A method for mining with unequal strength filling at the end of a working face

Through the unequal strong filling mining method at the end of the working face, the stress arch foot position and filling parameters are changed, and the problems of rock formation movement and resource waste in traditional coal mining are solved, the resource recovery rate and safety are improved, and the gangue treatment volume is reduced. Risk of top plate collapse.

CN118088259BActive Publication Date: 2024-11-19HUAINAN NORMAL UNIV
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202410390425.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-02
Publication Date
2024-11-19
Estimated Expiration
2044-04-02

AI Technical Summary

Technical Problem

Traditional coal mining methods lead to rock formation movement, roof collapse and bottom plate water inrush accidents, and serious resource waste. The existing filling methods are low in pushing and mining speed and cannot effectively control rock formation movement.

Method used

The unequal strong filling mining method of the working face is adopted. By determining the shortest distance, filling distance, filling gradient and parameters of the unequal strong filling section, the position of the stress arch foot is changed, the degree of stress concentration and the range of influence are reduced, and the coal mining is carried out. During the process, paste is filled to support the top plate.

Benefits of technology

The coal column width and stress gradient are reduced, resource recovery and safety are improved, gangue generation and treatment volume are reduced, the roof support capacity is enhanced, and the roof collapse and bottom water inrush accidents are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118088259B_ABST
    Figure CN118088259B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of coal mining, and specifically is a method for mining with unequal strength filling at the end of a working face, comprising the following steps: S1, determining the shortest distance of the unequal strength filling section; determining the shortest distance from the starting filling position to the stop line of the coal mining working face, when the distance is too short, the filling body does not completely become the arch foot of the stress arch, and the filling purpose is not achieved; S2, determining the designed filling distance of the working face according to demand; determining the actual filling distance according to specific conditions including the filling distance, the stress environment at the end of the working face, the amount of processed gangue, the mining connection, and the resource recovery rate; by changing the position of the arch foot of the working face stress arch, the arch foot position is transferred from the coal pillar in front of the working face to the unequal strength filling section, thereby reducing the stress concentration degree in front of the working face; the unequal strength filling increases the range of the arch foot of the stress arch, reduces the stress gradient, reduces the influence on the stress of the underlying coal layer, reduces the size of the coal pillar protecting the laneway between the upper and lower coal seams, and increases the safety of coal pillar recovery.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mining, and in particular to a method for mining with unequal strength filling at the end of a working face. Background Art

[0002] During coal mining, the rocks above are broken and fall, forming high stress around the mining area and advanced stress in front of the working face. The rock movement caused by mining is one of the main causes of mine accidents. The traditional mining method is to leave large tunnel coal pillars. When mining coal seams, the coal seams are mined from top to bottom, and the large tunnel coal pillars are left wider and wider, which often causes waste of resources. When the coal pillars are recovered at the end of mining, the coal pillars are isolated islands, which poses a great safety hazard. In addition, improper handling often fails to effectively control the movement of rock strata, and may also lead to roof collapse and floor water inrush accidents.

[0003] In many coal mines' current filling methods, filling materials in the goaf can effectively control surface subsidence and reduce the impact on the surrounding environment. However, the existing filling methods still have some drawbacks; for example, the pushing speed of the filling mining face is low, and the complete filling does not match the amount of solid waste generated. In view of this shortcoming, we have proposed a method of unequal strength filling mining at the end of the working face. Summary of the invention

[0004] The purpose of the present invention is to provide a method for unequal strength filling mining at the end of a working face to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the present invention provides the following technical solution: a method for mining with unequal strength filling at the end of a working face, comprising the following steps:

[0006] S1, determine the shortest distance of the unequal strength filling section; determine the shortest distance from the starting filling position to the stop line of the coal mining face. If the distance is too short, the filling body will not completely become the arch foot of the stress arch, and the filling purpose will not be achieved;

[0007] S2, determine the designed filling distance of the working face according to the demand; determine the actual filling distance according to specific conditions including filling distance, stress environment at the end of the working face, amount of waste rock to be processed, mining continuity, and resource recovery rate;

[0008] S3, determine the filling gradient of different strengths; determine the percentage of the unit filling distance. When the filling rate is 0%, it is not filled. Continue filling until it is close to the full filling rate;

[0009] S4, determine the matching between the unequal strength filling parameters and the actual working face; change the arch foot position of the working face stress arch, so that the arch foot position is transferred from the coal pillar in front of the working face to the unequal strength filling section, reducing the stress concentration degree and influence range in front of the working face;

[0010] Preferably, the coal mining face forms space due to mining, and the space behind the frame is dumped with gangue and filled with paste to form support for the roof. The characteristic is that the supporting effect on the roof is gradually enhanced, so that the collapse height of the roof is gradually reduced until it stops collapsing.

[0011] Preferably, the filling distance is equal to the strike length of the working face, and the filling width is equal to the width of the working face; the shortest distance of the unequal strength filling sections is the leading influence distance of the working face or the single square distance.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] By reducing the width of the coal pillar of this coal seam: changing the arch foot position of the working face stress arch, determining the high stress influence range after mining, determining the shortest distance based on the high stress influence range, and transferring the arch foot position from the coal pillar in front of the working face to the unequal strength filling section, reducing the stress concentration and influence range in front of the working face;

[0014] By reducing the width of the lower coal pillar, the unequal strength filling increases the range of the stress arch foot, reduces the stress gradient, and reduces the impact on the stress of the lower coal. The end of the lower coal is also mined with unequal strength filling, so that the working face can be pushed through the stress change area.

[0015] This solution can carry out filling within the working face, reduce the size of the protective coal pillars in the large tunnels, improve the resource recovery rate, balance the generation and disposal of gangue, and protect the environment; reduce the size of the coal pillars protecting the tunnels in the development or preparation of the current coal seam and the underlying coal seam, and increase the safety of coal pillar recovery; the two sides of the coal pillar recovery working face are filling bodies, which are highly safe and can be filled in time after recovery, making it safer when recovering coal pillars. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the stress of the working surface in an example of the present invention;

[0017] Figure 2 It is a comparison chart between the final stage unequal strength filling in the example of the present invention and the traditional collapse method. DETAILED DESCRIPTION

[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0019] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0020] Example:

[0021] See also Figure 1-2 The present invention provides a technical solution for a method for mining with unequal strength filling at the end of a working face, comprising the following steps:

[0022] S1, determine the shortest distance of the unequal strength filling section; determine the shortest distance from the starting filling position to the stop line of the coal mining face. When the distance is too short, the filling body does not completely become the arch foot of the stress arch, resulting in failure to achieve the filling purpose;

[0023] S2, determine the designed filling distance of the working face according to the demand; determine the actual filling distance according to specific conditions including filling distance, stress environment at the end of the working face, amount of waste rock to be processed, mining continuity, and resource recovery rate;

[0024] S3, determine the filling gradient of different strengths; determine the percentage of unit filling distance, when the filling rate is 0%, it is not filled, and then the filling rate increases until it is close to saturation, and when the filling rate changes to close to 100%, it is fully filled;

[0025] S4, determine the matching between the unequal strength filling parameters and the actual working face; change the arch foot position of the working face stress arch, so that the arch foot position is transferred from the coal pillar in front of the working face to the unequal strength filling section, reducing the stress concentration degree and influence range in front of the working face;

[0026] The coal mining face forms space due to mining, and the space behind the frame is filled with waste and paste to support the roof. The characteristic is that the supporting effect on the roof is gradually enhanced, so that the collapse height of the roof is gradually reduced until it stops collapsing;

[0027] The filling distance is equal to the strike length of the working face, and the filling width is equal to the width of the working face; the shortest distance of the unequal strength filling section is the leading influence distance of the working face or the single square distance;

[0028] For example: the working face pushing length is 2000m, the working face length is 240m, the working face mine pressure advance influence range is 180m, and the ratio of coal gangue to coal is 15%;

[0029] Determine the shortest distance of the unequal strength filling section. According to the observation of the working face mine pressure, the shortest distance of the unequal strength filling section is the leading influence range of the working face mine pressure (180m) or a square distance (240m);

[0030] The unequal strength filling distance required to process all the gangue is 400m (estimated). When the unequal strength filling distance of 400m meets the requirements of the stress environment, mining connection, resource recovery rate, etc. at the end of the working face, the unequal strength filling distance of 400m is determined; when the unequal strength filling distance of 400m does not meet the requirements of the stress environment, mining connection, resource recovery rate, etc. at the end of the working face, the unequal strength filling distance is re-determined;

[0031] Determine the filling gradient of unequal strength, linear gradient or nonlinear gradient; according to the gradient calculation formula: In vector calculus, the gradient of a scalar field is a vector field; the gradient at a point in a scalar field points in the direction of the fastest increase in the scalar field, and the length of the gradient is this maximum rate of change; more strictly speaking, the gradient of a function from Euclidean space Rn to R is the best linear approximation at a point in Rn; in this sense, the gradient is a special case of the Jacobian matrix; in the case of a real-valued function of a single variable, the gradient is just the derivative, or, for a linear function, the slope of the line;

[0032] Determine the matching of unequal-strength filling parameters with the actual working face, and match the unequal-strength filling gradient, filling distance, mining continuity, resource recovery rate, and processed gangue volume; fill the end section of the working face according to the determined unequal-strength filling parameters.

[0033] The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention; therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the attached claims rather than the above description, and it is intended to include all changes within the meaning and scope of the equivalent elements of the claims in the present invention, and any figure mark in the claims should not be regarded as limiting the claims involved; although the embodiments of the present invention have been shown and described, it is understandable to those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for mining with unequal strength filling at the end of a working face. It is characterized in that The steps include: S1, determine the shortest distance of the unequal strength filling section; determine the shortest distance from the starting filling position to the stop line of the coal mining face. If the distance is too short, the filling body will not completely become the arch foot of the stress arch, and the filling purpose will not be achieved; S2, determine the designed filling distance of the working face according to the demand; determine the actual filling distance according to specific conditions including filling distance, stress environment at the end of the working face, amount of waste rock to be processed, mining continuity, and resource recovery rate; S3, determine the filling gradient of different strengths; determine the percentage of the unit filling distance. When the filling rate is 0%, it is not filled. Continue filling until it is close to the full filling rate; S4, determine the matching between the unequal strength filling parameters and the actual working face; change the arch foot position of the working face stress arch, so that the arch foot position is transferred from the coal pillar in front of the working face to the unequal strength filling section, reducing the stress concentration degree and influence range in front of the working face.

2. A method for mining with unequal strength filling at the end of a working face according to claim 1, Features: The coal mining face forms space due to mining, and the space behind the frame is filled with waste rock and paste to support the roof. The characteristic of this system is that the supporting effect on the roof is gradually enhanced, which gradually reduces the height of the roof collapse until it stops collapsing.

3. A method for mining with unequal strength filling at the end of a working face according to claim 1, Features: The filling distance is equal to the strike length of the working face, and the filling width is equal to the width of the working face; the shortest distance of the unequal strength filling section is the working face advance influence distance or the single square distance.

Citation Information

Patent Citations

  • Coal mine gob-side entry retaining roadside segment bearing unequal strength support principle and application

    CN101922292A

  • Roadside proper yielding unequal combined filling structure of gob-side entry retaining and construction method

    CN102705002A

  • Design method for underground sorting and in-situ filling engineering of coal gangues

    CN109931095A

  • Pre-filling method for reducing end mining coal pillar

    CN113482711A

  • Method for designing parameters of long-wall roadway-by-roadway cemented filling coal face

    CN114017103A