A method and system for judging tunnel jam risk
Through technologies such as tunnel rock mass mechanical analysis models and hypergraph neural networks, the tunnel excavation resistance and surrounding rock conditions are identified and evaluated, solving the problem of large excavation resistance discrimination errors in the existing technology, and realizing machine jamming in complex tunnel environments. The accurate identification of risks and evaluation of rock breaking efficiency improve the dynamic adaptability and data sharing efficiency of tunnel boring machines.
Patent Information
- Application Number
- CN202410242638.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-04
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-03-04
AI Technical Summary
Existing tunnel jam risk assessment methods lack dynamic adaptability when dealing with tunneling resistance and cannot effectively identify different geological structures in complex tunnel environments, resulting in large tunneling resistance discrimination errors and affecting the accuracy of subsequent steps.
The tunnel rock mass mechanics analysis model and the naive Bayesian tunneling resistance clustering algorithm are used to identify the source and distribution of tunneling resistance, combined with the hypergraph neural network to determine the surrounding rock status, and the engineering geology BIM model and edge computing gateway are used to calculate the surrounding rock strength and The deformation modulus data is used to judge the rock-breaking efficiency through the cutterhead rotation resistance and effective rock-breaking resistance, and the excavation thrust is optimized through the recommended algorithm to confirm the machine jamming risk level.
It improves the accuracy of surrounding rock status identification, enhances the system's dynamic adaptability, can accurately identify machine jamming risks in complex tunnel environments, and improves the rock-breaking efficiency and data sharing capabilities of full-section tunnel boring machines.
Smart Images

Figure CN118171564B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of tunnel jammer risk assessment, and in particular to a tunnel jammer risk assessment method and system. Background Art
[0002] Different from the traditional drilling and blasting method, TBM tunneling has the characteristics of fast speed, good shaping and low pollution, but it is not adaptable enough to the changes in the strata. TBM jams often occur, which to a certain extent restricts the work efficiency of TBM. In order to better play the efficiency advantage of TBM excavation, it is urgent to judge the risk of TBM jams.
[0003] In the actual use of the tunnel stuck machine risk assessment method, since the existing method mainly relies on traditional tunneling resistance processing technology to deal with tunnel excavation resistance, it cannot effectively classify the complex interference brought by the tunnel environment, resulting in poor error in the resolution of excavation resistance, affecting the accuracy of subsequent steps. The existing method is relatively backward in the reconstruction of the risk of rock formations caused by the stuck machine, and cannot accurately obtain the position and deformation modulus data of different tunneling depths, which limits the recognition ability of the system. The existing method is relatively simple in terms of rock breaking efficiency assessment and excavation direction error judgment, lacks dynamic adaptability, and may perform poorly in complex tunnel environments. The existing method lacks an effective full-section tunnel boring machine coordination mechanism under different geological structures, and it is difficult to adapt to more complex and diverse tunnel risk requirements. Therefore, the present invention proposes a method and system for assessing tunnel stuck machine risks. Summary of the invention
[0004] The purpose of the present invention is to solve the shortcomings in the prior art and to propose a method and system for evaluating the risk of tunnel jams.
[0005] In order to achieve the above object, the present invention adopts the following technical solution: a method for judging the risk of tunnel jammers, comprising the following steps:
[0006] S1. Obtain tunneling resistance, use the tunnel rock mechanics analysis model and the naive Bayes tunneling resistance clustering algorithm to classify the resistance source, resistance distribution and resistance manifestation in the tunneling resistance, identify the surrounding rock influencing factors and resolution errors of the tunneling resistance, and obtain the clustered tunneling resistance as the initial tunneling resistance;
[0007] S2. Using a hypergraph neural network to identify the factors of tunneling resistance jamming, determine the state of the tunnel surrounding rock, and obtain a surrounding rock state determination result as an initial tunnel jam determination;
[0008] S3. Using the engineering geological BIM model and edge computing gateway, the initial judgment of the machine jam and the initial excavation resistance are used to calculate the surrounding rock strength and deformation modulus data at different excavation depths to generate the rock formation risk of the machine jam;
[0009] S4. Use the cutter head rotation resistance and the effective rock breaking resistance to judge the rock breaking efficiency, judge the optimal rock breaking efficiency of the full-face tunnel boring machine according to the rock formation risk of the machine jamming, and generate a rock breaking efficiency unit time curve;
[0010] S5. Determine the excavation direction error by combining the effective rock-breaking thrust and the effective rock-breaking torque. Adjust the excavation direction and perform dynamic rock-breaking efficiency statistics by combining the rock-breaking efficiency unit time curve with the variance of the excavation speed of the tunnel jam risk, and obtain an excavation thrust optimization plan.
[0011] S6. Adopting the recommended algorithm and utilizing the excavation thrust optimization scheme, the full-face tunnel boring machine under different geological structures is used to confirm the risk of machine jam and integrate the data to obtain the risk level of tunnel jam at different excavation depths.
[0012] As a further solution of the present invention, the steps of obtaining tunnel excavation resistance, using the tunnel rock mechanics analysis model and the naive Bayes excavation resistance clustering algorithm, classifying the resistance source, resistance distribution and resistance manifestation in the tunnel excavation resistance, identifying the surrounding rock influencing factors and resolution errors of the excavation resistance, and obtaining the clustered tunnel excavation resistance as the initial excavation resistance are specifically as follows:
[0013] The tunneling resistance is collected and transmitted by tunnel mechanical sensing equipment to obtain the original tunneling resistance;
[0014] The original tunneling resistance is input, and a normalization method is used to perform data limitation and data mapping to obtain a preprocessing tunneling resistance for rock mass mechanics analysis;
[0015] The tunneling resistance is preprocessed by rock mass mechanics analysis and processed based on the naive Bayes tunneling resistance clustering algorithm. The manifestation of tunneling resistance is explored so that it can be calculated under different distribution forms and the clustered tunneling resistance is obtained.
[0016] As a further solution of the present invention, the steps of using a hypergraph neural network to identify the initial tunneling resistance and the factors of the tunneling resistance blocking the tunnel, and determining the surrounding rock state of the tunnel, and obtaining the surrounding rock state determination result and the initial determination of the tunneling resistance blocking the tunnel are as follows:
[0017] Input the initial tunneling resistance into the hypergraph neural network, use the convolutional hypergraph neural network to identify the jamming factors, and obtain different characteristics of the jamming factors;
[0018] By utilizing the different characteristics of the jamming factors, the HG-DiffPool hypergraph pooling method reduces the feature dimension and surrounding rock state recognition, and outputs the surrounding rock state judgment result.
[0019] As a further solution of the present invention, an engineering geological BIM model and an edge computing gateway are used to calculate the surrounding rock strength and deformation modulus data at different excavation depths using the initial judgment of the machine jam and the initial excavation resistance. The steps for generating the rock formation risk of the machine jam are specifically as follows:
[0020] Input the initial judgment and initial excavation resistance of the card machine;
[0021] Use different strength calculation models to obtain surrounding rock strength data, calculate the fluctuation range of deformation modulus through the modulus calculation model, and obtain the type of rock formation deformation force;
[0022] The types of rock deformation forces are used to create edge computing gateway input data, and the engineering geological BIM model is used to perform geological modeling and statistics of geological parameters at different excavation depths to output the rock formation risk that may cause the machine to jam.
[0023] As a further solution of the present invention, the rock breaking efficiency is judged by using the cutter head rotation resistance and the effective rock breaking resistance, and the optimal rock breaking efficiency of the full-face tunnel boring machine is judged according to the rock formation risk of the machine being stuck. The steps of generating the rock breaking efficiency unit time curve are specifically as follows:
[0024] Input the rock formation risk of the machine jam, calculate the interval of rock breaking efficiency on the rock formation risk of the machine jam by the rotation resistance of the cutter head, and output the preliminary rock breaking efficiency;
[0025] The effective rock breaking resistance is used to perform rock breaking resistance analysis on the preliminary rock breaking efficiency, the optimal rock breaking efficiency of the full-face tunnel boring machine is judged, and a rock breaking efficiency unit time curve is generated.
[0026] As a further solution of the present invention, the step of combining the effective rock-breaking thrust and the effective rock-breaking torque to judge the excavation direction error, adjusting the excavation direction and performing dynamic rock-breaking efficiency statistics through the rock-breaking efficiency unit time curve combined with the variance of the tunnel jam risk excavation speed, and obtaining the excavation thrust optimization solution is specifically as follows:
[0027] Input the rock breaking efficiency unit time curve, perform dynamic rock breaking efficiency evaluation through variance calculation, and obtain dynamic rock breaking efficiency;
[0028] The dynamic rock breaking efficiency is utilized and effective rock breaking torque is adopted to perform risk assessment and strategy optimization of the dynamic rock breaking efficiency, and generate a tunneling thrust optimization plan.
[0029] As a further solution of the present invention, the recommended algorithm is adopted, and the tunneling thrust optimization solution is used to confirm the risk of machine jamming and integrate data of full-face tunnel boring machines under different geological structures. The specific steps of obtaining the risk level of tunnel jamming at different tunneling depths are as follows:
[0030] By using the thrust optimization scheme, risk sharing among full-face tunnel boring machines under different geological structures is established through a recommendation algorithm, and a machine jam risk confirmation and data integration model is generated;
[0031] Input the risk confirmation and data integration model of the machine jam, use the whale algorithm to track the risks of full-face tunnel boring machines under different geological structures, and generate a risk tracking plan;
[0032] By using the risk tracking scheme, the correlation between the risks of machine jams is calculated through a correlation analysis algorithm, and the risk levels of machine jams in tunnels with different excavation depths are obtained.
[0033] A tunnel jam risk-based assessment system is used to execute a tunnel jam risk-based assessment method. The tunnel jam risk-based assessment system consists of a tunneling resistance clustering unit, a tunnel jam factor identification and surrounding rock state identification unit, a tunnel jam rock stratum risk modeling unit, a rock breaking efficiency assessment unit, a tunneling direction error judgment and tunneling thrust optimization program unit, and a full-section tunnel boring machine sharing unit under different geological structures.
[0034] As a further solution of the present invention, the excavation resistance clustering unit is responsible for capturing the original excavation resistance from the tunnel mechanics sensing equipment, performing rock mass mechanics analysis preprocessing, and finally using the naive Bayesian excavation resistance clustering algorithm method to initialize the excavation resistance and output the clustered tunnel excavation resistance;
[0035] The blocking factor identification and surrounding rock state identification unit uses convolution to identify blocking factors based on clustered tunneling resistance, reduces feature dimensions and identifies surrounding rock states through the HG-DiffPool hypergraph pooling method, and outputs surrounding rock state judgment results;
[0036] The rock formation risk modeling unit obtains surrounding rock strength data through the engineering geological BIM model based on the surrounding rock status judgment result, and constructs the rock formation risk based on the edge computing gateway input data.
[0037] As a further solution of the present invention, the rock breaking efficiency evaluation unit inputs the rock formation risk of the machine, uses the rotation resistance of the cutter head to find the initial rock breaking efficiency, and optimizes the rock breaking efficiency through the effective rock breaking resistance to generate the best rock breaking efficiency unit time curve;
[0038] The tunneling direction error judgment and tunneling thrust optimization solution unit uses variance calculation and effective rock breaking torque, uses the optimal rock breaking efficiency unit time curve to adjust the tunneling direction and perform dynamic rock breaking efficiency statistics, and outputs a tunneling thrust optimization solution;
[0039] The full-section tunnel boring machine sharing unit under different geological structures uses the recommendation algorithm and the whale algorithm, and utilizes the excavation thrust optimization scheme to confirm the jam risk and integrate data between full-section tunnel boring machines under different geological structures, and obtains the tunnel jam risk level of different excavation depths.
[0040] Compared with the prior art, the present invention has the following beneficial effects:
[0041] The present invention proposes a method and system for judging the risk of tunnel boring machines being stuck. Through the tunneling resistance processing technology, the resistance source, resistance distribution and resistance manifestation of the tunnel boring resistance are effectively classified, making the tunneling resistance clearer, thereby improving the accuracy of the surrounding rock state identification. The engineering geological BIM model can be used to accurately identify the risk structure of the rock formation that causes the tunnel boring machine in the tunnel environment. Combining the rotation resistance of the cutter head and the effective rock-breaking thrust, it not only provides an accurate judgment of the rock-breaking efficiency, but also increases the dynamic adaptability of the system, and can respond to environmental changes in a timely manner. Through the recommendation algorithm, the execution efficiency and data sharing capability of the full-section tunnel boring machine under different geological structures are achieved. The present invention significantly improves the efficiency of identifying the risk of a full-section tunnel boring machine being stuck, and ensures the effective progress of tunnel boring. BRIEF DESCRIPTION OF THE DRAWINGS
[0042] Figure 1 Schematic diagram of the workflow of the method of the present invention;
[0043] Figure 2 2 is a unit composition diagram of the system of the present invention. DETAILED DESCRIPTION
[0044] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application may be combined with each other. The present application is further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0045] See also Figure 1 The present invention provides a technical solution: a method for judging the risk of tunnel jammers, comprising the following steps:
[0046] S1. Obtain tunneling resistance, use the tunnel rock mechanics analysis model and the naive Bayes tunneling resistance clustering algorithm to classify the resistance source, resistance distribution and resistance manifestation in the tunneling resistance, identify the surrounding rock influencing factors and resolution errors of the tunneling resistance, and obtain the clustered tunneling resistance as the initial tunneling resistance;
[0047] S2. Using a hypergraph neural network to identify the initial tunneling resistance and the factors causing the tunnel jam, determine the tunnel surrounding rock state, and obtain the surrounding rock state determination result as the initial tunnel jam determination;
[0048] S3. Using the engineering geological BIM model and edge computing gateway, based on the initial judgment of the machine jam and the initial excavation resistance, the surrounding rock strength and deformation modulus data at different excavation depths are calculated to generate the rock stratum risk of the machine jam;
[0049] S4. Use the cutter head rotation resistance and effective rock breaking resistance to judge the rock breaking efficiency, judge the optimal rock breaking efficiency of the full-face tunnel boring machine according to the risk of the rock formation that is stuck, and generate a rock breaking efficiency unit time curve;
[0050] S5. The excavation direction error is judged by combining the effective rock-breaking thrust and the effective rock-breaking torque. The excavation direction is adjusted and the dynamic rock-breaking efficiency is counted by combining the rock-breaking efficiency unit time curve with the variance of the tunnel jam risk excavation speed to obtain the excavation thrust optimization plan.
[0051] S6. Using the recommended algorithm and based on the excavation thrust optimization scheme, the full-section tunnel boring machine jam risk confirmation and data integration are carried out under different geological structures to obtain the tunnel jam risk level at different excavation depths.
[0052] By applying the tunnel rock mechanics analysis model and the tunneling resistance clustering algorithm, the surrounding rock influencing factors and the resolution error of tunneling resistance can be improved.
[0053] This will help mitigate issues such as scattering, absorption, and resistance distribution in the tunnel environment, making tunneling resistance easier to analyze and interpret.
[0054] By using hypergraph neural network to identify the factors of tunneling resistance and surrounding rock state, combined with engineering geological BIM model and edge computing gateway, the position and deformation modulus data of tunnel surrounding rock state can be accurately located. This is crucial for the full-section tunnel boring machine to accurately identify and track the tunneling speed of surrounding rock state in the tunnel environment. Combined with the cutter head rotation resistance and effective rock breaking resistance, the dynamic rock breaking efficiency of the full-section tunnel boring machine can be judged according to the information provided by the rock formation risk and surrounding rock state. Through efficient rock breaking efficiency judgment, the system can select the best rock breaking efficiency to avoid obstacles and quickly reach the surrounding rock state position. By using effective rock breaking thrust and effective rock breaking torque, the full-section tunnel boring machine can judge the tunneling direction error and adjust the dynamic rock breaking efficiency. The system can predict the possible tunneling direction and adjust the rock breaking efficiency accordingly based on the movement mode and environmental information of the surrounding rock state, thereby improving the system's adaptability and performance. The recommendation algorithm is applied to realize the jam risk confirmation and data integration between full-section tunnel boring machines under different geological structures. This will improve the efficiency of tunnel risk management and enable various systems to cooperate with each other, share information and collaborate to complete complex tunnel risks.
[0055] The steps to obtain tunnel excavation resistance, use the tunnel rock mechanics analysis model and the naive Bayes excavation resistance clustering algorithm to classify the resistance source, resistance distribution and resistance manifestation in the tunnel excavation resistance, identify the surrounding rock influencing factors and resolution errors of the excavation resistance, and obtain the clustered tunnel excavation resistance as the initial excavation resistance are as follows:
[0056] The tunneling resistance is collected and transmitted by tunnel mechanical sensing equipment to obtain the original tunneling resistance;
[0057] Input the original tunneling resistance, use the normalization method to limit and map the data, and get the preprocessing tunneling resistance for rock mass mechanics analysis;
[0058] The tunneling resistance is preprocessed by rock mass mechanics analysis and processed based on the naive Bayes tunneling resistance clustering algorithm. The manifestation of tunneling resistance is explored so that it can be calculated under different distribution forms and the clustered tunneling resistance is obtained.
[0059] The normalization method is used to data-limit and map the tunneling resistance. This step can reduce the effects of light transmission in the tunnel environment, such as light intensity attenuation and color shift. Through correction, the pre-processed tunneling resistance of rock mechanics analysis can more accurately reflect the real appearance of the tunnel scene. The tunneling resistance clustering algorithm such as Naive Bayes is used to adjust the contrast of the initial tunneling resistance and make it calculable under different distribution forms. The Naive Bayes tunneling resistance clustering algorithm can make the visual effect of the initial tunneling resistance clearer and more visible, thereby improving the surrounding rock influencing factors and resolution errors of tunneling resistance. The clustered tunneling resistance can classify the source of resistance, resistance distribution and resistance manifestation, and identify the surrounding rock influencing factors and resolution errors of tunneling resistance. This will provide more accurate and reliable tunneling resistance data for full-section tunnel boring machines, thereby clustering the performance and effect of the system. The effect of tunneling resistance clustering helps to improve the visual visibility of tunneling resistance and make the tunnel surrounding rock state easier to detect and identify. This is critical for full-face tunnel boring machines to accurately identify and track the state of the surrounding rock and advance speed in complex tunnel environments. By providing clearer and more detailed advance resistance, the advance resistance clustering technology can improve the accuracy, data sharing capabilities and reliability of full-face tunnel boring machines.
[0060] The hypergraph neural network is used to identify the initial tunneling resistance and the factors that cause the tunneling resistance to jam the tunnel, and the surrounding rock state is determined. The specific steps for obtaining the surrounding rock state judgment result and the initial tunneling resistance jamming judgment are as follows:
[0061] Input the initial tunneling resistance into the hypergraph neural network, use the convolutional hypergraph neural network to identify the jamming factors, and obtain different characteristics of the jamming factors;
[0062] Based on the different characteristics of the jamming factors, the HG-DiffPool hypergraph pooling method reduces the feature dimension and surrounding rock state identification, and outputs the surrounding rock state judgment results.
[0063] The clustered tunneling resistance is used as input and passed to the hypergraph neural network. The hypergraph neural network extracts the characteristics of tunneling resistance layer by layer through a series of convolution and pooling operations. The different characteristics of these jamming factors present the characteristics of tunneling resistance and can capture the key characteristics of the tunnel surrounding rock state. The different characteristics of the extracted jamming factors are input into the HG-DiffPool hypergraph pooling method to reduce the feature dimension and surrounding rock state identification.
[0064] It can effectively process high-dimensional feature data and has good classification performance.
[0065] Hypergraph neural networks are able to extract high-level semantic and structural features from clustered tunneling resistances. These features can more accurately represent the properties and characteristics of the tunnel surrounding rock state, improving the accuracy of surrounding rock state identification and data sharing capabilities. The HG-DiffPool hypergraph pooling method can effectively handle multi-category surrounding rock state identification risks. It has good generalization and scalability, can identify different types of tunnel surrounding rock states, and provide corresponding initial judgments of the machine. Both hypergraph neural networks and HG-DiffPool hypergraph pooling methods can be quickly calculated on modern hardware accelerators. This enables the surrounding rock state identification process to be completed in real-time or near real-time timeframes, meeting the real-time performance requirements of full-face tunnel boring machines.
[0066] Using the engineering geological BIM model and edge computing gateway, the surrounding rock strength and deformation modulus data at different excavation depths are calculated based on the initial judgment of the machine jam and the initial excavation resistance. The specific steps for generating the rock stratum risk of the machine jam are as follows:
[0067] Input the card machine's initial judgment and initial excavation resistance;
[0068] Use different strength calculation models to obtain surrounding rock strength data, calculate the fluctuation range of deformation modulus through the modulus calculation model, and obtain the type of rock formation deformation force;
[0069] Create edge computing gateway input data based on the type of rock deformation force, use the engineering geological BIM model to perform geological modeling and statistics of geological parameters at different excavation depths, and output the rock formation risk that causes the machine to jam.
[0070] By inputting the initial judgment of the jammer and the initial excavation resistance, the system obtains the identification information and optimized visual input of different excavation depths. Next, different strength calculation models are used to obtain the surrounding rock strength data, and the fluctuation range of the deformation modulus is calculated by the modulus calculation model to obtain the type of rock formation deformation force. The edge computing gateway input data is created based on the type of rock formation deformation force, and the engineering geological BIM model is applied to perform geological modeling and statistics of geological parameters at different excavation depths, which generates accurate jamming rock formation risks. The integration of these steps enables the system to calculate the surrounding rock strength and deformation modulus data at different excavation depths, and generate jamming rock formation risks that can be used for subsequent analysis and decision-making. At the same time, the engineering geological BIM model and the edge computing gateway can effectively classify the background resistance sources and improve the data sharing capabilities of the system. In summary, the steps based on the engineering geological BIM model and the edge computing gateway provide important recognition and understanding capabilities for the risk assessment of tunnel jammers, and provide beneficial effects for the system's surrounding rock state recognition, environmental recognition, and excavation direction error judgment and other risks.
[0071] The rock breaking efficiency is judged by using the cutter head rotation resistance and the effective rock breaking resistance. According to the risk of the rock formation that causes the machine to get stuck, the optimal rock breaking efficiency of the full-face tunnel boring machine is judged. The specific steps for generating the rock breaking efficiency unit time curve are as follows:
[0072] Input the rock formation risk of the machine jam, calculate the range of rock breaking efficiency based on the rock formation risk of the machine jam through the rotation resistance of the cutter head, and output the preliminary rock breaking efficiency;
[0073] The effective rock breaking resistance is used to analyze the initial rock breaking efficiency, the optimal rock breaking efficiency of the full-section tunnel boring machine is evaluated, and the rock breaking efficiency unit time curve is generated.
[0074] The rock formation risk of the machine is input as input, and the rock breaking efficiency unit time curve is generated according to the optimal rock breaking efficiency. The unit time curve contains the optimized rock breaking efficiency information, obstacles avoided, and places passed by. The rock breaking efficiency evaluation method that integrates the use of cutter head rotation resistance and effective rock breaking resistance can bring many beneficial effects in full-face tunnel boring machines. This includes judging the optimal rock breaking efficiency, flexibly adapting to the environment, considering obstacles and constraints, and generating information-rich rock breaking efficiency unit time curves. The implementation of these steps can improve the system's rock breaking efficiency evaluation more accurate and reliable.
[0075] The excavation direction error is judged by combining the effective rock-breaking thrust and the effective rock-breaking torque. The excavation direction is adjusted and the dynamic rock-breaking efficiency is statistically analyzed by combining the rock-breaking efficiency unit time curve with the variance of the tunnel jam risk excavation speed. The steps to obtain the excavation thrust optimization plan are as follows:
[0076] Input the rock breaking efficiency unit time curve, perform dynamic rock breaking efficiency evaluation through variance calculation, and obtain dynamic rock breaking efficiency;
[0077] Based on the dynamic rock breaking efficiency, the effective rock breaking torque is used to conduct risk assessment and strategy optimization of the dynamic rock breaking efficiency, and generate an optimization plan for the tunneling thrust.
[0078] The rock-breaking efficiency unit time curve is used as input, and the common variance calculation is used to perform dynamic rock-breaking efficiency judgment. In this stage, the rock-breaking efficiency unit time curve is used to guide the system to select the best rock-breaking efficiency in the tunnel environment. Then, based on the obtained dynamic rock-breaking efficiency, the effective rock-breaking torque is used for risk assessment and strategy optimization. It comprehensively evaluates the potential risks and benefits by considering the uncertainty of the environment and the state of the surrounding rock for risk assessment, thereby generating the best tunneling thrust optimization scheme. Finally, according to the optimized tunneling thrust optimization scheme, the tunneling direction of the full-face tunnel boring machine is predicted and the dynamic rock-breaking efficiency is adjusted. The method brings multiple benefits from the implementation perspective. It realizes dynamic rock-breaking efficiency judgment and flexibly adjusts the rock-breaking efficiency according to the real-time environment and risk assessment requirements. Risk assessment and strategy optimization are performed through effective rock-breaking torque, which improves the accuracy and efficiency of rock-breaking efficiency judgment. In addition, it has real-time and adaptive properties, and can adjust the tunneling thrust optimization scheme in real time according to the dynamic environment. Through accurate judgment of the excavation direction error, the system can better understand the movement pattern and excavation direction intention of the tunnel jam machine's risk excavation speed, and thus better select the optimization scheme of rock breaking efficiency and excavation thrust. The method of comprehensively using the excavation direction error judgment of effective rock breaking thrust and effective rock breaking torque and dynamic rock breaking efficiency adjustment can improve the risk assessment performance of the full-section tunnel boring machine, cluster its ability to adapt to changing environments, and improve accuracy and efficiency.
[0079] Using the recommended algorithm and based on the excavation thrust optimization scheme, the full-face tunnel boring machine under different geological structures is used to confirm the risk of machine jam and integrate data. The specific steps to obtain the risk level of tunnel jam at different excavation depths are as follows:
[0080] Based on the thrust optimization scheme, a recommendation algorithm is used to establish risk sharing among full-face tunnel boring machines under different geological structures, and a machine jam risk confirmation and data integration model is generated;
[0081] Input the card machine risk confirmation and data integration model, use the whale algorithm to track the risks of full-section tunnel boring machines under different geological structures, and generate a risk tracking plan;
[0082] Based on the risk tracking scheme, the correlation between the risks of tunnel jams is calculated through the correlation analysis algorithm, and the risk levels of tunnel jams at different excavation depths are obtained.
[0083] Based on the thrust optimization scheme, the risk sharing between full-section tunnel boring machines under different geological structures is established through the recommendation algorithm, forming a machine jam risk confirmation and data integration model. In this way, full-section tunnel boring machines under different geological structures can share the thrust optimization scheme and real-time information to achieve effective collaborative decision-making and risk tracking. Next, the whale algorithm is used for risk tracking. According to the available resources of the system, the capabilities of full-section tunnel boring machines under different geological structures, and risk priorities, the most suitable risks are tracked for each full-section tunnel boring machine under different geological structures, and a reasonable risk tracking scheme is generated. Then, the full-section tunnel boring machines under different geological structures execute tunnel risks according to the risk tracking scheme, and the correlation analysis algorithm is used to calculate the correlation between the jam risks. The correlation analysis algorithm performs real-time control and adjustment according to the current state and surrounding rock state based on the feedback loop to ensure that the full-section tunnel boring machines under different geological structures can jam the risks stably and accurately. Finally, after completing the tunnel risk, the full-section TBM under different geological structures obtains the tunnel jam risk level at different excavation depths, including the results of risk execution, data collection and detection results. The risk unit time curve provides detailed risk information, providing valuable data and reference for subsequent analysis, evaluation and decision-making. The use of the recommended algorithm for tunnel risk jam risk confirmation and data integration has the beneficial effects of efficient risk tracking, real-time full-section TBM communication under different geological structures, stable jam risk and risk assessment, and detailed risk unit time curve. This method can improve the efficiency, accuracy and stability of the full-section TBM, and provide useful information and guidance for the implementation and decision-making of the system.
[0084] See also Figure 2 A tunnel jam risk-based evaluation system is used to execute a tunnel jam risk-based evaluation method. A tunnel jam risk-based evaluation system is composed of a tunneling resistance clustering unit, a jam factor identification and surrounding rock state identification unit, a jam rock stratum risk modeling unit, a rock breaking efficiency evaluation unit, a tunneling direction error judgment and tunneling thrust optimization plan unit, and a full-section tunnel boring machine sharing unit under different geological structures.
[0085] The system can improve the accuracy of tunnel surrounding rock state detection. Through the clustering of tunneling resistance and identification of jamming factors and surrounding rock state identification units, it can optimize the tunneling resistance resolution error in the tunnel environment and achieve accurate surrounding rock state identification. The jamming rock formation risk modeling unit generates the jamming rock formation risk of the tunnel environment, providing detailed environmental information for rock breaking efficiency evaluation and risk assessment decision-making, thereby improving the efficiency and accuracy of risk assessment.
[0086] In addition, through the excavation direction error judgment and excavation thrust optimization plan unit, the system can predict the excavation direction pattern according to the surrounding rock state, and take appropriate excavation thrust optimization plans to cope with the changing tunnel environment and surrounding rock state excavation direction. The full-section tunnel boring machine sharing unit under different geological structures realizes data fusion and machine jam risk confirmation between full-section tunnel boring machines under different geological structures, optimizes risk tracking and resource utilization, and improves the performance and efficiency of the entire full-section tunnel boring machine. In summary, a tunnel jam risk-based evaluation system integrates multiple units, which significantly improves the efficiency, accuracy and reliability of tunnel risk execution and surrounding rock state detection by improving accuracy, providing environmental information, realizing excavation direction error judgment and excavation thrust optimization plans, and collaborative control.
[0087] The tunneling resistance clustering unit is responsible for capturing the original tunneling resistance from the tunnel mechanics sensing equipment, performing rock mass mechanics analysis preprocessing, and finally using the naive Bayes tunneling resistance clustering algorithm to calculate the initial tunneling resistance and output the clustered tunneling resistance.
[0088] The jam factor identification and surrounding rock state identification unit uses convolution to identify jam factors based on clustered tunneling resistance, reduces feature dimensions and identifies surrounding rock states through the HG-DiffPool hypergraph pooling method, and outputs surrounding rock state judgment results;
[0089] The rock formation risk modeling unit obtains the surrounding rock strength data through the engineering geological BIM model based on the surrounding rock status judgment results, and constructs the rock formation risk based on the edge computing gateway input data.
[0090] The rock breaking efficiency evaluation unit inputs the rock formation risk of the machine, uses the rotation resistance of the cutter head to find the initial rock breaking efficiency, and optimizes the rock breaking efficiency through the effective rock breaking resistance to generate the optimal rock breaking efficiency unit time curve;
[0091] The tunneling direction error judgment and tunneling thrust optimization plan unit uses variance calculation and effective rock-breaking torque to adjust the tunneling direction and perform dynamic rock-breaking efficiency statistics based on the optimal rock-breaking efficiency unit time curve, and outputs a tunneling thrust optimization plan;
[0092] The shared unit of full-section tunnel boring machines under different geological structures uses the recommendation algorithm and the whale algorithm to confirm the risk of jamming and integrate data between full-section tunnel boring machines under different geological structures based on the tunneling thrust optimization scheme, and obtains the risk level of tunnel jamming at different tunneling depths.
[0093] The tunneling resistance clustering unit clusters the resolution errors of tunneling resistance through rock mass mechanics analysis preprocessing and naive Bayes tunneling resistance clustering algorithm, thereby improving the accuracy and reliability of surrounding rock state detection. The jamming factor identification and surrounding rock state identification unit uses convolution to identify jamming factors, and combines the HG-DiffPool hypergraph pooling method to reduce feature dimensions and surrounding rock state identification, so that the system can quickly and accurately judge the tunnel surrounding rock state and generate detailed surrounding rock state judgment results. This helps the system to fully understand the tunnel environment and the accuracy of surrounding rock state monitoring. The jamming rock formation risk modeling unit combines the surrounding rock state judgment results and uses the engineering geological BIM model to obtain surrounding rock strength data, and constructs the jamming rock formation risk of the tunnel environment based on this. This modeling method provides the system with more detailed environmental information to support the optimization of rock breaking efficiency judgment and risk judgment decision. The rock breaking efficiency evaluation unit uses the cutter head rotation resistance to find the initial rock breaking efficiency, and further optimizes the rock breaking efficiency through the effective rock breaking resistance to generate the optimal rock breaking efficiency unit time curve. Such a rock-breaking efficiency evaluation scheme can reduce rock-breaking efficiency redundancy and energy consumption, and improve the efficiency of risk evaluation. The excavation direction error judgment and excavation thrust optimization scheme unit uses variance calculation and effective rock-breaking torque to make excavation direction error judgment and dynamic rock-breaking efficiency adjustment according to the optimal rock-breaking efficiency unit time curve. Such an implementation strategy enables the system to make intelligent risk evaluation decisions based on the real-time situation and the excavation direction of the surrounding rock state, clustering the system's adaptability and reliability. The full-section tunnel boring machine sharing unit under different geological structures uses the recommendation algorithm and the whale algorithm to realize the risk confirmation and data integration of the full-section tunnel boring machines under different geological structures. This collaborative control scheme can optimize risk tracking and resource utilization, and improve the performance and efficiency of the entire full-section tunnel boring machine. At the same time, after completing the tunnel risk, the system can obtain the tunnel jam risk level of different excavation depths, including the results of risk execution, collected data and test results, etc., providing valuable data and reference for the subsequent analysis, evaluation and decision-making of the system.
[0094] The tunneling resistance clustering unit improves the resolution error of tunneling resistance, reduces the resistance source and distribution, and clusters the accuracy of surrounding rock state identification through rock mass mechanics analysis preprocessing and naive Bayes tunneling resistance clustering algorithm. The jamming factor identification and surrounding rock state identification unit uses hypergraph neural network and machine learning algorithm to quickly and accurately judge the tunnel surrounding rock state and generate surrounding rock state judgment results.
[0095] The rock formation risk modeling unit uses the surrounding rock state judgment results and engineering geological BIM model and other technologies to construct the rock formation risk of the tunnel environment and provide detailed environmental information. The rock breaking efficiency evaluation unit uses the cutter head rotation resistance and effective rock breaking resistance to generate the optimal rock breaking efficiency unit time curve to ensure that the system can efficiently and safely evaluate the risk. The driving direction error judgment and driving thrust optimization scheme unit combines the effective rock breaking thrust and effective rock breaking torque to judge the driving direction error and dynamically adjust the rock breaking efficiency according to the driving direction mode of the surrounding rock state and the optimal rock breaking efficiency unit time curve. The full-section tunnel boring machine sharing unit under different geological structures uses communication protocols and distributed algorithms to realize the risk confirmation and data integration between full-section tunnel boring machines under different geological structures, optimize risk tracking and resource utilization. In summary, a tunnel jam risk evaluation system based on the comprehensive use of multiple units can significantly improve the efficiency, accuracy and reliability of tunnel risk execution and surrounding rock state detection by improving accuracy, providing environmental information, realizing driving direction error judgment and driving thrust optimization schemes, and optimizing collaborative control.
[0096] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various equivalent changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for judging the risk of tunnel jamming, characterized in that: The following steps are involved: S1. Obtain tunneling resistance, use the tunnel rock mechanics analysis model and the naive Bayes tunneling resistance clustering algorithm to classify the resistance source, resistance distribution and resistance manifestation in the tunneling resistance, identify the surrounding rock influencing factors and resolution errors of the tunneling resistance, and obtain the clustered tunneling resistance as the initial tunneling resistance; S2. Using a hypergraph neural network to identify the factors of tunneling resistance jamming, determine the state of the tunnel surrounding rock, and obtain a surrounding rock state determination result as an initial tunnel jam determination; S3. Using the engineering geological BIM model and edge computing gateway, the initial judgment of the machine jam and the initial excavation resistance are used to calculate the surrounding rock strength and deformation modulus data at different excavation depths to generate the rock jam risk, specifically, S31, inputting the initial judgment and initial excavation resistance of the card machine; S32, using different strength calculation models to obtain surrounding rock strength data, calculating the fluctuation range of the deformation modulus through the modulus calculation model, and obtaining the type of rock formation deformation force; S33, using the types of rock formation deformation forces to create edge computing gateway input data, using the engineering geological BIM model to perform geological modeling and statistics of geological parameters at different excavation depths, and outputting the risk of rock formations that cause machine jams; S4. Use the cutter head rotation resistance and the effective rock breaking resistance to judge the rock breaking efficiency, judge the optimal rock breaking efficiency of the full-face tunnel boring machine according to the rock formation risk of the machine jamming, and generate a rock breaking efficiency unit time curve; S5. Determine the excavation direction error by combining the effective rock-breaking thrust and the effective rock-breaking torque. Adjust the excavation direction and perform dynamic rock-breaking efficiency statistics by combining the rock-breaking efficiency unit time curve with the variance of the excavation speed of the tunnel jam risk, and obtain an excavation thrust optimization plan. S6. Adopting the recommended algorithm and utilizing the excavation thrust optimization scheme, the full-face tunnel boring machine under different geological structures is used to confirm the risk of machine jam and integrate the data to obtain the risk level of tunnel jam at different excavation depths.
2. According to claim 1, a method for judging the risk of tunnel jamming is characterized in that: S1, collecting and transmitting the tunneling resistance through the tunnel mechanical sensing equipment to obtain the original tunneling resistance; The original tunneling resistance is input, and a normalization method is used to perform data limitation and data mapping to obtain a preprocessing tunneling resistance for rock mass mechanics analysis; The tunneling resistance is preprocessed by rock mass mechanics analysis and processed based on the naive Bayes tunneling resistance clustering algorithm. The manifestation of tunneling resistance is explored so that it can be calculated under different distribution forms and the clustered tunneling resistance is obtained.
3. The method for judging the risk of tunnel jamming according to claim 1 is characterized in that: The S2 inputs the initial excavation resistance into the hypergraph neural network, uses a convolutional hypergraph neural network to identify the jamming factors, and obtains different features of the jamming factors; uses the different features of the jamming factors, and uses the HG-DiffPool hypergraph pooling method to reduce feature dimensions and surrounding rock state identification, and outputs the surrounding rock state judgment result.
4. The method for judging the risk of tunnel jamming according to claim 1 is characterized in that: The S4 inputs the stuck rock formation risk, calculates the interval of rock breaking efficiency on the stuck rock formation risk through the cutter head rotation resistance, and outputs the preliminary rock breaking efficiency; uses the effective rock breaking resistance to perform rock breaking resistance analysis on the preliminary rock breaking efficiency, judges the optimal rock breaking efficiency of the full-section tunnel boring machine, and generates a rock breaking efficiency unit time curve.
5. The method for judging the risk of tunnel jamming according to claim 1 is characterized in that: The S5 inputs the rock breaking efficiency unit time curve, performs dynamic rock breaking efficiency evaluation through common variance calculation, and obtains the dynamic rock breaking efficiency; utilizes the dynamic rock breaking efficiency and adopts the effective rock breaking torque to perform risk assessment and strategy optimization of the dynamic rock breaking efficiency, and generates an optimization plan for tunneling thrust.
6. The method for judging the risk of tunnel jamming according to claim 1 is characterized in that: S6, using the excavation thrust optimization scheme, establishing risk sharing among full-section tunnel boring machines under different geological structures through a recommendation algorithm, and generating a machine jam risk confirmation and data integration model; inputting the machine jam risk confirmation and data integration model, using the whale algorithm to track the risks of full-section tunnel boring machines under different geological structures, and generating a risk tracking scheme; By using the risk tracking scheme, the correlation between the risks of machine jams is calculated through a correlation analysis algorithm, and the risk levels of machine jams in tunnels with different excavation depths are obtained.
7. A system for judging the risk of tunnel jams, characterized in that: The evaluation system based on tunnel stuck risk is used to execute the evaluation method based on tunnel stuck risk described in any one of claims 1 to 6. The evaluation system based on tunnel stuck risk is composed of a tunneling resistance clustering unit, a tunnel stuck factor identification and surrounding rock state identification unit, a tunnel stuck rock formation risk modeling unit, a rock breaking efficiency evaluation unit, a tunneling direction error judgment and tunneling thrust optimization plan unit, and a full-section tunnel boring machine sharing unit under different geological structures.
8. The tunnel jam risk assessment system according to claim 7 is characterized in that: The excavation resistance clustering unit is responsible for capturing the original excavation resistance from the tunnel mechanics sensor equipment, performing rock mass mechanics analysis preprocessing, and finally using the naive Bayesian excavation resistance clustering algorithm method to obtain the initial excavation resistance and output the clustered tunnel excavation resistance; The blocking factor identification and surrounding rock state identification unit uses convolution to identify blocking factors based on clustered tunneling resistance, reduces feature dimensions and identifies surrounding rock states through the HG-DiffPool hypergraph pooling method, and outputs surrounding rock state judgment results; The rock formation risk modeling unit obtains surrounding rock strength data through the engineering geological BIM model based on the surrounding rock status judgment result, and constructs the rock formation risk based on the edge computing gateway input data.
9. The evaluation system based on tunnel jam risk according to claim 7 is characterized in that: The rock breaking efficiency evaluation unit inputs the risk of the rock formation stuck in the machine, uses the rotation resistance of the cutter head to find the initial rock breaking efficiency, and optimizes the rock breaking efficiency through the effective rock breaking resistance to generate the optimal rock breaking efficiency unit time curve; The tunneling direction error judgment and tunneling thrust optimization solution unit uses variance calculation and effective rock breaking torque, uses the optimal rock breaking efficiency unit time curve to adjust the tunneling direction and perform dynamic rock breaking efficiency statistics, and outputs a tunneling thrust optimization solution; The full-section tunnel boring machine sharing unit under different geological structures uses the recommendation algorithm and the whale algorithm, and utilizes the excavation thrust optimization scheme to confirm the jam risk and integrate data between full-section tunnel boring machines under different geological structures, and obtains the tunnel jam risk level of different excavation depths.
