A high-strength steel-concrete structural building node connection structure and construction method thereof
By designing a high-strength steel-concrete structural node connection structure and utilizing the adjustment function of the connecting components and reinforcing ribs, the complexity of installing precast I-beams and transition components was solved, enabling rapid and accurate installation and smooth concrete flow, thus improving construction efficiency.
Patent Information
- Application Number
- CN202410574647.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-10
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-05-10
AI Technical Summary
In existing prefabricated buildings, the connection method between prefabricated I-beams and transition components is complex, resulting in high installation difficulty and low efficiency, and the density of connections affects the flow of concrete.
The building adopts a high-strength steel-concrete structure with joint connections, including precast I-beams, steel reinforcement frames, and transition components. Through the design of the connection components and reinforcing ribs, the precast I-beams and transition components can be installed quickly and accurately. The spacing and height can be adjusted using connecting screws and clamping screws.
This enabled the rapid and accurate installation of precast I-beams and transition components, simplified the operation process, improved construction efficiency, and ensured the smooth flow of concrete.
Smart Images

Figure CN118187292B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of energy-saving buildings, and in particular relates to a high-strength steel-concrete structural building node connection structure and a construction method thereof. Background Art
[0002] The core problem of prefabricated structural buildings lies in the connection method of components at the splicing nodes. First of all, the reliability of the splicing nodes must be guaranteed, because the forces at the nodes are complex and they are also the weak links of the structure. Once damaged, the integrity of the entire frame structure will be lost. Secondly, the connection method of the nodes should also be simple, convenient and easy to operate. If it is too complicated, it will greatly increase the difficulty of manufacturing and assembling components. The cumbersome connection method will reduce the construction efficiency, which goes against its original intention of helping to achieve the industrialization of construction. Therefore, whether the connection method is simple and reliable determines whether this connection method can be widely promoted and applied in practice.
[0003] At present, the widely used beam-column connection mainly adopts the method of composite beam, that is, the steel bar joints reserved at the ends of the prefabricated I-beams are tied to the steel bar joints at the ends of the columns and stirrups are tied at the overlaps to form an integral node reinforcement, and then concrete is poured in the node area to connect the prefabricated I-beams and the transition components into a whole. There is a lot of concrete pouring and steel bar tying work during the construction work, the process is complicated and the labor required is also large. At the same time, affected by the installation of the prefabricated I-beams, there will be deviations between the prefabricated I-beams and the transition components, resulting in the inability to accurately install the prefabricated I-beams and the transition components, which increases the difficulty of installation and affects the work efficiency. Summary of the invention
[0004] The technical problem to be solved by the present invention is to provide a high-strength steel-concrete structural building node connection structure and a construction method thereof in view of the deficiencies in the prior art. The present invention can realize fast and accurate installation between prefabricated I-beams and transition components, is simple to operate, and is conducive to improving work efficiency.
[0005] This solution is achieved through the following technical measures: a high-strength steel-concrete structural building node connection structure, including a prefabricated I-beam and a steel frame, both ends of the prefabricated I-beam are fixedly connected with a connection component one, each outer side surface of the steel frame is fixedly connected with a transfer component, and the inner cavity of the steel frame is provided with a connection component two.
[0006] Preferably, the prefabricated I-beam comprises an I-beam body, a plurality of connection holes are respectively provided at both ends of the web of the I-beam body, and reinforcing ribs are symmetrically fixedly connected to the two side ends of the web in the I-beam body.
[0007] Preferably, the adapter assembly includes two connecting plates fixed to the outside of the steel frame, the connecting plate is fixedly connected to an I-shaped adapter on the side away from the steel frame, a mounting groove is provided in the middle of one end of the I-shaped adapter close to the steel frame, a plurality of connecting holes are evenly provided in the web of the I-shaped adapter at the end away from the steel frame, and two reinforcing ribs are symmetrically fixedly connected on both sides of the web of the I-shaped adapter at the end away from the steel frame.
[0008] Preferably, the steel bar frame includes a vertical steel bar body and a plurality of steel bar skeletons vertically surrounded and fixed on the outside of the vertical steel bar body;
[0009] The second connection component comprises a positioning bead, a connecting steel bar, a connecting piece, a fixing nut 1, a connecting screw and a fixing nut 2; a cross-shaped positioning steel bar is arranged through the inner cavity of the positioning bead;
[0010] Preferably, the connecting steel bars include U-shaped main steel bars and V-shaped main steel bars, and four groups of V-shaped main steel bars are provided;
[0011] The U-shaped main body steel bar comprises a first U-shaped main body steel bar and a second U-shaped main body steel bar, and the opening ends of the first U-shaped main body steel bar and the second U-shaped main body steel bar are both fixedly connected to the positioning beads;
[0012] The V-shaped main steel bar includes a first V-shaped steel bar and a second V-shaped steel bar, the first V-shaped steel bar and the second V-shaped steel bar respectively include two U-shaped steel bars, the open ends of the two U-shaped steel bars are opposite and fixedly connected to a circle, the circular ring is sleeved on the positioning steel bar, the V-shaped open ends of the first V-shaped steel bar and the second V-shaped steel bar are opposite, and the closed ends of the two U-shaped steel bars in the first V-shaped steel bar and the second V-shaped steel bar corresponding to each other are cross-hooked, and the four groups of V-shaped main steel bars are rotationally symmetrical about the positioning beads;
[0013] The connecting piece passes through the inner wall of the end of the connecting plate 2 and the connecting steel bar and is sleeved with the connecting plate 2, and the fixing nut 1 is threadedly connected to the connecting piece;
[0014] The connecting screw is threadedly connected to the positioning steel bar, and the connecting screw passes through the second connecting plate and is threadedly connected to the connecting screw by the second fixing nut.
[0015] Preferably, the connection assembly 1 includes a connection plate 1, the upper and lower ends of the connection plate 1 are fixedly connected with a reinforcement plate, a plurality of extrusion holes are evenly provided on the reinforcement plate, and extrusion screws are threadedly connected to the extrusion holes, an extrusion plate is arranged on the side of the reinforcement plate away from the connection plate 1, a plurality of connection holes 3 are evenly provided on the connection plate 1, and reinforcement bolts are installed in the connection holes 3, a correction seat is fixedly connected to the side of the connection plate 1 away from the I-beam body, a threaded hole is provided on the correction seat, and a correction screw is threadedly connected to the threaded hole, and a limited position slot is provided in the middle of the connection plate 1;
[0016] The connecting component is integrally placed in a cavity between two flange plates of the I-beam body and two flange plates of the I-shaped adapter.
[0017] Preferably, the two groups of connecting components 1 corresponding to each other are symmetrically arranged at the connection between the adapter component and the prefabricated I-beam, and each reinforcement bolt passes through the connecting hole 1 and the connecting hole 2 respectively. The reinforcement rib 2 and the reinforcement rib 1 are located in the limiting slot, one end of the extrusion plate is located between the reinforcement plate and the flange plate of the I-beam body, and the other end of the extrusion plate is located between the reinforcement plate and the flange plate of the I-shaped adapter.
[0018] The present invention also provides a construction method of the above-mentioned high-strength steel-concrete structural building node connection structure, comprising the following steps:
[0019] S1: Arrange the second connection component in the inner cavity of the steel frame so that the positioning bead is located at the axial center of the inner cavity of the steel frame 4;
[0020] S2: The transfer assembly is arranged around the steel frame and connected to the second connection assembly, the steel frame is covered with a template, and poured into the template to realize steel-concrete connection between the steel frame and the second connection assembly;
[0021] S3: adjusting the spacing between the prefabricated I-beam and the adapter assembly: temporarily fixing the connection assembly 1 and the adapter assembly by reinforcing bolts, turning the correction screws, and the correction screws drive the corresponding reinforcing rib 2 or reinforcing rib 1 to move, thereby changing the spacing between the prefabricated I-beam and the adapter assembly;
[0022] S4: Adjust the height of the prefabricated I-beam so that the prefabricated I-beam is flush with the adapter assembly: by placing the extrusion plate on the side of the reinforcing plate away from the connecting plate one, and by turning the extrusion screw, the connecting assembly one and the adapter assembly are fixed. At this time, by turning the extrusion screw located on one side of the prefabricated I-beam, the extrusion screw extrude the prefabricated I-beam through the extrusion plate, thereby adjusting the height of the prefabricated I-beam.
[0023] Beneficial effects of the present invention:
[0024] 1. In the present invention, the connection component 1 and the adapter component are temporarily fixed by reinforcing bolts, and the reinforcing rib 2 is sleeved in the inner cavity of the limit slot. When the correction screw is rotated, the correction screw drives the reinforcing rib 2, thereby changing the spacing between the prefabricated I-beam and the adapter component, thereby realizing the adjustment of the spacing between the prefabricated I-beam and the adapter component; by placing the extrusion plate on the side of the reinforcing plate away from the connection plate 1, the extrusion screw is rotated to realize the fixation of the connection component 1 and the adapter component. At this time, by rotating the extrusion screw located on one side of the prefabricated I-beam, the extrusion screw is used to extrude the prefabricated I-beam through the extrusion plate, thereby realizing the adjustment of the height of the prefabricated I-beam, making the prefabricated I-beam flush with the adapter component, and realizing the quick and accurate installation between the prefabricated I-beam and the adapter component, the operation is simple, and it is conducive to improving the working efficiency;
[0025] 2. The present invention can achieve the connection between the adapter assembly and the connecting steel bars by arranging connecting screws and connecting pieces. The connecting steel bars, the positioning steel bars and the connecting plate 2 are designed in a triangular structure, thereby increasing the stability between the adapter assembly and the steel frame. At the same time, the structural form of the connecting assembly 2 allows the concrete to pass smoothly through the connecting assembly 2 during the concrete pouring operation of the steel frame, thereby solving the problem that the traditional structure is too dense, resulting in the inability of concrete to flow. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of a high-strength steel-concrete structural building node connection structure of the present invention;
[0027] Figure 2 It is a structural schematic diagram of the prefabricated I-beam in the present invention;
[0028] Figure 3 It is a structural schematic diagram of the connection component 1 in the present invention;
[0029] Figure 4 It is a structural schematic diagram of the transfer assembly in the present invention;
[0030] Figure 5 It is a schematic diagram of the installation structure of the steel bar frame and the second connection component in the present invention;
[0031] Figure 6 It is a schematic diagram of the top view of the structure of the connecting component 2 in the present invention;
[0032] Figure 7 It is a schematic diagram of the installation structure of the connecting component 2 and the adapter component in the present invention;
[0033] Figure 8 It is a structural schematic diagram of the steel bar frame in the present invention;
[0034] Fig. 9 It is a schematic diagram of the top view of the connecting steel bars in the present invention;
[0035] Fig.10 It is a schematic diagram of the three-dimensional structure of connecting steel bars in the present invention;
[0036] Fig.11 It is a plan view schematic diagram of connecting steel bars in the present invention;
[0037] Fig.12 It is a schematic diagram of the planar structure of the connection state of the transfer component and the connection component 2 in the present invention;
[0038] Fig.13 It is a schematic diagram of the planar structure of the prefabricated I-beam, the first connecting component and the adapter component in the present invention in the installation state.
[0039] In the figure: 1. Prefabricated I-beam; 2. Connection component 1; 3. Transfer component; 4. Steel bar frame; 5. Connection component 2;
[0040] 101. I-beam body; 102. connection hole 1; 103. reinforcing rib 1;
[0041] 201, connecting plate 1; 202, reinforcing plate; 203, connecting hole 3; 204, extrusion hole; 205, extrusion screw; 206, extrusion plate; 207, reinforcing bolt; 208, correction seat; 209, threaded hole; 2010, correction screw; 2011, limit slot;
[0042] 301, connecting plate 2; 302, I-shaped adapter; 303, mounting groove; 304, connecting hole 2; 305, reinforcing rib 2;
[0043] 401, vertical reinforcement body; 402, reinforcement skeleton;
[0044] 501, positioning bead; 502, positioning steel bar; 503, connecting steel bar; 504, connecting piece; 505, fixing nut 1; 506, connecting screw; 507, fixing nut 2;
[0045] 5031, U-shaped main steel bar; 5032, V-shaped main steel bar;
[0046] 50311, first U-shaped main reinforcement; 50312, second U-shaped main reinforcement;
[0047] 50321, the first V-shaped steel bar; 50322, the second V-shaped steel bar. DETAILED DESCRIPTION
[0048] In order to clearly illustrate the technical features of this solution, this solution is described below through specific implementation methods and in conjunction with the accompanying drawings.
[0049] A high-strength steel-concrete structural building node connection structure includes a prefabricated I-beam 1 and a steel frame 4, both ends of the prefabricated I-beam 1 are fixedly connected with a connection component 1 2, each outer side surface of the steel frame 4 is fixedly connected with a transfer component 3, and the inner cavity of the steel frame 4 is provided with a connection component 2 5.
[0050] The prefabricated I-beam 1 comprises an I-beam body 101 , a plurality of connection holes 102 are respectively provided at both ends of the web of the I-beam body 101 , and reinforcing ribs 103 are symmetrically fixedly connected to the two side ends of the web of the I-beam body 101 .
[0051] The adapter assembly 3 includes a connecting plate 301 fixed to the outside of the steel frame 4, an I-shaped adapter 302 is fixedly connected to the side of the connecting plate 301 away from the steel frame 4, a mounting groove 303 is provided in the middle of one end of the I-shaped adapter 302 close to the steel frame 4, a plurality of connecting holes 304 are evenly provided in the web of the I-shaped adapter 302 at the end away from the steel frame 4, and reinforcing ribs 305 are symmetrically fixedly connected on both sides of the web of the I-shaped adapter 302 at the end away from the steel frame 4.
[0052] The steel bar frame 4 includes a vertical steel bar body 401 and a plurality of steel bar skeletons 402 vertically surrounded and fixed on the outside of the vertical steel bar body 401 .
[0053] The second connection component 5 includes a positioning bead 501, a connecting steel bar 503, a connecting piece 504, a fixing nut 1 505, a connecting screw 506 and a fixing nut 2 507; a cross-shaped positioning steel bar 502 is arranged through the inner cavity of the positioning bead 501.
[0054] The connecting steel bars 503 include U-shaped main steel bars 5031 and V-shaped main steel bars 5032, and four groups of V-shaped main steel bars 5032 are provided;
[0055] The U-shaped main reinforcement 5031 includes a first U-shaped main reinforcement 50311 and a second U-shaped main reinforcement 50312, and the opening ends of the first U-shaped main reinforcement 50311 and the second U-shaped main reinforcement 50312 are fixedly connected to the positioning beads 501;
[0056] The V-shaped main steel bar 5032 includes a first V-shaped steel bar 50321 and a second V-shaped steel bar 50322. The first V-shaped steel bar 50321 and the second V-shaped steel bar 50322 respectively include two U-shaped steel bars. The open ends of the two U-shaped steel bars are opposite to each other and fixedly connected to a circle. The circle is sleeved on the positioning steel bar 502. The V-shaped open ends of the first V-shaped steel bar 50321 and the second V-shaped steel bar 50322 are opposite to each other, and the closed ends of the two U-shaped steel bars in the first V-shaped steel bar 50321 and the second V-shaped steel bar 50322 corresponding to each other are cross-connected. The four groups of V-shaped main steel bars 5032 are rotationally symmetrical about the positioning bead 501.
[0057] The connecting piece 504 penetrates through the inner wall of the end of the connecting plate 301 and the connecting steel bar 503 and is sleeved with the connecting plate 301. The fixing nut 505 is threadedly connected with the connecting piece 504 to fix the connecting piece 504.
[0058] The connecting screw 506 is threadedly connected to the positioning steel bar 502 , the connecting screw 506 passes through the second connecting plate 301 , and the second fixing nut 507 is threadedly connected to the connecting screw 506 to fix the connecting screw 506 .
[0059] In the above-mentioned structural form, the connection between the adapter component 3 and the connecting steel bar 503 can be achieved by setting the connecting screw 506 and the connecting piece 504. The connecting steel bar 503, the positioning steel bar 502 and the connecting plate 2 301 are designed in a triangular structure to increase the stability between the adapter component 3 and the steel frame 4. At the same time, the connecting steel bar 503 is arranged in a ring shape on the outer edge of the positioning bead 501, so that when the steel frame 4 is being poured, its concrete can pass through the connecting component 2 5 smoothly, thereby solving the problem that the traditional structure is too dense and the concrete cannot flow.
[0060] The connecting component 2 includes a connecting plate 201, and the upper and lower ends of the connecting plate 201 are fixedly connected with reinforcement plates 202. The connecting plate 201 and the two reinforcement plates 202 form a U-shaped structure. A plurality of extrusion holes 204 are evenly provided on the reinforcement plate 202, and an extrusion screw 205 is threadedly connected to the extrusion hole 204. An extrusion plate 206 is arranged on the side of the reinforcement plate 202 away from the connecting plate 201. A plurality of connection holes 203 are evenly provided on the connecting plate 201, and reinforcement bolts 207 are installed in the connection holes 203. A correction seat 208 is fixedly connected to the side of the connecting plate 201 away from the I-beam body 101, and a threaded hole 209 is provided on the correction seat 208. A correction screw 2010 is threadedly connected to the threaded hole 209, and the end of the correction screw 2010 is rotatably connected to the corresponding reinforcement rib 2 305 and the end of the reinforcement rib 103. A limited slot 2011 is provided in the middle of the connecting plate 201.
[0061] The connecting component 1 2 is placed as a whole in the cavity between the two flange plates of the I-beam body 101 and the two flange plates of the I-shaped adapter 302 .
[0062] Two groups of connection components 1 2 with corresponding positions are symmetrically arranged at the connection between the adapter component 3 and the prefabricated I-beam 1, and each reinforcement bolt 207 passes through the connection hole 102 and the connection hole 2 304 respectively. The reinforcement rib 2 305 and the reinforcement rib 1 103 are located in the limiting slot 2011, one end of the extrusion plate 206 is located between the reinforcement plate 202 and the flange plate of the I-beam body 101, and the other end of the extrusion plate 206 is located between the reinforcement plate 202 and the flange plate of the I-shaped adapter 302.
[0063] In the above-mentioned structural form, one end of the extrusion plate 206 is located between the reinforcing plate 202 and the flange plate of the I-beam body 101, and the other end of the extrusion plate 206 is located between the reinforcing plate 202 and the flange plate of the I-shaped adapter 302. When adjusting the spacing between the prefabricated I-beam 1 and the adapter component 3, the connection component 1 2 and the adapter component 3 can be temporarily fixed, and the correction screw 2010 can be rotated. The correction screw 2010 drives the corresponding reinforcing rib 2 305 or reinforcing rib 1 103 to move, thereby changing the spacing between the prefabricated I-beam The spacing between the beam 1 and the adapter component 3, the connecting component 2 can be easily fitted with the I-shaped adapter 302, and the extrusion plate 206 is placed on the side of the reinforcing plate 202 away from the connecting plate 201, and the fixing of the connecting component 2 and the adapter component 3 is achieved by rotating the extrusion screw 205. At this time, by rotating the extrusion screw 205 located on one side of the prefabricated I-beam 1, the extrusion screw 205 extrude the prefabricated I-beam 1 through the extrusion plate 206, thereby achieving the adjustment of the height of the prefabricated I-beam 1.
[0064] The present invention also provides a construction method of the above-mentioned high-strength steel-concrete structural building node connection structure, comprising the following steps:
[0065] S1: The connecting component 2 5 is arranged in the inner cavity of the steel frame 4, so that the positioning bead 501 is located at the axial center of the inner cavity of the steel frame 4;
[0066] S2: The adapter component 3 is arranged around the steel frame 4 and connected to the second connection component 5, and the steel frame 4 is covered with a template, and poured into the template to realize the steel frame 4 and the second connection component 5.
[0067] S3: adjusting the spacing between the prefabricated I-beam 1 and the adapter assembly 3: temporarily fixing the connection assembly 1 2 and the adapter assembly 3 by means of the reinforcing bolt 207, and rotating the correction screw 2010, so that the correction screw 2010 drives the corresponding reinforcing rib 2 305 or reinforcing rib 1 103 to move, thereby changing the spacing between the prefabricated I-beam 1 and the adapter assembly 3;
[0068] S4: Adjust the height of the prefabricated I-beam 1 so that the prefabricated I-beam 1 is flush with the adapter assembly 3: by placing the extrusion plate 206 on the side of the reinforcing plate 202 away from the connecting plate 1 201, and by rotating the extrusion screw 205, the connecting assembly 1 2 and the adapter assembly 3 are fixed. At this time, by rotating the extrusion screw 205 located on one side of the prefabricated I-beam 1, the extrusion screw 205 extrude the prefabricated I-beam 1 through the extrusion plate 206, thereby achieving the adjustment of the height of the prefabricated I-beam 1 until the prefabricated I-beam 1 is flush with the height of the adapter assembly 3.
[0069] Technical features not described in the present invention can be implemented by existing technologies and will not be described in detail here. The present invention is not limited to the above specific embodiments, and changes, modifications, additions or substitutions made by ordinary technicians in the field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A high-strength steel-concrete structural building node connection structure, comprising a prefabricated I-beam (1) and a steel frame (4), Features: Both ends of the prefabricated I-beam (1) are fixedly connected to a connection component 1 (2), each outer side surface of the steel bar frame (4) is fixedly connected to a transfer component (3), and the inner cavity of the steel bar frame (4) is provided with a connection component 2 (5); The prefabricated I-beam (1) comprises an I-beam body (101), a plurality of connection holes (102) are respectively provided at both ends of the web of the I-beam body (101), and reinforcing ribs (103) are symmetrically fixedly connected to the ends of the two side surfaces of the web in the I-beam body (101); The adapter assembly (3) comprises a second connecting plate (301) fixed to the outside of the steel frame (4); an I-shaped adapter (302) is fixedly connected to a side of the second connecting plate (301) away from the steel frame (4); a mounting groove (303) is provided in the middle of one end of the I-shaped adapter (302) close to the steel frame (4); a plurality of second connecting holes (304) are evenly provided in the web of the I-shaped adapter (302) at one end away from the steel frame (4); and two reinforcing ribs (305) are symmetrically fixedly connected to both sides of the web of the I-shaped adapter (302) at one end away from the steel frame (4); The steel bar frame (4) comprises a vertical steel bar body (401) and a plurality of steel bar skeletons (402) vertically surrounded and fixed on the outside of the vertical steel bar body (401); The second connection component (5) comprises a positioning bead (501), a connecting steel bar (503), a connecting piece (504), a fixing nut (505), a connecting screw (506) and a fixing nut (507); a cross-shaped positioning steel bar (502) is provided through the inner cavity of the positioning bead (501); The connecting steel bars (503) include U-shaped main steel bars (5031) and V-shaped main steel bars (5032); The U-shaped main body steel bar (5031) comprises a first U-shaped main body steel bar (50311) and a second U-shaped main body steel bar (50312), and the opening ends of the first U-shaped main body steel bar (50311) and the second U-shaped main body steel bar (50312) are both fixedly connected to the positioning beads (501); The V-shaped main steel bar (5032) comprises a first V-shaped steel bar (50321) and a second V-shaped steel bar (50322), wherein the first V-shaped steel bar (50321) and the second V-shaped steel bar (50322) respectively comprise two U-shaped steel bars, the open ends of the two U-shaped steel bars are opposite to each other and fixedly connected to a circular ring, the circular ring is sleeved on the positioning steel bar (502), the V-shaped open ends of the first V-shaped steel bar (50321) and the second V-shaped steel bar (50322) are opposite to each other, and the closed ends of the two U-shaped steel bars at corresponding positions in the first V-shaped steel bar (50321) and the second V-shaped steel bar (50322) are cross-connected, and the four groups of V-shaped main steel bars (5032) are rotationally symmetrical about the positioning bead (501); The connecting piece (504) penetrates the inner wall of the end of the second connecting plate (301) and the connecting steel bar (503) and is sleeved with the second connecting plate (301), and the fixing nut (505) is threadedly connected to the connecting piece (504); The connecting screw (506) is threadedly connected to the positioning steel bar (502); the connecting screw (506) passes through the second connecting plate (301) and is threadedly connected to the connecting screw (506) via the second fixing nut (507); The connection assembly 1 (2) comprises a connection plate 1 (201), the upper and lower ends of the connection plate 1 (201) are fixedly connected to reinforcement plates (202), the connection plate 1 (201) and the two reinforcement plates (202) form a U-shaped structure, a plurality of extrusion holes (204) are evenly provided on the reinforcement plate (202), the extrusion holes (204) are internally threadedly connected to extrusion screws (205), an extrusion plate (206) is provided on the side of the reinforcement plate (202) away from the connection plate 1 (201), and the connection plate 1 (201) A plurality of connection holes three (203) are evenly provided on the connecting plate one (201), a side of the connecting plate one (201) away from the I-beam body (101) is fixedly connected to a correction seat (208), a threaded hole (209) is provided on the correction seat (208), a correction screw (2010) is internally threadedly connected to the threaded hole (209), an end of the correction screw (210) is rotatably connected to the corresponding end of the reinforcing rib two (305) and the reinforcing rib one (103), and a limit slot (211) is provided in the middle of the connecting plate one (201); The connecting assembly 1 (2) is placed as a whole in a cavity between two flange plates of the I-beam body (101) and two flange plates of the I-shaped adapter (302).
2. A high-strength steel-concrete structural building node connection structure according to claim 1, Features: Two groups of the connection components (2) corresponding in position are symmetrically arranged at the connection between the adapter component (3) and the prefabricated I-beam (1), each reinforcement bolt (207) respectively passes through the connection hole (102) and the connection hole (304), the reinforcement rib (305) and the reinforcement rib (103) are located in the limit slot (2011), one end of the extrusion plate (206) is located between the reinforcement plate (202) and the flange plate of the I-beam body (101), and the other end of the extrusion plate (206) is located between the reinforcement plate (202) and the flange plate of the I-shaped adapter (302).
3. A construction method for the high-strength steel-concrete structural building node connection structure as claimed in claim 2, It is characterized in that The steps include: S1: placing the second connection component (5) in the inner cavity of the steel frame (4) so that the positioning bead (501) is located at the axial center of the inner cavity of the steel frame (4); S2: The transfer assembly (3) is arranged around the steel frame (4) and connected to the second connection assembly (5), and the steel frame (4) is covered with a template, and poured into the template to realize steel-concrete connection between the steel frame (4) and the second connection assembly (5); S3: adjusting the distance between the prefabricated I-beam (1) and the adapter assembly (3): temporarily fixing the connection assembly (2) and the adapter assembly (3) by means of a reinforcing bolt (207), and rotating the correction screw (2010). The correction screw (2010) drives the corresponding reinforcing rib (305) or reinforcing rib (103) to move, thereby changing the distance between the prefabricated I-beam (1) and the adapter assembly (3); S4: Adjusting the height of the prefabricated I-beam (1) so that the prefabricated I-beam (1) is flush with the adapter assembly (3): by placing the extrusion plate (206) on the side of the reinforcing plate (202) away from the first connecting plate (201), and by rotating the extrusion screw (205), the connection assembly (2) and the adapter assembly (3) are fixed. At this time, by rotating the extrusion screw (205) located on one side of the prefabricated I-beam (1), the extrusion screw (205) is pressed against the prefabricated I-beam (1) through the extrusion plate (206), thereby adjusting the height of the prefabricated I-beam (1).