Substation measurement and control method, system, device, storage medium and electronic equipment

By nesting sampling and calculating interruption intervals in the measurement and control system of the substation, the accuracy of the target monitoring value is ensured, the problem of abnormal measurement and control methods caused by inaccurate target monitoring values ​​is solved, and the cost and debugging difficulty are reduced.

CN117996952BActive Publication Date: 2024-10-29SHANGHAI CHINT AUTOMATION SOFTWARE SYST CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410117658.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2024-10-29
Estimated Expiration
2044-01-26

AI Technical Summary

Technical Problem

In the measurement and control method of the substation, the calculated target monitoring value is inaccurate, resulting in abnormalities in the measurement and control method. Existing technology cannot effectively solve this problem.

Method used

In the measurement and control system of the substation, the target signal is collected every sampling interruption interval, and the first sampling calculation interruption interval is nested for calculation to ensure that the preset protection measures are executed when the target monitoring value is greater than or equal to the threshold, and based on the number of tasks and processing time Adjust the calculation interval to avoid task interruption.

Benefits of technology

It improves the accuracy of calculating target monitoring values, avoids abnormalities in measurement and control methods, reduces design costs, and simplifies debugging difficulty.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117996952B_ABST
    Figure CN117996952B_ABST
Patent Text Reader

Abstract

The present application discloses a measurement and control method, system, device, storage medium and electronic device for a substation. The method comprises: collecting monitoring data of a target signal at every sampling interruption interval, wherein the target signal comprises at least one of the following: a voltage signal and a current signal; calculating the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; when the target monitoring value is greater than or equal to the monitoring value threshold, receiving an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure; when the input signal is a preset value, outputting an output signal, and executing the preset protection measure on the target substation through the output signal. Through the present application, the problem that the measurement and control method of the substation is abnormal due to the inaccurate calculated target monitoring value of the substation in the related art is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of measurement and control of substations, and specifically, to a measurement and control method, system, device, storage medium and electronic equipment for substations. Background Art

[0002] In the field of secondary protection of substations, the chip industry has affected the cost of building a substation's measurement and control system, greatly increasing the risk of chip supply, and information security issues occur from time to time. In the related technologies, the secondary protection equipment software and hardware platforms of substations are developed using imported chips and foreign software systems. With the vigorous development of the power industry, the demand for secondary microcomputer protection devices in substations in various regions is increasing rapidly. The impact of import chip controls not only affects the devices on sale in the market, but also has a huge impact on the subsequent updates and maintenance of devices that have been put into operation. The protection measurement and control software and hardware platform in the related technology adopts an architecture that separates the system management chip and the protection algorithm chip, which has high design costs and is difficult to debug.

[0003] In the related technology, the protection and measurement and control hardware and software platforms need to rely on external interrupt intervals to collect discrete points when sampling data from the substation, so as to perform analog calculations and obtain data such as voltage, current, and frequency. In addition, due to dynamic frequency tracking limitations, the sampling interrupt interval and the sampling calculation interrupt interval are performed in the same interrupt. This will result in the next sampling interrupt interrupting the data before it is processed, resulting in abnormal data to be processed when the sampling interrupt interval is too high and the data processing task is large.

[0004] With regard to the problem in the related art that the target monitoring value of the substation is calculated inaccurately, which leads to abnormality in the measurement and control method of the substation, no effective solution has been proposed yet. Summary of the invention

[0005] The main purpose of the present application is to provide a substation measurement and control method, system, device, storage medium and electronic equipment to solve the problem in the related art that the substation measurement and control method becomes abnormal due to inaccurate calculated substation target monitoring values.

[0006] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a measurement and control method for a substation is provided. The method comprises: collecting monitoring data of a target signal at every sampling interruption interval, wherein the target signal comprises at least one of the following: a voltage signal and a current signal; calculating the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; when the target monitoring value is greater than or equal to the monitoring value threshold, receiving an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure; when the input signal is a preset value, outputting an output signal, and executing the preset protection measure on the target substation through the output signal.

[0007] Optionally, before calculating the monitoring data at every first sampling calculation interruption interval, the method also includes: determining whether the number of sampling calculation tasks of the monitoring data is greater than or equal to a task number threshold, and determining whether the processing time of the sampling calculation task is greater than or equal to a preset time threshold; when the number of sampling calculation tasks is greater than or equal to the task number threshold, or the processing time of the sampling calculation task is greater than or equal to the preset time threshold, executing the step of calculating the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value; when the number of sampling calculation tasks is less than the task number threshold, and the processing time of the sampling calculation task is less than the preset time threshold, determining a second sampling calculation interruption interval, wherein the second sampling calculation interruption interval is not nested in the sampling interruption interval; calculating the monitoring data at every second sampling calculation interruption interval to obtain a target monitoring value.

[0008] Optionally, after collecting monitoring data of the target signal at each sampling interrupt interval, the method further includes: determining whether the target signal fluctuates; if the target signal fluctuates, calculating the sampling interrupt interval based on the target signal after the fluctuation to obtain an updated sampling interrupt interval; and executing the step of collecting monitoring data of the target signal at each sampling interrupt interval based on the updated sampling interrupt interval.

[0009] Optionally, the method also includes: receiving communication monitoring data sent by a communication module of the measurement and control system of the substation, and calculating a communication monitoring value based on the communication monitoring data; when the communication monitoring value is greater than or equal to a monitoring value threshold, receiving an input signal for controlling the target substation; when the input signal is a preset value, outputting an output signal, and executing preset protection measures on the target substation through the output signal.

[0010] Optionally, collecting monitoring data of the target signal at every sampling interrupt interval includes: through a programmable logic device, wherein the programmable logic device is a device in the measurement and control system of the substation; controlling the programmable logic device to send the target signal to a multi-core heterogeneous chip, wherein the multi-core heterogeneous chip is a chip in the measurement and control system of the substation; determining the sampling interrupt interval through the multi-core heterogeneous chip, and controlling the multi-core heterogeneous chip to send the sampling interrupt interval to the programmable logic device; collecting monitoring data of the target signal through the programmable logic device and the sampling interrupt interval.

[0011] Optionally, receiving an input signal for controlling a target substation includes: controlling a switch quantity board to send an input signal to a multi-core heterogeneous chip, wherein the switch quantity board is a board in a measurement and control system of the substation; and receiving an input signal for controlling the target substation through the multi-core heterogeneous chip.

[0012] Optionally, outputting a switching signal, and executing preset protection measures on the target substation through the switching signal includes: controlling the switch quantity board to send the switching signal to the multi-core heterogeneous chip, and executing preset protection measures on the target substation through the switching signal and the multi-core heterogeneous chip.

[0013] According to another aspect of the present application, a substation measurement and control system using the substation measurement and control method is provided. The system includes: a multi-core heterogeneous chip, including a management chip and a protection chip, the management chip is used to manage the application in the substation measurement and control system, and the protection chip is used to calculate the target monitoring value based on the monitoring data and the communication monitoring data; a programmable logic device, which is connected to the multi-core heterogeneous chip for communication, and is used to collect the target signal of the target substation; a switch quantity board, which is connected to the management chip and the protection chip for communication, and is used to send input signals and output signals to the multi-core heterogeneous chip; a communication module, which is connected to the multi-core heterogeneous chip for communication, and is used to receive the communication monitoring data and send the communication monitoring data to the multi-core heterogeneous chip.

[0014] Optionally, the system also includes: a human-computer interaction interface, which is communicatively connected to the multi-core heterogeneous chip, and is used to receive user operation instructions for the substation's measurement and control system, and send the operation instructions to the management chip.

[0015] Optionally, an inter-core communication mechanism is established between the management chip and the protection chip, and data is transmitted between the management chip and the protection chip through the inter-core communication mechanism and the inter-core shared memory.

[0016] Optionally, the switch quantity board is connected to the management chip through the first communication bus, and the management chip obtains the input signal based on the management chip. The switch quantity board is connected to the protection chip through the second communication bus, and the protection chip drives the output node in the switch quantity board to output the output signal.

[0017] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a measurement and control device for a substation is provided. The device includes: a collection unit, which is used to collect monitoring data of a target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal; a calculation unit, which is used to calculate the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; a receiving unit, which is used to receive an input signal for controlling the target substation when the target monitoring value is greater than or equal to the monitoring value threshold, wherein the input signal is used to control whether to execute a preset protection measure; an execution unit, which is used to output an output signal when the input signal is a preset value, and execute the preset protection measure on the target substation through the output signal.

[0018] Through the present application, the following steps are adopted: monitoring data of the target signal is collected at every sampling interruption interval, wherein the target signal includes at least one of the following: voltage signal and current signal; the monitoring data is calculated at every first sampling calculation interruption interval to obtain the target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; when the target monitoring value is greater than or equal to the monitoring value threshold, an input signal for controlling the target substation is received, wherein the input signal is used to control whether to execute the preset protection measures; when the input signal is the preset value, an output signal is output, and the preset protection measures are executed on the target substation through the output signal, thereby solving the problem in the related art that the target monitoring value of the substation calculated is inaccurate, thereby causing the measurement and control method of the substation to be abnormal. By nesting the first sampling calculation interruption interval in the sampling interruption interval, the task of calculating the target monitoring value is prevented from being interrupted by the sampling task, thereby achieving the effect of improving the accuracy of calculating the target monitoring value and avoiding the measurement and control method of the substation to be abnormal. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0020] Figure 1 It is a structural schematic diagram of a measurement and control system for a substation provided according to an embodiment of the present application;

[0021] Figure 2 is a flow chart of a substation measurement and control method provided according to an embodiment of the present application;

[0022] Figure 3 is a schematic diagram of a measurement and control device for a substation provided according to an embodiment of the present application;

[0023] Figure 4 is a schematic diagram of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0026] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequential order. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described here. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0027] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for display, data for analysis, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties.

[0028] The present invention is described below in conjunction with preferred implementation steps. Figure 1 is a schematic diagram of the structure of the measurement and control system of the substation provided in accordance with an embodiment of the present application, such as Figure 1 As shown, the system includes:

[0029] The multi-core heterogeneous chip 101 includes a management chip and a protection chip, wherein the management chip is used to manage applications in the measurement and control system of the substation, and the protection chip is used to calculate target monitoring values ​​based on monitoring data and communication monitoring data;

[0030] Specifically, based on the multi-core heterogeneous chip 101, the system management and protection applications are run on the same chip. A linux system (an open source operating system) is built on a management chip such as a cortex-A55 architecture core (a processor core of ARM (Advanced RISC Machine, a processor architecture based on a reduced instruction set architecture)) to implement application management of the substation's measurement and control system, and is run naked on a protection chip such as a cortex-R5 architecture core (a processor core of ARM) to implement protection application algorithms. The monitoring data can be collected by sampling the ADC (Analog-to-Digital Converter) in an FPGA (Field-Programmable Gate Array, a programmable logic device) to collect the voltage signal or current signal of the substation, and the communication monitoring data can be the voltage signal or current signal of the substation obtained from other networked monitoring devices through a communication module.

[0031] The protection chip converts analog quantity by calculating the sampling point information, and implements the protection algorithm by using the input and output information and analog quantity data, that is, the target monitoring value is calculated based on the monitoring data and communication monitoring data, and the preset protection measures are executed when the target monitoring value and the input and output information meet the preset conditions. For example, the protection chip calculates the sampling data, calculates the real-time analog quantities such as voltage, current, and frequency, and determines the switch quantity information and protection setting value according to the relay protection algorithm, and drives the output node in the switch quantity board 103. Thereby realizing the substation protection measurement and control functions of different application scenarios. The management chip collects and organizes the protection data information and displays it on the human-computer interaction interface 105, and communicates data with other substation devices through the power system communication protocol.

[0032] The programmable logic device 102 is communicatively connected with the multi-core heterogeneous chip 101 and is used to collect target signals of the target substation;

[0033] Specifically, the programmable logic device 102 can be an FPGA (Field-Programmable Gate Array, a type of programmable logic device), which implements ADC (Analog-to-Digital Converter) sampling and network port expansion functions through the FPGA, establishes communication between the FPGA and the protection chip, and uses OSPI (Octal-SPI (Serial Peripheral Interface, synchronous serial communication interface), a high-speed serial interface protocol) to achieve rapid transmission of sampled data, and the sampled data is also the target signal. The FPGA is connected to the transformer on the target substation for ADC data sampling, and the transformer is such as a voltage transformer or a current transformer. Multiple network ports are extended to the management chip through the FPGA for debugging and maintaining the substation's measurement and control system and for network protocol communication with other devices.

[0034] For example, the programmable logic device 102 receives the sampling interruption interval sent by the protection chip, and notifies the protection chip to receive and calculate analog data in real time every sampling interruption interval when collecting the target signal, that is, to process the target signal in real time.

[0035] The switch card 103 is connected to the management chip and the protection chip for sending input signals and output signals to the multi-core heterogeneous chip 101;

[0036] Specifically, the switch card is also called the input and output card, which is used to send input signals and output signals. The input signal refers to the signal input into the measurement and control system of the substation, which can be various forms of signals such as current, voltage, sound waves, etc., used to drive the operation of the system. The output signal refers to the output signal generated by the measurement and control system of the substation after processing the input signal, which is used to feedback the operating status of the system or control the operation of other equipment.

[0037] The communication module 104 is communicatively connected to the multi-core heterogeneous chip 101 , and is used for receiving communication monitoring data and sending the communication monitoring data to the multi-core heterogeneous chip 101 .

[0038] Specifically, the communication monitoring data may be a target signal of a target substation obtained through network transmission or other means. In addition to performing protection and measurement and control on the target substation based on the target signal collected in real time by the programmable logic device 102, the measurement and control system of the substation may also perform protection and measurement and control on the target substation based on the communication monitoring data received by the communication module 104.

[0039] It should be noted that the communication module 104 is communicatively connected to the management chip in the multi-core heterogeneous chip 101, and the communication monitoring data is directly sent to the management chip. Then, based on the inter-core communication mechanism between the management chip and the protection chip, the communication monitoring data is sent to the protection chip. The protection chip calculates the target monitoring value based on the communication monitoring data to realize protection and control of the target substation.

[0040] The measurement and control system of the substation provided in the embodiment of the present application includes a management chip and a protection chip through a multi-core heterogeneous chip 101, wherein the management chip is used to manage the application in the measurement and control system of the substation, and the protection chip is used to calculate the target monitoring value based on the monitoring data and the communication monitoring data; the programmable logic device 102 is connected to the multi-core heterogeneous chip 101 for collecting the target signal of the target substation; the switch quantity board 103 is connected to the management chip and the protection chip for sending the input signal and the output signal to the multi-core heterogeneous chip 101; the communication module 104 is connected to the multi-core heterogeneous chip 101 for receiving the communication monitoring data and sending the communication monitoring data to the multi-core heterogeneous chip 101, which solves the problem that the management chip and the protection chip are separated in the chip architecture of the measurement and control system of the substation in the related art, resulting in high design cost and difficulty in debugging of the measurement and control system of the substation. By integrating the management chip and the protection chip in a multi-core heterogeneous chip, the design cost of the measurement and control system of the substation is saved and the stability of the measurement and control system of the substation is improved.

[0041] Optionally, in the measurement and control system of the substation provided in the embodiment of the present application, the system also includes: a human-computer interaction interface 105, which is communicatively connected to the multi-core heterogeneous chip 101, for receiving user operation instructions for the measurement and control system of the substation, and sending the operation instructions to the management chip.

[0042] Specifically, the measurement and control system of the substation also includes a human-computer interaction interface 105 for interacting with the user. The human-computer interaction interface 105 can receive various operation instructions from the user for the measurement and control system of the substation. The human-computer interaction interface 105 sends the operation instructions to the management chip, and the management chip performs various operations on the measurement and control system of the substation based on the operation instructions.

[0043] Optionally, in the measurement and control system of the substation provided in the embodiment of the present application, an inter-core communication mechanism is established between the management chip and the protection chip, and data is transmitted between the management chip and the protection chip through the inter-core communication mechanism and inter-core shared memory.

[0044] Specifically, an inter-core communication mechanism is established between the cortex-A55 core and the cortex-R5 core, and the message mechanism and inter-core shared memory function are used to realize command transmission and data transmission between the management chip and the protection chip. The protection data of the protection chip is shared with the management chip in real time, realizing fast communication between the management chip and the protection chip.

[0045] The system chip communicates through inter-core shared memory, collects information from protection chips and other input and output boards, and displays the protection information of the substation's measurement and control system on the human-computer interaction interface, making it operable and configurable. Through the network port and power system communication protocol, the substation's measurement and control system's own information is exchanged with the background and other substation devices.

[0046] Optionally, in the measurement and control system of the substation provided in an embodiment of the present application, the switch quantity board 103 is connected to the management chip through a first communication bus, and the management chip obtains the input signal. The switch quantity board 103 is connected to the protection chip through a second communication bus, and the protection chip drives the output node in the switch quantity board to output the output signal.

[0047] Specifically, the first communication bus and the second communication bus can be FDCAN (FlexRay Data Communication and Network, high-speed data bus protocol), and FDCAN is used to build data communication channels between input and output boards and other smart boards and management chips and protection chips. One FDCAN is given to the management chip and the other is given to the protection chip to obtain the input status in real time and drive the output node in real time through the protection algorithm.

[0048] Figure 2 is a flow chart of a substation measurement and control method provided in accordance with an embodiment of the present application, such as Figure 2 As shown, the method comprises the following steps:

[0049] Step S201 : collecting monitoring data of a target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal.

[0050] Specifically, the sampling interruption interval refers to the interval duration during which the system interrupts data processing and storage during the data collection process. The programmable logic device 102 of the substation's measurement and control system collects voltage signals or current signals from the target substation, and collects monitoring data for the target signal according to the sampling interruption interval determined in the protection chip.

[0051] Step S202 , calculating the monitoring data every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval.

[0052] Specifically, the sampling calculation interruption interval refers to the interval duration of the system interruption to calculate the collected data when the system calculates the monitoring data. The target monitoring value can be the central trend of the monitoring data that needs to be calculated, such as the mean, median, mode and variance of the monitoring data. The programmable logic device 102 sends the monitoring data to the protection chip, and the protection chip calculates the target monitoring value for the monitoring data collected within the first sampling calculation interruption interval based on the preset first sampling calculation interruption interval, such as calculating the average voltage of the voltage signal, etc. The first sampling calculation interruption interval is nested in the sampling interruption interval, which means that the first sampling calculation interruption interval is an integer multiple of the sampling interruption interval. For example, the sampling interruption interval is 416.6μs, and the first sampling calculation interruption interval is 833.3μs, which is twice the sampling interruption interval.

[0053] It should be noted that the sampling interrupt and the data processing task interrupt (i.e., the sampling calculation interrupt) can be configured to realize synchronous and asynchronous processing by means of interrupt nesting, wherein the data processing task can include the sampling point analog quantity calculation task and the protection logic task. The data processing task interrupt is nested in the sampling interrupt and divided into two interrupt vectors. The interrupt synchronization and asynchronous configuration is realized through the configuration tool. For example, the interrupt interval of the asynchronous data processing task is configured to be twice that of the sampling interrupt. Assuming that the sampling interrupt interval is 416.6μs, that is, sampling is performed every 416.6μs, the frequency of the target signal can be 50Hz, and when 48 sampling points are sampled in one cycle of the target signal, the first sampling calculation interrupt interval is 833.3μs. The sampling interrupt enters twice and the data processing task enters once. Each 416.6μs sampling interrupt will record the data of the previous sampling point and the current sampling point. Each data processing interrupt will read the data of two sampling points for analog quantity calculation, and the data processing task will not be interrupted by the sampling interrupt after the interrupt is nested. When the data processing task time is between 416.6μs and 833.3μs, if the interrupt synchronization method is used, 416.6μs will pass before the next sampling interrupt arrives, but the data processing task time is greater than 416.6μs, the data processing task will not be completed and will be forced to end by the next interrupt, causing an exception.

[0054] Step S203, when the target monitoring value is greater than or equal to the monitoring value threshold, receiving an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure.

[0055] Specifically, the monitoring value threshold can be a threshold artificially set based on expert experience. If the target monitoring value is greater than or equal to the monitoring value threshold, it means that the target signal of the target substation is abnormal, and the protection algorithm in the protection chip needs to be executed to ensure the safety of the target substation. The protection algorithm is used to drive the measurement and control system of the substation to execute preset protection measures, such as tripping or powering off the target substation. The execution of the protection algorithm in the protection chip needs to meet two conditions. In addition to the target monitoring value being greater than or equal to the monitoring value threshold, the input signal of the protection chip input by the switch quantity board 103 needs to be a preset value.

[0056] Step S204: when the input signal is a preset value, output an output signal, and execute preset protection measures on the target substation through the output signal.

[0057] Specifically, the input signal is a preset value, indicating that the measurement and control system of the substation has enabled the protection measurement and control function of the target substation. At this time, the protection chip drives the output node in the switch quantity board 103 to output an output signal to execute the preset protection measure.

[0058] The measurement and control method of the substation provided by the embodiment of the present application collects monitoring data of the target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal; calculates the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; when the target monitoring value is greater than or equal to the monitoring value threshold, receives an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure; when the input signal is a preset value, outputs an output signal, and executes the preset protection measure on the target substation through the output signal, thereby solving the problem in the related art that the target monitoring value of the substation calculated is inaccurate, which causes the measurement and control method of the substation to be abnormal. By nesting the first sampling calculation interruption interval in the sampling interruption interval, the task of calculating the target monitoring value is prevented from being interrupted by the sampling task, thereby achieving the effect of improving the accuracy of calculating the target monitoring value and avoiding the measurement and control method of the substation from being abnormal.

[0059] Optionally, in the measurement and control method for a substation provided in an embodiment of the present application, before calculating the monitoring data at every first sampling calculation interruption interval, the method also includes: determining whether the number of sampling calculation tasks of the monitoring data is greater than or equal to a task number threshold, and determining whether the processing time of the sampling calculation task is greater than or equal to a preset time threshold; when the number of sampling calculation tasks is greater than or equal to the task number threshold, or the processing time of the sampling calculation task is greater than or equal to the preset time threshold, executing the step of calculating the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value; when the number of sampling calculation tasks is less than the task number threshold, and the processing time of the sampling calculation task is less than the preset time threshold, determining a second sampling calculation interruption interval, wherein the second sampling calculation interruption interval is not nested in the sampling interruption interval; and calculating the monitoring data at every second sampling calculation interruption interval to obtain a target monitoring value.

[0060] Specifically, when the number of protection and data processing tasks is small and the processing time is short, that is, the number of sampling and calculation tasks is less than the task number threshold, and the processing time of the sampling and calculation tasks is less than the preset time threshold, the measurement and control system of the substation can be configured as interrupt synchronization, the second sampling and calculation interruption interval and the sampling interruption interval use the same interruption interval, and the sampling point data and protection tasks are processed synchronously; when the number of protection and data processing tasks is large and the processing time is long, and at the same time a high sampling frequency must be guaranteed, it can be configured as interrupt asynchrony, that is, the number of sampling and calculation tasks is greater than or equal to the task number threshold, or the processing time of the sampling and calculation tasks is greater than or equal to the preset time threshold, the measurement and control system of the substation is configured as interrupt asynchrony, that is, the first sampling and calculation interruption interval is configured as an integer multiple of the sampling interruption interval.

[0061] It should be noted that interrupt asynchrony can also configure the sampling calculation interrupt interval to be multiple times of the sampling interrupt interval. In the case of multiple times, each sampling interrupt needs to record multiple sampling points in the form of a cache. This method can be applied to measurement and control systems in different scenarios. For example, if the integrated protection and measurement device needs to ensure a high sampling frequency and a large amount of protection measurement and control data processing, and the task processing time is long, then the interrupt asynchronous configuration can be used. If the task processing time is long but the data processing volume of the protection device is not large, the interrupt synchronous configuration can be used.

[0062] By nesting the first sampling calculation interrupt interval in the sampling interrupt interval, the influence of real-time frequency tracking on the target monitoring value can be avoided. Optionally, in the measurement and control method of the substation provided in the embodiment of the present application, after collecting the monitoring data of the target signal at each sampling interrupt interval, the method also includes: judging whether there is fluctuation in the target signal; in the case that the target signal fluctuates, calculating the sampling interrupt interval based on the target signal after the fluctuation to obtain an updated sampling interrupt interval; and executing the step of collecting the monitoring data of the target signal at each sampling interrupt interval based on the updated sampling interrupt interval.

[0063] Specifically, in order to avoid that the real-time frequency tracking function of the measurement and control system of the substation is not affected, the sampling interruption interval is calculated in real time through the data processing task of the protection chip. That is, when the target signal fluctuates, the updated sampling interruption interval is calculated based on the target signal after the fluctuation, and the updated sampling interruption interval is sent to the programmable logic device 102, thereby realizing frequency tracking when sampling monitoring data.

[0064] Optionally, in the measurement and control method for the substation provided in an embodiment of the present application, the method also includes: receiving communication monitoring data sent by a communication module of the measurement and control system of the substation, and calculating a communication monitoring value based on the communication monitoring data; when the communication monitoring value is greater than or equal to a monitoring value threshold, receiving an input signal for controlling the target substation; when the input signal is a preset value, outputting an output signal, and executing preset protection measures on the target substation through the output signal.

[0065] Specifically, the communication monitoring data may be a target signal of a target substation obtained through network transmission or other means. In addition to performing protection and measurement on the target substation based on the target signal collected in real time by the programmable logic device 102, the measurement and control system of the substation may also perform protection and measurement on the target substation based on the communication monitoring data received by the communication module 104. For example, the communication monitoring value is calculated based on the communication monitoring data. When the communication monitoring value is greater than or equal to the monitoring value threshold, the input signal sent by the switch quantity board 103 is received. When the input signal is a preset value, the output signal is output by driving the output node in the switch quantity board 103 through the protection chip, and then the preset protection measures are executed through the protection chip.

[0066] Optionally, in the measurement and control method for the substation provided in an embodiment of the present application, collecting monitoring data of the target signal at every sampling interrupt interval includes: through a programmable logic device, wherein the programmable logic device is a device in the measurement and control system of the substation; controlling the programmable logic device to send the target signal to a multi-core heterogeneous chip, wherein the multi-core heterogeneous chip is a chip in the measurement and control system of the substation; determining the sampling interrupt interval through the multi-core heterogeneous chip, and controlling the multi-core heterogeneous chip to send the sampling interrupt interval to the programmable logic device; collecting monitoring data of the target signal through the programmable logic device and the sampling interrupt interval.

[0067] For example, the protection chip in the multi-core heterogeneous chip 101 determines the sampling interruption interval for the target signal through a preset protection algorithm, and sends the sampling interruption interval to the programmable logic device 102, which collects monitoring data for the target signal.

[0068] Optionally, in the measurement and control method for the substation provided in an embodiment of the present application, receiving the input signal for controlling the target substation includes: controlling the switch quantity board to send the input signal to the multi-core heterogeneous chip, wherein the switch quantity board is a board in the measurement and control system of the substation; and receiving the input signal for controlling the target substation through the multi-core heterogeneous chip.

[0069] For example, the switch quantity board 103 sends an input signal to the protection chip in the multi-core heterogeneous chip 101 in real time. After receiving the input signal, the protection chip determines whether the input signal is a preset value. If the input signal is the preset value and the target monitoring value is greater than or equal to the monitoring value threshold, the protection chip executes the protection algorithm to protect the target substation.

[0070] Optionally, in the measurement and control method for the substation provided in an embodiment of the present application, outputting an output signal, and executing preset protection measures on the target substation through the output signal includes: controlling the switch quantity board to send an output signal to the multi-core heterogeneous chip, and executing preset protection measures on the target substation through the output signal and the multi-core heterogeneous chip.

[0071] For example, when the input signal is a preset value and the target monitoring value is greater than or equal to the monitoring value threshold, the protection chip drives the output node in the switch quantity board 103 to output an output signal through the protection algorithm, and the protection chip executes the preset protection measures for the target substation after receiving the output signal.

[0072] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0073] The embodiment of the present application also provides a substation measurement and control device. It should be noted that the substation measurement and control device of the embodiment of the present application can be used to execute the substation measurement and control method provided in the embodiment of the present application. The measurement and control device of the substation provided in the embodiment of the present application is introduced below.

[0074] Figure 3 Schematic diagram of a substation measurement and control device provided according to an embodiment of the present application. Figure 3 As shown, the device comprises:

[0075] The collection unit 301 is used to collect monitoring data of the target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal;

[0076] A calculation unit 302, configured to calculate the monitoring data every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval;

[0077] A receiving unit 303 is used to receive an input signal for controlling a target substation when the target monitoring value is greater than or equal to the monitoring value threshold, wherein the input signal is used to control whether to execute a preset protection measure;

[0078] The execution unit 304 is used to output an output signal when the input signal is a preset value, and execute a preset protection measure on the target substation through the output signal.

[0079] The measurement and control device of the substation provided in the embodiment of the present application, through the collection unit 301, collects the monitoring data of the target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal; a calculation unit 302, calculates the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; a receiving unit 303, when the target monitoring value is greater than or equal to the monitoring value threshold, receives an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure; an execution unit 304, when the input signal is a preset value, outputs an output signal, and executes the preset protection measure on the target substation through the output signal, solves the problem in the related art that the target monitoring value of the substation calculated is inaccurate, thereby causing the measurement and control method of the substation to be abnormal, and by nesting the first sampling calculation interruption interval in the sampling interruption interval, it is avoided that the task of calculating the target monitoring value is interrupted by the sampling task, thereby achieving the effect of improving the accuracy of calculating the target monitoring value and avoiding the measurement and control method of the substation.

[0080] Optionally, in the measurement and control device of the substation provided in the embodiment of the present application, the device also includes: a first judgment unit, used to judge whether the number of sampling calculation tasks of the monitoring data is greater than or equal to the task number threshold, and judge whether the processing time of the sampling calculation task is greater than or equal to the preset time threshold; a first step execution unit, used to execute the step of calculating the monitoring data every first sampling calculation interruption interval to obtain the target monitoring value when the number of sampling calculation tasks is greater than or equal to the task number threshold, or the processing time of the sampling calculation task is greater than or equal to the preset time threshold; a determination unit, used to determine the second sampling calculation interruption interval when the number of sampling calculation tasks is less than the task number threshold and the processing time of the sampling calculation task is less than the preset time threshold, wherein the second sampling calculation interruption interval is not nested in the sampling interruption interval; a target monitoring value calculation unit, used to calculate the monitoring data every second sampling calculation interruption interval to obtain the target monitoring value.

[0081] Optionally, in the measurement and control device of the substation provided in the embodiment of the present application, the device also includes: a second judgment unit, used to judge whether there is fluctuation in the target signal; a sampling interruption interval calculation unit, used to calculate the sampling interruption interval based on the target signal after the fluctuation when the target signal fluctuates, to obtain an updated sampling interruption interval; a second step execution unit, used to execute the step of collecting monitoring data of the target signal every sampling interruption interval based on the updated sampling interruption interval.

[0082] Optionally, in the measurement and control device of the substation provided in the embodiment of the present application, the device also includes: a communication monitoring value calculation unit, which is used to receive the communication monitoring data sent by the communication module of the measurement and control system of the substation, and calculate the communication monitoring value based on the communication monitoring data; an input signal receiving unit, which is used to receive the input signal of controlling the target substation when the communication monitoring value is greater than or equal to the monitoring value threshold; and an output unit, which is used to output an output signal when the input signal is a preset value, and execute preset protection measures on the target substation through the output signal.

[0083] Optionally, in the measurement and control device of the substation provided in the embodiment of the present application, the acquisition unit 301 includes: a first acquisition module, used to control the programmable logic device through a programmable logic device, wherein the programmable logic device is a device in the measurement and control system of the substation; a first control module, used to control the programmable logic device to send the target signal to the multi-core heterogeneous chip, wherein the multi-core heterogeneous chip is a chip in the measurement and control system of the substation; a determination module, used to determine the sampling interrupt interval through the multi-core heterogeneous chip, and control the multi-core heterogeneous chip to send the sampling interrupt interval to the programmable logic device; a second acquisition module, used to collect monitoring data of the target signal through the programmable logic device and the sampling interrupt interval.

[0084] Optionally, in the measurement and control device of the substation provided in an embodiment of the present application, the receiving unit 303 includes: a second control module, used to control the switch quantity board to send an input signal to the multi-core heterogeneous chip, wherein the switch quantity board is a board in the measurement and control system of the substation; and a receiving module, used to receive the input signal of controlling the target substation through the multi-core heterogeneous chip.

[0085] Optionally, in the measurement and control device of the substation provided in the embodiment of the present application, the execution unit 304 includes: a third control module, used to control the switch quantity board to send an output signal to the multi-core heterogeneous chip, and execute preset protection measures on the target substation through the output signal and the multi-core heterogeneous chip.

[0086] The measurement and control device of the substation includes a processor and a memory. The above-mentioned acquisition unit 301, calculation unit 302, receiving unit 303 and execution unit 304 are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.

[0087] The processor includes a kernel, which retrieves the corresponding program unit from the memory. One or more kernels can be set, and the accuracy of calculating the target monitoring value can be improved by adjusting the kernel parameters to avoid abnormalities in the measurement and control method of the substation.

[0088] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.

[0089] An embodiment of the present invention provides a computer-readable storage medium on which a program is stored. When the program is executed by a processor, a measurement and control method for a substation is implemented.

[0090] An embodiment of the present invention provides a processor, which is used to run a program, wherein the program executes a measurement and control method for a substation when it is run.

[0091] Figure 4 is a schematic diagram of an electronic device provided according to an embodiment of the present application. Figure 4 As shown, the electronic device 401 includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, the following steps are implemented: monitoring data of the target signal is collected at each sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal; the monitoring data is calculated at each first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval; when the target monitoring value is greater than or equal to the monitoring value threshold, an input signal for controlling the target substation is received, wherein the input signal is used to control whether to execute a preset protection measure; when the input signal is a preset value, an output signal is output, and the preset protection measure is executed on the target substation through the output signal. The device in this article can be a server, a PC, a PAD, a mobile phone, etc.

[0092] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that is initialized with the following method steps: collecting monitoring data of a target signal at every sampling interrupt interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal; calculating the monitoring data at every first sampling calculation interrupt interval to obtain a target monitoring value, wherein the first sampling calculation interrupt interval is nested in the sampling interrupt interval; when the target monitoring value is greater than or equal to a monitoring value threshold, receiving an input signal for controlling the target substation, wherein the input signal is used to control whether to execute preset protection measures; when the input signal is a preset value, outputting an output signal, and executing preset protection measures on the target substation through the output signal.

[0093] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0094] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0095] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0096] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0097] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0098] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0099] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0100] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0101] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that contain computer-usable program code.

[0102] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A measurement and control method for a substation, characterized in that: include: Collect monitoring data of the target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal, and the sampling interruption interval refers to the interval duration of the system interruption for data processing and storage during the data collection process; The monitoring data is calculated every first sampling and calculation interruption interval to obtain a target monitoring value, wherein the first sampling and calculation interruption interval is nested in the sampling interruption interval, the sampling and calculation interruption interval refers to the interval length of the system interruption to calculate the collected data when the system calculates the monitoring data, and the first sampling and calculation interruption interval is nested in the sampling interruption interval means that the first sampling and calculation interruption interval is an integer multiple of the sampling interruption interval; When the target monitoring value is greater than or equal to the monitoring value threshold, receiving an input signal for controlling the target substation, wherein the input signal is used to control whether to execute a preset protection measure; When the input signal is a preset value, outputting an output signal, and executing the preset protection measure on the target substation through the output signal; Wherein, before calculating the monitoring data at every first sampling calculation interruption interval, the method further includes: determining whether the number of sampling calculation tasks of the monitoring data is greater than or equal to a task number threshold, and determining whether the processing time of the sampling calculation task is greater than or equal to a preset time threshold; when the number of the sampling calculation tasks is greater than or equal to the task number threshold, or the processing time of the sampling calculation task is greater than or equal to the preset time threshold, performing the step of calculating the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, configuring the measurement and control system of the substation as interruption asynchronous, wherein the interruption asynchronous is to configure the first sampling calculation interruption interval as an integer multiple of the sampling interruption interval; when the number of the sampling calculation tasks is less than the task number threshold, and the processing time of the sampling calculation task is less than the preset time threshold, determining a second sampling calculation interruption interval, configuring the measurement and control system of the substation as interruption synchronous, wherein the interruption synchronous is to use the same interruption interval for the second sampling calculation interruption interval and the sampling interruption interval, wherein the second sampling calculation interruption interval is not nested in the sampling interruption interval; calculating the monitoring data at every second sampling calculation interruption interval to obtain the target monitoring value.

2. The method according to claim 1, characterized in that: After collecting the monitoring data of the target signal at each sampling interruption interval, the method further includes: Determining whether the target signal fluctuates; In the case where the target signal fluctuates, calculating the sampling interruption interval based on the target signal after the fluctuation to obtain an updated sampling interruption interval; The step of collecting the monitoring data of the target signal at each sampling interruption interval is performed based on the updated sampling interruption interval.

3. The method according to claim 1, characterized in that: The method further comprises: Receiving communication monitoring data sent by a communication module of a measurement and control system of a substation, and calculating a communication monitoring value based on the communication monitoring data; When the communication monitoring value is greater than or equal to the monitoring value threshold, receiving an input signal for controlling the target substation; When the input signal is the preset value, an output signal is output, and a preset protection measure is executed on the target substation through the output signal.

4. The method according to claim 1, characterized in that: The monitoring data of the target signal collected at each sampling interruption interval includes: Collecting the target signal of the target substation through a programmable logic device, wherein the programmable logic device is a device in a measurement and control system of the substation; Controlling the programmable logic device to send the target signal to a multi-core heterogeneous chip, wherein the multi-core heterogeneous chip is a chip in a measurement and control system of the substation; Determine a sampling interruption interval by using the multi-core heterogeneous chip, and control the multi-core heterogeneous chip to send the sampling interruption interval to the programmable logic device; The monitoring data of the target signal is collected through the programmable logic device and the sampling interruption interval.

5. The method according to claim 1, characterized in that Receiving an input signal for controlling the target substation includes: Controlling the switch quantity card to send an input signal to the multi-core heterogeneous chip, wherein the switch quantity card is a card in the measurement and control system of the substation; An input signal for controlling the target substation is received through the multi-core heterogeneous chip.

6. The method according to claim 1, characterized in that Outputting an output signal, and executing a preset protection measure on the target substation through the output signal includes: The control switch quantity board sends an output signal to the multi-core heterogeneous chip, and the preset protection measures are executed on the target substation through the output signal and the multi-core heterogeneous chip.

7. A measurement and control system for a substation, wherein the measurement and control system for a substation applies the measurement and control method for a substation according to any one of claims 1 to 6, characterized in that: include: A multi-core heterogeneous chip, including a management chip and a protection chip, wherein the management chip is used to manage applications in the measurement and control system of the substation, and the protection chip is used to calculate a target monitoring value based on monitoring data and communication monitoring data; A programmable logic device, which is in communication connection with the multi-core heterogeneous chip and is used for collecting target signals of a target substation; A switch quantity card, which is in communication connection with the management chip and the protection chip, and is used to send a switch input signal and a switch output signal to the multi-core heterogeneous chip; A communication module is communicatively connected to the multi-core heterogeneous chip, and is used to receive communication monitoring data and send the communication monitoring data to the multi-core heterogeneous chip.

8. The system according to claim 7, characterized in that The system further comprises: A human-computer interaction interface is connected to the multi-core heterogeneous chip for receiving user operation instructions for the substation's measurement and control system and sending the operation instructions to the management chip.

9. The system according to claim 7, characterized in that An inter-core communication mechanism is established between the management chip and the protection chip, and data is transmitted between the management chip and the protection chip through the inter-core communication mechanism and the inter-core shared memory.

10. The system according to claim 7, characterized in that The switch card is connected to the management chip via a first communication bus, and the input signal is obtained based on the management chip. The switch card is connected to the protection chip via a second communication bus, and the protection chip drives the output node in the switch card to output the output signal.

11. A measurement and control device for a substation, characterized in that: include: A collection unit, used for collecting monitoring data of a target signal at every sampling interruption interval, wherein the target signal includes at least one of the following: a voltage signal and a current signal, and the sampling interruption interval refers to the interval duration of the system interrupting data processing and storage during the data collection process; a calculation unit, configured to calculate the monitoring data at every first sampling calculation interruption interval to obtain a target monitoring value, wherein the first sampling calculation interruption interval is nested in the sampling interruption interval, the sampling calculation interruption interval refers to the interval duration of the system interruption to calculate the collected data when the system calculates the monitoring data, and the first sampling calculation interruption interval is nested in the sampling interruption interval means that the first sampling calculation interruption interval is an integer multiple of the sampling interruption interval; A receiving unit, configured to receive an input signal for controlling a target substation when the target monitoring value is greater than or equal to a monitoring value threshold, wherein the input signal is used to control whether to execute a preset protection measure; An execution unit, configured to output an output signal when the input signal is a preset value, and execute the preset protection measure on the target substation through the output signal; a first judging unit, configured to judge whether the number of sampling and calculating tasks of the monitoring data is greater than or equal to a task number threshold, and to judge whether the processing time of the sampling and calculating tasks is greater than or equal to a preset time threshold; a first step executing unit, configured to, when the number of sampling and calculating tasks is greater than or equal to the task number threshold, or the processing time of the sampling and calculating tasks is greater than or equal to the preset time threshold, perform the step of calculating the monitoring data at every first sampling and calculating interruption interval to obtain a target monitoring value, and configure the measurement and control system of the substation as interrupt asynchronous, wherein the interrupt asynchronous is to configure the first sampling and calculating interruption interval to be an integer multiple of the sampling interruption interval; a determining unit, configured to, when the number of sampling and calculating tasks is less than the task number threshold, and the processing time of the sampling and calculating tasks is less than the preset time threshold, determine a second sampling and calculating interruption interval, and configure the measurement and control system of the substation as interrupt synchronous, wherein the interrupt synchronous is to use the same interruption interval for the second sampling and calculating interruption interval and the sampling interruption interval, wherein the second sampling and calculating interruption interval is not nested in the sampling interruption interval; and a target monitoring value calculating unit, configured to calculate the monitoring data at every second sampling and calculating interruption interval to obtain the target monitoring value.

12. A non-volatile storage medium, characterized in that: The non-volatile storage medium includes a stored program, wherein when the program is executed, the device where the non-volatile storage medium is located is controlled to execute the substation measurement and control method according to any one of claims 1 to 6.

13. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the substation measurement and control method described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method and system for remotely calibrating frequency standards

    CN101692163A

  • Microcomputer protection method for alternating current power supply system of transformer substation and related device

    CN117317990A