A helium separation and purification system and method

This helium separation and purification system, which combines multi-stage catalytic oxidation dehydrogenation, multi-stage membrane separation, and pressure swing adsorption, solves the problems of low purity and high cost in existing helium purification technologies. It achieves the extraction of high-purity helium and reduces costs, and has wide applicability, suitable for fields such as medical, aerospace, nuclear industry, and optoelectronic products.

CN118236824BActive Publication Date: 2026-11-17CHANGQING ENGINEERING DESIGN CO LTD +1
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202211669388.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-12-24
Publication Date
2026-11-17
Estimated Expiration
2042-12-24

AI Technical Summary

Technical Problem

Existing helium purification technologies suffer from low purity and high cost, especially when extracting helium from natural gas, where existing processes have poor adaptability and high energy consumption.

Method used

A method combining multi-stage catalytic oxidative dehydrogenation, multi-stage membrane separation, and pressure swing adsorption is employed. Helium is purified through a helium separation and purification system, including an air compressor, a multi-stage membrane separation unit, and a pressure swing adsorption branch, utilizing a liquid level control device and a multi-stage reactor.

Benefits of technology

Purifying crude helium in natural gas to 99.999% at room temperature meets the industrial demand for helium, simplifies the process, reduces equipment investment and operating costs, improves dehydrogenation efficiency, and avoids exothermic runaway reactions of high-content hydrogen.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118236824B_ABST
    Figure CN118236824B_ABST
Patent Text Reader

Abstract

This invention belongs to the field of helium purification technology, specifically relating to a helium separation and purification system and method. It includes an air compressor and a crude helium tank. The output ports of the air compressor and crude helium tank are connected to several reaction branches. Each reaction branch is connected to a multi-stage membrane separation device via a dehydration unit. The multi-stage membrane separation device is connected to several parallel pressure swing adsorption (PSA) branches via filters. The inlets of each PSA branch are connected to a desorption gas buffer tank, and the outlets of each PSA branch are connected to a flow tank and a helium buffer tank. This invention combines multi-stage catalytic oxidation dehydrogenation, multi-stage membrane separation concentration, and PSA purification to purify crude helium from natural gas helium extraction devices (with a concentration of over 10%) to 99.999% under ambient temperature conditions, meeting domestic industrial helium demand with high purity.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of helium purification technology, specifically relating to a helium separation and purification system and method. Background Technology

[0002] Helium is widely used in several fields, including medicine, aerospace, nuclear industry, superconducting experiments, and optoelectronic products, due to its unique physical properties. Modern industry's demand for helium is increasing daily, and currently, helium is mainly extracted from air or natural gas. The concentration of helium in air is 5 ppm, far lower than its concentration in natural gas.

[0003] The existing processes for extracting helium from natural gas mainly include membrane separation, pressure swing adsorption (PSA), and cryogenic methods. However, existing purification technologies suffer from drawbacks such as poor adaptability, low purity, high energy consumption, and high cost. Summary of the Invention

[0004] The purpose of this invention is to provide a helium separation and purification system and method to solve the technical problems of low purity and high cost in existing helium purification processes.

[0005] To achieve the above objectives, the present invention employs the following technical solution: In a first aspect, a helium separation and purification system includes an air compressor and a crude helium tank. The outlets of the air compressor and the crude helium tank are connected to several reaction branches. The reaction branches are connected to a multi-stage membrane separation device via a dehydration device. The multi-stage membrane separation device is connected to several parallel pressure swing adsorption (PSA) branches via a filter. The inlets of the several PSA branches are all connected to a desorption gas buffer tank, and the outlets of the several PSA branches are all connected to a flow tank and a helium buffer tank.

[0006] A further improvement of the present invention is that: there are three reaction branches in total; the air compressor is connected to the air inlet of the first heater, the second heater and the third heater respectively; the outlet of the first heater is connected to the inlet of the first reactor; the outlet of the first reactor is connected to the first separator through the first water cooler; the sewage outlet of the first separator is connected to the second sewage discharge outlet; and the product outlet of the first separator is connected to the inlet of the second heater. The outlet of the second reactor is connected to the second separator via the second water cooler, the wastewater outlet of the second separator is connected to the second wastewater discharge outlet, and the product outlet of the second separator is connected to the inlet of the third heater. The outlet of the third heater is connected to the inlet of the third reactor, the outlet of the third reactor is connected to the third separator via the third water cooler, the wastewater outlet of the third separator is connected to the second wastewater discharge outlet, and the product outlet of the third separator is connected to the dewatering device.

[0007] A further improvement of the present invention is that: a liquid level control device is provided in the first separator, the second separator and the third separator respectively, and the liquid level control device is used to control the liquid level in the first separator, the second separator and the third separator.

[0008] A further improvement of the present invention is that: the multi-stage membrane separation device includes a primary membrane separation device and a secondary membrane separation device, the permeate gas of the primary membrane separation device is connected to the inlet of the first nitrogen compressor, the outlet of the first nitrogen compressor is connected to the external nitrogen tank, the permeate gas of the primary membrane separation device is connected to the primary permeate gas compressor, and the outlet of the primary permeate gas compressor is connected to the secondary membrane separation device. The residual gas from the secondary membrane separation unit is connected to the primary membrane separation unit, the permeate gas from the secondary membrane separation unit is connected to the secondary permeate gas compressor, and the outlet of the secondary permeate gas compressor is connected to the filter.

[0009] A further improvement of the present invention is that: there are a total of five pressure swing adsorption (PSA) branches, and a desorption gas buffer tank is also included; a first helium shut-off valve is provided between the filter and the first PSA tower; a second helium shut-off valve is provided between the filter and the second PSA tower; a third helium shut-off valve is provided between the filter and the third PSA tower; a fourth helium shut-off valve is provided between the filter and the fourth PSA tower; a fifth helium shut-off valve is provided between the filter and the fifth PSA tower; the inlet of the desorption gas buffer tank is connected to the inlets of the first, second, third, fourth, and fifth PSA towers respectively; an eleventh shut-off valve is provided between the first PSA tower and pipeline a; a twelfth shut-off valve is provided between the second PSA tower and pipeline a; a thirteenth shut-off valve is provided between the third PSA tower and pipeline a; a fourteenth shut-off valve is provided between the fourth PSA tower and pipeline a; and a fifteenth shut-off valve is provided between the fifth PSA tower and pipeline a. A sixteenth shut-off valve is provided between the first pressure swing adsorption tower and pipeline b; a seventeenth shut-off valve is provided between the second pressure swing adsorption tower and pipeline b; an eighteenth shut-off valve is provided between the third pressure swing adsorption tower and pipeline b; a nineteenth shut-off valve is provided between the fourth pressure swing adsorption tower and pipeline b; and a twentieth shut-off valve is provided between the fifth pressure swing adsorption tower and pipeline b. A second shut-off valve is provided between the first pressure swing adsorption tower and pipeline c; a second shut-off valve is provided between the second pressure swing adsorption tower and pipeline c; a second shut-off valve is provided between the third pressure swing adsorption tower and pipeline c; a second shut-off valve is provided between the fourth pressure swing adsorption tower and pipeline c; and a second shut-off valve is provided between the fifth pressure swing adsorption tower and pipeline c. A second sixth shut-off valve is provided between the first pressure swing adsorption tower and pipeline d; a second seventh shut-off valve is provided between the second pressure swing adsorption tower and pipeline d; a second eighth shut-off valve is provided between the third pressure swing adsorption tower and pipeline d; a second ninth shut-off valve is provided between the fourth pressure swing adsorption tower and pipeline d; and a thirtieth shut-off valve is provided between the fifth pressure swing adsorption tower and pipeline d.

[0010] A further improvement of the present invention is that: a sixth helium shut-off valve is provided between the inlet of the desorption gas buffer tank and the inlet of the first pressure swing adsorption tower; a seventh helium shut-off valve is provided between the inlet of the desorption gas buffer tank and the inlet of the second pressure swing adsorption tower; an eighth helium shut-off valve is provided between the inlet of the desorption gas buffer tank and the inlet of the third pressure swing adsorption tower; a ninth helium shut-off valve is provided between the inlet of the desorption gas buffer tank and the inlet of the fourth pressure swing adsorption tower; and a tenth helium shut-off valve is provided between the inlet of the desorption gas buffer tank and the inlet of the fifth pressure swing adsorption tower. The desorption gas buffer tank is connected to the first sewage discharge port through a first pressure regulating valve and a first shut-off valve connected in parallel. The desorption gas buffer tank is connected to the inlet of the first-stage permeate compressor in sequence through a second pressure regulating valve and a shut-off valve.

[0011] A further improvement of the present invention is that: the pipeline b is connected to the discharge tank through a regulating valve group, the pipeline b is connected to the discharge tank through a fifth pressure regulating valve, and the discharge tank is connected to the first sewage discharge port through a third shut-off valve and a sixth pressure regulating valve connected in parallel; Pipeline c is connected to the third pressure regulating valve via a third shut-off valve, pipeline d is connected to the third pressure regulating valve, the third pressure regulating valve is connected to the helium buffer tank, the helium buffer tank outputs unqualified helium and high-purity helium respectively; the helium buffer tank is connected to the first sewage discharge port via a second shut-off valve and a fourth pressure regulating valve connected in parallel.

[0012] A further improvement of the present invention is that the crude helium in the crude helium tank has a pressure of 2MPa~3MPa, a temperature of 33℃~43℃, a hydrogen content of 1% (mol)~8% (mol), a nitrogen content of 60% (mol)~80% (mol), and a helium content of 10% (mol)~30% (mol).

[0013] A further improvement of the present invention is that the pressure in the first reactor, the second reactor, and the third reactor is all 2MPa~3MPa, and the temperature is all less than or equal to 180℃.

[0014] Secondly, a method for separating and purifying helium includes the following steps: The crude helium gas supplied from the crude helium gas tank and the compressed air supplied from the air compressor are mixed and then enter several reaction branches. The gas coming out of the several reaction branches enters the dehydration device for dehydration. After dehydration, the gas enters a multi-stage membrane separation unit for pressurization and then passes through a filter before entering several pressure swing adsorption branches. High-purity helium gas is obtained and exported through the pressure swing adsorption branch during the adsorption process. After adsorption is complete, the pressure swing adsorption branch enters the depressurization process. The gas is released along the adsorption direction into the release tank. After the pressure is regulated by the regulating valve group, it is used as backflush gas in the flushing process for cleaning.

[0015] Compared with the prior art, the present invention has at least the following beneficial effects: 1. This invention combines multi-stage catalytic oxidation dehydrogenation, multi-stage membrane separation concentration and pressure swing adsorption purification, which can purify crude helium gas with a concentration of more than 10% from natural gas helium extraction devices to 99.999% under normal temperature conditions, meeting the domestic industrial helium demand, and the helium purity is high.

[0016] 2. This invention simplifies the crude helium purification process, mitigates operating conditions, and reduces investment and operating costs for helium extraction equipment. 3. The reactor used in this invention is a multi-stage dehydrogenation reactor with low pressure and high dehydrogenation efficiency, which effectively avoids exothermic runaway reactions of high-content hydrogen gas and has a wide range of applications. Attached Figure Description

[0017] The accompanying drawings, which form part of this specification, are used to provide a further understanding of the invention. The illustrative embodiments of the invention and their descriptions are used to explain the invention and do not constitute an undue limitation of the invention. In the drawings: Figure 1 This is a block diagram of the overall structure of a helium separation and purification system according to the present invention.

[0018] In the diagram: 1. Air compressor; 2. Crude helium tank; 3. First system circulating water; 4. Substandard helium; 5. High-purity helium; 6. First wastewater discharge outlet; 7. First air controller; 8. First compressed air regulating valve; 9. First compressed air shut-off valve; 10. First heater; 11. First reactor; 12. Second air controller; 13. Second compressed air regulating valve; 14. Second compressed air shut-off valve; 15. Second heater; 16. Second reactor; 17. Third air controller; 18. Third compressed air regulating valve; 19. Third compressed air shut-off valve; 20. Third heater; 21. Third reactor; 22. Hydrogen and oxygen detector; 23. Dehydration device; 24. Third wastewater discharge outlet; 25. First... 26. Water cooler; 27. Second water cooler; 28. Third water cooler; 29. ​​First circulating water in the system; 30. First separator; 31. First level controller; 32. First level regulating valve; 33. Second level controller; 34. Second level regulating valve; 35. Third separator; 36. Third level controller; 37. Third level regulating valve; 38. Second wastewater discharge outlet; 39. First-stage membrane separator; 40. First nitrogen compressor; 41. External nitrogen tank; 42. Second circulating water in the system; 43. Second circulating water in the system; 44. First-stage permeate compressor; 45. Third circulating water in the system; 46. Third circulating water in the system; 47. Second-stage membrane separator; 48. Second-stage permeate compressor; 49. Fourth system circulating water; 50. Fourth return system circulating water; 51. Filter; 52. Forward discharge tank; 53. Fifth helium shut-off valve; 54. Tenth helium shut-off valve; 55. Fourth helium shut-off valve; 56. Ninth helium shut-off valve; 57. Third helium shut-off valve; 58. Eighth helium shut-off valve; 59. Second helium shut-off valve; 60. Seventh helium shut-off valve; 61. First helium shut-off valve; 62. Sixth helium shut-off valve; 63. Desorption gas buffer tank; 64. First pressure regulating valve; 65. First shut-off valve; 66. Second pressure regulating valve; 67. Shut-off valve; 68. First pressure swing adsorption tower; 69. Second pressure swing adsorption tower; 70. Third pressure swing adsorption tower; 71. Fourth pressure swing adsorption tower; 72. Fifth pressure swing adsorption tower; 73. Fifteenth shut-off valve; 74. Fourteenth shut-off valve; 75. Thirteenth shut-off valve; 76. Twelfth shut-off valve; 77. Eleventh shut-off valve; 78. Sixteenth shut-off valve; 79. Seventeenth shut-off valve; 80. Eighteenth shut-off valve; 81. Nineteenth shut-off valve; 82. Twentieth shut-off valve; 83. Twenty-fifth shut-off valve; 84. Twenty-fourth shut-off valve; 85. Twenty-third shut-off valve; 86. Twenty-second shut-off valve; 87. Twenty-first shut-off valve; 88. Thirtieth shut-off valve; 89. Twenty-ninth shut-off valve; 90. Twenty-eighth shut-off valve; 91. Twenty-seventh shut-off valve; 92. Twenty-sixth shut-off valve; 93. Twenty-first shut-off valve; 94. Third pressure regulating valve; 95. Helium buffer tank; 96. Second shut-off valve; 97. Fourth pressure regulating valve;98. Fifth pressure regulating valve; 99. Regulating valve assembly; 100. Third shut-off valve; 101. Sixth pressure regulating valve. Detailed Implementation

[0019] The present invention will now be described in detail with reference to the accompanying drawings and embodiments. It should be noted that, unless otherwise specified, the embodiments and features described herein can be combined with each other.

[0020] The following detailed description is exemplary and intended to provide further detailed explanation of the invention. Unless otherwise specified, all technical terms used in this invention have the same meaning as commonly understood by one of ordinary skill in the art. The terminology used in this invention is for describing particular embodiments only and is not intended to limit the scope of exemplary embodiments according to the invention.

[0021] Example 1 A helium separation and purification system, such as Figure 1 As shown, the system includes an air compressor 1 and a crude helium tank 2. The air compressor 1 outputs compressed air to several reaction branches, which are connected in series. The inlet of the first reaction branch is connected to the crude helium tank 2. In this embodiment, there are three reaction branches, including a first air controller 7, a second air controller 12, a third air controller 17, a first compressed air regulating valve 8, a second compressed air regulating valve 13, a third compressed air regulating valve 18, a first compressed air shut-off valve 9, a second compressed air shut-off valve 14, a third compressed air shut-off valve 19, a first heater 10, a second heater 15, a third heater 20, and a first reactor 11. The system includes: second reactor 16, third reactor 21, first water cooler 25, second water cooler 26, third water cooler 27, first separator 29, second separator 32, third separator 35, first liquid level controller 30, second liquid level controller 33, third liquid level controller 36, first liquid level regulating valve 31, second liquid level regulating valve 34, third liquid level regulating valve 37, second sewage discharge outlet 38, first circulating water system 28, hydrogen and oxygen detector 22, dehydration device 23, third sewage discharge outlet 24, and the air compressor 1 outlet is connected to the air inlet of the first heater 10, second heater 15, and third heater 20 respectively. The inlet of the first heater 10 is also connected to the outlet of the crude helium tank 2. A first compressed air regulating valve 8 and a first compressed air shut-off valve 9 are sequentially provided between the air compressor 1 and the first heater 10. A first air controller 7 is provided between the crude helium tank 2 and the first compressed air shut-off valve 9. The first air controller 7 is connected to the first compressed air regulating valve 8. The outlet of the first heater 10 is connected to the inlet of the first reactor 11. The product of the first reactor 11 enters the first separator 29 through the first water cooler 25. A first liquid level controller 30 is provided on the side wall of the first separator 29. The sewage outlet of the first separator 29 is connected to the second sewage discharge outlet 38 through the first liquid level regulating valve 31. The first liquid level regulating valve 31 is controlled by the first liquid level controller 30. When the liquid level needs to be adjusted, the first liquid level controller 30 controls the opening and closing of the first liquid level regulating valve 31. The product outlet of the first separator 29 is connected to the inlet of the second heater 15. A second compressed air regulating valve 13 and a second compressed air shut-off valve 14 are sequentially provided between the air compressor 1 and the second heater 15. A second air controller 12 is provided between the product outlet of the first separator 29 and the second compressed air shut-off valve 14. The second air controller 12 is connected to the second compressed air regulating valve 13. The outlet of the second heater 15 is connected to the inlet of the second reactor 16. The product of the second reactor 16 enters the second separator 32 through the second water cooler 26. A second liquid level controller 33 is provided on the side wall of the second separator 32. The sewage outlet of the second separator 32 is connected to the second sewage discharge outlet 38 through the second liquid level regulating valve 34. The second liquid level regulating valve 34 is controlled by the second liquid level controller 33. When the liquid level needs to be adjusted, the second liquid level controller 33 controls the opening and closing of the second liquid level regulating valve 34. The product outlet of the second separator 32 is connected to the inlet of the third heater 20. A third compressed air regulating valve 18 and a third compressed air shut-off valve 19 are sequentially installed between the air compressor 1 and the third heater 20. A third air controller 17 is installed between the product outlet of the second separator 32 and the third compressed air shut-off valve 19. The third air controller 17 is connected to the third compressed air regulating valve 18. The outlet of the third heater 20 is connected to the inlet of the third reactor 21. The product of the third reactor 21 enters the third separator 35 through the third water cooler 27. A third liquid level controller 36 is installed on the side wall of the third separator 35. The wastewater outlet of the third separator 35 is connected to the third liquid level regulating valve 18. 7 is connected to the second sewage discharge outlet 38. The third liquid level regulating valve 37 is controlled by the third liquid level controller 36. When the liquid level needs to be adjusted, the third liquid level controller 36 controls the opening and closing of the third liquid level regulating valve 37. The product outlet of the third separator 35 is connected to the dehydration device 23 via the hydrogen and oxygen detector 22. The sewage outlet of the dehydration device 23 is connected to the third sewage discharge outlet 24. The product outlet of the dehydration device 23 is connected to the first-stage membrane separation device 39. The first system circulating water 3 flows through the first water cooler 25, the second water cooler 26 and the third water cooler 27 and then completes the circulation through the first return system circulating water 28.

[0022] The permeate gas from the primary membrane separator 39 is connected to the inlet of the first nitrogen compressor 40. The inlet of the first nitrogen compressor 40 is connected to the second system circulating water 43. The outlet of the first nitrogen compressor 40 is connected to the second system circulating water 42. The outlet of the first nitrogen compressor 40 is connected to the external nitrogen tank 41 for nitrogen storage. The permeate gas from the primary membrane separator 39 is connected to the primary permeate gas compressor 44. The inlet of the primary permeate gas compressor 44 is connected to the third system circulating water 45. The outlet of the primary permeate gas compressor 44 is connected to the third system circulating water 45. The circulating water is connected to 46, and the outlet of the first-stage permeate compressor 44 is connected to the second-stage membrane separator 47. The permeate gas from the second-stage membrane separator 47 is connected to the first-stage membrane separator 39 through a pipeline, and the permeate gas from the second-stage membrane separator 47 is connected to the second-stage permeate compressor 48 through a pipeline. The inlet of the second-stage permeate compressor 48 is connected to the fourth system circulating water 49, and the outlet of the second-stage permeate compressor 48 is connected to the fourth system circulating water 50. The outlet of the second-stage permeate compressor 48 is connected to several parallel pressure swing adsorption branches through a filter 51.

[0023] Filter 51 is connected to the first pressure swing adsorption (PSA) tower 68, the second PSA tower 69, the third PSA tower 70, the fourth PSA tower 71, and the fifth PSA tower 72, respectively. A first helium shut-off valve 61 is provided between filter 51 and the first PSA tower 68; a second helium shut-off valve 59 is provided between filter 51 and the second PSA tower 69; a third helium shut-off valve 57 is provided between filter 51 and the third PSA tower 70; and a fourth helium shut-off valve 52 is provided between filter 51 and the fourth PSA tower 72. A fifth helium shut-off valve 53 is provided between the helium shut-off valve 55, the filter 51, and the fifth pressure swing adsorption tower 72. The inlet of the desorption gas buffer tank 63 is connected to the inlets of the first pressure swing adsorption tower 68, the second pressure swing adsorption tower 69, the third pressure swing adsorption tower 70, the fourth pressure swing adsorption tower 71, and the fifth pressure swing adsorption tower 72, respectively. A sixth helium shut-off valve 62 is provided between the inlet of the desorption gas buffer tank 63 and the inlet of the first pressure swing adsorption tower 68, and a sixth helium shut-off valve 62 is provided between the inlet of the desorption gas buffer tank 63 and the inlet of the second pressure swing adsorption tower 69. A seventh helium shut-off valve 60 is provided; an eighth helium shut-off valve 58 is provided between the inlet of the desorption gas buffer tank 63 and the inlet of the third pressure swing adsorption tower 70; a ninth helium shut-off valve 56 is provided between the inlet of the desorption gas buffer tank 63 and the inlet of the fourth pressure swing adsorption tower 71; and a tenth helium shut-off valve 54 is provided between the inlet of the desorption gas buffer tank 63 and the inlet of the fifth pressure swing adsorption tower 72. The first sewage discharge port 6 is connected to the desorption gas buffer tank 63 through a first pressure regulating valve 64 and a first shut-off valve 65 connected in parallel. Tank 63 is connected to the inlet of the first-stage permeate compressor 44 via the second pressure regulating valve 66 and the shut-off valve 67. The first pressure swing adsorption tower 68 is connected to pipeline a by an eleventh shut-off valve 77, the second pressure swing adsorption tower 69 is connected to pipeline a by a twelfth shut-off valve 76, the third pressure swing adsorption tower 70 is connected to pipeline a by a thirteenth shut-off valve 75, the fourth pressure swing adsorption tower 71 is connected to pipeline a by a fourteenth shut-off valve 74, and the fifth pressure swing adsorption tower 72 is connected to pipeline a by a fifteenth shut-off valve 73. A sixteenth shut-off valve 78 is provided between the first pressure swing adsorption tower 68 and pipeline b; a seventeenth shut-off valve 79 is provided between the second pressure swing adsorption tower 69 and pipeline b; an eighteenth shut-off valve 80 is provided between the third pressure swing adsorption tower 70 and pipeline b; a nineteenth shut-off valve 81 is provided between the fourth pressure swing adsorption tower 71 and pipeline b; and a twentieth shut-off valve 82 is provided between the fifth pressure swing adsorption tower 72 and pipeline b. A second shut-off valve 87 is provided between the first pressure swing adsorption tower 68 and pipeline c; a second shut-off valve 86 is provided between the second pressure swing adsorption tower 69 and pipeline c; a second shut-off valve 85 is provided between the third pressure swing adsorption tower 70 and pipeline c; a second shut-off valve 84 is provided between the fourth pressure swing adsorption tower 71 and pipeline c; and a second shut-off valve 83 is provided between the fifth pressure swing adsorption tower 72 and pipeline c. A second sixth shut-off valve 92 is provided between the first pressure swing adsorption tower 68 and pipeline d; a second seventh shut-off valve 91 is provided between the second pressure swing adsorption tower 69 and pipeline d; a second eighth shut-off valve 90 is provided between the third pressure swing adsorption tower 70 and pipeline d; a second ninth shut-off valve 89 is provided between the fourth pressure swing adsorption tower 71 and pipeline d; and a thirtieth shut-off valve 88 is provided between the fifth pressure swing adsorption tower 72 and pipeline d. Pipeline b is connected to the discharge tank 52 via regulating valve group 99. Pipeline b is connected to the discharge tank 52 via the fifth pressure regulating valve 98. The discharge tank 52 is connected to the first sewage discharge port 6 via the third shut-off valve 100 and the sixth pressure regulating valve 101 connected in parallel. Pipeline c is connected to the third pressure regulating valve 94 via the third shut-off valve 93, pipeline d is connected to the third pressure regulating valve 94, the third pressure regulating valve 94 is connected to the helium buffer tank 95, the helium buffer tank 95 outputs unqualified helium 4 and high-purity helium 5 respectively; the helium buffer tank 95 is connected to the first sewage discharge port 6 via the second shut-off valve 96 and the fourth pressure regulating valve 97 connected in parallel.

[0024] The crude helium in crude helium tank 2 has a pressure of 2MPa~3MPa, a temperature of 33℃~43℃, a hydrogen content of 1% (mol)~8% (mol), a nitrogen content of 60% (mol)~80% (mol), and a helium content of 10% (mol)~30% (mol).

[0025] The pressure in the first reactor 11, the second reactor 16, and the third reactor 21 is 2MPa~3MPa, and the temperature is less than or equal to 180℃.

[0026] The top gas phase pressure of the dehydration device 23 is 2MPa~3MPa, the temperature is 35℃~45℃, the helium content is 10% (mol)~20% (mol), the nitrogen content is 70% (mol)~90% (mol), the argon content is 0.10% (mol)~0.20% (mol), and the oxygen content is 0.01% (mol)~0.08% (mol).

[0027] The permeate pressure of the primary membrane separation unit 39 is 0.05MPa~0.15MPa, the temperature is 35℃~45℃, the helium content is 40% (mol)~50% (mol), the nitrogen content is 50% (mol)~60% (mol), the hydrogen content is 0.01% (mol)~0.09% (mol), the argon content is 0.20% (mol)~0.30% (mol), and the oxygen content is 0.01% (mol)~0.08% (mol).

[0028] The permeate pressure of the secondary membrane separation unit 47 is 2MPa~4MPa, the temperature is 35℃~45℃, the helium content is 10% (mol)~20% (mol), the nitrogen content is 75% (mol)~80% (mol), the hydrogen content is 0.01% (mol)~0.09% (mol), the argon content is 0.1% (mol)~0.8% (mol), and the oxygen content is 0.01% (mol)~0.09% (mol).

[0029] The permeate pressure of the secondary membrane separation unit 47 is 0.05MPa~0.15MPa, the temperature is 35℃~45℃, the helium content is 90% (mol)~99% (mol), the nitrogen content is 2.5% (mol)~3.5% (mol), the hydrogen content is 0.20% (mol)~0.30% (mol), the argon content is 0.1% (mol)~0.7% (mol), and the oxygen content is 0.05% (mol)~0.10% (mol).

[0030] The permeate gas from the secondary membrane separation unit 47 is pressurized by the secondary permeate gas compressor 48 and then enters the pressure swing adsorption unit filter 51.

[0031] The first pressure swing adsorption tower 68, the second pressure swing adsorption tower 69, the third pressure swing adsorption tower 70, the fourth pressure swing adsorption tower 71, and the fifth pressure swing adsorption tower 72 have a pressure of 1.0 MPa to 2.0 MPa, a temperature of 35℃ to 45℃, a helium content of 99.999% (mol), and an argon content of 0.01% (mol).

[0032] The desorption gas pressure at the outlet of the desorption buffer tank 63 is 0.05MPa~0.15MPa, the temperature is 35℃~45℃, the helium content is 80% (mol)~90% (mol), the nitrogen content is 2% (mol)~8% (mol), the argon content is 0.1% (mol)~0.9% (mol), and the oxygen content is 0.1% (mol)~0.9% (mol).

[0033] Example 2 A method for separating and purifying helium includes the following steps: S1. The crude helium gas (35℃~40℃, 2MPa~3MPa) provided in the crude helium gas tank 2 and the compressed air (35℃~40℃, 2.5MPa~3.5MPa) provided in the air compressor 1 are mixed and then fed into the first reactor 11, the second reactor 16 and the third reactor 21. The gas coming out of the first reactor 11, the second reactor 16 and the third reactor 21 is cooled to 40℃ by the first water cooler 25, the second water cooler 26 and the third water cooler 27 and then fed into the first separator 29, the second separator 32 and the third separator 35 to separate the liquid and then enter the dehydration device 23 for dehydration.

[0034] S2. The dehydrated gas enters the primary membrane separation unit 39. The residual gas in the primary membrane separation unit 39 is pressurized by the first nitrogen compressor 40 and then discharged. The permeate gas in the primary membrane separation unit 39 enters the primary permeate compressor 44 for pressurization and then enters the secondary membrane separation unit 47. S3. The residual gas in the secondary membrane separation unit 47 enters the primary membrane separation unit 39. The permeate gas in the secondary membrane separation unit 47 is pressurized by the secondary permeate gas compressor 48 and then enters several pressure swing adsorption branches through the filter 51. S4. During the adsorption process, high-purity helium gas at 35℃~45℃ and 1.0MPa~2.0MPa at the top of the pressure swing adsorption tower in the pressure swing adsorption branch enters the helium buffer tank and is then transported out.

[0035] S5. During the pressure reduction process of the pressure swing adsorption tower in the pressure swing adsorption branch, the gas released along the adsorption direction enters the release tank 52, and after being regulated by the regulating valve group 99, it is used as backflush gas in the flushing process. S6. During the reverse purging process, the desorbed gas at the bottom of the pressure swing adsorption tower is transported to the inlet of the first-stage permeate compressor 44 after passing through the desorbed gas buffer tank.

[0036] The first reactor 11, the second reactor 16, and the third reactor 21 are multi-stage dehydrogenation reactors with low pressure, high dehydrogenation efficiency, and effective avoidance of exothermic runaway reactions with high hydrogen content, making them widely adaptable.

[0037] The membrane separation unit uses a two-stage membrane separation device to concentrate helium to 96%, which has high concentration efficiency; Pressure swing adsorption (PSA) uses high-capacity adsorbents to purify helium to 99.999%, resulting in high purification efficiency and low operating costs.

[0038] As is known from common technical knowledge, this invention can be implemented through other embodiments that do not depart from its spirit or essential characteristics. Therefore, the disclosed embodiments described above are merely illustrative in all respects and are not the only ones. All modifications within the scope of this invention or its equivalents are included in this invention.

[0039] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A helium separation and purification system, characterized in that, The system includes an air compressor (1), a crude helium tank (2), three reaction branches connected in series, a dehydration device (23), a multi-stage membrane separation device, a filter (51), five parallel pressure swing adsorption branches, a desorption gas buffer tank (63), a forward discharge tank (52), a helium buffer tank (95), and pipelines a, b, c, and d; the crude helium in the crude helium tank (2) has a pressure of 2 MPa to 3 MPa, a temperature of 33°C to 43°C, a hydrogen molar content of 1% to 8%, a nitrogen molar content of 60% to 80%, and a helium molar content of 10% to 30%; The outlet of the crude helium tank (2) is connected to the inlet of the first heater (10), and the outlet of the air compressor (1) is connected to the inlets of the first heater (10), the second heater (15), and the third heater (20), respectively. The outlet of the first heater (10) is connected to the inlet of the first reactor (11), and the outlet of the first reactor (11) is connected to the first separator (29) via the first water cooler (25). The product outlet of the first separator (29) is connected to the inlet of the second heater (15). The outlet of the second heater (15) is connected to the inlet of the second reactor (16), and the outlet of the second reactor (16) is connected to the second separator (32) via the second water cooler (26). The product outlet of the second separator (32) is connected to the inlet of the third heater (20); the outlet of the third heater (20) is connected to the inlet of the third reactor (21); the outlet of the third reactor (21) is connected to the third separator (35) via the third water cooler (27); the product outlet of the third separator (35) is connected to the dehydration device (23) via the hydrogen and oxygen detector (22); the wastewater outlets of the first separator (29), the second separator (32), and the third separator (35) are all connected to the second wastewater discharge outlet (38); the pressure in the first reactor (11), the second reactor (16), and the third reactor (21) is 2MPa to 3MPa, and the temperature is less than or equal to 180℃. A first compressed air regulating valve (8) and a first compressed air shut-off valve (9) are sequentially provided between the air compressor (1) and the first heater (10); a second compressed air regulating valve (13) and a second compressed air shut-off valve (14) are sequentially provided between the air compressor (1) and the second heater (15); a third compressed air regulating valve (18) and a third compressed air shut-off valve (19) are sequentially provided between the air compressor (1) and the third heater (20); a first air controller (7) is provided between the crude helium tank (2) and the first compressed air shut-off valve (9); a second air controller (12) is provided between the product outlet of the first separator (29) and the second compressed air shut-off valve (14); a third air controller (17) is provided between the product outlet of the second separator (32) and the third compressed air shut-off valve (19); the first air controller (7), the second air controller (12), and the third air controller (17) are respectively connected to the first compressed air regulating valve (8), the second compressed air regulating valve (13), and the third compressed air regulating valve (18); The multi-stage membrane separation device includes a primary membrane separation device (39) and a secondary membrane separation device (47). The product outlet of the dehydration device (23) is connected to the air inlet of the primary membrane separation device (39). The permeate outlet of the primary membrane separation device (39) is connected to the air inlet of the first nitrogen compressor (40). The air outlet of the first nitrogen compressor (40) is connected to the external nitrogen tank (41). The permeate outlet of the primary membrane separation device (39) is connected to the air inlet of the primary permeate compressor (44). The outlet of the primary permeate compressor (44) is connected to the air inlet of the secondary membrane separation device (47). The permeate outlet of the secondary membrane separation device (47) is connected to the air inlet of the primary membrane separation device (39). The permeate outlet of the secondary membrane separation device (47) is connected to the air inlet of the secondary permeate compressor (48). The outlet of the secondary permeate compressor (48) is connected to the filter (51). The dehydration device (23) outputs a gas pressure of 2MPa to 3MPa, a helium molar content of 10% to 20%, and a temperature of 35℃ to 45℃; the primary membrane separation device (39) outputs a permeate gas pressure of 0.05MPa to 0.15MPa, a helium molar content of 40% to 50%, and a temperature of 35℃ to 45℃; the secondary membrane separation device (47) outputs a residual permeate gas pressure of 2MPa to 4MPa, a helium molar content of 10% to 20%, and a temperature of 35℃ to 45℃; the desorption gas buffer tank (63) outlet has a desorption gas pressure of 0.05MPa to 0.15MPa, a helium molar content of 80% to 90%, and a temperature of 35℃ to 45℃. The five pressure swing adsorption (PSA) branches include a first PSA tower (68), a second PSA tower (69), a third PSA tower (70), a fourth PSA tower (71), and a fifth PSA tower (72). The filter (51) is connected to the inlet of each of the five PSA towers, and the inlet of each of the five PSA towers is connected to the inlet of the desorption gas buffer tank (63). The outlets of the first PSA tower (68) to the fifth PSA tower (72) are respectively connected to the eleventh shut-off valve (77), the twelfth shut-off valve (76), the thirteenth shut-off valve (75), the fourteenth shut-off valve (74), and the fifteenth shut-off valve (75). 73) Connected to pipeline a, and connected to pipeline b through the corresponding sixteenth shut-off valve (78), seventeenth shut-off valve (79), eighteenth shut-off valve (80), nineteenth shut-off valve (81) and twentieth shut-off valve (82), respectively. Connected to pipeline c through the corresponding second first shut-off valve (87), second second shut-off valve (86), second third shut-off valve (85), second fourth shut-off valve (84) and second fifth shut-off valve (83), respectively. Connected to pipeline d through the corresponding second sixth shut-off valve (92), second seventh shut-off valve (91), second eighth shut-off valve (90), second ninth shut-off valve (89) and thirtieth shut-off valve (88), respectively. The pipeline b is connected to the feed tank (52) via the regulating valve group (99) and the feed tank (52) via the fifth pressure regulating valve (98); the pipeline c is connected to the third pressure regulating valve (94) via the third shut-off valve (93); the pipeline d is connected to the third pressure regulating valve (94); the third pressure regulating valve (94) is connected to the helium buffer tank (95); the helium buffer tank (95) is provided with output channels for unqualified helium (4) and high-purity helium (5); The forward discharge tank (52) is used to receive the forward discharge gas discharged along the adsorption direction during the pressure reduction process of the pressure swing adsorption tower, and the forward discharge gas is used as the backflush gas in the flushing process after being regulated by the regulating valve group (99); the desorption gas buffer tank (63) is used to receive the desorption gas discharged from the bottom of the tower during the reverse discharge flushing process of the pressure swing adsorption tower. The outlet of the desorption gas buffer tank (63) is connected to the inlet of the first-stage permeate compressor (44) through the second pressure regulating valve (66) and the shut-off valve (67) in sequence, so that the desorption gas and the permeate gas of the first-stage membrane separation device (39) are combined and then pressurized by the first-stage permeate compressor (44) before entering the second-stage membrane separation device (47).

2. The helium separation and purification system of claim 1, wherein, The first separator (29), the second separator (32) and the third separator (35) are respectively equipped with liquid level control devices, which are used to control the liquid level in the first separator (29), the second separator (32) and the third separator (35).

3. The helium separation and purification system of claim 1, wherein, A sixth helium shut-off valve (62) is provided between the inlet of the desorption gas buffer tank (63) and the inlet of the first pressure swing adsorption tower (68). A seventh helium shut-off valve (60) is provided between the inlet of the desorption gas buffer tank (63) and the inlet of the second pressure swing adsorption tower (69). An eighth helium shut-off valve (58) is provided between the inlet of the desorption gas buffer tank (63) and the inlet of the third pressure swing adsorption tower (70). A ninth helium shut-off valve (56) is provided between the inlet of the desorption gas buffer tank (63) and the inlet of the fourth pressure swing adsorption tower (71). A tenth helium shut-off valve (54) is provided between the inlet of the desorption gas buffer tank (63) and the inlet of the fifth pressure swing adsorption tower (72). The desorption gas buffer tank (63) is connected to the first sewage discharge port (6) through a first pressure regulating valve (64) and a first shut-off valve (65) connected in parallel.

4. The helium separation and purification system of claim 1, wherein, The discharge tank (52) is connected to the first sewage discharge port (6) via a third shut-off valve (100) and a sixth pressure regulating valve (101) connected in parallel; The helium buffer tank (95) is connected to the first sewage discharge port (6) via a second shut-off valve (96) and a fourth pressure regulating valve (97) connected in parallel.

5. A helium separation and purification method, realized based on the helium separation and purification system of claim 1, characterized in that, Includes the following steps: The crude helium gas supplied by the crude helium tank (2) is mixed with the compressed air supplied by the air compressor (1), and enters the first reactor (11) through the first heater (10). After the reaction, the gas is cooled by the first water cooler (25) and separated into liquid by the first separator (29). It is then mixed with the supplemented compressed air and enters the second reactor (16) through the second heater (15). The gas discharged from the second reactor (16) is cooled by the second water cooler (26) and separated into liquid by the second separator (32). It is then mixed with the supplemented compressed air and enters the third reactor (21) through the third heater (20). The gas discharged from the third reactor (21) is cooled by the third water cooler (27) and separated into liquid by the third separator (35). It then enters the dehydration device (23) through the hydrogen and oxygen detector (22) for dehydration. The pressure in each reactor is 2MPa to 3MPa, and the temperature is less than or equal to 180°C. Each water cooler cools the gas discharged from the corresponding reactor to 40°C. The dehydrated gas is sent to the first-stage membrane separation unit (39), and its residual gas is pressurized by the first nitrogen compressor (40) and then sent to the external nitrogen tank (41). The permeate gas with a pressure of 0.05MPa to 0.15MPa and a helium molar content of 40% to 50% is sent to the first-stage permeate compressor (44), and after pressurization, it is sent to the second-stage membrane separation unit (47). The permeate gas output from the secondary membrane separation unit (47) with a pressure of 2MPa to 4MPa and a helium molar content of 10% to 20% is returned to the inlet of the primary membrane separation unit (39). The permeate gas from the secondary membrane separation unit (47) is pressurized by the secondary permeate gas compressor (48) and then sent to the pressure swing adsorption branch through the filter (51). During the adsorption process, high-purity helium gas with a top temperature of 35℃~45℃ and a pressure of 1.0MPa~2.0MPa at the top of the pressure swing adsorption tower is sent into the helium buffer tank (95) and then transported out. During the pressure reduction process of the pressure swing adsorption tower, the outflow gas discharged along the adsorption direction is sent into the outflow tank (52), and after being regulated by the regulating valve group (99), it is used as the backflush gas in the flushing process. During the reverse flushing process of the pressure swing adsorption tower, the desorbed gas discharged from the bottom of the tower is sent to the desorbed gas buffer tank (63). The desorbed gas with an outlet pressure of 0.05MPa to 0.15MPa, a temperature of 35℃ to 45℃, and a helium molar content of 80% to 90% is successively sent to the inlet of the first-stage permeate compressor (44) through the second pressure regulating valve (66) and the shut-off valve (67), where it is combined with the permeate gas of the first-stage membrane separation device (39), pressurized, and sent to the second-stage membrane separation device (47).

Citation Information

Patent Citations

  • Device and method for extracting helium gas from hydrogen-containing crude helium

    CN110844893A

  • Multi-tower pressure swing adsorption testing device and pressure swing adsorption method

    CN111558279A

  • System for purifying helium from natural gas liquefied helium-containing tail gas

    CN210237128U