A seamless butt casting system for assembled bridge construction

By confirming the pouring amount of each pouring channel and adjusting the grouting parameters in the prefabricated bridge, the problem of unsaturated grout caused by uneven grouting channels is solved and the bridge quality and construction efficiency are ensured.

CN118241564BActive Publication Date: 2024-10-18GUANGZHOU NO 2 MUNICIPAL ENG CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410502448.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2024-10-18
Estimated Expiration
2044-04-25

AI Technical Summary

Technical Problem

During the grouting process of prefabricated bridges, due to the unevenness of the grouting channels, the grouting slurry in some areas is not full, which affects the quality of the bridge.

Method used

Determine the integrated model by correlating the model matching end, confirm the pouring amount of each pouring channel, calibrate the abnormal channels, and adjust the grouting parameters through the control unit to ensure that the pouring of each channel is full, including determining the pouring amount to be increased or decreased, and The grouting time is adjusted according to the area difference between the grouting port and the grouting port.

Benefits of technology

The uniformity of the pouring amount of each pouring channel is achieved, ensuring that the internal channels of the bridge are fully poured, and the accuracy of the bridge quality assessment and construction efficiency are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118241564B_ABST
    Figure CN118241564B_ABST
Patent Text Reader

Abstract

The present invention discloses a seamless butt casting system for prefabricated bridge construction, which relates to the technical field of prefabricated bridges and solves the problem that some grouting channels have too many or too few grouting channels, resulting in incomplete grouting slurry in some areas. The present invention identifies whether there are abnormal casting channels by confirming the specific casting amount of each casting channel, and then determines the casting amount of the channel corresponding to the abnormal casting channel. Based on the determined relevant numerical values, it is determined whether relevant increments will be generated in the subsequent casting process. Based on the corresponding numerical value analysis and secondary confirmation, the channels inside the butted assembly parts can be cast full, the casting effect is determined, and the overall butt joint effect between different assembly parts is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of assembled bridges, in particular to a seamless butt casting system for assembled bridge buildings. Background Art

[0002] For prefabricated bridges, the whole-span beam is first prefabricated in a bridge prefabrication factory or prefabrication yard into transverse pieces (or the entire span) or longitudinal sections. After the products pass the test, they are transported to the bridge site and installed in place.

[0003] The application with publication number CN111411592A discloses a seamless butt casting system for assembled bridge construction, which belongs to the technical field of bridge construction. The present invention comprises a vehicle body, a casting mechanism and a clamping mechanism, wherein the casting mechanism is arranged on the vehicle body and is used to cast concrete into the expansion joint of the bridge; the clamping mechanism is arranged at the front end of the vehicle body and is used to clamp the two ends of the expansion joint of the bridge, so as to facilitate the subsequent concrete casting. The whole operation process is simple and convenient, and no manual blocking is required, which greatly improves the work efficiency of the whole construction.

[0004] During the assembly and pouring process of the prefabricated bridge, the grouting port is grouted based on the corresponding grouting equipment. When part of the slurry overflows from the outlet, the grouting process is no longer carried out, which means that the grouting channel has completed the overall grouting process. However, with the original grouting method, some grouting channels have too much or too little grouting, which will affect the interconnecting channels they pass through. In the actual grouting process, the grouting slurry in some areas is not full, resulting in some problems with the quality of the prefabricated bridge. Summary of the invention

[0005] In view of the deficiencies in the prior art, the present invention provides a seamless butt casting system for prefabricated bridge construction, which solves the problem that there are too many or too few grouting channels in some areas, resulting in insufficient grouting slurry in some areas.

[0006] To achieve the above objectives, the present invention is implemented through the following technical solutions: a seamless butt casting system for assembled bridge construction, comprising:

[0007] At the associative model matching end, based on the butted casting object, the operator selects the object model of the same type from the database, and synchronously butts the two sets of object models to determine the integrated model according to the butt joint method of the butt joint casting object;

[0008] The pouring quantity confirmation end confirms the pouring quantity of different pouring channels of a single butt pouring object. According to the numerical changes between different pouring quantities, it is evaluated whether there is an abnormal pouring channel. If so, the abnormal pouring channel is marked in the integrated model. The specific method is as follows:

[0009] The pouring volume of different pouring channels is calibrated as JZi , where i represents different casting channels;

[0010] Set several groups of pouring volume JZ i Perform mean processing to determine the undetermined mean Dz, which will satisfy: |JZ i -Dz|>Y1 pouring volume is calibrated as abnormal volume, where Y1 is the preset value. If it is not satisfied, no calibration is performed;

[0011] The pouring channel corresponding to the abnormal amount is marked as the abnormal pouring channel, and JZ i >The abnormal pouring channel of Dz is marked as the abnormal pouring channel exceeding the standard;

[0012] JZ i The abnormal pouring channel with a value less than Dz is calibrated as a low-standard abnormal pouring channel, and the calibrated abnormal pouring channel is synchronously calibrated into the integrated model;

[0013] The pouring value confirmation center determines whether the connected pouring object is fully poured based on the integrated model and the corresponding pouring process, and generates the pouring values ​​of some pouring channels based on the confirmation results, and displays them through the control unit. The specific methods include:

[0014] Based on the abnormal pouring channels that exceed the standard or the abnormal pouring channels that are below the standard determined in the integrated model:

[0015] For the abnormal pouring channel that exceeds the standard, determine the related channel that is connected with the current channel and is in another docking object from the integrated model, and mark the related channel as the pouring channel to be reduced;

[0016] For the abnormal low-standard pouring channel, determine the related channel that is connected with the current channel and is located in another docking object from the integrated model, and mark the related channel as the pouring channel to be added;

[0017] Prioritize pouring of other pouring channels that have not been calibrated in another docking object in the integrated model, and record their pouring volume L k , where k represents different other pouring channels, and several groups of pouring volumes L k Perform random arrangement to determine the arrangement set, and then arrange the adjacent pouring amounts L in the arrangement set from front to back. k Perform difference processing, calibrate the corresponding values ​​of the difference values ​​that belong to the preset interval as similar values, calibrate the corresponding values ​​of the difference values ​​that do not belong to the preset interval as other values, perform mean processing on the confirmed groups of similar values, and determine the standard pouring volume Bz, where the endpoint values ​​of the preset interval are all preset values;

[0018] Then cast the pouring channel to be reduced or the pouring channel to be increased, and calibrate the pouring volume generated by the pouring channel to be reduced as: JJ1, and calibrate the pouring volume generated by the pouring channel to be increased as JJ2:

[0019] Determine whether JJ1 satisfies: JJ1 ≥ Bz-|JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL = JJ1-(Bz-|JZ i -Dz|);

[0020] Determine whether JJ2 satisfies: JJ2 ≥ Bz + | JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL = JJ2-(Bz+|JZ i -Dz|);

[0021] and transmitting the determined increment to be added to the control unit;

[0022] The control unit determines the secondary grouting parameters based on the corresponding increment ZL generated by the corresponding pouring channel and the area difference between the grouting port and the grouting outlet, and displays them in the following ways:

[0023] Based on the area difference Mc between the grouting port and the grouting port, the flow difference Lc is determined, where Lc = Mc × C1, where C1 is a preset fixed coefficient factor;

[0024] Using ZL÷Lc=T, the secondary grouting time T of this casting channel is determined, and the determined secondary grouting time T is displayed. Based on the displayed T, external personnel adjust the grouting rate of the grouting equipment to the maximum and grout the casting channel for a grouting time of T.

[0025] Preferably, the object models are restored in a one-to-one ratio with the butt-cast objects, and the object models are constructed in advance by the operator. Since there are two groups of butt-cast objects, the selected object models are also two groups.

[0026] Preferably, it also includes:

[0027] The signal evaluation center, based on the penetration plug inside the butt-jointed casting object, marks the through channels as the same type of channels, and confirms the overall casting volume of the same type of channels based on multiple casting processes, and identifies the overall casting quality of the butt-jointed casting object based on the overall casting volume of different same type of channels; the specific methods include:

[0028] The different overall pouring volumes of the same channel belonging to different insertion plugs are calibrated as GH q, where q represents different channels of the same type, and q=1, 2, ..., n, where n represents the total number of channels of the same type;

[0029] n groups of GH q Perform mean processing and determine the undetermined mean DJ using: Determine its evaluation value Fc, and identify whether the evaluation value Fc satisfies: Fc>Y2, where Y2 is a preset value. If so, a non-compliant signal is generated and displayed; if the evaluation value Fc does not satisfy: Fc>Y2, a compliant signal is generated and displayed.

[0030] The present invention provides a seamless butt casting system for assembled bridge construction. Compared with the prior art, it has the following beneficial effects:

[0031] The present invention identifies whether there is an abnormal pouring channel by confirming the specific pouring amount of each pouring channel, and then determines the pouring amount of the channel corresponding to the abnormal pouring channel. Based on the determined relevant values, it is determined whether a relevant increment will be generated in the subsequent pouring process. Based on the corresponding numerical analysis and secondary confirmation, the channel inside the assembly part to be connected can be poured full, the pouring effect is determined, and the overall docking effect between different assemblies is achieved.

[0032] Subsequently, the pouring volume generated by different channels during the entire pouring process is confirmed, and the confirmed values ​​are analyzed. By analyzing the degree of discreteness between the data, it is determined whether the quality meets the standards and achieve better assessment results. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 It is a schematic diagram of the principle framework of the present invention;

[0034] Figure 2 It is a schematic diagram of casting the butt joint of the present invention. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] Embodiment 1

[0037] See also Figure 1 and Figure 2, the present application provides a seamless butt casting system for prefabricated bridge construction, including a casting quantity confirmation end, a correlation model matching end, a numerical analysis processing end, a casting numerical confirmation center, a signal evaluation center and a control unit;

[0038] Among them, the associated model matching end is electrically connected to the pouring quantity confirmation end and the pouring value confirmation center input node respectively, and the pouring quantity confirmation end, the numerical analysis processing end and the pouring value confirmation center are electrically connected from the output node to the input node;

[0039] Among them, the associated model matching end is operated by the operator. Based on the butt-jointed casting object, the object model of the same type is selected from the database. The object model is restored one-to-one with the butt-jointed casting object, and the object models are all constructed in advance by the operator. Since the butt-jointed casting objects are two groups, the selected object models are also two groups. According to the butt-jointed casting object butt-jointed method, the two groups of object models are synchronously butt-jointed to determine the integrated model;

[0040] Among them, the pouring amount confirmation end confirms the pouring amount of different pouring channels of a single butt pouring object, and evaluates whether there is an abnormal pouring channel based on the numerical changes between different pouring amounts. If there is, the abnormal pouring channel is calibrated in the integrated model. When pouring, generally pour the object on one side first, and then pour the other side. The pouring mortar is injected from the grouting port. When the pouring mortar flows out from the corresponding grouting port, it means that the pouring of this pouring channel is completed, and the overall pouring amount of the corresponding pouring channel is recorded for confirmation. The overall pouring amount = injection amount - overflow amount;

[0041] Depend on Figure 2 As shown, the specific pouring process includes: placing the insertion plug used between the two pouring objects into the corresponding insertion slots of the two to complete the initial docking, and then pouring several grouting ports on one side until the mortar overflows from the grouting port, and then pouring several grouting ports on the other side based on the pouring data of the previous pouring process to ensure the overall pouring quality;

[0042] Among them, the specific methods for assessing whether there is an abnormal pouring channel are:

[0043] The pouring volume of different pouring channels is calibrated as JZ i , where i represents different casting channels;

[0044] Set several groups of pouring volume JZ i Perform mean processing to determine the undetermined mean Dz, which will satisfy: |JZ i -Dz|>Y1 pouring volume is calibrated as abnormal volume, where Y1 is a preset value, and its specific value is determined by the operator based on experience. If it is not satisfied, no calibration is performed;

[0045] The pouring channel corresponding to the abnormal amount is marked as the abnormal pouring channel, and JZ i >The abnormal pouring channel of Dz is marked as the abnormal pouring channel exceeding the standard, and JZ i The abnormal pouring channel with a value less than Dz is calibrated as a low-standard abnormal pouring channel, and the calibrated abnormal pouring channel is synchronously calibrated into the integrated model;

[0046] Specifically, during the pouring process, the pouring amount in some pouring channels is too much, and the pouring amount in some pouring channels is too little. When the pouring amount is too much, part of the pouring slurry flows from the corresponding pouring channel into the other docking object, so the specific pouring amount of the other docking object needs to be re-evaluated. When the pouring amount is too little, it is necessary to readjust the pouring amount during the pouring process of the other docking object to ensure that the entire docking object can achieve a fully full pouring effect during the pouring process.

[0047] Among them, the pouring value confirmation center determines whether the pouring object is fully poured based on the integrated model and the corresponding pouring process, and generates the increments to be poured in some pouring channels based on the confirmation results, and displays them through the control unit. The specific methods for determination include:

[0048] Based on the abnormal pouring channels that exceed the standard or the abnormal pouring channels that are below the standard determined in the integrated model:

[0049] For the abnormal pouring channel that exceeds the standard, determine the related channel that is connected with the current channel and is in another docking object from the integrated model, and mark the related channel as the pouring channel to be reduced;

[0050] For the abnormal low-standard pouring channel, determine the relevant channel that is connected with the current channel and is in another docking object from the integrated model (the two sets of connecting channels are penetrated by corresponding plugs, and based on the plugs, the relevant channels that are connected with it can be locked), and mark the relevant channel as the pouring channel to be added;

[0051] Prioritize pouring of other pouring channels that have not been calibrated in another docking object in the integrated model (that is, other related channels of the abnormal pouring channel), and record their pouring volume L k , where k represents different other pouring channels, and several groups of pouring volumes L k Perform random arrangement to determine the arrangement set, and then arrange the adjacent pouring amounts L in the arrangement set from front to back. kPerform difference processing, mark the corresponding values ​​of the difference values ​​that belong to the preset interval as the same value, mark the corresponding values ​​of the difference values ​​that do not belong to the preset interval as other values, and perform mean processing on several groups of similar values ​​confirmed to determine the standard pouring volume Bz, where the endpoint values ​​of the preset interval are all preset values, and the specific values ​​are formulated by the operator based on experience (for example: the generated permutation set is {2, 3, 2.5, 4, 3, 5}, and the preset interval is [-1, 1], where 2-3=-1, which belongs to this preset interval, then 2 and 3 belong to the same value, 3-2.5=0.5, and 2.5 also belongs to the same value. When 2.5-4=-1.5, -1.5 does not belong to this preset interval, then 4 belongs to other values, and 4-3=1, and 3 also belongs to the same value. Similarly, several groups of pouring volumes are processed to confirm the same value. The reason for confirming the same value here is to make the confirmed standard pouring volume more accurate and to ensure the accuracy of its corresponding value);

[0052] Then cast the pouring channel to be reduced or the pouring channel to be increased, and calibrate the pouring volume generated by the pouring channel to be reduced as: JJ1, and calibrate the pouring volume generated by the pouring channel to be increased as JJ2:

[0053] Determine whether JJ1 satisfies: JJ1 ≥ Bz-|JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL = JJ1-(Bz-|JZ i -Dz|);

[0054] Determine whether JJ2 satisfies: JJ2 ≥ Bz + | JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL = JJ2-(Bz+|JZ i -Dz|);

[0055] The determined increment to be added is transmitted to the control unit.

[0056] Embodiment 2

[0057] In the specific implementation process of this embodiment, compared with the above-mentioned embodiment, this embodiment mainly improves the pouring process of its corresponding docking parts to ensure that its docking parts can be poured fully;

[0058] The control unit determines the secondary grouting parameters based on the corresponding increment ZL generated by the corresponding pouring channel and the area difference between the grouting port and the grouting outlet (the grouting outlet is smaller than the grouting port), and displays them. The operator operates to complete the overall grouting process of the entire joint. The specific method for determining the secondary grouting parameters is:

[0059] Based on the area difference Mc between the grouting port and the grouting port, determine the flow difference Lc, where Lc = Mc × C1, where C1 is a preset fixed coefficient factor, and its specific value is determined by the operator based on experience;

[0060] Adopting ZL÷Lc=T, the secondary grouting time T of the casting channel is determined, and the determined secondary grouting time T is displayed. Based on the displayed T, the external personnel adjust the grouting rate of the grouting equipment to the maximum, and perform grouting on the casting channel, and the grouting time is T;

[0061] Specifically, the determined amount to be increased is the vacancy in this casting channel. Based on this vacancy, the channel needs to be grouting treated for the second time to ensure that the channel is relatively full. Therefore, based on the flow velocity difference between the grouting port and the grouting outlet, the corresponding grouting time is locked to make the casting channel full. When the power of the grouting equipment is adjusted to the maximum, the grouting port can be fully filled, thereby maximizing the grouting rate in the channel.

[0062] Embodiment 3

[0063] In the specific implementation process of this embodiment, based on the overall casting amount of different through-channels in the butt-joint casting object, it is identified whether the casting of the butt-joint casting object meets the casting standard during the casting process;

[0064] The specific execution end is the signal evaluation center. Based on the penetration plug inside the butt-jointed casting object, the through-channels are marked as the same type of channels. Based on multiple casting processes, the overall casting volume of the same type of channels is confirmed. Based on the overall casting volume of different same type of channels, the overall casting quality of the butt-jointed casting object is identified. The specific methods for identification include:

[0065] The different overall pouring volumes of the same channel belonging to different insertion plugs are calibrated as GH q , where q represents different channels of the same type, and q=1, 2, ..., n, where n represents the total number of channels of the same type;

[0066] n groups of GH q Perform mean processing and determine the undetermined mean DJ using: Determine its evaluation value Fc, and identify whether the evaluation value Fc satisfies: Fc>Y2, where Y2 is a preset value, and its specific value is formulated by the operator based on experience. If it is satisfied, a non-standard signal is generated and displayed, indicating that the casting of this butt casting object does not meet the standard and human intervention is required to ensure the quality of the construction. If it is not satisfied, a standard signal is generated and displayed;

[0067] Specifically, during the normal pouring process of the docking pouring object, since each set related channel has a unified standard to shape, the pouring volume of each channel should be similar and will not differ too much. Therefore, the degree of discreteness between the data can be analyzed to determine whether the quality meets the standard and achieve better assessment results.

[0068] Embodiment 4

[0069] The specific implementation process of this embodiment includes all the implementation processes of the above three groups of embodiments.

[0070] Some of the data in the above formulas are dimensionless and numerically calculated. Meanwhile, the contents not described in detail in this specification belong to the prior art known to those skilled in the art.

[0071] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. A seamless butt casting system for assembled bridge construction, characterized in that: include: At the associative model matching end, based on the butted casting object, the operator selects the object model of the same type from the database, and synchronously butts the two sets of object models to determine the integrated model according to the butt joint method of the butt joint casting object; The pouring quantity confirmation end confirms the pouring quantity of different pouring channels of a single butt pouring object. According to the numerical changes between different pouring quantities, it is evaluated whether there is an abnormal pouring channel. If so, the abnormal pouring channel is marked in the integrated model. The specific method is as follows: The pouring volume of different pouring channels is calibrated as JZ i , where i represents different casting channels; Set several groups of pouring volume JZ i Perform mean processing to determine the undetermined mean Dz, which will satisfy: |JZ i -Dz|>Y1 pouring volume is calibrated as abnormal volume, where Y1 is the preset value. If it is not satisfied, no calibration is performed; The pouring channel corresponding to the abnormal amount is marked as the abnormal pouring channel, and JZ i >The abnormal pouring channel of Dz is marked as the abnormal pouring channel exceeding the standard; JZ i The abnormal pouring channel with a value less than Dz is calibrated as a low-standard abnormal pouring channel, and the calibrated abnormal pouring channel is synchronously calibrated into the integrated model; The pouring value confirmation center determines whether the connected pouring object is fully poured based on the integrated model and the corresponding pouring process, and generates the pouring values ​​of some pouring channels based on the confirmation results, and displays them through the control unit, including: Based on the abnormal pouring channels that exceed the standard or the abnormal pouring channels that are below the standard determined in the integrated model: For the abnormal pouring channel that exceeds the standard, determine the related channel that is connected with the current channel and is in another docking object from the integrated model, and mark the related channel as the pouring channel to be reduced; For the abnormal low-standard pouring channel, determine the related channel that is connected with the current channel and is located in another docking object from the integrated model, and mark the related channel as the pouring channel to be added; Prioritize pouring of other pouring channels that have not been calibrated in another docking object in the integrated model, and record their pouring volume L k , where k represents different other pouring channels, and several groups of pouring volumes L k Perform random arrangement to determine the arrangement set, and then arrange the adjacent pouring amounts L in the arrangement set from front to back. k Perform difference processing, calibrate the corresponding values ​​of the difference values ​​that belong to the preset interval as similar values, calibrate the corresponding values ​​of the difference values ​​that do not belong to the preset interval as other values, perform mean processing on the confirmed groups of similar values, and determine the standard pouring volume Bz, where the endpoint values ​​of the preset interval are all preset values; Then cast the pouring channel to be reduced or the pouring channel to be increased, and calibrate the pouring volume generated by the pouring channel to be reduced as: JJ1, and calibrate the pouring volume generated by the pouring channel to be increased as JJ2: Determine whether JJ1 satisfies: JJ1 ≥ Bz-|JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL=JJ1-(Bz-|JZ i -Dz|); Determine whether JJ2 satisfies: JJ2 ≥ Bz + | JZ i -Dz|, if satisfied, no processing is performed, if not satisfied, an abnormal signal is generated and the increment to be determined: ZL=JJ2-(Bz+|JZ i -Dz|); and transmitting the determined increment to be added to the control unit; The control unit determines the secondary grouting parameters based on the corresponding increment ZL generated by the corresponding pouring channel and the area difference between the grouting port and the grouting outlet, and displays them; The specific pouring process includes: placing the insertion plug used between the two pouring objects into the corresponding insertion slots of the two, completing the initial docking, pouring several grouting openings on one side until the mortar overflows from the grouting outlet, and then pouring several grouting openings on the other side based on the pouring data of the previous pouring process; During the pouring process, some pouring channels have too much pouring volume, while some pouring channels have too little pouring volume. When the pouring volume is too much, part of the pouring slurry flows from the corresponding pouring channel into the other docking object, so the specific pouring volume of the other docking object needs to be re-evaluated. When the pouring volume is too little, it is necessary to readjust the pouring volume during the pouring process of the other docking object.

2. The seamless butt casting system for prefabricated bridge construction according to claim 1 is characterized in that: The object models are restored one-to-one with the butt-casting objects, and the object models are all constructed in advance by the operator. Since there are two groups of butt-casting objects, there are also two groups of object models selected.

3. The seamless butt casting system for prefabricated bridge construction according to claim 1 is characterized in that: The specific method of the control unit to determine the secondary grouting parameters is: Based on the area difference Mc between the grouting port and the grouting outlet, the flow difference Lc is determined, where Lc=Mc×C1, where C1 is a preset fixed coefficient factor; Using ZL÷Lc=T, the secondary grouting time T of this casting channel is determined, and the determined secondary grouting time T is displayed. Based on the displayed T, external personnel adjust the grouting rate of the grouting equipment to the maximum and grout the casting channel. The grouting time is T.

4. The seamless butt casting system for prefabricated bridge construction according to claim 3 is characterized in that: Also includes: The signal evaluation center, based on the penetration plugs inside the butt-jointed casting object, marks the penetrated channels as similar channels, and confirms the overall casting volume of similar channels based on multiple casting processes, and identifies the overall casting quality of the butt-jointed casting object based on the overall casting volume of different similar channels.

5. The seamless butt casting system for prefabricated bridge construction according to claim 4 is characterized in that: The signal evaluation center identifies the overall casting quality of the butt-jointed casting object in the following specific ways: The different overall pouring volumes of the same channel belonging to different insertion plugs are calibrated as GH q , where q represents different channels of the same type, and q=1, 2, ..., n, where n represents the total number of channels of the same type; n groups of GH q Perform mean processing and determine the undetermined mean DJ using: Determine its evaluation value Fc, and identify whether the evaluation value Fc satisfies: Fc>Y2, where Y2 is a preset value. If it satisfies, a non-compliance signal is generated and displayed.

6. The seamless butt casting system for prefabricated bridge construction according to claim 5, characterized in that: If the evaluation value Fc does not satisfy: Fc>Y2, a compliance signal is generated and displayed.

Citation Information

Patent Citations

  • Assembly type bridge building seamless butt joint pouring system

    CN111411592A

  • Building energy consumption management system based on BIM building

    CN116823531A