A galvanized steel sheet handling device

By using the combination of row lifting equipment and adsorption equipment in the galvanized steel plate handling device and combined with the design of the rail body and connecting mechanism, the problem of uneven swing and stacking of galvanized steel plates during the handling process is solved, and the plate is realized The stable transfer and neat stacking reduces the risk of deformation and damage.

CN118183489BActive Publication Date: 2024-11-22HEBEI WANLI NEW MATERIAL TECH CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410500593.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-24
Publication Date
2024-11-22
Estimated Expiration
2044-04-24

AI Technical Summary

Technical Problem

During the handling of galvanized steel plates, the plate swings due to inertia forces, which poses safety hazards and may cause uneven stacking of the plates and local uneven stresses, which will cause deformation and damage to the galvanized layer, and may easily bump during the later transfer process. .

Method used

A galvanized steel plate handling device is designed, using row lifting equipment and adsorption equipment arranged at the suspension end to realize the quick connection and guidance of adsorption equipment through the rail body and the connecting mechanism, and combined with the design of the bearing mechanism and clamp rod. Avoid swinging and uneven stacking of the board to ensure the stability of the board during transfer and stacking.

Benefits of technology

It effectively avoids the swing and uneven stacking of the plate during the transfer process, reduces the risk of deformation and damage to the galvanized layer, and improves the stability and safety of later transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118183489B_ABST
    Figure CN118183489B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of handling devices, and specifically relates to a galvanized steel plate handling device, comprising a overhead lifting device, an adsorption device and a handling mechanism, wherein the handling mechanism comprises a rail body, a connecting mechanism and a bearing mechanism, and the adsorption device is quickly connected to the rail body through the connecting mechanism, so that the adsorption device is guided and limited by the rail body when handling the galvanized steel plate, so as to avoid the galvanized steel plate from swinging during the handling process, causing the plate to collide or posing a safety hazard to the staff, and by arranging the bearing mechanism, in the process of the adsorption device lowering the galvanized steel plate, a plurality of clamping rods are driven to move at the same time, so as to straighten the galvanized steel plate during the lowering process, and at the same time, avoid the galvanized steel plate from swinging significantly during the lowering process, posing a safety hazard, or causing the galvanized steel plates to be unevenly stacked, thereby avoiding uneven force on the local positions of some galvanized steel plates when stacking the galvanized steel plates, causing deformation or damage to the zinc coating.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of conveying devices, and in particular relates to a galvanized steel plate conveying device. Background Art

[0002] Galvanized steel plate is a welded steel plate with a hot-dip or electroplated zinc layer on the surface. It is generally widely used in construction, home appliances, vehicles and ships, container manufacturing, electromechanical industry, etc. Galvanizing can effectively prevent steel corrosion and extend the service life of steel. Strict attention should be paid to the handling process of galvanized steel plates to avoid damaging the galvanized layer of the galvanized steel plates during transportation and to avoid deformation of the steel plates. Therefore, forklifts, overhead cranes and other methods are usually used instead of manual handling, which effectively reduces labor intensity and improves handling efficiency.

[0003] When using a crane to transport galvanized steel plates, a combination of a winch, a hook and an adsorption device is usually used to adsorb the galvanized steel plates, and then the galvanized steel plates are transferred to a transport vehicle through a drive unit and stacked on the transport vehicle to achieve automatic transportation of the galvanized steel plates.

[0004] However, in the process of transferring the galvanized sheet to the transport vehicle by driving the winch, hook and adsorption equipment through the driving unit, the galvanized sheet will swing due to the inertia force in this process. The galvanized sheet that swings during the transportation and transfer process will not only pose a safety hazard to the workers in the working environment, but also cause the sheets stacked on the transport vehicle to be uneven, which will cause uneven force on some local positions of the galvanized sheets, thereby causing the galvanized sheet to deform and damage the galvanized layer of the galvanized sheet. In addition, the uneven stacking will easily cause the galvanized sheet to collide with other objects during the later transportation process, thereby damaging the galvanized sheet.

[0005] In view of this, in order to improve the above-mentioned technical problems, the present invention provides a galvanized steel plate conveying device. Summary of the invention

[0006] The technical problems to be solved by the present invention are as follows: In the process of transferring the galvanized sheet to the transport vehicle by driving the winch, hook and adsorption equipment through the driving unit, the galvanized sheet will swing due to the inertia force in this process. The galvanized sheet that swings during the transportation and transfer process will not only pose a safety hazard to the workers in the working environment, but also cause the sheets stacked on the transport vehicle to be uneven when the galvanized sheet is stacked on the transport vehicle, which will cause uneven force on the local positions of some galvanized sheets, thereby causing the galvanized sheet to deform and damage the galvanized layer of the galvanized sheet. In addition, the uneven stacking will also cause the galvanized sheet to easily collide with other objects during the later transportation process, thereby damaging the galvanized sheet.

[0007] A galvanized steel sheet handling device provided by the present invention includes a gantry hoisting device and an adsorption device arranged at the hanging end of the gantry hoisting device. The adsorption device includes a main rod and a plurality of auxiliary rods installed on both sides of the main rod, and further includes: a handling mechanism. Among the plurality of auxiliary rods, the auxiliary rod located at the end of the main rod is the main connecting rod. A handling mechanism is installed on each main connecting rod. The handling mechanism includes a rail body, a connecting mechanism, and a bearing mechanism. There are two groups of the rail bodies, and the two groups of rail bodies are respectively located at both ends of the main rod. There are multiple groups of the connecting mechanisms and they are all installed between the main connecting rod and the rail body. The bearing mechanism is located between the two groups of rail bodies and on one side of the auxiliary rod, and the rail body is installed on the bearing mechanism.

[0008] Preferably, each group of the rail bodies includes a fixed guide rail. The fixed guide rail is installed above the bearing mechanism and at the end of the main rod. The fixed guide rail is a "C"-shaped structure with one end closed and the other end open. An extension guide rail is arranged inside the fixed guide rail, and the extension guide rail is slidably connected with the fixed guide rail. The extension guide rail is a "C"-shaped structure with both ends closed.

[0009] Preferably, each group of the connecting mechanisms includes a first slider arranged inside the extension guide rail. The first slider is slidably connected with the extension guide rail. A mounting box is fixedly connected to the surface of the first slider close to the auxiliary rod. A rotating shaft is rotatably connected inside the mounting box. A coil spring is fixedly connected to the rotating shaft. A through groove is opened on the bottom surface of the mounting box. The other end of the coil spring extends out of the through groove. A hanging plate is fixedly connected to the end of the coil spring located outside the mounting box. A through hole is opened on the hanging plate. A hanging rod is rotatably connected to the surface of the main connecting rod close to the extension guide rail. The bent end of the hanging rod is adapted to the through hole on the hanging plate.

[0010] Preferably, a plug rod is fixedly connected to the hanging plate, and a jack is opened at the bottom of the mounting box. The plug rod is adapted to the jack.

[0011] Preferably, the bearing mechanism includes a load-bearing plate. A plurality of universal wheels are installed at the bottom of the load-bearing plate. A handle is fixedly installed at one end of the load-bearing plate. A plurality of adjusting grooves are opened on the upper surface of the load-bearing plate. Springs are arranged in the plurality of adjusting grooves. One end of each spring is fixedly connected to the load-bearing plate, and the other end is fixedly connected to a moving block. The moving block is slidably connected with the load-bearing plate. A clamping rod is fixedly connected to the upper surface of the moving block. Each clamping rod is arranged错开 with the auxiliary rod. An arc-shaped push rod is installed between each main connecting rod and each auxiliary rod. The bent end of the arc-shaped push rod faces the adsorption device. In the initial state, the lower end of the arc-shaped push rod is flush with the upper end of the clamping rod.

[0012] Preferably, the surface of each clamping rod facing away from the center of the load-bearing plate is perpendicular to the load-bearing plate.

[0013] Preferably, a guide groove is provided on one side of the clamping rod close to the center of the load-bearing plate, a plurality of guide rollers are arranged in the guide groove, and each of the guide rollers is rotatably connected to the clamping rod.

[0014] Preferably, a limiting plate is provided on the side of the clamping rod away from the center of the load-bearing plate, and the limiting plate is slidably connected to the load-bearing plate. A No. 1 fixing block is provided on the side of the limiting plate away from the clamping rod, and the No. 1 fixing block is fixedly connected to the load-bearing plate. A No. 1 screw passes through the No. 1 fixing block, and the No. 1 screw is threadedly connected to the No. 1 fixing block, and the end of the No. 1 screw is fixedly connected to the limiting plate.

[0015] Preferably, an adjusting rod is provided at one end of the main connecting rod away from the main rod, the adjusting rod is fixedly connected to the end face of the main connecting rod, a No. 2 fixing block is fixedly connected to a side of the adjusting rod close to the adsorption device, a No. 2 screw penetrates the No. 2 fixing block, the No. 2 screw is threadedly connected to the No. 2 fixing block, a connecting plate is fixedly connected to the end of the No. 2 screw, the connecting plate is slidably connected to the adjusting rod, and the lower surface of the connecting plate is fixedly connected to the arc-shaped push rod.

[0016] The beneficial effects of the present invention are as follows:

[0017] The galvanized steel plate handling device provided by the present invention can quickly connect the adsorption equipment to the rail body by setting a rail body and a connecting mechanism, so that when the adsorption equipment drives the galvanized steel plate to be transferred, it is guided and limited by the rail body, thereby preventing the galvanized steel plate from swinging during the transfer process and causing the plate to collide with other objects or pose a safety hazard to the staff. By setting a bearing mechanism, it is convenient to carry the galvanized steel plate, and in the process of the adsorption equipment lowering the galvanized steel plate, it drives multiple clamping rods to move simultaneously, so that the multiple clamping rods are close to each other, and the galvanized steel plate is straightened during the lowering process, and at the same time, it is avoided that the galvanized steel plate swings significantly during the lowering process, causing a safety hazard or uneven stacking of the galvanized steel plates, thereby preventing the galvanized steel plates from being deformed or the galvanized layer from being damaged due to uneven force at local positions of some galvanized steel plates due to messy stacking, and reducing the collision phenomenon in the later transportation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to make the contents of the present invention more clearly understood, the present invention is further described in detail below based on specific embodiments in conjunction with the accompanying drawings.

[0019] Figure 1 It is a schematic diagram of the overall appearance structure of the present invention;

[0020] Figure 2 It is a structural schematic diagram of the handling mechanism of the present invention when adsorbing a galvanized steel sheet;

[0021] Figure 3 For the present invention Figure 2Enlarged view of point A in the middle;

[0022] Figure 4 For the present invention Figure 2 Enlarged view of point B in the middle;

[0023] Figure 5 For the present invention Figure 2 Enlarged view of point C in the middle;

[0024] Figure 6 It is a schematic diagram of the top view of the structure of the handling mechanism of the present invention when adsorbing the galvanized steel plate;

[0025] Figure 7 It is a schematic diagram of the structure of two working states of the handling mechanism of the present invention when adsorbing the galvanized steel sheet and placing the galvanized steel sheet;

[0026] Figure 8 For the present invention Figure 7 Enlarged view of point D in the middle;

[0027] Fig. 9 It is a schematic structural diagram of the galvanized steel plate below the handling mechanism of the present invention;

[0028] Fig.10 It is a schematic diagram of the internal structure of the installation box of the present invention;

[0029] In the figure: 1. overhead crane; 2. adsorption equipment; 21. main rod; 22. auxiliary rod; 221. main connecting rod; 3. transport mechanism; 31. rail body; 311. fixed guide rail; 312. extension guide rail; 32. connecting mechanism; 321. No. 1 slider; 322. installation box; 323. rotating shaft; 324. coil spring; 325. through groove; 326. hanging plate; 327. hanging rod; 33. bearing mechanism; 331. load-bearing plate; 332. universal wheel; 333. handle; 334. adjustment groove; 335. spring; 337. clamping rod; 338. arc push rod; 4. insertion rod; 5. guide groove; 6. guide roller; 7. limit plate; 8. No. 1 fixed block; 9. No. 1 screw; 10. adjustment rod; 11. No. 2 fixed block; 12. No. 2 screw; 13. connecting plate. DETAILED DESCRIPTION

[0030] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] like Figure 1 , Figure 2 and Figure 6As shown, a galvanized steel plate handling device provided by the present invention comprises a crane hoisting device 1 and an adsorption device 2 arranged at the hanging end of the crane hoisting device 1, the crane hoisting device 1 comprises a frame, a driving unit, a winch, a rope and a hook, the adsorption device 2 is suspended on the hook, the adsorption device 2 comprises a main rod 21 and a plurality of auxiliary rods 22 symmetrically arranged on both sides of the main rod 21, each auxiliary rod 22 is equipped with a suction cup, and the suction cup is used to adsorb the galvanized steel plate, a galvanized steel plate handling device also comprises: a handling mechanism 3, the handling mechanism 3 is used for the crane hoisting device 1 and the adsorption device 2 to prevent the galvanized steel plate from swinging left and right when the galvanized steel plate is galvanized, and to ensure that the galvanized steel plate is stacked neatly when the galvanized steel plate is stacked on the handling vehicle body, the auxiliary rod 22 located at the end of the main rod 21 among the plurality of auxiliary rods 22 is a main connecting rod 221, and each main connecting rod 221 is equipped with a handling mechanism The transport mechanism 3 includes a rail body 31, a connecting mechanism 32 and a bearing mechanism 33. The rail body 31 is provided with two groups. The two groups of rail bodies 31 are respectively located at the two ends of the main rod 21, so that when the driving unit drives the winch, rope, hook and adsorption device 2 to drive the galvanized steel plate to move, it moves along the rail body 31 to avoid the galvanized steel plate from swinging when the galvanized steel plate is transferred. The connecting mechanism 32 is provided with multiple groups and is all installed between the main connecting rod 221 and the rail body 31. The connecting mechanism 32 is used to quickly connect the main connecting rod 221 to the rail body 31. The bearing mechanism 33 is located between the two groups of rail bodies 31 and on one side of the auxiliary rod 22. The rail body 31 is installed on the bearing mechanism 33. The bearing mechanism 33 supports the rail body 31. The receiving mechanism is used to straighten the steel plate during the process of lowering the galvanized steel plate by the overhead lifting equipment 1, and is used to bear the galvanized steel plate for later transportation.

[0032] During operation, first, the controller controls the overhead crane lifting equipment 1 to work. The driving unit drives the hoist to move on the truss, so that the hoist drives the adsorption device 2 to move directly above the galvanized steel plate to be transported through the hook. Then, the operator quickly connects the adsorption device 2 with the rail body 31 through the connecting mechanism 32. Next, the controller controls the hoist to work. The driving shaft of the hoist rotates forward, lowering the rope and the hook, so that the suction cup contacts the galvanized steel plate. At the same time, the controller controls the adsorption device 2 to work, so that the suction cup adsorbs the galvanized steel plate. Then, the controller controls the driving shaft of the hoist to rotate reversely, lifting the rope and the hook, and the hook drives the galvanized steel plate to move upward. Then, the controller controls the driving unit to drive the hoist to move along the truss to above the bearing mechanism 33. During this process, the adsorption device 2 also moves along the rail body 31. Due to the guidance and limitation of the rail body 31, the galvanized sheet is prevented from swinging during the transfer process, so that the sheet does not collide with other objects or pose a safety hazard to the operator. Then, the controller controls the driving shaft of the hoist to rotate forward again, lowering the rope and the hook, and the hook drives the adsorption device 2 to move downward until the galvanized steel plate is placed in the bearing mechanism 33. And during the process of the adsorption device 2 moving downward to lower the galvanized steel plate to the bearing mechanism 33, it drives multiple moving parts in the bearing mechanism 33 to move simultaneously, so that the multiple moving parts approach each other, straighten the galvanized steel plate during the lowering process, and at the same time prevent the galvanized steel plate from swinging greatly during the lowering process, which may pose a safety hazard or cause the galvanized steel plates to be stacked unevenly. Thus, it is avoided that due to the disorderly stacking of the galvanized steel plates, the local positions of some galvanized steel plates are unevenly stressed, resulting in deformation or damage to the galvanized layer, and reducing the occurrence of collision phenomena during the later handling process.

[0033] As Figures 1 to 3 shown, each group of rail bodies 31 includes a fixed guide rail 311. The fixed guide rail 311 is installed above the bearing mechanism 33 and at the end of the main rod 21. The fixed guide rail 311 is a "C"-shaped structure with one end closed and the other end open. An extension guide rail 312 is arranged inside the fixed guide rail 311. The extension guide rail 312 is used to increase the overall length of the rail body 31 when using the overhead crane lifting equipment 1 to transport the galvanized steel plate, so that the adsorption device 2 can be guided and limited by the rail body 31 during the process of transferring the galvanized steel plate, improving the scope of application. The extension guide rail 312 is slidably connected with the fixed guide rail 311. After the overhead crane lifting equipment 1 transports all the galvanized sheets to the bearing mechanism 33, the extension guide rail 312 can be pushed into the fixed guide rail 311, which is convenient for storage and at the same time convenient for the bearing mechanism 33 to transport the galvanized sheets. The extension guide rail 312 is a "C"-shaped structure with both ends closed.

[0034] As Figure 1 、 Figure 2 、 Figure 3 、 Figure 6 、 Fig. 9 and Fig.10As shown, each set of connecting mechanisms 32 includes a first slider 321 arranged inside the extension guide rail 312, the first slider 321 is slidably connected to the extension guide rail 312, a mounting box 322 is fixedly connected to the first slider 321 on a side close to the auxiliary rod 22, a rotating shaft 323 is rotatably connected inside the mounting box 322, a coil spring 324 is wound around the rotating shaft 323, one end of the coil spring 324 is fixedly connected to the rotating shaft 323, and a through slot 32 is provided on the bottom surface of the mounting box 322. 5. The other end of the coil spring 324 extends out of the through slot 325. One end of the coil spring 324 located outside the installation box 322 is fixedly connected to a hanging plate 326. A through hole is provided on the hanging plate 326. A hanging rod 327 is rotatably connected to the side of the main connecting rod 221 close to the extension guide rail 312. The bent end of the hanging rod 327 is matched with the through hole on the hanging plate 326. The hanging plate 326 is fixedly connected with an insertion rod 4. A socket is provided at the bottom of the installation box 322, and the insertion rod 4 is matched with the socket.

[0035] When connecting the adsorption device 2 and the rail body 31 , the staff rotates the hanging rod 327 so that the bent end of the hanging rod 327 corresponds to the through hole on the hanging plate 326 , thereby realizing a quick connection between the adsorption device 2 and the rail body 31 .

[0036] By setting the installation box 322, the rotating shaft 323, the coil spring 324 and the hanging plate 326, when the driving shaft of the winch rotates forward to lower the adsorption device 2 to adsorb the galvanized steel plate, the main connecting rod 221 in the adsorption device 2 drives the hanging rod 327 to move downward, and the hanging rod 327 moves downward to pull out the coil spring 324 through the hanging plate 326. After the galvanized steel plate is adsorbed, the winch controls the adsorption device 2 to move upward, and the main connecting rod 221 in the adsorption device 2 drives the hanging rod 327 to move upward. At this time, the coil spring 324 restores its elastic deformation to drive the hanging plate 326 to follow the hanging rod 327 to move upward, thereby ensuring that the adsorption device 2 passes through the hanging rod 327, the hanging plate 326, the installation box 32 2. On the basis of the quick connection between the rotating shaft 323, the coil spring 324 and the first slider 321 and the rail body 31, the adsorption device 2 can move up and down normally. When the hanging plate 326 moves up to the insertion rod 4 on it and is inserted into the jack at the bottom of the installation box 322, the controller controls the driving unit to drive the winch and the adsorption device 2 to move toward the bearing mechanism 33. Since the insertion rod 4 is plugged into the installation box 322 at this time, the hanging rod 327 can normally follow the adsorption device 2 to move up. When the hanging rod 327 follows the adsorption device 2 to move left and right, the hanging rod 327 drives the insertion rod 4 to move horizontally, and the insertion rod 4 can thereby drive the installation box 322 to move horizontally. , to avoid pulling out the coil spring 324 during left and right translation and making the installation box 322 unable to move, thereby ensuring the guiding function of the rail body 31, when the adsorption device 2 drives the installation box 322 to move to the end of the extension guide rail 312 through the hanging rod 327, since the end of the extension guide rail 312 is closed, when the adsorption device 2 drives the installation box 322 to move to the end of the extension guide rail 312 through the hanging rod 327 and continues to move, the extension guide rail 312 can be continuously pushed by the installation box 322 to move along the fixed guide rail 311 until the adsorption device 2 drives the galvanized steel plate to move to the top of the bearing mechanism 33, and then, the control The controller controls the winch to lower the adsorption device 2, and the adsorption device 2 moves downward, and the coil spring 324 is pulled out again through the hanging rod 327, and the galvanized steel plate is placed on the supporting mechanism 33, and when the galvanized steel plate is below, the galvanized steel plate is straightened through the moving parts in the supporting mechanism 33. After the placement is completed, the controller controls the adsorption device 2 to detach from the galvanized steel plate, and then the controller controls the winch to drive the adsorption device 2 to lift up, and the coil spring 324 is rolled into the installation box 322, and then the driving device controls the winch again to drive the adsorption device 2 to move above the galvanized steel plate to be transported, and repeats the above actions until all the galvanized steel plates are transported to the supporting mechanism 33.

[0037] like Figure 1 , Figure 2 , Figures 4 to 9As shown, the bearing mechanism 33 includes a load-bearing plate 331 for placing the galvanized steel plate. A plurality of universal wheels 332 are installed at the bottom of the load-bearing plate 331. A handle 333 is fixedly installed at one end of the load-bearing plate 331. The handle 333 and the universal wheel 332 are convenient for later transportation of the galvanized steel plate. The handle 333, the universal wheel 332 and the load-bearing plate 331 form a transfer vehicle. A support rod is fixedly connected to the load-bearing plate 331. The upper end of the support rod is fixedly connected to the fixed guide rail 311, so as to support the fixed guide rail 311. A plurality of adjustment slots 334 are opened on the upper surface of the load-bearing plate 331. Springs 335 are arranged in the plurality of adjustment slots 334. One end of the spring 335 is fixed to the load-bearing plate 331 The main rod 21 is fixedly connected to the main connecting rod 221, and the other end is fixedly connected to a moving block, which is slidably connected to the load-bearing plate 331. A clamping rod 337 is fixedly connected to the upper surface of the moving block. Each clamping rod 337 is staggered with the auxiliary rod 22, and at the same time, it is ensured that during the left and right translation of the adsorption device 2, the main rod 21 is located above the clamping rod 337, thereby avoiding the adsorption device 2 being limited by the clamping rod 337 and unable to move normally when the galvanized steel plate is translated left and right. An arc-shaped push rod 338 is installed between each main connecting rod 221 and each auxiliary rod 22, and the curved end of the arc-shaped push rod 338 is set toward the adsorption device 2. In the initial state, the lower end of the arc-shaped push rod 338 is flush with the upper end of the clamping rod 337.

[0038] When the adsorption device 2 moves the galvanized steel plate to the top of the load-bearing plate 331, it also drives the arc push rod 338 to move to the top of the clamp rod 337. At this time, the clamp rod 337 is tangent to the arc push rod 338. Then the controller controls the winch to drive the adsorption device 2 to lower the galvanized steel plate. At this time, multiple main connecting rods 221 move downward, driving multiple arc push rods 338 to move downward. The multiple arc push rods 338 move downward and push the multiple clamp rods 337 to move closer to each other. At the same time, the spring 335 is stretched, and the multiple clamp rods 337 move closer to each other until they contact the edge of the galvanized steel plate, thereby placing the galvanized steel plate under the galvanized steel plate. During the process, multiple clamping rods 337 approaching each other at the same time can straighten the galvanized steel plate to prevent the galvanized steel plate from shaking left and right during the lowering process and eventually causing messy stacking. After the galvanized steel plate is placed, the winch drives the adsorption device 2 to move upward, and the adsorption device 2 drives the arc push rod 338 to move upward. The spring 335 restores its elastic deformation and drives the clamping rod 337 away from the galvanized steel plate. Therefore, in the process of placing the next galvanized steel plate on the load-bearing plate 331, the multiple clamping rods 337 can be driven closer to each other again, so that the next galvanized steel plate can be straightened again, thereby ensuring that the galvanized steel plates are stacked neatly.

[0039] like Figure 6 , Figure 8 , Fig. 9As shown, in the initial state, it is necessary to ensure that the distance between the bending points of the two arc-shaped push rods 338 located at the same end of the main rod 21 and the sum of the thicknesses of the two clamping rods 337 are equal to the width of the galvanized steel plate. As more and more galvanized steel plates are stacked on the load-bearing plate 331, the downward movement stroke of the adsorption device 2 when lowering the galvanized steel plate to the load-bearing plate 331 will gradually decrease each time. In order to ensure that the clamping rod 337 can contact the edge of the galvanized steel plate and will not squeeze the galvanized steel plate each time the adsorption device 2 moves downward, it is set that one side of each clamping rod 337 away from the center of the load-bearing plate 331 is in contact with the load-bearing plate The plate 331 is arranged vertically, so that when the bending point of the arc push rod 338 moves to the side of the clamping rod 337 away from the center of the load-bearing plate 331, the sum of the distance between the bending points of the two arc push rods 338 at the same end of the main rod 21 and the thickness of the two clamping rods 337 is equal to the width of the galvanized steel plate, so that the galvanized steel plate, the clamping rod 337 and the arc push rod 338 are in contact with each other at this time. At this time, if the arc push rod 338 continues to move downward with the adsorption device 2, it will only move vertically downward along the side of the clamping rod 337 away from the load-bearing plate 331 and will not continue to push the clamping rod 337 to squeeze the galvanized steel plate.

[0040] like Figure 5 As shown, in order to facilitate the adjustment of the distance between the two arc-shaped push rods 338 so that the bearing mechanism 33 is suitable for galvanized steel plates of different sizes, an adjusting rod 10 is provided at the end of the main connecting rod 221 away from the main rod 21, and the adjusting rod 10 is fixedly connected to the end face of the main connecting rod 221. A No. 2 fixing block 11 is fixedly connected to the side of the adjusting rod 10 close to the adsorption device 2, and a No. 2 screw 12 runs through the No. 2 fixing block 11. The No. 2 screw 12 is threadedly connected to the No. 2 fixing block 11, and a connecting plate 13 is fixedly connected to the end of the No. 2 screw 12. The connecting plate 13 is slidably connected to the adjusting rod 10, and the lower surface of the connecting plate 13 is fixedly connected to the arc-shaped push rod 338. When the No. 2 screw 12 rotates, it pushes the connecting plate 13 to move, and the connecting plate 13 drives the arc-shaped push rod 338 to move. Therefore, the staff can adjust the distance between the two arc-shaped push rods 338 by rotating the No. 2 screw 12 forward or reversely.

[0041] like Figure 4 As shown, in order to avoid that after the clamp rod 337 contacts the edge of the galvanized steel plate, if the galvanized steel plate continues to move downward, there will be a large friction between the clamp rod 337 and the galvanized steel plate, which will cause the galvanized steel plate to tilt, a guide groove 5 is provided on one side of the clamp rod 337 close to the center of the load-bearing plate 331, and a plurality of guide rollers 6 are provided in the guide groove 5, each of which is rotatably connected to the clamp rod 337 through a bearing, thereby reducing the contact area, thereby reducing the friction resistance, and further ensuring that the galvanized steel plates are stacked neatly.

[0042] like Figure 6 , Figure 7 and Fig. 9As shown, a limit plate 7 is provided on one side of the clamp rod 337 away from the center of the load-bearing plate 331, and the limit plate 7 is slidably connected to the load-bearing plate 331. A No. 1 fixing block 8 is provided on the side of the limit plate 7 away from the clamp rod 337, and the No. 1 fixing block 8 is fixedly connected to the load-bearing plate 331. A No. 1 screw 9 runs through the No. 1 fixing block 8, and the No. 1 screw 9 is threadedly connected to the No. 1 fixing block 8. The end of the No. 1 screw 9 is fixedly connected to the limit plate 7. When the No. 1 screw 9 rotates forward, it can drive the limit plate 7 to approach the clamp rod 337. After the lifting equipment 1 moves the galvanized steel plates to the load-bearing plate 331, the staff will rotate the hanging rod 327 to separate the hanging rod 327 from the hanging plate 326 , and then the staff needs to transport the galvanized steel plate to the designated position through the transfer vehicle composed of the load-bearing plate 331, the universal wheel 332 and the handle 333. In order to ensure the stability of the galvanized steel plate during the transportation process and prevent it from shaking, the staff can rotate the No. 1 screw 9 to make the limit rod fit with the clamping rod 337, and push the clamping rod 337 to contact the galvanized steel plate to stretch the spring 335, thereby ensuring the clamping effect of the clamping rod 337 on the galvanized steel plate. When the galvanized steel plate needs to be removed, the No. 1 screw 9 is rotated in the opposite direction to make the limit plate 7 away from the clamping rod 337, and the spring 335 drives the clamping rod 337 to reset, so that the clamping rod 337 is away from the galvanized steel plate, thereby facilitating unloading.

[0043] Working principle:

[0044] During operation, the controller first controls the crane lifting device 1 to work, and the driving unit drives the winch to move on the frame, so that the winch drives the adsorption device 2 to move to the top of the galvanized steel plate to be transported through the hook, and then the staff rotates the hanging rod 327 to make the bent end of the hanging rod 327 correspond to the through hole on the hanging plate 326, thereby realizing the rapid connection between the adsorption device 2 and the rail body 31, and then the controller controls the winch to work, the driving shaft of the winch rotates forward, and the rope and the hook are lowered to make the suction cup contact with the galvanized steel plate. At the same time, the controller controls the adsorption device 2 to work and adsorb the galvanized steel plate, and during the downward movement of the adsorption device 2, the main connecting rod 221 drives the hanging rod 327 to move downward, and the hanging rod 327 moves downward to pull out the coil spring 324 through the hanging plate 326, and the suction cup in the adsorption device 2 After the galvanized steel plate of the adsorption column is attached, the winch controls the adsorption device 2 to move up, and the main connecting rod 221 in the adsorption device 2 drives the hanging rod 327 to move up. At this time, the coil spring 324 restores its elastic deformation to drive the hanging plate 326 to follow the hanging rod 327 to move up, thereby ensuring that the adsorption device 2 is quickly connected to the rail body 31 through the hanging rod 327, the hanging plate 326, the installation box 322, the rotating shaft 323, the coil spring 324 and the first slider 321. On the basis of this, the adsorption device 2 can move up and down normally. When the hanging plate 326 moves up to the insertion rod 4 on it and is inserted into the socket at the bottom of the installation box 322, the controller controls the driving unit to drive the winch and the adsorption device 2 to move toward the bearing mechanism 33. Since the insertion rod 4 is plugged into the installation box 322 at this time, the hanging rod 327 can normally follow the adsorption The attachment device 2 moves upward, and when the hanging rod 327 follows the adsorption device 2 to move left and right, the hanging rod 327 drives the insertion rod 4 to move, and the insertion rod 4 can drive the installation box 322 to move, so as to avoid pulling out the coil spring 324 during the left and right translation and making the installation box 322 unable to move, thereby ensuring the guiding function of the rail body 31, and when the adsorption device 2 drives the installation box 322 to move to the end of the extension guide rail 312 through the hanging rod 327, since the end of the extension guide rail 312 is closed, when the adsorption device 2 drives the installation box 322 to move to the end of the extension guide rail 312 through the hanging rod 327 and continues to move, the extension guide rail 312 can continue to be pushed to move along the fixed guide rail 311 through the installation box 322 until the adsorption device 2 drives the galvanized steel plate to move to the carrier The adsorption device 2 is directly above the structure 33, and then the controller controls the winch to lower the adsorption device 2, the adsorption device 2 moves downward, and the coil spring 324 is pulled out again through the hanging rod 327, and the galvanized steel plate is placed on the bearing mechanism 33, and when the galvanized steel plate is below, the multiple main connecting rods 221 in the adsorption device 2 move downward at the same time, driving the multiple arc push rods 338 to move downward, and the multiple arc push rods 338 move downward to push the multiple clamping rods 337 to approach each other, and at the same time the spring 335 is stretched, and the multiple clamping rods 337 approach each other at the same time until they contact the edge of the galvanized steel plate, so that in the process of lowering the galvanized steel plate, the multiple clamping rods 337 that approach each other at the same time can straighten the galvanized steel plate to avoid the galvanized steel plate from shaking left and right during the lowering process and eventually causing messy stacking. When the galvanized steel plate is placed,The winch drives the adsorption device 2 to move upward, and the adsorption device 2 drives the arc push rod 338 to move upward, and the spring 335 restores its elastic deformation, driving the clamping rod 337 away from the galvanized steel plate, so that when the next galvanized steel plate is placed on the load-bearing plate 331, it can drive multiple clamping rods 337 to move closer to each other again, so that the next galvanized steel plate can be straightened again, thereby ensuring that the galvanized steel plates are stacked neatly. At the same time, the adsorption device 2 moves upward, and the coil spring 324 is rolled into the installation box 322. Then the driving device controls the winch again to drive the adsorption device 2 to move above the galvanized steel plate to be transported, and repeats the above actions until all the galvanized steel plates are transported to the bearing mechanism 33. After the lifting device 1 transports all the galvanized steel plates to the load-bearing plate 331, the work The staff will rotate the hanging rod 327 to make the hanging rod 327 separate from the hanging plate 326, and then the staff will need to transport the galvanized steel plate to the designated location through the transfer vehicle composed of the load-bearing plate 331, the universal wheel 332 and the handle 333. In order to ensure the stability of the galvanized steel plate during the transportation process and prevent it from shaking, the staff can rotate the No. 1 screw rod 9 to make the limit rod fit with the clamp rod 337, and push the clamp rod 337 to contact the galvanized steel plate to stretch the spring 335, thereby ensuring the clamping effect of the clamp rod 337 on the galvanized steel plate. When the galvanized steel plate needs to be removed, the No. 1 screw rod 9 is rotated in the opposite direction to make the limit plate 7 away from the clamp rod 337. The spring 335 drives the clamp rod 337 to reset, so that the clamp rod 337 is away from the galvanized steel plate, thereby facilitating unloading.

[0045] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A galvanized steel sheet handling device, comprising an overhead crane lifting device (1) and an adsorption device (2) arranged at the suspension end of the overhead crane lifting device (1). The adsorption device (2) includes a main rod (21) and a plurality of secondary rods (22) installed on both sides of the main rod (21). It is characterized in that it further includes: A handling mechanism (3). Among the plurality of secondary rods (22), the secondary rods (22) located at the end of the main rod (21) are main connecting rods (221). A handling mechanism (3) is installed on each main connecting rod (221). The handling mechanism (3) includes a rail body (31), a connecting mechanism (32) and a bearing mechanism (33). There are two groups of the rail bodies (31), and the two groups of rail bodies (31) are respectively located at both ends of the main rod (21). There are multiple groups of the connecting mechanisms (32) and they are all installed between the main connecting rod (221) and the rail body (31). The bearing mechanism (33) is located between the two groups of rail bodies (31) and on one side of the secondary rod (22). The rail body (31) is installed on the bearing mechanism (33). Each group of the rail bodies (31) includes a fixed guide rail (311). The fixed guide rail (311) is installed above the bearing mechanism (33) and at the end of the main rod (21). The fixed guide rail (311) is in a "C"-shaped structure with one end closed and the other end open. An extending guide rail (312) is arranged inside the fixed guide rail (311). The extending guide rail (312) is slidably connected to the fixed guide rail (311). The extending guide rail (312) is in a "C"-shaped structure with both ends closed. Each group of the connecting mechanisms (32) includes a first slider (321) arranged inside the extending guide rail (312). The first slider (321) is slidably connected to the extending guide rail (312). A mounting box (322) is fixedly connected to the side of the first slider (321) close to the secondary rod (22). A rotating shaft (323) is rotatably connected inside the mounting box (322). A torsion spring (324) is fixedly connected to the rotating shaft (323). A through groove (325) is opened on the bottom surface of the mounting box (322). The other end of the torsion spring (324) extends out of the through groove (325). A hanging plate (326) is fixedly connected to the end of the torsion spring (324) located outside the mounting box (322). A through hole is opened on the hanging plate (326). A hanging rod (327) is rotatably connected to the side of the main connecting rod (221) close to the extending guide rail (312). The bent end of the hanging rod (327) is adapted to the through hole on the hanging plate (326). The bearing mechanism (33) comprises a load-bearing plate (331), a plurality of universal wheels (332) are mounted on the bottom of the load-bearing plate (331), a handle (333) is fixedly mounted on one end of the load-bearing plate (331), a plurality of adjustment slots (334) are provided on the upper surface of the load-bearing plate (331), a spring (335) is disposed in each of the plurality of adjustment slots (334), one end of the spring (335) is fixedly connected to the load-bearing plate (331), and the other end is fixedly connected to a moving block. The moving block is slidably connected to the load-bearing plate (331), and a clamping rod (337) is fixedly connected to the upper surface of the moving block. Each of the clamping rods (337) is staggered with the auxiliary rod (22). An arc-shaped push rod (338) is installed between each of the main connecting rods (221) and each of the auxiliary rods (22). The curved end of the arc-shaped push rod (338) is arranged toward the adsorption device (2). In the initial state, the lower end of the arc-shaped push rod (338) is flush with the upper end of the clamping rod (337).

2. A galvanized steel sheet handling device according to claim 1, Features: The hanging plate (326) is fixedly connected with an insertion rod (4), the bottom of the installation box (322) is provided with an insertion hole, and the insertion rod (4) is adapted to fit the insertion hole.

3. A galvanized steel sheet handling device according to claim 1, Features: A side of each clamping rod (337) facing away from the center of the load-bearing plate (331) is arranged perpendicular to the load-bearing plate (331).

4. A galvanized steel sheet handling device according to claim 1, Features: A guide groove (5) is provided on one side of the clamping rod (337) close to the center of the load-bearing plate (331), and a plurality of guide rollers (6) are arranged in the guide groove (5), and each of the guide rollers (6) is rotatably connected to the clamping rod (337).

5. A galvanized steel sheet handling device according to claim 1, Features: A limiting plate (7) is arranged on the side of the clamping rod (337) away from the center of the load-bearing plate (331), and the limiting plate (7) is slidably connected to the load-bearing plate (331). A No. 1 fixing block (8) is arranged on the side of the limiting plate (7) away from the clamping rod (337), and the No. 1 fixing block (8) is fixedly connected to the load-bearing plate (331). A No. 1 screw rod (9) passes through the No. 1 fixing block (8), and the No. 1 screw rod (9) is threadedly connected to the No. 1 fixing block (8), and the end of the No. 1 screw rod (9) is fixedly connected to the limiting plate (7).

6. A galvanized steel sheet handling device according to claim 1, Features: An adjusting rod (10) is provided at one end of the main connecting rod (221) away from the main rod (21), and the adjusting rod (10) is fixedly connected to the end face of the main connecting rod (221). A second fixing block (11) is fixedly connected to the side of the adjusting rod (10) close to the adsorption device (2), and a second screw rod (12) passes through the second fixing block (11), and the second screw rod (12) is threadedly connected to the second fixing block (11). A connecting plate (13) is fixedly connected to the end of the second screw rod (12), and the connecting plate (13) is slidably connected to the adjusting rod (10), and the lower surface of the connecting plate (13) is fixedly connected to the arc-shaped push rod (338).

Citation Information

Patent Citations

  • Galvanized workpiece station transfer equipment and working method thereof

    CN112499472A

  • Intelligent stacking robot for aluminum veneers

    CN114229466A

  • Plate-material gas-pressure loading hanger

    CN201961991U

  • Anti-swing device of single-beam crane

    CN211198386U