A water conservancy project sluice auxiliary anti-blocking and pollution cleaning device and method

Through the double-layer sluice auxiliary anti-blocking and sewage cleaning equipment, large-hole longitudinal filter screens and solid waste crushing devices are used to solve the problem of low efficiency of traditional anti-blocking and sewage cleaning equipment, and the effect of efficient removal of solid pollutants in rivers and crushing and recycling is achieved.

CN118186997BActive Publication Date: 2025-03-18HENAN RUITONG WATER CONSERVANCY ENG CONSTR GRP CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410066983.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-03-18
Estimated Expiration
2044-04-25

AI Technical Summary

Technical Problem

Traditional river channel anti-blocking and sewage cleaning equipment and methods have problems such as low efficiency, large engineering volume, and unsuitable for deep river use, making it difficult to effectively remove solid pollutants in the river channel.

Method used

The double-layer sluice auxiliary anti-blocking and cleaning equipment is adopted to realize the interception and separation through the double-layer sluice gate. The large-hole longitudinal filter screen and solid waste crushing device are used to realize the filtration and crushing of solid waste. Then the solid-liquid separation and recycling are performed through the cleaning and cleaning suction pump and separation tank.

Benefits of technology

It improves the efficiency and automation of preventing blockage and pollution cleaning, saves human resources, has a wide range of applications, can effectively remove solid pollutants in river channels, and realizes crushing and recycling and rapid backfill of water resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118186997B_ABST
    Figure CN118186997B_ABST
Patent Text Reader

Abstract

The invention relates to a water conservancy project sluice auxiliary anti-blocking and pollution cleaning equipment and method; a pollution cleaning suction pump is connected with a transverse sewage pipe clamped on the middle and upper part of a side wall through a longitudinal sewage suction pipe, the water outlet of the transverse sewage pipe faces the outside of a river channel, a separation tank is fixedly installed below the water outlet of the transverse sewage pipe, a longitudinal small-pore filter screen is arranged in the middle of the separation tank, the water outlet of the transverse sewage pipe is arranged on the side of the longitudinal small-pore filter screen facing upstream, a clean water drainage pipe is connected to the bottom of the separation tank on the side of the longitudinal small-pore filter screen facing downstream, a solid waste crushing device is installed in the anti-blocking and pollution cleaning section on the side of the longitudinal filter screen facing upstream of the river channel; a separate crushing processing chamber for solid waste is implemented in the anti-blocking and pollution cleaning section, and an independent isolation chamber is formed when the processing operation is running, which can prevent pollutants from leaking to the downstream or re-mixing to the upstream.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of advanced environmental protection industry in energy-saving and environmental protection industry, specifically to special equipment for water pollution environmental protection and environmental protection engineering construction, and especially to a water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment and method. Background Art

[0002] Water conservancy projects are different types of hydraulic structures such as dams, dikes, spillways, sluices, channels, ferry canals, rafts, and fishways. This year, with the increase of people's environmental awareness, the awareness and operation methods of anti-blocking and pollution removal in water conservancy projects have been continuously improved. In water conservancy projects, the most serious problem is river blockage, which refers to the accumulation of deposits in the river, which hinders the smooth flow of water. This blockage may be caused by the continuous deposition of silt, suspended matter, plant residues, construction waste, etc. River blockage will limit the ability of the river to pass water, causing the water level to rise and the flood process to intensify, and will also destroy the river's ecosystem, thereby adversely affecting the survival and reproduction of fish and other aquatic organisms. At the same time, blocked rivers will also accumulate toxic and harmful substances, causing water pollution in downstream areas. In addition, river blockage will also lead to water shortages.

[0003] In recent years, the technology of using water conservancy projects to prevent blockage and clean up rivers has become more and more mature. The traditional method of preventing blockage and cleaning pollution generally uses a ship to load special anti-blockage and cleaning equipment for mobile large-scale cruise cleaning operations. This method requires the support of the ship and requires large-scale mobile operations, and the overall efficiency is low. In addition to the first time, there are some traditional methods of preventing blockage and cleaning pollution, such as: building cofferdams in sections of the river, and then draining and cleaning operations in sections. This method has a large overall engineering volume and is not suitable for cleaning operations in rivers. Other methods of preventing blockage and cleaning pollution are to use mechanical arms to dig and clean up with water. This method is not suitable for use in deep rivers. Some other siphon or winch methods require the installation of longer equipment on the river channel and the operation of larger auxiliary equipment on the outside of the river channel. It can be seen that traditional river channel anti-blocking and cleaning equipment and methods have some defects when used.

[0004] To sum up, in view of the shortcomings of the prior art, the present invention provides a water gate-assisted anti-blocking and pollution cleaning equipment and method for water conservancy projects which has a simple structure and is easy to operate. It utilizes a double-layer water gate to reduce the moving range of pollution cleaning and utilizes a double-layer water gate to achieve interception and separation. It has a high degree of automation, saves human resources, has high work and operation efficiency, has a wide range of applications, and has strong anti-blocking and pollution cleaning capabilities. It can effectively remove solid pollutants and implement crushing and recovery operations on solid impurities, which is beneficial to the protection of water resources. At the same time, it can quickly backfill water resources, filter out solid impurities while backfilling the filtered water source. The method is simple and easy to operate, and the water conservancy project water gate-assisted anti-blocking and pollution cleaning equipment and method have broad market prospects. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a water gate-assisted anti-blocking and pollution-cleaning equipment and method for water conservancy projects which has a simple structure and is easy to operate. The equipment utilizes a double-layer water gate to reduce the moving range of pollution cleaning and utilizes a double-layer water gate to achieve interception and separation. The equipment has a high degree of automation, saves human resources, has high work and operation efficiency, has a wide range of applications, and has strong anti-blocking and pollution-cleaning capabilities. The equipment can effectively remove solid pollutants and implement crushing and recovery operations on solid impurities, which is beneficial to the protection of water resources. At the same time, the equipment can quickly backfill water resources, filter out solid impurities while backfilling the filtered water source. The equipment and method are simple and easy to operate.

[0006] The technical solution of the present invention is implemented as follows: a water conservancy project sluice auxiliary anti-blocking and pollution cleaning equipment, including two side walls arranged between two slope bottoms of a river channel and arranged in parallel along the direction of water flow, at least one middle wall arranged between the two side walls and parallel to the side walls, a blocking wall arranged between the side walls and the river channel slope, a first crossbeam arranged at the top of the two side walls and the middle wall in the upstream direction, a first sluice lifter fixedly installed above the first crossbeam, an upstream sluice connected to the first sluice lifter through a first lifting member, a second crossbeam fixedly installed on the top of the two side walls and the middle wall in the downstream direction, a second lifter fixedly installed on the top of the second crossbeam, the second lifter is connected to the downstream sluice through the second lifting member, and a An anti-blocking and pollution-cleaning section, in which a large-pore longitudinal filtering screen is longitudinally inserted between the side wall and the middle wall in the middle part, from the bottom surface to the bottom of the river channel; a sewage suction pump is installed at the bottom of the side of the longitudinal filtering screen facing the downstream side of the river channel; the sewage suction pump is connected to the transverse sewage pipe clamped on the middle and upper part of the side wall through the longitudinal sewage suction pipe; the water outlet of the transverse sewage pipe faces the outside of the river channel; a separation tank is fixedly installed below the water outlet of the transverse sewage pipe; a longitudinal small-pore filtering screen is arranged in the middle part of the separation tank; the water outlet of the transverse sewage pipe is arranged on the side of the longitudinal small-pore filtering screen facing upstream; a clean water drainage pipe is connected to the bottom of the separation tank on the side of the longitudinal small-pore filtering screen facing downstream; a solid waste crushing device is installed in the anti-blocking and pollution-cleaning section on the side of the longitudinal filtering screen facing the upstream side of the river channel.

[0007] The solid waste crushing device comprises longitudinal limit sliding grooves which are symmetrically arranged on the inner sides of the side walls and the middle wall, longitudinal limit sliding blocks are installed in the two longitudinal limit sliding grooves, a crushing isolation cover is fixedly installed between the two longitudinal limit sliding blocks, a worm gear transmission is fixedly installed on the top of the crushing isolation cover, a transmission shaft is transversely sleeved in the worm gear transmission, a transmission motor matching the transmission shaft is installed on one side of the worm gear transmission, the transmission shaft is connected to a crushing roller installed below the crushing isolation cover through a longitudinal transmission component, an array structure of crushing blades are distributed on the outer surface of the crushing roller, a receiving shearing blade matching the crushing blade is arranged on the bottom surface of the crushing isolation cover, a lifting support seat is fixedly installed in the middle and upper part between the side wall and the middle wall above the worm gear transmission, a winch is fixedly installed on the lifting support seat, a lifting bracket with a pulley is fixedly installed on the outer side of the lifting support seat, and the winch is connected to the top of the worm gear transmission through a lifting rope sleeved on the outer side of the pulley.

[0008] The blocking wall is of a triangular structure, the bottom of the blocking wall is on the same horizontal plane as the top surfaces on both sides of the river channel, the heights of the upstream sluice and the downstream sluice are equal, and the top surface of the upstream sluice is on the same horizontal plane as the top surface of the blocking wall, the bottom surfaces of the upstream sluice and the downstream sluice are both provided with a leveling solidification layer, the heights of the side walls and the middle wall are equal, the lengths of the side walls and the middle wall are equal, the length of the blocking wall matches the length of the side walls, the height of the side walls is twice the height of the upstream sluice, the first crossbeam and the second crossbeam are parallel to each other, and the bottom surfaces of the first crossbeam and the second crossbeam are on the same horizontal plane.

[0009] The anti-blocking and cleaning section is a square cavity structure, the large-pore longitudinal filter screen is a square screen structure, the height of the large-pore longitudinal filter screen is equal to the height of the blocking wall, the width of the large-pore longitudinal filter screen is matched with the spacing between the side wall and the middle wall, the large-pore longitudinal filter screen is arranged on the side of the middle part of the anti-blocking and cleaning section facing the downstream direction, the spacing between the large-pore longitudinal filter screen and the downstream sluice is not greater than the spacing between the large-pore longitudinal filter screen and the upstream sluice, and the cleaning suction pump is arranged between the large-pore longitudinal filter screen and the downstream sluice.

[0010] A transverse sewage pipe clamping hole is provided in the middle and upper part of the side wall, and the transverse sewage pipe is clamped in the transverse sewage pipe clamping hole. There is at least one sewage cleaning suction pump, and each sewage cleaning suction pump is connected to one side of the middle wall by a lifting and limiting rope. The separation tank is a square trough structure with an opening on the top, and the longitudinal small-hole filter screen is fixedly installed in the middle of the length direction of the separation tank. The separation tank is divided into a filter tank and a reflow tank by the longitudinal small-hole filter screen. The water outlet of the transverse sewage pipe is located at the top of the filter tank, and the clean water drain pipe is connected to the bottom of the reflow tank. A sewage pipe connected to a waste recovery and processing device is provided on one side of the bottom of the filter tank, and the aperture of the longitudinal small-hole filter screen is not larger than the aperture of the large-hole longitudinal filter screen.

[0011] The height of the longitudinal limit sliding groove is not greater than the height of the blocking wall, the top surface of the longitudinal limit sliding groove is located below the top surface of the blocking wall, the longitudinal limit sliding groove is a square groove structure longitudinally opened on the inner surface of the side wall and the middle wall, and the longitudinal limit sliding block is a square block structure whose outer diameter matches the inner diameter of the longitudinal limit sliding groove.

[0012] The crushing isolation cover is a cover structure with an arc-shaped cross-section. The bottom length of the crushing isolation cover is not greater than the distance between the large-pore longitudinal filter screen and the upstream sluice. The two sides of the crushing isolation cover are fixedly connected to the longitudinal limit sliding block through the outer shell of the longitudinal transmission component. The length of the crushing isolation cover matches the distance between the side wall and the middle wall.

[0013] The two ends of the crushing roller are respectively connected to the two ends of the transmission shaft through longitudinal transmission components. The length of the transmission shaft is not less than the length of the crushing isolation cover. The worm drive is fixedly installed at the top center position of the crushing isolation cover through a connecting piece. A hanging ring that cooperates with the lifting rope is provided at the top center position of the worm drive.

[0014] The crushing roller is of cylindrical structure, the crushing blade is of conical blade structure, the receiving shear blade is of triangular blade structure, the tip parts of all receiving shear blades arranged on the bottom surface of the crushing isolation cover are facing the axis of the crushing roller, the installation height of the lifting support seat is equal to the setting height of the horizontal sewage pipe, the installation direction of the lifting bracket is located on the side of the lifting support seat facing the upstream direction, and the transmission motor is a waterproof motor.

[0015] A method for preventing and cleaning pollution of a water conservancy project sluice auxiliary type anti-blocking and cleaning pollution device as described in any one of the above, wherein the method comprises:

[0016] S1. In the initial state, the upstream sluice gate is in the open state. When it is necessary to implement anti-blocking and pollution cleaning operations, the downstream sluice gate is opened, and the upstream water passes through the longitudinal filter screen and then the anti-blocking and pollution cleaning section and is discharged toward the downstream. After a specific period of time, the upstream sluice gate and the downstream sluice gate are closed at the same time;

[0017] S2, the anti-blocking and cleaning section isolated between the upstream sluice and the downstream sluice is filled with solid waste filtered by the longitudinal filter screen, the transmission motor is turned on, the transmission motor drives the transmission shaft in the worm gear to rotate, and further drives the crushing roller to rotate through the longitudinal transmission component;

[0018] S3. The crushing roller is initially located at the top of the longitudinal limit sliding groove. When the crushing operation is in progress, the winch is turned on to slowly operate the lifting rope. As the lifting rope is slowly unwound, the crushing blade of the worm gear on the outside of the longitudinal limit sliding block crushes the solids in the anti-blocking and cleaning section between the longitudinal filter screen and the upstream sluice gate and the solid garbage attached to the longitudinal filter screen. The crushing operation is accompanied by the lifting and lowering operation of the crushing roller. The solid garbage is crushed by reciprocating up and down motion and continuous crushing by the crushing roller until it is crushed to a size that can pass through the longitudinal filter screen.

[0019] S4, turning on the sewage suction pump, and using the sewage suction pump to suck the crushed fine particles that can pass through the longitudinal filter screen through the longitudinal sewage suction pipe to the transverse sewage discharge pipe, and then discharge them into the separation tank through the transverse sewage discharge pipe;

[0020] S5. The outlet of the horizontal sewage pipe is matched with the top of the filter tank. The sewage is discharged from the outlet of the horizontal sewage pipe into the filter tank. After being filtered by the longitudinal small-pore filter screen, the water source with solid particles removed flows into the reflow tank and returns to the downstream of the river through the clean water drainage pipe. When the solid particles in the filter tank reach the preset range, the sewage pipe is opened to discharge the solid particles to the external waste recycling and treatment device for recycling, and the longitudinal small-pore filter screen is cleaned.

[0021] The present invention has the following positive effects:

[0022] Firstly, the present invention utilizes a solid waste crushing device to implement segmented anti-blocking and pollution-cleaning treatment operations on solid waste in a river channel, utilizes two sluice gates arranged in parallel between a side wall and a middle wall to implement uninterrupted treatment, utilizes an upstream sluice gate normally open and a downstream sluice gate open to filter solid waste, isolates solid waste in the upstream direction of a large-pore longitudinal filter screen, and then closes the upstream and downstream sluice gates to form an independent anti-blocking and pollution-cleaning section, implements a separate crushing and treatment chamber for solid waste in the anti-blocking and pollution-cleaning section, and forms an independent isolation chamber when the treatment operation is running, which can prevent pollutants from leaking to the downstream or being remixed to the upstream.

[0023] Secondly, when crushing and processing the solid waste in the anti-blocking and pollution cleaning section, the present invention does not need to collect solid waste on a large scale. It only needs to control the opening and closing of upstream and downstream sluice gates to achieve self-collection of solid waste as the river water flows. When the self-collection of solid waste reaches the preset range value of the processing operation, an independent processing chamber is formed to implement closed processing. While processing, the solid waste can be crushed and sucked to the outside to implement solid-liquid separation. The separated liquid can use its own weight to quickly flow back to the downstream, avoiding the waste and loss of water resources.

[0024] Thirdly, when implementing the crushing operation, the inventor uses a crushing roller that can move up and down to perform reciprocating crushing operations in an independent anti-blocking and cleaning section until the particle size reaches a preset range and then passes through the longitudinal filter screen and is sucked out. In order to improve the crushing efficiency of the product, the present invention provides a receiving shear blade that cooperates with the crushing blade on the bottom surface of the crushing isolation cover, thereby improving the crushing effect and preventing the linear solid shell from being entangled on the crushing roller and causing the crushing operation to fail. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the main structure of the present invention.

[0026] Figure 2 It is a schematic diagram of the top structure of the present invention.

[0027] Figure 3 It is a schematic diagram of the layered structure viewed from above of the present invention.

[0028] Figure 4 It is a partial side structural schematic diagram of the present invention.

[0029] Figure 5 For the present invention Figure 2 Schematic diagram of the AA cross-section structure.

[0030] Figure 6 For the present invention Figure 2 Schematic diagram of the BB cross-section structure.

[0031] Figure 7 For the present invention Figure 2 Schematic diagram of the CC cross-section structure. DETAILED DESCRIPTION

[0032] like Figure 1 , 2As shown in Figures 3, 4, 5, 6 and 7, a water conservancy project sluice auxiliary anti-blocking and pollution cleaning equipment comprises two side walls 1 arranged between two slope bottoms of a river channel and arranged in parallel along the direction of water flow, at least one middle wall 3 arranged between the two side walls 1 and parallel to the side walls 1, a blocking wall 2 arranged between the side walls 1 and the river channel slope, a first crossbeam 5 arranged at the top of the two side walls 1 and the middle wall 3 in the upstream direction, a first sluice lifter 6 fixedly installed above the first crossbeam 5, an upstream sluice 4 connected to the first sluice lifter 6 through a first lifting member 7, a second crossbeam 17 fixedly installed at the top of the two side walls 1 and the middle wall 3 in the downstream direction, a second lifter 18 fixedly installed on the top of the second crossbeam 17, the second lifter 18 is connected to the downstream sluice 31 through a second lifting member 19, and an anti-blocking and pollution cleaning device is arranged between the upstream sluice 4 and the downstream sluice 31. A large-pore longitudinal filter screen 21 is longitudinally inserted between the side wall 1 and the middle wall 3 in the middle of the anti-blocking and cleaning section, and a cleaning suction pump 20 is installed at the bottom of the side of the longitudinal filter screen 21 facing the downstream of the river channel. The cleaning suction pump 20 is connected to the transverse sewage pipe 13 connected to the upper and middle part of the side wall 1 through the longitudinal sewage suction pipe 32. The water outlet of the transverse sewage pipe 13 faces the outside of the river channel. A separation tank 14 is fixedly installed below the water outlet of the transverse sewage pipe 13. A longitudinal small-pore filter screen 15 is arranged in the middle of the separation tank 14. The water outlet of the transverse sewage pipe 13 is arranged on the side of the longitudinal small-pore filter screen 15 facing upstream. A clean water drain pipe 16 is connected to the bottom of the separation tank 14 on the downstream side of the longitudinal small-pore filter screen 15. A solid waste crushing device is installed in the anti-blocking and cleaning section on the side of the longitudinal filter screen 21 facing the upstream of the river channel. The solid waste crushing device comprises longitudinal limit sliding grooves 26 symmetrically arranged on the inner side surfaces of the side wall 1 and the middle wall 3, longitudinal limit sliding blocks 27 are installed in the two longitudinal limit sliding grooves 26, a crushing isolation cover 22 is fixedly installed between the two longitudinal limit sliding blocks 27, a worm gear transmission 24 is fixedly installed on the top of the crushing isolation cover 22, a transmission shaft 23 is transversely sleeved in the worm gear transmission 24, a transmission motor 25 matched with the transmission shaft 23 is installed on one side of the worm gear transmission 24, and the transmission shaft 23 is connected to the crushing isolation cover 22 through a longitudinal transmission component 28. The crushing roller 33 below the separation cover 22 is connected, and an array structure of crushing blades 34 are distributed on the outer surface of the crushing roller 33. A receiving shear blade 35 matched with the crushing blade 34 is arranged on the bottom surface of the crushing isolation cover 22. A lifting support seat 8 is fixedly installed in the middle and upper part between the side wall 1 and the middle wall 3 above the worm drive 24, and a winch 9 is fixedly installed on the lifting support seat 8. A lifting bracket 10 with a pulley 12 is fixedly installed on the outer side of the lifting support seat 8. The winch 9 is connected to the top of the worm drive 24 through a lifting rope 11 mounted on the outer side of the pulley 12.

[0033] The blocking wall 2 is of a triangular structure, the bottom of the blocking wall 2 is on the same horizontal plane as the top surfaces of both sides of the river channel, the heights of the upstream sluice 4 and the downstream sluice 31 are equal, and the top surface of the upstream sluice 4 is on the same horizontal plane as the top surface of the blocking wall 2, the bottom surfaces of the upstream sluice 4 and the downstream sluice 31 are both provided with a leveling solidification layer, the heights of the side walls 1 and the middle wall 3 are equal, the lengths of the side walls 1 and the middle wall 3 are equal, the length of the blocking wall 2 matches the length of the side walls 1, the height of the side wall 1 is twice the height of the upstream sluice 4, the first crossbeam 5 and the second crossbeam 17 are parallel to each other, and the bottom surfaces of the first crossbeam 5 and the second crossbeam 17 are on the same horizontal plane. The anti-blocking and cleaning section is a square cavity structure, the large-pore longitudinal filter screen 21 is a square screen structure, the height of the large-pore longitudinal filter screen 21 is equal to the height of the blocking wall 2, the width of the large-pore longitudinal filter screen 21 is matched with the spacing between the side wall 1 and the middle wall 3, the large-pore longitudinal filter screen 21 is arranged on the side of the middle part of the anti-blocking and cleaning section facing the downstream direction, the spacing between the large-pore longitudinal filter screen 21 and the downstream sluice 31 is not greater than the spacing between the large-pore longitudinal filter screen 21 and the upstream sluice 4, and the cleaning suction pump 20 is arranged between the large-pore longitudinal filter screen 21 and the downstream sluice 31. A transverse sewage pipe clamping hole is provided in the middle and upper part of the side wall 1, and the transverse sewage pipe 13 is clamped in the transverse sewage pipe clamping hole. There is at least one sewage cleaning suction pump 20, and each sewage cleaning suction pump 20 is connected to one side of the middle wall 3 by a lifting and limiting rope. The separation tank 14 is a square trough structure with an opening on the top, and the longitudinal small-pore filter screen 15 is fixedly installed in the middle of the length direction of the separation tank 14. The separation tank 14 is divided into a filter tank and a reflow tank by the longitudinal small-pore filter screen 15. The outlet of the transverse sewage pipe 13 is located at the top of the filter tank, and the clean water drain pipe 16 is connected to the bottom of the reflow tank. A sewage pipe 36 connected to the waste recovery and processing device is provided on one side of the bottom of the filter tank. The aperture of the longitudinal small-pore filter screen 15 is not larger than the aperture of the large-pore longitudinal filter screen 21.

[0034] The height of the longitudinal limit sliding groove 26 is not greater than the height of the blocking wall 2, the top surface of the longitudinal limit sliding groove 26 is located below the top surface of the blocking wall 2, the longitudinal limit sliding groove 26 is a square groove structure longitudinally opened on the inner side of the side wall 1 and the middle wall 3, and the longitudinal limit sliding block 27 is a square block structure with an outer diameter matching the inner diameter of the longitudinal limit sliding groove 26. The crushing isolation cover 22 is a cover structure with an arc cross section, the bottom length of the crushing isolation cover 22 is not greater than the distance between the large-pore longitudinal filter screen 21 and the upstream sluice 4, the two sides of the crushing isolation cover 22 are fixedly connected to the longitudinal limit sliding block 27 through the outer shell of the longitudinal transmission component 28, and the length of the crushing isolation cover 22 matches the distance between the side wall 1 and the middle wall 3. The two ends of the crushing roller 33 are connected to the two ends of the transmission shaft 23 through the longitudinal transmission components 28, the length of the transmission shaft 23 is not less than the length of the crushing isolation cover 22, the worm drive 24 is fixedly installed at the top center of the crushing isolation cover 22 through the connecting piece 29, and a hanging ring 30 matched with the lifting rope 11 is arranged at the top center of the worm drive 24. The crushing roller 33 is a cylindrical structure, the crushing blade 34 is a conical blade structure, the receiving shear blade 35 is a triangular blade structure, and the tip parts of all the receiving shear blades 35 arranged on the bottom surface of the crushing isolation cover 22 are all facing the axis of the crushing roller 33, the installation height of the lifting support seat 8 is equal to the setting height of the horizontal sewage pipe 13, the installation direction of the lifting bracket 10 is located on the side of the lifting support seat 8 facing the upstream direction, and the transmission motor 25 is a waterproof motor.

[0035] When the present invention performs the sluice-assisted anti-blocking and pollution-clearing operation of the water conservancy project, in the initial state, the upstream sluice 4 is in the open state. When the anti-blocking and pollution-clearing operation needs to be implemented, the downstream sluice 31 is opened, and the upstream water passes through the longitudinal filtering screen 21 and then passes through the anti-blocking and pollution-clearing section and is discharged toward the downstream. After a specific period of time, the upstream sluice 4 and the downstream sluice 31 are closed at the same time. The anti-blocking and pollution-clearing section isolated between the upstream sluice 4 and the downstream sluice 31 is filled with solid waste filtered by the longitudinal filtering screen 21, and the transmission motor 25 is turned on, and the transmission motor 25 drives the transmission shaft 23 in the worm gear 24 to rotate, and further drives the crushing roller 33 to rotate through the longitudinal transmission component 28. In the initial state, the crushing roller 33 is located at the top of the longitudinal limit sliding groove 26. When the crushing operation is performed, the hoist 9 is turned on to perform a slow directional operation on the lifting rope 11. As the lifting rope 11 is slowly unwound, the worm gear 24 slowly descends under the limiting action of the longitudinal limit sliding block 27. While descending, the crushing blade 34 on the outer side of the crushing roller 33 crushes the solids in the anti-blocking and cleaning section between the longitudinal filter screen 21 and the upstream sluice 4 and the solid garbage attached to the longitudinal filter screen 21. The crushing operation is accompanied by the lifting operation of the crushing roller 33. The solid garbage is crushed by reciprocating up and down motion and continuous crushing by the crushing roller 33 until it is crushed to a size that can pass through the longitudinal filter screen 21.

[0036] The cleaning suction pump 20 is turned on, and the fine particles that are broken and can pass through the longitudinal filter screen 21 are sucked to the transverse sewage pipe 13 through the longitudinal suction pipe 32 by the cleaning suction pump 20, and discharged into the separation tank 14 through the transverse sewage pipe 13. The outlet of the transverse sewage pipe 13 is matched with the top of the filter tank, and the sewage is discharged into the filter tank from the outlet of the transverse sewage pipe 13. After being filtered by the longitudinal small-pore filter screen 15, the water source with solid particles removed flows into the reflow tank and flows back to the downstream of the river through the clean water drainage pipe 16. When the solid particles in the filter tank reach a preset range, the sewage pipe 36 is opened to discharge the solid particles to the external waste recycling and treatment device for recycling, and the longitudinal small-pore filter screen 15 is cleaned.

[0037] When the present invention is used in practice, the side wall 1 is set according to the specific width of the river channel, two parallel and corresponding side walls 1 are set between the bottom edge of the river channel and the bottom of the river channel slope, and the number of middle walls 3 is set according to the specific width of the river channel. When there are multiple middle walls 3, each middle wall needs to be evenly arranged and set according to the operating width of the sluice.

[0038] The distance between the upstream sluice gate 4 and the downstream sluice gate 31 shall not exceed five meters to ensure the effective crushing range of the crushing roller 33. The length of each independent anti-blocking and pollution cleaning section shall not exceed 5 meters, and the width shall not exceed 5 meters, which is convenient for the effective crushing coverage of the crushing roller 33. During operation, in order to improve the stability of the product, a water leakage hole is opened on the crushing isolation cover 22 to reduce the resistance during the descending and ascending operations and reduce energy consumption.

[0039] The crushing blade 34 cooperates with the receiving shear blade 35. When the cutting operation is performed, the crushing blade 34 rotates with the crushing roller 33, and the receiving shear blade 35 is fixed to crush the solid particles and long strip particles. When the crushing reaches the particle size requirement, they are sucked to the outside for filtration, solid-liquid separation and separate recovery treatment.

[0040] As another embodiment of the present invention, the present invention can implement uninterrupted up and down crushing operation of the crushing roller 33 when both water gates are in the open state, and the specific start-up and opening conditions are selected according to the water level height and the amount of solid waste.

[0041] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment, comprising two side walls (1) arranged between two slope bottoms of a river channel and arranged in parallel along a water flow direction, at least one middle wall (3) arranged between the two side walls (1) and parallel to the side walls (1), a blocking wall (2) arranged between the side walls (1) and the river channel slope, a first crossbeam (5) arranged at the top of the two side walls (1) and the middle wall (3) in the upstream direction, a first sluice lifter (6) fixedly mounted above the first crossbeam (5), and an upstream sluice (4) connected to the first sluice lifter (6) via a first lifting member (7), characterized in that: A second crossbeam (17) is fixedly installed on the top of the two side walls (1) and the middle wall (3) in the downstream direction, a second lifter (18) is fixedly installed on the top of the second crossbeam (17), and the second lifter (18) is connected to the downstream sluice gate (31) through a second lifter (19). An anti-blocking and cleaning section is provided between the upstream sluice gate (4) and the downstream sluice gate (31), and a large-pore longitudinal filtering screen (21) is longitudinally inserted between the side wall (1) and the middle wall (3) in the middle of the anti-blocking and cleaning section from the bottom surface to the bottom of the river channel, and a cleaning suction pump (20) is installed at the bottom of the longitudinal filtering screen (21) facing the downstream side of the river channel, and the cleaning suction pump (20) sucks the sewage longitudinally. The pipe (32) is connected to a transverse sewage pipe (13) clamped at the middle and upper part of the side wall (1), the water outlet of the transverse sewage pipe (13) faces the outside of the river channel, a separation tank (14) is fixedly installed below the water outlet of the transverse sewage pipe (13), a longitudinal small hole filter screen (15) is arranged in the middle of the separation tank (14), the water outlet of the transverse sewage pipe (13) is arranged on the side of the longitudinal small hole filter screen (15) facing upstream, the bottom of the separation tank (14) on the side of the longitudinal small hole filter screen (15) facing downstream is connected to a clean water drainage pipe (16), and a solid waste crushing device is installed in the anti-blocking and cleaning section on the side of the longitudinal filter screen (21) facing upstream of the river channel.

2. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 1 is characterized by: The solid waste crushing device comprises longitudinal limit sliding grooves (26) symmetrically arranged on the inner side surfaces of the side walls (1) and the middle wall (3), longitudinal limit sliding blocks (27) are installed in both longitudinal limit sliding grooves (26), a crushing isolation cover (22) is fixedly installed between the two longitudinal limit sliding blocks (27), a worm gear transmission (24) is fixedly installed on the top of the crushing isolation cover (22), a transmission shaft (23) is transversely sleeved in the worm gear transmission (24), a transmission motor (25) matched with the transmission shaft (23) is installed on one side of the worm gear transmission (24), and the transmission shaft (23) is connected to the crushing isolation cover (22) through a longitudinal transmission component (28). 2) is connected to a crushing roller (33) below, an array structure of crushing blades (34) are distributed on the outer surface of the crushing roller (33), a receiving shearing blade (35) matched with the crushing blade (34) is arranged on the bottom surface of the crushing isolation cover (22), a lifting support seat (8) is fixedly installed in the middle and upper part between the side wall (1) and the middle wall (3) above the worm gear drive (24), a winch (9) is fixedly installed on the lifting support seat (8), a lifting bracket (10) with a pulley (12) is fixedly installed on the outer side of the lifting support seat (8), and the winch (9) is connected to the top of the worm gear drive (24) through a lifting rope (11) sleeved on the outer side of the pulley (12).

3. The water conservancy project sluice auxiliary anti-blocking and pollution cleaning equipment according to claim 2 is characterized by: The blocking wall (2) is of a triangular structure, the bottom of the blocking wall (2) is on the same horizontal plane as the top surfaces of both sides of the river channel, the heights of the upstream sluice (4) and the downstream sluice (31) are equal, and the top surface of the upstream sluice (4) is on the same horizontal plane as the top surface of the blocking wall (2), the bottom surfaces of the upstream sluice (4) and the downstream sluice (31) are both provided with a leveling solidification layer, the heights of the side walls (1) and the middle wall (3) are equal, the lengths of the side walls (1) and the middle wall (3) are equal, the length of the blocking wall (2) matches the length of the side walls (1), the height of the side walls (1) is twice the height of the upstream sluice (4), the first crossbeam (5) and the second crossbeam (17) are parallel to each other, and the bottom surfaces of the first crossbeam (5) and the second crossbeam (17) are on the same horizontal plane.

4. The water conservancy project sluice auxiliary anti-blocking and pollution cleaning equipment according to claim 2 is characterized by: The anti-blocking and cleaning section is a square cavity structure, the large-pore longitudinal filtering screen (21) is a square screen structure, the height of the large-pore longitudinal filtering screen (21) is equal to the height of the blocking wall (2), the width of the large-pore longitudinal filtering screen (21) is matched with the spacing between the side wall (1) and the middle wall (3), the large-pore longitudinal filtering screen (21) is arranged on the side of the middle part of the anti-blocking and cleaning section facing the downstream direction, the spacing between the large-pore longitudinal filtering screen (21) and the downstream sluice (31) is not greater than the spacing between the large-pore longitudinal filtering screen (21) and the upstream sluice (4), and the cleaning suction pump (20) is arranged between the large-pore longitudinal filtering screen (21) and the downstream sluice (31).

5. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 2 is characterized by: A transverse sewage pipe clamping hole is provided in the middle and upper part of the side wall (1), and the transverse sewage pipe (13) is clamped in the transverse sewage pipe clamping hole. There is at least one sewage cleaning suction pump (20), and each sewage cleaning suction pump (20) is connected to one side of the middle wall (3) through a lifting limit rope. The separation tank (14) is a square groove structure with an opening on the top. The longitudinal small hole filter screen (15) is fixedly installed in the middle of the length direction of the separation tank (14). The separation tank (14) is divided into a filter tank and a return tank by the longitudinal small hole filter screen (15). The water outlet of the transverse sewage pipe (13) is located at the top of the filter tank. The clean water drainage pipe (16) is connected to the bottom of the return tank. A sewage pipe (36) connected to the waste recovery and processing device is provided on one side of the bottom of the filter tank. The aperture of the longitudinal small hole filter screen (15) is not larger than the aperture of the large hole longitudinal filter screen (21).

6. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 2 is characterized by: The height of the longitudinal limit sliding groove (26) is not greater than the height of the blocking wall (2), the top surface of the longitudinal limit sliding groove (26) is located below the top surface of the blocking wall (2), the longitudinal limit sliding groove (26) is a square groove structure longitudinally opened on the inner surface of the side wall (1) and the middle wall (3), and the longitudinal limit sliding block (27) is a square block structure with an outer diameter matching the inner diameter of the longitudinal limit sliding groove (26).

7. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 2 is characterized by: The crushing isolation cover (22) is a cover structure with an arc-shaped cross section. The bottom length of the crushing isolation cover (22) is no longer than the distance between the large-pore longitudinal filtering screen (21) and the upstream sluice gate (4). Both sides of the crushing isolation cover (22) are fixedly connected to the longitudinal limit sliding block (27) through the outer shell of the longitudinal transmission component (28). The length of the crushing isolation cover (22) matches the distance between the side wall (1) and the middle wall (3).

8. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 2 is characterized by: The two ends of the crushing roller (33) are respectively connected to the two ends of the transmission shaft (23) through the longitudinal transmission components (28); the length of the transmission shaft (23) is not less than the length of the crushing isolation cover (22); the worm gear drive (24) is fixedly mounted at the top center position of the crushing isolation cover (22) through the connecting piece (29); and a hanging ring (30) matched with the lifting rope (11) is provided at the top center position of the worm gear drive (24).

9. The water conservancy project sluice auxiliary anti-blocking and pollution-clearing equipment according to claim 2 is characterized by: The crushing roller (33) is a cylindrical structure, the crushing blade (34) is a conical blade structure, the receiving shear blade (35) is a triangular blade structure, the tip of all the receiving shear blades (35) arranged on the bottom surface of the crushing isolation cover (22) are facing the axis of the crushing roller (33), the installation height of the lifting support seat (8) is equal to the setting height of the horizontal sewage pipe (13), the installation direction of the lifting bracket (10) is located on the side of the lifting support seat (8) facing the upstream direction, and the transmission motor (25) is a waterproof motor.

10. A method for preventing and cleaning pollution using a water conservancy project sluice auxiliary anti-blocking and cleaning equipment according to any one of claims 2 to 9, characterized in that: The method is: S1, in the initial state, the upstream sluice gate (4) is in an open state. When it is necessary to implement anti-blocking and pollution cleaning operations, the downstream sluice gate (31) is opened, and the upstream water passes through the longitudinal filtering screen (21) and then passes through the anti-blocking and pollution cleaning section and is discharged toward the downstream. After a specific period of time, the upstream sluice gate (4) and the downstream sluice gate (31) are closed at the same time; S2, the anti-blocking and cleaning section isolated between the upstream sluice gate (4) and the downstream sluice gate (31) is filled with solid waste filtered by the longitudinal filtering screen (21), the transmission motor (25) is turned on, the transmission motor (25) drives the transmission shaft (23) in the worm gear drive (24) to rotate, and further drives the crushing roller (33) to rotate through the longitudinal transmission component (28); S3, the crushing roller (33) is initially located at the top of the longitudinal limit sliding groove (26). When the crushing operation is performed, the winch (9) is turned on to slowly move the lifting rope (11). As the lifting rope (11) is slowly unwound, the worm gear (24) slowly descends under the limiting action of the longitudinal limit sliding block (27). While descending, the crushing blade (34) on the outer side of the crushing roller (33) crushes the solids in the anti-blocking and cleaning section between the longitudinal filter screen (21) and the upstream sluice (4) and the solid waste attached to the longitudinal filter screen (21). The crushing operation is accompanied by the lifting operation of the crushing roller (33). The solid waste is crushed by the reciprocating up and down motion and the continuous crushing of the crushing roller (33) until it is crushed to a size that can pass through the longitudinal filter screen (21); S4, turning on the sewage suction pump (20), and using the sewage suction pump (20) to suck the fine particles that have been crushed and can pass through the longitudinal filter screen (21) into the transverse sewage discharge pipe (13) through the longitudinal sewage suction pipe (32), and then discharge the fine particles into the separation tank (14) through the transverse sewage discharge pipe (13); S5. The outlet of the horizontal sewage pipe (13) is matched with the top of the filter tank. The sewage is discharged from the outlet of the horizontal sewage pipe (13) into the filter tank. After being filtered by the longitudinal small hole filter screen (15), the water source with solid particles removed flows into the reflow tank and is returned to the downstream of the river through the clean water drainage pipe (16). When the solid particles in the filter tank reach a preset range, the sewage pipe (36) is opened to discharge the solid particles to an external waste recovery and treatment device for recovery, and the longitudinal small hole filter screen (15) is cleaned.