A control method and system for superconducting wire production line
Through real-time monitoring and control of each process data of the superconducting wire production line, the problem of insufficient collaborative control of the superconducting wire production line equipment has been solved, the painting qualification rate has been improved, the scrap rate has been reduced, and the rapid traceability of superconducting wire quality problems has been achieved.
Patent Information
- Application Number
- CN202410478206.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-19
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2044-04-19
AI Technical Summary
The existing superconducting wire production line equipment lacks coordinated control, resulting in frequent problems in the painting process, resulting in a high superconducting wire scrap rate and difficulty in tracing quality problems.
A control method for the superconducting wire production line is adopted to obtain each process data in real time and compare it with the threshold range. If the data exceeds the range, the system will shut down or adjust the equipment parameters. The real-time process data of each superconducting wire is stored to achieve traceability.
It improves the qualification rate of superconducting wire painting, reduces the amount of scrap, and quickly finds quality problems through traceability to ensure product quality.
Smart Images

Figure CN118173326B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of enameled wire painting control, and in particular to a control method and system for a superconducting wire production line. Background Art
[0002] Enameled wire is widely used in electrical equipment. When the enameled wire is painted, the wire continuously passes through the pay-off equipment, forming equipment, annealing equipment, painting equipment, testing equipment and winding equipment. After the wire spool of the pay-off equipment is finished, the fully loaded spool is quickly replaced, and the front and rear wires are welded together to achieve continuous painting; in the winding equipment, after a spool is fully loaded, the wire is cut, and the empty spool is replaced and rewound. The core wire of conventional enameled wire is copper wire, aluminum wire, copper-clad aluminum or aluminum-clad copper. The core wire material is single or the structure is simple. The core wire welding position in the enameled wire has little effect on the performance of the enameled wire. Therefore, the existing enameled wire painting process replaces the spool in the winding equipment based on the full load of the spool. The length of the enameled wire wound on each fully loaded spool of the same specification is basically the same.
[0003] Superconducting wires are used in medical equipment, laboratory instruments, superconducting energy storage, maglev trains and other fields. The core wire of superconducting wires is required to be continuous and uniform in thickness, especially for superconducting wires used to make coils. The core wire structure of a superconducting wire is generally a copper sheath wrapped with multiple thin superconducting wires, and the copper sheath is wrapped with insulating paint. If there is a welding position in the core wire of a superconducting wire, it will greatly affect the performance of the superconducting coil. Therefore, in the painting process of superconducting wires, each spool of the winding equipment is required to wind up a superconducting wire without welding positions.
[0004] The existing superconducting wire production line equipment is not coordinated and controlled. If a problem occurs in a certain process of the painting process, the entire superconducting wire will be scrapped, and the scrap rate of superconducting wire painting is high. Summary of the invention
[0005] The purpose of the present invention is to provide a control method for a superconducting wire production line, improve the product qualification rate of superconducting wire painting, and store the painting process data of each superconducting wire for easy traceability;
[0006] The purpose of the present invention is to provide a superconducting wire painting control system. By applying the above control method, the painting qualification rate is high and the amount of waste is small.
[0007] To achieve this object, the present invention adopts the following technical solutions:
[0008] A control method for a superconducting wire production line, applied to a superconducting wire production line, wherein the superconducting wire production line comprises a pay-off device, a molding device, an annealing device, a painting device, a testing device and a winding device arranged in sequence;
[0009] The control method comprises the following steps:
[0010] (1) Real-time acquisition of process data of superconducting wire painting and the position of joints of two adjacent superconducting wires, wherein the process data includes wire laying data, forming data, annealing data, painting data, inspection data and winding data;
[0011] (2) comparing the process data with a threshold range; if all of the process data are within the threshold range, the superconducting wire production line continues to operate; if at least one of the process data exceeds the threshold range, determining that an abnormal process has occurred, and controlling the superconducting wire production line to shut down or adjusting equipment operating parameters of the superconducting wire production line according to the location of the superconducting wire joint and the abnormal process;
[0012] (3) Real-time process data of superconducting wire painting is acquired and stored once per second, and the joints of the two adjacent superconducting wires are used as nodes to store the real-time process data of each superconducting wire.
[0013] Furthermore, in step (2), when the detection data exceeds a threshold range, the abnormal process is one or more of the pay-off process, the forming process, the annealing process, the painting process and the winding process, and the superconducting wire production line is controlled to shut down;
[0014] When any data in the process data except the detection data exceeds a threshold range, and the superconducting wire in the superconducting wire production line has no joints, the equipment operation parameters of the superconducting wire production line are adjusted to restore the process data to within the threshold range, and if the process data cannot be restored, the superconducting wire production line is shut down;
[0015] When any data in the process data except the detection data exceeds a threshold range and two adjacent superconducting wire joints are located in the production line, the superconducting wire production line is controlled to shut down or equipment operating parameters of the superconducting wire production line are adjusted according to the process in which the two adjacent superconducting wire joints are located.
[0016] Furthermore, when only one data in the process data other than the detection data exceeds the threshold range, if two adjacent superconducting wire joints are located at the abnormal process or after the abnormal process, the superconducting wire production line is controlled to shut down; if two adjacent superconducting wire joints are located before the abnormal process, the equipment operating parameters of the superconducting wire production line are adjusted; if the process data does not recover to the pre-threshold range after the two superconducting wire joints move to the abnormal process, the superconducting wire production line is controlled to shut down.
[0017] Furthermore, the length of each device in the superconducting wire production line is calculated according to the running speed and running time of the superconducting wire.
[0018] Furthermore, the length of the wire between the outlet end of the wire-releasing device and the outlet end of the painting device is obtained as the online processing length, and the process where the midpoint of the online processing length is located is the midpoint process;
[0019] When multiple data in the process data except the detection data exceed the threshold range, if the two adjacent superconducting wire joints are located at the midpoint process or after the midpoint process, the superconducting wire production line is controlled to shut down; if the two adjacent superconducting wire joints are located before the midpoint process, the equipment operating parameters of the superconducting wire production line are adjusted, and if the process data does not recover to the pre-threshold range after the two superconducting wire joints move to the midpoint process, the superconducting wire production line is controlled to shut down.
[0020] Further, the pay-off data includes pay-off speed and pay-off tension;
[0021] The forming data includes forming tension and cross-sectional dimensions of the wire after forming;
[0022] The annealing data includes annealing time and annealing temperature;
[0023] The painting data includes the tension of the paint wire, the speed of the paint wire, the temperature of the paint liquid, the temperature of the paint environment, the baking temperature, the baking time, and the cross-sectional dimensions of the wire after each coat of paint;
[0024] The detection data includes the cross-sectional dimensions of the finished wire, the number of pinholes, the location of the pinholes, the number of surface irregularities, and the location of surface irregularities;
[0025] The winding data includes winding speed, bobbin moving speed and wire in place monitoring at the bobbin end.
[0026] Furthermore, the winding device includes a winding bobbin and a laser detector, and the laser detector is used to monitor the presence of the wire at the end of the bobbin, that is, to detect whether the wire reaches the end of the winding bobbin.
[0027] Furthermore, two adjacent superconducting wires are welded with ferromagnetic material to form a joint, and the joint identification mechanism includes a pressure sensor and a strong magnet connected to each other, and the strong magnet is used to generate suction to the joint to change the sensing data of the pressure sensor.
[0028] Furthermore, the method further comprises step (4), establishing and storing a processing file for each superconducting wire, wherein the processing file comprises a material number, a processing time, a device number, an operator number and real-time process data.
[0029] A superconducting wire painting control system, applying the above-mentioned superconducting wire production line control method; the control system includes a data acquisition module, a processing module, an instruction issuing module and a storage module;
[0030] The data acquisition module is used to acquire the process data of superconducting wire painting and the position of the joints of two adjacent superconducting wires in real time;
[0031] The processing module is used to compare the process data with the threshold range and determine the abnormal process, and generate a control instruction;
[0032] The instruction sending module is used to send control instructions to the wire-paying equipment, the forming equipment, the annealing equipment, the painting equipment, the testing equipment and / or the winding equipment;
[0033] The storage module is used to establish and store processing files, which include incoming material numbers, processing time, equipment numbers, operator numbers, and real-time process data.
[0034] The technical solution provided by the present invention may include the following beneficial effects:
[0035] In this technical solution, the data of each process of the superconducting wire production line is obtained in real time to determine whether the superconducting wire production line is operating normally. If a process is abnormal, the superconducting wire production line is controlled to shut down or the equipment operating parameters of the superconducting wire production line are adjusted according to the position of the superconducting wire joint and the abnormal process, so as to maximize the painting qualification rate and reduce the scrap rate. At the same time, the real-time process data corresponding to each superconducting wire and the length position is stored to achieve traceability. If quality problems are found in the detection of superconducting wires before application, the cause of the problem can be found through traceability and the quality of the same batch of products can be verified. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 This is a flow chart of a control method for a superconducting wire production line. DETAILED DESCRIPTION
[0037] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0038] In the description of the present invention, unless otherwise specified, "plurality" means two or more.
[0039] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] Combine the following Figure 1, describing a control method for a superconducting wire production line according to an embodiment of the present invention.
[0041] A control method for a superconducting wire production line is applied to a superconducting wire production line, wherein the superconducting wire production line includes a pay-off device, a molding device, an annealing device, a painting device, a testing device and a winding device which are arranged in sequence;
[0042] The control method comprises the following steps:
[0043] (1) Real-time acquisition of superconducting wire painting process data and the location of two adjacent superconducting wire joints. The process data includes wire laying data, forming data, annealing data, painting data, inspection data, and winding data;
[0044] (2) Compare the process data with the threshold range. If all the process data are within the threshold range, the superconducting wire production line continues to operate. If at least one of the process data exceeds the threshold range, determine the abnormal process, and control the superconducting wire production line to shut down or adjust the equipment operating parameters of the superconducting wire production line according to the location of the superconducting wire joint and the abnormal process.
[0045] (3) The real-time process data of superconducting wire painting is acquired and stored once per second. The joints of two adjacent superconducting wires are used as nodes to store the real-time process data of each superconducting wire.
[0046] In this technical solution, the data of each process of the superconducting wire production line is obtained in real time to determine whether the superconducting wire production line is operating normally. If a process is abnormal, the superconducting wire production line is controlled to shut down or the equipment operating parameters of the superconducting wire production line are adjusted according to the position of the superconducting wire joint and the abnormal process, so as to maximize the painting qualification rate and reduce the scrap rate. At the same time, the real-time process data corresponding to each superconducting wire and the length position is stored to achieve traceability. If quality problems are found in the detection of superconducting wires before application, the cause of the problem can be found through traceability and the quality of the same batch of products can be verified.
[0047] It is understandable that the incoming material of the pay-off equipment is generally a wire with a circular cross-section. The forming equipment squeezes the round wire into a flat wire or a round wire with a smaller diameter, and also increases the length of the wire. By obtaining the position of the joints of two adjacent superconducting wires, it is possible to determine whether the joint of the superconducting wire is located in the superconducting wire production line and the specific process where the joint is located. At the same time, combined with the abnormal process, the control method of the equipment operation of the superconducting wire production line is determined to ensure the length of the superconducting wire while reducing the amount of waste.
[0048] Specifically, the pay-off data, forming data, annealing data, painting data, testing data and winding data all have corresponding threshold ranges, which are the ranges between the lowest value and the highest value.
[0049] It should be noted that when at least one of the process data exceeds the threshold range and an abnormal process is determined to have occurred, the equipment or controller issues an abnormal alarm, manually adjusts the equipment operating parameters of the production line, and causes the controller to record the superconducting wire length interval with abnormal data.
[0050] In one embodiment of the present invention, in step (2), when the detection data exceeds the threshold range, the abnormal process is one or more of the pay-off process, the forming process, the annealing process, the painting process and the winding process, and the superconducting wire production line is controlled to shut down;
[0051] When any data except the detection data in the process data exceeds the threshold range, and the superconducting wire in the superconducting wire production line has no joints, the equipment operation parameters of the superconducting wire production line are adjusted to restore the process data to the threshold range. If the process data cannot be restored, the superconducting wire production line is shut down;
[0052] When any data in the process data except the detection data exceeds the threshold range and two adjacent superconducting wire joints are located in the production line, the superconducting wire production line is controlled to shut down or the equipment operating parameters of the superconducting wire production line are adjusted according to the process where the two adjacent superconducting wire joints are located.
[0053] It can be understood that the test data is used to reflect whether the superconducting wire is qualified. If there is a problem with the test data, it means that the enameled wire is unqualified. The abnormal process is one or more of the wire-laying process, forming process, annealing process, painting process and winding process. The superconducting wire production line needs to be shut down immediately, and each process must be checked and eliminated to stop the loss in time. The number of unqualified products is at most two superconducting wires to prevent batches of unqualified products.
[0054] When other data except the detection data are abnormal, it means that the abnormality has not caused defective products. If the superconducting wire in the superconducting wire production line has no joints, the equipment operating parameters of the superconducting wire production line can be adjusted in time to ensure that the superconducting wire being processed is a qualified product; if the joints of two adjacent superconducting wires are located in the production line, the superconducting wire production line can be controlled to stop or the equipment operating parameters of the superconducting wire production line can be adjusted according to the process where the two adjacent superconducting wire joints are located. This greatly improves the qualified rate of products.
[0055] In another embodiment of the present invention, when only one data in the process data other than the detection data exceeds the threshold range, if two adjacent superconducting wire joints are located at an abnormal process or after an abnormal process, the superconducting wire production line is controlled to shut down; if two adjacent superconducting wire joints are located before the abnormal process, the equipment operating parameters of the superconducting wire production line are adjusted; if the process data does not recover to the pre-threshold range after the two superconducting wire joints proceed to the abnormal process, the superconducting wire production line is controlled to shut down.
[0056] When only one data in the process data exceeds the threshold range except the detection data, it means that only one process is abnormal. If the joints of two adjacent superconducting wires are located in the abnormal process or after the abnormal process, the superconducting wire production line is controlled to shut down. Then, one of the two adjacent superconducting wires in the downstream is a qualified product, and the end part of the other superconducting wire is of low quality. At this time, the production line is shut down, and only the end part of the other superconducting wire needs to be cut off, and the length of the waste product is small. Moreover, shutting down the equipment to check it at this time is more conducive to the smooth progress of subsequent processing than adjusting the parameters. It is understandable that the superconducting wire has a larger length after being flattened and formed, and the superconducting wire needs to be cut when in use. When the length of a superconducting wire is slightly shorter, it will not affect the use.
[0057] If the joints of two adjacent superconducting wires are located before the abnormal process, the equipment operating parameters of the superconducting wire production line are adjusted. If the process data does not recover to the pre-threshold range after the two superconducting wire joints advance to the abnormal process, the superconducting wire production line is controlled to shut down. It can be understood that if the joints of two adjacent superconducting wires are located before the abnormal process, the tail end of the downstream superconducting wire of the two adjacent superconducting wires has a larger length and low quality. If the process parameters can be restored to normal by adjusting the equipment operating parameters of the superconducting wire production line, the appearance of defective products can be avoided.
[0058] Furthermore, the length of each device in the superconducting wire production line is calculated according to the running speed and running time of the superconducting wire.
[0059] Through multiple joint identification mechanisms and length acquisition, the position of the joints of two superconducting wires in the production line can be detected, and the association of real-time data and length locations can be achieved, that is, the process data of a certain position of the superconducting wire can be obtained.
[0060] In another embodiment of the present invention, the length of the wire between the outlet end of the wire-paying device and the outlet end of the painting device is obtained as the online processing length, and the process where the midpoint of the online processing length is located is the midpoint process;
[0061] When multiple data in the process data except the detection data exceed the threshold range, if the joints of two adjacent superconducting wires are located at the midpoint process or after the midpoint process, the superconducting wire production line is controlled to shut down; if the joints of two adjacent superconducting wires are located before the midpoint process, the equipment operating parameters of the superconducting wire production line are adjusted, and if the process data does not recover to the pre-threshold range after the two superconducting wire joints move to the midpoint process, the superconducting wire production line is controlled to shut down.
[0062] In this technical solution, the control method of the superconducting wire production line is determined based on the midpoint process, which is particularly suitable for controlling multiple data in the process data other than the detection data that exceed the threshold range, ensuring that the qualified lengths of the two superconducting wires before and after meet the requirements.
[0063] Specifically, the pay-off data includes the pay-off speed and the pay-off tension; the forming data includes the forming tension and the cross-sectional size of the wire after forming; the annealing data includes the annealing time and the annealing temperature; the painting data includes the painting wire tension, the painting wire speed, the paint liquid temperature, the painting environment temperature, the baking temperature, the baking time and the cross-sectional size of the wire after each coat of paint; the inspection data includes the cross-sectional size of the finished wire, the number of pinholes, the position of the pinholes, the number of surface irregularities and the position of the surface irregularities; the winding data includes the winding speed, the spool moving speed and the monitoring of the wire in place at the end of the spool.
[0064] In one embodiment of the present invention, the winding device includes a winding bobbin and a laser detector, and the laser detector is used to monitor the wire at the end of the bobbin, that is, to detect whether the wire reaches the end of the winding bobbin.
[0065] When the superconducting wire is wound on the bobbin, if the pressure of two adjacent rows of wires is different, the superconducting wire will be deformed, which may cause the superconducting wire to be unqualified. Therefore, making the superconducting wire evenly arranged on the bobbin can further ensure the quality of the superconducting wire. When winding, the laser detector detects whether the wire reaches the end of the winding bobbin to ensure that the wire is close to the top and bottom of the winding bobbin. Based on the speed setting of the winding bobbin, the uniform arrangement of the superconducting wire is guaranteed.
[0066] In one embodiment of the present invention, two adjacent superconducting wires are welded with ferromagnetic material to form a joint, and the joint identification mechanism includes a pressure sensor and a strong magnet connected to each other. The strong magnet is used to generate suction to the joint to change the sensing data of the pressure sensor.
[0067] Based on the ferromagnetic material welding to form the joint, when the joint passes through the strong magnet, the strong magnet generates attraction to the joint, and when the pressure sensor is located at the bottom of the strong magnet and the joint passes through the top of the strong magnet, the pressure value detected by the pressure sensor changes, and the joint can be accurately identified. Preferably, two adjacent superconducting wires are welded to form a joint through ferromagnetic material with iron wire as a connecting piece, which can improve the sensitivity of joint identification.
[0068] In one embodiment of the present invention, the control method of the superconducting wire production line further includes step (4), establishing and storing a processing file for each superconducting wire, wherein the processing file includes an incoming material number, processing time, equipment number, operator employee number, and real-time process data to facilitate traceability.
[0069] Correspondingly, the present invention also provides a superconducting wire painting control system, which applies the above-mentioned superconducting wire production line control method; the control system includes a data acquisition module, a processing module, an instruction issuing module and a storage module;
[0070] The data acquisition module is used to obtain the process data of superconducting wire painting in real time and obtain the position of the joints of two adjacent superconducting wires;
[0071] The processing module is used to compare the process data with the threshold range and determine the abnormal process, and generate control instructions;
[0072] The instruction sending module is used to send control instructions to the pay-off equipment, the forming equipment, the annealing equipment, the painting equipment, the testing equipment and / or the winding equipment;
[0073] The storage module is used to establish and store processing files, which include incoming material number, processing time, equipment number, operator employee number and real-time process data.
[0074] Specifically, the data acquisition module is used to implement step (1), and the data acquisition module is electrically connected to the pay-off equipment, the forming equipment, the annealing equipment, the painting equipment, the testing equipment, the winding equipment, the joint identification mechanism and the length measurement mechanism to obtain the process data and the joint position in real time. The processing module is used to implement step (2), and the storage module is used to implement steps (3) and (4). The data acquisition module, the processing module, the instruction issuing module and the storage module are interconnected to realize data transmission.
[0075] Other structures and operations of the control method and system of a superconducting wire production line according to the embodiment of the present invention are well known to those skilled in the art and will not be described in detail here.
[0076] In the description of this specification, the description with reference to the terms "embodiment", "example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0077] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.
Claims
1. A control method for a superconducting wire production line, characterized in that: Applicable to a superconducting wire production line, the superconducting wire production line includes a pay-off device, a molding device, an annealing device, a painting device, a testing device and a winding device arranged in sequence; The control method comprises the following steps: (1) acquiring process data of superconducting wires and the positions of joints of two adjacent superconducting wires in real time, wherein the process data includes pay-off data, forming data, annealing data, painting data, inspection data and winding data; (2) comparing the process data with a threshold range; if all of the process data are within the threshold range, the superconducting wire production line continues to operate; if at least one of the process data exceeds the threshold range, determining that an abnormal process has occurred, and controlling the superconducting wire production line to shut down or adjusting equipment operating parameters of the superconducting wire production line according to the location of the superconducting wire joint and the abnormal process; (3) acquiring and storing the real-time process data of the superconducting wire once per second, taking the joints of the two adjacent superconducting wires as nodes, and storing the real-time process data of each superconducting wire; In the step (2), when the detection data exceeds the threshold range, the abnormal process is one or more of the pay-off process, the forming process, the annealing process, the painting process and the winding process, and the superconducting wire production line is controlled to shut down; When any data in the process data except the detection data exceeds a threshold range, and the superconducting wire in the superconducting wire production line has no joints, adjusting the equipment operation parameters of the superconducting wire production line to restore the process data to within the threshold range, and if the process data cannot be restored, shutting down the superconducting wire production line; When any data in the process data except the detection data exceeds a threshold range and two adjacent superconducting wire joints are located in the production line, the superconducting wire production line is controlled to shut down or the equipment operation parameters of the superconducting wire production line are adjusted according to the process in which the two adjacent superconducting wire joints are located; When only one data other than the detection data in the process data exceeds the threshold range, if two adjacent superconducting wire joints are located in an abnormal process or after an abnormal process, the superconducting wire production line is controlled to shut down; If the two adjacent superconducting wire joints are located before the abnormal process, the equipment operation parameters of the superconducting wire production line are adjusted; if the process data is not restored to within the threshold range after the two superconducting wire joints advance to the abnormal process, the superconducting wire production line is controlled to shut down; The length of the wire between the outlet end of the wire-paying device and the outlet end of the painting device is obtained as the online processing length, and the process where the midpoint of the online processing length is located is the midpoint process; When multiple data in the process data except the detection data exceed the threshold range, if the joints of two adjacent superconducting wires are located at the midpoint process or after the midpoint process, the superconducting wire production line is controlled to stop; If the joints of two adjacent superconducting wires are located before the midpoint process, the equipment operating parameters of the superconducting wire production line are adjusted; if the process data does not return to the threshold range after the two superconducting wire joints reach the midpoint process, the superconducting wire production line is controlled to shut down.
2. The control method of a superconducting wire production line according to claim 1, characterized in that: The length of the superconducting wire passing through each device in the superconducting wire production line is calculated based on the running speed and running time of the superconducting wire.
3. The control method of a superconducting wire production line according to claim 1 or 2, characterized in that: The pay-off data includes pay-off speed and pay-off tension; The forming data includes forming tension and cross-sectional dimensions of the wire after forming; The annealing data includes annealing time and annealing temperature; The painting data includes the tension of the paint wire, the speed of the paint wire, the temperature of the paint liquid, the temperature of the paint environment, the baking temperature, the baking time, and the cross-sectional dimensions of the wire after each coat of paint; The detection data includes the cross-sectional dimensions of the finished wire, the number of pinholes, the location of the pinholes, the number of surface irregularities, and the location of surface irregularities; The winding data includes winding speed, bobbin moving speed and wire in place monitoring at the end of the bobbin.
4. The control method of a superconducting wire production line according to claim 3, characterized in that: The winding device comprises a winding bobbin and a laser detector, wherein the laser detector is used for monitoring the arrival of the wire at the end of the bobbin, that is, detecting whether the wire reaches the end of the winding bobbin.
5. The control method of a superconducting wire production line according to claim 1, characterized in that: Two adjacent superconducting wires are welded with ferromagnetic materials to form a joint. The joint identification mechanism includes a pressure sensor and a strong magnet connected to each other. The strong magnet is used to generate suction force on the joint to change the sensing data of the pressure sensor.
6. The control method of a superconducting wire production line according to claim 1, characterized in that: The method further includes step (4), of establishing and storing a processing file for each superconducting wire, wherein the processing file includes a material number, a processing time, a device number, an operator number, and real-time process data.
7. A superconducting wire painting control system, characterized in that: A control method for a superconducting wire production line according to any one of claims 1 to 6 is applied; the control system comprises a data acquisition module, a processing module, an instruction issuing module and a storage module; The data acquisition module is used to acquire the process data of superconducting wire painting and the position of the joints of two adjacent superconducting wires in real time; The processing module is used to compare the process data with the threshold range and determine the abnormal process, and generate a control instruction; The instruction sending module is used to send control instructions to the wire-paying equipment, the forming equipment, the annealing equipment, the painting equipment, the testing equipment and / or the winding equipment; The storage module is used to establish and store processing files, which include incoming material numbers, processing time, equipment numbers, operator numbers, and real-time process data.