A method for lifting and installing a steel-concrete composite arch bridge deck using a crane.

By designing an arch-mounted crane device, the clamping system of the main beam structure and support beams provides stable support and guidance on the chord tube of the arch, solving the problem of the significant impact of track setting on the chord tube in existing technologies, and achieving efficient and safe steel beam hoisting.

CN118206012BActive Publication Date: 2026-11-10GUANGXI ROAD & BRIDGE ENG GRP CO LTD +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410542298.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2026-11-10
Estimated Expiration
2044-04-30

AI Technical Summary

Technical Problem

The existing arch crane requires the installation of tracks on the arch chords during steel beam hoisting, which significantly impacts the chords and has poor guiding and limiting capabilities, affecting the operability, safety, and efficiency of construction.

Method used

An arch-mounted crane device is adopted, including a lifting mechanism, a traction mechanism, and a main beam structure. Driven by an electrical system, the main beam structure uses a clamping system and a traveling locking mechanism to provide stable support and guidance on the arch's chord tubes, avoiding the need for tracks. The clamping mechanisms of the front and rear support beams are used for limiting and guiding, ensuring the stability and accuracy of the hoisting process.

Benefits of technology

This method enables efficient and safe hoisting without the need for tracks on the arch, improving the stability and precision of construction, reducing construction difficulty, and ensuring the safe installation of beam segments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118206012B_ABST
    Figure CN118206012B_ABST
Patent Text Reader

Abstract

This invention relates to a method for lifting and installing a steel-concrete composite arch bridge deck using a crane on the arch. The crane moves from the arch foot to the arch crown, utilizing the existing chords of the arch as force points, resulting in more precise positioning. This ensures accurate placement of the crane after movement. During movement, the traction mechanism, supported by front and rear support beams and limited and guided by a clamping mechanism, guarantees stability and directional accuracy. The main beam structure is limited by the clamping system, with clamping support wheels supporting the outer side of the corresponding chord on the lateral side and rolling along the chords of the arch. This lateral limitation prevents damage to the arch. The guiding method eliminates the need for tracks on the arch, increasing construction efficiency, stability, and safety. This makes the beam segment lifting and installation process safer, more stable, and more precise, improving construction efficiency and quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of steel-concrete composite arch bridge deck hoisting construction technology, and in particular to a method for hoisting and installing a steel-concrete composite arch bridge deck using a crane on the arch. Background Technology

[0002] In my country's rapidly developing bridge construction industry, steel arch bridges are increasingly emerging in complex structures such as long-span bridges, those navigating mountainous areas, canyons, sea crossings, river crossings, and road crossings. Prefabricated bridges offer advantages such as high standardization, reliable quality, low safety risks, and rapid construction, leading to their increasingly widespread application in modern bridge construction, particularly in steel structure bridge construction. Due to the complex on-site construction environment, traditional construction methods have been affected to varying degrees, necessitating the use of arch-mounted cranes to lift and install the bridge deck steel beams from the arch ribs.

[0003] As the direct load-bearing structure of the bridge deck, the quality control of the bridge deck steel beams during construction is particularly important. Bridge deck steel beams are typically prefabricated in factories and assembled on-site. Traditional methods, such as cable-stayed installation, require specific site conditions and are difficult to implement in certain environmentally restricted environments. They also involve significant work at height, posing considerable risks to the surrounding environment. Furthermore, the initial setup of the cable system requires considerable time and material costs. In contrast, the arch-mounted crane utilizes the fully closed arch rib as a load-bearing structure, assembling the crane onto the rib. This reduces preliminary work, and after installation, the crane automatically climbs along the arch rib under load, sequentially lifting and installing the bridge deck steel beam segments to their designed positions. The lifting process reduces the number of personnel working at height and effectively controls the safety hazards of high-altitude construction. This method is suitable for steel arch bridge construction projects in various environments.

[0004] However, conventional arch cranes: There are many types of such equipment in the entire field of steel beam hoisting. Their structures have no fixed frame and need to be customized according to the actual arch bridge. Their stress state is also difficult to determine. At the same time, the difficulty of moving and positioning is relatively large. In addition, they need to set tracks on the chord tubes of the arch, which is complicated to operate. Setting tracks has a significant impact on the chord tubes. Moreover, the poor ability of track guidance and limiting fixation results in poor operability and safety, which leads to a certain degree of uncontrollability in actual construction and makes it impossible to guarantee the construction requirements of steel beam hoisting. Summary of the Invention

[0005] The purpose of this invention is to address the problems in existing technologies where arch-mounted cranes are used to lift bridge beam segments. These technologies require the installation of tracks on the chord tubes of the arch, which has a significant impact on the chord tubes. Furthermore, the poor guiding and limiting capabilities of the tracks result in poor operability and safety, leading to a certain degree of uncontrollability in actual construction. Consequently, these issues affect the lifting efficiency, accuracy, and stability of the beam segments. This invention provides a construction method for lifting and installing steel-concrete composite arch bridge decks using an arch-mounted crane.

[0006] To achieve the above objectives, the technical solution adopted by the present invention is as follows:

[0007] A construction method for lifting and installing a steel-concrete composite arch bridge deck using an arch-mounted crane, which includes a lifting mechanism, a traction mechanism, and a main beam structure, and is driven by an electrical system.

[0008] The traction mechanism includes a front support beam, a rear support beam, a traction winch mechanism, a clamping mechanism, a traction locking mechanism, and a support traveling mechanism;

[0009] The main beam structure is equipped with a traveling locking mechanism, a clamping system and a traveling mechanism. The lifting mechanism is fixedly connected to the main beam structure and is connected to a lifting device located below the main beam structure. The traction wire rope of the traction winch mechanism is connected between the main beam structure and the rear support beam.

[0010] Includes the following steps:

[0011] S1. Install the arch crane device above the arch foot of the closed arch, so that: the wheels of the traveling mechanism at the bottom of the main beam structure are placed directly on the chord tube of the arch; the traveling locking mechanism of the main beam structure hooks the transverse duct of the arch on the rear side; and the clamping support wheel of the clamping system of the main beam structure supports inward on the outer side of the chord tube on the corresponding transverse side. Also, the traction locking mechanism of the traction mechanism hooks the transverse duct of the arch on the front side; the clamping mechanisms on the left and right sides of the traction mechanism clamp the chord tubes on the left and right sides of the arch; and the support traveling wheel of the traction mechanism is placed on the chord tube.

[0012] S2. Move the arch-mounted crane to the position where the beam segment will be lifted. The moving steps are as follows:

[0013] S2A: The walking locking mechanism hooks the transverse duct of the arch to ensure that the main beam structure remains stationary. The clamping mechanism at the rear support beam clamps the chord tube to ensure that the rear support beam remains stationary. The clamping mechanism at the front support beam is released. By extending the moving cylinder, the front support beam can be pushed to climb up the arch and move forward to the designated position.

[0014] Then, the clamping mechanism of the rear support beam is released, and the clamping mechanism of the front support beam is clamped to the string tube. Using the front support beam as the base point, the hydraulic cylinder is shortened and the traction wire rope of the traction winch mechanism is lengthened simultaneously, so that the rear support beam and the traction locking mechanism are moved forward as a whole, and then the rear support beam and the front support beam are moved forward to the designated position.

[0015] S2B: After the rear support beam and the front support beam are moved into place, control the traction locking mechanism at the rear support beam to lock it in the transverse duct of the arch, control the clamping mechanism at the rear support beam to clamp the chord tube to ensure that the rear support beam cannot move, and then release the locking mechanism of the travel locking mechanism. Using the rear support beam as the base point, by shortening the length of the traction wire rope, drag the main beam structure forward to the beam segment to be lifted.

[0016] After the S2C main beam structure moves to the next beam segment waiting to be lifted, the traveling locking mechanism hooks the transverse duct of the arch, so that the main beam structure cannot move.

[0017] S3. The lifting device is lowered to connect the beam segment through the lifting mechanism above the main beam structure, and then the beam segment is lifted by the lifting mechanism for installation;

[0018] S4. Repeat steps S2-S3 to complete the installation of all bridge beam segments.

[0019] The steel-concrete composite arch bridge deck arch-mounted crane lifting and installation method of this invention uses an arch-mounted crane device, which is installed at the arch foot. Its low lifting height facilitates installation and reduces construction difficulty. Furthermore, the wheels of the traveling mechanism at the bottom of the main beam structure support the main beam structure, and the traveling locking mechanism of the main beam structure hooks onto the transverse duct of the arch on the rear side to ensure that the main beam structure does not slip downwards. The clamping support wheels of the clamping system of the main beam structure clamp the outer side of the chord tube to form a lateral limit, preventing the main beam structure from tipping over or sliding down, thus ensuring the stability of the main beam structure hoisted on the arch. Similarly, the traction locking mechanism of the traction mechanism hooks onto the transverse duct of the arch on the front side to ensure that the traction mechanism does not slide down, and the clamping mechanisms on both sides of the traction mechanism clamp the chord tubes on the left and right sides of the arch to prevent the traction mechanism from tipping over or sliding down. The support traveling wheels of the traction mechanism are placed on the chord tube to support the traction mechanism. This ensures the stability of the traction mechanism hoisted on the arch.

[0020] Driven by an electrical system, the main beam structure remains stationary by hooking the transverse duct of the arch through a walking locking mechanism. The clamping mechanisms of the front and rear support beams can clamp the chord tubes to form different fulcrums. The extension and retraction of the moving cylinders can then cause the front and rear support beams to move forward sequentially. During the movement of the rear and front support beams, the support wheels of the corresponding support traveling mechanism move on the chord tubes to ensure stability and ease of movement.

[0021] After the rear support beam and the front support beam are moved into place, the traction locking mechanism at the rear support beam is locked to the transverse duct of the arch, which can ensure that the position of the traction mechanism remains unchanged. By shortening the length of the traction wire rope of the traction winch mechanism, the main beam structure is dragged forward to the beam segment to be lifted. During the movement of the main beam structure, the clamping support wheel can roll on the outside of the chord tube. The clamping support wheel of the clamping system guides the main beam structure while ensuring the transverse limitation of the main beam structure.

[0022] The arch-mounted crane moves from the arch foot to the arch crown by utilizing the existing chord tubes of the arch as force points, resulting in more precise positioning. This ensures accurate placement of the crane after movement. During movement, a clamping system provides restraint, and the clamping support wheels of the main beam structure's clamping system support the outer side of the corresponding chord tube laterally, allowing them to roll along the chord tubes. This lateral restraint prevents damage to the arch. This guiding method eliminates the need for tracks on the arch, leading to higher construction efficiency, greater stability, and greater safety. Consequently, the beam segment lifting and installation process is safer and more stable, with more precise positioning, improving construction efficiency and quality.

[0023] As a preferred embodiment of the present invention, when the rear support beam and the front support beam have not moved to the next beam segment waiting to be lifted position, step S2A is repeated until the rear support beam and the front support beam are moved as a whole to the next beam segment waiting to be lifted position.

[0024] By using a cyclical approach, the rear and front support beams can be used as support points and lateral limiting points to ensure that the forward movement always proceeds along the axial direction of the arch.

[0025] As a preferred embodiment of the present invention, step S3 includes the following steps:

[0026] S3A: The lifting mechanism lowers the lifting device to the target bridge deck beam segment, and then completes the connection and fixation at the lifting point;

[0027] S3B: After the beam segment is lifted to a certain height by the hoisting mechanism, it is crawled under load by the arch crane device to complete the longitudinal movement of the beam segment.

[0028] S3C, after automatic adjustment, the beam segment is smoothly brought closer to the design position, and then the lifting mechanism lifts and adjusts the end of the beam segment on the side closest to the center of the bridge to the design elevation.

[0029] S3D adjusts and connects the end of the beam segment near the arch abutment to the previous beam segment or abutment to ensure precise positioning to meet design requirements. High-strength bolts are then promptly connected, and finally the lifting points are loosened, allowing the current beam segment to be suspended on the arch, thus completing the installation of the current beam segment.

[0030] By following the steps described above, the hoisting of each beam segment can be completed quickly and accurately.

[0031] As a preferred embodiment of the present invention, in step S3C, the end of the beam section near the center of the bridge is raised and adjusted to a height higher than the design elevation by the lifting mechanism to complete the pre-lifting.

[0032] As a preferred embodiment of the present invention, the main beam structure includes two main beam box steels spaced apart along the walking direction and two main beam H steels spaced apart along the left and right directions. The main beam box steels are arranged along the left and right directions, and the main beam H steels are arranged along the walking direction. The main beam box steels are located above the main beam H steels. The two main beam box steels and the two main beam H steels are connected by flanges to form a frame structure.

[0033] Step S1 includes the following steps:

[0034] S1A. Use a crane to hoist the traction mechanism onto the arch, so that: the traction locking mechanism of the traction mechanism is locked to the transverse chord tube of the arch on the front side, the clamping mechanisms on the left and right sides of the traction mechanism clamp the chord tubes on the left and right sides of the arch, and the support traveling wheel of the traction mechanism is placed on the chord tube.

[0035] S1B. Using a crane, the main beam H-beam, traveling locking mechanism, clamping system, and traveling mechanism of the main beam structure, which are connected as a whole, are hoisted onto the arch, so that: the wheels of the traveling mechanism at the bottom of the main beam structure are placed directly on the chord tube of the arch; the traveling locking mechanism of the main beam structure is locked to the transverse duct of the arch on the rear side; and the clamping support wheel of the clamping system of the main beam structure is supported inward on the outer side of the chord tube on the corresponding transverse side. Then, the traction wire rope of the traction winch mechanism is connected to the main beam H-beam.

[0036] S1C. Using a crane, the main beam box steel and the lifting mechanism above the main beam structure, which are connected as a whole, are lifted together onto the main beam H-beam for installation and connection.

[0037] S1D, complete the installation of remaining ropes, hoisting mechanism lifting cables, and electrical systems.

[0038] The above steps are used to install the arch crane at the arch foot, which facilitates safe hoisting.

[0039] As a preferred embodiment of the present invention, after the arch crane device is installed above the arch foot of the closed arch, the traveling function of the arch crane device is first tested by unloaded travel. If it is not normal, it is adjusted in time.

[0040] If normal, after lifting a load of the same weight as the beam segment onto the structure, check whether the traveling and lifting functions of the arch crane are normal. If not, adjust them in time.

[0041] As a preferred embodiment of the present invention, after the standard beam segments of the entire bridge are installed, the bolt anchorage of each part is checked. If the beam segment is equipped with hangers, the hangers are tensioned for the first time. Then the bridge deck linearity is adjusted, the hangers are anchored again, and various joints are welded and inspected.

[0042] As a preferred embodiment of the present invention, two arch-mounted cranes are used to construct the bridge symmetrically from both ends of the arch towards the middle. After the standard section is completed, the closure section is constructed using one of the arch-mounted cranes, with a 50-100mm margin reserved in the closure section. All bolts are checked for secondary tightening and joint welding. If the beam section is equipped with hangers, the hangers of the entire bridge are tensioned a second time.

[0043] As a preferred embodiment of the present invention, if the beam segment is fixed with a hanger, the hanger is installed on the beam segment before the beam segment is hoisted.

[0044] In step S3, after the lifting mechanism above the main beam structure lowers the lifting rod connecting the beam segment, the lifting mechanism lifts the beam segment for installation.

[0045] As a preferred embodiment of the present invention, after the beam segment is in place, the lower end of the hanger is first inserted into the reserved hole in the beam segment, and then fixed by the anchor nut. The hanger is then leveled according to the bridge deck design elevation.

[0046] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:

[0047] 1. The steel-concrete composite arch bridge deck arch crane lifting and installation construction method of the present invention uses an arch crane device, which is installed at the arch foot. Its low lifting height facilitates installation, reduces construction difficulty, and ensures the stability of the main beam structure and the traction mechanism on the arch. The method of moving the arch crane device from the arch foot to the arch crown utilizes the existing chords of the arch to provide force points, resulting in more precise positioning. This ensures accurate positioning of the arch crane device after movement. Furthermore, during the movement, the traction mechanism is supported by the front and rear support beams. The clamping mechanism limits and guides the movement of the traction mechanism, ensuring its stability and directional accuracy. The main beam structure is limited by the clamping system, and the clamping support wheels of the main beam structure are supported inward on the outer side of the chord tube on the corresponding lateral side, and can roll along the chord tube of the arch. While limiting the movement laterally, it will not damage the arch. The guiding method does not require the installation of tracks on the arch, making the construction more efficient, the movement more stable, and safer. This makes the beam segment lifting and installation process safer and more stable, and the positioning more accurate, improving construction efficiency and quality.

[0048] 2. The steel-concrete arch bridge deck arch crane lifting and installation construction method of the present invention, through a cyclic method, can use the rear support beam and the front support beam as support points and lateral limit points to ensure that the traction mechanism always moves forward along the axial direction of the arch during the forward movement process.

[0049] 3. The construction method for lifting and installing a crane on the arch of a steel-concrete composite arch bridge described in this invention involves first hoisting the traction mechanism and fixing it on the arch. Compared to the main beam structure, the traction mechanism is located closer to the top of the arch, making its hoisting more difficult. This method avoids interference with the hoisting of the main beam structure. By hoisting the traction mechanism and the main beam structure separately, the hoisting difficulty is reduced. Furthermore, the main beam structure is hoisted in two parts, further reducing the hoisting difficulty. The H-beam of the main beam structure, which was hoisted first, is connected to the traction mechanism to ensure the safety of the already hoisted structure. Then, the box-section steel of the main beam structure and the hoisting mechanism above it are hoisted as a whole. Finally, the remaining ropes, the lifting cables of the hoisting mechanism, and the electrical system are installed, making the entire hoisting process simpler, safer, and more reliable. Attached Figure Description

[0050] Figure 1 This is a schematic diagram of the arch-mounted crane device of the present invention hoisting a beam segment on an arch;

[0051] Figure 2 This is a schematic diagram of the arch crane device in the front and rear directions;

[0052] Figure 3 This is a plan view of the arch crane device;

[0053] Figure 4 This is a schematic diagram of the left and right sides of the arch crane device;

[0054] Figure 5 yes Figure 4 A magnified view of a portion of circle A in the middle;

[0055] Figure 6 This is a schematic diagram of the left and right directions of the front support beam;

[0056] Figure 7 yes Figure 6 A magnified view of the area at point B in the middle circle;

[0057] Figure 8 This is a schematic diagram of the traction locking mechanism;

[0058] Figure 9 This is a schematic diagram of the walking locking mechanism;

[0059] Figure 10 This is a schematic diagram of the arch crane device climbing the slope on the arch;

[0060] Figure 11This is a schematic diagram of the arch crane installation at the top of the arch;

[0061] Figure 12 This is a schematic diagram of a lifting device used to lift a steel beam.

[0062] Icons: 1. Lifting mechanism; 11. Lifting winch; 101. Fixed platform; 2. Traction mechanism; 211. Front support beam; 212. Rear support beam; 22. Traction winch mechanism; 221. Traction pulley block; 222. Traction fixed pulley block; 223. Traction winch; 224. Traction wire rope; 23. Clamping mechanism; 231. Clamping vertical beam; 232. Clamping lateral telescopic cylinder; 233. Clamping limit head; 24. Moving cylinder; 25. Support limit mechanism; 251. Support limit head; 252. Height telescopic cylinder; 26. Traction locking mechanism; 261. Traction telescopic cylinder; 262. Traction locking hook; 263. Traction support pad; 27. Support traveling mechanism; 271. Support traveling seat; 272. Support traveling wheel; 273. Traction... 3. Main beam structure; 31. Traveling locking mechanism; 311. Traveling locking telescopic cylinder; 312. Traveling locking hook; 313. Traveling pin hole; 314. Traveling locking gasket; 32. Guide wheel assembly; 33. Main beam box steel; 334. Flange; 34. Main beam H-beam; 35. Clamping system; 351. Cantilever support; 352. Vertical support; 353. Bending part; 354. Clamping support seat; 355. Clamping support wheel; 36. Cantilever beam; 4. Traveling mechanism; 41. Wheel assembly; 42. Distribution beam; 43. Wheel beam; 5. Lifting device; 51. Lifting moving pulley assembly; 52. Lifting device beam; 53. Lifting lug on beam; 54. Lifting wire rope; 55. Lifting fixed pulley assembly; 8. Steel beam; 9. Arch; 91. Chord tube; 92. Connecting tube. Detailed Implementation

[0063] The present invention will be further described in detail below with reference to experimental examples and specific embodiments. However, this should not be construed as limiting the scope of the above-mentioned subject matter of the present invention to the following embodiments; all technologies implemented based on the content of the present invention fall within the scope of the present invention.

[0064] Unless otherwise specified, the use of terms such as "upper," "lower," "left," "right," "center," "inner," and "outer" to indicate orientation or positional relationships in the description of specific embodiments of the present invention is based on the orientation or positional relationships shown in the accompanying drawings, or the orientation or positional relationship in which the product / equipment / device is typically placed during use. These terms are merely for the purpose of facilitating the description of the present invention or simplifying the description in specific embodiments, enabling those skilled in the art to quickly understand the solution, and do not indicate or imply that a particular device / component / element must have a specific orientation, or be constructed and operated in a specific positional relationship. Therefore, they should not be construed as limitations on the present invention.

[0065] Furthermore, the use of terms such as "horizontal," "vertical," "suspended," and "parallel" does not imply that the corresponding device / component / element must be absolutely horizontal, vertical, suspended, or parallel, but rather that it can be slightly tilted or have a deviation. For example, "horizontal" merely means that its direction is more horizontal relative to "vertical," not that the structure must be completely horizontal, but that it can be slightly tilted. Alternatively, it can be simplified to mean that the corresponding device / component / element, when set in a "horizontal," "vertical," "suspended," or "parallel" direction, can have an error / deviation of ±10% relative to the corresponding direction, more preferably within ±8%, more preferably within ±6%, more preferably within ±5%, and more preferably within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its function in the present invention.

[0066] Furthermore, the use of terms such as "first," "second," "third," etc. in terminology is merely for distinguishing identical or similar components and should not be interpreted as emphasizing or implying the relative importance of a particular component.

[0067] Furthermore, in the description of the embodiments of the present invention, "several", "more than", and "a number of" represent at least two. The number can be any number, such as 2, 3, 4, 5, 6, 7, 8, or 9, and can even exceed nine.

[0068] Furthermore, in the description of the technical solution of this invention, unless otherwise explicitly specified / limited / restricted, the terms "set up," "install," "connect," "link," "provided with," "laid out," and "arranged" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to common connection methods in the art, such as welding, riveting, bolting, and threaded connections. Such connections can be mechanical, electrical, or communication connections; they can be direct connections or indirect connections through an intermediate medium; and they can refer to the internal communication between two components.

[0069] Example 1

[0070] This embodiment provides a method for lifting and installing a steel-concrete composite arch bridge deck using a crane on the arch. This method addresses situations where the bridge deck is positioned below the arch ribs of a steel arch bridge, requiring the lifting position of the bridge deck steel beams to be located below the arch ribs. It employs an arch-mounted crane device, which includes a lifting mechanism 1, a traction mechanism 2, and a main beam structure 3. The arch-mounted crane device is driven by an electrical system, which includes a hydraulic cylinder, a winch, and other control systems.

[0071] As a preferred implementation method, such as Figures 2-4As shown, the main beam structure 3 includes two main beam box sections 33 spaced apart along the travel direction and two main beam H sections 34 spaced apart along the left and right directions. The main beam box sections 33 are arranged along the left and right directions, which is the transverse direction of the bridge. That is, the main beam H sections 34 are related to the positions of the left and right chords of the arch. The main beam H sections 34 are arranged along the travel direction, which is the axial direction of the arch. The main beam box sections 33 are located above the main beam H sections 34. The two main beam box sections 33 and the two main beam H sections 34 are connected by flanges 334 to form a frame structure, ensuring the structural stability in the transverse direction of the bridge and the axial direction of the arch, and providing a position for the installation or connection of the lifting mechanism 1, the traction mechanism 2 and the traveling mechanism 4.

[0072] The main beam structure 3 is equipped with a traveling locking mechanism 31 and a clamping system 35. The lifting mechanism 1 is fixedly connected to the main beam structure 3. The lifting mechanism 1 is connected to a lifting device 5, which is located below the main beam structure 3. The lifting mechanism 1 is capable of lifting and lowering the lifting device 5. Figure 3 As shown, the lifting mechanism 1 includes four lifting winches 11 arranged in a rectangular array and a fixed platform 101. The fixed platform 101 is fixedly mounted on the two main beam box-section steels 33 and located in the middle of the main beam structure 3 in the left-right direction. The lifting winches 11 are mounted on the fixed platform 101 to provide counterweight to the main beam structure and ensure the balance of the structure, preventing imbalance on the left and right sides of the arch. The lifting mechanism 1 includes four lifting winches 11 arranged in a rectangular array, which can correspond to the four lifting points of the four parts of the lifting device, and thus the four lifting points of the bridge deck such as the steel beam 8, ensuring the stability and safety of the lifting. Of course, the number of lifting winches 11 can be greater than four, but four are generally sufficient to meet the lifting requirements, saving costs and avoiding excessive weight. Figures 2-4As shown, the lifting device 5 includes a lifting movable pulley block 51 and a lifting beam 52. The lifting movable pulley block 51 is connected to the lifting beam 52, and the lifting beam 52 is used to connect to the beam lifting lug 53 on the steel beam 8. The lifting mechanism 1 also includes a guide wheel block 32 and a lifting fixed pulley block 55 disposed on the main beam structure 3. The axial direction of the guide wheel block 32 is the radial direction of the arch 9, and the axial direction of the lifting fixed pulley block 55 is the horizontal direction. The lifting wire rope 54 of the lifting winch 11 passes around the guide wheel block 32 and then turns and winds around the lifting fixed pulley block 55 and the lifting fixed pulley block 55. Between the movable pulley blocks 51; specifically, cantilever supports 351 are set on the left and right sides of the main beam structure 3. The cantilever supports 351 have cantilever beams along the arch axis and cantilever beams 36 along the left and right directions. Guide wheel blocks 32 are set at the front and rear ends of the cantilever beams respectively to guide the lifting wire ropes 54 in the corresponding front and rear directions, so that the lifting wire ropes 54 can ensure the vertical setting of the lifting equipment. This guide wheel block 32 can increase the lifting length of the steel beam 8. That is to say, under the premise of the same lifting length of the steel beam 8, the size of the main beam structure 3 in the front and rear directions can be reduced.

[0073] The bottom of the main beam structure 3 is connected to a traveling mechanism 4. The traveling mechanism 4 is equipped with wheels, which can be directly placed on the chord tubes 91 of the arch 9. The traveling mechanism 4 can move along the axial direction of the corresponding chord tube 91. The wheels are adapted to the arc shape of the chord tube 91, which can increase the support area, make the support more stable, and form a limit, thus providing a guiding effect. The traveling mechanism 4 is set at the bottom of the main beam H-beam 34, which makes the connection more convenient and the force transmission path clearer and more reliable. Specifically, the traveling mechanism 4 includes wheel sets 41, distribution beams 42, and wheel beams 43. The distribution beams 42 are connected to the bottom of the main beam H-beam 34. Two wheel beams 43 are set at the bottom of the left and right sides of the distribution beams 42. Each wheel beam 43 has two wheel sets 41 at the bottom of its front and rear ends. The axial direction of the wheel sets 41 is left and right, that is, a total of 8 wheel sets are set, which can ensure that it can travel on two chord tubes of the same height on the same side of the arch at the same time, thus making the movement safer.

[0074] The main beam structure 3 is equipped with a walking locking mechanism 31 and a clamping system 35. The walking locking mechanism 31 can lock onto the transverse connecting tubes 92 of the arch 9. The transverse connecting tubes 92 of the arch 9 refer to the connecting rods between the same-side equal-height chord tubes 91. The clamping system 35 is located on the left and right sides of the main beam structure 3. The clamping system 35 has clamping support wheels 355. The clamping support wheels 355 support the outer side of the corresponding transverse chord tube 91 inward. The clamping support wheels 355 can move axially along the outer side of the corresponding chord tube 91. Specifically, as shown... Figure 2 and Figure 9As shown, the walking locking mechanism 31 includes a walking locking telescopic cylinder 311 and a walking locking hook 312. One end of the walking locking telescopic cylinder 311 is fixed to the main beam structure 3, and the other end is fixed to the walking locking hook 312. A walking locking pad 314 is provided in the opening of the walking locking hook 312. The walking locking pad 314 is used to abut against the arc shape of one side of the duct 92 and adapt to the arc shape of the outer side of the duct 92. The walking locking mechanism 31 adopts a hook form that can be hung on the duct 92. It is automatically controlled by a hydraulic cylinder, which is simple to operate. Moreover, the pad adapted to the duct 92 is provided in the opening of the hook, which can improve the friction and avoid damage to the duct 92. Furthermore, the travel locking hook 312 includes two bending areas in the same direction. The bending area at the end of the travel locking hook 312 is open. Travel pin holes 313 are provided at different positions on the bending area near the end of the travel locking telescopic cylinder 311. The travel locking telescopic cylinder 311 is connected to the travel locking hook 312 by inserting a pin into the travel pin hole 313. The travel locking telescopic cylinder 311 can change the angle and length of the travel locking hook 312 by connecting to different travel pin holes 313 of the travel locking hook 312.

[0075] like Figure 4 As shown, the clamping system 35 is located on the left and right sides of the main beam structure 3. The clamping system 35 has clamping support wheels 355, which are inwardly supported on the outer side of the chord tube 91 on the corresponding lateral side. The clamping support wheels 355 can move axially along the outer side of the chord tube 91 on the corresponding side. In this embodiment, as... Figure 4 and Figure 5 As shown, the clamping system 35 further includes a cantilever support 351, a vertical support 352, a bending portion 353, and a clamping support seat 354. The cantilever support 351 is connected to the side of the main beam structure 3. Specifically, the cantilever support 351 has a cantilever beam 36 along the left-right direction, connected to the main beam box steel 33. The upper end of the vertical support 352 is fixedly connected to the cantilever support 351, and the lower end has the bending portion 353. The bending portion 353 bends along the vertical support 352 toward the middle of the main beam structure 3. A clamping support seat 354 is fixed on the side of the bending portion 353 toward the middle of the main beam structure 3. The clamping support wheel 355 rolls on the clamping support seat 354, and the clamping support wheel 355 is inclined upward and supported on the outside of the corresponding chord tube 91. The clamping support wheel 355 is adapted to the arc shape of the string tube 91, which can increase the support area, make the support more stable, and form a limit, thus having a guiding effect.

[0076] The traction mechanism 2 is located at the front end of the main beam structure 3 along the walking direction, and the traction mechanism 2 is provided on both the left and right sides of the main beam structure 3; the traction mechanism 2 includes a front support beam 211, a rear support beam 212, a traction winch mechanism 22, a clamping mechanism 23, a traction locking mechanism 26 and the supporting traveling mechanism 27.

[0077] The front support beam 211 and the rear support beam 212 are spaced apart along the walking direction, and both the front support beam 211 and the rear support beam 212 are arranged in the left-right direction. The front support beam 211 and the rear support beam 212 are connected by a movable hydraulic cylinder 24, which can change the distance between the front support beam 211 and the rear support beam 212. The rear support beam 212 is located between the front support beam 211 and the main beam structure 3.

[0078] The traction winch mechanism 22 includes a traction movable pulley block 221, a traction fixed pulley block 222, and a traction winch 223. The traction movable pulley block 221 and the traction fixed pulley block 222 are respectively disposed on the rear support beam 212 and the main beam structure 3. The traction wire rope 224 of the traction winch 223 is wound between the traction movable pulley block 221 and the traction fixed pulley block 222. The traction winch mechanism 22 can change the distance between the rear support beam 212 and the main beam structure 3.

[0079] The clamping mechanism 23 and the supporting traveling mechanism 27 are both connected to the rear support beam 212 and the front support beam 211. The traction locking mechanism 26 is connected to the rear support beam 212 and can lock onto the transverse chord tube 92 of the arch 9. The clamping mechanism 23 is located on the left and right sides and can clamp or release the chord tubes 91 on the left and right sides of the arch 9. The supporting traveling mechanism 27 has supporting traveling wheels 272, which can be placed directly on the chord tube 91. The supporting traveling mechanism 27 can move along the axial direction of the corresponding chord tube 91.

[0080] In this embodiment, as Figure 2 , Figure 8 , Figure 10 and Figure 11As shown, the traction locking mechanism 26 includes a traction telescopic cylinder 261 and a traction locking hook 262. The traction telescopic cylinder 261 is arranged in the front-rear direction. One end of the traction telescopic cylinder 261 is connected to the rear support beam 212, and the other end is hinged to two different points of the traction locking hook 262. The extension and retraction of the traction telescopic cylinder 261 can drive the traction locking hook 262 to change its angle. The opening of the traction locking hook 262 faces the middle of the main beam structure 3 in the front-rear direction. A traction support pad 263 is provided in the opening of the traction locking hook 262. The traction support pad 263 is used to abut against the arc shape of one side of the duct 92 and adapt to the arc shape of the outer side of the duct 92. The traction locking mechanism 26 adopts a hook form and can be hung on the duct 92. It is automatically controlled by a hydraulic cylinder and is easy to operate. Moreover, the pad adapted to the duct 92 is provided in the opening of the hook, which can improve the friction and avoid damage to the duct 92.

[0081] Specifically, the clamping mechanisms 23 are located on the left and right sides, and the clamping mechanisms 23 on the left and right sides can clamp or release the string tubes 91 on the left and right sides of the arch 9; for example Figure 6 and Figure 7 As shown, the clamping mechanism 23 includes a clamping vertical beam 231, a clamping transverse telescopic cylinder 232, and a clamping limiting head 233. The upper end of the clamping vertical beam 231 is connected to the ends of the rear support beam 212 and the front support beam 211, and the lower end of the clamping vertical beam 231 is connected to the clamping transverse telescopic cylinder 232. The axial direction of the clamping transverse telescopic cylinder 232 is left-right. The clamping limiting head 233 is hinged to one end of the clamping transverse telescopic cylinder 232 near the chord tube 91. The axial direction of the hinge axis corresponding to the clamping limiting head 233 is front-back. The surface of the clamping limiting head 233 that abuts against the chord tube 91 is adapted to the arc surface of the chord tube 91. The adaptation of the surface of the clamping limiting head 233 that abuts against the chord tube 91 to the arc surface of the chord tube 91 ensures the stability of the support. The clamping transverse telescopic cylinder 232 is hinged to a clamping limiting head 233 at one end near the chord tube 91. This allows the clamping limiting head 233 to move in the left and right directions, thereby enabling the clamping mechanisms 23 on both sides to clamp or release the chord tubes 91 on both sides of the arch 9. The hinged design allows the clamping limiting head 233 to rotate, which can better adapt to the clamping direction, forming a buffer and preventing excessive force from causing clamping damage.

[0082] like Figure 7As shown, the supporting traveling mechanism 27 has supporting traveling wheels 272, which can be directly placed on the chord tube 91. The supporting traveling mechanism 27 can move along the axial direction of the corresponding chord tube 91. The supporting traveling mechanism 27 includes a supporting traveling seat 271, supporting traveling wheels 272, and a traction rotating shaft 273. The supporting traveling wheels 272 are rotatably connected to the supporting traveling seat 271 via the traction rotating shaft 273. The upper end of the supporting traveling seat 271 is fixedly connected to the bottom of the front support beam 211 or the bottom of the rear support beam 212. The supporting traveling wheels 272 are adapted to the arc shape of the chord tube 91, which can increase the support area, make the support more stable, and also form a limiting position, thus providing a guiding effect.

[0083] The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane includes the following steps:

[0084] S1. The arch-mounted crane device is installed above the arch foot of the closed arch 9, such that: the wheels of the traveling mechanism 4 at the bottom of the main beam structure 3 are directly placed on the chord tube 91 of the arch 9 to support the main beam structure; the traveling locking mechanism 31 of the main beam structure 3 is locked to the lateral duct 92 of the arch 9 on the rear side to ensure that the main beam structure does not slide downward; the clamping support wheel 355 of the clamping system 35 of the main beam structure 3 is supported inward on the outer side of the chord tube 91 on the corresponding lateral side to form a lateral limit, preventing the main beam structure from overturning and sliding down, and ensuring the stability of the main beam structure hoisted on the arch; the arch-mounted crane device is installed at the arch foot, with a low hoisting height, which facilitates hoisting and installation and reduces construction difficulty;

[0085] The traction locking mechanism 26 of the traction mechanism 2 is locked to the transverse duct 92 of the front arch 9 to ensure that the traction mechanism 2 does not slide down. The clamping mechanisms 23 on the left and right sides of the traction mechanism 2 clamp the chord tubes 91 on the left and right sides of the arch 9 to prevent the traction mechanism from tipping over and sliding down. The support walking wheel 272 of the traction mechanism 2 is placed on the chord tube 91 to support the traction mechanism 2, which can ensure the stability of the traction mechanism 2 when it is hoisted on the arch.

[0086] Step S1 includes the following steps:

[0087] S1A. Use a crane to hoist the traction mechanism 2 onto the arch 9, so that: the traction locking mechanism 26 of the traction mechanism 2 is locked to the transverse chord tube 92 of the front arch 9, the clamping mechanisms 23 on the left and right sides of the traction mechanism 2 clamp the chord tubes 91 on the left and right sides of the arch 9, and the support traveling wheel 272 of the traction mechanism 2 is placed on the chord tube 91.

[0088] S1B. Using a crane, the main beam H-beam 34, the traveling locking mechanism 31, the clamping system 35, and the traveling mechanism 4, which are connected as a whole, are hoisted onto the arch 9, so that: the wheels of the traveling mechanism 4 at the bottom of the main beam structure 3 are placed directly on the chord tube 91 of the arch 9; the traveling locking mechanism 31 of the main beam structure 3 is locked to the transverse duct 92 of the arch 9 on the rear side; and the clamping support wheel 355 of the clamping system 35 of the main beam structure 3 is supported inwardly on the outer side of the chord tube 91 on the corresponding transverse side; then the traction wire rope 224 of the traction winch mechanism 22 is connected to the main beam H-beam 34.

[0089] S1C. Using a crane, the main beam box steel 33 and the lifting mechanism 1 above the main beam structure 3, which are connected as a whole, are lifted together onto the main beam H-beam 34 for installation and connection.

[0090] S1D, complete the installation of the remaining ropes, the lifting cable of the hoisting mechanism 1, and the electrical system.

[0091] The above-described method of installing the arch crane device above the arch foot of the already closed arch 9 involves first hoisting the traction mechanism 2 and fixing it on the arch. Compared to the main beam structure 3, the traction mechanism 2 is located closer to the arch crown, making its hoisting more difficult. This method avoids interference with the hoisting of the main beam structure. By hoisting the traction mechanism 2 and the main beam structure 3 separately, the hoisting difficulty is reduced. Furthermore, the hoisting of the main beam structure 3 in two parts further reduces the hoisting difficulty. The main beam H-beam 34 of the main beam structure 3, which was hoisted first, is connected to the traction mechanism 2 to ensure the safety of the hoisted structure. Then, the main beam box-section 33 of the main beam structure 3 and the hoisting mechanism 1 above it are hoisted as a whole. Finally, the remaining ropes, the lifting cables of the hoisting mechanism 1, and the electrical system are installed, making the entire hoisting process simpler, safer, and more reliable.

[0092] After installing the arch crane device above the arch foot of the already joined arch 9, first test its walking function by unloaded travel. If it is not normal, adjust it promptly. If it is normal, then test the walking and lifting functions of the arch crane device by lifting a load of the same weight as the beam segment onto structure 1. If it is not normal, adjust it promptly. Specifically, after completing the assembly of the arch crane, check whether the equipment is ready for normal use. Use the arch rib as a "track" and perform unloaded travel of the qualified arch crane via hydraulic crawling. Then, perform a test lift using an object of the same weight as the design lifting capacity and perform loaded travel on the arch to check for any problems during the test lift and make timely repairs.

[0093] S2. Move the arch-mounted crane to the position where the beam segment will be lifted. The moving steps are as follows:

[0094] S2A, hook the walking locking mechanism 31 onto the transverse duct 92 of the arch 9 to ensure that the main beam structure 3 remains stationary, and clamp the chord tube 91 through the clamping mechanism 23 at the rear support beam 212 to ensure that the rear support beam 212 remains stationary, and release the clamping mechanism 23 at the front support beam 211. By extending the moving cylinder 24, the front support beam 211 can be pushed forward.

[0095] Then, the clamping mechanism 23 of the rear support beam 212 is released, and the clamping mechanism 23 of the front support beam 211 is clamped to the string tube 91. Taking the front support beam 211 as the base point, the moving cylinder 24 is shortened and the traction wire rope 224 of the traction winch mechanism 22 is lengthened simultaneously, so that the rear support beam 212 and the traction locking mechanism 26 are pulled forward as a whole, and then the rear support beam 212 and the front support beam 211 are all moved forward.

[0096] During the movement of the rear support beam 212 and the front support beam 211, the support travel wheel 272 of the corresponding support travel mechanism 27 moves on the string tube 91, which reduces friction, makes movement easier, and reduces the scraping of the string tube.

[0097] Driven by the electrical system, the main beam structure 3 is kept stationary by hooking the transverse duct 92 of the arch 9 with the walking locking mechanism 31. The clamping mechanism 23 of the front support beam 211 and the rear support beam 212 can clamp the chord tube 91 to form different fulcrums. Then, the extension and retraction of the moving cylinder 24 can make the front support beam 211 and the rear support beam 212 move forward one after another. During the movement of the rear support beam 212 and the front support beam 211, the support walking wheel 272 of the corresponding support walking mechanism 27 moves on the chord tube 91 to ensure the stability and effortless movement.

[0098] Among them, as a better option, such as Figure 7As shown, the traction mechanism 2 also includes a support limiting mechanism 25, which is located at the rear support beam 212 and the front support beam 211. The support limiting mechanism includes a height telescopic cylinder 252 and a support limiting head 251. The height telescopic cylinder 252 is vertically arranged, and its upper end is fixed to the rear support beam 212 and the front support beam 211. The lower end of the height telescopic cylinder 252 is connected to the support limiting head 251. The bottom of the support limiting head 251 is adapted to the arc shape of the top surface of the corresponding chord tube 91. The height telescopic cylinder 252 can adjust the height of the support limiting head 251. When the rear support beam 212 and / or the front support beam 211 need to be fixed, the support limiting mechanism 25 provides support to ensure stability. The bottom of the support limiting head 251 is adapted to the arc shape of the top surface of the corresponding chord tube 91, resulting in better support and providing lateral limiting. When the rear support beam 212 or the front support beam 211 needs to be fixed, the height telescopic cylinder 252 raises the position of the support limiting head 251, canceling the support and avoiding any impact on movement or excessive scratching of the chord tube. Furthermore, as... Figure 7 As shown, the support limiting mechanism 25 and the support traveling mechanism 27 are respectively provided on two equal-height string tubes 91 on the same side, which provides higher support stability. Moreover, choosing one support limiting mechanism 25 and one support traveling mechanism 27 for support is more effective and has less impact on the string tubes than choosing two support traveling mechanisms 27 for support.

[0099] In step S2A, when the stroke of the moving cylinder 24 is sufficient, the rear support beam 212 and the front support beam 211 can be moved forward to the next beam segment to be lifted in just one stroke. When the stroke of the moving cylinder 24 is insufficient, the movement in S2A can be repeated to move to the next beam segment to be lifted. By repeating the process, the rear support beam 212 and the front support beam 211 can be used as support points and lateral limit points to ensure that the traction mechanism always moves forward along the axial direction of the arch during the forward movement process.

[0100] S2B. After the rear support beam 212 and the front support beam 211 are moved into place, the traction locking mechanism 26 at the rear support beam 212 is locked to the transverse duct 92 of the arch 9, and the clamping mechanism 23 at the rear support beam 212 is clamped to the chord tube to ensure that the rear support beam 212 cannot move, and the support limiting mechanism 25 at the rear support beam 212 can form support. Then the locking of the travel locking mechanism 31 is released. With the rear support beam 212 as the base point, the main beam structure 3 is dragged forward to the beam segment waiting to be lifted by shortening the length of the traction wire rope 224.

[0101] During the movement of the main beam structure 3, the clamping support wheel 355 can roll on the outside of the chord tube 91. The clamping support wheel 355 of the clamping system 35 ensures the lateral limitation of the main beam structure 3 and guides the main beam structure 3 without affecting its movement, thus reducing the scraping of the chord tube 91. In addition, the wheels of the traveling mechanism 4 can roll on the top of the chord tube 91, ensuring the rapid and stable movement of the main beam structure 3 and reducing the scraping of the chord tube 91.

[0102] After the main beam structure 3 moves to the next beam segment to be lifted, the walking locking mechanism 31 hooks the transverse duct 92 of the arch 9, which can ensure that the main beam structure 3 cannot move. At this time, the six degrees of freedom of the main beam structure 3 can be guaranteed not to move, and then the lifting mechanism 1 can lift and lower the lifting device 5 to complete the lifting work.

[0103] S3. The lifting device 5 is lowered and connected to the beam segment through the lifting mechanism 1 above the main beam structure 3, and then the beam segment is lifted and installed through the lifting mechanism 1 above the main beam structure 3.

[0104] Step S3 includes the following steps:

[0105] S3A: The lifting mechanism 1 lowers the lifting device 5 to the target bridge deck beam segment, and then completes the connection and fixation at the lifting point. If the beam segment is fixed with a suspender rod, the suspender rod is installed on the beam segment before the beam segment is lifted. In step S3, after the lifting mechanism 1 above the main beam structure 3 lowers the lifting device 5 to connect the suspender rod of the beam segment, the lifting mechanism 1 lifts the beam segment for installation. Specifically, after the beam segment is in place, the lower end of the suspender rod is inserted into the reserved hole in the beam segment, and then fixed with anchor nuts. The suspender rod is then leveled according to the bridge deck design elevation. If the steel arch bridge is equipped with tie rods, the position of the lifting device must be considered in advance to avoid conflict with the position of the tie rods.

[0106] S3B. After the beam segment is lifted to a certain height by the lifting mechanism 1, it is crawled under load by the arch crane device to complete the longitudinal movement of the beam segment.

[0107] S3C: After automatic adjustment, the beam segment is smoothly aligned with the design position. Then, the end of the beam segment near the center of the bridge is raised and adjusted to the design elevation using the lifting mechanism 1. In step S3C, the end of the beam segment near the center of the bridge is raised and adjusted to slightly above the design elevation using the lifting mechanism 1, completing the pre-lifting. Specifically, after installing the hangers for the steel beams such as the grid beams, when installing the grid beams, the hangers pass through the grid beams, and the nuts at the bottom of the hangers are tightened to allow for a pre-lifting value for the grid beams. When lowering the grid beams, the hangers are extended so that the grid beams reach the design elevation position exactly.

[0108] S3D: Adjust and connect the end of the beam segment near the arch abutment to the previous beam segment or abutment to ensure precise positioning to meet design requirements. Then, promptly connect the high-strength bolts and finally loosen the lifting points to suspend the current beam segment on arch 9, thus completing the installation of the current beam segment.

[0109] By following the steps described above, the hoisting of each beam segment can be completed quickly and accurately.

[0110] S4. Repeat steps S2-S3 to complete the installation of all bridge beam segments.

[0111] After the standard beam segments of the entire bridge are installed, the bolt anchorage of each part is checked. If the beam segment is equipped with hangers, the hangers are tensioned for the first time. Then, the bridge deck alignment is adjusted, the hangers are anchored again, and various joints are welded and inspected. Construction is carried out symmetrically from both ends of arch 9 towards the middle using two arch-mounted cranes. See [link / reference]. Figure 1 After the standard section is completed, the closure section is constructed using one of the arch-mounted cranes. The hoisting of the closure section is similar to that of other standard sections of the bridge deck steel beams, except that a 50-100mm allowance is reserved during the prefabrication of the closure section. After the closure section is in place, all bolts are checked for secondary tightening and joint welding. If the beam segment has hangers, the entire bridge hangers undergo secondary tensioning. Deviations may occur during the on-site construction and installation of the grid beams. By reserving a 50-100mm allowance, corrections can be made when deviations occur. This 50-100mm allowance also facilitates the lowering of the final closure section grid beam.

[0112] The method of moving the arch-mounted crane from the arch foot to the arch crown utilizes the existing chord tubes 91 of arch 9 as force-bearing points, resulting in more precise positioning and accurate placement of the crane after movement. During movement, the clamping system 35 provides lateral restraint, and the clamping support wheels 355 of the clamping system 35 of the main beam structure 3 provide inward support to the outer side of the corresponding chord tube 91 on the lateral side, allowing them to roll along the chord tube 91 of arch 9. This lateral restraint prevents damage to the arch. This guiding method eliminates the need for tracks on the arch, resulting in higher construction efficiency, greater stability, and enhanced safety. Consequently, the beam segment lifting and installation process is safer and more stable, with more precise positioning, improving construction efficiency and quality. This method solves the problems of difficult bridge deck steel beam hoisting under specific environmental constraints, extensive preliminary preparation work, high equipment costs, and frequent high-altitude operations, achieving the goal of convenient, efficient, and low-risk installation of steel arch bridge deck steel beams. It is suitable for various environmental conditions, does not require high site conditions for equipment use, and requires less time for preliminary work preparation, thus achieving the goal of economical, efficient and convenient installation of bridge deck steel beams.

[0113] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.

Claims

1. A method for lifting and installing a steel-concrete composite arch bridge deck using a crane, characterized in that... An arch-mounted crane device is adopted, which includes a lifting mechanism (1), a traction mechanism (2) and a main beam structure (3). The arch-mounted crane device is driven by an electrical system. The traction mechanism (2) includes a front support beam (211), a rear support beam (212), a traction winch mechanism (22), a clamping mechanism (23), a traction locking mechanism (26), and a support traveling mechanism (27). The main beam structure (3) is equipped with a walking locking mechanism (31), a clamping system (35) and a traveling mechanism (4). The lifting mechanism (1) is fixedly connected to the main beam structure (3). The lifting mechanism (1) is connected to a lifting device (5). The lifting device (5) is located below the main beam structure (3). The traction wire rope (224) of the traction winch mechanism (22) is connected between the main beam structure (3) and the rear support beam (212). Includes the following steps: S1. Install the arch crane device above the arch foot of the closed arch (9) so that: the wheels of the traveling mechanism (4) at the bottom of the main beam structure (3) are placed directly on the chord tube (91) of the arch (9); the traveling locking mechanism (31) of the main beam structure (3) hooks the transverse duct (92) of the arch (9) on the rear side; the clamping support wheel (355) of the clamping system (35) of the main beam structure (3) supports inward on the outer side of the chord tube (91) on the corresponding transverse side; and so that: the traction locking mechanism (26) of the traction mechanism (2) hooks the transverse duct (92) of the arch (9) on the front side; the clamping mechanisms (23) on the left and right sides of the traction mechanism (2) clamp the chord tubes (91) on the left and right sides of the arch (9); and the support traveling wheel (272) of the traction mechanism (2) is placed on the chord tube (91); S2. Move the arch-mounted crane to the position where the beam segment will be lifted. The moving steps are as follows: S2A, hook the walking locking mechanism (31) onto the transverse duct (92) of the arch (9) to ensure that the main beam structure (3) remains stationary, and clamp the chord tube (91) through the clamping mechanism (23) at the rear support beam (212) to ensure that the rear support beam (212) remains stationary, and release the clamping mechanism (23) at the front support beam (211). By extending the moving cylinder (24), the front support beam (211) can be pushed to climb up the arch (9) and move forward to the designated position. Then, the clamping mechanism (23) of the rear support beam (212) is released, and the clamping mechanism (23) at the front support beam (211) is clamped to the string tube (91). Taking the front support beam (211) as the base point, the moving cylinder (24) is shortened and the traction wire rope (224) of the traction winch mechanism (22) is lengthened simultaneously, so that the rear support beam (212) and the traction locking mechanism (26) are pulled forward as a whole, and then the rear support beam (212) and the front support beam (211) are all moved forward to the designated position. S2B. After the rear support beam (212) and the front support beam (211) are moved into place, the traction locking mechanism (26) at the rear support beam (212) is locked to the transverse duct (92) of the arch (9), and the clamping mechanism (23) at the rear support beam (212) is clamped to ensure that the rear support beam (212) cannot move. Then the locking mechanism (31) is released. Using the rear support beam (212) as the base point, the main beam structure (3) is dragged forward to the beam section waiting to be lifted by shortening the length of the traction wire rope (224). After the S2C main beam structure (3) moves to the next beam segment waiting to be lifted position, it hooks the transverse duct (92) of the arch (9) through the walking locking mechanism (31), so that the main beam structure (3) cannot move. S3. The lifting device (5) is lowered and connected to the beam segment through the lifting mechanism (1) above the main beam structure (3), and then the beam segment is lifted and installed through the lifting mechanism (1); S4. Repeat steps S2-S3 to complete the installation of all bridge beam segments.

2. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 1, characterized in that, When the rear support beam (212) and the front support beam (211) have not moved to the next beam segment waiting to be lifted position, repeat step S2A until the rear support beam (212) and the front support beam (211) have moved as a whole to the next beam segment waiting to be lifted position.

3. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 1, characterized in that, Step S3 includes the following steps: S3A, the lifting mechanism (1) lowers the lifting device (5) to the target bridge deck beam segment, and then completes the connection and fixation at the lifting point; S3B, After the beam segment is lifted to a certain height by the lifting mechanism (1), it is crawled under load by the arch crane device to complete the longitudinal bridge movement of the beam segment; S3C, After automatic adjustment, the beam segment is brought close to the design position. Then, the end of the beam segment near the center of the bridge is lifted and adjusted to the design elevation by the lifting mechanism (1). S3D, adjust the end of the beam segment near the arch seat to connect with the previous beam segment or abutment, so that its precise positioning meets the design requirements, and promptly connect the high-strength bolts, and finally loosen the lifting point so that the current beam segment is suspended on the arch (9) to complete the installation of the current beam segment.

4. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 3, characterized in that, In step S3C, the end of the beam section near the center of the bridge is raised and adjusted to a height higher than the design elevation by the lifting mechanism (1) to complete the pre-lifting.

5. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 1, characterized in that, The main beam structure (3) includes two main beam box steels (33) spaced apart along the walking direction and two main beam H steels (34) spaced apart along the left and right directions. The main beam box steels (33) are arranged along the left and right directions, and the main beam H steels (34) are arranged along the walking direction. The main beam box steels (33) are located above the main beam H steels (34). The two main beam box steels (33) and the two main beam H steels (34) are connected by flanges (334) to form a frame structure. Step S1 includes the following steps: S1A. Using a crane, the traction mechanism (2) is hoisted onto the arch (9) so that: the traction locking mechanism (26) of the traction mechanism (2) is locked to the transverse chord tube (92) of the front arch (9); the clamping mechanisms (23) on the left and right sides of the traction mechanism (2) clamp the chord tubes (91) on the left and right sides of the arch (9); and the support traveling wheel (272) of the traction mechanism (2) is placed on the chord tube (91). S1B. Using a crane, the main beam H-beam (34), travel locking mechanism (31), clamping system (35) and travel mechanism (4) of the main beam structure (3) are hoisted as a whole onto the arch (9), so that: the wheels of the travel mechanism (4) at the bottom of the main beam structure (3) are placed directly on the chord tube (91) of the arch (9), the travel locking mechanism (31) of the main beam structure (3) is locked to the transverse duct (92) of the arch (9) on the rear side, and the clamping support wheel (355) of the clamping system (35) of the main beam structure (3) is supported inward on the outer side of the chord tube (91) on the corresponding transverse side; then the traction wire rope (224) of the traction winch mechanism (22) is connected to the main beam H-beam (34); S1C. Using a crane, the main beam box steel (33) of the main beam structure (3) connected as a whole and the lifting mechanism (1) above it are hoisted together onto the main beam H-beam (34) for installation and connection. S1D, complete the installation of the remaining ropes, the hoisting mechanism (1) lifting cable and electrical system.

6. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 5, characterized in that, After installing the arch crane device above the arch foot of the closed arch (9), first test the walking function of the arch crane device by walking it under no load. If it is not normal, adjust it in time. If normal, after loading a heavy object of the same weight as the beam segment through the lifting mechanism (1), check whether the walking and lifting functions of the arch crane are normal. If not, adjust in time.

7. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 1, characterized in that, After the standard beam segments of the entire bridge are installed, check the bolt anchorage of each part. If the beam segment is equipped with hangers, perform the first round of hanger tensioning, then adjust the bridge deck alignment, anchor the hangers again, and perform welding and inspection of various joints.

8. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 7, characterized in that, Two arch-mounted cranes are used to symmetrically construct from both ends of the arch (9) toward the middle. After the standard section is completed, the closure section is constructed using one of the arch-mounted cranes. The closure section is reserved with a spare length of 50-100mm. All bolts are checked for secondary tightening and joint welding. If the beam section is equipped with hangers, the hangers of the entire bridge are tensioned for the second time.

9. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to any one of claims 1-8, characterized in that, If the beam segment is fixed with hangers, the hangers should be installed on the beam segment before the beam segment is hoisted. In step S3, after the lifting mechanism (1) above the main beam structure (3) lowers the lifting rod of the lifting device (5) to connect the beam segment, the lifting mechanism (1) lifts the beam segment for installation.

10. The construction method for lifting and installing a steel-concrete composite arch bridge deck using a crane according to claim 9, characterized in that, After the beam segment is in place, the lower end of the hanger is first inserted into the reserved hole in the beam segment, then fixed with anchor nuts, and the hanger is leveled according to the bridge deck design elevation.

Citation Information

Patent Citations

  • Whole-section erecting method for open lattice type steel beam of half-through steel box tied-arch bridge

    CN104727227A

  • Construction method of single-arch-rib wide-deck arch bridge in non-stop water area

    CN117403564A