Tool, equipment and method for peeling test after hot melt adhesive bonding
By designing peel testing tooling and equipment for hot melt adhesive bonding, the problem of low efficiency of existing equipment in testing hot melt adhesive connection strength and pulling strength is solved, and rapid temperature control and automated testing are achieved, adapting to large Batch testing requirements improve testing efficiency and equipment performance.
Patent Information
- Application Number
- CN202410392762.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-02
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-04-02
AI Technical Summary
The existing universal testing machines are inefficient when testing the connection strength and pulling strength of hot melt adhesives, and it is difficult to achieve performance testing under different temperature conditions. The changes in the formula of each batch of hot melt adhesives result in a large increase in the test volume, which is not met by conventional equipment. High efficiency demand.
Designed peel test tooling and equipment for hot melt adhesive bonding, including upper and lower tooling modules, temperature control pipelines, elastic guide rod components and automatic feeding mechanisms to achieve rapid temperature adjustment and sample sliding installation, and support pulling and pulling. Seamless switching with shear strength tests reduces test clamping and temperature waiting time.
Through the temperature control structure and special tooling design, the testing efficiency is improved, the rapid temperature control and automated testing of hot melt adhesives are realized, the difficulty and cost of equipment control is reduced, and the large-scale testing needs are adapted.
Smart Images

Figure CN118225675B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of material testing, and in particular to a peeling test tool, equipment and method for hot melt adhesive bonding. Background Art
[0002] In industrial production, many products use hot melt adhesives. For example, in industries such as bottle caps and packaging, hot melt adhesives are generally used to bond aluminum to plastic or plastic to plastic. In order to ensure the connection strength and firmness after bonding, we need to perform corresponding tests on them to ensure their performance under normal use environments. In order to meet the requirements of each customer, the formula of each batch of hot melt adhesives will change, which leads to a significant increase in the amount of hot melt adhesive performance tests. Conventional universal testing machines require repeated clamping, which makes it impossible to meet the high-efficiency testing requirements of a large number of products. In addition, the universal testing machine needs to replace the tooling when testing shear strength and tensile strength, which further reduces the detection efficiency. In addition, during the detection of hot melt adhesives, it is also necessary to test the performance under different temperature conditions, which is difficult to achieve with conventional universal testing machines and tooling. In view of the above problems, this application is proposed. Summary of the invention
[0003] The object of the present invention is to provide a peeling test tool, equipment and method for hot melt adhesive bonding, which can meet the high-efficiency test requirements and can achieve rapid temperature adjustment of the sample.
[0004] The present invention is achieved through the following technical solutions.
[0005] The present invention provides a peeling test tool for hot melt adhesive bonding, which includes two tooling modules, namely an upper tooling module and a lower tooling module. When in use, the upper tooling module and the lower tooling module are symmetrically installed on the test equipment. The tooling module includes a fixed part, a sample connecting part and a temperature control pipeline. The sample connecting part includes a neck and a force-bearing part. The neck is connected to one end of the fixed part. A temperature control pipeline interface is provided on the fixed part. The temperature control pipeline extends between the fixed part and the sample connecting part. The sample can be slidably installed at the force-bearing part and contact the force-bearing part.
[0006] Furthermore, the lower tooling module also includes an elastic guide rod assembly, which is arranged on a side end face of the fixed part where the sample connecting part is provided. The elastic guide rod assembly is arranged in several groups, and the elastic guide rod assembly includes a spring and a guide rod. The guide rod protrudes from the surface of the fixed part under the action of the spring, and the guide rod compresses the spring after being compressed and shrinks inside the fixed part. The extension direction of the guide rod is the same as the extension direction of the force-bearing part.
[0007] Furthermore, two groups of sample connection parts are arranged in each of the tooling modules, wherein one group of sample connection parts is connected to a retracting mechanism, and the retracting mechanism is used to drive the sample connection parts to extend and retract, and the sample connection parts connected to the retracting mechanism in the upper tooling module and the lower tooling module are staggered.
[0008] The peeling test equipment after hot melt adhesive bonding includes a main body, a test drive component, a fixture, the above-mentioned peeling test tooling and a feeding mechanism, wherein the fixture includes an upper fixture and a lower fixture, the upper fixture is connected to a force sensor and a test drive component, the upper fixture and the lower fixture respectively clamp an upper tooling module and a lower tooling module, the feeding mechanism is provided with a material box and a feeding drive component, the feeding drive component is connected to a push rod, and the feeding drive component can push the sample in the material box between the upper tooling module and the lower tooling module.
[0009] Furthermore, the peeling test equipment after hot melt adhesive bonding also includes a recycling box. When the feeding mechanism feeds materials, the time when the test between the upper tooling module and the lower tooling module is completed is pushed into the recycling box.
[0010] Furthermore, the peeling test equipment after hot melt adhesive bonding also includes a temperature regulating mechanism, which includes two groups of closed drive components and two groups of temperature regulating plates, and the temperature regulating plates are connected to the closed drive components. After the two groups of temperature regulating plates are in contact, they are used to wrap the sample.
[0011] Furthermore, the closed drive assembly is mounted on a height-adjusting slide rail.
[0012] The peeling test method after hot melt adhesive bonding, based on the above-mentioned peeling test equipment, includes the following steps:
[0013] S1: Install the upper tooling module and the lower tooling module on the upper fixture and the lower fixture respectively, and place several samples in the material box;
[0014] S2: The feeding drive assembly drives the push rod to push the sample in the material box between the upper tooling module and the lower tooling module. The docking groove in the sample is connected to the sample connection part. When the pull-out strength test is performed, the sample adopts a pull-out sample, and the pull-out sample is connected to the four sets of sample connection parts. When the shear strength test is performed, the sample adopts a shear sample, and the contraction mechanism drives the sample connection part to contract, and the shear sample is connected to the two sets of sample connection parts.
[0015] S3: introducing a temperature control medium into the temperature control pipeline, and adjusting the temperature of the sample by utilizing the contact between the fixing part and the sample connecting part and the sample;
[0016] S4: After the temperature adjustment is completed, the test drive assembly is started, and the upper fixture rises to perform a loading test on the sample;
[0017] S5: After the test is completed, the feeding mechanism performs the feeding action and pushes the tested specimens out for discharge.
[0018] Furthermore, step S3 also includes the following steps: the closed driving component drives the two groups of temperature regulating plates to approach and contact each other, and the two groups of temperature regulating plates surround the sample in a ring shape after contact, and the temperature regulating plates are adjusted to the corresponding temperature to control the temperature of the sample.
[0019] Furthermore, step S2 also includes the following steps: during the docking process between the sample and the sample connecting part, there are gaps between the docking groove and the neck and the force-bearing part. After the sample reaches the set position between the upper tooling module and the lower tooling module, the test drive assembly drives the upper tooling module to move downward, compresses the elastic guide rod assembly, and stops pressing until the end face of the force-bearing part contacts the bottom surface of the docking groove, so that the force-bearing part can more efficiently transfer the temperature to the position of the sample close to the bonding surface.
[0020] Beneficial effects of the present invention:
[0021] By setting a temperature control structure in the tooling, the temperature of the sample can be controlled to meet the test requirements. At the same time, the special structural design of the connection between the tooling and the sample eliminates the need for repeated clamping of the sample, achieving the effect of convenient loading, and also enables the tooling to extend into the sample to transfer the temperature of the sample. The temperature control method from the inside can make the bonding surface of the sample reach the required temperature more quickly. In large-scale testing, there is no need to wait for the entire sample to reach the set temperature, thereby shortening the time required for temperature control and improving test efficiency.
[0022] Through the setting of the sample connection part and the guide rod, the sample can be installed smoothly due to the influence of offset friction and the distortion of test results due to premature shear force during sliding installation. It also avoids the problem that the force-bearing part cannot achieve good contact with the inner wall of the docking groove due to size error, thus ensuring the heat transfer efficiency.
[0023] By setting two groups of specimen connection parts in each tooling module, one group of specimen connections is connected to the shrinkage mechanism, so that the tooling can realize tensile strength test and shear strength test, and the two tests can be switched seamlessly, realizing the applicability of two testing methods, and both can realize sliding loading, without repeated clamping of the tooling, and without changing the tooling, so that the test efficiency is further improved.
[0024] Through the setting of the feeding mechanism, automatic feeding of samples is realized, and the tooling auxiliary equipment realizes automated testing, which is suitable for tensile strength testing and shear strength testing, reduces the difficulty of equipment control and equipment cost, and improves test efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0026] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0027] Figure 1 It is a schematic diagram of the overall structure of the peeling test equipment after hot melt adhesive bonding;
[0028] Figure 2 for Figure 1 Right view of the middle tooling module and loading mechanism;
[0029] Figure 3 This is a schematic diagram of the feeding mechanism when loading materials;
[0030] Figure 4 This is a structural diagram of the first embodiment of the tooling module;
[0031] Figure 5 It is a structural schematic diagram of the upper tooling module and the lower tooling module;
[0032] Figure 6 It is a structural schematic diagram of the upper tooling module and the lower tooling module;
[0033] Figure 7 This is a structural diagram of the second embodiment of the tooling module;
[0034] Figure 8 This is a schematic diagram of the connection between the tooling module and the specimen during the shear strength test;
[0035] Fig. 9 Schematic diagram of temperature control structure. DETAILED DESCRIPTION
[0036] Combine the following Figure 1-Figure 9 The present invention is described in detail.
[0037] Embodiment 1 of the peeling test tool for hot melt adhesive bonding of the present invention:
[0038] like Figure 5-Figure 6, including two tooling modules, namely an upper tooling module 58 and a lower tooling module 59. When in use, the upper tooling module 58 and the lower tooling module 59 are symmetrically installed on the test equipment from top to bottom. The tooling module includes a fixing part 51, a sample connecting part 52 and a temperature control pipeline 54. The fixing part 51 has a clamping end, and the sample connecting part 52 includes a neck 521 and a force-bearing part 522. The neck 521 is connected to one end of the fixing part 51, and the neck 521 and the force-bearing part 522 form a T shape. One or more temperature control pipeline interfaces 53 are arranged on the fixing part 51. The temperature control pipeline 54 is connected to the fixing part 51. The tooling module extends in the part 51 and the sample connecting part 52. The tooling module is preferably made of metal. Specifically, a hollow pipe can be provided in the tooling module. For example, the tooling module can be arranged as a half-assembled structure to form a circulation pipeline inside to realize the circulation of the control medium. A flexible pipeline can also be provided in the tooling module to realize heat transfer. An electric heating wire can also be provided in the tooling module, and the temperature control pipeline interface 53 is used as a power supply interface to realize temperature control. When the electric heating wire is used, the temperature adjustment range is small. When the control medium is used, such as water, oil or liquid nitrogen, a wider range of temperature adjustment can be achieved.
[0039] The sample 6 can be slidably installed to the force-bearing part 522 and contact with the force-bearing part 522, so that the sample 6 can be loaded when the tooling is in motion. At the same time, since the force-bearing part 522 extends into the T-shaped docking groove 61 of the sample 6, the temperature of the sample 6 can be controlled from the inside. The sample 6 is generally a plastic block and a plastic block or an aluminum block bonded by hot melt adhesive. The temperature control method from the inside can make the position of the bonding surface in the sample reach the required temperature more quickly. In large-scale testing, there is no need to wait for the entire sample to reach the set temperature, thereby shortening the time required for temperature control and improving test efficiency.
[0040] Sample 6 is designed as Figure 5 As shown, it is made of two parts of materials bonded together, and the outer end surface of each part of the material is provided with a T-shaped groove running through the front and back. When clamping the sample, it is only necessary to insert the sample from one end of the sample connecting part 52. When switching the sample, it is only necessary to slide and install it, and there is no need to repeatedly clamp the tooling.
[0041] Embodiment 2: Based on Embodiment 1, preferably, as Figure 6, the docking groove 61 and the sample connecting part 52 are clearance fit. Since the sample is not a precise structure, it is inevitable that there will be certain dimensional errors, burrs and other problems. When installing the sample, during the process of the sample connecting part 52 entering the docking groove 61, the upper sample connecting part 52 can avoid contacting with the inner wall of the upper docking groove 61, and the bottom surface of the upper fixing part 51 can avoid contacting with the upper surface of the upper sample, so that the sample can be loaded more easily, avoiding the contact and friction between the sample connecting part 52 and the inner wall of the docking groove 61, which causes the shear force on the sample to affect the test results. In order to make the lower sample achieve the above effect, the lower tooling module 59 also includes an elastic guide rod assembly 55, which is arranged on one side end surface of the fixing part 51 where the sample connecting part 52 is arranged. Figure 5 At least three groups of elastic guide rod assemblies 55 are arranged, and the elastic guide rod assemblies 55 include a spring and a guide rod connected thereto. The spring is installed in a groove on the upper end surface of the fixing portion 51 of the lower tooling module 59. The top of the guide rod is an arc surface, and the extension direction of the guide rod is the same as the extension direction of the force-bearing portion 522.
[0042] During the sliding installation of the sample, the guide rod protrudes from the surface of the fixing part 51 under the action of the spring, and the guide rods on both sides contact the end surfaces of the sample on both sides to play a guiding role. The spacing between the center lines of the guide rods on both sides is greater than the width of the sample, so that the sample with a width within a certain error range can be guided and supported, so that the lower material of the sample can contact the guide rod during installation, and the upper end surface of the fixing part 51 on the lower side can avoid contacting the lower surface of the lower sample, and the lower sample connecting part 52 can avoid contacting the inner wall of the lower docking groove 61, thereby The resistance during sample installation is reduced in one step to ensure the test results. After the sample is installed at the specified position, the upper tooling module 58 moves downward to make the upper force-bearing part 522 contact the bottom wall of the upper docking groove 61. The sample is pressed down, and the guide rod is compressed to compress the spring and shrink it inside the fixing part 51 until the lower force-bearing part 522 contacts the bottom wall of the lower docking groove 61. This method avoids the problem that the force-bearing part 522 cannot achieve good contact with the inner wall of the docking groove 61 due to dimensional error, ensuring the heat transfer efficiency. In the best case, Figure 6 As shown, the end surface of the fixing portion 51 contacts the upper and lower surfaces of the sample, further improving the heat transfer efficiency.
[0043] Embodiment 3: Based on Embodiment 1 or 2, Figure 7-Figure 8As shown, the tooling of this embodiment can realize pull-out strength test and shear strength test. Specifically, two groups of sample connection parts 52 are arranged in each tooling module, and one group of sample connection parts 52 is connected to the retraction mechanism 81. The retraction mechanism 81 can be an electric cylinder, a pneumatic cylinder, or a hydraulic cylinder. One or more corresponding interfaces 82 are arranged on the fixed part for realizing the control of the retraction mechanism 81. The retraction mechanism 81 is used to drive the sample connection part 52 to extend and retract. The sample connection parts 52 connected to the retraction mechanism 81 in the upper tooling module 58 and the lower tooling module 59 are staggered.
[0044] When performing a shear test, Figure 8 As shown, the retracting mechanism 81 drives the sample connection part 52 to be stored in the fixed part, and the upper and lower tooling modules are respectively connected to the sample through the staggered sample connection parts 52, so that when the upper tooling module moves upward, the shear force is loaded on the sample to perform a shear strength test. When performing a pull-out strength test, the retracting mechanism 81 drives the sample connection part 52 to extend out of the fixed part. The test steps are the same as those in Example 1. Preferably, the retracting mechanism 81 is connected to the sample connection part 52 through a slider arranged in the fixed part. During the pull-out test, the slider and the internal structure of the fixed part resist the force to prevent the retracting mechanism 81 from being subjected to tension.
[0045] There are two types of sample 6, such as Figure 5 The middle drawing specimen 63 is made of two pieces of material bonded together, such as Figure 8 The shear specimen 62 is formed by bonding two pieces of material together. The two specimens have similar structures and are easy to manufacture.
[0046] Through the design of this tooling, it is possible to achieve the applicability of two types of testing, and both can realize sliding loading, without the need to repeatedly clamp the tooling, and without the need to replace the tooling, so that the testing efficiency is further improved.
[0047] Optionally, at the moment of test completion, the retracting mechanism 81 can adjust the position of the sample connecting portion 52 to keep it in contact with the sample, thereby preventing the sample from being separated from the sample connecting portion 52 due to vibration at the moment of disconnection.
[0048] Equipment for peeling test after hot melt adhesive bonding, embodiment 1:
[0049] like Figure 1, including a main body 1, a control component, a test drive component 21, a fixture, the above-mentioned peeling test tooling and a feeding mechanism 7. The control component is controlled by PLC and a human-machine interface and / or a computer. The fixture includes an upper fixture 31 and a lower fixture 32. The upper fixture 31 is connected to the force sensor and the test drive component 21. The upper fixture 31 and the lower fixture 32 clamp the upper tooling module 58 and the lower tooling module 59 respectively. The feeding mechanism 7 is provided with a material box 72 and a feeding drive component 71. The feeding drive component 71 is connected to a push rod 73. The feeding drive component 71 can push the sample in the material box 72 into between the upper tooling module 58 and the lower tooling module 59.
[0050] The main body 1 includes a base 11 and a bracket 12, and a test drive component 21 is installed on the bracket 12. A sliding frame 22 is also installed on the bracket 12. The driving end of the test drive component 21 is connected to the sliding frame to ensure stability during action. The test drive component 21 can adopt a hydraulic cylinder or a screw push rod. The lower clamp 32 is installed on the base 11. The clamp can adopt a pneumatic clamp or a manual clamp. The manual clamp includes a clamp body, a clamp plate 33, an adjustment handle 34 and a guide rod 35. The adjustment handle 34 is connected to the clamp plate 33 through a threaded rod, and the threaded rod is installed on the clamp body. The guide rod 35 is connected to the clamp plate 33 and is connected to the sliding guide hole on the clamp body. The rotating adjustment handle 34 controls the clamp plate 33 to clamp the tooling.
[0051] Feeding mechanism 7 Figure 2 , Figure 3 The material box 72 in the main body is arranged vertically, and the lower side is connected to the feeding port. The feeding drive assembly 71 adopts a cylinder, and the push rod 73 is connected to the cylinder. Optionally, the push rod 73 is an L-shaped plate to block the upper sample from falling when pushing the material, or a pneumatic door panel is arranged at the bottom of the material box 72. Each time the door panel is opened, the material is discharged to the feeding port. When the pneumatic door panel is used, when switching between the pulling and shear strength tests, the push plate 73 can first push out the sample on the tooling, and then load the sample after the tooling adjustment is completed.
[0052] Preferably, the peeling test equipment after hot melt adhesive bonding also includes a recycling box 8. When the feeding mechanism 7 feeds materials, the time when the test is completed between the upper tooling module 58 and the lower tooling module 59 is pushed into the recycling box 8.
[0053] Embodiment 2, based on embodiment 1, the peeling test equipment after hot melt adhesive bonding also includes a temperature regulating mechanism, the temperature regulating mechanism includes two groups of closed driving components 42 and two groups of semi-annular temperature regulating plates 43, the temperature regulating plates 43 are connected to the closed driving components 42, the closed driving components 42 use cylinders, and the two groups of temperature regulating plates 43 are used to wrap the sample after contact.
[0054] Preferably, the closed drive assembly 42 is mounted on the height adjustment rail 41 .
[0055] The temperature regulating sheet 43 can be provided with a heating wire to achieve temperature control. Fig. 9 The temperature regulating plate 43 and the tooling module both adopt medium circulation to perform temperature control, and include a medium supply device 9, which is connected to the temperature regulating plate 43 and the tooling module through a pipeline. The medium supply device 9 can achieve temperature control by heating the medium to different temperatures or by adjusting the type of supplied medium.
[0056] A peeling test method after hot melt adhesive bonding, based on the peeling test device in any of the above embodiments, comprises the following steps:
[0057] S1: Install the upper tooling module 58 and the lower tooling module 59 on the upper fixture 31 and the lower fixture 32 respectively, and place a plurality of specimens 6 including a tensile specimen 63 and a shear specimen 62 in a material box 72;
[0058] S2: The feeding drive assembly 71 drives the push rod 73 to push the sample 6 in the material box 72 between the upper tooling module 58 and the lower tooling module 59. The docking groove 61 in the sample 6 is connected to the sample connection part 52. When the pull-out strength test is performed, the sample 6 adopts the pull-out sample 63, and the pull-out sample 63 is connected to the four groups of sample connection parts 52. When the shear strength test is performed, the sample 6 adopts the shear sample 62. The contraction mechanism 81 drives the sample connection part 52 to contract, and the shear sample 62 is connected to the two groups of sample connection parts 52.
[0059] S3: A temperature control medium is introduced into the temperature control pipeline 54, and the temperature of the sample 6 is adjusted by utilizing the contact between the fixing part 51 and the sample connecting part 52 and the sample 6;
[0060] S4: After the temperature adjustment is completed, the test drive assembly 21 is started, and the upper fixture 31 rises to perform a loading test on the sample 6;
[0061] S5: After the test is completed, the feeding mechanism 7 performs a feeding action and pushes out the tested sample 6 for discharge.
[0062] Furthermore, step S3 also includes the following steps: the closed driving component 42 drives the two groups of temperature regulating plates 43 to approach and contact each other, and after the two groups of temperature regulating plates 43 contact, they surround the sample 6 in a ring shape, and the temperature regulating plates 43 are adjusted to the corresponding temperature to control the temperature of the sample 6.
[0063] Furthermore, step S2 also includes the following steps: during the docking process of the sample 6 and the sample connecting portion 52, there are gaps between the docking groove 61 and the neck 521 and the force-bearing portion 522. After the sample 6 reaches the set position between the upper tooling module 58 and the lower tooling module 59, the test drive assembly 21 drives the upper tooling module 58 to move downward, compresses the elastic guide rod assembly 55, and stops pressing until the end face of the force-bearing portion 522 contacts the bottom surface of the docking groove 61, so that the force-bearing portion 522 can more efficiently transfer the temperature to the position of the sample 6 close to the bonding surface.
[0064] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable people familiar with the technology in this field to understand the content of the present invention and implement it, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made according to the spirit of the present invention should be included in the protection scope of the present invention.
Claims
1. Used for peeling test after hot melt adhesive bonding, characterized by: The invention comprises two tooling modules, namely an upper tooling module (58) and a lower tooling module (59). When in use, the upper tooling module (58) and the lower tooling module (59) are symmetrically installed on the test equipment. The tooling module comprises a fixing part (51), a sample connecting part (52) and a temperature control pipeline (54). The sample connecting part (52) comprises a neck (521) and a force-bearing part (522). The neck (521) is connected to one end of the fixing part (51). The fixing part (51) is provided with a control The temperature control pipeline interface (53) is provided, the temperature control pipeline (54) extending between the fixing portion (51) and the sample connecting portion (52), the sample can be slidably mounted to the force-bearing portion (522) and contact the force-bearing portion (522); the lower tooling module (59) also includes an elastic guide rod assembly (55), the elastic guide rod assembly (55) is arranged on a side end surface of the fixing portion (51) where the sample connecting portion (52) is arranged, the elastic guide rod assembly (55) is arranged in a plurality of groups, and the elastic guide rod assembly (55) 55) comprises a spring and a guide rod, wherein the guide rod protrudes from the surface of the fixing part (51) under the action of the spring, and when pressed, the guide rod compresses the spring and contracts inside the fixing part (51), and the extension direction of the guide rod is the same as the extension direction of the force-bearing part (522); two groups of sample connection parts (52) are arranged in each of the tooling modules, one of which is connected to a contraction mechanism (81), and the contraction mechanism (81) is used to drive the sample connection part (52) to extend and retract, and the upper tooling module (58) is provided with a plurality of sample connection parts (52) and a plurality of sample connection parts (52) connected to each of the tooling modules. ) and the specimen connection portion (52) in the upper and lower tooling modules (59) connected to the retraction mechanism (81) are staggered; when a shear test is performed, the retraction mechanism (81) drives the specimen connection portion (52) to be stored in the fixed portion, and the upper and lower tooling modules are respectively connected to the specimen via the staggered specimen connection portions (52), so that when the upper tooling module moves upward, a shear force is applied to the specimen to perform a shear strength test, and when a pull-out strength test is performed, the retraction mechanism (81) drives the specimen connection portion (52) to extend out of the fixed portion.
2. Used for peeling test equipment after hot melt adhesive bonding, characterized by: The invention comprises a main body (1), a test drive component (21), a fixture, the peeling test tooling and a feeding mechanism (7) as claimed in claim 1, wherein the fixture comprises an upper fixture (31) and a lower fixture (32), wherein the upper fixture (31) is connected to a force sensor and a test drive component (21), wherein the upper fixture (31) and the lower fixture (32) respectively clamp an upper tooling module (58) and a lower tooling module (59), wherein the feeding mechanism (7) is provided with a material box (72) and a feeding drive component (71), wherein the feeding drive component (71) is connected to a push rod (73), and wherein the feeding drive component (71) can push the sample in the material box (72) between the upper tooling module (58) and the lower tooling module (59).
3. The peeling test device for hot melt adhesive bonding according to claim 2, characterized in that: The peeling test device after hot melt adhesive bonding also includes a recycling box (8). When the feeding mechanism (7) feeds materials, the time when the test is completed between the upper tooling module (58) and the lower tooling module (59) is pushed into the recycling box (8).
4. The peeling test device for hot melt adhesive bonding according to claim 2 or 3, characterized in that: The peeling test device after hot melt adhesive bonding also includes a temperature regulating mechanism, which includes two groups of closed drive components (42) and two groups of temperature regulating sheets (43). The temperature regulating sheets (43) are connected to the closed drive components (42). The two groups of temperature regulating sheets (43) are used to wrap the sample after contact.
5. The peeling test device for hot melt adhesive bonding according to claim 4, characterized in that: The closed drive assembly (42) is mounted on the height adjustment slide rail (41).
6. A peel test method after hot melt adhesive bonding, based on the peel test device according to any one of claims 2 to 5, characterized in that: The steps include: S1: installing an upper tooling module (58) and a lower tooling module (59) on an upper fixture (31) and a lower fixture (32) respectively, and placing a plurality of samples (6) in a material box (72); S2: The material loading drive assembly (71) drives the push rod (73) to push the sample (6) in the material box (72) between the upper tooling module (58) and the lower tooling module (59), and the docking groove (61) in the sample (6) is connected to the sample connection part (52). When performing a pull-out strength test, the sample (6) uses a pull-out sample (63), and the pull-out sample (63) is connected to the four groups of sample connection parts (52). When performing a shear strength test, the sample (6) uses a shear sample (62), and the contraction mechanism (81) drives the sample connection part (52) to contract, and the shear sample (62) is connected to the two groups of sample connection parts (52); S3: introducing a temperature control medium into the temperature control pipeline (54), and adjusting the temperature of the sample (6) by utilizing the contact between the fixing portion (51) and the sample connecting portion (52) and the sample (6); S4: After the temperature adjustment is completed, the test drive assembly (21) is started, and the upper fixture (31) rises to perform a loading test on the sample (6); S5: After the test is completed, the loading mechanism (7) performs a loading action and pushes the tested sample (6) out of the discharge chamber.
7. The peeling test method after hot melt adhesive bonding according to claim 6, characterized in that: Step S3 also includes the following steps: the closed driving component (42) drives the two groups of temperature regulating plates (43) to approach and contact each other, the two groups of temperature regulating plates (43) surround the sample (6) in a ring shape after contact, and the temperature regulating plates (43) are adjusted to a corresponding temperature to control the temperature of the sample (6).
8. The peeling test method after hot melt adhesive bonding according to claim 6 or 7, characterized in that: Step S2 also includes the following steps: during the docking process of the sample (6) and the sample connecting portion (52), there are gaps between the docking groove (61) and the neck (521) and the force-bearing portion (522); after the sample (6) reaches the set position between the upper tooling module (58) and the lower tooling module (59), the test drive component (21) drives the upper tooling module (58) to move downward, compressing the elastic guide rod component (55) until the end surface of the force-bearing portion (522) contacts the bottom surface of the docking groove (61), and then stops the downward pressing action, so that the force-bearing portion (522) can more efficiently transfer the temperature to the position of the sample (6) close to the bonding surface.
