An operation control method for electric vehicles to participate in power supply branch balance interaction

Through user selection of charging mode and dynamic adjustment of charging power, the balanced and interactive operation control of electric vehicle branches is realized, which solves the problem of low management efficiency of traditional charging stations, meets the differentiated needs of users, and improves charging resource utilization and grid stability.

CN118254632BActive Publication Date: 2024-10-29STATE GRID HUBEI ELECTRIC POWER RES INST +2
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410352889.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-03-26
Publication Date
2024-10-29
Estimated Expiration
2044-03-26

AI Technical Summary

Technical Problem

The traditional management method of electric vehicle charging stations is inefficient, cannot meet the charging needs of different vehicles, and cannot effectively consider the bearing capacity of the power grid, making it difficult to ensure grid stability.

Method used

An operation control method is proposed for electric vehicles to participate in the balanced interaction of power supply branches. By users selecting the charging mode (emergency charging, transfer charging, basic charging) and calculating the spare charging resources of the branch, the charging power is dynamically adjusted to achieve orderly branch circuits. Charging control ensures reasonable allocation of charging resources and stability of the power grid.

Benefits of technology

It meets the differentiated charging needs of users, efficiently utilizes charging resources, ensures the safe operation of the power supply system, and achieves optimal utilization of charging resources and guarantees grid stability under limited resource conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118254632B_ABST
    Figure CN118254632B_ABST
Patent Text Reader

Abstract

The present invention provides an operation control method for electric vehicles to participate in the balanced interaction of power supply branches. The present invention takes the load capacity of the power supply line as the main limiting factor, and provides a variety of charging operation mode options such as basic, transfer, and emergency. Users can independently select the charging mode based on the battery capacity of the vehicle and the urgency of charging, so as to achieve orderly control of the charging load of the branch electric vehicle and ensure that the branch is not overloaded. The method can provide a complete solution to the problems of limited line power supply capacity and low resource utilization, realize orderly charging control at the line level of the power supply system, ensure the safe and reliable operation of the power supply system, and the user's independent selection of the charging mode meets the user's differentiated energy needs. The method has a simple calculation model, high calculation efficiency, and precise calculation accuracy. It achieves efficient utilization of charging resources on the basis of ensuring the safety of line power supply.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric vehicle charging management, and in particular to an operation control method for electric vehicles to participate in balanced interaction of power supply branches. Background Art

[0002] With the rapid development of the electric vehicle industry, more and more electric vehicles are flooding the market, and electric vehicle charging control technology has also become a key research direction. At present, the technology of electric vehicle charging equipment is relatively mature, including DC fast charging, AC slow charging and other charging methods. These devices can meet the basic charging needs of different types of electric vehicles. However, there are still many challenges in how to effectively manage and control these charging devices so that the charging of electric vehicles can be carried out in an orderly manner.

[0003] Traditional charging station management methods are often based on manual operation and simple time period control. This method has low efficiency and flexibility and cannot meet the charging needs of different vehicles. Therefore, it is necessary to introduce more reasonable charging management and control technology to achieve orderly charging of charging stations, which can not only consider the differences in the needs of different charging users, but also consider the bearing capacity of the power grid, ensure the stability of the power grid, and allocate resources more reasonably according to factors such as user needs and power grid conditions. Summary of the invention

[0004] In view of the above problems, the present invention proposes an operation control method for electric vehicles to participate in the balanced interaction of power supply branches.

[0005] The method comprises the following steps:

[0006] S1, after the charging user connects the electric vehicle to the charging pile, the electric vehicle user selects a charging mode through the operator's charging APP according to the vehicle battery shortage and the expected stay time. The charging modes include emergency charging, transfer charging, and basic charging;

[0007] S2, after the electric vehicle user completes the charging mode selection, before the charging pile is ready to start charging, the branch free charging power resources are calculated to determine whether to start the branch orderly charging control; if the branch free charging resources can meet the rated power charging demand of the newly connected charging pile, the branch orderly charging control will not be started temporarily, the newly connected charging pile will charge at the rated power, and the settlement will be made according to the basic rate; if the branch free charging resources can no longer meet the rated power charging demand of the newly connected user, the branch orderly charging control will be started;

[0008] S3, when starting the branch orderly charging control, calculate the average charging power resource P of the connected charging pile cav , if P cav ≥The minimum charging power P of the charging pile min , then the charging pile is allowed to connect; if Pcav <The minimum charging power P of the charging pile min , then the charging pile needs to wait in line and charging will not start temporarily;

[0009] S4, according to the charging mode of the connected charging pile, calculate the control command power and settlement rate of the charging pile of each charging mode, send the control command and settlement rate to the corresponding charging pile to adjust its operating power, and calculate the total cost generated during the charging process;

[0010] S5, when the connected charging pile completes charging and exits, recalculate the branch's available charging power resources to determine whether to start the branch's orderly charging control. If the branch's available charging resources can meet the rated power charging requirements of all remaining charging piles, the branch's orderly charging control will not be started temporarily, and settlement will be made according to the basic rate; if the branch's available charging resources cannot meet the rated power charging requirements of all remaining charging piles, that is, the branch's charging resources are in a tight state, then the branch's orderly charging control needs to be started.

[0011] Furthermore, the charging mode in step S1 and the corresponding charging power control and rate settlement method are defined as follows:

[0012] Emergency charging mode: Applicable to users whose vehicles have a large battery shortage, are expected to stay for a short time, have an emergency power replenishment need, and are willing to pay a charging fee higher than the basic rate to obtain additional charging resources when branch charging resources are in short supply;

[0013] The transfer charging mode is suitable for users whose vehicles have a small battery shortage, are expected to stay for a long time, have no urgent charging needs, and are willing to transfer part of the charging power to obtain certain income compensation when the branch charging resources are in a tight state. However, the charging power shall not be less than the minimum charging power of the charging pile.

[0014] Basic charging mode: Suitable for users who have no clear charging needs, choose to charge according to the average charging power resources of the charging pile, and do not transfer or obtain additional charging power. The charging rate is settled according to the basic rate.

[0015] Furthermore, step S2 specifically includes:

[0016] S21. Calculate the maximum allowable charging power of the branch ;

[0017] S22. Calculate the spare charging power resources of the branch ;

[0018] S23. Determine whether to start the orderly charging control of the branch: if the free charging power resource of the branch is greater than or equal to the rated charging power of the newly connected charging pile, the orderly charging control of the branch is not started; if the free charging power resource of the branch is less than the rated charging power of the newly connected charging pile, the orderly charging control of the branch is started;

[0019] In the formula, Indicates the maximum allowable charging power of the branch. Indicates the maximum load capacity of the branch. Indicates the real-time power of other loads in the branch. Indicates the available charging power resources in the branch. It indicates the sum of the real-time charging power of N charging piles that are connected and in charging state.

[0020] Furthermore, step S3 calculates the average charging power resource of the charging pile, as follows:

[0021] S31. When a new charging pile is connected and the branch orderly charging control is started, the average charging power resource of the charging pile is calculated: ;

[0022] S32. When the connected charging pile completes charging and exits, and the branch orderly charging control is still executed, the average charging power resource of the charging pile is calculated: ;

[0023] in, represents the average charging power resource of the charging pile, It indicates the maximum allowable charging power of the branch, and N indicates the number of charging piles.

[0024] Furthermore, step S4 calculates the charging control command power and settlement rate of each type of charging pile according to the charging mode of the connected charging pile, as follows:

[0025] S41. Charging pile running in basic charging mode, charging control command power , and settle according to the basic rate, which is set by the charging pile operator;

[0026] S42. Comparison N o The charging pile transfer power resource P in the transfer charging mode s , and N u The additional power resources P required by the emergency charging mode charging pile b , P s With P b The calculation is as follows:

[0027]

[0028] Then, through the orderly charging control of the branch, the actual power resource to establish the power transfer and demand matching relationship is ; The rated power of the charging pile is P max is the power required by the user in emergency charging mode, and the minimum charging power of the charging pile P min The lower limit of power transfer for users in transfer charging mode;

[0029] S43. Charging pile running in transfer charging mode, charging control power , settle according to the basic rate and transfer power resources The electricity generated is compensated according to a certain income, among which the basic rate and income compensation amount are determined by the charging pile operator;

[0030] S44. Charging pile running in emergency charging mode, charging control power , average power P cav The generated electricity is settled according to the basic rate; the additional power required The electricity generated is settled according to (basic rate + service expenses), where the basic rate and service expenses are set by the charging pile operator;

[0031] Among them, N u 、N o 、N f are the number of charging piles in emergency, transfer and basic charging modes respectively. If a new charging user is connected, then N u +N o +N f =N+1; if a connected charging user completes charging and exits, then N u +N o +N f =N-1.

[0032] Furthermore, in step S5, after the connected charging pile completes charging and exits, the branch free charging power resources are recalculated to determine whether to start the branch orderly charging control, as follows:

[0033] S51. If the branch is still connected to the total rated power of (N-1) charging piles , then the branch orderly charging control will not be started;

[0034] S52. If the branch is still connected to the total rated power of (N-1) charging piles , then the branch orderly charging control is executed;

[0035] in It indicates the maximum allowable charging power of the branch, and N indicates the number of charging piles.

[0036] The operation control method for electric vehicles participating in the balanced interaction of power supply branches proposed by the present invention has the following beneficial effects:

[0037] 1) Meet users' differentiated charging needs. The orderly charging system for electric vehicles provides a variety of charging operation modes such as basic, transfer, and emergency. Users can independently select the charging mode based on the battery shortage of the vehicle and the expected length of stay to meet differentiated energy needs.

[0038] 2) Efficiently utilize limited charging resources and support the safe operation of the power supply system. The large-scale orderly charging control method for private cars comprehensively considers key changing factors such as the maximum load capacity of the branch, the current load situation, and the user's charging mode, and dynamically adjusts the charging power of the charging pile to achieve better utilization of charging resources under the premise of limited charging resources and support the safe operation of the power supply system. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 This is a flow chart of an operation control method for electric vehicles participating in power supply branch balance interaction according to an embodiment of the present invention;

[0040] Figure 2 A schematic diagram of charging mode division according to an embodiment of the present invention;

[0041] Figure 3 This is a schematic diagram of average distribution of redundant power of branch charging resources according to an embodiment of the present invention;

[0042] Figure 4 This is a schematic diagram of average power distribution when a new user accesses and branch charging resources are scarce in an embodiment of the present invention;

[0043] Figure 5 This is a schematic diagram of power balance interaction when a new user accesses and branch charging resources are scarce in an embodiment of the present invention;

[0044] Figure 6 A schematic diagram of power balance interaction when a user completes charging and exits and branch charging resources are tight in an embodiment of the present invention;

[0045] Figure 7 This is a schematic diagram of a new user accessing and waiting in line for access due to insufficient branch charging resources in an embodiment of the present invention. DETAILED DESCRIPTION

[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0047] See also Figure 1 The embodiment of the present invention provides an operation control method for electric vehicles to participate in the balanced interaction of power supply branches. The method divides the user-selectable charging modes into three types, and comprehensively considers factors such as user willingness and branch load capacity to achieve orderly charging control of electric vehicle charging piles. The control logic is designed to meet the needs of ordinary users, and some users can obtain additional charging resources by paying higher electricity prices when they have urgent power replenishment needs, and also allow some users to obtain certain benefits by giving up charging power when the charging needs are not urgent. The method specifically includes the following steps.

[0048] S1, electric vehicle users can choose the charging mode through the operator's charging APP according to the battery shortage of the vehicle and the expected length of stay, including emergency charging, transfer charging, and basic charging. Figure 2 As shown, the text in the box represents the charging mode, and the number in the box represents the charging power, in kilowatts (kW). The same format is used in the subsequent figures of the embodiments of the present invention for description.

[0049] Obtain user charging mode selection information. The charging mode and its corresponding charging power control and rate settlement method are defined as follows:

[0050] Emergency Charging Mode: Suitable for users whose vehicles have a large battery shortage, are expected to stay for a short time, have an emergency power replenishment need, and are willing to pay a charging fee higher than the basic rate to obtain additional charging resources when branch charging resources are in short supply.

[0051] Transfer charging mode: It is suitable for users whose vehicles have a small battery shortage, are expected to stay for a long time, have no urgent charging needs, and are willing to transfer part of the charging power to obtain certain income compensation when branch charging resources are in a tight state. However, the charging power must not be less than the minimum charging power of the charging pile.

[0052] Basic charging mode: Suitable for users who have no clear charging needs, choose to charge according to the average charging power resources of the charging pile, and do not transfer or obtain additional charging power. The charging rate is settled according to the basic rate.

[0053] S2, the electric vehicle user completes the charging mode selection, and before preparing to start charging, calculates the branch free charging power resources to determine whether to start the branch orderly charging control. If the branch free charging resources can meet the rated power charging requirements of the newly connected user, the branch orderly charging control will not be started temporarily, and the newly connected charging pile will charge at the rated power and settle according to the basic rate; if the branch free charging resources can no longer meet the rated power charging requirements of the newly connected user, that is, the branch charging resources are in a tight state, it is necessary to start the branch orderly charging control, and execute step S31. The method for determining whether to start the branch orderly charging control is as follows:

[0054] S21. Calculate the maximum allowable charging power of the branch ,like Figure 3 As shown in the figure, when the branch maximum load capacity is 80kW, and the branch lighting, fire protection, ventilation and other types of loads are 9kW at this moment, the calculated branch maximum allowable charging power is 71kW. At this time, there are 10 charging piles connected to the branch, of which 3 choose the tight charging mode, 3 choose the transfer charging mode, and 4 choose the basic charging mode, and all can be charged at the rated power of 7kW. Therefore, the branch charging resources are not in a tight state, and there is no need to start the branch orderly charging control.

[0055] S22. Figure 3 As shown, the branch spare charging power resources are calculated , when the maximum allowed charging power of the branch is 71kW, of which 70kW of the branch charging power resources have been occupied, the branch free charging power resources are 1kW;

[0056] S23. When a new private electric vehicle user applies for charging access, determine whether to start the branch orderly charging control: if the branch free charging power resources are greater than or equal to the rated charging power of the newly connected charging pile, the branch orderly charging control is not started; if the branch free charging power resources are less than the rated charging power of the newly connected charging pile, the branch orderly charging control is started and step S31 is executed. Figure 4 As shown, at this time, the available charging power resource of the branch is 1kW, which is less than the rated charging power of the charging pile 7kW, so the branch orderly charging control is started and step S31 is executed.

[0057] In the formula, Indicates the maximum allowable charging power of the branch. Indicates the maximum load capacity of the branch. Indicates the real-time power of other loads in the branch. Indicates the available charging power resources in the branch. It indicates the sum of the real-time charging power of N charging piles that are connected and in charging state.

[0058] S3, when starting the branch orderly charging control, calculate the average charging power resource P of the connected charging pile cav , if P cav ≥The minimum charging power P of the charging pile min , then the charging pile is allowed to connect; if P cav <The minimum charging power P of the charging pile min , the charging pile needs to wait in line and will not start charging for the time being. The method for calculating the average charging power of the charging pile is as follows:

[0059] S31. When a new charging pile is connected and the branch orderly charging control is started, the average charging power of the charging pile is calculated: .like Figure 4 As shown, when a new user joins, the 71kW available charging resources of the branch need to be distributed among the 11 charging piles. If all 11 users choose the emergency charging mode, the users who have not chosen the transfer charging mode will establish a power resource transfer and demand matching relationship with them. Therefore, the power resources are evenly distributed among the 11 users, and the power resources of each user are 71kW / 11 = 6.45kW / unit, and the settlement is based on the basic rate. Similarly, if the charging mode selections of the 11 users are as follows: 1) All are transfer charging mode; 2) All are basic charging mode; 3) A combination of emergency and basic charging modes; 4) A combination of transfer and basic charging modes, the charging control command power and settlement rate are the same as above.

[0060] S32. When the connected charging pile completes charging and exits, and the branch orderly charging control is still executed, the average charging power resource of the charging pile is calculated: .like Figure 6 As shown in the figure, when one of the 11 charging piles completes charging and exits, the branch charging power is still fully occupied, and the branch orderly charging control is enabled. The 44kW available charging resources of the branch are evenly distributed among 10 users of the same type, 4.4kW per user.

[0061] S4, according to the charging mode of the connected charging pile, calculate the charging control command power and settlement rate of each type of charging pile, the specific method is as follows:

[0062] S41. Figure 5 As shown in the figure, 8 out of 11 users choose the basic charging mode, 1 user chooses the emergency charging mode, and 2 users choose the transfer charging mode. , which is 71kW / 11 = 6.45kW / unit, and is settled according to the basic rate, which is set by the charging pile operator;

[0063] S42. Figure 5 As shown, the power resources P transferred by two charging piles in the transfer charging mode are compared.s , and the power resource P required by a charging pile in emergency charging mode b , then the actual transaction power resource is controlled in an orderly manner through the branch as follows: According to the charging mode selection requirements defined in S1, define:

[0064]

[0065] It is stipulated that the user demand power of the emergency charging mode is the rated power of the charging pile P max =7kW, and the lower limit of the user's transfer power in the transfer charging mode defaults to the minimum charging power of the charging pile P min =1kW. Therefore:

[0066] P s =2*(6.45kW-1kW)=10.9kW;

[0067] P b =1*(7kW-6.45kW)=0.55kW; P t =0.55kW.

[0068] S43. Figure 5 As shown, the charging pile is running in the transfer charging mode, and the charging control power , settle according to the basic rate and transfer power resources Compensation is made according to certain service income. cav =6.45kW, then the gap between the emergency user and the average power is 7kW-6.45kW=0.55kW. At this time, the two users in the yield charging mode need to reduce the charging power to 6.45kW-0.55kW / 2=6.175kW to establish a user power supply and demand matching relationship;

[0069] S44. Figure 5 As shown, the charging pile is running in emergency charging mode, and the charging control power , average power P cav The generated electricity is settled according to the basic electricity price; the additional power required The generated electricity is settled according to (basic electricity price + service expenses). cav =6.45kW, the shortfall of the emergency charging mode user's charging power is obtained through the transfer of the two transfer charging mode users, so its charging command power is 7kW, establishing a user power supply and demand matching relationship.

[0070] like Figure 5As shown in the figure, the present invention meets the emergency, transfer, and basic differentiated charging needs of 11 users through orderly branch charging control under the condition of limited charging power resources of 71kW. At the same time, by allocating power between users in emergency and transfer charging modes, efficient resource utilization is achieved, and the charging power is guaranteed not to exceed the resource limit, ensuring safe and stable operation.

[0071] in , , are the number of charging piles in emergency, transfer and basic charging modes, respectively, and N u +N o +N f =N+1.

[0072] S5, when the connected charging pile completes charging and exits, recalculate the branch free charging power resources to determine whether to start the branch orderly charging control. If the branch free charging resources can meet the rated power charging requirements of all remaining charging piles, the branch orderly charging control will not be started temporarily, and settlement will be made according to the basic rate; if the branch free charging resources cannot meet the rated power charging requirements of all remaining charging piles, that is, the branch charging resources are in a tight state, then the branch orderly charging control needs to be started, and step S32 is executed. The specific method is as follows:

[0073] S51. If the branch is still connected to the total rated power of (N-1) charging piles , then the branch orderly charging control will not be started;

[0074] S52. If the branch is still connected to the total rated power of (N-1) charging piles , then the branch orderly charging control is started, and then step S32 is executed.

[0075] At this time, the maximum allowable power of the line is 71kW. When a charging pile stops being used, the total rated power of the remaining charging piles is greater than the maximum allowable power of the line. At this time, orderly branch charging control is executed and the average power is recalculated to 7kW.

[0076] Among them, is the maximum allowable charging power of the line at time T.

[0077] S6, if the average power is calculated <1kw, electric vehicles need to wait in line. Figure 7 As shown, at this time, the maximum allowable power of the branch is low, causing the average power calculation of the connected charging pile to reach the minimum value of 1kW. At this time, if an electric vehicle requests charging again, it will enter a waiting state.

[0078] The present invention takes the load capacity of the power supply line as the main limiting factor, and provides a variety of charging operation mode options such as basic, transfer, and emergency. Users can independently select the charging mode based on the battery capacity of the vehicle and the urgency of charging, and realize orderly control of the charging load of the branch electric vehicle to ensure that the branch is not overloaded. This method can provide a complete solution to the problems of limited line power supply capacity and low resource utilization, realize orderly charging control at the line level of the power supply system, and ensure the safe and reliable operation of the power supply system. The user's independent selection of charging mode meets the user's differentiated energy needs. This method has a simple calculation model, high calculation efficiency, and precise calculation accuracy. It realizes efficient utilization of charging resources on the basis of ensuring the safety of line power supply.

[0079] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An operation control method for electric vehicles to participate in the balanced interaction of power supply branches, characterized in that: The following steps are involved: S1, after the charging user connects the electric vehicle to the charging pile, the electric vehicle user selects a charging mode through the operator's charging APP according to the vehicle battery shortage and the expected stay time. The charging modes include emergency charging, transfer charging, and basic charging; S2, after the electric vehicle user completes the charging mode selection, before the charging pile is ready to start charging, the branch free charging power resources are calculated to determine whether to start the branch orderly charging control; if the branch free charging resources can meet the rated power charging demand of the newly connected charging pile, the branch orderly charging control will not be started temporarily, the newly connected charging pile will charge at the rated power, and the settlement will be made according to the basic rate; if the branch free charging resources can no longer meet the rated power charging demand of the newly connected user, the branch orderly charging control will be started; S3, when starting the branch orderly charging control, calculate the average charging power resource P of the connected charging pile cav , if P cav ≥The minimum charging power P of the charging pile min , then the charging pile is allowed to connect; if P cav <The minimum charging power P of the charging pile min , then the charging pile needs to wait in line and charging will not start temporarily; S4, according to the charging mode of the connected charging pile, calculate the control command power and settlement rate of the charging pile of each charging mode, send the control command power and settlement rate to the corresponding charging pile to adjust its operating power, and calculate the total cost generated during the charging process; S5, when the connected charging pile completes charging and exits, recalculate the branch's available charging power resources to determine whether to start the branch's orderly charging control. If the branch's available charging resources can meet the rated power charging requirements of all remaining charging piles, the branch's orderly charging control will not be started temporarily, and settlement will be made according to the basic rate; if the branch's available charging resources cannot meet the rated power charging requirements of all remaining charging piles, that is, the branch's charging resources are in a tight state, then the branch's orderly charging control needs to be started.

2. The operation control method of an electric vehicle participating in the balanced interaction of a power supply branch according to claim 1, characterized in that: The charging mode in step S1 and the corresponding charging power control and rate settlement method are defined as follows: Emergency charging mode: Applicable to users whose vehicles have a large battery shortage, are expected to stay for a short time, have an emergency power replenishment need, and are willing to pay a charging fee higher than the basic rate to obtain additional charging resources when branch charging resources are in short supply; The transfer charging mode is suitable for users whose vehicles have a small battery shortage, are expected to stay for a long time, have no urgent charging needs, and are willing to transfer part of the charging power to obtain certain income compensation when the branch charging resources are in a tight state. However, the charging power shall not be less than the minimum charging power of the charging pile. Basic charging mode: Suitable for users who have no clear charging needs, choose to charge according to the average charging power resources of the charging pile, and do not transfer or obtain additional charging power. The charging rate is settled according to the basic rate.

3. The operation control method of an electric vehicle participating in the power supply branch balance interaction according to claim 1 is characterized in that: Step S2 specifically includes: S21. Calculate the maximum allowable charging power P of the branch Lc_max =P L_max -P Le ; S22. Calculate the spare charging power resources of the branch S23. Determine whether to start the orderly charging control of the branch: if the free charging power resource of the branch is greater than or equal to the rated charging power of the newly connected charging pile, the orderly charging control of the branch is not started; if the free charging power resource of the branch is less than the rated charging power of the newly connected charging pile, the orderly charging control of the branch is started; Where P Lc_max Indicates the maximum allowable charging power of the branch, P L_max Indicates the maximum load capacity of the branch, P Le Indicates the real-time power of other loads in the branch, P Lc_a Indicates the available charging power resources in the branch. It indicates the sum of the real-time charging power of N charging piles that are connected and in charging state.

4. The operation control method of an electric vehicle participating in the balanced interaction of a power supply branch according to claim 1, characterized in that: Step S3 calculates the average charging power resource of the charging pile, as follows: S31. When a new charging pile is connected and the branch orderly charging control is started, the average charging power resource of the charging pile is calculated: P cav =P Lc_max / (N+1); S32. When the connected charging pile has completed charging and exited, and the branch orderly charging control is still executed, calculate the average charging power resource of the charging pile: P cav =P Lc_max / (N-1); Among them, P cav Represents the average charging power resource of the charging pile, P Lc_max It indicates the maximum allowable charging power of the branch, and N indicates the number of charging piles.

5. The operation control method of an electric vehicle participating in the balanced interaction of a power supply branch according to claim 1, characterized in that: Step S4 calculates the charging pile control command power and settlement rate of each charging mode according to the charging mode of the connected charging pile, as follows: S41. The charging pile operates in the basic charging mode, and the control command power P f_c =P cav , and settle according to the basic rate, which is set by the charging pile operator; S42. Compare N o The charging pile transfer power resource P in the transfer charging mode s , and N u The additional power resources P required by the emergency charging mode charging pile b , P s With P b The calculation is as follows: P s =N o *(P cav -P min ) P b =N u *(P max -P cav ) Then, through the orderly charging control of the branch, the actual power resource to establish the power transfer and demand matching relationship is P t =min(P s , P b );in Charging pile rated power P max is the power required by the user in emergency charging mode, and the minimum charging power of the charging pile P min The lower limit of power transfer for users in transfer charging mode; S43. The charging pile is operated in the transfer charging mode, and the charging control power P o_c =P cav -P t / N o , settle according to the basic rate, transfer power resources P t / N o The electricity generated is compensated according to a certain income, among which the basic rate and income compensation amount are determined by the charging pile operator; S44. Charging pile running in emergency charging mode, charging control power P u_c =P cav +P t / N u , average power P cav The generated electricity is settled according to the basic rate; the additional required power P t / N u The electricity generated is settled according to the basic rate plus service expenses, where the basic rate and service expenses are set by the charging pile operator; Among them, N u 、N o 、N f are the number of charging piles in emergency, transfer and basic charging modes respectively. If a new charging user is connected, then N u +N o +N f =N+1; if a connected charging user completes charging and exits, then N u +N o +N f =N-1.

6. The operation control method of an electric vehicle participating in the power supply branch balance interaction according to claim 1 is characterized in that: Step S5, after the connected charging pile has completed charging and exited, recalculate the branch free charging power resources to determine whether to start the branch orderly charging control, as follows: S51. If the branch is still connected to the total rated power of N-1 charging piles Then the branch orderly charging control will not be started; S52. If the branch is still connected to the total rated power of N-1 charging piles Then the orderly charging control of the branch is executed; Where P Lc_max It indicates the maximum allowable charging power of the branch, and N indicates the number of charging piles.

Citation Information

Patent Citations

  • Electric car charging control method and charging pile

    CN109327034A

  • Ordered charging system and method for electric vehicle, medium, terminal and local charging pile

    CN112874372A