Device and method for transporting and storing multiple energy storage blocks above and below ground in gravity energy storage system of waste mine

By designing the above-ground and underground transportation and storage devices of multiple energy storage blocks in waste mines, combining linear motors and hub motors, using frame structure and slide rail technology, the problems of energy storage block transportation and storage are solved, and the efficiency of energy storage blocks is achieved , automation and collaborative control improve the reliability and efficiency of the system.

CN118125061BActive Publication Date: 2024-11-29CHINA UNIV OF MINING & TECH
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202410308428.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-29
Estimated Expiration
2044-03-18

AI Technical Summary

Technical Problem

The existing technology has failed to effectively solve the transportation and storage problems of energy storage blocks in gravity energy storage systems of linear motors in waste mines at ground or underground locations, especially the coordinated control of multiple energy storage blocks and the accurate arrival of designated locations, which has affected the system. collaborative operation.

Method used

A multi-energy storage block above-ground and underground transportation and storage device in a gravity energy storage system in a waste mine was designed, using frame structure, above-ground and underground transportation tracks, telescopic tracks and multi-channel variable single-channel track technology, combining linear motors and hub motors , realizes the automation, flexible transportation and storage of energy storage blocks, and ensures high flexibility and safety of energy storage blocks through the position unlocking and locking device of the slide rail.

Benefits of technology

It realizes efficient, automated and safe transportation and storage of energy storage blocks, ensures the accuracy and flexibility of coordinated control of multiple energy storage blocks, meets the power generation requirements of gravity energy storage systems, and improves the reliability and efficiency of the system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118125061B_ABST
    Figure CN118125061B_ABST
Patent Text Reader

Abstract

The present invention discloses an above-ground and underground transportation and storage device and method for multiple energy storage blocks in a gravity energy storage system of an abandoned mine, including a frame structure, an energy storage block, and above-ground and underground transportation tracks; the energy storage block can move up and down in the frame structure; the energy storage block finishes the energy storage work in the frame structure and arrives at the above-ground port, enters the storage area of ​​the above-ground energy storage block through the above-ground transportation track, and conversely, the energy storage blocks of different power levels stored in the above-ground storage area can also reach the above-ground port through the above-ground transportation track for power generation; the energy storage block finishes the power generation work in the frame structure and arrives at the underground designated position, enters the storage area of ​​the underground energy storage block through the underground transportation track, and conversely, the energy storage blocks of different power levels stored in the underground storage area can also reach the underground port through the underground transportation track for energy storage. The present invention not only has high automation, high safety and reliability, simple structure, but also takes into account above-ground and underground transportation and storage, and makes reasonable use of space.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of gravity energy storage, and in particular relates to an above-ground and underground transportation and storage device for multiple energy storage blocks in a gravity energy storage system of an abandoned mine. Background Art

[0002] With the continuous development of energy storage technology, gravity energy storage has received more attention as a potential cost-effective, environmentally friendly and reliable energy storage technology. Compared with traditional energy storage technologies, such as battery energy storage systems, gravity energy storage systems have longer life, higher reliability and higher energy density. However, most gravity energy storage systems focus on the research of their power generation and energy storage, especially for systems that use linear motors for gravity energy storage. Different from traditional rotating motors and steel cables for gravity energy storage, their energy storage blocks are independent and detachable, and transportation and storage above or below the ground is a key issue.

[0003] On this basis, the already disclosed Chinese invention patent - A gravity energy storage device and control method based on a permanent magnet linear motor (202210356158.7) proposes a gravity energy storage device in which a permanent magnet linear motor is applied to a gravity energy storage system, and the already accepted Chinese invention patent - Linear motor gravity energy storage device for abandoned mines and its multi-energy storage block collaborative control method (202311611162.4) proposes a linear motor gravity energy storage device for abandoned mines and its multi-energy storage block collaborative control method. Both patents are aimed at the research of gravity energy storage using linear motors in abandoned mines. The number of energy storage blocks can be one or more, but neither of them studies the transportation and storage problems of the energy storage blocks when they reach the ground or underground locations, and there is no research on how multiple energy storage blocks of different power levels stored on the ground or underground can accurately reach the designated location to work when the gravity energy storage system needs them. The lack of this part of the research has a great impact on the timely collaborative operation of multiple energy storage blocks. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention provides a ground and underground transportation and storage device for multiple energy storage blocks in the gravity energy storage system of abandoned mines. This device not only has high automation, high safety and reliability, simple structure, but also takes into account ground and underground transportation and storage, and makes rational use of space. And it can flexibly and continuously transport multiple groups of energy storage blocks to meet the power generation demand of gravity energy storage according to the system's coordinated control signal for multiple energy storage blocks, making the coordinated control of multiple energy storage blocks more accurate and automated.

[0005] The present invention is implemented according to the following technical solutions:

[0006] In a first aspect, the present invention discloses an above-ground and underground transportation and storage device for multiple energy storage blocks in a gravity energy storage system of an abandoned mine, comprising:

[0007] a frame structure extending vertically downward from the ground and having an above-ground port and an underground port;

[0008] An energy storage block is installed in the frame structure, and the energy storage block can move up and down in the frame structure;

[0009] The above-ground transport track, the energy storage block finishes the energy storage work in the frame structure and arrives at the above-ground port, and enters the storage area of ​​the above-ground energy storage block through the above-ground transport track, and conversely, the energy storage block stored in the above-ground storage area arrives at the above-ground port through the above-ground transport track to perform power generation;

[0010] Underground transport track, the energy storage block finishes power generation in the frame structure and reaches the underground port, and enters the storage area of ​​the underground energy storage block through the underground transport track. Conversely, the energy storage block stored in the underground storage area reaches the underground port through the underground transport track to perform energy storage.

[0011] In some embodiments, the ground transport track is installed with a telescopic track at the end close to the ground port. When the energy storage block moves to the ground port, the telescopic track extends into the ground port, and the energy storage block falls into the expanded track and moves to the ground transport track; the track is retracted to open the ground port to ensure that the transportation and storage of other energy storage blocks proceed normally.

[0012] In some embodiments, the above-ground transport track adopts a one-way-to-multiple-way transport track structure, and the one-way track coming out of the above-ground port reaches the storage area of ​​the above-ground energy storage block after multiple forks; the underground transport track adopts a one-way-to-multiple-way transport track structure, and the one-way track coming out of the underground port reaches the storage area of ​​the underground energy storage block after multiple forks.

[0013] In some embodiments, the above-ground transport track and the underground transport track are both composed of a one-way-to-four-way transport track formed by combining a double-opening turnout and a triple-opening turnout.

[0014] In some embodiments, the storage area of ​​the above-ground energy storage block and the storage area of ​​the underground energy storage block are composed of multiple energy storage block storage areas with different power levels, so as to realize the coordinated operation of multiple energy storage blocks; the energy storage block can enter the energy storage block storage area matching its power level through the transportation track.

[0015] In some embodiments, the energy storage block is composed of a weight block, a linear motor primary and a hub motor; the linear motor primary is installed on both sides of the weight block, the hub motor is installed at the bottom of the weight block, and the energy storage block is driven by the hub motor to move on the ground or underground.

[0016] In some embodiments, a slide rail is installed on each side of the frame structure, and the energy storage block is slidably installed on the slide rails on both sides; the slide rail on one side is longer than the slide rail on the other side, and both ends of the long slide rail extend from the ground port and the underground port, and the slide rail is installed with a position unlocking and a position locking device at the extended frame structure part.

[0017] In a second aspect, the present invention discloses a method for above-ground and underground transportation and storage of multiple energy storage blocks in a gravity energy storage system of an abandoned mine: transportation and storage areas for energy storage blocks are established both above and below ground, the energy storage blocks complete energy storage work in the frame structure and arrive at a designated position above ground, and enter the storage area of ​​the above ground energy storage blocks via an above-ground transportation track, and conversely the energy storage blocks stored in the above-ground storage area arrive at the designated position above ground via an above-ground transportation track to perform power generation work; the energy storage blocks complete power generation work in the frame structure and arrive at a designated underground position, and enter the storage area of ​​the underground energy storage blocks via an underground transportation track, and conversely the energy storage blocks stored in the underground storage area arrive at the designated position underground via an underground transportation track to perform energy storage work.

[0018] In some embodiments, the underground transportation and storage area is composed of a transportation track that changes from one track to multiple tracks and a corresponding plurality of energy storage block storage areas of different power levels;

[0019] The steps of the energy storage block working underground are as follows: when the energy storage block finishes power generation and arrives at the designated underground location, the energy storage block is separated from the slide rail, and the energy storage block falls into the underground transport track, and moves on the underground transport track through its own hub motor, and the transport track changes according to the power level of the energy storage block so that the energy storage block enters the designated power level energy storage block storage area to complete the storage work; when a designated power level energy storage block is required to perform energy storage work, the track changes according to the power level of the energy storage block so that the energy storage block enters the designated underground location, and the energy storage block is connected to the slide rail so that the energy storage block performs energy storage work in the frame structure;

[0020] The ground transportation and storage area consists of a telescopic track, a one-way-to-multi-way transportation track, and corresponding energy storage block storage areas of multiple different power levels;

[0021] The steps of the energy storage block working on the ground are as follows: when the energy storage block finishes the energy storage work and arrives at the designated position on the ground, the telescopic track at the entrance of the ground transport track is extended, and the energy storage block is separated from the slide rail, and the energy storage block falls into the ground transport track, and moves on the ground transport track through its own hub motor. After the energy storage block completely passes through this track, the telescopic track is retracted into the entrance of the transport track to ensure that the transportation and storage of other energy storage blocks are carried out normally, and then the transport track is changed according to the power level of the energy storage block so that the energy storage block enters the storage area of ​​the energy storage block with the designated power level to complete the storage work; when the energy storage block with the designated power level is required to generate electricity, the track is changed according to the power level of the energy storage block so that the energy storage block continues to move to the entrance of the transport track. When the energy storage block is about to leave the entrance of the transport track, the telescopic track is extended so that the energy storage block reaches the designated position on the ground, the energy storage block is connected to the slide rail, and the telescopic track is retracted into the entrance of the transport track so that the energy storage block performs energy storage work in the frame structure.

[0022] In some embodiments, when an existing energy storage block is generating electricity, the power generation power required by the power grid increases or in order to suppress the output power fluctuation of a single energy storage block, the coordinated operation of multiple energy storage blocks is required. At this time, energy storage blocks of specified power levels among multiple groups of energy storage blocks of different power levels stored in the ground storage area need to be moved to a specified position on the ground for coordinated work. The transportation track on the ground can change track through the power level demand feedback signal of the energy storage system so that the corresponding energy storage block arrives at the specified position on the ground and works in coordination; and when the power grid is at its peak, the underground transportation and storage device can realize the continuous transportation of multiple groups of energy storage blocks of different power levels to the specified underground position and perform energy storage work.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The present invention combines the technology of train track change and turnout with automation technology; its energy storage block is composed of a linear motor, a weight block and a hub motor, and has the advantage of high integration; the slide rails installed on both sides of the frame structure are different from the conventional installation of the slide rails in the center of the energy storage block, and have high stability and high flexibility. The slide rail is slightly shorter than the other side on one side of the energy storage block entering and exiting the ground and underground positions, which is convenient for the energy storage block to enter and exit and flexibly install and configure; and the slightly longer side slide rail is installed with a position unlocking and position locking device when the energy storage block reaches the designated position on the ground or underground, which has the characteristics of low control difficulty and high flexibility. When the energy storage block reaches the designated position, it can be quickly connected or separated from the slide rail. Both the ground and underground transportation tracks use the double-opening turnout and the three-opening turnout in the technology of train track change and turnout to form a track with one road divided into four roads, so as to flexibly transport the energy storage block into the energy storage block storage area matching its power level; on the contrary, when the gravity energy storage system needs an energy storage block of a specified power level, flexible scheduling can also be achieved through this transportation track, especially for the gravity energy storage system that requires multiple groups of energy storage blocks to work together to generate electricity, flexible scheduling is particularly important. The entrance of the ground transport track adopts a telescopic track to ensure that the energy storage block can safely enter the entrance of the ground transport track when it reaches the designated position on the ground from underground. Correspondingly, the energy storage block can also be safely guaranteed to generate electricity when entering the designated position on the ground. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings are part of the present invention and are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but do not constitute an improper limitation of the present invention. Obviously, the accompanying drawings described below are only some embodiments. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.

[0026] In the attached picture:

[0027] Figure 1 A top view of the overall structure of the multi-energy storage block ground transportation and storage device of the present invention;

[0028] Figure 2 A top view of the overall structure of the multi-energy storage block underground transportation and storage device of the present invention;

[0029] Figure 3 It is a front view of the overall structure of the above-ground and underground transportation and storage device of multiple energy storage blocks of the present invention;

[0030] Figure 4 It is a front view of the gravity energy storage device of the present invention;

[0031] Figure 5 A top view of the above-ground telescopic slide rail of the present invention;

[0032] Figure 6It is a three-dimensional diagram of the overall structure of the above-ground and underground transportation and storage device of multiple energy storage blocks of the present invention.

[0033] Figure identification: 1-energy storage block at a specified position on the ground, 2, 3, 4, 5, 7, 8, 9, 10-energy storage blocks of different power levels, 6-energy storage block at a specified position underground, 11-weight block, 12-linear motor, 13-ground transport track, 14-storage area of ​​ground energy storage block, 15-underground transport track, 16-storage area of ​​underground energy storage block, 17-hub motor, 18-soil, 19-frame structure, 20-slightly longer slide rail with position unlocking and position locking device, 21-slightly shorter slide rail, 22-telescopic track.

[0034] It should be noted that these drawings and textual descriptions are not intended to limit the conceptual scope of the present invention in any way, but are intended to illustrate the concept of the present invention for those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0035] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The following embodiments are used to illustrate the present invention but are not used to limit the scope of the present invention.

[0036] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as “upper”, “lower”, “front”, “back”, “left”, “right”, “vertical”, “inside” and “outside” are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0037] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0038] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6As shown, a ground and underground transportation and storage device for multiple energy storage blocks in a gravity energy storage system of an abandoned mine includes a frame structure 19, energy storage blocks 1-10, a ground transportation track 13, and an underground transportation track 15; the frame structure 19 extends vertically downward from the ground, the frame structure 19 is completely in the soil 18, and has an above-ground port and an underground port; the energy storage blocks are installed in the frame structure 19, and the energy storage blocks can move up and down in the frame structure 19; the energy storage block 1 ends the energy storage work in the frame structure 19 and arrives at the above-ground port, and enters the storage area 14 of the above-ground energy storage blocks through the above-ground transportation track 13, and conversely, the energy storage blocks 2, 3, 4, and 5 of different power levels stored in the above-ground storage area 14 can also reach the above-ground port through the above-ground transportation track 13 to perform power generation; the energy storage block 6 ends the power generation work in the frame structure 19 and arrives at a designated underground position, and enters the storage area 16 of the underground energy storage blocks through the underground transportation track 15, and conversely, the energy storage blocks 7, 8, 9, and 10 of different power levels stored in the underground storage area 16 can also reach the underground port through the underground transportation track 15 to perform energy storage.

[0039] like Figure 5 As shown, the ground transport track 13 is installed with a telescopic track 22 at the end close to the ground port. When the energy storage block 1 moves to the ground port, the telescopic track 22 extends into the ground port, and the energy storage block 1 falls into the unfolded track and moves to the ground transport track 13; the track is retracted to open the ground port to ensure the normal transportation and storage of other energy storage blocks.

[0040] like Figure 1 , Figure 2 , Figure 6 As shown, the storage area 14 of the above-ground energy storage block and the storage area 16 of the underground energy storage block are both composed of multiple energy storage block storage areas with different power levels, which are used to realize the coordinated operation of multiple energy storage blocks; the energy storage blocks can enter the energy storage block storage area matching their power level through the transportation track.

[0041] It should be noted that when existing energy storage blocks are generating electricity, in order to achieve the coordinated operation of multiple energy storage blocks, energy storage blocks of different power levels are required to enter designated positions on the ground for coordinated work. The transportation track on the ground can change track through the power level demand feedback signal of the energy storage system so that the corresponding energy storage blocks can reach the designated position on the ground and work in coordination. It can also realize the continuous transportation of multiple groups of energy storage blocks of different power levels to designated positions underground for energy storage.

[0042] like Figure 1 , Figure 2 , Figure 6As shown, the ground transport track 13 adopts a one-way-to-multiple-way transport track structure, and the one-way track coming out of the ground port reaches the storage area 14 of the ground energy storage block after multiple forks; the underground transport track 15 adopts a one-way-to-multiple-way transport track structure, and the one-way track coming out of the underground port reaches the storage area 16 of the underground energy storage block after multiple forks.

[0043] The preferred solution is provided in this implementation. The ground transport track 13 and the storage area 14 are formed by combining the double-open turnout and the triple-open turnout in the train track changing technology to form a one-way transport track that can be converted into four-way transport tracks and the corresponding four energy storage block storage areas of different power levels (energy storage blocks 2, 3, 4, and 5 of different power levels are placed respectively); the underground transport track 15 and the storage area 16 are formed by combining the double-open turnout and the triple-open turnout in the train track changing technology to form a one-way transport track that can be converted into four-way transport tracks and the corresponding four energy storage block storage areas of different power levels (energy storage blocks 7, 8, 9, and 10 of different power levels are placed respectively).

[0044] It should be noted that the structure and number of the transport track and the storage area are not limited to the above embodiments and can be changed accordingly according to actual needs.

[0045] like Figure 1 , Figure 2 and Figure 3 As shown, the energy storage block 1-10 is composed of a weight block 11, a linear motor 12 and a hub motor 17. The linear motor 12 is installed on both sides of the weight block 11, and the hub motor 17 is installed at the bottom of the weight block 11; the energy storage block 1-10 is driven by the hub motor 17 to move on the ground or underground.

[0046] like Figure 4 As shown, a slide rail 20, 21 is installed on each side of the frame structure 19, and the energy storage blocks are slidably installed on the slide rails 20, 21 on both sides; one side of the slide rails 20 installed on both sides of the frame structure 19 is slightly longer than the other side slide rail 21 above and below the ground, and the slide rail 20 on the slightly longer side is installed with a position unlocking and position locking device when the energy storage blocks 1, 6 reach the specified position above or below the ground.

[0047] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 6 As shown, the underground transport track 15 and the storage area 16 are composed of a one-way to four-way transport track combined with a double-opening switch and a triple-opening switch in the train track change technology and four corresponding energy storage block storage areas with different power levels.

[0048] The steps of the energy storage block 6 working underground are as follows: when the energy storage block 6 finishes the power generation work and arrives at the designated underground position, the slide rail 20 is separated from the energy storage block 6, and the energy storage block 6 falls into the underground transportation track 15, and moves on the underground transportation track 15 through the hub motor 17. The transportation track changes according to the power level of the energy storage block 6 so that the energy storage block 6 enters the storage area of ​​the energy storage block with the designated power level to complete the storage work; when the energy storage blocks 7, 8, 9, 10 with the designated power level are required to perform energy storage work, the energy storage blocks 7, 8, 9, 10 are changed according to the power level of the energy storage blocks 7, 8, 9, 10 so that they enter the designated underground position, and the slide rail 20 connects the energy storage blocks so that the energy storage blocks perform energy storage work.

[0049] like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 As shown, the ground transport track 13 and the storage area 14 are composed of a telescopic track 22, a one-way-to-four-way transport track combined with double-opening turnouts and triple-opening turnouts in train track change technology, and four corresponding energy storage block storage areas with different power levels.

[0050] The steps of the energy storage block 1 working on the ground are as follows: when the energy storage block 1 finishes the energy storage work and arrives at the designated position on the ground, the telescopic track 22 at the entrance of the ground transport track 13 is extended, and the energy storage block 1 here is separated from the slide rail 20, and the energy storage block 1 falls into the ground transport track 13, and moves on the ground transport track 13 through the hub motor 17. After the energy storage block 1 completely passes through this track, the telescopic track 22 retracts into the entrance of the transport track to ensure that the transportation and storage work of other energy storage blocks proceeds normally, and then the transport track changes according to the power level of the energy storage block so that the energy storage block 1 enters The storage area of ​​the energy storage block with the specified power level completes the storage work; when the energy storage blocks 2, 3, 4, 5 with the specified power level need to generate electricity, the track is changed according to the power level of the energy storage blocks 2, 3, 4, 5 so that the energy storage blocks 2, 3, 4, 5 continue to move toward the entrance of the transport track. When the energy storage blocks 2, 3, 4, 5 are about to leave the entrance of the transport track, the telescopic track 22 is extended so that the energy storage blocks 2, 3, 4, 5 reach the specified position on the ground, where the slide rail 20 is connected to the energy storage blocks, and the telescopic track 22 is retracted to the entrance of the transport track, so that the energy storage blocks perform energy storage work.

[0051] Further solutions: Figure 1 and Figure 2As shown, when the existing energy storage block 1 is generating electricity, the power generation power required by the power grid increases or in order to suppress the output power fluctuation of a single energy storage block, the coordinated operation of multiple energy storage blocks is required. At this time, the energy storage blocks of specified power levels among the four groups of energy storage blocks 2, 3, 4, and 5 with different power levels stored in the ground storage area 14 need to be moved to the specified position on the ground for coordinated operation. The ground transportation track 13 can change the track through the power level demand feedback signal of the energy storage system so that the corresponding energy storage blocks 2, 3, 4, and 5 arrive at the specified position on the ground and work in coordination; and when the power grid is at its peak, the underground transportation and storage device can realize the continuous transportation of multiple groups of energy storage blocks 7, 8, 9, and 10 with different power levels to the specified position underground and perform energy storage work.

[0052] In summary, the present invention discloses a device for transporting and storing multiple energy storage blocks above and below ground in a gravity energy storage system for abandoned mines. The device is designed for energy storage systems that currently use linear motors for gravity energy storage in abandoned mines. In order to realize convenient transportation and storage of multiple energy storage blocks above and below ground, the device uses hub motor technology. The energy storage blocks are made of low-cost concrete, linear motors and hub motors. The hub motors are mainly responsible for the movement of the energy storage blocks above or below ground. To facilitate the separation and connection of the energy storage blocks and the slide rails, slide rails are installed on both sides of the mine where the linear motors are not installed to ensure that the energy storage blocks can generate electricity and store energy. One side of the slide rail is slightly longer than the other side above and below ground. The slightly longer side of the slide rail has a slide rail installation position unlocking and position locking device at the corresponding position when the energy storage block reaches the ground or underground. At the same time, the above-ground and underground transport tracks adopt train track-changing switch technology, and the single-track track is transformed into a four-track track through double-opening switch and triple-opening switch to realize the transportation of energy storage blocks of four power levels. Accordingly, transport tracks and storage areas for storing energy storage blocks of four different power levels are built above-ground and underground respectively; in order for the energy storage blocks to reach the ground and enter the transport track safely, a section of telescopic track needs to be built to ensure that the energy storage blocks are transported to the designated track.

[0053] In the description provided herein, a large number of specific details are described. However, it is understood that embodiments of the present invention can be practiced without these specific details. In some instances, well-known methods, structures and techniques are not shown in detail so as not to obscure the understanding of this description.

[0054] In addition, those skilled in the art will understand that, although some embodiments described herein include certain features included in other embodiments but not other features, the combination of features of different embodiments also means being within the scope of protection of the present invention and forming different embodiments. For example, in the above embodiments, those skilled in the art can use them in combination according to the known technical solutions and the technical problems to be solved by this application.

[0055] The above is only a preferred embodiment of the present invention, and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this patent can make some changes or modify the technical contents suggested above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent change and modification made to the above embodiments according to the technical essence of the present invention without departing from the content of the technical solution of the present invention still fall within the scope of the solution of the present invention.

Claims

1. The above-ground and underground transportation and storage device of multiple energy storage blocks in the gravity energy storage system of abandoned mines, It is characterized in that include: a frame structure extending vertically downward from the ground and having an above-ground port and an underground port; An energy storage block is installed in the frame structure, and the energy storage block can move up and down in the frame structure; The above-ground transport track, the energy storage block finishes the energy storage work in the frame structure and arrives at the above-ground port, and enters the storage area of ​​the above-ground energy storage block through the above-ground transport track, and conversely, the energy storage block stored in the above-ground storage area arrives at the above-ground port through the above-ground transport track to perform power generation; Underground transport track, the energy storage block finishes power generation in the frame structure and reaches the underground port, and enters the storage area of ​​the underground energy storage block through the underground transport track, and conversely, the energy storage block stored in the underground storage area reaches the underground port through the underground transport track to perform energy storage work; The ground transport track is provided with a telescopic track at the end close to the ground port. When the energy storage block moves to the ground port, the telescopic track extends into the ground port, and the energy storage block falls into the extended track and then moves to the ground transport track. Retract the track to open the ground port to ensure the normal transportation and storage of other energy storage blocks; The aboveground transport track adopts a one-way-to-multiple-way transport track structure, where the one-way track coming out of the aboveground port branches into multiple paths before reaching the storage area of ​​the aboveground energy storage block; The underground transport track adopts a one-way-to-multi-way transport track structure, and the one-way track coming out of the underground port reaches the storage area of ​​the underground energy storage block after multiple forks; The storage area of ​​the above-ground energy storage block and the storage area of ​​the underground energy storage block are both composed of multiple energy storage block storage areas of different power levels, which are used to realize the coordinated operation of multiple energy storage blocks; the energy storage block can enter the energy storage block storage area matching its power level through the transportation track; A slide rail is installed on each side of the frame structure, and the energy storage block is slidably installed on the slide rails on both sides; The slide rail on one side is longer than the slide rail on the other side, and both ends of the long slide rail extend from the above-ground port and the underground port, and the slide rail is equipped with a position unlocking and locking device at the extended frame structure portion.

2. The above-ground and underground transportation and storage device for multiple energy storage blocks in the gravity energy storage system of abandoned mines according to claim 1, Features: The above-ground transport track and the underground transport track are both formed by combining a double-opening turnout and a triple-opening turnout to form a one-way-to-four-way transport track.

3. The above-ground and underground transportation and storage device for multiple energy storage blocks in the gravity energy storage system of abandoned mines according to claim 1, Features: The energy storage block consists of a weight block, a linear motor primary and a hub motor; the linear motor primary is installed on both sides of the weight block, the hub motor is installed at the bottom of the weight block, and the energy storage block is driven by the hub motor to move on the ground or underground.

4. The above-ground and underground transportation and storage method of multiple energy storage blocks in the gravity energy storage system of abandoned mines, Features: Transport and storage areas for energy storage blocks are established both above and below ground. After the energy storage work is completed in the frame structure, the energy storage block arrives at a designated position above ground, and enters the storage area of ​​the above ground energy storage block via the above ground transport track. On the contrary, the energy storage block stored in the above ground storage area arrives at a designated position above ground via the above ground transport track for power generation. After the energy storage block completes power generation work in the frame structure, it arrives at a designated position underground, and enters the storage area of ​​the underground energy storage block via the underground transport track. On the contrary, the energy storage block stored in the underground storage area arrives at a designated position underground via the underground transport track for energy storage. The underground transportation and storage area consists of a transportation track that changes from one track to multiple tracks and corresponding energy storage block storage areas of multiple different power levels; The steps of the energy storage block working underground are as follows: when the energy storage block finishes power generation and arrives at the designated underground location, the energy storage block is separated from the slide rail, and the energy storage block falls into the underground transport track, and moves on the underground transport track through its own hub motor, and the transport track changes according to the power level of the energy storage block so that the energy storage block enters the designated power level energy storage block storage area to complete the storage work; when a designated power level energy storage block is required to perform energy storage work, the track changes according to the power level of the energy storage block so that the energy storage block enters the designated underground location, and the energy storage block is connected to the slide rail so that the energy storage block performs energy storage work in the frame structure; The ground transportation and storage area consists of a telescopic track, a one-way-to-multi-way transportation track, and corresponding energy storage block storage areas of multiple different power levels; The steps of the energy storage block working on the ground are as follows: when the energy storage block finishes the energy storage work and arrives at the designated position on the ground, the telescopic track at the entrance of the ground transport track is extended, and the energy storage block is separated from the slide rail, and the energy storage block falls into the ground transport track, and moves on the ground transport track through its own hub motor. After the energy storage block completely passes through this track, the telescopic track is retracted into the entrance of the transport track to ensure that the transportation and storage of other energy storage blocks are carried out normally, and then the transport track is changed according to the power level of the energy storage block so that the energy storage block enters the storage area of ​​the energy storage block with the designated power level to complete the storage work; when the energy storage block with the designated power level is required to generate electricity, the track is changed according to the power level of the energy storage block so that the energy storage block continues to move to the entrance of the transport track. When the energy storage block is about to leave the entrance of the transport track, the telescopic track is extended so that the energy storage block reaches the designated position on the ground, the energy storage block is connected to the slide rail, and the telescopic track is retracted into the entrance of the transport track so that the energy storage block performs energy storage work in the frame structure.

5. The above-ground and underground transportation and storage method of multiple energy storage blocks in the gravity energy storage system of abandoned mines according to claim 4, Features: When the existing energy storage blocks are generating electricity, the power generation power required by the power grid increases or in order to suppress the output power fluctuation of a single energy storage block, the coordinated operation of multiple energy storage blocks is required. At this time, the energy storage blocks of specified power levels among the multiple groups of energy storage blocks with different power levels stored in the ground storage area need to be moved to the specified position on the ground for coordinated work. The transportation track on the ground can change the track through the power level demand feedback signal of the energy storage system so that the corresponding energy storage block arrives at the specified position on the ground and works in coordination; and when the power grid is at its peak, the underground transportation and storage device can realize the continuous transportation of multiple groups of energy storage blocks with different power levels to the specified underground position and perform energy storage work.

Citation Information

Patent Citations

  • Gravity energy storage device based on permanent magnet linear motor and control method

    CN114665612A

  • Linear motor gravity energy storage device for abandoned mines and multi-energy storage block coordinated control method thereof

    CN117639015B

  • Electric telescopic approach bridge of lifting bridge

    CN113981798A

  • Automatic connection and parking system for multi-weight gravity energy storage

    CN114899951A

  • Linear motor gravity energy storage device for waste mine and multi-energy-storage-block cooperative control method of linear motor gravity energy storage device

    CN117639015A