality reduction range of the optimization solution algorithm, clarifies the differences in the optimal scheduling results of hydropower stations at different time scales, and quantifies the scale effect in the optimal allocation of load for hydropower station units, providing a quantitative scientific basis for the selection of time scale in the optimal allocation of scale load for hydropower station units at the practical level and the innovation of time dimensionality reduction solution algorithms at the scientific research level. BRIEF DESCRIPTION OF THE DRAWINGS

[0073] Figure 1 It is a time scale correspondence relationship of the time scale effect quantification method in the load optimization distribution of the hydropower station units of the present invention and an example diagram of load processes at different time scales;

[0074] Figure 2(a)-Figure 2(d) 2(a) is a graph showing the load process of the Zangmu Hydropower Station on a typical day at different time scales, wherein FIG. 2(b) is a graph showing the load of the Zangmu Hydropower Station on a typical day at a time scale of 15 minutes, FIG. 2(c) is a graph showing the load of the Zangmu Hydropower Station on a typical day at a time scale of 30 minutes, and FIG. 2(d) is a graph showing the load of the Zangmu Hydropower Station on a typical day at a time scale of 60 minutes;

[0075] Figure 3(a)-Figure 3(c) 3 is a diagram of the unit output process at different time scales on a typical day of the Zangmu Hydropower Station in Example 3, wherein FIG3(a) is a diagram of the unit output at a time scale of 15 minutes, FIG3(b) is a diagram of the unit output at a time scale of 30 minutes, and FIG3(c) is a diagram of the unit output at a time scale of 60 minutes;

[0076] Figure 4(a)-Figure 4(d) It is a scale effect diagram of load optimization distribution of Zangmu Hydropower Station units in Example 3, wherein Figure 4(a) is a water consumption diagram at different time scales, Figure 4(b) is a diagram of the number of times of crossing vibration zones at different time scales, Figure 4(c) is a diagram of the number of starts and stops at different time scales, and Figure 4(d) is a diagram of the calculation time consumption at different time scales. DETAILED DESCRIPTION

[0077] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0078] Example 1

[0079] This embodiment provides a method for quantifying the time scale effect in the optimal load distribution of hydropower station units, which is specifically implemented according to the following steps:

[0080] Step 1: Determine the indicators used to quantify the scale effect of hydropower stations;

[0081] Scale effect refers to the phenomenon that when the time, space amplitude or granularity changes, the change law of the main object changes accordingly, or even the change law of the object shows inconsistency due to different scales. The scale effect phenomenon also exists in the scheduling of hydropower stations in both time and space scales.

[0082] The spatial scale effect of hydropower stations refers to the situation when a group of hydropower stations are jointly dispatched. Because the regulating capacities of reservoirs are different, such as the joint dispatch of annual or multi-year regulating reservoirs and daily regulating reservoirs, in order to reduce the dimension of the joint dispatch model, reservoirs and hydropower stations with consistent regulating capacities are often selected for joint dispatch at different long, medium and short time scales, while the operating modes of reservoirs and hydropower stations with smaller regulating capacities are insufficiently considered, resulting in the phenomenon that the dispatching decisions of annual or multi-year regulating reservoirs exceed the regulating capacity of daily regulating reservoirs, resulting in unreasonable water abandonment and mismatch between water supply and demand processes.

[0083] The time scale effect of hydropower stations refers to the phenomenon that long-time scale joint scheduling ignores the fluctuations of hydrological processes (such as runoff, river evolution, etc.) and power system processes (such as load, wind power, photovoltaic output, etc.) on short time scales, resulting in differences in hydropower station scheduling results in different dimensions (such as water consumption, power generation, unit load distribution plan, crossing vibration zone, etc.).

[0084] The indicators used to quantify the scale effect of hydropower stations include indicators used to quantify spatial scale effects and temporal scale effects, including water consumption, power generation, unit load distribution plan, crossing vibration zones, and number of unit starts and stops.

[0085] Step 2: Reconstruction of load processes at different time scales;

[0086] During the daily power generation cycle of the hydropower station, a load reconstruction strategy is adopted to select multiple time scales with multiple relationships, such as 60 minutes, 30 minutes, and 15 minutes, to ensure the total load characteristics on the time scale, and generate the daily load process of each time scale through random simulation.

[0087] Step 3: Quantification of scale effect under optimal load allocation of hydropower stations;

[0088] The daily load process under different time scales is substituted into the load optimization distribution model of the hydropower station unit for solution. The water consumption of the hydropower station for power generation, the number of times the vibration zone is crossed, the number of unit starts and stops, and the time consumed for solution under different time scales and different load processes are counted. Thus, the daily load of the hydropower station unit is spatially optimized and temporally optimized. Spatial optimization refers to determining the optimal distribution plan of the whole plant load among the units at a certain moment according to the number of times the units cross the vibration zone and the output characteristics. Temporal optimization refers to determining the unit combination plan for all calculation periods within the day according to the number of unit starts and stops and the constraints of the load optimization distribution model of the hydropower station unit.

[0089] Example 2

[0090] This embodiment provides a method for quantifying the time scale effect in the optimal allocation of loads for hydropower station units. Based on Embodiment 1, in step 3,

[0091] The objective function of the load optimization distribution model of hydropower station units is as follows:

[0092]

[0093] In formula (1), W(T) is the total water consumption of the hydropower station during the dispatch period, m 3 ; t is any time period during the dispatch period; T is the total time period length of the dispatch period; L(t,j) is the plant number corresponding to the jth unit that can be put into operation in time period t, L(t,j)∈[1,N], j=1~n(t); n(t) is the number of units that can be put into operation during the dispatch period (n(t)≤N), and N is the total number of units in the hydropower station; Q fd,L(t,j) (t) is the working flow of the L(t,j)th unit in period t, m 3 / s; ΔT(t) is the length of the time period t in seconds, s.

[0094] The constraints of the load optimization distribution model of hydropower station units are as follows:

[0095] 1) Power system constraints:

[0096]

[0097] In formula (2): P s (t), P L(t,j) (t) are the total load of the hydropower station and the output of unit L(t,j) in period t, kW;

[0098] 2) Reservoir characteristic constraints:

[0099] ① Reservoir water balance:

[0100] make:

[0101]

[0102] Then we have:

[0103]

[0104] In formulas (3) and (4), V(t) and V(t+1) are the reservoir water storage at the beginning and end of the time period, m 3 ;Q rk (t), Q ck (t), Q qs (t) are the average inflow, outflow and abandoned water flow in period t, respectively, m 3 / s;

[0105] ② Storage capacity curve constraints:

[0106] Z sy (t+1)=f ZV [V(t+1)](5)

[0107] In formula (5): Z sy (t+1) is the water level upstream of the reservoir at the end of period t, m; f ZV (·) is the storage capacity curve function;

[0108] ③Reservoir water level or storage capacity constraints:

[0109]

[0110] In formula (6): are the lowest and highest water levels allowed upstream of the reservoir at the end of period t, m; V min (t+1), V max (t+1) are the minimum and maximum water storage allowed in the upstream of the reservoir at the end of period t, m 3 ;

[0111] ④Capacity constraints of discharge facilities:

[0112]

[0113] In formula (7): M xie is the number of reservoir discharge facilities; N i is the number of holes of each discharge facility (i=1~Mxie); f xie,i (·) is the maximum discharge capacity function of the ith discharge facility;

[0114] ⑤ Downstream water level and flow relationship constraints:

[0115] Z xy (t) = f ZQ [Q ck (t)](8)

[0116] In formula (8): Z xy(t) is the average downstream water level during period t, m; f ZQ (·) is the downstream water level-discharge relationship function;

[0117] 3) Hydropower station characteristic constraints:

[0118] ① Unit head:

[0119]

[0120] In formula (9): ΔH L(t,j) (t), H L(t,j) (t) are the head loss and unit head of unit L(t,j) in period t, m; are the minimum and maximum permissible heads of unit L(t,j), m;

[0121] f ΔH,L(t,j) (·) is the head loss function of unit L(t,j);

[0122] ②Unit output limit:

[0123]

[0124] In formula (10): are the minimum and maximum output of unit L(t,j) in period t, kW;

[0125] ③ System spare capacity constraints:

[0126]

[0127] In formula (11): It is the system load reserve for period t.

[0128] ④ Unit flow consumption characteristics:

[0129]

[0130] In formula (12): Q L(t,j) [P L(t,j) (t),H L(t,j) (t)] is the flow consumption characteristic curve of unit L(t,j), indicating that the water head of unit L(t,j) in period t is H L(t,j) (t), the load is P L(t,j) (t) The flow rate consumed at time, m 3 / s;

[0131] ⑤Vibration zone constraints:

[0132]

[0133] ⑥Unit status constraints:

[0134] The unit is in a state of fault maintenance or under overhaul, and cannot be arranged to generate electricity at this time;

[0135] 4) Outbound traffic restrictions:

[0136]

[0137] In formula (14): is the minimum downstream discharge required for downstream comprehensive utilization during period t, m 3 / s;

[0138] 5) Initial condition constraints:

[0139]

[0140] In formula (15): is the initial reservoir water level during the dispatch period, m;

[0141] 6) Non-negative variables:

[0142] The various variables must be non-negative values.

[0143] Example 3

[0144] This embodiment provides a method for quantifying the time scale effect in the optimal load distribution of the units of a hydropower station. On the basis of Embodiment 1-2, the time scale effect in the optimal load distribution of the units of the Zangmu Hydropower Station is quantified, and is specifically implemented in the following steps:

[0145] Step 1: Determine the indicators used to quantify the scale effect of hydropower stations;

[0146] The indicators used to quantify the scale effect of hydropower stations include indicators used to quantify spatial scale effects and temporal scale effects, including water consumption, power generation, unit load distribution plan, crossing vibration zones, and number of unit starts and stops.

[0147] Step 2: Reconstruction of load processes at different time scales

[0148] During the daily power generation cycle of Zangmu Hydropower Station, a load reconfiguration strategy is adopted, such as Figure 1 As shown in Figure 2(a), three time scales of 60 min, 30 min, and 15 min are selected to ensure the total load characteristics on the time scale. Then, based on the typical daily load process of Zangmu Hydropower Station, the following are randomly generated: Figure 2(b)-Figure 2(d) The daily load process of Zangmu Hydropower Station at the scales of 60min, 30min and 15min is shown in the formula, and the optimal distribution results of power station load at various time scales are obtained;

[0149] Based on the load values ​​of each time period with a time scale of 2h, 200 groups of 15min scale daily load processes are randomly generated using normal distribution, and the 30min and 60min daily load processes are determined accordingly. Specifically, based on the load process with 2h as the time unit, the total load within 2h is guaranteed to remain unchanged, and the 15min scale load is randomly generated based on the normal distribution model; the daily load process at the 30min and 60min scales can be obtained by averaging or summing the randomly generated 15min scale loads.

[0150] Step 3: Quantification of scale effect under optimal load allocation of hydropower stations;

[0151] Substitute 200 groups of daily load processes at different scales into the load optimization allocation model of the hydropower station unit to solve it. The water consumption of the hydropower station, the number of times it crosses the vibration zone, the number of unit starts and stops, and the time consumed for solving it under different load processes at different time scales are counted. The output processes of the 1#, 2#, 3#, 4#, 5#, and 6# units at different time scales are as follows: Figure 3(a)-Figure 3(c) shown.

[0152] Therefore, the daily load of the hydropower station units is spatially and temporally optimized. Specifically, the maximum load of the power station during the day is 10%, 30%, 50%, 70% and 90% of the total installed capacity of the plant, respectively. Combined with the typical daily load per unit sequence of the Zangmu Hydropower Station, the load process of the hydropower station is reconstructed, thereby obtaining the scale effect in the optimal distribution of the hydropower station load under different load levels as shown in Figure 4(a)-(d).

[0153] From the above content, it can be known that the method for quantifying the time scale effect in the optimal allocation of load for hydropower station units of the present invention proposes quantitative indicators of scale effect including water consumption for power generation, number of crossing vibration zones, number of unit start-up and shutdown, time consumption for solution, etc., and based on the optimal allocation model of load for hydropower station units, the scale effect of optimal allocation of load for hydropower station units on typical days and considering the randomness of load process and load level is analyzed step by step. It provides a quantitative scientific basis for the selection of time scale in the optimal allocation of scale load for hydropower station units at the practical level and the innovation of time dimension reduction solution algorithm at the scientific research level.

Claims

1. A method for quantifying the time scale effect in the optimal load allocation of hydropower station units, characterized in that: Follow the steps below to implement it: Step 1: Determine the indicators used to quantify the scale effect of hydropower stations; Step 2: Reconstruction of load processes at different time scales; In the daily power generation cycle of the hydropower station, multiple time scales with multiple relationships are selected to determine the daily load process of different time scales; The step 2 is specifically as follows: During the daily power generation cycle of the hydropower station, a load reconstruction strategy is adopted to select multiple time scales in multiple relationships to ensure the total load characteristics on the time scale, and the daily load process of each time scale is generated through a random simulation method. The multiple time scales selected in multiple relationships are 60 minutes, 30 minutes, and 15 minutes; Step 3: Quantification of scale effect under optimal load allocation of hydropower stations; Substitute the daily load process under different time scales into the load optimization allocation model of the hydropower station unit to solve it, and count the water consumption of the hydropower station under different time scales and different load processes, the number of times the vibration zone is crossed, the number of unit start-up and shutdown times, and the time consumption for solving it, so as to optimize the daily load of the hydropower station unit in space and time; In step 3, The objective function of the load optimization distribution model of hydropower station units is as follows: In formula (1), W(T) is the total water consumption of the hydropower station during the dispatch period, m 3 ; t is any time period during the dispatch period; T is the total time period length of the dispatch period; L(t,j) is the plant number corresponding to the jth unit that can be put into operation in time period t, L(t,j)∈[1,N], j=1~n(t); n(t) is the number of units that can be put into operation during the dispatch period (n(t)≤N), and N is the total number of units in the hydropower station; Q fd,L(t,j) (t) is the working flow of the L(t,j)th unit in period t, m 3 / s; ΔT(t) is the length of the time period t in seconds, s; The constraints of the load optimization distribution model of the hydropower station units are as follows: 1) Power system constraints: In formula (2): P s (t), P L(t,j) (t) are the total load of the hydropower station and the output of unit L(t,j) in period t, kW; 2) Reservoir characteristic constraints: ① Reservoir water balance: make: Then we have: In formulas (3)-(4), V(t) and V(t+1) are the reservoir water storage at the beginning and end of the time period, m 3 ;Q rk (t), Q ck (t), Q qs (t) are the average inflow, outflow and abandoned water flow in period t, respectively, m 3 / s; ② Storage capacity curve constraints: Z sy (t+1)=f ZV [V(t+1)](5) In formula (5): Z sy (t+1) is the water level upstream of the reservoir at the end of period t, m; f ZV (·) is the storage capacity curve function; ③Reservoir water level or storage capacity constraints: In formula (6): are the lowest and highest water levels allowed upstream of the reservoir at the end of period t, m; V min (t+1), V max (t+1) are the minimum and maximum water storage allowed in the upstream of the reservoir at the end of period t, m 3 ; ④Capacity constraints of discharge facilities: In formula (7): M xie is the number of reservoir discharge facilities; N i is the number of holes of each discharge facility (i=1~Mxie); f xie,i (·) is the maximum discharge capacity function of the ith discharge facility; ⑤ Downstream water level and flow relationship constraints: Z xy (t)=f ZQ [Q ck (t)](8) In formula (8): Z xy (t) is the average downstream water level during period t, m; f ZQ (·) is the downstream water level-discharge relationship function; 3) Hydropower station characteristic constraints: ① Unit head: In formula (9): ΔH L(t,j) (t), H L(t,j) (t) are the head loss and unit head of unit L(t,j) in period t, m; are the minimum and maximum allowable water heads of unit L(t,j), m; f ΔH,L(t,j) (·) is the head loss function of unit L(t,j); ②Unit output limit: In formula (10): are the minimum and maximum output of unit L(t,j) in period t, kW; ③ System spare capacity constraints: In formula (11): It is the system load reserve for period t; ④ Unit flow consumption characteristics: In formula (12): Q L(t,j) [P L(t,j) (t),H L(t,j) (t)] is the flow consumption characteristic curve of unit L(t,j), indicating that the water head of unit L(t,j) in period t is H L(t,j) (t), the load is P L(t,j) (t) The flow rate consumed at time, m 3 / s; ⑤Vibration zone constraints: ⑥Unit status constraints: The unit is in a state of fault maintenance or under overhaul, and cannot be arranged to generate electricity at this time; 4) Outbound traffic restrictions: In formula (14): is the minimum downstream discharge required for downstream comprehensive utilization during period t, m 3 / s; 5) Initial condition constraints: In formula (15): is the initial reservoir water level during the dispatch period, m; 6) Non-negative variables: The various variables must be non-negative values.

2. The method for quantifying the time scale effect in the optimal load distribution of hydropower station units according to claim 1 is characterized in that: The indicators used to quantify the scale effect of a hydropower station include indicators used to quantify the spatial scale effect and the temporal scale effect, specifically including water consumption, power generation, unit load distribution plan, vibration zone crossing, and number of unit starts and stops.

3. The method for quantifying the time scale effect in the optimal load distribution of hydropower station units according to claim 1 is characterized in that: The spatial optimization refers to determining the optimal distribution plan of the entire plant load among the units at a certain moment according to the number of times the units cross the vibration zone and the output characteristics. The time optimization refers to determining the unit combination plan for all calculation periods within the day according to the number of unit starts and stops and the constraints of the load optimization distribution model of the hydropower station units.