A task planning method for railway-road combined transport based on NT-Dijkstra

Through the NT-Dijkstra algorithm combined with the transportation hub network topology map, the route conflict and time constraint problems in the railway-road combined transport task planning are solved, the real-time route planning of the railway-road combined transport and the meeting of the task arrival time limit are realized, and a targeted solution is provided. plan.

CN118115068BActive Publication Date: 2024-10-15CHINESE PEOPLES LIBERATION ARMY UNIT 96901
View PDF 8 Cites -1 Cited by

Patent Information

Application Number
CN202311623050.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-11-30
Publication Date
2024-10-15
Estimated Expiration
2043-11-30

Smart Images

  • Figure CN118115068B_ABST
    Figure CN118115068B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of intelligent logistics, and specifically relates to a task planning method for rail-road combined transport based on NT-Dijkstra, including: Step 1: Construction of a transport hub network topology map; Step 2: Design and application of the NT-Dijkstra algorithm; The method proposes real-time capacity scheduling task planning to solve the real-time route conflict problem. Under the constraints of the maximum capacity of the line and the used capacity, the maximum available capacity of the rail-road road changes in real time. The present invention combines real-time capacity scheduling with the Dijkstra algorithm to plan the shortest route under the constraints of dynamic capacity and satellite access; The method proposes task scheduling that meets the arrival time limit to solve the problem of task arrival time. Being late for the arrival time limit will affect the execution of the task, so the present invention globally schedules tasks based on the arrival time limit so that all tasks are completed within the arrival time limit.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of intelligent logistics, and in particular relates to a task planning method for railway-road combined transport based on NT-Dijkstra. Background Art

[0002] The task planning of rail-road intermodal transport is to complete the logistics guarantee task, and intelligently plan the route and time of the rail-road intermodal transport to guarantee the task under certain constraints. At present, the technology for solving the transportation task planning problem at home and abroad is mainly intelligent optimization algorithm, which is divided into single-objective shortest path planning and multi-objective scheduling planning. There are many single-objective route planning technologies. Qin Kepeng summarized the principles of Dijkstra algorithm and Floyd intelligent algorithm and their practical applications in the shortest path. Michalewicz used matrix optimization algorithm to improve the encoding method of genetic intelligence algorithm, so as to optimize the transportation path. This method only plans the route without considering the time and flow constraints, which may lead to route conflicts. There are relatively few multi-objective scheduling planning technologies. Li Jiayan used the improved ant colony intelligent algorithm to solve the total transportation time, arrival time and vehicle scheduling time of the path for the vehicle scheduling problem. This method focuses on the characteristics of specific problems and cannot be directly transplanted to the task planning of rail-road intermodal transport.

[0003] In summary, there is currently no targeted solution for intelligent rail-road intermodal transport task planning for logistics at home and abroad. Summary of the invention

[0004] 1. Technical issues to be resolved

[0005] The technical problem to be solved by the present invention is: how to provide a targeted solution for intelligent railway-road combined transport task planning of logistics.

[0006] (II) Technical solution

[0007] In order to solve the above technical problems, the present invention provides a task planning method for railway-road combined transport based on NT-Dijkstra, combining the characteristics of railway and road transport, the method includes two steps: construction of a transport hub network topology map and design and application of the NT-Dijkstra algorithm;

[0008] Step 1: Construction of the transport hub network topology map;

[0009] First, a transportation network topology map is constructed based on railway stations and railway lines, highway nodes and highway lines; then, hub points are extracted based on the transportation network, and the transportation network is converted into hub points and sections to form a transportation hub network, reducing the redundancy and complexity of subsequent calculations;

[0010] Step 2: Design and application of NT-Dijkstra algorithm;

[0011] Railway support tasks have the attributes of starting station, terminal station, urgency and required capacity; in the hub network topology diagram, there are constraints of road capacity, mission urgency, arrival time limit and satellite time window;

[0012] The NT-Dijkstra algorithm is used to solve the rail-road combined transport task planning problem, and the route and time planning of each task is obtained under the conditions that are met;

[0013] The implementation process of the NT-Dijkstra algorithm involves three functional modules: emergency processing module, Dijkstra module for real-time capacity scheduling, and time adjustment optimization module;

[0014] During the implementation of the NT-Dijkstra algorithm in step 2, the initial input is the starting station, terminal station, task arrival time limit, task urgency and hub network topology of the railway-highway transport task, and the output is the departure time of each task from the starting station, the arrival time of the terminal station, the highway route and the railway route; the processing steps of the NT-Dijkstra algorithm are as follows:

[0015] Step 21: Input all tasks into the urgency processing module to obtain a list of urgency order of each task;

[0016] Step 22: Plan the most urgent task at the moment, and obtain a shortest route plan that meets the conditions through the Dijkstra module of real-time capacity scheduling while satisfying the satellite's time window constraints;

[0017] Step 23: The time adjustment optimization module adjusts the time and route according to the task arrival time limit;

[0018] Step 24: Update the hub network and recalculate the maximum available capacity on the hub line at each time;

[0019] Step 25: Determine whether the urgency list is empty. If it is empty, it means that all tasks have been planned, and the planning results of all guarantee tasks are directly output; if it is not empty, jump to step 22.

[0020] Wherein, the step 1 comprises:

[0021] Step 11: Construction of transportation network topology

[0022] According to graph theory, the railway and highway network is abstracted into a transportation network topology graph A = (V, E, W, S), where V is the transportation node, including all railway stations T and highway nodes G, E is the railway and highway line between the transportation nodes, W is the distance between the railway and highway lines, and S is the maximum available capacity under the road capacity constraint, which changes over time and is a dynamic variable.

[0023] Step 12: Hub network topology construction

[0024] In the transportation network, for a station, if there is only one railway line or highway line passing through it, or if there are three or more railway lines or highway lines passing through it at the same time, then the station is called a hub station, and the lines between stations are called sections. The length of the section is the sum of the lengths of all railway lines between the hub stations, and the maximum capacity of the section is the minimum capacity of all railway lines or highway lines between the hub stations.

[0025] Wherein, in said step 12, in the hub network topology diagram, non-hub nodes are deleted to simplify the road network and reduce the time complexity of the algorithm.

[0026] Wherein, in the step 21, the urgency processing module is used to determine the order of guaranteeing task planning according to the urgency of the task.

[0027] Wherein, in the step 21, the urgency processing module first determines the major urgency level according to the urgency of the task itself;

[0028] Then determine the order of tasks at the same emergency level. Divide the straight-line distance between the starting station and the end station of the task by the task time limit to estimate the slowest acceptable speed of the task. Then sort the tasks from the highest to the lowest speed to get the order of urgency of the tasks at the same level.

[0029] Finally, all urgency levels are merged to obtain a list of all tasks in order of urgency.

[0030] Among them, in step 22, the Dijkstra module of real-time capacity scheduling is used to find a shortest route that meets the conditions from the railway hub network where the capacity changes in real time; the satellite's presence in the air affects the loading and unloading time of the task, and the hub network's capacity changes over time; therefore, the factor of the satellite's presence in the air needs to be considered in the real-time capacity path planning.

[0031] Wherein, the step 22 specifically includes:

[0032] Step 221: Initialize the hub network, the waiting list, the starting point s and the end point t of the task. The waiting list is used to record the current candidate shortest path;

[0033] Step 222: Search for reachable points of the point to be inspected according to the dynamic hub network and the to-be-inspected table, and the dynamic hub network records the real-time available transport capacity; first search for all adjacent points of the point, and the points whose transport capacity meets the transport capacity requirements during the time period when the point passes; determine whether a reachable point is found, if so, jump to step 223; if not, jump to step 225;

[0034] Step 223: determine whether the point is a transfer point for railway and highway / highway and railway. If so, determine whether the current time is within the satellite over-the-air time window. If so, wait for the satellite over-the-air time and then jump to step 224. If not, jump directly to step 224. If the point is not a transfer point, jump directly to step 224.

[0035] Step 224: Calculate the minimum distance f(x) from the starting point through the point to be examined to all adjacent points, where f(x)=g(x)+h(x), g(x) is the shortest distance from the starting point to the point to be examined, and h(x) is the distance from the point to be examined to the adjacent points;

[0036] Step 225: Update the to-be-investigated table. There are three cases at this time. If there is an adjacent point and the adjacent point is a point that does not appear in the investigation table, it is directly added to the to-be-investigated table and the shortest distance from it to the starting point is recorded; if there is an adjacent point and the adjacent point already appears in the to-be-investigated table, the sizes of the two are compared and updated to the value with the smaller distance; if no adjacent point is found, a fallback process is performed, the to-be-investigated point is kicked out of the to-be-investigated table, and marked as blocked in the next round, and kicked out at the end of the next round;

[0037] Step 226: Select the next round of points to be examined from the table to be examined according to the path length. If the point is the end point, find the shortest route. If it is not the end point, jump to step 222 for the next round of iteration.

[0038] Wherein, in step 23, the time adjustment optimization module is used to ensure that all tasks arrive within the time limit as much as possible.

[0039] Among them, in the step 23, after the scheduling of the Dijkstra module of the real-time capacity scheduling, the time adjustment optimization module is used to find a feasible path. At this time, each task has two situations:

[0040] (1) If the arrival time is within the arrival time limit, the time adjustment optimization module directly outputs the task;

[0041] (2) If the arrival time is within the arrival time limit, the time adjustment optimization module finds all conflicting tasks that are involved in the scheduling in the Dijkstra module of real-time capacity scheduling, and inserts the tasks in the urgency list from the back to the front in front of the conflicting tasks, and re-plans the tasks until all tasks meet the arrival time limit requirements; if the arrival time limit requirements cannot be met after adjustment, it means that the task cannot be completed within the time window under the conditions of the transportation network, and it is directly output and handed over to human decision-making.

[0042] The method uses the NT-Dijkstra algorithm to solve the railway-highway transportation path planning problem in the transportation delivery task with task time window and road capacity constraints.

[0043] (III) Beneficial effects

[0044] According to the complex railway and highway network, road capacity, task urgency, arrival time limit, satellite time window and other characteristics of railway transportation tasks, this method proposes a railway and highway combined transportation task planning method based on the NT-Dijkstra (Network Traffic Constraint And Time Windows Dijkstra) intelligent algorithm. The full name of the NT-Dijkstra algorithm is the Dijkstra algorithm with network traffic constraints and task time window constraints. It is a general algorithm that schedules transportation tasks in time and solves the problem of real-time route conflicts.

[0045] The existing technologies either only focus on route optimization or have different focuses and poor portability, and are unable to solve the railway security problem. In view of the above problems, the railway-highway combined transport task planning method based on the NT-Dijkstra algorithm proposed in the present invention has the following advantages:

[0046] (1) A real-time capacity scheduling task planning is proposed to solve the real-time route conflict problem. Under the constraints of the maximum capacity of the line and the used capacity, the maximum available capacity of the railway and highway changes in real time. The present invention combines real-time capacity scheduling with the Dijkstra algorithm to plan the shortest route under the constraints of dynamic capacity and satellite access;

[0047] (2) A task scheduling method that meets the arrival deadline is proposed to solve the problem of task arrival time. If the task is executed later than the arrival deadline, the execution of the task will be affected. Therefore, the present invention globally schedules tasks based on the arrival deadline so that all tasks are completed within the arrival deadline.

[0048] (3) High universality and portability. The path optimization problem with road network flow restrictions and task time window constraints is a common problem. The NT-Dijkstra algorithm proposed in this paper can be directly applied to such problems and is highly practical.

[0049] (4) This method is specifically aimed at the problem of intermodal transport between rail and highway. It sets road transport capacity and satellite airspace constraints, builds a hub network, and plans support tasks. It is currently the only targeted solution. BRIEF DESCRIPTION OF THE DRAWINGS

[0050] Figure 1 This is a conceptual diagram of the transportation network topology.

[0051] Figure 2 This is a conceptual diagram of the hub network topology.

[0052] Figure 3 This is the flow chart of the NT-Dijkstra algorithm.

[0053] Figure 4 This is a schematic diagram of the working process of the Dijkstra module for real-time capacity scheduling. DETAILED DESCRIPTION

[0054] In order to make the purpose, content, and advantages of the present invention more clear, the specific implementation methods of the present invention are further described in detail below in conjunction with the accompanying drawings and examples.

[0055] In order to solve the problems in the prior art, the present invention provides a task planning method for railway-road combined transport based on NT-Dijkstra, which uses the NT-Dijkstra algorithm to solve the railway-road transport path planning problem in the transport delivery task with task time window and road capacity constraints; combining the characteristics of railway and road transport, the method includes two steps: constructing a topological map of a transport hub network and designing and applying the NT-Dijkstra algorithm;

[0056] Step 1: Construction of the transport hub network topology map;

[0057] First, a transportation network topology map is constructed based on railway stations and railway lines, highway nodes and highway lines; then, hub points are extracted based on the transportation network, and the transportation network is converted into hub points and sections to form a transportation hub network, reducing the redundancy and complexity of subsequent calculations;

[0058] The step 1 comprises:

[0059] Step 11: Construction of transportation network topology

[0060] According to graph theory, the railway and highway network is abstracted into a transportation network topology graph A = (V, E, W, S), where V is the transportation node, including all railway stations T and highway nodes G, E is the railway and highway line between the transportation nodes, W is the distance between the railway and highway lines, and S is the maximum available capacity under the road capacity constraint, which changes over time and is a dynamic variable.

[0061] like Figure 1 Shown is a conceptual diagram of the transportation network topology.

[0062] Step 12: Hub network topology construction

[0063] In the transportation network, for a station, if there is only one railway line or highway line passing through it, or if there are three or more railway lines or highway lines passing through it at the same time, then the station is called a hub station, and the lines between stations are called sections. The length of the section is the sum of the lengths of all railway lines between the hub stations, and the maximum capacity of the section is the minimum capacity of all railway lines or highway lines between the hub stations.

[0064] like Figure 2 The figure shows the concept diagram of hub network topology, where G2, G3, G4, and G6 are non-hub nodes, which are deleted to simplify the road network and reduce the time complexity of the algorithm;

[0065] Step 2: Design and application of NT-Dijkstra algorithm;

[0066] Railway support tasks have the attributes of starting station, terminal station, urgency and required capacity; in the hub network topology diagram, there are constraints of road capacity, mission urgency, arrival time limit and satellite time window;

[0067] The NT-Dijkstra algorithm is used to solve the rail-road combined transport task planning problem, and the route and time planning of each task is obtained under the conditions that are met;

[0068] The implementation process of the NT-Dijkstra algorithm involves three functional modules: emergency processing module, Dijkstra module for real-time capacity scheduling, and time adjustment optimization module;

[0069] like Figure 3 It is the main flow chart of NT-Dijkstra algorithm. During the implementation of NT-Dijkstra algorithm in step 2, the initial input is the starting station, terminal station, task arrival time limit, task urgency and hub network topology diagram of the railway-highway combined transport task, and the output is the departure time of each task from the starting station, the arrival time of the terminal station, the highway route and the railway route; the processing steps of NT-Dijkstra algorithm are as follows:

[0070] Step 21: Input all tasks into the urgency processing module to obtain a list of urgency order of each task;

[0071] Step 22: Plan the most urgent task at the moment, and obtain a shortest route plan that meets the conditions through the Dijkstra module of real-time capacity scheduling while satisfying the satellite's time window constraints;

[0072] Step 23: The time adjustment optimization module adjusts the time and route according to the task arrival time limit;

[0073] Step 24: Update the hub network and recalculate the maximum available capacity on the hub line at each time;

[0074] Step 25: Determine whether the urgency list is empty. If it is empty, it means that all tasks have been planned, and the planning results of all guarantee tasks are directly output; if it is not empty, jump to step 22.

[0075] Wherein, in the step 21, the urgency processing module is used to determine the order of guaranteeing task planning according to the urgency of the task.

[0076] Wherein, in the step 21, the urgency processing module first determines the major urgency level according to the urgency of the task itself;

[0077] Then determine the order of tasks at the same emergency level. Divide the straight-line distance between the starting station and the end station of the task by the task time limit to estimate the slowest acceptable speed of the task. Then sort the tasks from the highest to the lowest speed to get the order of urgency of the tasks at the same level.

[0078] Finally, all urgency levels are merged to obtain a list of all tasks in order of urgency;

[0079] Among them, in step 22, the Dijkstra module of real-time capacity scheduling is used to find a shortest route that meets the conditions from the railway hub network where the capacity changes in real time; the satellite's presence in the air affects the loading and unloading time of the task, and the hub network's capacity changes over time; therefore, the factor of the satellite's presence in the air needs to be considered in the real-time capacity path planning.

[0080] Wherein, the step 22 specifically includes:

[0081] Step 221: Initialize the hub network, the waiting list, the starting point s and the end point t of the task. The waiting list is used to record the current candidate shortest path;

[0082] Step 222: Search for reachable points of the point to be inspected according to the dynamic hub network and the to-be-inspected table, and the dynamic hub network records the real-time available transport capacity; first search for all adjacent points of the point, and the points whose transport capacity meets the transport capacity requirements during the time period when the point passes; determine whether a reachable point is found, if so, jump to step 223; if not, jump to step 225;

[0083] Step 223: determine whether the point is a transfer point for railway and highway / highway and railway. If so, determine whether the current time is within the satellite over-the-air time window. If so, wait for the satellite over-the-air time and then jump to step 224. If not, jump directly to step 224. If the point is not a transfer point, jump directly to step 224.

[0084] Step 224: Calculate the minimum distance f(x) from the starting point through the point to be examined to all adjacent points, where f(x)=g(x)+h(x), g(x) is the shortest distance from the starting point to the point to be examined, and h(x) is the distance from the point to be examined to the adjacent points;

[0085] Step 225: Update the to-be-investigated table. There are three cases at this time. If there is an adjacent point and the adjacent point is a point that does not appear in the investigation table, it is directly added to the to-be-investigated table and the shortest distance from it to the starting point is recorded; if there is an adjacent point and the adjacent point already appears in the to-be-investigated table, the sizes of the two are compared and updated to the value with the smaller distance; if no adjacent point is found, a fallback process is performed, the to-be-investigated point is kicked out of the to-be-investigated table, and marked as blocked in the next round, and kicked out at the end of the next round;

[0086] Step 226: Select the next round of points to be examined from the table to be examined according to the path length. If the point is the end point, find the shortest route. If it is not the end point, jump to step 222 for the next round of iteration.

[0087] Wherein, in step 23, the time adjustment optimization module is used to ensure that all tasks arrive within the time limit as much as possible.

[0088] After the Dijkstra module of real-time capacity scheduling, the time adjustment optimization module is used to find a feasible path. At this time, each task has two situations:

[0089] (1) If the arrival time is within the arrival time limit, the time adjustment optimization module directly outputs the task;

[0090] (2) If the arrival time is within the arrival time limit, all conflicting tasks involved in the scheduling in the Dijkstra module of real-time capacity scheduling are found, and the tasks are inserted in the urgency list from the back to the front before the conflicting tasks, and the tasks are re-planned until all tasks meet the arrival time limit requirements; if the arrival time limit requirements cannot be met after adjustment, it means that the task cannot be completed within the time window under the conditions of the transportation network, and it is directly output and handed over to human decision-making.

[0091] The key points in the above technical solution are:

[0092] (1) Hub network topology map construction method. Including the construction process of the transportation network topology map, the processing methods of railway stations, railway lines, highway nodes, highway lines, etc., the hub network topology map construction process, and the generation method of hub stations, sections, and section capacity;

[0093] (2) Main process of NT-Dijkstra algorithm: First, the task order is arranged through the urgency module, then the feasible route is obtained through the Dijkstra module of real-time capacity scheduling, and finally the task scheduling time is adjusted through the time adjustment optimization module.

[0094] (3) The Dijkstra module for real-time transport scheduling is the core of the NT-Dijkstra algorithm. It combines the Dijkstra algorithm with real-time transport scheduling to plan the shortest transport route without conflicts.

[0095] (4) Time adjustment optimization module: This part is the key to the NT-Dijkstra algorithm and determines whether the railway security task can be completed according to the time limit. There are two cases for discussion: if the time limit is less than the arrival time limit, the task is directly output; if the time limit is greater than the arrival time limit, the conflicting task is adjusted to ensure that the current task and the planned task can arrive within the arrival time limit.

[0096] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A task planning method for railway-road combined transport based on NT-Dijkstra, characterized in that: The full name of NT-Dijkstra is Dijkstra algorithm with road network flow restriction and task time window constraint; Combining the characteristics of railway and road transportation, the method includes two steps: construction of a transportation hub network topology map and design and application of the NT-Dijkstra algorithm; Step 1: Construction of the transport hub network topology map; First, a transportation network topology map is constructed based on railway stations and railway lines, highway nodes and highway lines; Then, hub points are extracted based on the transportation network, and the transportation network is converted into hub points and sections to form a transportation hub network, thus reducing the redundancy and complexity of subsequent calculations; Step 2: Design and application of NT-Dijkstra algorithm; Railway support tasks have the attributes of starting station, terminal station, urgency and required capacity; in the topology diagram of the transport hub network, there are constraints on road capacity, mission urgency, arrival time limit and satellite time window; The NT-Dijkstra algorithm is used to solve the rail-road combined transport task planning problem, and the route and time planning of each task is obtained under the conditions that are met; The implementation process of the NT-Dijkstra algorithm involves three functional modules: emergency processing module, Dijkstra module for real-time capacity scheduling, and time adjustment optimization module; During the implementation of the NT-Dijkstra algorithm in step 2, the initial input is the starting station, terminal station, task arrival time limit, task urgency and transportation hub network topology map of the railway-highway combined transport task, and the output is the departure time of each task from the starting station, the arrival time of the terminal station, the highway route and the railway route; the processing steps of the NT-Dijkstra algorithm are as follows: Step 21: Input all tasks into the urgency processing module to obtain a list of urgency order of each task; Step 22: Plan the most urgent task at the moment, and obtain a shortest route plan that meets the conditions through the Dijkstra module of real-time capacity scheduling while satisfying the satellite's time window constraints; Step 23: The time adjustment optimization module adjusts the time and route according to the task arrival time limit; Step 24: Update the hub network and recalculate the maximum available capacity on the hub line at each time; Step 25: Determine whether the urgency list is empty. If it is empty, it means that all tasks have been planned, and the planning results of all guarantee tasks are directly output; If it is not empty, jump to step 22; The step 1 comprises: Step 11: Construction of transportation network topology According to graph theory, the railway and highway network is abstracted into a transportation network topology graph A = (V, E, W, S), where V is the transportation node, including all railway stations T and highway nodes G, E is the railway and highway line between the transportation nodes, W is the distance between the railway and highway lines, and S is the maximum available capacity under the road capacity constraint, which changes over time and is a dynamic variable. Step 12: Construction of the transport hub network topology In the transportation network, for a station, if there is only one railway line or highway line passing through it, or if there are three or more railway lines or highway lines passing through it at the same time, then the station is called a hub station, and the lines between stations are called sections. The length of the section is the sum of the lengths of all railway lines or highway lines between the hub stations, and the maximum capacity of the section is the minimum capacity of all railway lines or highway lines between the hub stations.

2. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 1, characterized in that: In step 12, in the transport hub network topology diagram, non-hub nodes are deleted to simplify the road network and reduce the time complexity of the algorithm.

3. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 1, characterized in that: In step 21, the urgency processing module is used to determine the order of guaranteeing task planning according to the urgency of the task.

4. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 3 is characterized in that: In the step 21, the urgency processing module first determines the major urgency level according to the urgency of the task itself; Then determine the order of tasks at the same emergency level. Divide the straight-line distance between the starting station and the end station of the task by the task time limit to estimate the slowest acceptable speed of the task. Then sort the tasks from the highest to the lowest speed to get the order of urgency of the tasks at the same level. Finally, all urgency levels are merged to obtain a list of all tasks in order of urgency.

5. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 4, characterized in that: In step 22, the Dijkstra module of real-time capacity scheduling is used to find a shortest route that meets the conditions from the railway hub network where the capacity changes in real time; the satellite's presence in the air affects the loading and unloading time of the task, and the hub network's capacity changes over time; therefore, the factor of the satellite's presence in the air needs to be considered in the real-time capacity path planning.

6. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 1, characterized in that: The step 22 specifically includes: Step 221: Initialize the hub network, the waiting list, the starting point s and the end point t of the task, and the waiting list is used to record the current candidate shortest path; Step 222: Search for reachable points of the point to be inspected according to the dynamic hub network and the to-be-inspected table, and the dynamic hub network records the real-time available transport capacity; first search for all adjacent points of the point, and the points whose transport capacity meets the transport capacity requirements during the time period when the point passes; determine whether a reachable point is found, if so, jump to step 223; if not, jump to step 225; Step 223: determine whether the point is a transfer point for railway and highway / highway and railway. If so, determine whether the current time is within the satellite over-the-air time window. If so, wait for the satellite over-the-air time and then jump to step 224. If not, jump directly to step 224. If the point is not a transfer point, jump directly to step 224. Step 224: Calculate the minimum distance f(x) from the starting point through the point to be examined to all adjacent points, where f(x)=g(x)+h(x), g(x) is the shortest distance from the starting point to the point to be examined, and h(x) is the distance from the point to be examined to the adjacent points; Step 225: Update the to-be-investigated table. There are three cases at this time. If there is an adjacent point and the adjacent point is a point that does not appear in the investigation table, it is directly added to the to-be-investigated table and the shortest distance from it to the starting point is recorded; if there is an adjacent point and the adjacent point already appears in the to-be-investigated table, the sizes of the two are compared and updated to the value with the smaller distance; if no adjacent point is found, a fallback process is performed, the to-be-investigated point is kicked out of the to-be-investigated table, and marked as blocked in the next round, and kicked out at the end of the next round; Step 226: Select the next round of points to be examined from the table to be examined according to the path length. If the point is the end point, find the shortest route. If it is not the end point, jump to step 222 for the next round of iteration.

7. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 6, characterized in that: In step 23, the time adjustment optimization module is used to ensure that all tasks arrive within the time limit as much as possible.

8. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 1, characterized in that: In step 23, after the Dijkstra module of real-time capacity scheduling is used to schedule, the time adjustment optimization module is used to find a feasible path. At this time, each task has two situations: (1) If the arrival time is within the arrival time limit, the time adjustment optimization module directly outputs the task; (2) If the arrival time is after the arrival time limit, the time adjustment optimization module finds all conflicting tasks that are involved in the scheduling in the Dijkstra module of real-time capacity scheduling, and inserts the tasks in the urgency list from the back to the front, and re-plans the tasks until all tasks meet the arrival time limit requirements; If the arrival time requirement still cannot be met after adjustment, it means that the task cannot be completed within the time window under the conditions of the transportation network, and it will be directly output and handed over to human decision-making.

9. The task planning method for railway-road combined transport based on NT-Dijkstra as claimed in claim 1, characterized in that: The method uses the NT-Dijkstra algorithm to solve the railway and highway transportation path planning problem in the transportation delivery task with task time window and road capacity constraints.

Citation Information

Patent Citations

  • Motorcade path optimization method and system considering avoidance of satellites

    CN114093189A

  • Multimodal transport planning method and device, electronic equipment and storage medium

    CN114298419A

  • Multi-agent network connection cooperative scheduling planning method and system based on improved time window

    CN114625140A

  • Relay satellite dynamic scheduling method based on task relaxation

    CN115276758A

  • System and method for adaptive path planning

    US20050216181A1