Gluing system and control method
By designing the carrying, transferring and gluing mechanisms of the gluing system, the automatic preparation of glue for the water-cooling plate of the power battery is realized, which solves the problems of long preparation time and insufficient reliability of the first piece, improves the preparation efficiency and reliability, and ensures the colloid accurate contact and weighing.
Patent Information
- Application Number
- CN202410471312.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-18
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-04-18
AI Technical Summary
Power batteries generate a large amount of heat when discharging with high energy density and power. The existing water-cooled plate glue preparation process takes a long time to prepare the first part and lacks reliability. It is necessary to improve the degree of automation and work efficiency.
Design a gluing system, including a load-bearing mechanism, a transfer mechanism and a gluing mechanism. It reduces manual intervention through automated gluing steps, improves the preparation time and reliability of the first piece, and uses fixed grooves and limiters to improve the stability of the glue-containing parts. and adaptability, and realize automated inspection of colloid weight and proportion through the weighing mechanism.
It realizes the automation of the first piece preparation of the glue coating system, reduces the preparation time, improves work efficiency and reliability, ensures accurate contact and weighing of the colloid, and reduces the risk of manual intervention.
Smart Images

Figure CN118060145B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of battery technology, and in particular to a glue coating system and a control method. Background Art
[0002] During use, power batteries are often in a high-energy-density, high-power discharge state, which usually generates a lot of heat. In order to ensure that the power battery can work stably for a long time, a cooling structure needs to be set in the battery module for cooling and heat dissipation. A water-cooled plate is commonly used for cooling. Heat is mainly transferred through the contact between the battery module and the surface of the water-cooled plate, and the coolant in the internal flow channel of the water-cooled plate can accelerate the dissipation of heat, so as to quickly reduce the battery temperature and ensure that the battery operating temperature is in a healthy state. There is usually a certain gap between the battery module and the water-cooled plate for coating thermal conductive adhesive, which can improve the thermal conductivity of the heat from the battery cell to the surface of the water-cooled plate.
[0003] Before the glue coating of water-cooled plates is produced, the system is usually debugged and verified by preparing the first piece. Currently, the process of preparing the first piece is time-consuming and lacks reliability, which urgently needs to be improved. Summary of the invention
[0004] In view of the above problems, the present application provides a gluing system and a control method, which can improve the automation level of the first piece preparation of the gluing system, reduce the first piece preparation time of the gluing system, and improve the working efficiency and reliability of the gluing system.
[0005] In a first aspect, the present application provides a glue coating system, comprising: a carrying mechanism for carrying a glue-containing member, the glue-containing member is used to contain the glue, the carrying mechanism comprises a first fixing portion, the first fixing portion comprises a recessed fixing groove, the fixing groove is used to contain the glue-containing member, and / or the carrying mechanism comprises a second fixing portion, the second fixing portion comprises a limiting area and a plurality of limiting members arranged around the limiting area, the limiting area is used to contain the glue-containing member, and the limiting members are used to limit the glue-containing member; a glue coating mechanism, used to release the glue to the glue-containing member; a transfer mechanism, arranged on one side of the glue coating mechanism, wherein the glue coating system comprises a starting position and a glue connecting position, the glue coating mechanism can release the glue to the glue-containing member of the carrying mechanism located at the glue connecting position, and the transfer mechanism is used to move the carrying mechanism between the starting position and the glue connecting position.
[0006] In the scheme of the embodiment of the present application, the glue coating system includes a carrying mechanism, a transfer mechanism and a glue coating mechanism. The carrying mechanism can carry a glue-containing part for containing the colloid, and the transfer mechanism can move the carrying mechanism between a starting position and a glue connection position. When the transfer mechanism transfers the carrying mechanism to the glue connection position, the glue coating mechanism releases the colloid to the glue-containing part in the carrying mechanism. Therefore, in the first-piece preparation process of the glue coating system, the glue connection step can be automated through the cooperation of the carrying mechanism and the transfer mechanism, so as to reduce manual intervention in the first-piece preparation process of the glue coating system, reduce the first-piece preparation time of the glue coating system, and improve the working efficiency and reliability of the glue coating system. The carrying mechanism includes a first The fixing part and / or the second fixing part are used to improve the connection stability between the supporting mechanism and the glue container and improve the reliability of the glue coating system. The first fixing part includes a recessed fixing groove, and the glue container can be accommodated in the fixing groove, that is, the supporting mechanism can accommodate a higher glue container through the fixing groove. A limiting area is provided on the supporting mechanism. The second fixing part includes a limiting area and a plurality of limiting members arranged around the limiting area. The limiting area is used to accommodate the glue container, and the limiting members are used to limit the glue container, so that the supporting mechanism can carry a glue container with a lower height but a larger cross-sectional area in the height direction, so that the supporting mechanism can be applied to different steps of the first piece preparation, thereby improving the adaptability of the supporting mechanism.
[0007] In some embodiments, the glue coating system also includes a glue container, the supporting mechanism includes a first fixed portion, the glue container includes a first glue container, the first glue container includes a recessed receiving groove, and the receiving groove is used to receive the colloid; or, the supporting mechanism includes a second fixed portion, the glue container includes a second glue container, the second glue container is in the shape of a plate, and a side surface of the second glue container facing away from the supporting mechanism is used to carry the colloid.
[0008] In the technical solution of the embodiment of the present application, the supporting mechanism includes a first fixed part, the glue container includes a first glue container, the first glue container includes a recessed receiving groove, the receiving groove is used to receive and restrain the colloid, and it is convenient to weigh the first glue container, through the cooperation of the first fixed part and the first glue container, the glue coating system can be used to check the weight of the colloid during the preparation of the first piece; the supporting mechanism includes a second fixed part, the glue container includes a second glue container, the second glue container is flat, and the side surface of the second glue container facing away from the supporting mechanism is used to carry the colloid, through the cooperation of the second fixed part and the second glue container, the glue coating system can be used to check the shear force of the colloid during the preparation of the first piece.
[0009] In some embodiments, the fixing groove includes two sub-fixing grooves spaced apart along the first direction, the two sub-fixing grooves are respectively used to accommodate the glue-containing parts, and the glue coating mechanism includes two glue outlets spaced apart, the two glue outlets are respectively used to release the glue to the glue-containing parts located in the two sub-fixing grooves.
[0010] In the technical solution of the embodiment of the present application, the fixing groove includes two sub-fixing grooves spaced apart along a first direction, the glue containing parts are respectively arranged in the two sub-fixing grooves, and the glue coating mechanism includes two glue outlets spaced apart, and the two glue outlets respectively release the colloid to the glue containing parts located in the two sub-fixing grooves, so that the two glue containing parts can respectively receive different colloids, so that the glue coating system can be used to inspect the colloid ratio during the preparation process of the first piece.
[0011] In some embodiments, the plurality of fixing grooves are spaced apart along the first direction, and a distance between two sub-fixing grooves located in the same fixing groove in the first direction is smaller than a distance between adjacent fixing grooves in the first direction.
[0012] In the technical solution of the embodiment of the present application, multiple fixed grooves are arranged at intervals along the first direction, and the spacing between two sub-fixed grooves located in the same fixed groove in the first direction is smaller than the spacing between adjacent fixed grooves in the first direction. This facilitates the accurate matching of the glue containing parts and the glue outlet located in the sub-fixed grooves during the glue ratio inspection, and improves the problem of mutual interference of glue containing parts in adjacent fixed grooves during the colloid weight inspection.
[0013] In some embodiments, the carrying mechanism includes a first fixed part, the gluing system includes a weighing mechanism, the gluing system includes a weighing position, the weighing position is set between the starting position and the gluing position, the transfer mechanism can move the carrying mechanism between the starting position, the gluing position and the weighing position, and the weighing mechanism is used to obtain the weight information of the glue-containing part in the fixed groove located at the weighing position.
[0014] In the technical solution of the embodiment of the present application, the gluing system also includes a weighing mechanism, and the gluing system includes a weighing position, which is arranged between the starting position and the gluing position. The transfer mechanism can move the carrying mechanism between the starting position, the gluing position and the weighing position, so that the weighing process in the first piece preparation process of the gluing system can also be automatically realized through the cooperation of the transfer mechanism and the carrying mechanism, thereby further reducing manual interference in the first piece preparation process to improve the reliability of the gluing system.
[0015] In some embodiments, a through hole is provided through a partial area of the bottom of the fixed groove, and the weighing mechanism includes a base and a weighing part protruding from the base, and the weighing part can be passed through the through hole and abut against the plastic container in the fixed groove, so that the weighing mechanism can obtain weight information of the plastic container.
[0016] In the technical solution of the embodiment of the present application, a through hole is provided through a partial area of the bottom of the fixed groove, and the weighing mechanism includes a base and a weighing part protruding from the base. The weighing part can be passed through the through hole and abut against the rubber-containing part in the fixed groove, so that the weighing mechanism can accurately obtain the weight information of the rubber-containing part while reducing the influence of other components on the weighing accuracy of the weighing mechanism.
[0017] In some embodiments, the gluing system further includes an isolation mechanism, which is disposed around the gluing mechanism and the transfer mechanism. A working window is provided through the isolation mechanism, and the starting position is located within the working window.
[0018] In the technical solution of the embodiment of the present application, the isolation mechanism is wrapped around the gluing mechanism and the transfer mechanism, and a working window is arranged through the isolation mechanism. The starting position is located within the working window to reduce the risk of accidents caused by the gluing mechanism and the transfer mechanism and improve the reliability of the gluing system.
[0019] In some embodiments, a first sliding member extending along the thickness direction of the isolation mechanism is provided in the working window; a second sliding member is provided at the edge of the supporting mechanism, and the first sliding member and the second sliding member are relatively movably provided along the thickness direction of the isolation mechanism, wherein a first stop member is provided at one end of the working window away from the transfer mechanism, and a second stop member is provided at one end of the supporting mechanism close to the transfer mechanism, and the first stop member stops at the second stop member along the thickness direction of the isolation mechanism.
[0020] In the technical solution of the embodiment of the present application, the first sliding member and the first stop member arranged on the isolation mechanism and the second sliding member and the second stop member arranged on the carrying mechanism cooperate to reduce the operating difficulty and operation time of the carrying mechanism at the working window, improve the efficiency of the coating system, and reduce the risk of safety accidents caused by the carrying system detaching from the working window.
[0021] In a second aspect, the present application provides a control method, which is applied to the gluing system of the first aspect embodiment, and the control method includes:
[0022] The plastic container is arranged on the carrying mechanism;
[0023] Instruct the transfer mechanism to transfer the carrier mechanism from the starting position to the glue connection position;
[0024] The glue coating mechanism is made to release glue to the glue receiving member located at the glue connection position.
[0025] In the technical solution of the embodiment of the present application, after the glue-receiving part is set on the supporting mechanism, the transfer mechanism can transfer the supporting mechanism from the starting position to the gluing position, and the gluing mechanism releases the colloid to the glue-receiving part located at the gluing position. Therefore, in the first-piece preparation process of the gluing system, the gluing step can be automated through the cooperation of the supporting mechanism and the transfer mechanism, so as to reduce manual intervention in the first-piece preparation process of the gluing system, reduce the first-piece preparation time of the gluing system, and improve the working efficiency and reliability of the gluing system.
[0026] In some embodiments, the bearing mechanism includes a first fixing portion, the first fixing portion is a fixing groove arranged in a concave manner, the gluing system further includes a weighing mechanism, and the gluing system further includes a weighing position.
[0027] The step of arranging the adhesive container on the supporting mechanism includes:
[0028] The plastic container is arranged in the fixing groove of the supporting mechanism;
[0029] The step of causing the glue coating mechanism to release glue to the glue receiving member located at the glue connection position includes:
[0030] The glue coating mechanism releases glue to the glue containing member in the fixed groove at the glue connection position;
[0031] After the step of causing the glue coating mechanism to release the glue to the glue receiving member located at the glue connection position,
[0032] Instruct the transfer mechanism to move the carrying mechanism to the weighing position;
[0033] The weighing mechanism is instructed to obtain the weight information of the adhesive container located at the weighing position.
[0034] In the technical solution of the embodiment of the present application, after the gluing mechanism releases the colloid to the carrying mechanism, the transfer mechanism moves the carrying mechanism to the weighing mechanism, so that the weighing process in the first-piece preparation process of the gluing system can also be automated through the cooperation of the transfer mechanism and the carrying mechanism, further reducing manual interference in the first-piece preparation process to improve the reliability of the gluing system.
[0035] In some embodiments, the glue coating mechanism includes two glue outlets spaced apart, the fixing groove includes two sub-fixing grooves spaced apart along the first direction, and the step of placing the glue container in the fixing groove of the supporting mechanism includes:
[0036] The two plastic containing parts are respectively arranged in the two sub-fixing grooves of the carrying mechanism;
[0037] The step of causing the glue coating mechanism to release glue to the glue containing member in the fixed groove located at the glue connection position includes:
[0038] The glue coating mechanism releases glue from two glue outlets to the glue containing parts in the two sub-fixing grooves respectively;
[0039] The step of enabling the weighing mechanism to obtain the weight information of the adhesive container located at the weighing position includes:
[0040] The weighing mechanism is instructed to respectively obtain the weight information of the glue containing parts in the two sub-fixing grooves located at the weighing position.
[0041] In the technical solution of the embodiment of the present application, through the above solution, the two glue outlets of the glue coating system release the colloid to the glue-containing parts in the two sub-fixed grooves respectively, and then the transfer mechanism transfers the carrying mechanism to the weighing mechanism to obtain the weight information of the glue-containing parts in the two sub-fixed grooves respectively, so that the glue coating system can be used to inspect the colloid ratio during the preparation process of the first piece. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Also, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0043] Figure 1 is a schematic diagram of a glue coating system provided by an embodiment of the present application;
[0044] Figure 2 It is a structural schematic diagram of a bearing mechanism of a gluing system provided in one embodiment of the present application;
[0045] Figure 3 yes Figure 2 Bottom view at center A;
[0046] Figure 4 yes Figure 1 A schematic diagram of the enlarged structure at B in the middle;
[0047] Figure 5 It is a flow chart of a control method provided by an embodiment of the present application.
[0048] Description of reference numerals:
[0049] 1. Gluing system;
[0050] 11. Carrying mechanism; 111. First fixing part; 1111. Fixing groove; 112. Second fixing part; 1121. Limiting area; 1122. Limiting member; 1112. Sub-fixing groove; 1113. First area; 1114. Second area; 113. Second sliding member; 114. Second stopping member;
[0051] 12. Gluing mechanism;
[0052] 13. Transfer institution;
[0053] 14. weighing mechanism; 141. base; 142. weighing unit;
[0054] 15. Isolation agency; 151. Working window. DETAILED DESCRIPTION
[0055] The following embodiments of the technical solution of the present application will be described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.
[0056] It should be noted that, unless otherwise specified, the technical terms or scientific terms used in the embodiments of the present application should have the common meanings understood by technicians in the field to which the embodiments of the present application belong.
[0057] In the description of the embodiments of the present application, the orientations or positional relationships indicated by technical terms such as "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", and "circumferential" are based on the orientations or positional relationships shown in the accompanying drawings and are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the embodiments of the present application.
[0058] In addition, the technical terms "first", "second", etc. are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined.
[0059] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
[0060] In the description of the embodiments of the present application, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0061] At present, from the perspective of market development, the application of power batteries is becoming more and more extensive. Power batteries are not only used in energy storage power systems such as hydropower, thermal power, wind power and solar power stations, but also widely used in electric vehicles such as electric bicycles, electric motorcycles, electric cars, as well as military equipment and aerospace and other fields. With the continuous expansion of the application field of power batteries, the market demand is also constantly expanding.
[0062] In the present application, the battery cell may include a lithium-ion secondary battery cell, a lithium-ion primary battery cell, a lithium-sulfur battery cell, a sodium-lithium-ion battery cell, a sodium-ion battery cell or a magnesium-ion battery cell, etc., and the embodiments of the present application do not limit this. The battery cell may be cylindrical, flat, rectangular or other shapes, etc., and the embodiments of the present application do not limit this.
[0063] The battery mentioned in the embodiments of the present application refers to a single physical module including one or more battery cells to provide higher voltage and capacity. For example, the battery mentioned in the present application may include a battery module or a battery pack. The battery generally includes a box for encapsulating one or more battery cells. The box can prevent liquid or other foreign matter from affecting the charging or discharging of the battery cells.
[0064] A battery cell includes an electrode assembly and an electrolyte. The electrode assembly includes a positive electrode sheet, a negative electrode sheet and a separator. A battery cell mainly works by the movement of metal ions between the positive electrode sheet and the negative electrode sheet. The positive electrode sheet includes a positive current collector and a positive active material layer. The positive active material layer is coated on the surface of the positive current collector. The positive current collector includes a positive current collector and a positive electrode ear connected to the positive current collector. The positive current collector is coated with a positive active material layer, and the positive electrode ear is not coated with a positive active material layer. Taking a lithium-ion battery as an example, the material of the positive current collector can be aluminum, and the positive active material layer includes a positive active material. The positive active material can be lithium cobalt oxide, lithium iron phosphate, ternary lithium or lithium manganese oxide, etc. The negative electrode sheet includes a negative current collector and a negative active material layer, and the negative active material layer is coated on the surface of the negative current collector; the negative current collector includes a negative current collector and a negative electrode tab connected to the negative current collector, the negative current collector is coated with the negative active material layer, and the negative electrode tab is not coated with the negative active material layer. The material of the negative current collector can be copper, and the negative active material layer includes a negative active material, and the negative active material can be carbon or silicon, etc. The material of the separator can be PP (polypropylene, polypropylene) or PE (polyethylene, polyethylene), etc.
[0065] During use, power batteries are often in a high-energy-density, high-power discharge state, in which a large amount of heat is usually generated. In order to ensure that the power battery can work stably for a long time, a cooling structure needs to be set in the battery module for cooling and heat dissipation. A water-cooled plate is commonly used for cooling. The heat is mainly transferred through the contact between the battery module and the surface of the water-cooled plate. The coolant in the internal flow channel of the water-cooled plate can accelerate the heat dissipation, so as to quickly reduce the battery temperature and ensure that the battery operating temperature is in a healthy state. There is usually a certain gap between the battery module and the water-cooled plate for coating thermal conductive adhesive. The thermal conductive adhesive can improve the thermal conductivity of the heat from the battery cell to the surface of the water-cooled plate. Before the water-cooled plate is coated with glue, the system is usually debugged and verified by preparing the first piece. At present, the process of preparing the first piece is time-consuming and the reliability is insufficient.
[0066] The above problems are caused by the fact that, in the first-piece preparation process of the glue coating system, too many processes need to be completed manually, and manual operation is time-consuming and unreliable.
[0067] Based on the above problems, an embodiment of the present application provides a glue coating system, which includes a carrying mechanism, a transfer mechanism and a glue coating mechanism. The carrying mechanism can carry a glue-containing part for containing the colloid, and the transfer mechanism can move the carrying mechanism between a starting position and a glue connecting position. When the transfer mechanism transfers the carrying mechanism to the glue connecting position, the glue coating mechanism releases the colloid to the glue-containing part in the carrying mechanism. Therefore, in the first-piece preparation process of the glue coating system, the glue connecting step can be automated through the cooperation of the carrying mechanism and the transfer mechanism, so as to reduce manual intervention in the first-piece preparation process of the glue coating system, reduce the first-piece preparation time of the glue coating system, and improve the working efficiency and reliability of the glue coating system.
[0068] See also Figure 1 and Figure 2 , Figure 1 is a schematic diagram of a glue coating system provided by an embodiment of the present application; Figure 2 It is a structural schematic diagram of the bearing mechanism of the gluing system provided in one embodiment of the present application.
[0069] First, as Figure 1 and Figure 2As shown, the present application provides a glue coating system 1, which includes a carrying mechanism 11, a transfer mechanism 13 and a glue coating mechanism 12. The carrying mechanism 11 is used to carry a glue container, and the glue container is used to contain a colloid. The carrying mechanism 11 includes a first fixing portion 111, and the first fixing portion 111 includes a recessed fixing groove 1111, and the fixing groove 1111 is used to contain the glue container; and / or the carrying mechanism 11 includes a second fixing portion 112, and the second fixing portion 112 includes a limiting area 1121 and a surrounding limiting area A plurality of limiting members 1122 are arranged in the positioning area 1121, the limiting area 1121 is used to accommodate the glue-containing member, and the limiting members 1122 are used to limit the glue-containing member; the gluing mechanism 12 is used to release the glue to the glue-containing member; the transfer mechanism 13 is arranged on one side of the gluing mechanism 12, wherein the gluing system 1 includes a starting position and a gluing position, the gluing mechanism 12 can release the glue to the glue-containing member of the supporting mechanism 11 located at the gluing position, and the transfer mechanism 13 is used to move the supporting mechanism 11 between the starting position and the gluing position.
[0070] In the scheme of the embodiment of the present application, the gluing system 1 includes a carrying mechanism 11, a transfer mechanism 13 and a gluing mechanism 12. The carrying mechanism 11 can carry a glue-containing part for containing the colloid, and the transfer mechanism 13 can move the carrying mechanism 11 between the starting position and the gluing position. When the transfer mechanism 13 transfers the carrying mechanism 11 to the gluing position, the gluing mechanism 12 releases the colloid to the glue-containing part in the carrying mechanism 11. Therefore, in the first-piece preparation process of the gluing system 1, the gluing step can be automated through the cooperation of the carrying mechanism 11 and the transfer mechanism 13, so as to reduce manual intervention in the first-piece preparation process of the gluing system 1, reduce the first-piece preparation time of the gluing system 1, and improve the working efficiency and reliability of the gluing system 1. The carrying mechanism 11 includes a first fixing portion 111 and / or a second fixing portion 1 12, in order to improve the connection stability between the supporting mechanism 11 and the glue-containing part and improve the reliability of the glue coating system 1, the first fixing part 111 includes a recessed fixing groove 1111, and the glue-containing part can be accommodated in the fixing groove 1111, that is, the supporting mechanism 11 can accommodate a glue-containing part with a higher height through the fixing groove 1111, and a limiting area 1121 is provided on the supporting mechanism 11, and the second fixing part 112 includes a limiting area 1121 and a plurality of limiting members 1122 arranged around the limiting area 1121, the limiting area 1121 is used to accommodate the glue-containing part, and the limiting members 1122 are used to limit the glue-containing part, so that the supporting mechanism 11 can carry a glue-containing part with a lower height but a larger cross-sectional area in the height direction, so that the supporting mechanism 11 can be applied to different steps of first piece preparation, thereby improving the adaptability of the supporting mechanism 11.
[0071] Before the production line of the glue coating system 1 is officially started, it is necessary to prepare the first piece to calibrate the system. The first piece preparation process or verification process may include at least one of glue weight inspection, glue shear force inspection and glue ratio inspection.
[0072] The glue coating system 1 includes a carrying mechanism 11, which is used to carry a glue-containing part, and the glue-containing part is used to contain a colloid. The glue-containing part is a carrier for containing a colloid for subsequent processes. The glue-containing part and the carrying mechanism 11 are detachably arranged so that subsequent steps can be conveniently performed after the glue-containing part is glued. The material of the glue-containing part can be metal, polymer material, fiber material, etc. The specific shape and specifications of the glue-containing part can be set by oneself. For example, the glue-containing part is a paper cup or a plastic cup.
[0073] The carrying mechanism 11 is used to carry and store the plastic containers, so that the transfer mechanism 13 can move a plurality of plastic containers at the same time by moving the carrying mechanism 11 .
[0074] The transfer mechanism 13 is used to move the carrier mechanism 11 between the glue connection position and the starting position. The transfer mechanism 13 can be a robotic arm or an AGV (Automated Guided Vehicle) trolley, etc. In order to improve the efficiency of the coating system and reduce the cost of the coating system, the transfer mechanism 13 can be reused as the transfer mechanism 13 for transferring the heat exchange plate on the production line when the coating system is officially running. Therefore, the size of the carrier mechanism 11 should be close to the size of the heat exchange plate on the coating system production line to facilitate the transfer mechanism 13 to fix the carrier mechanism 11.
[0075] After the adhesive-containing part is placed on the carrying mechanism 11, the carrying mechanism 11 is connected to the transfer mechanism 13 at the starting position, and then the transfer mechanism 13 transfers the carrying mechanism 11 to the gluing position, where the gluing mechanism 12 releases the glue to the adhesive-containing part. Thus, the gluing process of the first piece preparation can be automatically performed without the need for operators to go near the gluing mechanism 12 to glue, which improves the problem of insufficient reliability of manual gluing.
[0076] The first fixing portion 111 and / or the second fixing portion 112 on the carrying mechanism 11 are both used to fix the adhesive container to reduce the risk of the adhesive container being misplaced or slipping when the transfer mechanism 13 transfers the carrying mechanism 11 .
[0077] The carrying mechanism 11 includes one of the first fixing portion 111 or the second fixing portion 112, so that the carrying mechanism 11 can be applied to plastic containers of different shapes, thereby reducing the difficulty of processing the carrying mechanism 11. Alternatively, the carrying mechanism 11 includes both the first fixing portion 111 and the second fixing portion 112, so that the carrying mechanism 11 can adapt to plastic containers of two different shapes, thereby improving the adaptability of the carrying mechanism 11.
[0078] The first fixing portion 111 includes a recessed fixing groove 1111. Specifically, the shape and size of the fixing groove 1111 can be flexibly set according to the actual size and shape of the plastic container. For example, the fixing groove 1111 is cylindrical or prism-shaped. The first fixing portion 111 may include a plurality of fixing grooves 1111 so that one supporting mechanism 11 can accommodate different numbers of plastic containers.
[0079] The shape of the glue container matches the fixing groove 1111, so the glue container is suitable for containing the colloid and reducing the risk of colloid overflow. Therefore, the glue container is suitable for the step of weighing the colloid in the first piece preparation process.
[0080] The second fixing portion 112 includes a limiting region 1121 and a plurality of limiting members 1122 disposed around the limiting region 1121. Specifically, the shape of the limiting region 1121 is flexibly set according to the shape of the actual adhesive container. For example, the limiting region 1121 is rectangular or circular.
[0081] The edge of the plastic container overlaps with the edge of the limiting area 1121, so that the limiting member 1122 arranged around the limiting area 1121 can contact the plastic container, and thus the limiting member 1122 can be clamped on the plastic container. The shape of the plastic container matches the limiting area 1121, so that the plastic container can be in a plate shape, which is suitable for the step of testing the shear force of the colloid during the preparation of the first piece.
[0082] In some embodiments, Figure 1 and Figure 2 As shown, the glue coating system 1 also includes a glue container, the supporting mechanism 11 includes a first fixed portion 111, the glue container includes a first glue container, the first glue container includes a recessed receiving groove, and the receiving groove is used to receive the colloid; or, the supporting mechanism 11 includes a second fixed portion 112, the glue container includes a second glue container, the second glue container is in a flat plate shape, and a side surface of the second glue container facing away from the supporting mechanism 11 is used to carry the colloid.
[0083] In these embodiments, the supporting mechanism 11 includes a first fixed portion 111, the glue container includes a first glue container, the first glue container includes a recessed receiving groove, the receiving groove is used to receive and restrain the colloid, and the first glue container is convenient for weighing. Through the cooperation between the first fixed portion 111 and the first glue container, the glue coating system 1 can be applied to the inspection of the weight of the colloid during the preparation of the first piece; the supporting mechanism 11 includes a second fixed portion 112, the glue container includes a second glue container, the second glue container is in a flat plate shape, and a side surface of the second glue container facing away from the supporting mechanism 11 is used for carrying the colloid. Through the cooperation between the second fixed portion 112 and the second glue container, the glue coating system 1 can be applied to the inspection of the shear force of the colloid during the preparation of the first piece.
[0084] The plastic container includes a first plastic container and a second plastic container. The first plastic container is matched with the first fixing portion 111 , and the second plastic container is matched with the second fixing portion 112 .
[0085] The first plastic container includes a receiving groove for receiving the colloid, and the glue coating mechanism 12 releases the colloid into the receiving groove of the first plastic container. Before assembling the first plastic container on the supporting mechanism 11, the weight of the first plastic container itself is marked, and then after injecting the colloid into the first plastic container, the total weight of the first plastic container and the colloid is weighed to obtain the weight of the colloid in the first plastic container.
[0086] Optionally, the first plastic container includes a body and an isolation membrane, the containing groove is opened in the body, the isolation membrane can be detachably covered on the inner wall of the containing groove, the body material has a high structural strength so that the body can be used multiple times, and the isolation membrane is used to isolate the colloid and the body to reduce the risk of the colloid corroding the body or the body material interfering with the colloid. Alternatively, the first plastic container can be a paper cup.
[0087] The second adhesive container is in the form of a flat plate, the transfer mechanism 13 transfers the carrier mechanism 11 to the adhesive coating position, the adhesive coating mechanism 12 releases the adhesive to the surface of the second adhesive container, and then the transfer mechanism 13 transfers the carrier mechanism 11 to the starting position, and then attaches the other side plate, the two plates are bonded by the adhesive, and then the adhesive shear force test of the first piece can be carried out. Exemplarily, the second adhesive container is an aluminum plate.
[0088] In some embodiments, Figure 1 and Figure 2 As shown, the fixing groove 1111 includes two sub-fixing grooves 1112 spaced apart along the first direction X, the two sub-fixing grooves 1112 are respectively used to accommodate the glue-containing parts, and the glue coating mechanism 12 includes two glue outlets spaced apart, the two glue outlets are respectively used to release the glue to the glue-containing parts located in the two sub-fixing grooves 1112.
[0089] In these embodiments, the fixing groove 1111 includes two sub-fixing grooves 1112 spaced apart along the first direction X, the glue containing parts are respectively placed in the two sub-fixing grooves 1112, and the glue coating mechanism 12 includes two glue outlets spaced apart, and the two glue outlets respectively release the glue to the glue containing parts located in the two sub-fixing grooves 1112, so that the two glue containing parts can respectively receive different colloids, so that the glue coating system 1 can be used to inspect the colloid ratio during the first piece preparation process.
[0090] The glue of the glue coating mechanism 12 is a mixture of two different colloids. In order to test the ratio of the colloids, it is necessary to test the quality of each glue separately. Therefore, two sub-fixed grooves 1112 are set on the carrier mechanism 11, and two glue containers are placed in the sub-fixed grooves 1112. When the transfer mechanism 13 transfers the carrier mechanism 11 to the glue connection position, the two glue outlets of the glue coating mechanism 12 correspond to the glue containers located in the two sub-fixed grooves 1112, and the colloid is injected into the two glue containers respectively. After that, the two glue containers are weighed respectively to determine the ratio of the two glues.
[0091] When the glue coating system 1 is in operation, the glue coating mechanism 12 coats the material with mixed glue, so the glue coating mechanism 12 also includes a mixing tube connected to the two glue outlets. When the two glue outlets are required to inject glue into the glue-containing parts in the two sub-fixing grooves 1112, the mixing tube needs to be separated from the glue coating mechanism 12 first.
[0092] The spacing between the axes of the two sub-fixing grooves 1112 in the supporting mechanism 11 along the first direction X should be equal to the spacing between the axes of the two glue application ports of the glue application mechanism 12 to reduce the risk of glue overflow when injecting glue into the glue container.
[0093] Alternatively, when the colloid is a mixture of three or more different kinds of colloids, the fixing groove 1111 may include a corresponding number of sub-fixing grooves 1112 to respectively accommodate the colloid-containing parts that can receive each kind of colloid.
[0094] In some embodiments, Figure 1 and Figure 2 As shown, a plurality of fixing grooves 1111 are arranged at intervals along the first direction X, and a spacing L1 between two sub-fixing grooves 1112 located in the same fixing groove 1111 in the first direction X is smaller than a spacing L2 between adjacent fixing grooves 1111 in the first direction X.
[0095] In these embodiments, a plurality of fixing grooves 1111 are spaced apart along the first direction X, and a spacing L1 between two sub-fixing grooves 1112 located in the same fixing groove 1111 in the first direction X is smaller than a spacing L2 between adjacent fixing grooves 1111 in the first direction X. This facilitates accurate matching of the glue container and the glue outlet located in the sub-fixing groove 1112 during the glue ratio inspection process, and improves the problem of mutual interference of glue containers in adjacent fixing grooves 1111 during the colloid weight inspection process.
[0096] During the glue ratio inspection process, since the two sub-fixed grooves 1112 need to match the spacing between the two glue outlets, the spacing L1 between the two sub-fixed grooves 1112 needs to be shortened so that the two glue outlets can accurately inject glue into the two glue-containing parts; and the spacing L2 between adjacent fixed grooves 1111 is larger, because in the process of testing the colloid weight, there is no need to multiply the two colloids separately, thereby increasing the distance between the two glue-containing parts and reducing the risk of colloid mixing in the two glue-containing parts.
[0097] Optionally, the first fixing parts 111 in the carrying mechanism 11 are arranged in an array along the length and width direction of the carrying mechanism 11. A plurality of fixing grooves 1111 are provided on the carrying mechanism 11, so that the plastic container can be arranged in different fixing grooves 1111 according to actual conditions. By setting different tracks for the transfer mechanism 13, the plastic container can be arranged in the fixing grooves 1111 at different positions according to actual conditions.
[0098] In some embodiments, Figure 1 and Figure 2 As shown, the supporting mechanism 11 includes a first fixed part 111, the gluing system 1 includes a weighing mechanism 14, the gluing system 1 includes a weighing position, the weighing position is set between the starting position and the gluing position, the transfer mechanism 13 can move the supporting mechanism 11 between the starting position, the gluing position and the weighing position, and the weighing mechanism 14 is used to obtain the weight information of the glue-containing part in the fixed groove 1111 located at the weighing position.
[0099] In these embodiments, the gluing system 1 also includes a weighing mechanism 14, and the gluing system 1 includes a weighing position, which is set between the starting position and the gluing position. The transfer mechanism 13 can move the carrying mechanism 11 between the starting position, the gluing position and the weighing position, so that the weighing process in the first piece preparation process of the gluing system 1 can also be automatically realized through the cooperation of the transfer mechanism 13 and the carrying mechanism 11, further reducing manual interference in the first piece preparation process to improve the reliability of the gluing system 1.
[0100] The gluing system 1 includes a starting position, a gluing position and a weighing position. Specifically, the transfer mechanism 13 transfers the carrying mechanism 11 from the gluing position to the weighing position to obtain the total weight information of the glue part in the fixed groove 1111 and the glue contained therein, and then transfers it to the starting position; and / or the transfer mechanism 13 transfers the carrying mechanism 11 from the starting position to the weighing position to obtain the weight information of the glue part in the fixed groove 1111, and then transfers the carrying mechanism 11 to the gluing mechanism 12.
[0101] Therefore, by setting a weighing mechanism 14 in the gluing system 1, the weighing process of the colloid can be automated through the cooperation of the transfer mechanism 13, the carrying mechanism 11 and the weighing mechanism 14, thereby improving the reliability of the gluing system 1.
[0102] See also Figure 3 and Figure 4 , Figure 3 yes Figure 2 Bottom view at center A; Figure 4 yes Figure 1 Schematic diagram of the enlarged structure at point B in the middle.
[0103] In some embodiments, Figures 1 to 4 As shown, a partial area of the bottom of the fixed groove 1111 is penetrated with a through hole, and the weighing mechanism 14 includes a base 141 and a weighing part 142 protruding from the base 141. The weighing part 142 can be passed through the through hole and abut against the plastic container in the fixed groove 1111, so that the weighing mechanism 14 can obtain the weight information of the plastic container.
[0104] In these embodiments, a partial area of the bottom of the fixing groove 1111 is penetrated by a through hole, and the weighing mechanism 14 includes a base 141 and a weighing part 142 protruding from the base 141. The weighing part 142 can be passed through the through hole and abut against the plastic container in the fixing groove 1111, so that the weighing mechanism 14 can accurately obtain the weight information of the plastic container and reduce the influence of other components on the weighing accuracy of the weighing mechanism 14.
[0105] A through hole is provided in a part of the bottom area of the fixing groove 1111. Specifically, Figure 3 As shown, the bottom of the fixing groove 1111 includes a first area 1113 and a second area 1114 surrounding the first area 1113 , and the through hole passes through the first area 1113 , so the second area 1114 at the bottom of the fixing groove 1111 can stop the plastic component.
[0106] The weighing mechanism 14 includes a base 141 and a weighing portion 142 protruding from the base 141. The weighing portion 142 can be inserted into the through hole and abut against the bottom of the plastic container to obtain the weight information of the plastic container, and the weighing portion 142 will not be disturbed by the weight of the supporting mechanism 11 or the second plastic container. Exemplarily, the weighing portion 142 can be a pressure sensor.
[0107] The arrangement of the weighing parts 142 matches the arrangement of the sub-fixing grooves 1112 , so that the weighing mechanism 14 can simultaneously obtain weight information of multiple plastic containers.
[0108] In some embodiments, Figure 1 and Figure 2As shown, the gluing system 1 further comprises an isolation mechanism 15 , which is arranged around the gluing mechanism 12 and the transfer mechanism 13 . A working window 151 is provided through the isolation mechanism 15 , and the starting position is located in the working window 151 .
[0109] In these embodiments, the isolation mechanism 15 is arranged around the gluing mechanism 12 and the transfer mechanism 13, and a working window 151 is arranged through the isolation mechanism 15, and the starting position is located in the working window 151, so as to reduce the risk of accidents caused by the gluing mechanism 12 and the transfer mechanism 13 and improve the reliability of the gluing system 1.
[0110] The isolation mechanism 15 is arranged around the gluing mechanism 12 and the transfer mechanism 13 to separate the operator or other personnel and equipment from the gluing mechanism 12 and the transfer mechanism 13 when the system is working, so as to reduce the risk of mutual interference between the equipment and safety accidents caused by the equipment.
[0111] The isolation mechanism 15 can be disposed around the gluing mechanism 12 and the transfer mechanism 13 ; or the isolation mechanism 15 and other devices can be disposed around the gluing mechanism 12 and the transfer mechanism 13 together.
[0112] The isolation mechanism 15 can be a fence or an isolation board, etc.
[0113] The isolation mechanism 15 is provided with a working window 151, and the starting position is set at the working window 151, so that after the plastic container is set on the carrier mechanism 11, the transfer mechanism 13 grabs the carrier mechanism 11 at the working window 151; and the transfer mechanism 13 will place the carrier mechanism 11 outside the working window 151, so that the operator can detach the plastic container from the carrier mechanism 11 at the working window 151. This not only makes it convenient for the operator to pick up the carrier mechanism 11, but also reduces the contact between the operator and the transfer mechanism 13. There is no need to handle the plastic container when the transfer mechanism 13 grabs the carrier mechanism 11, which greatly improves the safety of the system, and there is no need to set up an additional platform for placing the carrier mechanism 11, saving equipment costs.
[0114] The shape of the working window 151 can be freely designed. For example, the working window 151 is rectangular.
[0115] In some embodiments, Figure 1 and Figure 2As shown, a first sliding member extending along the thickness direction of the isolation mechanism 15 is arranged in the working window 151; a second sliding member 113 is arranged at the edge of the supporting mechanism 11, and the first sliding member and the second sliding member 113 are relatively movably arranged along the thickness direction of the isolation mechanism 15, wherein a first stop member is arranged at one end of the working window 151 away from the transfer mechanism 13, and a second stop member 114 is arranged at one end of the supporting mechanism 11 close to the transfer mechanism 13, and the first stop member stops at the second stop member 114 along the thickness direction of the isolation mechanism 15.
[0116] In these embodiments, the first sliding member and the first stop member provided on the isolation mechanism 15 and the second sliding member 113 and the second stop member 114 provided on the carrying mechanism 11 cooperate with each other to reduce the operating difficulty and time of the carrying mechanism 11 at the working window 151, thereby improving the efficiency of the coating system and reducing the risk of safety accidents caused by the carrying system detaching from the working window 151.
[0117] Through the cooperation of the first sliding part and the second sliding part, the supporting mechanism 11 and the working window 151 can move relatively along the thickness direction of the isolation mechanism 15. One of the first sliding part and the second sliding part is a slider, and the other of the first sliding part and the second sliding part is a slide groove.
[0118] A first stopper is provided at one end of the working window 151 away from the transfer mechanism 13, and a second stopper 114 is provided at one end of the supporting mechanism 11 close to the transfer mechanism 13. The first stopper stops at the second stopper 114 along the thickness direction of the isolation mechanism 15, so that the supporting mechanism 11 cannot be separated from the working window 151 from the side of the isolation mechanism 15 away from the glue coating mechanism 12. Therefore, there is no need to manually lift the supporting mechanism 11, which saves time; and can reduce the risk of safety accidents caused by the supporting mechanism 11 separating from the working window 151; the transfer mechanism 13 can grab the supporting mechanism 11 from the side of the working window 151 close to the coating mechanism and perform subsequent steps, and the transfer mechanism 13 can place the supporting mechanism 11 in the working window 151 from the side of the working window close to the coating mechanism.
[0119] The first stopper and the second stopper 114 are both protrusions, and the two protrusions of the first stopper and the second stopper 114 can stop each other along the thickness direction of the isolation mechanism 15; or one of the first stopper and the second stopper 114 is a groove, and the other of the first stopper and the second stopper 114 is an elastic protrusion, so that when the elastic protrusion is accommodated in the groove, the supporting mechanism 11 stops at the working window 151.
[0120] See also Figure 5 , Figure 5 It is a flow chart of a control method provided by an embodiment of the present application.
[0121] Second, as Figure 1 and Figure 5 As shown, the present application provides a control method, which is applied to the gluing system 1 of the first aspect embodiment above, and the control method includes:
[0122] Step S1: placing the plastic container on the supporting mechanism 11;
[0123] Step S2: instructing the transfer mechanism 13 to transfer the supporting mechanism 11 from the starting position to the gluing position;
[0124] Step S3: the glue coating mechanism 12 releases glue to the glue receiving member located at the glue connection position.
[0125] In the technical solution of the embodiment of the present application, after the glue-receiving part is set on the supporting mechanism 11, the transfer mechanism 13 can transfer the supporting mechanism 11 from the starting position to the gluing position, and the gluing mechanism 12 releases the colloid to the glue-receiving part located at the gluing position. Therefore, in the first-piece preparation process of the gluing system 1, the gluing step can be automated through the cooperation of the supporting mechanism 11 and the transfer mechanism 13, so as to reduce manual intervention in the first-piece preparation process of the gluing system 1, reduce the first-piece preparation time of the gluing system 1, and improve the working efficiency and reliability of the gluing system 1.
[0126] Optionally, after step S3 , the gluing mechanism 12 is instructed to transfer the supporting mechanism 11 from the gluing position to the starting position.
[0127] In step S1 , the adhesive container may be installed on the supporting mechanism 11 mechanically or manually.
[0128] In step S2, the running track of the transfer mechanism 13 between the starting position and the glue joining position can be set by itself.
[0129] In some embodiments, Figure 1 and Figure 2 As shown, the bearing mechanism 11 includes a first fixing portion 111, and the first fixing portion 111 is a fixing groove 1111 arranged concavely. The gluing system 1 also includes a weighing mechanism 14, and the gluing system 1 also includes a weighing position.
[0130] Step S1 includes:
[0131] Step S11: placing the plastic container in the fixing groove 1111 of the supporting mechanism 11;
[0132] Step S3 includes:
[0133] Step S31: the glue coating mechanism 12 releases glue to the glue containing member in the fixing groove 1111 located at the glue connection position;
[0134] After step S3,
[0135] Step S41: instructing the transfer mechanism 13 to move the carrying mechanism 11 to a weighing position;
[0136] Step S42: instructing the weighing mechanism 14 to obtain the weight information of the plastic container located at the weighing position.
[0137] In these embodiments, after the gluing mechanism 12 releases the colloid to the carrying mechanism 11, the transfer mechanism 13 moves the carrying mechanism 11 to the weighing mechanism 14, so that the weighing process in the first piece preparation process of the gluing system 1 can also be automated through the cooperation of the transfer mechanism 13 and the carrying mechanism 11, further reducing manual interference in the first piece preparation process to improve the reliability of the gluing system 1.
[0138] In step S11, the weight D1 of the plastic container itself is obtained.
[0139] In step S42, the weight information of the plastic container at the weighing position is the weight of the plastic container body and the plastic contained in the plastic container plus D2. D3 is the difference between D2 and D1, and D3 is the weight of the plastic.
[0140] In some embodiments, Figure 1 and Figure 2 As shown, the glue coating mechanism 12 includes two glue outlets spaced apart, and the fixing groove 1111 includes two sub-fixing grooves 1112 spaced apart along the first direction X. In step S11, the following steps are included:
[0141] Step S111: placing two plastic containers in two sub-fixing grooves 1112 of the supporting mechanism 11 respectively;
[0142] Step S31 includes:
[0143] Step S311: the glue coating mechanism 12 releases glue from two glue outlets to the glue-containing parts in the two sub-fixing grooves 1112 respectively;
[0144] Step S42 includes:
[0145] Step S421: instruct the weighing mechanism 14 to respectively obtain the weight information of the plastic containers in the two sub-fixing grooves 1112 located at the weighing position.
[0146] In these embodiments, through the above scheme, the two glue outlets of the glue coating system 1 release the colloid to the glue-containing parts in the two sub-fixed grooves 1112 respectively, and then the transfer mechanism 13 transfers the carrying mechanism 11 to the weighing mechanism 14 to obtain the weight information of the glue-containing parts in the two sub-fixed grooves 1112 respectively, so that the glue coating system 1 can be used to inspect the colloid ratio during the preparation process of the first piece.
[0147] As described above, in step S111, the weight values of the two plastic containers themselves can be obtained. In step S421, the weight information of the plastic container at the weighing position is the weight of the plastic container body and the plastic inside it.
[0148] Step S311 includes separating the mixing tube from the glue coating mechanism 12 , and then the two glue outlets of the glue coating mechanism 12 release the glue to the glue containing parts in the two sub-fixing grooves 1112 .
[0149] In some embodiments, Figures 1 to 4 As shown, the glue coating system 1 includes a carrying mechanism 11, a transfer mechanism 13, a glue coating mechanism 12, a weighing mechanism 14 and an isolation mechanism 15. The carrying mechanism 11 is used to carry the glue container, and the glue container is used to contain the colloid; the carrying mechanism 11 includes a first fixing portion 111 and a second fixing portion 112, the first fixing portion 111 is a recessed fixing groove 1111, and the fixing groove 1111 is used to contain the glue container. The carrying mechanism 11 includes a limiting area 1121, and the second fixing portion 112 is a plurality of limiting members 1122 arranged around the limiting area 1121, and the limiting area 1121 is used to contain the glue container. The limiting members 1 122 is used to limit the glue-containing part; the fixed groove 1111 includes two sub-fixed grooves 1112 spaced apart along the first direction X, the two sub-fixed grooves 1112 are respectively used to accommodate the glue-containing part, the glue-spreading mechanism 12 includes two glue outlets spaced apart, the two glue outlets are respectively used to release the glue to the glue-containing part located in the two sub-fixed grooves 1112, the multiple fixed grooves 1111 are spaced apart along the first direction X, the spacing between the two sub-fixed grooves 1112 located in the same fixed groove 1111 in the first direction X is smaller than the spacing between the adjacent fixed grooves 1111 in the first direction X, and the glue-spreading mechanism 12 is used to release the glue to the glue-containing part;
[0150] The transfer mechanism 13 is arranged on one side of the glue coating mechanism 12, wherein the glue coating system 1 includes a starting position, a glue connection position and a weighing position, the weighing position is arranged between the starting position and the glue connection position, the glue coating mechanism 12 can release the glue to the glue-containing part of the carrier mechanism 11 located at the glue connection position, the transfer mechanism 13 can move the carrier mechanism 11 between the starting position, the glue connection position and the weighing position, the weighing mechanism 14 is used to obtain the weight information of the glue-containing part in the fixed groove 1111 located at the weighing position; a through hole is penetrated through a part of the bottom area of the fixed groove 1111, the weighing mechanism 14 includes a base 141 and a weighing part 142 protruding from the base 141, the weighing part 142 can be penetrated through the through hole and abut against the glue-containing part in the fixed groove 1111, so that the weighing mechanism 14 can obtain the weight information of the glue-containing part;
[0151] The isolation mechanism 15 is wound around the gluing mechanism 12 and the transfer mechanism 13, and a working window 151 is set through the isolation mechanism 15. The starting position is located in the working window 151, and a first sliding member extending along the thickness direction of the isolation mechanism 15 is set in the working window 151; a second sliding member 113 is set at the edge of the supporting mechanism 11, and the first sliding member and the second sliding member 113 are relatively movable along the thickness direction of the isolation mechanism 15, wherein a first stopper is set at the end of the first sliding member away from the transfer mechanism 13, and a second stopper 114 is set at the end of the second sliding member 113 close to the transfer mechanism 13, and the first stopper stops at the second stopper 114 along the thickness direction of the isolation mechanism 15.
[0152] In the scheme of the embodiment of the present application, the gluing system 1 includes a carrying mechanism 11, a transfer mechanism 13 and a gluing mechanism 12. The carrying mechanism 11 can carry a glue-containing part for containing the colloid, and the transfer mechanism 13 can move the carrying mechanism 11 between a starting position and a gluing position. When the transfer mechanism 13 transfers the carrying mechanism 11 to the gluing position, the gluing mechanism 12 releases the colloid to the glue-containing part in the carrying mechanism 11. Therefore, in the first-piece preparation process of the gluing system 1, the gluing step can be automated through the cooperation of the carrying mechanism 11 and the transfer mechanism 13, so as to reduce manual intervention in the first-piece preparation process of the gluing system 1, reduce the first-piece preparation time of the gluing system 1, and improve the working efficiency and reliability of the gluing system 1.
[0153] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them; although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present application, and they should all be included in the scope of the claims and specification of the present application. In particular, as long as there is no structural conflict, the various technical features mentioned in the various embodiments can be combined in any way. The present application is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.
Claims
1. A gluing system, characterized in that: include: A bearing mechanism, used for bearing a plastic container, the plastic container is used for containing a colloid, the bearing mechanism comprises a first fixing portion, the first fixing portion comprises a fixing groove arranged in a concave manner, the fixing groove is used for containing the plastic container, and / or the bearing mechanism comprises a second fixing portion, the second fixing portion comprises a limiting area and a plurality of limiting members arranged around the limiting area, the limiting area is used for containing the plastic container, and the limiting members are used for limiting the plastic container; A glue-spreading mechanism, used for releasing glue to the glue-containing member; The transfer mechanism is arranged on one side of the gluing mechanism. The glue coating system includes a starting position and a glue connection position, the glue coating mechanism can release glue to the glue container of the carrier mechanism located at the glue connection position, and the transfer mechanism is used to move the carrier mechanism between the starting position and the glue connection position. The fixing groove comprises two sub-fixing grooves spaced apart along a first direction, the two sub-fixing grooves are respectively used to accommodate the glue-containing parts, the glue-applying mechanism comprises two glue outlets spaced apart, the two glue outlets are respectively used to release glue to the glue-containing parts located in the two sub-fixing grooves, so that the two glue-containing parts can respectively accommodate different glues, The carrying mechanism includes a first fixed part, the gluing system includes a weighing mechanism, the gluing system includes a weighing position, the weighing position is arranged between the starting position and the gluing position, the transfer mechanism can move the carrying mechanism between the starting position, the gluing position and the weighing position, the weighing mechanism is used to obtain the weight information of the glue container in the fixed groove located at the weighing position, a partial area of the bottom of the fixed groove is penetrated by a through hole, the weighing mechanism includes a base and a weighing part protruding from the base, the weighing part can be passed through the through hole and abut against the glue container in the fixed groove, the arrangement of the weighing part matches the arrangement of the sub-fixed grooves, so that the weighing mechanism can simultaneously obtain the weight information of the glue container in the two sub-fixed grooves.
2. The gluing system according to claim 1, characterized in that: The glue coating system further comprises the glue container, the bearing mechanism comprises a first fixing portion, the glue container comprises a first glue container, the first glue container comprises a concave receiving groove, and the receiving groove is used to receive the colloid; Alternatively, the bearing mechanism includes a second fixing portion, the adhesive container includes a second adhesive container, the second adhesive container is in a flat plate shape, and a side surface of the second adhesive container facing away from the bearing mechanism is used for bearing the colloid.
3. The gluing system according to claim 1, characterized in that: The plurality of fixing grooves are arranged at intervals along the first direction, and a distance between two sub-fixing grooves located in the same fixing groove in the first direction is smaller than a distance between adjacent fixing grooves in the first direction.
4. The gluing system according to claim 1, characterized in that: The gluing system further comprises an isolation mechanism, which is arranged around the gluing mechanism and the transfer mechanism. A working window is provided through the isolation mechanism, and the starting position is located in the working window.
5. The gluing system according to claim 4, characterized in that: A first sliding member extending along the thickness direction of the isolation mechanism is arranged in the working window; a second sliding member is arranged at the edge of the supporting mechanism, and the first sliding member and the second sliding member are relatively movable along the thickness direction of the isolation mechanism. A first stopper is provided at one end of the working window away from the transfer mechanism, and a second stopper is provided at one end of the isolation mechanism close to the transfer mechanism. The first stopper stops at the second stopper along the thickness direction of the isolation mechanism.
6. A control method, applied to the gluing system according to any one of claims 1 to 5, characterized in that: The control method comprises: The adhesive container is arranged on the carrying mechanism; Instructing the transfer mechanism to transfer the support mechanism from the starting position to the glue connection position; The glue coating mechanism is caused to release glue to the glue containing member located at the glue connection position.
7. The control method according to claim 6, characterized in that: The bearing mechanism includes a first fixing portion, the first fixing portion is a fixing groove arranged in a concave manner, the gluing system also includes a weighing mechanism, and the gluing system also includes a weighing position. The step of arranging the adhesive container on the supporting mechanism includes: The plastic container is arranged in the fixing groove of the supporting mechanism; The step of causing the glue coating mechanism to release glue to the glue receiving member located at the glue connection position includes: The glue coating mechanism releases glue to the glue containing member in the fixing groove at the glue connection position; After the step of causing the glue coating mechanism to release glue to the glue receiving member located at the glue connection position, Instructing the transfer mechanism to move the carrying mechanism to the weighing position; The weighing mechanism is enabled to obtain weight information of the plastic container located at the weighing position.
8. The control method according to claim 7, characterized in that: The glue coating mechanism includes two glue outlets spaced apart, the fixing groove includes two sub-fixing grooves spaced apart along a first direction, and the step of placing the glue container in the fixing groove of the bearing mechanism includes: The two adhesive containing members are respectively arranged in the two sub-fixing grooves of the carrying mechanism; The step of causing the glue coating mechanism to release glue to the glue containing member in the fixing groove located at the glue connection position includes: The glue coating mechanism releases glue from the two glue outlets to the glue containing parts in the two sub-fixing grooves respectively; The step of enabling the weighing mechanism to obtain the weight information of the plastic container located at the weighing position includes: The weighing mechanism is instructed to respectively obtain the weight information of the glue containing parts in the two sub-fixing grooves located at the weighing position.
Citation Information
Patent Citations
Gluing monitoring equipment and gluing quality monitoring method
CN113546811A
Bearing pad and robot
CN217751500U
