The invention belongs to the field of reservoir
erosion and deposition scheduling, and particularly relates to a
sediment-carrying reservoir power generation-
erosion and deposition dynamic optimization scheduling model construction method. The invention discloses a
sediment-carrying reservoir power generation-
erosion and deposition dynamic optimization scheduling model construction method. The method comprises the following steps of S10, collecting reservoir
terrain scanning data, hydrological
monitoring data and ecological space data; the ecological space data comprises a
spawning site elevation threshold distribution map and a benthic
organism habitat substrate type partition map; superposing the data into a three-dimensional geographic ecological model through the acquisition positions of the data; s20, based on historical erosion and deposition operation records, erosion and deposition equipment scheduling parameters and corresponding geographic ecological models before and after erosion and deposition are extracted, and an erosion and deposition reduction model is established; and calculating the
siltation reduction amount according to the geographic ecological model before and after erosion and
siltation. According to the scheme, the problem that the reservoir
ecology is destroyed due to extensive scouring and silting scheduling in the prior art is solved, the
dynamic prediction, intelligent scheduling and closed-loop management capabilities are achieved, and the scouring and silting precision, efficiency and benefits are remarkably improved.