Chip packaging test system and test method thereof

By designing a chip packaging testing system and using air-tight cabinets and sensors to monitor and control air pressure, the problem of accuracy in chip packaging air-tightness detection has been solved, and efficient detection of chip packaging air-tightness has been achieved.

CN118169542BActive Publication Date: 2024-10-11深圳市芯华实业有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410422429.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-09
Publication Date
2024-10-11
Estimated Expiration
2044-04-09

AI Technical Summary

Technical Problem

During the chip packaging process, gaps may occur between the external packaging layer and the chip wafer, resulting in substandard airtightness after packaging. An accurate testing system is needed to detect the airtightness of the chip after packaging.

Method used

A chip packaging test system is designed, including an airtight cabinet, a negative pressure component and an air supply component. The air inside the airtight cabinet is extracted through a negative pressure pump, and compressed gas is input through a booster pump until it reaches the reference chamber and test chamber. The internal air pressure reaches a balance, and sensors and PLC control modules are used to monitor and control the air pressure to detect the air tightness of the chip package.

Benefits of technology

By extracting air and inputting compressed gas, it is ensured that the reference chamber and the test chamber are in the same state, avoiding air pressure from affecting detection accuracy, improving the accuracy of chip package air tightness detection, and effectively identifying chip package air tightness problems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118169542B_ABST
    Figure CN118169542B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of chip testing technology, specifically to a chip packaging test system and a test method thereof, comprising an airtight cabinet, a negative pressure component is provided on the right part of the airtight cabinet, an air supply component is provided on the left part of the airtight cabinet, and a partition plate is fixedly connected to the inner wall of the airtight cabinet, and the partition plate divides the interior of the airtight cabinet into two parts: a reference chamber and a test chamber. The air inside the airtight cabinet is extracted by the negative pressure component, on the one hand to ensure that the interior of the reference chamber and the test chamber are in the same negative pressure state, and on the other hand, the air can be extracted to extract the gas inside the chip package that is not sufficiently sealed, so that the inside of the chip package is in a vacuum state, avoiding the influence of the accuracy of subsequent airtightness test due to the air pressure inside the chip package, and by using a qualified reference chip to perform a reference test with the tested chip, the detection accuracy of the airtightness of the chip package is greatly improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of chip testing, and in particular to a chip packaging testing system and a testing method thereof. Background Art

[0002] Chip packaging is the shell used to install semiconductor integrated circuit chips. It has the functions of placing, fixing, sealing, protecting chips and enhancing electrical and thermal performance. Chip packaging is a bridge between the internal world of the chip and the external circuit. The contacts of the chip are connected to the pins of the package shell with wires, and the pins are connected to other devices through wires on the printed circuit board.

[0003] During the chip packaging process, some chips will have gaps between the external packaging layer and the chip wafer, resulting in the chip's airtightness not meeting the standard after packaging, and therefore not meeting factory requirements. Therefore, it is particularly important to detect the airtightness of the chip after packaging. Therefore, it is necessary to provide a chip packaging test system to accurately test the airtightness of the chip after packaging. Summary of the invention

[0004] To this end, the present invention provides a chip packaging test system and a test method thereof to solve the above-mentioned problems.

[0005] The present invention provides the following technical solutions: a chip packaging test system, comprising an airtight cabinet, a negative pressure assembly is provided on the right part of the airtight cabinet, and an air supply assembly is provided on the left part of the airtight cabinet, a partition plate is fixedly connected to the inner wall of the airtight cabinet, the partition plate divides the interior of the airtight cabinet into two parts, a reference chamber and a test chamber, and the reference chamber is located at the bottom of the test chamber, a first negative pressure sensor and a second negative pressure sensor are fixedly provided on the right wall of the airtight cabinet, a first boost sensor and a second boost sensor are fixedly provided on the left wall of the airtight cabinet, and a PLC control module is fixedly provided on the top of the airtight cabinet;

[0006] The negative pressure assembly comprises a negative pressure pump, the negative pressure end of the negative pressure pump is fixedly connected to a negative pressure main pipe, one end of the negative pressure main pipe away from the negative pressure pump is connected to a negative pressure branch pipe through a three-way pipe, and the ends of the negative pressure branch pipe are respectively connected to a first negative pressure solenoid valve and a second negative pressure solenoid valve;

[0007] The air supply assembly includes a first air storage tank fixedly installed on the left side of the airtight cabinet and a second air storage tank fixedly installed on the left side of the airtight cabinet, the first air storage tank is located at the bottom of the second air storage tank, the air supply assembly also includes a boost pump, the output end of the boost pump is fixedly connected to a boost main pipe, the outer wall of the boost main pipe is connected to a boost branch pipe through a three-way pipe, the end of the boost main pipe away from the boost pump is fixedly connected to the second boost solenoid valve, the end of the boost branch pipe is fixedly connected to the first boost solenoid valve, the first boost solenoid valve is connected to the input end of the first air storage tank, and the second boost solenoid valve is connected to the input end of the second air storage tank, the output end of the first air storage tank is fixedly connected to the first pressure relief pipe, the output end of the second air storage tank is fixedly connected to the second pressure relief pipe, the end of the first pressure relief pipe away from the first air storage tank is fixedly connected to the first pressure relief solenoid valve, and the end of the second pressure relief pipe away from the second air storage tank is fixedly connected to the second pressure relief solenoid valve.

[0008] As a preferred solution of the present invention, a first air exhaust hole and a second air exhaust hole are opened through the right side of the airtight cabinet, the first air exhaust hole is located inside the reference chamber, and the second air exhaust hole is located inside the test chamber, the first negative pressure solenoid valve is fixedly installed on the periphery of the opening of the first air exhaust hole, and the second negative pressure solenoid valve is fixedly installed on the periphery of the opening of the second air exhaust hole.

[0009] As a preferred solution of the present invention, a first air supply hole and a second air supply hole are opened through the left side of the airtight cabinet, the first air supply hole is located inside the reference chamber, and the second air supply hole is located inside the test chamber, the first pressure relief solenoid valve is fixedly installed on the periphery of the opening of the first air supply hole, and the second pressure relief solenoid valve is fixedly installed on the periphery of the opening of the second air supply hole.

[0010] As a preferred solution of the present invention, the first negative pressure sensor and the first boost pressure sensor are both located inside the reference chamber, and the second negative pressure sensor and the second boost pressure sensor are both located inside the test chamber.

[0011] As a preferred solution of the present invention, a first pressure sensor is fixedly installed on the top of the first gas storage tank, and the first pressure sensor extends into the interior of the first gas storage tank. A second pressure sensor is fixedly installed on the top of the second gas storage tank, and the second pressure sensor extends into the interior of the second gas storage tank.

[0012] As a preferred solution of the present invention, the negative pressure pump, the first negative pressure solenoid valve and the second negative pressure solenoid valve are all electrically connected to the PLC control module, the boost pump, the first boost solenoid valve, the second boost solenoid valve, the first pressure release solenoid valve, the second pressure release solenoid valve, the first pressure sensor and the second pressure sensor are all electrically connected to the PLC control module, and the first negative pressure sensor, the second negative pressure sensor, the first boost pressure sensor and the second boost pressure sensor are all electrically connected to the PLC control module.

[0013] As a preferred solution of the present invention, four fixing rods are fixedly connected to the bottom wall of the airtight cabinet and the top of the partition plate, a plurality of placement tables distributed up and down are fixedly connected between the four fixing rods, and two heating tubes distributed up and down are fixedly connected to the rear wall of the airtight cabinet, the two heating tubes are respectively located inside the reference chamber and inside the test chamber, and the two heating tubes are electrically connected to the PLC control module.

[0014] As a preferred solution of the present invention, two upper and lower access windows are provided through the front of the airtight cabinet, and the peripheries of the two access windows are rotatably connected to airtight doors through hinges. The airtight doors are limited between the airtight cabinet by locks, and a sealing gasket is provided between the airtight doors and the access windows.

[0015] As a preferred solution of the present invention, a tripod is fixedly provided at the bottom of the airtight cabinet, and the first gas storage tank and the booster pump are both fixedly mounted on the top of the tripod at the bottom of the airtight cabinet.

[0016] A test method for a chip packaging test system includes the following steps:

[0017] S1. Computer programming of PLC control module;

[0018] S2. Open the upper and lower airtight doors, place the chip to be tested on the top of the placement table inside the test chamber, and then place the qualified chip of the same specification on the top of the placement table inside the reference chamber. After the placement is completed, close and lock the two airtight doors to seal the two access windows;

[0019] S3. The tester sets the negative pressure parameters inside the reference chamber and the test chamber through the operation panel, and then starts the negative pressure pump, and opens the first negative pressure solenoid valve and the second negative pressure solenoid valve at the same time; the negative pressure pump starts to generate negative pressure suction, which is transmitted to the inside of the airtight cabinet through the negative pressure main pipe, negative pressure branch pipe, and the first negative pressure solenoid valve and the second negative pressure solenoid valve in the open state, and the air inside the reference chamber and the test chamber is extracted. During this period, the first negative pressure sensor continuously monitors the air pressure changes inside the reference chamber, and the second negative pressure sensor continuously monitors the air pressure changes inside the test chamber. If the first negative pressure sensor detects that the air pressure inside the reference chamber is negative, If the second negative pressure sensor detects that the air pressure inside the test chamber is in a negative pressure state, and the air pressure value inside the test chamber is the same as the set negative pressure parameter, the signal is transmitted to the PLC control module, and the PLC control module outputs an instruction to close the first negative pressure solenoid valve. If the second negative pressure sensor detects that the air pressure inside the test chamber is in a negative pressure state, and the air pressure value inside the test chamber is the same as the set negative pressure parameter, the signal is transmitted to the PLC control module, and the PLC control module outputs an instruction to close the second negative pressure solenoid valve. When the first negative pressure solenoid valve and the second negative pressure solenoid valve are both closed, the PLC control module outputs a closing instruction to the negative pressure pump, and the negative pressure pump stops running;

[0020] S4. Turn on the two heating tubes through the operation panel, and the two heating tubes heat the interior of the reference chamber and the test chamber respectively, so that the temperature inside the reference chamber is consistent with the temperature inside the test chamber;

[0021] S5. When the internal temperatures of the reference chamber and the test chamber are adjusted to temperatures suitable for the test, and the temperatures inside the reference chamber and the test chamber are adjusted to be the same, the inflation pressure parameters inside the first gas tank and the second gas tank are set through the operation panel, and the booster pump is started. The booster pump delivers compressed gas to the inside of the booster main pipe and the booster branch pipe. The compressed gas is delivered to the inside of the first gas tank and the second gas tank respectively through the first booster solenoid valve and the second booster solenoid valve; at the same time, the first pressure sensor and the second pressure sensor monitor the air pressure inside the first gas tank and the second gas tank respectively. If the first pressure sensor detects that the air pressure inside the first gas tank has reached the set air pressure When the pressure reaches the set value, the first pressure sensor transmits a monitoring signal to the PLC control module, and the PLC control module transmits a closing command to the first boosting solenoid valve to stop delivering gas to the first gas storage tank. If the second pressure sensor detects that the air pressure inside the second gas storage tank has reached the set air pressure value, the second pressure sensor transmits a monitoring signal to the PLC control module, and the PLC control module transmits a closing command to the second boosting solenoid valve to stop delivering gas to the second gas storage tank. When the first boosting solenoid valve and the second boosting solenoid valve are both closed, the PLC control module transmits a closing command to the boosting pump, and the boosting pump stops running. At this time, the air pressure inside the first gas storage tank and the second gas storage tank is the same;

[0022] S6. After the PLC control module sends a shutdown command to the boosting pump for 5 seconds, the PLC control module sends a start command to the first pressure relief solenoid valve and the second pressure relief solenoid valve respectively, so that the first pressure relief solenoid valve and the second pressure relief solenoid valve are opened at the same time. At this time, the compressed gas inside the first gas tank is input to the interior of the reference chamber through the first pressure relief pipe, and the compressed gas inside the second gas tank is input to the interior of the test chamber through the second pressure relief pipe. After the air pressure inside the first gas tank and the reference chamber is in a balanced state and the air pressure inside the second gas tank and the test chamber is in a balanced state, the first booster is turned on. The pressure sensor transmits the air pressure value inside the reference chamber to the PLC control module, and the second boost sensor transmits the air pressure value inside the test chamber to the PLC control module. If the two values ​​are the same, it means that the chip package placed inside the test chamber is airtight. If the chip package being tested has an airtightness problem, part of the air inside the test chamber will enter the chip, causing the air pressure inside the test chamber to be slightly lower than the air pressure inside the reference chamber. Therefore, when the air pressure value monitored by the second boost sensor is lower than the air pressure value monitored by the first boost sensor, it means that the chip package is not airtight enough.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1. In the present invention, the air inside the airtight cabinet is extracted by a negative pressure component. On the one hand, it is to ensure that the interior of the reference chamber and the test chamber are in the same negative pressure state. On the other hand, by extracting air, the gas inside the chip package that is not sufficiently sealed can be extracted, so that the interior of the chip package is in a vacuum state, avoiding the accuracy of the subsequent airtightness test being affected by the air pressure inside the chip package.

[0025] 2. In the present invention, compressed gas is input into the reference chamber and the test chamber through the gas supply assembly until the air pressure inside the first gas tank and the reference chamber is in a balanced state and the air pressure inside the second gas tank and the test chamber is in a balanced state. Then, the first boost sensor transmits the air pressure value inside the reference chamber to the PLC control module, and at the same time, the second boost sensor transmits the air pressure value inside the test chamber to the PLC control module. If the two values ​​are the same, it means that the air tightness of the chip package placed inside the test chamber is qualified. If the chip package being tested has an air tightness problem, part of the air inside the test chamber will enter the chip, so that the air pressure inside the test chamber will be slightly lower than the air pressure inside the reference chamber. Therefore, when the second boost sensor monitors an air pressure value that is lower than the air pressure value monitored by the first boost sensor, it means that the chip package is not airtight enough. This system greatly improves the detection accuracy of the air tightness of the chip package by using a qualified reference chip and the chip being tested for reference testing. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the structure of the present invention from a left front viewing angle;

[0027] Figure 2 It is a schematic diagram of the left front detail structure of the present invention;

[0028] Figure 3 It is a schematic diagram of the right front detail structure of the present invention;

[0029] Figure 4 It is a schematic diagram of the internal structure of the airtight cabinet of the present invention;

[0030] Figure 5 It is a schematic diagram of the planar cross-sectional structure of the present invention;

[0031] Figure 6 It is a schematic diagram of the partial structure of the air supply component of the present invention;

[0032] Figure 7 It is a schematic diagram of the left side planar structure of the present invention.

[0033] In the figure: 1, airtight cabinet; 101, first air extraction hole; 102, second air extraction hole; 103, first air supply hole; 104, second air supply hole; 105, access window; 106, airtight door; 2, negative pressure assembly; 201, negative pressure pump; 202, negative pressure main pipe; 203, negative pressure branch pipe; 204, first negative pressure solenoid valve; 205, second negative pressure solenoid valve; 3, air supply assembly; 301, first gas storage tank; 302, second gas storage tank; 303, booster pump; 304, booster main pipe; 305, booster branch pipe; 306, first booster pressure solenoid valve; 307, second pressure-boosting solenoid valve; 308, first pressure-releasing pipe; 309, first pressure-releasing solenoid valve; 3010, second pressure-releasing pipe; 3011, second pressure-releasing solenoid valve; 3012, first pressure sensor; 3013, second pressure sensor; 4, partition plate; 5, reference chamber; 6, test chamber; 7, first negative pressure sensor; 8, second negative pressure sensor; 9, first pressure-boosting sensor; 10, second pressure-boosting sensor; 11, heating tube; 12, fixing rod; 13, placement table; 14, PLC control module. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] See also Figure 1-7 The technical solution provided by the present invention specifically includes the following embodiments:

[0036] Embodiment 1: A chip packaging test system comprises an airtight cabinet 1, a negative pressure assembly 2 is provided on the right part of the airtight cabinet 1, an air supply assembly 3 is provided on the left part of the airtight cabinet 1, a partition plate 4 is fixedly connected to the inner wall of the airtight cabinet 1, and the partition plate 4 divides the interior of the airtight cabinet 1 into two parts, a reference chamber 5 and a test chamber 6. The reference chamber 5 is located at the bottom of the test chamber 6. A first negative pressure sensor 7 and a second negative pressure sensor 8 are fixedly provided on the right wall of the airtight cabinet 1, a first boost sensor 9 and a second boost sensor 10 are fixedly provided on the left wall of the airtight cabinet 1, and a PLC control module 14 is fixedly provided on the top of the airtight cabinet 1. The first negative pressure sensor 7 and the first boost sensor 9 are both located inside the reference chamber 5, and the second negative pressure sensor 8 and the second boost sensor 10 are both located inside the test chamber 6;

[0037] The negative pressure assembly 2 includes a negative pressure pump 201, a negative pressure main pipe 202 is fixedly connected to the negative pressure end of the negative pressure pump 201, and one end of the negative pressure main pipe 202 away from the negative pressure pump 201 is connected to a negative pressure branch pipe 203 through a three-way pipe, and the ends of the negative pressure branch pipe 203 are respectively connected to a first negative pressure solenoid valve 204 and a second negative pressure solenoid valve 205;

[0038] More specifically, negative pressure suction is generated by starting the negative pressure pump 201, and the suction is transmitted to the interior of the airtight cabinet 1 through the negative pressure main pipe 202, the negative pressure branch pipe 203, and the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 in the open state, so as to extract the air inside the reference chamber 5 and the test chamber 6. During this period, the first negative pressure sensor 7 continuously monitors the air pressure changes inside the reference chamber 5, and the second negative pressure sensor 8 continuously monitors the air pressure changes inside the test chamber 6. If the first negative pressure sensor 7 detects that the air pressure inside the reference chamber 5 is in a negative pressure state, when it is detected that the air pressure value inside the reference chamber 5 is the same as the set negative pressure parameter, the acquisition signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the first negative pressure solenoid valve 204; if the second negative pressure sensor 7 detects that the air pressure inside the reference chamber 5 is in a negative pressure state, when it is detected that the air pressure value inside the reference chamber 5 is the same as the set negative pressure parameter, the acquisition signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the first negative pressure solenoid valve 204. The sensor 8 detects that the air pressure inside the test chamber 6 is in a negative pressure state. When it is detected that the air pressure value inside the test chamber 6 is the same as the set negative pressure parameter, the signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the second negative pressure solenoid valve 205. When the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 are both closed, the PLC control module 14 outputs a closing instruction to the negative pressure pump 201, and the negative pressure pump 201 stops running. On the one hand, it is to ensure that the interior of the reference chamber 5 and the test chamber 6 are in the same negative pressure state. On the other hand, by extracting air, the internal gas of the chip package that is not sufficiently sealed can be extracted, so that the inside of the chip package is in a vacuum state, thereby avoiding the accuracy of the subsequent airtightness test being affected by the air pressure inside the chip package.

[0039] Embodiment 2: The air supply assembly 3 includes a first air storage tank 301 fixedly installed on the left side of the airtight cabinet 1 and a second air storage tank 302 fixedly installed on the left side of the airtight cabinet 1, the first air storage tank 301 is located at the bottom of the second air storage tank 302, the air supply assembly 3 also includes a booster pump 303, the output end of the booster pump 303 is fixedly connected to a booster main pipe 304, the outer wall of the booster main pipe 304 is connected to a booster branch pipe 305 through a three-way pipe, the end of the booster main pipe 304 away from the booster pump 303 is fixedly connected to a second booster solenoid valve 307, and the end of the booster branch pipe 305 A first boost solenoid valve 306 is fixedly connected, the first boost solenoid valve 306 is connected to the input end of the first gas tank 301, the second boost solenoid valve 307 is connected to the input end of the second gas tank 302, the output end of the first gas tank 301 is fixedly connected to a first pressure relief pipe 308, the output end of the second gas tank 302 is fixedly connected to a second pressure relief pipe 3010, the end of the first pressure relief pipe 308 away from the first gas tank 301 is fixedly connected to the first pressure relief solenoid valve 309, and the end of the second pressure relief pipe 3010 away from the second gas tank 302 is fixedly connected to the second pressure relief solenoid valve 3011;

[0040] A first pressure sensor 3012 is fixedly installed on the top of the first gas storage tank 301, and the first pressure sensor 3012 extends to the interior of the first gas storage tank 301. A second pressure sensor 3013 is fixedly installed on the top of the second gas storage tank 302, and the second pressure sensor 3013 extends to the interior of the second gas storage tank 302.

[0041] More specifically, the inflation pressure parameters inside the first gas tank 301 and the second gas tank 302 are set through the operation panel, and the booster pump 303 is started. The booster pump 303 delivers compressed gas to the inside of the booster main pipe 304 and the booster branch pipe 305. The compressed gas is delivered to the inside of the first gas tank 301 and the second gas tank 302 respectively through the first booster solenoid valve 306 and the second booster solenoid valve 307;At the same time, the first pressure sensor 3012 and the second pressure sensor 3013 monitor the air pressure inside the first gas tank 301 and the second gas tank 302 respectively. If the first pressure sensor 3012 detects that the air pressure inside the first gas tank 301 has reached the set air pressure value, the first pressure sensor 3012 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing command to the first boosting solenoid valve 306 to stop continuing to deliver gas to the first gas tank 301. If the second pressure sensor 3013 detects that the air pressure inside the second gas tank 302 has reached the set air pressure value, the second pressure sensor 3013 will close the first boosting solenoid valve 306. The device 3013 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing instruction to the second boosting solenoid valve 307 to stop continuing to deliver gas to the second gas storage tank 302. When the first boosting solenoid valve 306 and the second boosting solenoid valve 307 are both closed, the PLC control module 14 transmits a closing instruction to the boosting pump 303, and the boosting pump 303 stops running. At this time, the gas pressure inside the first gas storage tank 301 and the second gas storage tank 302 is the same. After the PLC control module 14 transmits a closing instruction to the boosting pump 303, after an interval of 5 seconds, the PLC control module 14 transmits a start instruction to the first pressure release solenoid valve 309 and the second pressure release solenoid valve 309, respectively. The second pressure relief solenoid valve 3011 makes the first pressure relief solenoid valve 309 and the second pressure relief solenoid valve 3011 open at the same time. At this time, the compressed gas in the first gas tank 301 is input to the interior of the reference chamber 5 through the first pressure relief pipe 308, and the compressed gas in the second gas tank 302 is input to the interior of the test chamber 6 through the second pressure relief pipe 3010, until the air pressure in the first gas tank 301 and the reference chamber 5 is in a balanced state and the air pressure in the second gas tank 302 and the test chamber 6 is in a balanced state, the first boost sensor 9 transmits the air pressure value in the reference chamber 5 to the PLC control module 14, and the second boost sensor 1 0 transmits the air pressure value inside the test chamber 6 to the PLC control module 14. If the two values ​​are the same, it means that the chip package placed inside the test chamber 6 is airtight. If the chip package under test has airtightness problems, part of the air inside the test chamber 6 will enter the chip, making the air pressure inside the test chamber 6 slightly lower than the air pressure inside the reference chamber 5. Therefore, when the air pressure value monitored by the second boost sensor 10 is lower than the air pressure value monitored by the first boost sensor 9, it means that the chip package is not airtight enough. This system greatly improves the detection accuracy of chip package airtightness by using qualified reference chips and the tested chips for reference testing. ;

[0042] Embodiment 3: A first air extraction hole 101 and a second air extraction hole 102 are formed on the right side of the airtight cabinet 1. The first air extraction hole 101 is located inside the reference chamber 5, and the second air extraction hole 102 is located inside the test chamber 6. The first negative pressure solenoid valve 204 is fixedly installed on the periphery of the opening of the first air extraction hole 101, and the second negative pressure solenoid valve 205 is fixedly installed on the periphery of the opening of the second air extraction hole 102.

[0043] Specifically, by opening the first exhaust hole 101, the first negative pressure solenoid valve 204 is connected to the interior of the reference chamber 5, thereby extracting the internal air of the reference chamber 5, and by opening the second exhaust hole 102, the second negative pressure solenoid valve 205 is connected to the interior of the test chamber 6, thereby extracting the air inside the test chamber 6.

[0044] A first air supply hole 103 and a second air supply hole 104 are formed through the left side of the airtight cabinet 1. The first air supply hole 103 is located inside the reference chamber 5, and the second air supply hole 104 is located inside the test chamber 6. A first pressure release solenoid valve 309 is fixedly installed at the periphery of the opening of the first air supply hole 103, and a second pressure release solenoid valve 3011 is fixedly installed at the periphery of the opening of the second air supply hole 104.

[0045] Specifically, by opening the first air supply hole 103, the first pressure relief solenoid valve 309 is connected to the interior of the reference chamber 5, so that the gas inside the first gas tank 301 is input to the interior of the reference chamber 5 through the first pressure relief pipe 308, and by opening the second air supply hole 104, the second pressure relief solenoid valve 3011 is connected to the interior of the test chamber 6, so that the gas inside the second gas tank 302 is input to the interior of the test chamber 6 through the second pressure relief pipe 3010.

[0046] The negative pressure pump 201, the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 are all electrically connected to the PLC control module 14, the boost pump 303, the first boost solenoid valve 306, the second boost solenoid valve 307, the first pressure release solenoid valve 309, the second pressure release solenoid valve 3011, the first pressure sensor 3012 and the second pressure sensor 3013 are all electrically connected to the PLC control module 14, and the first negative pressure sensor 7, the second negative pressure sensor 8, the first boost sensor 9 and the second boost sensor 10 are all electrically connected to the PLC control module 14;

[0047] Specifically, by computer programming the PLC control module 14, and electrically connecting the PLC control module 14 with the negative pressure pump 201, the first negative pressure solenoid valve 204, the second negative pressure solenoid valve 205, the boost pump 303, the first boost solenoid valve 306, the second boost solenoid valve 307, the first pressure release solenoid valve 309, the second pressure release solenoid valve 3011, the first pressure sensor 3012, the second pressure sensor 3013, the first negative pressure sensor 7, the second negative pressure sensor 8, the first boost sensor 9 and the second boost sensor 10, the PLC control module 14 can be used to perform separate command control on the above-mentioned components, so that the system runs according to the computer programming program to achieve the test of the airtightness of the chip package.

[0048] Four fixing rods 12 are fixedly connected to the bottom wall of the airtight cabinet 1 and the top of the partition plate 4, and a plurality of placement tables 13 distributed up and down are fixedly connected between the four fixing rods 12. Two heating tubes 11 distributed up and down are fixedly connected to the rear wall of the airtight cabinet 1. The two heating tubes 11 are respectively located inside the reference chamber 5 and inside the test chamber 6. The two heating tubes 11 are electrically connected to the PLC control module 14.

[0049] Specifically, by setting a fixing rod 12 to support and fix the placement table 13, the chip package is placed on the top of the placement table 13, and the chip package is tested. By turning on the two heating tubes 11, the two heating tubes 11 heat the interior of the reference chamber 5 and the test chamber 6 respectively, so that the temperature inside the reference chamber 5 is consistent with the temperature inside the test chamber 6, thereby avoiding test errors caused by temperature differences and improving test accuracy.

[0050] The front of the airtight cabinet 1 is provided with two upper and lower access windows 105, and the peripheries of the two access windows 105 are connected to airtight doors 106 by hinge rotation. The airtight doors 106 are limited between the airtight cabinet 1 by locks, and a sealing gasket is provided between the airtight door 106 and the access window 105. A tripod is fixedly provided at the bottom of the airtight cabinet 1, and the first gas storage tank 301 and the booster pump 303 are fixedly installed on the top of the tripod at the bottom of the airtight cabinet 1;

[0051] Specifically, by providing the pick-and-place window 105, it is convenient to pick and place the chip package on the top of the placement table 13, and by providing the airtight door 106, the pick-and-place window 105 can be closed to avoid the problem of pressure release in the pick-and-place window 105 during testing.

[0052] A test method for a chip packaging test system includes the following steps:

[0053] S1, computer programming of the PLC control module 14;

[0054] S2, open the upper and lower airtight doors 106, place the chip to be tested on the top of the placement table 13 inside the test chamber 6, and then place the qualified chip of the same specification on the top of the placement table 13 inside the reference chamber 5. After the placement is completed, close and lock the two airtight doors 106 to seal the two access windows 105;

[0055] S3. The tester sets the negative pressure parameters inside the reference chamber 5 and the test chamber 6 through the operation panel, and then starts the negative pressure pump 201, and opens the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 at the same time; the negative pressure pump 201 starts to generate negative pressure suction, which is transmitted to the interior of the airtight cabinet 1 through the negative pressure main pipe 202, the negative pressure branch pipe 203, and the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 in the open state, and the air inside the reference chamber 5 and the test chamber 6 is extracted. During this period, the first negative pressure sensor 7 continuously monitors the air pressure changes inside the reference chamber 5, and the second negative pressure sensor 8 continuously monitors the air pressure changes inside the test chamber 6. If the first negative pressure sensor 7 detects that the air inside the reference chamber 5 is negative, the air inside the test chamber 6 is sucked out. If the pressure inside the test chamber 6 is in a negative pressure state, when the pressure value inside the reference chamber 5 is detected to be the same as the set negative pressure parameter, the collected signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the first negative pressure solenoid valve 204. If the second negative pressure sensor 8 detects that the pressure inside the test chamber 6 is in a negative pressure state, when the pressure value inside the test chamber 6 is detected to be the same as the set negative pressure parameter, the signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the second negative pressure solenoid valve 205. When the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 are both closed, the PLC control module 14 outputs a closing instruction to the negative pressure pump 201, and the negative pressure pump 201 stops running;

[0056] S4, turning on the two heating tubes 11 through the operation panel, the two heating tubes 11 heat the interior of the reference chamber 5 and the test chamber 6 respectively, so that the temperature inside the reference chamber 5 is consistent with the temperature inside the test chamber 6;

[0057] S5. When the internal temperatures of the reference chamber 5 and the test chamber 6 are adjusted to temperatures suitable for testing, and the internal temperatures of the reference chamber 5 and the test chamber 6 are adjusted to be the same, the inflation pressure parameters of the first gas tank 301 and the second gas tank 302 are set through the operation panel, and the booster pump 303 is started. The booster pump 303 delivers compressed gas to the inside of the booster main pipe 304 and the booster branch pipe 305. The compressed gas is delivered to the inside of the first gas tank 301 and the second gas tank 302 respectively through the first booster solenoid valve 306 and the second booster solenoid valve 307; at the same time, the first pressure sensor 3012 and the second pressure sensor 3013 monitor the air pressure inside the first gas tank 301 and the second gas tank 302 respectively. If the first pressure sensor 3012 detects that the air pressure inside the first gas tank 301 has reached the set air pressure When the pressure reaches the set value, the first pressure sensor 3012 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing instruction to the first boosting solenoid valve 306 to stop the further delivery of gas to the first gas storage tank 301. If the second pressure sensor 3013 detects that the air pressure inside the second gas storage tank 302 has reached the set air pressure value, the second pressure sensor 3013 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing instruction to the second boosting solenoid valve 307 to stop the further delivery of gas to the second gas storage tank 302. When the first boosting solenoid valve 306 and the second boosting solenoid valve 307 are both closed, the PLC control module 14 transmits a closing instruction to the boosting pump 303, and the boosting pump 303 stops running. At this time, the air pressure inside the first gas storage tank 301 and the second gas storage tank 302 are the same.

[0058] S6. After the PLC control module 14 sends a shutdown command to the boost pump 303, after an interval of 5 seconds, the PLC control module 14 sends a start command to the first pressure release solenoid valve 309 and the second pressure release solenoid valve 3011, respectively, so that the first pressure release solenoid valve 309 and the second pressure release solenoid valve 3011 are opened at the same time. At this time, the compressed gas inside the first gas tank 301 is input to the interior of the reference chamber 5 through the first pressure release pipe 308, and the compressed gas inside the second gas tank 302 is input to the interior of the test chamber 6 through the second pressure release pipe 3010, until the air pressure inside the first gas tank 301 and the reference chamber 5 is in a balanced state and the air pressure inside the second gas tank 302 and the test chamber 6 is balanced. After the air pressure is in a balanced state, the first boost sensor 9 transmits the air pressure value inside the reference chamber 5 to the PLC control module 14, and the second boost sensor 10 transmits the air pressure value inside the test chamber 6 to the PLC control module 14. If the two values ​​are the same, it means that the air tightness of the chip package placed inside the test chamber 6 is qualified. If the chip package being tested has an air tightness problem, part of the air inside the test chamber 6 will enter the chip, making the air pressure inside the test chamber 6 slightly lower than the air pressure inside the reference chamber 5. Therefore, when the second boost sensor 10 monitors an air pressure value that is lower than the air pressure value monitored by the first boost sensor 9, it means that the chip package is not airtight enough.

[0059] When a chip packaging and testing system of this scheme is working, the PLC control module 14 is firstly computer-programmed;

[0060] Open the upper and lower airtight doors 106, place the chip to be tested on the top of the placement table 13 inside the test chamber 6, and then place the qualified chip of the same specification on the top of the placement table 13 inside the reference chamber 5. After the placement is completed, close and lock the two airtight doors 106 to seal the two access windows 105;

[0061] The tester sets the negative pressure parameters inside the reference chamber 5 and the test chamber 6 through the operation panel, and then starts the negative pressure pump 201, and opens the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 at the same time; the negative pressure pump 201 starts to generate negative pressure suction, and the suction is transmitted to the interior of the airtight cabinet 1 through the negative pressure main pipe 202, the negative pressure branch pipe 203, and the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 in the open state, and the air inside the reference chamber 5 and the test chamber 6 is extracted. During this period, the first negative pressure sensor 7 continuously monitors the air pressure changes inside the reference chamber 5, and the second negative pressure sensor 8 continuously monitors the air pressure changes inside the test chamber 6. If the first negative pressure sensor 7 detects that the air pressure inside the reference chamber 5 is If the air pressure in the test chamber 6 is in a negative pressure state, when the air pressure value in the reference chamber 5 is detected to be the same as the set negative pressure parameter, the collected signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the first negative pressure solenoid valve 204. If the second negative pressure sensor 8 detects that the air pressure in the test chamber 6 is in a negative pressure state, when the air pressure value in the test chamber 6 is detected to be the same as the set negative pressure parameter, the signal is transmitted to the PLC control module 14, and the PLC control module 14 outputs an instruction to close the second negative pressure solenoid valve 205. When the first negative pressure solenoid valve 204 and the second negative pressure solenoid valve 205 are both closed, the PLC control module 14 outputs a closing instruction to the negative pressure pump 201, and the negative pressure pump 201 stops running;

[0062] The two heating tubes 11 are turned on through the operation panel, and the two heating tubes 11 heat the interior of the reference chamber 5 and the test chamber 6 respectively, so that the temperature inside the reference chamber 5 is consistent with the temperature inside the test chamber 6;

[0063] When the internal temperatures of the reference chamber 5 and the test chamber 6 are adjusted to temperatures suitable for testing, and the internal temperatures of the reference chamber 5 and the test chamber 6 are adjusted to be the same, the inflation pressure parameters of the first gas tank 301 and the second gas tank 302 are set through the operation panel, and the booster pump 303 is started. The booster pump 303 delivers compressed gas to the inside of the booster main pipe 304 and the booster branch pipe 305. The compressed gas is delivered to the inside of the first gas tank 301 and the second gas tank 302 respectively through the first booster solenoid valve 306 and the second booster solenoid valve 307; at the same time, the first pressure sensor 3012 and the second pressure sensor 3013 monitor the air pressure inside the first gas tank 301 and the second gas tank 302 respectively. If the first pressure sensor 3012 detects that the air pressure inside the first gas tank 301 has reached the set air pressure value , the first pressure sensor 3012 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing instruction to the first boosting solenoid valve 306 to stop continuing to deliver gas to the first gas storage tank 301. If the second pressure sensor 3013 detects that the air pressure inside the second gas storage tank 302 has reached the set air pressure value, the second pressure sensor 3013 transmits the monitoring signal to the PLC control module 14, and the PLC control module 14 transmits a closing instruction to the second boosting solenoid valve 307 to stop continuing to deliver gas to the second gas storage tank 302. When the first boosting solenoid valve 306 and the second boosting solenoid valve 307 are both closed, the PLC control module 14 transmits a closing instruction to the boosting pump 303, and the boosting pump 303 stops running. At this time, the air pressure inside the first gas storage tank 301 and the second gas storage tank 302 are the same;

[0064] After the PLC control module 14 sends a shutdown command to the boost pump 303, after an interval of 5 seconds, the PLC control module 14 sends a start command to the first pressure relief solenoid valve 309 and the second pressure relief solenoid valve 3011 respectively, so that the first pressure relief solenoid valve 309 and the second pressure relief solenoid valve 3011 are opened at the same time. At this time, the compressed gas inside the first gas tank 301 is input to the interior of the reference chamber 5 through the first pressure relief pipe 308, and the compressed gas inside the second gas tank 302 is input to the interior of the test chamber 6 through the second pressure relief pipe 3010, until the air pressure inside the first gas tank 301 and the reference chamber 5 is in a balanced state and the air pressure inside the second gas tank 302 and the test chamber 6 is balanced. After the pressure is in a balanced state, the first boost sensor 9 transmits the air pressure value inside the reference chamber 5 to the PLC control module 14, and the second boost sensor 10 transmits the air pressure value inside the test chamber 6 to the PLC control module 14. If the two values ​​are the same, it means that the air tightness of the chip package placed inside the test chamber 6 is qualified. If the chip package being tested has an air tightness problem, part of the air inside the test chamber 6 will enter the chip, making the air pressure inside the test chamber 6 slightly lower than the air pressure inside the reference chamber 5. Therefore, when the second boost sensor 10 monitors an air pressure value that is lower than the air pressure value monitored by the first boost sensor 9, it means that the chip package is not airtight enough.

[0065] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A chip packaging test system, Features: The invention comprises an airtight cabinet (1), wherein a negative pressure assembly (2) is provided on the right part of the airtight cabinet (1), and an air supply assembly (3) is provided on the left part of the airtight cabinet (1); a partition plate (4) is fixedly connected to the inner wall of the airtight cabinet (1), and the partition plate (4) divides the interior of the airtight cabinet (1) into two parts, namely a reference chamber (5) and a test chamber (6); and the reference chamber (5) is located at the bottom of the test chamber (6); a first negative pressure sensor (7) and a second negative pressure sensor (8) are fixedly provided on the right wall of the airtight cabinet (1); a first boost sensor (9) and a second boost sensor (10) are fixedly provided on the left wall of the airtight cabinet (1); and a PLC control module (14) is fixedly provided on the top of the airtight cabinet (1); The negative pressure assembly (2) comprises a negative pressure pump (201), the negative pressure end of the negative pressure pump (201) is fixedly connected to a negative pressure main pipe (202), one end of the negative pressure main pipe (202) away from the negative pressure pump (201) is connected to a negative pressure branch pipe (203) via a three-way pipe, and the ends of the negative pressure branch pipe (203) are respectively connected to a first negative pressure solenoid valve (204) and a second negative pressure solenoid valve (205); The gas supply assembly (3) comprises a first gas storage tank (301) fixedly mounted on the left side of the gas-tight cabinet (1) and a second gas storage tank (302) fixedly mounted on the left side of the gas-tight cabinet (1), wherein the first gas storage tank (301) is located at the bottom of the second gas storage tank (302), and the gas supply assembly (3) further comprises a booster pump (303), wherein the output end of the booster pump (303) is fixedly connected to a booster main pipe (304), a booster branch pipe (305) is connected to the outer wall of the booster main pipe (304) via a three-way pipe, a second booster solenoid valve (307) is fixedly connected to one end of the booster main pipe (304) away from the booster pump (303), and an end of the booster branch pipe (305) is fixedly connected to the booster main pipe (304) A first boost solenoid valve (306) is fixedly connected, the first boost solenoid valve (306) is connected to the input end of the first gas storage tank (301), and the second boost solenoid valve (307) is connected to the input end of the second gas storage tank (302); the output end of the first gas storage tank (301) is fixedly connected to a first pressure relief pipe (308), the output end of the second gas storage tank (302) is fixedly connected to a second pressure relief pipe (3010), one end of the first pressure relief pipe (308) away from the first gas storage tank (301) is fixedly connected to the first pressure relief solenoid valve (309), and one end of the second pressure relief pipe (3010) away from the second gas storage tank (302) is fixedly connected to the second pressure relief solenoid valve (3011); A first air extraction hole (101) and a second air extraction hole (102) are formed through the right side of the airtight cabinet (1), the first air extraction hole (101) is located inside the reference chamber (5), and the second air extraction hole (102) is located inside the test chamber (6), the first negative pressure solenoid valve (204) is fixedly installed on the periphery of the opening of the first air extraction hole (101), and the second negative pressure solenoid valve (205) is fixedly installed on the periphery of the opening of the second air extraction hole (102), and a first air supply hole (103) and a second air supply hole (104) are formed through the left side of the airtight cabinet (1), the first air supply hole (103) is located inside the reference chamber (5), and the second air supply hole (104) is fixedly installed on the periphery of the opening of the second air extraction hole (102). The first pressure release solenoid valve (309) is fixedly mounted on the periphery of the opening of the first gas supply hole (103), and the second pressure release solenoid valve (3011) is fixedly mounted on the periphery of the opening of the second gas supply hole (104). A first pressure sensor (3012) is fixedly mounted on the top of the first gas storage tank (301), and the first pressure sensor (3012) extends to the inside of the first gas storage tank (301). A second pressure sensor (3013) is fixedly mounted on the top of the second gas storage tank (302), and the second pressure sensor (3013) extends to the inside of the second gas storage tank (302); The negative pressure pump (201), the first negative pressure solenoid valve (204) and the second negative pressure solenoid valve (205) are all electrically connected to the PLC control module (14); the boost pump (303), the first boost solenoid valve (306), the second boost solenoid valve (307), the first pressure release solenoid valve (309), the second pressure release solenoid valve (3011), the first pressure sensor (3012) and the second pressure sensor (3013) are all electrically connected to the PLC control module (14); and the first negative pressure sensor (7), the second negative pressure sensor (8), the first boost sensor (9) and the second boost sensor (10) are all electrically connected to the PLC control module (14).

2. A chip packaging test system according to claim 1, Features: The first negative pressure sensor (7) and the first pressure increase sensor (9) are both located inside the reference chamber (5), and the second negative pressure sensor (8) and the second pressure increase sensor (10) are both located inside the test chamber (6).

3. A chip packaging test system according to claim 2, Features: Four fixing rods (12) are fixedly connected to the bottom wall of the airtight cabinet (1) and the top of the partition plate (4); a plurality of vertically distributed placement tables (13) are fixedly connected between the four fixing rods (12); two vertically distributed heating tubes (11) are fixedly connected to the rear wall of the airtight cabinet (1); the two heating tubes (11) are respectively located inside the reference chamber (5) and inside the test chamber (6); and the two heating tubes (11) are electrically connected to the PLC control module (14).

4. A chip packaging test system according to claim 3, Features: The front of the airtight cabinet (1) is provided with two upper and lower access windows (105), the peripheries of the two access windows (105) are rotatably connected to airtight doors (106) via hinges, the airtight doors (106) are limited in position between the airtight cabinet (1) via locks, and a sealing gasket is provided between the airtight doors (106) and the access windows (105).

5. A chip packaging test system according to claim 4, Features: A tripod is fixedly provided at the bottom of the airtight cabinet (1), and the first gas storage tank (301) and the booster pump (303) are both fixedly mounted on the top of the tripod at the bottom of the airtight cabinet (1).

6. The chip packaging test system testing method according to claim 5, Features: The usage steps include the following: S1, programming the PLC control module (14); S2, opening the upper and lower airtight doors (106), placing the chip to be tested on the top of the placement table (13) located inside the test chamber (6), and then placing the standard qualified chip of the same specification on the top of the placement table (13) located inside the reference chamber (5). After the placement is completed, the two airtight doors (106) are closed and locked, thereby sealing the two access windows (105); S3. The tester sets the negative pressure parameters inside the reference chamber (5) and the test chamber (6) through the operation panel, and then starts the negative pressure pump (201), and opens the first negative pressure solenoid valve (204) and the second negative pressure solenoid valve (205) at the same time; the negative pressure pump (201) starts to generate negative pressure suction, which is transmitted to the inside of the airtight cabinet (1) through the negative pressure main pipe (202), the negative pressure branch pipe (203) and the first negative pressure solenoid valve (204) and the second negative pressure solenoid valve (205) in the open state, and the air inside the reference chamber (5) and the test chamber (6) is extracted. During this period, the first negative pressure sensor (7) continuously monitors the changes in the air pressure inside the reference chamber (5), and the second negative pressure sensor (8) continuously monitors the changes in the air pressure inside the test chamber (6). If the first negative pressure sensor (7) detects that the air pressure inside the reference chamber (5) is negative, the negative pressure sensor (8) will start to monitor the changes in the air pressure inside the test chamber (6). When the air pressure in the reference chamber (5) is in a negative pressure state, and when it is detected that the air pressure value inside the reference chamber (5) is the same as the set negative pressure parameter, a collected signal is transmitted to the PLC control module (14), and the PLC control module (14) outputs an instruction to close the first negative pressure solenoid valve (204); if the second negative pressure sensor (8) detects that the air pressure inside the test chamber (6) is in a negative pressure state, and when it is detected that the air pressure value inside the test chamber (6) is the same as the set negative pressure parameter, a signal is transmitted to the PLC control module (14), and the PLC control module (14) outputs an instruction to close the second negative pressure solenoid valve (205); when the first negative pressure solenoid valve (204) and the second negative pressure solenoid valve (205) are both closed, the PLC control module (14) outputs a closing instruction to the negative pressure pump (201), and the negative pressure pump (201) stops operating; S4, turning on the two heating tubes (11) through the operation panel, the two heating tubes (11) respectively heating the interior of the reference chamber (5) and the test chamber (6), so that the temperature inside the reference chamber (5) is consistent with the temperature inside the test chamber (6); S5. When the internal temperatures of the reference chamber (5) and the test chamber (6) are adjusted to temperatures suitable for testing, and the internal temperatures of the reference chamber (5) and the test chamber (6) are adjusted to be the same, the inflation pressure parameters of the first gas storage tank (301) and the second gas storage tank (302) are set through the operation panel, and the booster pump (303) is started. The booster pump (303) delivers compressed gas to the inside of the booster main pipe (304) and the booster branch pipe (305). The compressed gas is delivered to the inside of the first gas storage tank (301) and the second gas storage tank (302) through the first booster solenoid valve (306) and the second booster solenoid valve (307). At the same time, the first pressure sensor (3012) and the second pressure sensor (3013) monitor the gas pressure inside the first gas storage tank (301) and the second gas storage tank (302) respectively. If the first pressure sensor (3012) detects that the gas pressure inside the first gas storage tank (301) has reached the set gas pressure, the pressure sensor (3013) is turned on. When the pressure value reaches the set value, the first pressure sensor (3012) transmits a monitoring signal to the PLC control module (14), and the PLC control module (14) transmits a closing instruction to the first boosting solenoid valve (306), thereby stopping the continued delivery of gas to the first gas storage tank (301). If the second pressure sensor (3013) detects that the gas pressure inside the second gas storage tank (302) has reached the set pressure value, the second pressure sensor (3013) transmits a monitoring signal to the PLC control module (14), and the PLC control module (14) transmits a closing instruction to the second boosting solenoid valve (307), thereby stopping the continued delivery of gas to the second gas storage tank (302). When the first boosting solenoid valve (306) and the second boosting solenoid valve (307) are both closed, the PLC control module (14) transmits a closing instruction to the boosting pump (303), and the boosting pump (303) stops running. At this time, the gas pressure inside the first gas storage tank (301) and the second gas storage tank (302) are the same. S6. After an interval of 5 seconds after the PLC control module (14) transmits a closing instruction to the boosting pump (303), the PLC control module (14) transmits a starting instruction to the first pressure release solenoid valve (309) and the second pressure release solenoid valve (3011), respectively, so that the first pressure release solenoid valve (309) and the second pressure release solenoid valve (3011) are opened simultaneously. At this time, the compressed gas inside the first gas storage tank (301) is input into the interior of the reference chamber (5) through the first pressure release pipe (308), and the compressed gas inside the second gas storage tank (302) is input into the interior of the test chamber (6) through the second pressure release pipe (3010), until the gas pressure inside the first gas storage tank (301) and the reference chamber (5) are in a balanced state and the gas pressure inside the second gas storage tank (302) and the test chamber is in a balanced state. After the air pressure inside the test chamber (6) is in a balanced state, the first boost sensor (9) transmits the air pressure value inside the reference chamber (5) to the PLC control module (14), and at the same time, the second boost sensor (10) transmits the air pressure value inside the test chamber (6) to the PLC control module (14). If the two values ​​are the same, it means that the air tightness of the chip package placed inside the test chamber (6) is qualified. If the chip package being tested has an air tightness problem, part of the air inside the test chamber (6) will enter the chip, making the air pressure inside the test chamber (6) slightly lower than the air pressure inside the reference chamber (5). Therefore, when the air pressure value monitored by the second boost sensor (10) is less than the air pressure value monitored by the first boost sensor (9), it means that the air tightness of the chip package is not enough.