A heavy load release method for integrated installation of floating offshore wind turbines
By monitoring the state of the waves and the installation ship in real time, using the hull dynamic model to decide the release time of pre-assembled accessories and release them to the floating foundation, it solves the shaking problem caused by inertial loads in wind power installation and improves installation safety and efficiency , realizes the offset between wave force and reaction force.
Patent Information
- Application Number
- CN202410115997.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-01-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2044-01-29
AI Technical Summary
During the installation of wind power, the huge inertial load generated when pre-assembled accessories are transferred to the fan foundation causes violent shaking of the installation ship, affecting the mechanical structure, and even causing damage and failure, challenging the safety and stability of integrated fan installation.
By monitoring the motion status of the sea waves and the installation ship in real time, a hull dynamic model considering the heavy-load release force term is built, and the optimal release time of pre-assembled accessories is determined, so that it can be released from the installation ship to the floating basis and use the wave loading Forge the reaction load to ensure safety and stability.
It improves the safety and stability of heavy load release, saves transportation time, realizes large-scale installation, and offsets reaction forces to the greatest extent during the docking process, ensuring the safety of integrated wind power installation.
Smart Images

Figure CN117948246B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of marine engineering technology, and in particular to a heavy load release method for integrated installation of a floating offshore wind turbine. Background Art
[0002] Wind power generation can be divided into two types: onshore wind power generation and offshore wind power generation. Compared with onshore wind power generation, offshore wind power generation has the advantages of faster wind speed, more stable wind direction, no land area occupied, and convenient power transmission in coastal areas. The development of fixed offshore wind turbines in my country has reached saturation in recent years. Floating wind turbines suitable for deep seas are bound to become the construction trend of wind power in my country in the future. For the installation of floating wind turbines, it is generally adopted on the shore close to the working sea area, and the wind power is assembled as a whole, and then the floating wind turbine is towed to the designated working sea area by wet towing. During the towing process, the submerged part of the wind turbine will be affected by resistance, and the influence of the wind, wave and current environment and the overall stability of the towing system need to be considered. The towing process is slow.
[0003] As floating wind power develops towards deep sea, integrated installation of wind turbines has an increasingly high potential for use. This installation method builds the tower-nacelle-blade pre-assembled parts and the floating foundation of the wind turbine separately in the dock. The wind turbine foundation is transported to the working sea area without the upper wind turbine to complete the mooring layout, and then a floating wind power installation ship carries multiple upper pre-assembled parts to perform docking and assembly operations on the pre-assembled parts and the wind turbine foundation at sea. With the development trend of large-scale wind power, at the moment when the upper pre-assembled parts of the wind turbine are released and the heavy-load fixing device is loosened, the gravity of the pre-assembled parts originally acting on the floating installation ship is transferred to the wind turbine foundation, which will generate a huge inertial load on the installation ship in a balanced state, causing violent shaking, affecting the mechanical structure in the nacelle of the remaining pre-assembled parts on the deck, and even causing damage and failure, which poses a huge challenge to the integrated installation of wind turbines. Summary of the invention
[0004] The purpose of the present invention is to solve the technical problem of adverse effects caused by the huge inertial load generated when the pre-assembled parts are transferred to the wind turbine foundation, and to propose an integrated installation method and a heavy load release method for a floating offshore wind turbine.
[0005] The technical problem of the present invention is solved by the following technical solutions:
[0006] A heavy load release method for integrated installation of a floating offshore wind turbine comprises the following steps:
[0007] S1. For installation vessels carrying pre-installed wind turbine parts, real-time wave sensing and movement status monitoring of the installation vessels are performed;
[0008] S2. Using the real-time perception and monitoring data of the waves and the motion state of the installation vessel, and through the constructed hull dynamics model taking into account the heavy load release force term, determine the release time of the pre-assembled parts from the installation vessel;
[0009] S3. Release the pre-assembled parts from the installation vessel to a floating foundation that has been moored in advance according to the release time, so that the reverse acting load generated at the moment of release of the pre-assembled parts is at least partially offset by the wave force load acting on the installation vessel.
[0010] In some embodiments, sea surface waves are sensed in real time by wave radar, or the wave environment in which the installation vessel is located is inverted in real time by methods such as ship motion inversion of waves, and the movement of the installation vessel is monitored in real time by posture sensors (such as inertial sensors and satellite positioning systems, etc.) installed on the installation vessel, wherein the real-time sensing and monitoring data include the real-time liquid level and the real-time motion status of the installation vessel in six degrees of freedom.
[0011] In some embodiments, step S2 specifically includes:
[0012] According to the wave spectrum and wave element information obtained by real-time perception, the wave load to which the installation ship will be subjected in the future is predicted through the wave load inversion algorithm; the data obtained from wave perception and ship motion monitoring are used as the state quantity at the current moment; according to the position of heavy load release (such as: bow or side of the ship), the simplified degrees of freedom (2 degrees of freedom or 3 degrees of freedom) of the hull dynamics model considering the heavy load release force term are used for simplifying the control model design, based on the simplified control model, combined with the perceived external load, the future motion state quantity of the ship within the prediction step number is calculated, wherein the future period of time is decomposed into N sampling time intervals, N is the prediction step length, and at each sampling time point, a sampling penalty function is established, the expression of the penalty function is composed of multiple optimization objectives, and constraints are set, and the control problem is transformed into an optimization problem of solving the minimization penalty function at each sampling time step; thereby the optimal heavy load release time is calculated.
[0013] In some embodiments, the future period of time is 0.5-50 seconds.
[0014] In some embodiments, a multiple shooting method is used to calculate the motion state of the ship within the predicted number of steps, and the future period of time is decomposed into N sampling time intervals based on the multiple shooting method.
[0015] In some embodiments, the multiple optimization objectives may include acceleration at the wind turbine nacelle and contact force at the wind turbine heavy-load fixture, but are not limited to the above objectives.
[0016] In some embodiments, the simplified control model is used as a control state space equation, and the heavy load release load is used as a dynamic equation in which an external force term related to the heavy load release time acts.
[0017] In some embodiments, based on model predictive control, after the state space equation is discretized, a penalty function is set at each sampling time step, and the penalty function within the next N steps of prediction time at the sampling time point is minimized to obtain the local optimal release time; the release condition is set, and if the responses of various focus points on the installation ship meet the release requirements within the next N steps of prediction time calculated at a certain sampling time point, the local optimal release time calculated at this time point is accepted as the optimal overload release time.
[0018] In some embodiments, the responses of the various focus points satisfying the release requirements include but are not limited to the peak value of the acceleration amplitude at each wind turbine nacelle on the deck being less than a preset limit and the contact force at the wind turbine heavy-load fixing device being less than a limit value.
[0019] In some embodiments, the release condition is mainly determined by the maximum acceleration that the mechanical structure inside the pre-assembled fan nacelle can withstand.
[0020] The beneficial effects of the present invention compared with the prior art include:
[0021] The present invention proposes a heavy-load release method for integrated installation of floating offshore wind turbines, which monitors real-time wave perception and the movement state of the installation ship, constructs a hull dynamics model that takes heavy-load release force items into consideration, determines the time for releasing the pre-assembled parts of the wind turbine from the installation ship, and releases the pre-assembled parts from the installation ship to a floating foundation on the sea surface according to the release time, so that the reverse acting load generated at the moment of releasing the pre-assembled parts and the wave force load acting on the installation ship are at least offset to a certain extent, thereby improving the safety during heavy-load release and ensuring the safety during docking; further, the preferred scheme of the present invention can realize the decision of optimizing the release time of the pre-assembled parts.
[0022] During implementation, the pre-assembled parts of the wind turbine can be carried by an installation ship and run to the floating foundation on the sea surface. According to the optimal release time determined by the heavy load release method as mentioned above, the pre-assembled parts are released from the installation ship to the floating foundation on the sea surface, so as to achieve the docking installation of the pre-assembled parts and the floating foundation. This can not only save transportation time and realize large-scale installation, but also make the reaction force generated at the moment of heavy load release offset the wave force acting on the ship, thereby improving the safety of the integrated installation process of floating wind power.
[0023] Other beneficial effects of the embodiments of the present invention will be further described below. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1This is a flow chart of a heavy load release method for integrated installation of a floating offshore wind turbine according to an embodiment of the present invention;
[0025] Figure 2 It is a schematic diagram of the installation of the integrated installation method of the floating offshore wind turbine according to the embodiment of the present invention;
[0026] Figure 3 This is a control flow chart of the integrated installation method of a floating offshore wind turbine according to an embodiment of the present invention;
[0027] Figure 4 is an initial estimation diagram of the state quantity and the control quantity of the embodiment of the present invention;
[0028] Figure 5 It is a diagram of the final optimization results of the state quantity and control quantity of the embodiment of the present invention.
[0029] 1- floating catamaran wind turbine installation vessel, 2- pre-assembled accessories, 3- floating wind turbine foundation, 4- heavy load fixing device, 5- wave radar, 6- pre-assembled accessories fixing truss, 7- mooring anchor chain, 8- lower fixing claw. DETAILED DESCRIPTION
[0030] The present invention is further described below with reference to the accompanying drawings and in combination with preferred embodiments. It should be noted that the embodiments and features in the embodiments of the present application can be combined with each other without conflict.
[0031] It should be noted that the directional terms such as left, right, up, down, top, and bottom in this embodiment are merely relative concepts or are based on the normal use status of the product, and should not be considered as restrictive.
[0032] The embodiment of the present invention shows a heavy load release method for integrated installation of a floating offshore wind turbine, comprising:
[0033] For installation vessels carrying pre-assembled wind turbine parts (such as tower-nacelle-blade pre-assembled parts), real-time wave sensing and movement status monitoring of the installation vessel are carried out;
[0034] Using real-time perception and monitoring data of waves and the motion state of the installation vessel, and through a constructed hull dynamics model that takes into account the heavy-load release force term, the release time of the pre-assembled parts from the installation vessel is determined;
[0035] After the pre-assembled component is docked with the floating foundation, the pre-assembled component can be released from the installation vessel to the floating foundation on the sea surface according to the release time, so that the reverse acting load generated at the moment of releasing the pre-assembled component is at least partially offset by the wave force load acting on the installation vessel.
[0036] like Figure 1As shown, the integrated installation method of floating offshore wind turbines in this embodiment includes a wave sensing module, a ship motion monitoring module, a signal operation processing module and an execution module.
[0037] Among them, Figure 2 As shown, the wave sensing module is a wave radar 5, through which the wave field data such as the real-time liquid level height is obtained; the ship motion monitoring module includes a posture sensor (such as an inertial navigation sensor and a satellite positioning system) for monitoring the real-time motion state, speed and acceleration of the six degrees of freedom of the installation ship; the signal operation and processing module includes a wave force inversion calculation module and a controller calculation module, which are used to receive the signals transmitted by the wave sensing and ship motion monitoring modules, and control the motion state of the execution module through calculation; the execution module includes a wind power pre-assembled parts clamping and moving device and a heavy-load fixing device 4 (a crane or a hydraulic clamping device can be used), the clamping and moving device can make the heavy-load fixing device 4 move freely on the ship deck, so as to change the position of the wind power pre-assembled parts on the deck, and when the installation ship 1 arrives at the floating foundation 3, the pre-assembled parts 2 are moved to the stern to complete the subsequent assembly of the pre-assembled parts 2 and the floating foundation 3.
[0038] In this embodiment, the deck of the installation vessel 1 is provided with a pre-assembled parts fixing truss 6, a wind power pre-assembled parts clamping and moving device, a heavy-load fixing device 4 and a lower fixing claw 8. The pre-assembled parts fixing truss 6 is used to keep the pre-assembled parts 2 stable during transportation. The wind power pre-assembled parts clamping and moving device is a slideway distributed along the length direction of the installation vessel 1 to translate the pre-assembled parts so that the pre-assembled parts 2 are close to the floating foundation 3. The heavy-load fixing device 4 is used to fix the pre-assembled parts 2 to be released onto the floating foundation 3. The lower fixing claw 8 is used to maintain the relative position between the installation vessel 1 and the floating foundation 3 during the installation process.
[0039] Specifically, the installation vessel 1 is a floating installation vessel, the pre-assembled parts 2 are tower-nacelle-blade pre-assembled parts, and the wind power pre-assembled parts clamping and moving device is a crane or a hydraulic clamping device to support the movement on the deck of the installation vessel.
[0040] The deck of the installation vessel 1 can carry multiple pre-assembled parts 2, which are lifted onto the installation vessel 1 on the shore and fixed on the deck of the installation vessel 1 by the pre-assembled parts fixing trusses 6. A semi-circular construction moon well for releasing the pre-assembled parts 2 is provided at the tail of the installation vessel 1, and the lower fixing claws 8 are arranged at the semi-circular construction moon well to embrace the floating foundation 3. The ends of the lower fixing claws 8 are pulley structures, which do not restrict the vertical movement of the floating wind turbine.
[0041] The floating foundation 3 can be constructed at a location different from the prefabricated parts 2 , and then be transported to a designated sea area by a semi-submersible vessel or wet towing, and the floating foundation 3 can be anchored and fixed in advance by mooring anchor chains 7 .
[0042] When the ship arrives at the working sea area, it is fixed by the dynamic positioning system or the mooring anchor chain 7 to resist the environmental load to keep the relative position of the ship in a static state. When the installation ship 1 is ready to perform the assembly operation, one of the pre-assembled parts 2 carried on the ship is clamped to the stern by the wind power pre-assembled parts clamping device, and the heavy-load fixing device 4 fixes the pre-assembled part 2 to be released.
[0043] The method of pre-installation of wind turbines is to pre-assemble the floating wind turbine superstructure on shore, then transport multiple superstructures by installation ship, and complete the docking of the superstructure with the floating foundation at sea, which greatly saves wind power transportation time.
[0044] like Figure 3 As shown, the overload release method of the embodiment of the present invention includes the following steps:
[0045] S1. For the installation vessel equipped with tower-nacelle-blade pre-assembly components, real-time wave sensing and movement status monitoring of the installation vessel;
[0046] S2. Using the real-time perception and monitoring data of the waves and the motion state of the installation vessel, and through the constructed hull dynamics model that takes into account the heavy load release force term, the release time of the pre-assembled parts from the installation vessel is determined;
[0047] S3. Release the pre-assembled components from the installation vessel to the pre-moored floating foundation according to the release time, so that the reverse acting load generated at the moment of release of the pre-assembled components and the wave force load acting on the installation vessel are at least partially offset.
[0048] Specifically, in step S1 of this embodiment: the sea surface waves are sensed in real time by the sea wave radar, and the movement of the installation ship is monitored in real time by the posture sensor (such as inertial sensor and satellite positioning system) installed on the installation ship. The real-time sensing and monitoring data include the real-time liquid level, the real-time motion state of the installation ship in six degrees of freedom, speed and acceleration.
[0049] In step S2 of this embodiment: based on the wave data obtained by real-time perception, the wave spectrum information S(ω k), based on the obtained wave spectrum information, the wave force to which the installation ship will be subjected in a future period of time, preferably in the future 0.5-50 seconds, preferably in the future 5-10 seconds is predicted, and the data obtained from wave perception and ship motion monitoring are used as the state quantity at the current moment. For different release tasks (such as at the stern or the side of the ship), different hull dynamics models are simplified to 2 degrees of freedom or 3 degrees of freedom for simplifying the construction of the control model, and the multiple shooting method is used to calculate the ship motion state quantity within the predicted number of steps, wherein the future period of time is decomposed into N sampling time intervals based on the multiple shooting method, N is the prediction step length, and at each sampling time point, a sampling penalty function is established, the expression of the penalty function is composed of two items: the acceleration at the wind turbine cabin and the heavy load release time, and constraints are set to transform the control problem into an optimization problem of solving the minimization of the penalty function at each sampling time step; thereby the optimal heavy load release time is calculated.
[0050] Specifically, the wave force inversion calculation module in Example 1 predicts the wave force acting on the installation ship by receiving data from the wave sensing module. The wave force is expressed as follows:
[0051]
[0052]
[0053]
[0054] in, and represent the first-order and second-order wave forces, respectively. and represents the first-order and second-order wave force response transfer factors, ∈ k represents the random phase angle of the kth wave component, and U represents the forward speed of the ship. In the formula, since the wind turbine installation ship is equipped with a DP positioning system, the second-order wave force can be offset.
[0055] The controller calculation module collects the motion state of the installation ship collected by the ship motion monitoring module and the wave force inverted by the wave sensing module, and uses the established simplified degree of freedom installation ship dynamics model as the control state space equation, and takes the heavy load release load as an external force term related to the heavy load release time to act on the installation ship. The symbols in the model are expressed in the form of vectors and matrices.
[0056] The simplified control design model designed with simplified 2 degrees of freedom as an example is:
[0057]
[0058]
[0059] Where M is the mass matrix, τw1 is the first-order wave force, G is the restoring force matrix, represents the motion state of the installation ship, z represents the heave motion state of the installation ship, θ represents the pitch motion state of the installation ship, D is the damping matrix, t represents time, m l represents the weight of the released heavy load, δ represents the heavy load release factor, g represents the unit of gravity, t r Indicates the time point of overload release, represents the speed in the hull coordinate system. In the simplified control model, only the heave speed w and the pitch angular velocity q are considered. represents the acceleration in the body coordinate system, τ l The load magnitude for the heavy load release item in the heave and pitch degrees of freedom.
[0060] Based on model predictive control, after discretizing the state space equation, a penalty function L is set at each sampling time step. By minimizing the penalty function within the next N steps of prediction time at the sampling time point, the local optimal release time t is obtained. r ; Set the release condition. If the peak value of the acceleration amplitude at each wind turbine nacelle on the installation ship is calculated at a certain sampling time point within the next N-step prediction time, If it is less than the release condition, the local optimal release time t calculated at this time step is accepted. r As the optimal heavy load release time.
[0061] The release condition is mainly determined by the maximum acceleration that the mechanical structure inside the pre-assembled fan nacelle can withstand.
[0062] The signal operation processing module collects the data obtained by the wave sensing module and the ship motion monitoring module as the current state quantity, and constructs an ordinary differential equation through the established simplified control model:
[0063]
[0064]
[0065]
[0066] Where z is the amplitude of the ship's heave motion, θ is the ship's pitch angle, w and q are the ship's heave and pitch speeds, respectively, m is the ship's mass, and I is the ship's y is the moment of inertia of the ship around the y-axis, a 33 and a 55 is the additional mass of the ship motion, n f is the number of wave frequencies, ω k is the kth wave frequency, S(ω k ) is the wave spectrum, Δω is the wave frequency interval, is the wave force transfer function, is the initial angle transfer function, ε k is the random wave phase angle, m l is the mass of pre-assembled parts waiting to be released at the bow, x l and z l Respectively represent the values of the center of gravity of the heavy load on the x and z axes, G 33 , G 35 , G 53 , G 55 The restoring force coefficient of the ship's corresponding motion, D 33 , D 55 represents the damping factor, It represents the hydrodynamic additional mass caused by the linear acceleration along the z-axis and the angular acceleration of the rotation along the y-axis. The heavy load release process is a step process. By using the properties of the inverse tangent function to approximate the heavy load release factor δ, the sudden load is expressed continuously. The expression formula is:
[0067]
[0068] In the formula, ε is the minimum value, t r is the heavy load release time. Based on the established simplified control model, the ship motion state quantity within the prediction step is calculated by using the multiple shooting method. The formula of the multiple shooting method is expressed as:
[0069] x(k+1)=f(s(k),r(k))
[0070] f(s(k),r(k))=s(k+1)
[0071] In the formula, f(·) represents the ordinary differential equation for simplifying the control model, s and r are auxiliary coefficients, and k is the sampling time point. Based on the multiple shooting method, a period of time is decomposed into N sampling time intervals, N is the prediction step size, and at each sampling time point, a sampling penalty function is established. The expression of the penalty function consists of two terms: the acceleration at the wind turbine nacelle and the heavy load release time.
[0072] Figure 4 , Figure 5 The calculation process of the multiple shooting method is shown. First, the predicted state quantity and predicted control quantity are preliminarily taken within the prediction step length. Then, the control quantity that minimizes the penalty function is iteratively calculated to obtain the final state quantity and control quantity.
[0073] There are multiple wind turbine nacelles placed on the ship deck, and the acceleration expression at each wind turbine nacelle is:
[0074]
[0075] In the formula, represents the acceleration at the jth nacelle, is the acceleration at the ship's center of gravity, represents the transformation matrix, represents the cross-product factor, Indicates the position of the jth engine room from the center of gravity of the ship.
[0076] Set the penalty function to:
[0077]
[0078] And set the following constraints:
[0079] x(0)-s(0)=0
[0080] f(s(k))=s(k+1)
[0081] 0≤t r ≤NΔt
[0082] The control problem is transformed into an optimization problem of minimizing the penalty function at each sampling time. By calculating the optimal load release time, it is achieved that when the load is released at the optimal load release time, the external wave force and the reaction force generated by the load release can be offset to the greatest extent.
[0083] Some embodiments of the present invention provide a method for releasing pre-assembled wind power parts for situations where the pre-assembled parts and the floating foundation have been docked. The method offsets the wave load at the moment of heavy load release and the reaction load generated by the heavy load release, thereby further improving the safety during heavy load release. The method performs dynamic modeling on the wind power installation ship and the heavy load release process, obtains the wave force to which the ship will be subjected in the future through a wave sensing algorithm, and then uses the model predictive control method to use the predicted wave force as control support. The algorithm determines the optimal release time, so that the reaction force generated at the moment of heavy load release can be offset to the maximum extent by the wave force acting on the ship, thereby ensuring safety during the docking process.
[0084] The above content is a further detailed description of the present invention in combination with specific preferred embodiments, and it cannot be determined that the specific implementation of the present invention is limited to these descriptions. For those skilled in the art of the present invention, without departing from the concept of the present invention, several equivalent substitutions or obvious variations can be made, and the performance or use is the same, which should be regarded as belonging to the protection scope of the present invention. In the description of this specification, the description of the reference terms "an embodiment", "some embodiments", "preferred embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in combination with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily target the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner. In the absence of mutual contradiction, those skilled in the art can combine and combine the different embodiments or examples described in this specification and the features of different embodiments or examples. Although the embodiments of the present invention and their advantages have been described in detail, it should be understood that various changes, substitutions and modifications can be made herein without departing from the scope of protection of the patent application.
Claims
1. A heavy load release method for integrated installation of floating offshore wind turbines, It is characterized in that The steps include: S1. For installation vessels carrying pre-installed wind turbine parts, real-time wave sensing and movement status monitoring of the installation vessels are performed; S2. Using the real-time perception and monitoring data of the waves and the motion state of the installation vessel, and through the constructed hull dynamics model taking into account the heavy load release force term, determine the release time of the pre-assembled parts from the installation vessel; S3. Release the pre-assembled component from the installation vessel to a pre-moored floating foundation according to the release time, so that the reverse acting load generated at the moment of release of the pre-assembled component is at least partially offset by the wave force load acting on the installation vessel.
2. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 1, It is characterized in that The sea surface waves are sensed in real time by wave radar or the wave environment where the installation vessel is located is inverted in real time by using ship motion inversion waves. The movement of the installation vessel is monitored in real time by the posture sensor installed on the installation vessel. The real-time sensing and monitoring data include the real-time liquid level and the real-time motion status of the installation vessel in six degrees of freedom.
3. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 1 or 2, It is characterized in that Step S2 specifically includes: According to the wave spectrum and wave element information obtained by real-time perception, the wave load to which the installation ship will be subjected in the future is predicted through the wave load inversion algorithm; the data obtained from wave perception and ship motion monitoring are used as the state quantity at the current moment; according to the position of heavy load release, the simplified degrees of freedom of the hull dynamics model considering the heavy load release force term are used to simplify the control model design, based on the simplified control model, combined with the perceived external load, the future motion state quantity of the ship within the prediction step number is calculated, wherein the future period of time is decomposed into N sampling time intervals, N is the prediction step length, and at each sampling time point, a sampling penalty function is established, the expression of the penalty function is composed of multiple optimization objectives, and constraints are set, so that the control problem is transformed into an optimization problem of solving the minimization penalty function at each sampling time step; thereby the optimal heavy load release time is calculated.
4. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 3, It is characterized in that The future period of time is 0.5-50 seconds.
5. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 3, It is characterized in that The multiple shooting method is used to calculate the ship motion state quantity within the prediction step number, and the future period of time is decomposed into N sampling time intervals based on the multiple shooting method.
6. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 3, It is characterized in that The multiple optimization objectives include acceleration at the wind turbine nacelle and contact force at the wind turbine heavy-load fixing device.
7. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 3, It is characterized in that The simplified control model is used as a control state space equation, and the heavy load release load is used as a dynamic equation in which an external force term related to the heavy load release time acts.
8. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 7, It is characterized in that Based on model predictive control, after the state space equation is discretized, a penalty function is set at each sampling time step, and the penalty function within the next N prediction time steps at the sampling time point is minimized to obtain the local optimal release time; Set the release conditions. If the responses of the various focus points on the installation ship meet the release requirements within the next N-step prediction time calculated at a certain sampling time point, the local optimal release time calculated at this time point is accepted as the optimal heavy load release time.
9. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 8, It is characterized in that The response of each focus point meets the release requirements, including that the peak value of the acceleration amplitude at each wind turbine cabin on the deck is less than the preset limit, and the contact force at the wind turbine heavy load fixing device is less than the limit value.
10. The heavy load release method for integrated installation of floating offshore wind turbines according to claim 8 or 9, It is characterized in that The release condition is mainly determined by the maximum acceleration that the mechanical structure inside the pre-assembled fan nacelle can withstand.