Task allocation system based on big data analysis

Through the task allocation system based on big data analysis, task information is captured and optimized in real time, which solves the problem of traditional systems being unable to adapt to rapidly changing task requirements, improves resource utilization and task completion efficiency, and enhances the system's adaptability.

CN118193172BActive Publication Date: 2024-10-15ZHENGZHOU DIGITAL INTELLIGENCE TECH GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410491285.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-10-15
Estimated Expiration
2044-04-23

AI Technical Summary

Technical Problem

Traditional task allocation systems lack flexibility and cannot effectively adapt to rapidly changing task requirements and resource status, resulting in improper resource allocation and task delays, affecting work efficiency and task completion quality.

Method used

Adopt a task allocation system based on big data analysis to capture task information in real time, analyze urgency, optimize resource allocation, and adjust tasks through the task capture module, emergency analysis module, resource optimization module, task scheduling strategy module, and task execution and monitoring module. Scheduling ensures that urgent tasks receive resources first, takes into account dependencies and concurrency between tasks, and creates detailed scheduling strategies.

Benefits of technology

It improves resource utilization and the timeliness of task completion, enhances the adaptability of the system, improves the flexibility and response speed of task processing, and reduces resource waste and delays.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118193172B_ABST
    Figure CN118193172B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of task optimization technology, specifically to a task allocation system based on big data analysis, which includes a task capture module, an urgency analysis module, a resource optimization module, a task scheduling strategy module, a task execution and monitoring module, and a system optimization module. In the present invention, the resource optimization module optimizes the existing resource distribution and adjusts the resources to match the priority of the task requirements, thereby ensuring that the urgent tasks can obtain the necessary resources first, effectively improving the utilization rate of resources and the timeliness of task completion, and the task scheduling strategy module further strengthens the efficient operation of the system, by reallocating time and resources for tasks, and considering the dependencies and concurrency between tasks, a detailed scheduling strategy is created, which not only improves the flexibility and response speed of task processing, but also enhances the adaptability of the entire system in the face of complex and dynamically changing working environments.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of task optimization, and in particular to a task allocation system based on big data analysis. Background Art

[0002] Task optimization focuses on using advanced data analysis technology to improve the efficiency and effectiveness of task allocation. It combines theories and methods from multiple disciplines such as data analysis, machine learning, and operations research, aiming to optimize the process and results of task allocation through intelligent data processing and decision support. Effective task allocation plays a vital role in improving production efficiency, reducing costs, and enhancing competitiveness.

[0003] Among them, the traditional task allocation system is an IT solution that can automatically allocate work tasks to suitable executors based on various computing models and data analysis results. The purpose of the system is to maximize resource utilization efficiency, ensure that each task can be completed on time and executed by the most suitable person or machine, so as to help enterprises or organizations optimize human resource allocation and operation processes while maintaining efficient operations.

[0004] Traditional task allocation systems have obvious inadequacies in actual operation. They lack flexibility and cannot effectively adapt to rapidly changing task requirements and resource status, resulting in improper resource allocation and task delays. For example, in the absence of real-time adjustment of task priorities and resource allocation, urgent tasks may not obtain the required resources in a timely manner, thus affecting overall work efficiency and task completion quality. In addition, due to the lack of effective management of task dependencies and concurrency, task scheduling often fails to maximize the use of available resources, resulting in idle resources or excessive competition, increased costs, and negative impacts on customer service and market response speed. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art and to propose a task allocation system based on big data analysis.

[0006] In order to achieve the above object, the present invention adopts the following technical solution: The task allocation system based on big data analysis includes:

[0007] The task capture module captures the information of pending tasks based on the real-time operation environment, including task type, expected deadline and resource requirements, and generates a task detail list;

[0008] The urgency analysis module analyzes the urgency of each task based on the task details list, sorts the tasks by urgency with reference to the deadline and resource availability, and obtains a sorted task list;

[0009] The resource optimization module optimizes the existing resource distribution based on the sorted task list, adjusts the priority of resource matching task requirements, ensures that urgent tasks obtain necessary resources first, and outputs an optimized resource allocation plan;

[0010] The task scheduling strategy module reallocates time and resources for tasks based on the optimized resource allocation plan, and creates a detailed scheduling strategy in combination with dependencies and concurrency between tasks;

[0011] The task execution and monitoring module monitors the execution progress and resource usage of all tasks based on the detailed scheduling strategy, adjusts the task execution sequence and resource allocation in real time, and generates monitoring execution records;

[0012] The system optimization module performs system optimization based on the monitoring execution record, adjusts resource allocation and task scheduling, minimizes delay and resource waste, and obtains an optimized system configuration.

[0013] As a further solution of the present invention, the task details list includes task number, task deadline, required key skills and resource amount; the sorted task list is specifically a list of tasks arranged in order of urgency level; the optimized resource allocation plan includes resource allocation ratio, scheduled time and resource priority; the detailed scheduling strategy includes the start time of each task, required resource type and quantity, and dependent task identifier; the monitoring execution record includes task status update, resource usage and time deviation; the optimized system configuration is specifically adjusted resource allocation parameters, task priority rules and response thresholds.

[0014] As a further solution of the present invention, the task capture module includes:

[0015] The information collection submodule automatically captures task information based on the real-time operating environment, including task type, expected deadline, and required resources, and obtains preliminary task data;

[0016] The task attribute analysis submodule performs attribute identification based on the preliminary task data, separates key fields including resource categories, marks data importance levels, integrates key task attributes, and generates a task attribute summary;

[0017] The task details sorting submodule performs data verification based on the task attribute summary, corrects errors and missing information, unifies the data format, and sorts and sorts the task information to obtain a task details list.

[0018] As a further solution of the present invention, the urgency analysis module includes:

[0019] The task urgency assessment submodule performs urgency calibration based on the task details list, assesses the task deadline, scores the urgency of resource requirements, summarizes the scores to formulate an urgency rating, and obtains the urgency assessment results;

[0020] The urgency sorting submodule performs priority allocation based on the urgency assessment result, sorts the tasks according to the urgency rating, updates the task queue status, and obtains a priority sorting list;

[0021] The task urgency report submodule performs report compilation based on the priority ranking list, records the urgency score and ranking position of each task, and organizes them into a structured document to obtain a ranked task list.

[0022] As a further solution of the present invention, the resource optimization module includes:

[0023] The resource demand analysis submodule performs resource classification based on the sorted task list, analyzes the resource type and quantity requirements of each task, evaluates the current resource inventory status, compares the demand and supply conditions, and obtains the resource demand analysis results;

[0024] The resource preliminary matching submodule performs resource allocation simulation based on the resource demand analysis results, compares the task resource demand with the available resources, makes resource allocation adjustments, updates the resource allocation log, and obtains a preliminary resource matching solution;

[0025] The resource allocation optimization submodule uses a linear programming algorithm to optimize the distribution and flow of resources based on the preliminary resource matching solution, detect potential resource circulation problems, adjust resource configuration parameters, update resource configuration logs, and output an optimized resource allocation plan.

[0026] As a further solution of the present invention, the linear programming algorithm is according to the formula:

[0027]

[0028] The optimal solution Z for computing resource allocation, where c i is the unit cost or benefit of each resource, x i is the allocation amount of the corresponding resource, α i is the attenuation coefficient of resource circulation, t is the time factor, and e is the base of the natural logarithm.

[0029] As a further solution of the present invention, the task scheduling strategy module includes:

[0030] The scheduling strategy design submodule analyzes resource usage constraints and task delivery time frames based on the optimized resource allocation plan, draws a preliminary task flow chart, and obtains a preliminary scheduling strategy;

[0031] The task dependency analysis submodule performs dependency mapping based on the preliminary scheduling strategy, uses a topological sorting algorithm to analyze the task execution sequence, performs link analysis on the task execution sequence, adjusts the time and resource links between tasks, updates the task link graph, and obtains the dependency analysis result;

[0032] The scheduling execution plan submodule refines the execution plan based on the dependency analysis results, sets time nodes and resource allocation for each task, updates the execution plan document, and obtains a detailed scheduling strategy.

[0033] As a further solution of the present invention, the topological sorting algorithm is according to the formula:

[0034]

[0035] Calculate the weighted in-degree of the task vertex, where v represents a task node, u represents a node in the set of task nodes that directly point to v, and w uv is the importance weight of edge u to v, p u is the priority coefficient of vertex u, d uv is the data size from vertex u to v, s u Score the stability of vertex u.

[0036] Compared with the prior art, the advantages and positive effects of the present invention are:

[0037] In the present invention, the resource optimization module optimizes the existing resource distribution and adjusts the resources to match the priority of the task requirements, ensuring that urgent tasks can obtain the necessary resources first, effectively improving the resource utilization and the timeliness of task completion. The task scheduling strategy module further enhances the efficient operation of the system by reallocating time and resources to tasks and creating a detailed scheduling strategy taking into account the dependencies and concurrency between tasks. This not only improves the flexibility and response speed of task processing, but also enhances the adaptability of the entire system in the face of complex and dynamically changing working environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] Figure 1 is a system flow chart of the present invention;

[0039] Figure 2 It is a schematic diagram of the system framework of the present invention;

[0040] Figure 3 It is a flow chart of the task capture module of the present invention;

[0041] Figure 4 It is a flow chart of the urgency analysis module of the present invention;

[0042] Figure 5It is a flow chart of the resource optimization module of the present invention;

[0043] Figure 6 It is a flow chart of the task scheduling strategy module of the present invention;

[0044] Figure 7 It is a flowchart of the task execution and monitoring module of the present invention;

[0045] Figure 8 It is a flow chart of the system optimization module of the present invention. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0047] In the description of the present invention, it should be understood that the terms "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, in the description of the present invention, "multiple" means two or more, unless otherwise clearly and specifically defined.

[0048] Embodiment 1

[0049] See also Figure 1 and Figure 2 ,The task allocation system based on big data analysis includes task ,capture module, urgency analysis module, resource optimization module, task scheduling ,strategy module, task execution and monitoring module and system ,optimization module;

[0050] The task capture module captures the information of pending tasks based on the real-time operation environment, including task type, expected deadline and resource requirements, and generates a task detail list;

[0051] The urgency analysis module analyzes the urgency of each task based on the task details list, sorts the tasks by urgency with reference to the deadline and resource availability, and obtains a sorted task list;

[0052] The resource optimization module optimizes the existing resource distribution based on the sorted task list, adjusts the priority of resource matching task requirements, ensures that urgent tasks get the necessary resources first, and outputs an optimized resource allocation plan;

[0053] The task scheduling strategy module reallocates time and resources for tasks based on an optimized resource allocation plan to ensure conflict-free task execution and creates detailed scheduling strategies based on dependencies and concurrency between tasks.

[0054] The task execution and monitoring module monitors the execution progress and resource usage of all tasks based on detailed scheduling strategies, adjusts the task execution sequence and resource allocation in real time, and generates monitoring execution records;

[0055] The system optimization module performs in-depth system optimization based on monitoring execution records, adjusts resource allocation and task scheduling, minimizes delays and resource waste, and obtains the optimized system configuration.

[0056] The task details list includes the task number, task deadline, required key skills and resource quantity. The sorted task list is specifically a list of tasks arranged in order of urgency level. The optimized resource allocation plan includes the resource allocation ratio, scheduled time and resource priority. The detailed scheduling strategy includes the start time of each task, the required resource type and quantity, and the dependent task identifier. The monitoring execution record includes task status updates, resource usage and time deviation. The optimized system configuration is specifically the adjusted resource allocation parameters, task priority rules and response thresholds.

[0057] See also Figure 2 and Figure 3 ,The task capture module includes the task information collection submodule, the task attribute analysis submodule, and the task details ,collation submodule;

[0058] The information collection submodule automatically captures task information based on the real-time operating environment, including task type, expected deadline, and required resources, and obtains preliminary task data;

[0059] In the task information collection submodule, based on the real-time operating environment, automatic monitoring technology is adopted, and the network packet capture tool Wireshark is used to capture data flows in real time. By capturing data packets, network traffic is analyzed, and key information contained in the data packets, such as task type, expected deadline, and required resources, is automatically identified and extracted. This process involves setting capture filters so that only data flows related to the task are focused on. For example, the filter syntax is used to set up only packets of specific ports or protocols to ensure that the most relevant information is extracted from a large amount of network data. In addition, the tool will also analyze the timestamp of the data packet to extract the expected deadline. The processing of the data packet does not involve the storage or long-term retention of personal data, but is only temporarily processed in the memory to ensure the real-time and security of the data, thereby generating preliminary task data.

[0060] The task attribute analysis submodule performs attribute identification based on preliminary task data, separates key fields including resource categories, marks data importance levels, integrates key task attributes, and generates a task attribute summary;

[0061] In the task attribute analysis submodule, the generated preliminary task data is used to adopt the data classification algorithm and configure the decision tree model. The model is implemented using Python's scikit-learn library. The model parameter configuration includes setting the maximum depth of the tree to 10 and the minimum number of samples for node segmentation to 2. Through this configuration, the decision tree can effectively identify the key attributes of the task from the preliminary data. For example, the identification of resource categories is carried out by analyzing the keywords in the required resource fields, such as the identification and classification of words such as "server" and "manpower". At the same time, the marking of data importance levels is performed through data sensitivity analysis, and the task data is divided into three levels: high, medium, and low. This facilitates subsequent data processing and security management. Each step of execution is carried out under strict data processing specifications and privacy protection measures to ensure the security and accuracy of the data classification process. Through detailed operations and parameter configuration, a task attribute summary is generated.

[0062] The task details sorting submodule performs data validation based on the task attribute summary, corrects errors and missing information, unifies the data format, and sorts the task information to obtain a task details list;

[0063] In the task details sorting submodule, based on the task attribute summary, data formatting tools are used for operation, which includes using the pandas library in Python to clean the data and unify the format. First, the data is verified, and data validation functions such as pandas.validate() are used to check the integrity and accuracy of the data, and corrections are made for errors and missing information found. For example, the fillna() method is used to fill missing values, and the replace() method is used to correct data errors. At the same time, a unified data format is set, such as the date field is uniformly in the "YYYY-MM-DD" format, and the text field is uniformly encoded in UTF-8. In addition, data classification is performed, and the groupby() method is used to group and sort the data according to the task type. These operations ensure the neatness and consistency of the data, making the final task information sorting more systematic and easy to manage. All these operations are completed under the guidance of detailed steps to ensure that every detail of data processing is strictly controlled and a task details list is generated.

[0064] See also Figure 2 and Figure 4 ,The urgency analysis module includes a task urgency assessment submodule, an urgency ranking submodule, and a task urgency reporting submodule;

[0065] The task urgency assessment submodule performs urgency calibration based on the task details list, evaluates the task deadline, scores the urgency of resource requirements, summarizes the scores to formulate an urgency rating, and obtains the urgency assessment results;

[0066] In the task urgency assessment submodule, based on the task details list, a scoring algorithm is adopted, and numerical calculations are performed using Python's NumPy library to evaluate the task deadline. By calculating the difference in days between the current date and the deadline, an urgency scoring standard is set. For example, a deadline within a week gets 10 points, a week to a month gets 5 points, and more than a month gets 1 point. The resource requirements are scored for urgency, and a similar scoring logic is used. Tasks with large resource requirements get high scores, and tasks with small resource requirements get low scores. The weighted average of these two scores (40% for the deadline and 60% for the resource requirement) is used to summarize the scores, and the weight parameters are configured to be 0.4 and 0.6 respectively. Through this scoring mechanism, the urgency assessment results are generated.

[0067] The urgency sorting submodule performs priority allocation based on the urgency assessment results, sorts the tasks by urgency rating, updates the task queue status, and obtains a priority sorting list;

[0068] In the urgency sorting submodule, a sorting algorithm is used based on the urgency assessment results. The Python Pandas library is used to perform data sorting. The sorting function DataFrame.sort_values() is set to sort the tasks. The sorting is based on the urgency rating. The sorting parameter ascending = False is configured to ensure that the list is from the most urgent to the least urgent. In addition, the task queue status is updated, and the DataFrame.update() method is used to reflect the sorting results in the task queue in real time, ensuring that the priority of task execution is executed according to the latest sorting, and generating a priority sorting list.

[0069] The task urgency report submodule compiles reports based on the priority ranking list, records the urgency score and ranking position of each task, and organizes them into structured documents to obtain a ranked task list;

[0070] In the task urgency report submodule, based on the priority list, a report preparation tool is used, Microsoft Excel and VBA scripts are used for automated report generation, and VBA scripts are set to perform Excel operations, such as using the Range object to specify cells, and the Value property to enter the task's urgency score and sorting position, which is organized into a structured document. The document format is configured such as automatic adjustment of font size and column width to ensure the readability and professionalism of the report. In addition, the urgency score and sorting position of each task are presented in a chart, and Excel's chart tool is used to generate a bar chart to ensure the intuitive display and easy understanding of the data, and finally a sorted task list is generated.

[0071] See also Figure 2 and Figure 5 ,The resource optimization module includes the resource demand analysis submodule, the resource ,preliminary matching submodule, and the resource allocation optimization submodule;

[0072] The resource demand analysis submodule performs resource classification based on the sorted task list, analyzes the resource type and quantity requirements of each task, evaluates the current resource inventory status, compares demand and supply, and obtains resource demand analysis results;

[0073] In the resource demand analysis submodule, based on the sorted task list, a resource classification algorithm is adopted, and Python's Pandas library is used to analyze the resource type and quantity requirements of each task. The groupby() and sum() methods in Pandas are configured to summarize the total demand for the same type of resources. At the same time, the current resource inventory status is evaluated, and SQL queries are used to extract existing resource data from the database. The task requirements are compared with the existing resources through SQL JOIN operations, and the WHERE clause in the SQL query is set to filter out resource shortages, ensuring an accurate assessment of resource demand and supply conditions and generating resource demand analysis results.

[0074] The resource preliminary matching submodule performs resource allocation simulation based on the resource demand analysis results, compares the task resource demand with the available resources, makes resource allocation adjustments, updates the resource allocation log, and obtains a preliminary resource matching plan;

[0075] In the resource preliminary matching submodule, resource allocation simulation is performed based on the results of resource demand analysis. The simulation allocation algorithm is used to configure the SimPy library in the Java environment to perform resource allocation simulation. The SimPy library provides an event-based simulation framework that allows simulation of the allocation and adjustment of various types of resources. The simulation parameters include resource type, quantity, and allocation priority. Resource allocation is performed in the SimPy environment by writing Python scripts, comparing the matching of task resource requirements with available resources, and making dynamic adjustments based on resource type and priority. The Python update() method is used to update the resource allocation log to ensure that the results of each resource allocation are recorded and a preliminary resource matching plan is generated.

[0076] The resource allocation optimization submodule uses a linear programming algorithm to optimize the distribution and flow of resources based on the preliminary resource matching scheme, detect potential resource circulation problems, adjust resource allocation parameters, update resource allocation logs, and output optimized resource allocation plans;

[0077] Linear programming algorithm, according to the formula:

[0078]

[0079] The optimal solution Z for computing resource allocation, where c i is the unit cost or benefit of each resource, x i is the allocation amount of the corresponding resource, α i is the attenuation coefficient of resource circulation, t is the time factor, and e is the base of the natural logarithm, which is approximately equal to 2.71828.

[0080] The execution process is as follows:

[0081] First, ci represents the importance or cost of different resources, and xi represents the allocation amount of different resources. The overall resource allocation effect is optimized by adjusting the allocation of each resource.

[0082] Next, we introduce a new parameter α i and t to account for the decay or depreciation of resource allocation over time, where α i It reflects the rate of circulation or consumption of each resource, t represents the length of time considered, and α is calculated i The coefficient value can be analyzed by historical data or experiments to determine the decay rate of each resource.

[0083] Through this approach, the resource allocation plan can be adjusted and optimized more accurately to adapt to resource demand and circulation in different time periods, and the overall implementation process of the improved formula can be integrated and explained.

[0084] See also Figure 2 and Figure 6,The task scheduling strategy module includes the scheduling strategy design submodule, the task ,dependency analysis submodule, and the scheduling execution plan submodule;

[0085] The scheduling strategy design submodule analyzes resource usage constraints and task delivery time frames based on the optimized resource allocation plan, draws a preliminary task flow chart, and obtains a preliminary scheduling strategy;

[0086] In the scheduling strategy design submodule, based on the optimized resource allocation plan, the process analysis method is adopted, and the Microsoft Visio software is used to draw the preliminary task flow chart. The relationship diagram of tasks and resources is drawn by configuring Visio's graphic inventory access and using specific templates. This process includes analyzing resource usage constraints and task delivery time frames, setting Visio's timeline tool to mark the start and end time of each task, and ensuring the logical clarity and visual rationality of the task process through the automatic layout function of the drawing software to generate a preliminary scheduling strategy.

[0087] The task dependency analysis submodule performs dependency mapping based on the preliminary scheduling strategy, uses a topological sorting algorithm to analyze the task execution sequence, performs link analysis on the task execution sequence, adjusts the time and resource links between tasks, updates the task link graph, and obtains the dependency analysis results;

[0088] Topological sorting algorithm, according to the formula:

[0089]

[0090] Calculate the weighted in-degree of the task vertex, where v represents a task node, u represents a node in the set of task nodes that directly point to v, and w uv is the importance weight of the edge u to v, which can be quantitatively evaluated based on the urgency or criticality of the task, p u is the priority coefficient of vertex u, which is usually determined by the task time limit or resource consumption, d uv is the amount of data from vertex u to v, reflecting the amount of data transferred between tasks, s u To score the stability of vertex u, we can evaluate it from the failure history or change frequency of the task.

[0091] The execution process is as follows:

[0092] First, for each task vertex v, traverse all its predecessor nodes u and calculate the weighted contribution of each edge u to v. The weight here is w uv , reflecting the importance of the dependency, and then multiplying by p u , which is the priority of vertex u, taking into account the urgency or importance of the task;

[0093] Then, multiply by duv , that is, the amount of data transferred between tasks, considering the amount of information required to perform the task;

[0094] Finally, multiply by s u , which is the stability score of vertex u. Considering the reliability of the task, these values ​​are accumulated to obtain the weighted in-degree of vertex v. 加权 (v),The in-degree of a vertex not only considers the number of tasks, but also comprehensively considers the importance, urgency, data dependency, and stability of the tasks to optimize the effect of task scheduling.

[0095] In this way, we not only simply calculate the number of task dependencies, but also introduce multiple influencing factors to make the resulting task execution order more reasonable and efficient, more accurately reflect the execution priority of tasks and resource allocation needs in actual work, and ensure more effective task scheduling and management.

[0096] The scheduling execution plan submodule refines the execution plan based on the dependency analysis results, sets time nodes and resource allocation for each task, updates the execution plan document, and obtains a detailed scheduling strategy;

[0097] In the scheduling execution plan submodule, based on the dependency analysis results, the execution plan is refined, and time management tools are used. Microsoft Project software is used to set time nodes and resource allocation for each task, configure the resource pool and calendar view in Project, set the duration and resource requirements of each task by dragging and dropping, and use Project's update_project() method to update the execution plan document to ensure that the time node and resource allocation of each task are recorded and optimized in detail. In addition, the report function of Project is used to generate a view of the scheduling strategy, which shows the progress and resource distribution of the entire project in the form of charts and timelines to obtain a detailed scheduling strategy.

[0098] See also Figure 2 and Figure 7 ,The task execution and monitoring module includes the execution monitoring ,startup submodule, the real-time task tracking submodule, and the execution evaluation submodule;

[0099] The execution monitoring startup submodule starts task execution monitoring based on the detailed scheduling strategy, initializes the monitoring interface, records the start task status, configures the alarm threshold, and obtains the task startup record;

[0100] In the execution monitoring startup submodule, based on the detailed scheduling strategy, monitoring software is used to start task execution monitoring using the Splunk tool. The Splunk dashboard is configured to initialize the monitoring interface through custom queries, and the start task status is recorded by setting query parameters, such as task ID and start timestamp. The alarm threshold is configured through Splunk's real-time monitoring function, and the alarm conditions are set such as triggering when the task is delayed for more than the scheduled time. The parameters are specified in the Splunk settings, such as setting the delay trigger threshold to 20% of the scheduled task time, and obtaining the task startup record.

[0101] The real-time task tracking submodule performs real-time tracking based on the task start record, monitors the completion of each stage of the task, records resource consumption, updates the task schedule, and obtains real-time execution data;

[0102] In the real-time task tracking submodule, real-time tracking is performed based on the task startup record. Dynamic monitoring technology is adopted, and Nagios is used to monitor the completion of each stage of the task. The Nagios monitoring script is configured to detect the completion status of specific task nodes, and the resource consumption is recorded. The detailed data of the resources consumed by each task is collected through the Nagios performance data plug-in, such as CPU and memory usage. The task schedule is automatically updated by writing a Nagios event processor script to ensure that each task status update is recorded. Through detailed monitoring and data collection, real-time execution data is obtained.

[0103] The execution evaluation submodule integrates data based on real-time execution data, analyzes the task completion time and resource consumption ratio, updates efficiency analysis charts, and generates monitoring execution records;

[0104] In the execution evaluation submodule, data integration is performed based on real-time execution data, efficiency analysis methods are adopted, and data visualization is performed using Tableau software. The data source of Tableau is configured to connect to the real-time monitoring database. By setting analysis parameters, such as the ratio of task completion time to resource consumption, Tableau's chart tools are used to draw efficiency analysis charts, such as bar charts and scatter plots to represent the efficiency comparison of each task. Monitoring execution records are generated through dynamic configuration of chart tools and real-time data updates.

[0105] See also Figure 2 and Figure 8 ,The system optimization module includes a performance data analysis submodule, an ,optimization strategy testing submodule, and a system parameter adjustment submodule;

[0106] The performance data analysis submodule is based on monitoring execution records, performing data aggregation, analyzing task execution time and resource consumption patterns, marking frequently delayed tasks and resource shortages, and generating performance analysis results;

[0107] In the performance data analysis submodule, based on the monitoring execution records, data aggregation technology is adopted, and data aggregation is performed using SQL query statements. Query instructions are set to extract task execution time and resource consumption data from the monitoring database. The average value of the data is calculated and classified through the SQL GROUP BY and AVG() functions, and the task execution time and resource consumption patterns are analyzed. Frequently delayed tasks and resource shortages are marked by setting threshold judgment logic. For example, when the number of task delays exceeds five times or the resource utilization rate exceeds 90% continuously, it is marked. The data is processed and analyzed in detail to ensure accurate identification of performance bottlenecks and key problem areas, and generate performance analysis results.

[0108] The optimization strategy test submodule designs the experimental control group and the change group based on the performance analysis results, applies the difference configuration to perform real-time simulation, records the execution efficiency changes before and after the improvement, and obtains the optimization strategy test report record;

[0109] In the optimization strategy testing sub-module, based on the performance analysis results, the experimental control group and the change group are designed, the A / B testing method is adopted, the experimental parameters are configured, and real-time simulation is performed through dedicated testing software. Differential configuration parameters are set, such as adjusting the resource allocation algorithm or changing the task scheduling priority. Real-time simulation is performed by deploying the configuration before and after the change in the test environment, recording the changes in execution efficiency before and after the improvement, and capturing key performance indicators such as changes in processing time and resource utilization through the logging function of the testing software. Through these detailed configurations and monitoring, reliable test results are ensured and optimization strategy test records are obtained.

[0110] The system parameter adjustment submodule updates the execution parameter adjustment log based on the optimization strategy test record, adjusts the task allocation logic and resource configuration parameters, and synchronously updates the system configuration database to obtain the optimized system configuration;

[0111] In the system parameter adjustment submodule, based on the optimization strategy test records, parameter adjustment log updates are executed. Configuration management tools are used to adjust the task allocation logic and resource configuration parameters using Ansible automation scripts. Parameter variables in the scripts, such as CPU allocation ratio and memory upper limit, are set. These adjustments are executed through Ansible's playbook, and the system configuration database is updated synchronously. Configuration database update operations are executed through SQL scripts to ensure that all changes are accurately recorded and deployed. The optimized system configuration is obtained through refined management and automated execution of operations.

[0112] The above are only preferred embodiments of the present invention and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the technical contents disclosed above to change or modify them into equivalent embodiments with equivalent changes and apply them to other fields. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. Task allocation system based on big data analysis, characterized by: The system comprises: The task capture module captures the information of pending tasks based on the real-time operation environment, including task type, expected deadline and resource requirements, and generates a task detail list; The urgency analysis module analyzes the urgency of each task based on the task details list, sorts the tasks by urgency with reference to the deadline and resource availability, and obtains a sorted task list; The resource optimization module optimizes the existing resource distribution based on the sorted task list, adjusts the priority of resource matching task requirements, ensures that urgent tasks obtain necessary resources first, and outputs an optimized resource allocation plan; The task scheduling strategy module reallocates time and resources for tasks based on the optimized resource allocation plan, and creates a detailed scheduling strategy in combination with dependencies and concurrency between tasks; The task execution and monitoring module monitors the execution progress and resource usage of all tasks based on the detailed scheduling strategy, adjusts the task execution sequence and resource allocation in real time, and generates execution monitoring records; The system optimization module performs system optimization based on the execution monitoring record, adjusts resource allocation and task scheduling, minimizes delay and resource waste, and obtains an optimized system configuration; The task scheduling strategy module includes: The scheduling strategy design submodule analyzes resource usage constraints and task delivery time frames based on the optimized resource allocation plan, draws a preliminary task flow chart, and obtains a preliminary scheduling strategy; The task dependency analysis submodule performs dependency mapping based on the preliminary scheduling strategy, uses a topological sorting algorithm to analyze the task execution sequence, performs link analysis on the task execution sequence, adjusts the time and resource links between tasks, updates the task link graph, and obtains the dependency analysis result; The scheduling execution plan submodule refines the execution plan based on the dependency analysis results, sets time nodes and resource allocation for each task, updates the execution plan document, and obtains a detailed scheduling strategy; The topological sorting algorithm is based on the formula: Calculate the weighted in-degree of the task vertex, where Represents a task node. Represents direct pointing A node in the task node set. For edge arrive The importance weight of Vertex The priority coefficient of Vertex arrive The amount of data, Vertex stability score.

2. The task allocation system based on big data analysis according to claim 1 is characterized in that: The task details list includes task number, task deadline, required key skills and resource quantity; the sorted task list is specifically a list of tasks arranged in order of urgency level; the optimized resource allocation plan includes resource allocation ratio, scheduled time and resource priority; the detailed scheduling strategy includes the start time of each task, required resource type and quantity, and dependent task identifier; the execution monitoring record includes task status update, resource usage and time deviation; the optimized system configuration is specifically adjusted resource allocation parameters, task priority rules and response thresholds.

3. The task allocation system based on big data analysis according to claim 1 is characterized in that: The task capture module includes: The information collection submodule automatically captures task information based on the real-time operating environment, including task type, expected deadline, and required resources, and obtains preliminary task data; The task attribute analysis submodule performs attribute identification based on the preliminary task data, separates key fields including resource categories, marks data importance levels, integrates key task attributes, and generates a task attribute summary; The task details sorting submodule performs data verification based on the task attribute summary, corrects errors and missing information, unifies the data format, and sorts and sorts the task information to obtain a task details list.

4. The task allocation system based on big data analysis according to claim 1 is characterized in that: The urgency analysis module comprises: The task urgency assessment submodule performs urgency calibration based on the task details list, assesses the task deadline, scores the urgency of resource requirements, summarizes the scores to formulate an urgency rating, and obtains the urgency assessment results; The urgency sorting submodule performs priority allocation based on the urgency assessment result, sorts the tasks according to the urgency rating, updates the task queue status, and obtains a priority sorting list; The task urgency report submodule performs report compilation based on the priority ranking list, records the urgency score and ranking position of each task, and organizes them into a structured document to obtain a ranked task list.

5. The task allocation system based on big data analysis according to claim 1 is characterized in that: The resource optimization module includes: The resource demand analysis submodule performs resource classification based on the sorted task list, analyzes the resource type and quantity requirements of each task, evaluates the current resource inventory status, compares the demand and supply conditions, and obtains the resource demand analysis results; The resource preliminary matching submodule performs resource allocation simulation based on the resource demand analysis results, compares the task resource demand with the available resources, makes resource allocation adjustments, updates the resource allocation log, and obtains a preliminary resource matching solution; The resource allocation optimization submodule uses a linear programming algorithm to optimize the distribution and flow of resources based on the preliminary resource matching solution, detect potential resource circulation problems, adjust resource configuration parameters, update resource configuration logs, and output an optimized resource allocation plan.

6. The task allocation system based on big data analysis according to claim 5 is characterized in that: The linear programming algorithm is according to the formula: Optimal solution for computing resource allocation ,in, is the unit cost or benefit of each resource, is the allocation amount of the corresponding resource, is the attenuation coefficient of resource circulation, is the time factor, is the base of natural logarithms.