Wastewater treatment device for river management and process thereof

By designing a wastewater treatment device for river management that includes a surface suction pipe and an underwater dip pipe, the problem that existing technology cannot simultaneously treat wastewater on the surface and middle and lower layers of the water body is solved, achieving comprehensive and efficient treatment of wastewater and improving water quality. .

CN118164639BActive Publication Date: 2025-01-21ZHEJIANG ZHONGWO ENVIRONMENTAL ENGINEERING TECHNOLOGY CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410442808.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-12
Publication Date
2025-01-21
Estimated Expiration
2044-04-12

AI Technical Summary

Technical Problem

The existing river channel management technology cannot simultaneously treat wastewater in the surface and middle and lower layers of the water body, resulting in incomplete cleaning and affecting water quality.

Method used

A wastewater treatment device for river management is designed, which includes a first treatment chamber, a second treatment chamber and a third treatment chamber arranged in sequence from top to bottom. The surface layer and the middle and lower layers of the water body are synchronously treated through the surface water suction pipe and the underwater dip pipe. The wastewater is further treated using multi-step treatment devices and chemicals.

Benefits of technology

It achieves simultaneous treatment of wastewater on the surface and middle and lower layers of the water body, ensuring comprehensive and efficient treatment of river wastewater and improving the health of the water quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118164639B_ABST
    Figure CN118164639B_ABST
Patent Text Reader

Abstract

The present invention discloses a wastewater treatment device for river channel management and a process thereof, and relates to the technical field of river channel wastewater treatment, comprising a first treatment chamber, a second treatment chamber and a third treatment chamber, wherein a plurality of groups of water absorption components are circumferentially distributed on the outer wall of the first treatment chamber, the water absorption components comprising an angle adjuster, a surface water absorption pipe and an underwater suction pipe installed on the outer wall of the first treatment chamber, one end of the surface water absorption pipe is connected to the angle adjuster through a rotating shaft, the other end of the surface water absorption pipe is connected to a surface water absorption port, a fixed ring is sleeved on the surface water absorption pipe, an electric slide rail is installed between the fixed rings, the underwater suction pipe is connected to a slider installed on the electric slide rail through a U-shaped clamp, and the present invention can simultaneously clean water areas such as the surface layer of a water body and the middle and lower layers of a water body, and at the same time adopts a multi-step treatment device to solve the problems existing in different water areas in a targeted manner, so that the wastewater treatment is more comprehensive and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of river wastewater treatment, and in particular to a wastewater treatment device for river management and a process thereof. Background Art

[0002] The generation of river wastewater mainly comes from multiple aspects, including urban domestic sewage, industrial wastewater discharge, and pollution caused by agricultural activities. Therefore, the composition of river wastewater is complex, including domestic garbage, suspended particulate matter, heavy metals and pathogens.

[0003] At present, the methods of river management are relatively simple. Usually, the upper water body of the river is managed through manual salvage and single-layer screen filtration, but the middle and lower water bodies of the river cannot be treated simultaneously, resulting in incomplete cleaning of river wastewater, which affects the water quality of the river. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a wastewater treatment device and process for river management, which can simultaneously clean the surface layer of the water body and the middle and lower layers of the water body, and at the same time use a multi-step treatment device to solve the problems existing in different waters in a targeted manner, making wastewater treatment more comprehensive and efficient.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solution: a wastewater treatment device for river management, comprising a first treatment chamber, a second treatment chamber and a third treatment chamber arranged in sequence from top to bottom, the first treatment chamber is connected to the second treatment chamber through a fixed bracket installed on its outer side wall, a plurality of lamp racks are distributed on the bottom circumference of the second treatment chamber, and the second treatment chamber is connected to the third treatment chamber through the lamp rack;

[0006] A plurality of groups of water absorption components are circumferentially distributed on the outer side wall of the first processing chamber;

[0007] The water absorption assembly includes an angle adjuster installed on the outer side wall of the first treatment chamber, a surface water absorption pipe and an underwater suction pipe, one end of the surface water absorption pipe is connected to the angle adjuster through a rotating shaft, and the other end of the surface water absorption pipe is connected to a surface water absorption port, and the angle adjuster can control the expansion range of the surface water absorption pipe so that the surface water absorption port can absorb water close to the surface of the water body;

[0008] The surface water absorption pipe is sleeved with two fixed rings arranged at intervals, an electric slide rail is installed between the two fixed rings, and a motor for driving the electric slide rail is installed on the fixed ring near the first processing chamber. The underwater suction pipe is connected to a slider installed on the electric slide rail through a U-shaped clip. Driven by the motor, the slider moves along the extension direction of the electric slide rail, thereby adjusting the depth of the underwater suction pipe entering the water body.

[0009] The tops of the surface water suction pipe and the underwater suction pipe are both provided with a T-shaped pipe, and a hose I is provided at the outer wall of the first processing chamber, one end of the hose I extends into the first processing chamber and is connected to the water inlet installed in the first processing chamber, and the other end of the hose I is connected to the T-shaped pipe installed on the surface water suction pipe, and the water in the surface water suction pipe is transferred to the first processing chamber through the hose I through the T-shaped pipe;

[0010] A hose II is provided on the outer wall of the second treatment chamber, one end of which extends into the second treatment chamber, and the other end of which is connected to a T-type pipe installed on an underwater suction pipe, thereby transmitting the wastewater sucked underwater to the second treatment chamber.

[0011] Preferably, the first processing chamber is provided with a plurality of groups of mutually cooperating crushing rollers. Since the pollutants on the surface of the water body are relatively large in volume, the pollutants on the surface of the water body are transferred to the first processing chamber through the surface water suction pipe and are initially crushed by the crushing rollers to be converted into fine particles.

[0012] A plurality of leak holes are provided at the bottom of the first processing chamber, and the treated pollutants enter the second processing chamber through the leak holes.

[0013] Preferably, a sieve body is installed in the second processing chamber, and the sieve body is a conical structure that is narrow at the top and wide at the bottom. A plurality of sieve holes are opened on the surface of the sieve body, and a rotatable movable ball is installed on the top of the sieve body. When the pollutants processed by the first processing chamber enter the sieve body, the pollutants are scattered by the sieve body surface and the movable ball, and the particles that meet the size of the sieve holes fall into the interior of the sieve body for further processing.

[0014] Preferably, a plurality of drug dosing boxes are installed on the outer wall of the second treatment chamber, and flocculants, disinfectants and heavy metal capture agents are respectively added into the drug dosing boxes, so that the suspended particles, pathogens and heavy metals in the surface water falling from the first treatment chamber and the middle and lower water bodies drawn by the underwater drawing pipe can be reacted for a long time in the second treatment chamber using chemical reagents.

[0015] Preferably, a plurality of precision screens are installed at the bottom of the second processing chamber for filtering the treated suspended particles, and a control valve is provided at the position of the precision screens for controlling the water output from the second processing chamber.

[0016] Preferably, an upwardly inclined gas rod is installed at the position of the water absorption component on the outer wall of the second processing chamber, and the telescopic end of the gas rod is connected to the surface water absorption pipe. The gas rod can cooperate with the angle adjuster to adjust the position of the surface water absorption pipe and can also play a role in supporting the surface water absorption pipe.

[0017] Preferably, the diameter of the third treatment chamber is larger than that of the first treatment chamber and the second treatment chamber, and the height of the third treatment chamber is smaller than that of the first treatment chamber and the second treatment chamber. An ultraviolet irradiation lamp is installed on the side of the lamp holder facing the inside of the third treatment chamber. The large diameter and low height setting can better spread the water body, and the ultraviolet irradiation lamp can fully cover the treated water body, so that the sterilization effect is more significant;

[0018] The third treatment chamber is provided with a plurality of water outlet valves distributed around its circumference, through which the treated water is discharged again to improve the water quality of the surrounding water.

[0019] Preferably, a float is installed at the bottom of the third processing chamber. Since the bottom diameter of the third processing chamber is relatively large, the buoyancy of the device can be increased by installing a float at the bottom thereof, so that the device can float stably on the water surface.

[0020] Preferably, the diameter of the surface water suction pipe is larger than that of the underwater suction pipe, so as to absorb larger pollutants. At the same time, the outer part of the surface water suction pipe is provided with a foam tube, which can increase the buoyancy of the surface water suction pipe. A suspension detector is installed at the bottom of the underwater suction pipe to detect the surrounding water quality and move to a suitable position through an electric slide rail to absorb river wastewater.

[0021] A wastewater treatment process for river management, which is applicable to the above-mentioned wastewater treatment device for river management, and the process steps are as follows:

[0022] S1: The device is placed in the river channel, and the air rod cooperates with the angle adjuster to unfold the water absorption component, wherein the surface water absorption pipe floats on the surface of the water body and relies on the surface water absorption port to absorb the surface wastewater mixed with pollutants into the first processing chamber, and the crushing rollers in the first processing chamber cooperate with each other to finely crush the large volume of pollutants, and the crushed particles enter the second processing chamber through the leakage hole at the bottom of the first processing chamber;

[0023] S2: The suspended liquid detector detects the water body that exceeds the pollution index, and the motor drives the electric slide rail to drive the underwater suction pipe connected to the slider to move to the position of the water body to be treated. Since the underwater suction pipe has a certain length and can extend to the middle and lower layers of the water body, the river wastewater in the middle and lower layers is sucked into the second treatment chamber;

[0024] S3: The surface water that has been crushed and the middle and lower water that has been sucked through the underwater suction pipe enter the second treatment chamber and impact with the movable ball, so that the water is dispersed on the screen body. At the same time, the flocculants, disinfectants and heavy metal capture agents contained in multiple dosing boxes are added to the second treatment chamber according to the proportion. Since the water is dispersed, the chemical agents can better contact and react with the impurities in the water, and the formed sediment is screened by the precision screen at the bottom of the second treatment chamber;

[0025] S4: The control valve sets a preset threshold value according to the amount of water entering the second treatment chamber, and controls the outflow, so that the chemical agent in the second treatment chamber can fully react with the wastewater and continuously treat the wastewater, and the water after screening by the precision screen is controlled by the control valve to flow into the third treatment chamber;

[0026] S5: The third treatment chamber adopts a large diameter and low height setting to better spread the water body and allow the ultraviolet lamp to fully cover the treated water body. The water body treated by the ultraviolet lamp can effectively kill pathogens and ensure the health of the water quality. The outlet valve sets the water outlet interval time to discharge the treated water body, thereby completing the entire river wastewater treatment step.

[0027] Compared with the prior art, the present invention has the following beneficial effects:

[0028] 1. In the present invention, the air rod cooperates with the angle adjuster to unfold the water absorption component, which can simultaneously clean the surface layer of the water body and the middle and lower layers of the water body. The surface water absorption pipe floats on the surface of the water body and relies on the surface water absorption port to suck the surface wastewater of the water body mixed with pollutants into the first treatment chamber, and pre-treats it and cooperates with the underwater suction pipe to suck the river wastewater in the middle and lower layers into the second treatment chamber, so as to solve the problems existing in different waters in a targeted manner, making the wastewater treatment more comprehensive and efficient.

[0029] 2. In the present invention, the surface water that has been crushed and the middle and lower water that is sucked through the underwater suction pipe collide with the movable ball when entering the second processing chamber, and the water is dispersed on the sieve body. Since the sieve body has a conical structure that is narrow at the top and wide at the bottom, the water can be dispersed and can better contact and react with the chemical agent.

[0030] 3. The third treatment chamber of the present invention adopts a large diameter and low height setting to better spread the water body and allow the ultraviolet irradiation lamp to fully cover the treated water body. The water body treated by the ultraviolet irradiation lamp can effectively kill pathogens and ensure the health of the water quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] In order to make the contents of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments in conjunction with the accompanying drawings.

[0032] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0033] Figure 2 It is a schematic diagram of the structural installation of the water absorption component in the present invention;

[0034] Figure 3 It is a schematic diagram of the structural installation of the crushing roller in the first processing chamber of the present invention;

[0035] Figure 4 It is a schematic diagram of the structural installation of the second processing chamber and the third processing chamber in the present invention;

[0036] Figure 5 It is a schematic diagram of the structural installation of the lamp holder, ultraviolet irradiation lamp, precision screen and control valve in the present invention.

[0037] In the figure: 1. first processing chamber; 2. second processing chamber; 3. third processing chamber; 4. fixed bracket; 5. lamp holder; 6. water absorption assembly; 61. angle adjuster; 62. surface water absorption pipe; 621. rotating shaft; 622. surface water absorption port; 623. fixing ring; 624. hose I; 625. water inlet; 63. underwater suction pipe; 631. hose II; 64. electric slide rail; 65. motor; 66. slider; 67. T-type pipe; 68. U-type clamp; 7. crushing roller; 8. sieve body; 9. movable ball; 10. dosing box; 11. precision screen; 12. control valve; 13. gas rod; 14. ultraviolet irradiation lamp; 15. water outlet valve; 16. float; 17. foam tube; 18. suspension detector. DETAILED DESCRIPTION

[0038] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0039] See also Figure 1-5 A wastewater treatment device for river management of the present invention comprises a first treatment chamber 1, a second treatment chamber 2 and a third treatment chamber 3 arranged in sequence from top to bottom, wherein the first treatment chamber 1 is connected to the second treatment chamber 2 via a fixed bracket 4 installed on its outer side wall, a plurality of lamp holders 5 are distributed around the bottom circumference of the second treatment chamber 2, and the second treatment chamber 2 is connected to the third treatment chamber 3 via the lamp holder 5;

[0040] A plurality of water absorption components 6 are distributed circumferentially on the outer wall of the first processing chamber 1;

[0041] The water absorption assembly 6 includes an angle adjuster 61, a surface water absorption pipe 62 and an underwater suction pipe 63 installed on the outer wall of the first treatment chamber 1. One end of the surface water absorption pipe 62 is connected to the angle adjuster 61 through a rotating shaft 621, and the other end of the surface water absorption pipe 62 is connected to a surface water absorption port 622. The angle adjuster 61 can control the expansion range of the surface water absorption pipe 62, so that the surface water absorption port 622 can absorb water close to the surface of the water body;

[0042] The surface water absorption pipe 62 is sleeved with two fixed rings 623 arranged at intervals, an electric slide rail 64 is installed between the two fixed rings 623, and a motor 65 for driving the electric slide rail 64 is installed at the fixed ring 623 near the first processing chamber 1. The underwater suction pipe 63 is connected to a slider 66 installed on the electric slide rail 64 through a U-shaped clamp 68. Driven by the motor 65, the slider 66 moves along the extension direction of the electric slide rail 64, thereby adjusting the depth of the underwater suction pipe 63 entering the water body.

[0043] The tops of the surface water suction pipe 62 and the underwater suction pipe 63 are both provided with a T-shaped pipe 67, and a hose I 624 is provided at the outer wall of the first treatment chamber 1, one end of the hose I 624 extends to the inside of the first treatment chamber 1 and is connected to the water inlet 625 installed in the first treatment chamber 1, and the other end of the hose I 624 is connected to the T-shaped pipe 67 installed on the surface water suction pipe 62, and the water in the surface water suction pipe 62 is transferred to the first treatment chamber 1 through the hose I 624 through the T-shaped pipe 67;

[0044] A hose II 631 is provided on the outer wall of the second treatment chamber 2 , one end of the hose II 631 extends into the second treatment chamber 2 , and the other end of the hose II 631 is connected to a T-type pipe 67 installed on the underwater suction pipe 63 , thereby transmitting the wastewater sucked underwater to the second treatment chamber 2 .

[0045] Preferably, the first processing chamber 1 is provided with a plurality of groups of mutually cooperating crushing rollers 7. Since the pollutants on the surface of the water body are of large volume, the pollutants on the surface of the water body are transferred to the first processing chamber 1 through the surface water suction pipe 62 and are initially crushed by the crushing rollers 7 to be converted into fine particles.

[0046] A plurality of leak holes are provided at the bottom of the first processing chamber 1 , and the treated pollutants enter the second processing chamber 2 through the leak holes.

[0047] Preferably, a sieve body 8 is installed in the second processing chamber 2. The sieve body 8 is a conical structure that is narrow at the top and wide at the bottom. A plurality of sieve holes are opened on the surface of the sieve body 8. A rotatable movable ball 9 is installed on the top of the sieve body 8. When the pollutants processed by the first processing chamber 1 enter the sieve body 8, the pollutants are scattered by the surface of the sieve body 8 and the movable ball 9, and the particles that meet the size of the sieve holes fall into the sieve body 8 for further processing.

[0048] Preferably, a plurality of dosing boxes 10 are installed on the outer wall of the second treatment chamber 2, and flocculants, disinfectants and heavy metal capture agents are respectively added into the dosing boxes 10, so that the suspended particles, pathogens and heavy metals in the surface water falling from the first treatment chamber 1 and the middle and lower water bodies drawn by the underwater drawing pipe 63 are reacted for a long time in the second treatment chamber 2 using chemical reagents.

[0049] Preferably, a plurality of precision screens 11 are installed at the bottom of the second processing chamber 2 for filtering the treated suspended particles, and a control valve 12 is provided at the position of the precision screen 11 for controlling the water output from the second processing chamber 2 .

[0050] Preferably, an upwardly inclined gas rod 13 is installed at the position of the water absorption assembly 6 on the outer wall of the second processing chamber 2, and the telescopic end of the gas rod 13 is connected to the surface water absorption pipe 62. The gas rod 13 can cooperate with the angle adjuster 61 to adjust the position of the surface water absorption pipe 62, and at the same time can play a role in supporting the surface water absorption pipe 62.

[0051] Preferably, the diameter of the third treatment chamber 3 is larger than that of the first treatment chamber 1 and the second treatment chamber 2, and the height of the third treatment chamber 3 is smaller than that of the first treatment chamber 1 and the second treatment chamber 2. The ultraviolet irradiation lamp 14 is installed on the side of the lamp holder 5 facing the inside of the third treatment chamber 3. The large diameter and low height setting can better spread the water body, and the ultraviolet irradiation lamp 14 can fully cover the treated water body, so that the sterilization effect is more significant;

[0052] The third treatment chamber 3 is provided with a plurality of water outlet valves 15 distributed around its circumference, through which the treated water is discharged again to improve the water quality of the surrounding water.

[0053] Preferably, a float 16 is installed at the bottom of the third processing chamber 3. Since the bottom diameter of the third processing chamber 3 is relatively large, the buoyancy of the device can be increased by installing the float 16 at the bottom thereof, so that the device can float stably on the water surface.

[0054] Preferably, the diameter of the surface water suction pipe 62 is larger than that of the underwater suction pipe 63, so as to absorb pollutants with a larger volume. At the same time, the outer part of the surface water suction pipe 62 is provided with a foam tube 17, which can increase the buoyancy of the surface water suction pipe 62. A suspension detector 18 is installed at the bottom of the underwater suction pipe 63 to detect the surrounding water quality and move to a suitable position through an electric slide rail 64 to absorb river wastewater.

[0055] Working principle: the device can be matched with a set of power system. Before treating the river wastewater, the device can be placed in the river, and suspended above the water area to be treated by relying on the external power system. The air rod 13 and the angle adjuster 61 are started to unfold the water absorption component 6, so that the surface water absorption port 622 can absorb water close to the surface of the water body. Since there are many suspended substances above the river water body and the volume is relatively large, the surface water absorption pipe 62 absorbs the water at this position into the first treatment chamber 1, and relies on the crushing roller 7 in the first treatment chamber 1 to crush the large volume of pollutants into suspended particles, and enters the second treatment chamber 2 for treatment together with the suspended particles sucked by the underwater suction pipe 63, and the pollutants are separated by the surface of the sieve body 8 and the movable ball 9. The pollutants are scattered, and the suspended particles are condensed into sediments by adding flocculants, and then secondary screening is carried out by relying on the precision screen 11. At the same time, disinfectants are added to kill pathogens in the water, and heavy metal capture agents separate heavy metals in the water. The scattered water can be more fully in contact with chemical agents, which increases the reaction efficiency. Particles that meet the size of the sieve holes fall into the sieve body 8 for the final sterilization treatment. The large diameter and low height setting can better spread the water, and the ultraviolet irradiation lamp 14 can fully cover the treated water, making the sterilization effect more significant. At the same time, a plurality of water outlet valves 15 are distributed around the third treatment chamber 3, and the treated water is discharged again through the water outlet valve 15 to improve the water quality of the surrounding water.

[0056] A wastewater treatment process for river management, which is applicable to the above-mentioned wastewater treatment device for river management, and the process steps are as follows:

[0057] S1: The device is placed in the river channel, and the air rod 13 cooperates with the angle adjuster 61 to unfold the water absorption component 6, wherein the surface water absorption pipe 62 floats on the surface of the water body and relies on the surface water absorption port 622 to absorb the surface wastewater mixed with pollutants into the first processing chamber 1, and the crushing rollers 7 in the first processing chamber 1 cooperate with each other to finely crush the large volume of pollutants, and the crushed particles enter the second processing chamber 2 through the leakage hole at the bottom of the first processing chamber 1;

[0058] S2: The suspended liquid detector 18 detects the water body that exceeds the pollution index, and the motor 65 drives the electric slide rail 64 to drive the underwater suction pipe 63 connected to the slider 66 to move to the position of the water body to be treated. Since the underwater suction pipe 63 has a certain length and can extend into the middle and lower layers of the water body, the river wastewater in the middle and lower layers is sucked into the second treatment chamber 2;

[0059] S3: The surface water that has been crushed and the middle and lower water that has been sucked through the underwater suction pipe 63 enter the second processing chamber 2 and impact with the movable ball 9, so that the water is dispersed on the screen body 8. At the same time, the flocculants, disinfectants and heavy metal capture agents contained in the multiple dosing boxes 10 are added to the second processing chamber 2 according to the proportion. Since the water is dispersed, the chemical agents can better contact and react with the impurities in the water, and the formed sediment is screened by the precision screen 11 at the bottom of the second processing chamber 2;

[0060] S4: The control valve 12 sets a preset threshold value according to the amount of water entering the second treatment chamber 2, and controls the outflow, so that the chemical agent in the second treatment chamber 2 can fully react with the wastewater and continuously treat the wastewater, and the water screened by the precision screen 11 is controlled by the control valve 12 to flow into the third treatment chamber 3;

[0061] S5: The third treatment chamber 3 adopts a large diameter and low height setting to better spread the water body, and allows the ultraviolet lamp 14 to fully cover the treated water body. The water body treated by the ultraviolet lamp 14 can effectively kill pathogens and ensure the health of the water quality. The water outlet valve 15 sets the water outlet interval time to discharge the treated water body, thereby completing the entire river wastewater treatment step.

[0062] The above description is only a preferred embodiment of the present invention and is not intended to be a further limitation of the present invention. All equivalent changes made using the contents of the present specification and drawings are within the protection scope of the present invention.

Claims

1. A wastewater treatment device for river management, characterized in that: The invention comprises a first processing chamber (1), a second processing chamber (2) and a third processing chamber (3) which are arranged in sequence from top to bottom, the first processing chamber (1) being connected to the second processing chamber (2) via a fixing bracket (4) installed on an outer side wall thereof, a plurality of lamp holders (5) being distributed around the bottom circumference of the second processing chamber (2), and the second processing chamber (2) being connected to the third processing chamber (3) via the lamp holders (5); A plurality of groups of water absorption components (6) are distributed circumferentially on the outer wall of the first processing chamber (1); The water absorption assembly (6) comprises an angle adjuster (61) mounted on the outer wall of the first processing chamber (1), a surface water absorption pipe (62) and an underwater suction pipe (63); one end of the surface water absorption pipe (62) is connected to the angle adjuster (61) via a rotating shaft (621), and the other end of the surface water absorption pipe (62) is connected to a surface water absorption port (622); The surface water absorption pipe (62) is sleeved with two fixed rings (623) arranged at intervals, an electric slide rail (64) is installed between the two fixed rings (623), a motor (65) for driving the electric slide rail (64) is installed at the fixed ring (623) near the first processing chamber (1), and the underwater absorption pipe (63) is connected to a slider (66) installed on the electric slide rail (64) via a U-shaped clamp (68); The tops of the surface water suction pipe (62) and the underwater suction pipe (63) are both provided with a T-shaped pipe (67); a hose I (624) is provided on the outer wall of the first processing chamber (1); one end of the hose I (624) extends into the first processing chamber (1) and is connected to a water inlet (625) installed in the first processing chamber (1); the other end of the hose I (624) is connected to a T-shaped pipe (67) installed on the surface water suction pipe (62); A hose II (631) is provided on the outer wall of the second processing chamber (2), one end of the hose II (631) extends into the interior of the second processing chamber (2), and the other end of the hose II (631) is connected to a T-shaped pipe (67) installed on the underwater suction pipe (63).

2. A wastewater treatment device for river management according to claim 1, characterized in that: The first processing chamber (1) is provided with a plurality of groups of mutually cooperating crushing rollers (7); A plurality of leakage holes are provided at the bottom of the first processing chamber (1).

3. A wastewater treatment device for river management according to claim 1, characterized in that: A sieve body (8) is installed in the second processing chamber (2); the sieve body (8) is in the shape of a cone that is narrow at the top and wide at the bottom; a plurality of sieve holes are provided on the surface of the sieve body (8); and a rotatable movable ball (9) is installed on the top of the sieve body (8).

4. A wastewater treatment device for river management according to claim 3, characterized in that: A plurality of drug adding boxes (10) are installed on the outer wall of the second treatment chamber (2), and flocculants, disinfectants and heavy metal capture agents are respectively added into the drug adding boxes (10).

5. A wastewater treatment device for river management according to claim 3, characterized in that: A plurality of precision screens (11) are installed at the bottom of the second processing chamber (2), and a control valve (12) is provided at the position of the precision screens (11).

6. A wastewater treatment device for river management according to claim 3, characterized in that: An upwardly inclined gas rod (13) is installed at a position on the outer wall of the second processing chamber (2) corresponding to the water absorption assembly (6), and the telescopic end of the gas rod (13) is connected to the surface water absorption pipe (62).

7. A wastewater treatment device for river management according to claim 1, characterized in that: The diameter of the third processing chamber (3) is greater than that of the first processing chamber (1) and the second processing chamber (2); the height of the third processing chamber (3) is less than that of the first processing chamber (1) and the second processing chamber (2); and an ultraviolet irradiation lamp (14) is installed on a side of the lamp holder (5) facing the interior of the third processing chamber (3); The third processing chamber (3) is provided with a plurality of water outlet valves (15) distributed around its circumference.

8. A wastewater treatment device for river management according to claim 7, characterized in that: A float (16) is installed at the bottom of the third processing chamber (3).

9. A wastewater treatment device for river management according to claim 1, characterized in that: The diameter of the surface water absorption pipe (62) is larger than that of the underwater suction pipe (63); a foam tube (17) is sleeved on the outside of the surface water absorption pipe (62); and a suspension detector (18) is installed at the bottom of the underwater suction pipe (63).

10. A process for treating wastewater for river regulation, which is suitable for operating a wastewater treatment device for river regulation according to any one of claims 1 to 9, characterized in that: The process steps are as follows: S1: The device is placed in a river channel, and the air rod (13) cooperates with the angle adjuster (61) to unfold the water absorption component (6), wherein the surface water absorption pipe (62) floats on the surface of the water body and relies on the surface water absorption port (622) to absorb the surface wastewater mixed with pollutants into the first processing chamber (1), and the crushing rollers (7) in the first processing chamber (1) cooperate with each other to finely crush the large volume of pollutants, and the crushed particles enter the second processing chamber (2) through the leakage hole at the bottom of the first processing chamber (1); S2: The suspended liquid detector (18) detects water that exceeds the pollution index, and the motor (65) drives the electric slide rail (64) to drive the underwater suction pipe (63) connected to the slider (66) to move to the position of the water body to be treated. Since the underwater suction pipe (63) has a certain length and can extend into the middle and lower layers of the water body, the river wastewater in the middle and lower layers is sucked into the second treatment chamber (2); S3: The surface water that has been pulverized and the middle and lower water that has been sucked in through the underwater suction pipe (63) enter the second treatment chamber (2) and impact with the movable ball (9), so that the water is dispersed on the sieve body (8). At the same time, the flocculants, disinfectants and heavy metal capture agents contained in the multiple dosing boxes (10) are added to the second treatment chamber (2) according to the proportion. Since the water is dispersed, the chemical agents can better contact and react with the impurities in the water. The formed sediment is screened by the precision screen (11) at the bottom of the second treatment chamber (2); S4: the control valve (12) sets a preset threshold value according to the amount of water entering the second treatment chamber (2) and controls the outflow, so that the chemical agent in the second treatment chamber (2) reacts fully with the wastewater and the wastewater can be continuously treated at the same time, and the water after being screened by the precision screen (11) is controlled by the control valve (12) to flow into the third treatment chamber (3); S5: The third treatment chamber (3) is configured with a large diameter and a low height to better spread the water body and allow the ultraviolet irradiation lamp (14) to fully cover the treated water body. The water body treated by the ultraviolet irradiation lamp (14) can effectively kill pathogens and ensure the health of the water quality. The water outlet valve (15) is set with a water outlet interval to discharge the treated water body, thereby completing the entire river wastewater treatment step.

Citation Information