Existing foundation pile detection method, system, equipment and medium based on pile outer span hole

Through the detection method based on the pile span holes, the pile-soil wave speed difference auxiliary line and acoustic measurement line analysis was used to solve the problem of difficult to identify the pile bottom position and accurately assess the damage in the foundation pile detection in the existing technology, and the foundation pile is realized Efficient and comprehensive inspection ensures the safety of foundation pile projects.

CN118311148BActive Publication Date: 2024-11-08广东交科检测有限公司 +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410536852.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-04-30
Publication Date
2024-11-08
Estimated Expiration
2044-04-30

AI Technical Summary

Technical Problem

Existing foundation pile detection methods are difficult to accurately identify the pile bottom position and accurately detect the damage range and degree of pile body damage, especially when embedded in hard rock formations, resulting in a lack of authenticity and reliability of the detection results.

Method used

Using detection methods based on the span holes outside the pile, the pile bottom position analysis is performed by obtaining flat measurement and fan-shaped scanning data, using the pile-soil wave speed difference auxiliary line, and the acoustic speed and pile diameter abnormality analysis is carried out, combined with the installation environment Geological data to achieve accurate assessment of pile body integrity categories.

Benefits of technology

It realizes efficient, comprehensive and accurate detection of existing foundation piles, provides important data support, and ensures the safety and reliability of foundation pile projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118311148B_ABST
    Figure CN118311148B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of pile foundation engineering detection, and discloses an existing pile foundation detection method, system, equipment and medium based on a pile outer cross hole. The present invention combines horizontal measurement data and sector scanning measurement data of a target existing pile foundation, utilizes a pile-soil wave velocity difference auxiliary line, accurately locates the pile bottom position of the target existing pile foundation, and then performs an acoustic measurement line sound velocity abnormality analysis and an acoustic measurement line pile diameter abnormality analysis on the target existing pile foundation, thereby realizing a pile body integrity category analysis of the target existing pile foundation. The present invention can efficiently, comprehensively and accurately detect the damage range and damage severity of the target existing pile foundation, which is beneficial to provide important data support for whether the pile foundation foundation should continue to be used, the formulation of a maintenance plan, etc., and ensures the safety of the pile foundation engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of pile foundation engineering detection, and in particular to an existing pile foundation detection method, system, equipment and medium based on a pile outer span hole. Background Art

[0002] The pile foundation is an important hidden project underground. It bears all the loads transmitted from the superstructure and piers. Since the pile foundation is often buried underground, quality problems are prone to occur during construction. When a building is hit, landslide, mudslide and other geological disasters during its service, it may cause damage to the existing pile foundation, and the extent of the pile damage needs to be assessed. In addition, some bridges facing reconstruction and expansion also need to detect the condition of the pile foundation to decide whether to continue to use it. Therefore, as an important part of ensuring the quality and safety of buildings, pile foundation detection is of great significance. Most of the current pile foundation detection methods use the flat measurement method, which makes it difficult to accurately delineate the specific scope and degree of damage to the pile foundation, especially when facing pile foundations embedded in harder rock formations. It is impossible to accurately identify the position of the pile bottom, resulting in a lack of authenticity and reliability in the pile foundation detection effect.

[0003] Therefore, there is an urgent need for a new method for detecting existing foundation piles to accurately and comprehensively detect existing foundation piles and provide important data support for the continued use and maintenance of existing foundation piles. Summary of the invention

[0004] The present invention provides a method, system, equipment and medium for detecting existing foundation piles based on a pile outer cross hole, so as to solve the defects that the prior art cannot accurately identify the pile bottom position of the existing foundation piles, and it is also difficult to accurately detect the damage range and damage degree of the existing foundation piles, resulting in poor foundation pile detection results.

[0005] The present invention provides a method for detecting existing foundation piles based on a pile outer span hole, comprising:

[0006] Obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0007] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0008] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0009] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0010] According to the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0011] According to the abnormal degree of the acoustic velocity of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic detection line at the i-th depth cross section of the j-th detection section, the integrity function value I(j,i) of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is obtained;

[0012] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained, and the pile body integrity category analysis is performed based on the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0013] In one embodiment, the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section is c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross sectiont (i) Obtain the auxiliary line of the pile-soil wave velocity difference of the target existing foundation pile, and perform pile bottom position analysis based on the auxiliary line of the pile-soil wave velocity difference of the target existing foundation pile and the geological data of the installation environment to obtain the suspected pile bottom position of the target existing foundation pile, including:

[0014] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Obtain the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile through the expression of the pile-soil wave velocity difference auxiliary line, and draw the pile-soil wave velocity difference auxiliary line of the target existing foundation pile according to the curve values ​​of all detection sections of the target existing foundation pile;

[0015] According to the trend of the pile-soil wave velocity difference auxiliary line of the target existing foundation pile, the pile bottom position is analyzed in combination with the installation environment geological data of the target existing foundation pile, and the suspected pile bottom position of the target existing foundation pile is obtained.

[0016] In one embodiment, the pile bottom position analysis is performed based on the trend of the pile-soil wave velocity difference auxiliary line of the target existing foundation pile in combination with the installation environment geological data of the target existing foundation pile to obtain the suspected pile bottom position of the target existing foundation pile, including:

[0017] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is greater than 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is in the soil layer or soft rock layer;

[0018] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is less than 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is in a hard rock layer;

[0019] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is at a position where a suspected pile bottom position exists;

[0020] The above determination results are verified using the installation environment geological data of the target existing foundation piles to obtain the suspected pile bottom position of the target existing foundation piles.

[0021] In one embodiment, the expression of the pile-soil wave velocity difference auxiliary line is:

[0022]

[0023] In the expression of the pile-soil wave velocity difference auxiliary line, D represents the designed pile diameter of the target existing foundation pile, and l represents the distance that the ultrasonic wave of the pile section detection line passes through the soil (rock) around the pile.

[0024] In one embodiment, the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile is 上 and the lower part of the ultrasonic travel time slope data k 下 Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile, including:

[0025] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 , the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing foundation pile is obtained;

[0026] When the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing foundation pile is greater than 0, the suspected pile bottom position of the target existing foundation pile is determined to be the final pile bottom position of the target existing foundation pile;

[0027] When the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing pile is less than or equal to 0, it is determined that the suspected pile bottom position of the target existing pile does not belong to the final pile bottom position of the target existing pile.

[0028] In one embodiment, the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section is c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) Analyze the abnormal degree of the acoustic velocity of the acoustic test line to obtain the abnormal degree of the acoustic velocity of the acoustic test line at the i-th depth cross section of the j-th detection section of the target existing foundation pile, including:

[0029] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j), obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j);

[0030] The longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection sectionm (j) ratio V c (j,i) / V m (j) The abnormal degree of the sound velocity of the acoustic test line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is compared with the preset abnormal degree judgment condition of the sound velocity of the acoustic test line to obtain the abnormal degree of the sound velocity of the acoustic test line at the i-th depth cross section of the j-th detection section of the target existing foundation pile.

[0031] In one embodiment, the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) comparing with the preset sound velocity abnormality judgment condition of the sound measurement line to obtain the abnormality of the sound velocity of the sound measurement line of the target existing foundation pile at the i-th depth cross section of the j-th detection section, including:

[0032] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m When (j) is greater than or equal to 0.95, it is determined that the abnormality of the acoustic velocity of the acoustic measurement line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is normal;

[0033] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) when the first wave velocity ratio is within the preset range [0.85, 0.95), it is determined that the abnormality of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is slightly abnormal;

[0034] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) when the second wave velocity ratio is within the preset range [0.65, 0.85), it is determined that the abnormal degree of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is obviously abnormal;

[0035] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m When (j) is less than 0.65, the abnormal degree of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is determined to be seriously abnormal.

[0036] In one embodiment, the pile diameter data D(j,i) calculated based on the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D calculated based on the j-th detection section of the pile body m (j) Analyze the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile, including:

[0037] According to the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j), obtain the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j);

[0038] The calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average value data D of the calculated pile diameter of the j-th detection section pile body are combined. m (j) The ratio of D(j,i) / D m (j) The abnormality degree of the pile diameter of the acoustic testing line is compared with the preset judgment conditions of the abnormality degree of the pile diameter of the acoustic testing line, and the abnormality degree of the pile diameter of the target existing foundation pile at the i-th depth cross section of the j-th detection section is obtained.

[0039] In one embodiment, the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the calculated pile diameter average data D of the j-th detection section pile body are combined. m (j) The ratio of D(j,i) / D m (j) comparing with the preset acoustic testing line pile diameter abnormality judgment conditions to obtain the acoustic testing line pile diameter abnormality of the target existing foundation pile at the i-th depth cross section of the j-th detection section, including:

[0040] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / Dm When (j) is greater than or equal to 0.95, it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is no abnormality;

[0041] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j) when the first pile diameter ratio is within the preset range [0.85, 0.95), it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is slightly abnormal;

[0042] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j) when the second pile diameter ratio is within the preset range [0.65, 0.85), it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is obviously abnormal;

[0043] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m When (j) is less than 0.65, the abnormality of the pile diameter of the acoustic detection line in the i-th depth cross section of the j-th detection section of the target existing foundation pile is determined to be serious.

[0044] In one embodiment, obtaining the sound detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile according to the abnormal degree of sound velocity of the sound detection line of the i-th depth cross section of the j-th detection section and the abnormal degree of pile diameter of the sound detection line of the i-th depth cross section of the j-th detection section includes:

[0045] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic line are both normal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is normal, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 1;

[0046] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormal degree of the pile diameter of the acoustic line is slightly abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform distortion is more obvious, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 2;

[0047] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormal degree of the pile diameter of the acoustic line is obviously abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is obviously distorted, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 3;

[0048] When the abnormality degree of sound velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormality degree of pile diameter of the acoustic measurement line is seriously abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is seriously distorted, it is determined that the integrity function value I(j,i) of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is 4.

[0049] In one embodiment, the method of obtaining the pile body integrity category index of the i-th depth cross section of the target existing foundation pile according to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section includes:

[0050] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained by using the expression of the pile body integrity category index;

[0051] Among them, the expression of pile body integrity category index is:

[0052]

[0053] Where K(i) represents the pile integrity category index of the i-th depth cross section, n represents the number of cross sections, and INT represents the rounding function.

[0054] In one embodiment, the pile body integrity category analysis is performed according to the pile body integrity category indexes of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile, including:

[0055] When the pile body integrity category index of all cross sections of the target existing foundation pile is 1, the pile body integrity category of the target existing foundation pile is determined to be Category I;

[0056] When there is a cross section with a pile body integrity category index of 2 among all cross sections of the target existing pile foundation, the pile body integrity category of the target existing pile foundation is determined to be Category II;

[0057] When there is a cross section with a pile body integrity category index of 3 among all cross sections of the target existing foundation pile, and the pile body integrity category indexes of the cross sections within 50 cm of the i-th depth cross section are all 2, the pile body integrity category of the target existing foundation pile is determined to be III;

[0058] When there is a cross section with a pile body integrity category index of 4 among all cross sections of the target existing foundation pile, and the pile body integrity category indexes of the cross sections within 50 cm of the i-th depth cross section are all 3, the pile body integrity category of the target existing foundation pile is determined to be IV.

[0059] The present invention also provides an existing foundation pile detection system based on a pile outer span hole, comprising:

[0060] The data acquisition module is used to obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement. c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0061] The first positioning module is used to: according to the pile body longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0062] The second positioning module is used to: determine the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0063] The acoustic velocity anomaly analysis module of the acoustic testing line is used to: calculate the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0064] The acoustic testing line pile diameter abnormality analysis module is used to: calculate the pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0065] The acoustic line integrity analysis module is used to obtain the acoustic line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile according to the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section and the abnormal degree of the pile diameter of the acoustic line of the i-th depth cross section of the j-th detection section;

[0066] The pile body integrity category analysis module is used to obtain the pile body integrity category index of the i-th depth cross section of the target existing foundation pile according to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, and perform pile body integrity category analysis based on the pile body integrity category indexes of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0067] The present invention also provides an electronic device, comprising a processor and a memory storing a computer program, wherein the processor implements any of the above-mentioned existing foundation pile detection methods based on pile outer cross-hole when executing the computer program.

[0068] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the computer program implements any of the above-mentioned existing foundation pile detection methods based on pile outer cross-hole.

[0069] The present invention also provides a computer program product, which includes a computer program. The computer program can be stored on a non-transitory computer-readable storage medium. When the computer program is executed by a processor, the computer can execute any of the above-mentioned existing foundation pile detection methods based on pile external cross-hole.

[0070] The present invention provides a method, system, equipment and medium for detecting existing foundation piles based on a pile outer cross hole. The method combines the horizontal measurement data and the sector scanning measurement data of the target existing foundation piles, utilizes the pile-soil wave velocity difference auxiliary line, accurately locates the pile bottom position of the target existing foundation pile, and then performs an acoustic measurement line sound velocity abnormality analysis and an acoustic measurement line pile diameter abnormality analysis on the target existing foundation pile, thereby realizing a pile body integrity category analysis of the target existing foundation pile. The present invention can efficiently, comprehensively and accurately detect the damage scope and damage severity of the target existing foundation pile, which is beneficial to provide important data support for whether the foundation piles should continue to be used and the formulation of maintenance plans, thereby ensuring the safety of the foundation pile project. BRIEF DESCRIPTION OF THE DRAWINGS

[0071] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0072] Figure 1 A shows a schematic diagram of the flat measurement. Figure 1 B shows a schematic diagram of cross oblique measurement. Figure 1 C shows a schematic diagram of sector scanning.

[0073] Figure 2 A shows the schematic diagram of the fan-shaped scanning of the pile bottom. Figure 2 B shows a schematic diagram of a survey line for fan-shaped scanning of the pile bottom.

[0074] Figure 3 It is a schematic diagram of the arrangement of the detection holes of the specific embodiment 1.

[0075] Figure 4 It is a schematic diagram of direct acoustic time data of the pile-passing section in specific embodiment 1.

[0076] Figure 5 It is a schematic diagram of the auxiliary line of pile-soil wave velocity difference in specific embodiment 1.

[0077] Figure 6 It is a schematic diagram of identifying the pile bottom position by fan-shaped scanning of the pile bottom position in specific embodiment 1.

[0078] Figure 7 It is a schematic diagram of the abnormal degree of sound velocity in specific embodiment 1.

[0079] Figure 8 It is a schematic diagram of the abnormal degree value of pile diameter in specific embodiment 1. DETAILED DESCRIPTION

[0080] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments, and they should not be understood as limitations on the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. In the description of the present invention, it should be understood that the terms used are only for descriptive purposes and cannot be understood as indicating or implying relative importance.

[0081] Combine the following Figure 1-Figure 8 The present invention describes an existing foundation pile detection method, system, equipment and medium based on a pile outer cross hole.

[0082] The present invention provides a method for detecting existing foundation piles based on a pile outer span hole, which may include:

[0083] Step S110, obtaining the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0084] Step S120: The longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section is calculated. c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0085] Step S130: based on the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0086] Step S140: The longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section is calculated. c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0087] Step S150: Calculate the pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and calculate the average pile diameter data D of the j-th detection section of the pile body. m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0088] Step S160, obtaining the sound detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile according to the abnormal degree of the sound velocity of the sound detection line of the i-th depth cross section of the j-th detection section and the abnormal degree of the pile diameter of the sound detection line of the i-th depth cross section of the j-th detection section;

[0089] Step S170, obtaining the pile body integrity category index of the i-th depth cross section of the target existing foundation pile according to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section, and performing pile body integrity category analysis according to the pile body integrity category indexes of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0090] It should be noted that the execution entity of the existing foundation pile detection method based on pile outer span hole provided by the present invention can be any network side device / terminal side device that meets the technical requirements, such as an existing foundation pile detection device based on pile outer span hole.

[0091] In one embodiment, the inspection personnel may first drill inspection holes in the target existing foundation piles and perform encrypted horizontal measurement of the cross-holes outside the piles, oblique measurement of the cross-holes outside the piles, and fan-shaped scanning of the cross-holes outside the piles to obtain horizontal measurement data and fan-shaped scanning data of the target existing foundation piles, including step S110 and various data used in the present invention.

[0092] Regarding the arrangement of drilling holes: first, two or more groups of detection holes are drilled around the target existing foundation piles and arranged symmetrically. Each group of detection holes consists of two detection holes vertically downward and parallel to the axial direction of the foundation piles. The connecting line between each group of detection holes passes through the center of the target existing foundation piles and is symmetrically distributed. Any adjacent detection holes are located in the soil layer around the piles and do not pass through the target existing foundation piles. The distance between any two detection holes on any depth cross section i is the same, and the drilling depth of any detection hole should exceed a certain depth below the bottom of the target existing foundation pile.

[0093] Regarding the encrypted horizontal survey outside the pile hole: first, a horizontal survey can be carried out on the existing target foundation piles, and the ultrasonic transmitting transducer T and the receiving transducer R can be placed at the bottom of the detection hole. The test spacing used in the horizontal survey is 200mm, and the acoustic time data T(j,i) of the pile section under any depth cross section i in the jth detection section is collected at a uniform speed from bottom to top. Similarly, the acoustic time data T(k,i) of the soil (rock) around the pile under any depth cross section i in the kth detection section is collected at a uniform speed from top to bottom. Furthermore, by analyzing the acoustic time data of the pile end after the horizontal survey results, the depth range of the measuring point in question can be found out according to the relative changes of parameters such as acoustic time and amplitude and the shape of the measured waveform. Targeted encrypted horizontal surveys are carried out on the measuring points in question (such as Figure 1 A), verify the abnormal situation of the suspicious measuring point and determine the longitudinal depth range of the abnormal part. The spacing between the measuring points of the intensified horizontal measurement can be reduced to 50mm~100mm.

[0094] Regarding the cross-hole oblique measurement outside the pile: the oblique measurement method can be used to detect the severity of abnormal point defects. The oblique measurement method means that the transmitting transducer T and the receiving transducer R are kept at a certain height difference (the angle between the center line of the transmitting and receiving transducers and the horizontal plane should be ≤30°), and they are raised and lowered synchronously in the detection hole. The oblique measurement method can be used to further detect the severity of the abnormal depth range after the encrypted horizontal measurement. Furthermore, oblique measurement can be performed in both directions to form a cross oblique measurement (such as Figure 1 B), cross-oblique measurements are performed on the j-th detection section of the pile section in turn, and the test results of each detection section on the same depth cross section i are comprehensively analyzed to determine the projection range of the defect on each detection section of the pile section, and the distribution range of the pile body defect on the cross section of the foundation pile can be further inferred.

[0095] Regarding the cross-hole sector scanning outside the pile: In order to reduce the number of transducer lifting and lowering times, sector scanning can also be directly used on the basis of intensive flat measurement (such as Figure 1C). Sector scanning means fixing one transducer at a certain height and moving the other transducer point by point (the transducer movement interval can be 100mm~200mm, and the maximum angle between the center line of the transmitting and receiving transducers and the horizontal plane should be ≤30°), and the measuring line presents a sector shape. It can find out whether the measuring line encounters defects based on the sudden change of the measured values ​​of adjacent measuring points. In addition, sector scanning can also be used to identify the bottom position of foundation piles.

[0096] In one embodiment, step S120 may include:

[0097] Step S1201: Based on the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Obtain the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile through the expression of the pile-soil wave velocity difference auxiliary line, and draw the pile-soil wave velocity difference auxiliary line of the target existing foundation pile according to the curve values ​​of all detection sections of the target existing foundation pile;

[0098] Step S1202: According to the trend of the pile-soil wave velocity difference auxiliary line of the target existing foundation pile, the pile bottom position is analyzed in combination with the installation environment geological data of the target existing foundation pile to obtain the suspected pile bottom position of the target existing foundation pile.

[0099] In one embodiment, step S1202 may include:

[0100] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is greater than 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is in the soil layer or soft rock layer;

[0101] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is less than 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is in a hard rock layer;

[0102] When the curve value of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to 0, it is determined that the i-th depth cross section of the j-th detection section of the target existing foundation pile is at a position where a suspected pile bottom position exists;

[0103] The above determination results are verified using the installation environment geological data of the target existing foundation piles to obtain the suspected pile bottom position of the target existing foundation piles.

[0104] Specifically, based on the flat measurement method, in order to solve the problem that the bottom position of some piles with deep rock penetration and good rock quality is not obvious during the cross-hole ultrasonic test outside the pile, an auxiliary line of pile-soil wave velocity difference can be added on the basis of the measured signal to help determine the pile bottom position. This auxiliary line can be used to pass through the pile section at the i-th depth cross section position at the j-th section to reach the wave velocity V z (j,i) and soil wave velocity V t The difference between (i) is expressed as follows:

[0105] Pile-soil wave velocity difference auxiliary line = V z (j,i)-V t (i)

[0106] in,

[0107]

[0108] Substituting equation (2) into equation (1), after some changes, the expression of the pile-soil wave velocity difference auxiliary line can be obtained as follows:

[0109]

[0110] Where D is the designed pile diameter of the target existing foundation pile (m), l is the distance of the ultrasonic wave passing through the soil (rock) around the pile (m), L0 is the distance between the two horizontal test holes (L0 = l + D) (m), T(j,i) is the acoustic time value of the target existing foundation pile under the cross section of the jth test section at the i-th depth (s), V z (j,i) represents the direct wave velocity (m / s) of the cross section of the jth detection section of the target existing foundation pile at the i-th depth, V c (j,i) represents the longitudinal wave velocity of the target existing foundation pile at the cross section of the jth detection section at the i-th depth (m / s), V t (i) represents the average longitudinal wave velocity of the soil (rock) layer around the target existing foundation pile at the i-th depth cross section (m / s).

[0111] When judging the pile bottom position, the pile-soil wave velocity difference auxiliary line may have the following three situations according to the strength of the soil (rock) layer on the pile side:

[0112] ①When V c (j,i)>V t (i) If the soil layer and soft rock layer are z (j,i)-V t (i)>0;

[0113] ②When V c (j,i) <V t (i) If the rock is of high strength and hardness, then V z (j,i)-Vt (i) <0;

[0114] ③When V c (j,i)=V t (i), that is, when the strength of the rock mass is exactly the same as that of the pile body (generally this situation will not occur) or when there is no pile body in the soil (rock) layer (i.e. below the pile bottom), then V z (j,i)-V t (i)=0.

[0115] Therefore, for rock-embedded piles (moderately weathered or slightly weathered), the soil layer above the rock surface has a lower strength than the pile body, while the soil layer below the rock surface has a higher strength than the pile body. z (j,i)-V t (i) The curve value changes from positive to negative at the rock penetration depth, and then changes from negative to zero at the pile bottom burial depth. Based on this rule and geological data, the actual pile bottom burial depth can be determined. In addition, this auxiliary line is also suitable for identifying the bottom position of friction piles (including strongly weathered rocks). For friction piles, the surrounding soil (including strongly weathered rocks) has a lower strength than the pile body, V z (j,i)-V t (i)>0, when V z (j,i)-V t When (i) = 0, the depth corresponds to the buried depth of the pile bottom.

[0116] When determining the position of the pile bottom, the accuracy of the pile length determination by the cross-hole ultrasonic method can be effectively improved by combining the measured signal characteristics with the pile bottom position indicated by the pile-soil wave velocity difference auxiliary line.

[0117] Furthermore, based on the horizontal survey method, using the above-mentioned auxiliary line method, some pile bottom positions may still be difficult to identify, so a fan-shaped scanning method can be used to conduct further targeted scanning of the suspected pile bottom positions.

[0118] See also Figure 2 When the fan-shaped scanning is performed, the actual distance between the pile and the soil that the ultrasonic wave passes through satisfies the following formula:

[0119] L′=L / cosθ, (4)

[0120] Where: L' is the actual distance between the transmitting transducer and the receiving transducer (m), L is the horizontal distance between the two transmitting horizontal detection holes (m), and θ is the angle between the connecting line of the transmitting transducer and the receiving transducer and the horizontal plane.

[0121] The ultrasonic wave travels at the same time as the following relationship:

[0122]

[0123] Where: T is the travel time of ultrasonic wave penetrating soil layer and pile body (s), D is the design diameter of pile foundation (m), Vc is the average wave velocity of pile foundation body within the sector scanning range (m / s), Vt is the average wave velocity of soil (rock) layer around pile within the sector scanning range (m / s).

[0124] Let X = 1 / cosθ, then the above formula can be converted into a simple linear function:

[0125]

[0126] The slope of the above equation is

[0127] The reference line is defined as the line where the angle between the transmitting transducer and the receiving transducer and the horizontal plane is 0°. The upper half is scanned upwards, and the lower half is scanned downwards.

[0128] 1) If the sector scanning depth range is entirely within the pile body, the following relationship holds true:

[0129]

[0130] Then the Δk of the ultrasonic travel time slope of the lower half and the ultrasonic travel time slope of the upper half satisfies the following formula:

[0131] Δk=0, (8)

[0132] 2) If the sector scanning depth range is below the pile bottom, D = 0, then the following relationship holds:

[0133]

[0134] Then the difference Δk between the ultrasonic travel time slope of the lower half and the ultrasonic travel time slope of the upper half satisfies the following formula:

[0135] Δk=0, (9)

[0136] 3) If the sector scanning reference line is the buried depth of the pile bottom, the slope kup of the ultrasonic travel time in the upper part is:

[0137]

[0138] The slope k of the ultrasonic travel time in the lower part 下 for:

[0139]

[0140] Then the difference Δk between the ultrasonic travel time slope of the lower half and the ultrasonic travel time slope of the upper half satisfies the following formula:

[0141]

[0142] In summary, during actual measurement, we can further judge whether the abnormal part is the pile bottom position based on whether the difference in slope between the upper and lower travel times of the sector scan is close to zero. When Δk≈0, the suspicious position is not the pile bottom. If Δk is obviously greater than 0, the depth position of the suspicious measuring point is the detection pile bottom position.

[0143] In one embodiment, step S130 may include:

[0144] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 , the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing foundation pile is obtained;

[0145] When the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing foundation pile is greater than 0, the suspected pile bottom position of the target existing foundation pile is determined to be the final pile bottom position of the target existing foundation pile;

[0146] When the difference Δk between the upper half ultrasonic travel time slope and the lower half ultrasonic travel time slope of the suspected pile bottom position of the target existing pile is less than or equal to 0, it is determined that the suspected pile bottom position of the target existing pile does not belong to the final pile bottom position of the target existing pile.

[0147] Furthermore, the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section is c The expression of (j,i) can be:

[0148]

[0149]

[0150] Where V c (j,i) is the longitudinal wave velocity of the pile body at the cross section at the i-th depth of the j-th detection section (m / s), V m (j) is the average longitudinal wave velocity of the pile body in the jth test section (m / s), D is the designed pile diameter (m), L0 is the distance between the two horizontal test holes (m), m is the number of test cross sections, T(j,i) is the acoustic time value of the pile section under any depth cross section i in the jth test section (s), V t (i) is the longitudinal wave velocity of the soil (rock) layer around the pile at the cross section at the i-th depth (m / s).

[0151] The calculation of the pile wave velocity reflects the change of the pile wave velocity, that is, the pile strength. c (j,i) can be used to determine whether there are defects in the pile body and the degree of defects. For the case where the cross-section of the pile body does not change much, Vc (j,i) is close to the empirical wave velocity value. If there are defects in the pile body, it will be reflected in V c (j,i)-on the depth i curve, V c (j,i) will become lower. The ratio of the pile wave velocity to its average value V is calculated c (j,i) / V m (j) is used to characterize the abnormal degree of sound velocity in the cross section at the i-th depth on the j-th detection section. The abnormal degree of sound velocity in the acoustic detection line can be determined according to Table 1 below.

[0152] <![CDATA[The ratio V c (j,i) / V m (j)]]> Abnormal degree of sound speed <![CDATA[V c (j,i) / V m (j)≥0.95]]> No abnormality <![CDATA[0.85≤V c (j,i) / V m (j)<0.95]]> Slight abnormality <![CDATA[0.65≤V c (j,i) / V m (j)<0.85]]> Obvious abnormality <![CDATA[V c (j,i) / V m (j)<0.65]]> Severe abnormalities

[0153] Table 1 Determination table of abnormal degree of sound velocity of sound measurement line

[0154] In one embodiment, step S140 may include:

[0155] Step S1401: Based on the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j), obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j);

[0156] Step S1402: The longitudinal wave velocity data V of the pile body of the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) The abnormal degree of the sound velocity of the acoustic test line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is compared with the preset abnormal degree judgment condition of the sound velocity of the acoustic test line to obtain the abnormal degree of the sound velocity of the acoustic test line at the i-th depth cross section of the j-th detection section of the target existing foundation pile.

[0157] In one embodiment, step S1402 may include:

[0158] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V mWhen (j) is greater than or equal to 0.95, it is determined that the abnormality of the sound velocity of the acoustic line of the j-th detection section of the target existing foundation pile at the i-th depth cross section is normal;

[0159] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) when the first wave velocity ratio is within the preset range [0.85, 0.95), it is determined that the abnormality of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is slightly abnormal;

[0160] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m (j) when the second wave velocity ratio is within the preset range [0.65, 0.85), it is determined that the abnormal degree of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is obviously abnormal;

[0161] When the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile is c (j,i) and the average longitudinal wave velocity data V of the pile body of the jth detection section m (j) ratio V c (j,i) / V m When (j) is less than 0.65, the abnormal degree of the sound velocity of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is determined to be seriously abnormal.

[0162] Furthermore, the pile diameter D(j,i) calculated at any depth position i in the jth detection section of the pile section can be converted into the following relationship:

[0163]

[0164]

[0165] Where D(j,i) is the calculated pile diameter at any depth position i in the jth detection section (m), and D m (j) is the average value of the pile diameter calculated for the jth detection section (m / s), L0 is the distance between the two horizontal detection holes (m), T(j,i) is the acoustic time value of the pile section under any depth cross section i in the jth detection section (s), V t(i) is the longitudinal wave velocity of the soil (rock) layer around the pile at the cross section at the i-th depth (m / s), V c is the empirical value of the longitudinal wave velocity of the pile concrete (m / s). Generally, 4200m / s can be taken for C30 concrete.

[0166] The calculated pile diameter D(j,i) reflects the change in the cross-sectional area of ​​the pile body (expansion or reduction). For the case where the wave velocity of the pile body does not change much, D(j,i) should be close to the actual pile diameter value. The ratio of the calculated pile diameter to its average value D(j,i) / D is used. m (j) is used to characterize the abnormality of the pile diameter in the cross section at the i-th depth on the j-th detection section. The abnormality of the pile diameter of the acoustic detection line can be determined according to Table 2 below.

[0167] <![CDATA[Ratio of the pile diameter of the acoustic measurement line to its average value D(j,i) / D m (j)]]> Pile diameter abnormality <![CDATA[D(j,i) / D m (j)≥0.95]]> No abnormality <![CDATA[0.85≤D(j,i) / D m (j)<0.95]]> Slight abnormality <![CDATA[0.65≤D(j,i) / D m (j)<0.85]]> Obvious abnormality <![CDATA[D(j,i) / D m (j)<0.65]]> Severe abnormalities

[0168] Table 2 Determination of abnormal degree of pile diameter of acoustic testing line

[0169] In one embodiment, step S150 may include:

[0170] Step S1501: Calculate the pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and calculate the average pile diameter data D of the j-th detection section of the pile body. m (j), obtain the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j);

[0171] Step S1502: Compare the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile with the calculated pile diameter average data D m (j) The ratio of D(j,i) / D m (j) The abnormality degree of the pile diameter of the acoustic testing line is compared with the preset judgment conditions of the abnormality degree of the pile diameter of the acoustic testing line, and the abnormality degree of the pile diameter of the target existing foundation pile at the i-th depth cross section of the j-th detection section is obtained.

[0172] In one embodiment, step S1502 may include:

[0173] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m When (j) is greater than or equal to 0.95, it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is no abnormality;

[0174] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j) when the first pile diameter ratio is within the preset range [0.85, 0.95), it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is slightly abnormal;

[0175] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m (j) when the second pile diameter ratio is within the preset range [0.65, 0.85), it is determined that the abnormality of the pile diameter of the acoustic detection line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is obviously abnormal;

[0176] When the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile is equal to the average value data D of the calculated pile diameter of the j-th detection section pile body m (j) The ratio of D(j,i) / D m When (j) is less than 0.65, the abnormality of the pile diameter of the acoustic detection line in the i-th depth cross section of the j-th detection section of the target existing foundation pile is determined to be serious.

[0177] Furthermore, the integrity function value of each acoustic test line of each test section should be determined according to the abnormality of the pile body wave velocity and the pile diameter parameters calculated by the tested pile body concrete, combined with the distortion degree of the measured waveform, according to the characteristics described in Table 3 below.

[0178]

[0179] Table 3 Integrity function value determination table of acoustic test line

[0180] In one embodiment, step S160 may include:

[0181] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic line are both normal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is normal, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 1;

[0182] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormal degree of the pile diameter of the acoustic line is slightly abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform distortion is more obvious, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 2;

[0183] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormal degree of the pile diameter of the acoustic line is obviously abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is obviously distorted, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 3;

[0184] When the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile and / or the abnormal degree of the pile diameter of the acoustic line is seriously abnormal, and the waveform data of the i-th depth cross section of the j-th detection section indicates that the measured waveform is seriously distorted, it is determined that the integrity function value I(j,i) of the acoustic line of the i-th depth cross section of the j-th detection section of the target existing foundation pile is 4;

[0185] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained by using the expression of the pile body integrity category index;

[0186] Among them, the expression of pile body integrity category index is:

[0187]

[0188] Where K(i) represents the pile integrity category index of the i-th depth cross section, n represents the number of cross sections, and INT represents the rounding function.

[0189] The pile body integrity category of the inspected pile can be determined according to the pile body integrity category index of each cross section of the pile body in accordance with Table 4 below.

[0190]

[0191] Table 4 Pile body integrity category determination table

[0192] In one embodiment, step S160 may further include:

[0193] When the pile body integrity category index of all cross sections of the target existing foundation pile is 1, the pile body integrity category of the target existing foundation pile is determined to be Category I;

[0194] When there is a cross section with a pile body integrity category index of 2 among all cross sections of the target existing pile foundation, the pile body integrity category of the target existing pile foundation is determined to be Category II;

[0195] When there is a cross section with a pile body integrity category index of 3 among all cross sections of the target existing foundation pile, and the pile body integrity category indexes of the cross sections within 50 cm of the i-th depth cross section are all 2, the pile body integrity category of the target existing foundation pile is determined to be III;

[0196] When there is a cross section with a pile body integrity category index of 4 among all cross sections of the target existing foundation pile, and the pile body integrity category indexes of the cross sections within 50 cm of the i-th depth cross section are all 3, the pile body integrity category of the target existing foundation pile is determined to be IV.

[0197] A specific embodiment 1 will be provided below to describe the present invention in detail.

[0198] 1# target existing foundation pile 100, the designed pile diameter is 1.5m, and the pile body concrete grade is C25. Four geological holes 101, 102, 103, and 104 are drilled symmetrically around the target existing foundation pile, with a hole depth of 28m. The distance between each geological hole and the target existing foundation pile is less than 50cm. After the hole is completed, a PVC pipe is placed in the geological hole, and cement slurry is poured into the PVC pipe wall and the soil layer on the side of the pipe to ensure good coupling between the PVC pipe and the soil layer on the side of the pipe. Finally, the PVC pipe is filled with clean water. The schematic diagram of the drilling arrangement is shown in the figure below. Figure 3 shown.

[0199] First, the inspection personnel carried out ultrasonic level survey outside the pile and across the hole. The ultrasonic transmitting ring energy device and the receiving transducer were placed in the inspection hole respectively. The measuring point spacing was set to 200mm. The transmitting and receiving transducers were pulled up slowly and evenly synchronously to detect the ultrasonic acoustic time data of any depth of the 201, 202, 203, 204, 301, and 302 sections in turn. Among them, the 201, 202, 203, and 204 sections reflect the soil layer information on the side of the pile. According to the formula, the 301 and 302 sections reflect the comprehensive information of the pile and soil in the pile section. A preliminary analysis of the average acoustic time data of the 301 and 302 sections in the pile section showed that there were three abnormal inflection points at around 15.8m, 21.8m, and 23.2m, such as Figure 4 Drilling data show that the depths of 15.4m and 21.8m correspond to the interface between moderately weathered granite and slightly weathered granite, respectively, which matches the inflection point.

[0200] Furthermore, the method of intensified horizontal measurement was used to carry out detection in the depth range of 15.0-25.0m. The pile section profiles 301 and 302 were tested. The distance between the measuring points was set to 100mm. The acoustic time data was measured and the auxiliary line V of the pile-soil wave velocity difference was calculated. z (j,i)-Vt (i) The result is Figure 5 As shown in the figure, the pile-soil auxiliary line curve is analyzed. The auxiliary line is positive (0-1.4) in the depth range of 15.0-21.8m, indicating that the wave velocity of the pile body is greater than the wave velocity of the soil (rock) on the pile side; the auxiliary line is negative (-0.73-0) in the depth range of 21.8-23.3m, indicating that the wave velocity of the pile body is less than the wave velocity of the soil (rock) around the pile in this depth range, and the position of 21.8m is the rock entry position, which matches the drilling data; the auxiliary line is close to the zero line in the depth range of 23.3-25.0m, indicating that there is no pile foundation in this depth range or the wave velocity of the pile foundation is consistent with the rock layer, and the suspected pile bottom position of the target existing foundation pile is obtained.

[0201] Furthermore, a sector scan is used to confirm whether 23.3m is the final pile bottom position. The ultrasonic transmitting transducer is lowered to hole 101, and the depth is kept fixed at 23.3m. The receiving transducer is placed in the corresponding hole 103. The receiving transducer is placed at a depth of 22.3m and pulled up to 24.3m. The spacing between the pulling measuring points is 200mm. A scatter plot of ultrasonic travel time and 1 / cosθ is drawn, and a regression regression curve is drawn, as shown in Figure 1. Figure 6 As shown. The slope k1 of the part above the baseline is extracted = 461.65, and the slope k2 of the part below the baseline is extracted = 396.12, so Δk = 65.53> 0. It is further confirmed that the position of 23.3m is the final pile bottom position.

[0202] Pile integrity evaluation: Get V c (j,i) / V m (j) and D(j,i) / D m (j) curve, such as Figure 7-Figure 8 As shown, it can be seen that within the range of the pile body (0-23.3m), V c (j,i) / V m (j)>0.95, D(j,i) / D m (j)>0.95. According to Tables 1 to 4 of this embodiment, the integrity category index of each detected cross section of the 1# pile body is 1, and the pile body integrity category of the pile body is evaluated as Class I pile. After consulting relevant data, the pile length is 23.4m, which is 0.1m different from the length of the pile detected by the present invention. The acceptance test result is Class I pile, which confirms the effectiveness of the present invention.

[0203] The existing foundation pile detection method based on the pile outer cross hole provided by the present invention combines the horizontal measurement data and the sector scanning measurement data of the target existing foundation pile, utilizes the pile-soil wave velocity difference auxiliary line, accurately locates the pile bottom position of the target existing foundation pile, and then performs the acoustic velocity abnormality degree analysis and the acoustic line pile diameter abnormality degree analysis of the target existing foundation pile, realizes the pile body integrity category analysis of the target existing foundation pile, and through the present invention, the damaged scope and the damaged severity of the target existing foundation pile can be detected efficiently, comprehensively and accurately, which is beneficial to provide important data support for whether the foundation pile continues to be used, the formulation of maintenance plans, etc., and ensures the safety of the foundation pile project.

[0204] The existing pile foundation detection system based on the pile outer span hole provided by the present invention is described below. The existing pile foundation detection system based on the pile outer span hole described below and the existing pile foundation detection method based on the pile outer span hole described above can be referenced to each other.

[0205] The present invention provides an existing foundation pile detection system based on a pile outer span hole, which may include:

[0206] The data acquisition module is used to obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement. c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0207] The first positioning module is used to: according to the pile body longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0208] The second positioning module is used to: analyze the pile bottom position according to the upper half ultrasonic travel time slope data kup and the lower half ultrasonic travel time slope data kdown of the suspected pile bottom position of the target existing foundation pile, and obtain the final pile bottom position of the target existing foundation pile;

[0209] The acoustic velocity anomaly analysis module of the acoustic testing line is used to: calculate the longitudinal wave velocity data V of the pile body at the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0210] The acoustic testing line pile diameter abnormality analysis module is used to: calculate the pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0211] The acoustic line integrity analysis module is used to obtain the acoustic line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile according to the abnormal degree of the acoustic velocity of the acoustic line of the i-th depth cross section of the j-th detection section and the abnormal degree of the pile diameter of the acoustic line of the i-th depth cross section of the j-th detection section;

[0212] The pile body integrity category analysis module is used to obtain the pile body integrity category index of the i-th depth cross section of the target existing foundation pile according to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, and perform pile body integrity category analysis based on the pile body integrity category indexes of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0213] This embodiment provides an electronic device, which may include: a processor, a communications interface, a memory, and a communication bus, wherein the processor, the communications interface, and the memory communicate with each other via the communication bus. The processor may call logic instructions in the memory to execute an existing pile foundation detection method based on a pile outer cross hole, the method comprising:

[0214] Obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement c(j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0215] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0216] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0217] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0218] According to the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0219] According to the abnormal degree of the acoustic velocity of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic detection line at the i-th depth cross section of the j-th detection section, the integrity function value I(j,i) of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is obtained;

[0220] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained, and the pile body integrity category analysis is performed based on the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0221] In addition, the logic instructions in the above-mentioned memory can be implemented in the form of software functional units and can be stored in a computer-readable storage medium when sold or used as an independent product. Based on such an understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0222] On the other hand, the present invention further provides a computer program product, the computer program product comprising a computer program, the computer program can be stored in a non-transitory computer-readable storage medium, when the computer program is executed by a processor, the computer can execute the existing pile foundation detection method based on the pile outer cross hole provided by the above methods, the method comprising:

[0223] Obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m(j), waveform data of the i-th depth cross section of the j-th detection section, and the upper and lower ultrasonic travel time slope data k of the suspected pile bottom position of the target existing foundation pile during the sector scanning. 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0224] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0225] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0226] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0227] According to the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile body m (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0228] According to the abnormal degree of the acoustic velocity of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic detection line at the i-th depth cross section of the j-th detection section, the integrity function value I(j,i) of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is obtained;

[0229] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained, and the pile body integrity category analysis is performed based on the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0230] In another aspect, the present invention further provides a non-transitory computer-readable storage medium having a computer program stored thereon, which is implemented when the computer program is executed by a processor to execute the existing pile foundation detection method based on the pile outer cross hole provided by the above methods, the method comprising:

[0231] Obtain the longitudinal wave velocity data V of the pile body of the target existing foundation pile at the i-th depth cross section of the j-th detection section during the horizontal measurement c (j,i), average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) Average longitudinal wave velocity data V of the pile body at the jth detection section m (j), the calculated pile diameter data D(j,i) of the cross section at the i-th depth of the j-th detection section, and the average value data D of the pile body calculated at the j-th detection section m (j), the waveform data of the i-th depth cross section of the j-th detection section, and the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scanning 上 and the lower part of the ultrasonic travel time slope data k 下 , and, obtaining geological data of the installation environment of the target existing foundation piles;

[0232] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the soil (rock) layer around the pile at the i-th depth cross section t (i) obtaining a pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and performing pile bottom position analysis based on the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain a suspected pile bottom position of the target existing foundation pile;

[0233] According to the ultrasonic travel time slope data k of the upper half of the suspected pile bottom position of the target existing foundation pile 上 and the lower part of the ultrasonic travel time slope data k 下 Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile;

[0234] According to the pile longitudinal wave velocity data V of the i-th depth cross section of the j-th detection section of the target existing foundation pile c (j,i) and the average longitudinal wave velocity data V of the pile body of the j-th detection section m (j) analyzing the abnormal degree of the acoustic velocity of the acoustic measurement line to obtain the abnormal degree of the acoustic velocity of the acoustic measurement line at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0235] According to the calculated pile diameter data D(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile and the average pile diameter data D of the j-th detection section pile bodym (j) analyzing the abnormality of the acoustic testing line pile diameter to obtain the abnormality of the acoustic testing line pile diameter at the i-th depth cross section of the j-th detection section of the target existing foundation pile;

[0236] According to the abnormal degree of the acoustic velocity of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile and the abnormal degree of the pile diameter of the acoustic detection line at the i-th depth cross section of the j-th detection section, the integrity function value I(j,i) of the acoustic detection line at the i-th depth cross section of the j-th detection section of the target existing foundation pile is obtained;

[0237] According to the acoustic detection line integrity function value I(j,i) of the i-th depth cross section of the j-th detection section of the target existing foundation pile, the pile body integrity category index of the i-th depth cross section of the target existing foundation pile is obtained, and the pile body integrity category analysis is performed based on the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

[0238] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0239] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0240] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for detecting existing foundation piles based on the outer span hole of the pile, characterized in that: include: Get the first Detection section Pile longitudinal wave velocity data of deep cross section , No. Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , No. Average longitudinal wave velocity data of the pile body in the test section , No. Detection section Calculated pile diameter data for depth cross section , No. Calculate the average value of pile diameter from the detected pile section , No. Detection section Waveform data of the depth cross section, and the ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scan And the ultrasonic travel time slope data in the lower part , and, obtaining geological data of the installation environment of the target existing foundation piles; According to the target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , obtain the pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and analyze the pile bottom position according to the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain the suspected pile bottom position of the target existing foundation pile; Based on the ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile And the ultrasonic travel time slope data in the lower part Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile; According to the target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the pile body in the test section Analyze the abnormal degree of sound velocity of the acoustic test line and obtain the first Detection section The degree of abnormal sound velocity of the sound measurement line in the depth cross section, including: According to the target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the pile body in the test section , and obtain the first Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio ; The target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio , and compared with the preset sound velocity abnormality judgment conditions of the sound measurement line to obtain the target existing foundation pile Detection section The degree of sound velocity anomalies in the depth cross section; and / or, The target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio , and compared with the preset sound velocity abnormality judgment conditions of the sound measurement line to obtain the target existing foundation pile Detection section The degree of abnormal sound velocity of the sound measurement line in the depth cross section, including: When the target has the first Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio When it is greater than or equal to 0.95, the target existing pile is judged to be Detection section The degree of abnormality of the sound velocity of the acoustic measurement line in the deep cross section is no abnormality; When the target has the first Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio When the first wave speed ratio is within the preset range [0.85, 0.95), the first wave speed ratio of the target existing pile is determined. Detection section The degree of abnormality of the sound velocity of the acoustic line in the deep cross section is slight; When the target has the first Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio When the second wave speed ratio is within the preset range [0.65, 0.85), the first Detection section The abnormal degree of sound velocity of the acoustic measurement line in the deep cross section is obviously abnormal; When the target has the first Detection section Pile longitudinal wave velocity data of deep cross section With Average longitudinal wave velocity data of the pile body in the test section Ratio When it is less than 0.65, the target existing pile is judged to be Detection section The abnormal degree of sound velocity of the acoustic measurement line in the deep cross section is serious; According to the target existing foundation pile Detection section Calculated pile diameter data for depth cross section and Calculate the average value of pile diameter from the detected pile section Analyze the abnormality of the pile diameter of the acoustic test line and obtain the first Detection section The degree of abnormality of the pile diameter of the acoustic test line in the deep cross section, including: When the target has the first Detection section Calculated pile diameter data for depth cross section With Calculate the average value of pile diameter from the detected pile section Ratio When it is greater than or equal to 0.95, the target existing pile is judged to be Detection section The degree of abnormality of the pile diameter of the acoustic test line in the deep cross section is no abnormality; When the target has the first Detection section Calculated pile diameter data for depth cross section With Calculate the average value of pile diameter from the detected pile section Ratio When the first pile diameter ratio is within the preset range [0.85, 0.95), the first pile diameter ratio of the target existing foundation pile is determined to be Detection section The degree of anomaly of the pile diameter of the acoustic test line in the deep cross section is slightly abnormal; When the target has the first Detection section Calculated pile diameter data for depth cross section With Calculate the average value of pile diameter from the detected pile section Ratio When the second pile diameter ratio is within the preset range [0.65, 0.85), the first pile of the target existing foundation pile is determined to be Detection section The abnormal degree of pile diameter of the acoustic test line in the deep cross section is obviously abnormal; When the target has the first Detection section Calculated pile diameter data for depth cross section With Calculate the average value of pile diameter from the detected pile section Ratio When it is less than 0.65, the target existing foundation pile is judged to be Detection section The abnormality of the pile diameter of the acoustic test line in the deep cross section is serious; According to the target existing foundation pile Detection section The degree of abnormal sound velocity of the acoustic line in the deep cross section and the Detection section The abnormality of the pile diameter of the acoustic test line in the deep cross section is used to obtain the target existing foundation pile Detection section The value of the acoustic line integrity function for the depth cross section ,include: When the target has the first Detection section The abnormal degree of the acoustic velocity of the acoustic test line and the abnormal degree of the pile diameter of the acoustic test line in the deep cross section are both normal. Detection section The waveform data of the depth cross section indicates that when the measured waveform is normal, the target existing foundation pile is judged to be Detection section The value of the acoustic line integrity function for the depth cross section is 1; When the target has the first Detection section The abnormal degree of the acoustic velocity of the acoustic line of the depth cross section and / or the abnormal degree of the pile diameter of the acoustic line is slightly abnormal, and the Detection section When the waveform data of the depth cross section indicates that the measured waveform distortion is obvious, the target existing foundation pile is judged to be Detection section The value of the acoustic line integrity function for the depth cross section is 2; When the target has the first Detection section The abnormal degree of the acoustic velocity of the acoustic test line and / or the abnormal degree of the pile diameter of the acoustic test line in the depth cross section is obviously abnormal, and the Detection section The waveform data of the depth cross section indicates that when the measured waveform is obviously distorted, the target existing foundation pile is judged to be Detection section The value of the acoustic line integrity function for the depth cross section is 3; When the target has the first Detection section The abnormal degree of the acoustic velocity of the acoustic test line and / or the abnormal degree of the pile diameter of the acoustic test line in the depth cross section is serious abnormality, and the Detection section The waveform data of the depth cross section indicates that when the measured waveform is seriously distorted, the first Detection section The value of the acoustic line integrity function for the depth cross section is 4; According to the target existing foundation pile Detection section The value of the acoustic line integrity function for the depth cross section , and obtain the first The pile body integrity category index of the deep cross section is calculated, and the pile body integrity category analysis is performed according to the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

2. The existing pile foundation detection method based on the pile outer span hole according to claim 1 is characterized in that: The method according to the target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , obtain the auxiliary line of the pile-soil wave velocity difference of the target existing foundation pile, and analyze the pile bottom position based on the auxiliary line of the pile-soil wave velocity difference of the target existing foundation pile and the geological data of the installation environment, and obtain the suspected pile bottom position of the target existing foundation pile, including: According to the target existing foundation pile Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , the first value of the target existing foundation pile is obtained through the expression of the pile-soil wave velocity difference auxiliary line Detection section The curve value of the depth cross section is obtained, and the auxiliary line of the pile-soil wave velocity difference of the target existing foundation pile is drawn according to the curve values ​​of all the detection sections of the target existing foundation pile; According to the trend of the pile-soil wave velocity difference auxiliary line of the target existing foundation pile, the pile bottom position is analyzed in combination with the installation environment geological data of the target existing foundation pile, and the suspected pile bottom position of the target existing foundation pile is obtained.

3. The existing pile foundation detection method based on the pile outer span hole according to claim 2 is characterized in that: The pile bottom position analysis is performed based on the trend of the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the installation environment geological data of the target existing foundation pile to obtain the suspected pile bottom position of the target existing foundation pile, including: When the target has the first Detection section When the curve value of the depth cross section is greater than 0, the target existing foundation pile is determined to be Detection section The depth cross section is in soil or soft rock; When the target has the first Detection section When the curve value of the depth cross section is less than 0, the target existing foundation pile is determined to be Detection section The depth cross section is in hard rock formation; When the target has the first Detection section When the curve value of the depth cross section is equal to 0, the target existing foundation pile is determined to be Detection section The depth cross section is at a location where there is a suspected pile bottom location; Verify the determination result using the geological data of the installation environment of the target existing foundation pile to obtain the suspected pile bottom position of the target existing foundation pile; and / or, The expression of the pile-soil wave velocity difference auxiliary line is: , In the expression of the pile-soil wave velocity difference auxiliary line, represents the design pile diameter of the target existing foundation pile, It indicates the distance that the ultrasonic wave of the pile section detection line passes through the soil around the pile.

4. The existing pile foundation detection method based on the pile outer span hole according to claim 3 is characterized in that: The ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile And the ultrasonic travel time slope data in the lower part Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile, including: Based on the ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile And the ultrasonic travel time slope data in the lower part , the difference between the upper and lower ultrasonic travel time slopes of the suspected pile bottom position of the target existing foundation pile is obtained ; The difference between the upper and lower ultrasonic travel time slopes at the suspected pile bottom position of the target existing foundation pile When it is greater than 0, the suspected pile bottom position of the target existing foundation pile is determined to be the final pile bottom position of the target existing foundation pile; The difference between the upper and lower ultrasonic travel time slopes at the suspected pile bottom position of the target existing foundation pile When it is less than or equal to 0, it is determined that the suspected pile bottom position of the target existing foundation pile does not belong to the final pile bottom position of the target existing foundation pile.

5. The existing pile foundation detection method based on the pile outer span hole according to claim 1 is characterized in that: The method according to the target existing foundation pile Detection section The value of the acoustic line integrity function for the depth cross section , and obtain the first Pile integrity category index for depth cross sections, including: According to the target existing foundation pile Detection section The value of the acoustic line integrity function for the depth cross section , using the expression of pile integrity category index, the first The pile integrity category index of the depth cross section, where the expression of the pile integrity category index is: , In the formula, Indicates Pile integrity category index for depth cross section, represents the number of detection sections, represents a rounding function; and / or, The pile body integrity category analysis is performed according to the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile, including: When the pile body integrity category index of all cross sections of the target existing foundation pile is 1, the pile body integrity category of the target existing foundation pile is determined to be Category I; When there is a cross section with a pile body integrity category index of 2 among all cross sections of the target existing pile foundation, the pile body integrity category of the target existing pile foundation is determined to be Category II; When there is a cross section with a pile integrity category index of 3 among all cross sections of the target existing pile foundation, and When the pile integrity category index of the cross section within 50 cm of the depth cross section is 2, the pile integrity category of the target existing foundation pile is determined to be III; When there is a cross section with pile integrity category index 4 among all cross sections of the target existing pile foundation, and When the pile integrity category index of the cross sections within 50 cm of the depth cross section is 3, the pile integrity category of the target existing foundation pile is determined to be IV.

6. An existing pile foundation detection system based on the pile outer span hole, characterized in that: The existing pile foundation detection method based on the pile outer span hole according to any one of claims 1 to 5 comprises: The data acquisition module is used to obtain the first Detection section Pile longitudinal wave velocity data of deep cross section , No. Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , No. Average longitudinal wave velocity data of the pile body in the test section , No. Detection section Calculated pile diameter data for depth cross section , No. Calculate the average value of pile diameter from the detected pile section , No. Detection section Waveform data of the depth cross section, and the ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile during the sector scan And the ultrasonic travel time slope data in the lower part , and, obtaining geological data of the installation environment of the target existing foundation piles; The first positioning module is used to: Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the soil layer around the pile in the depth cross section , obtain the pile-soil wave velocity difference auxiliary line of the target existing foundation pile, and analyze the pile bottom position according to the pile-soil wave velocity difference auxiliary line of the target existing foundation pile and the geological data of the installation environment to obtain the suspected pile bottom position of the target existing foundation pile; The second positioning module is used to: determine the ultrasonic travel time slope data of the upper half of the suspected pile bottom position of the target existing foundation pile And the ultrasonic travel time slope data in the lower part Perform pile bottom position analysis to obtain the final pile bottom position of the target existing foundation pile; The acoustic velocity anomaly analysis module of the acoustic testing line is used to: Detection section Pile longitudinal wave velocity data of deep cross section and Average longitudinal wave velocity data of the pile body in the test section Analyze the abnormal degree of sound velocity of the acoustic test line and obtain the first Detection section The degree of abnormal sound velocity of the acoustic line in the depth cross section; The acoustic testing line pile diameter abnormality analysis module is used to: Detection section Calculated pile diameter data for depth cross section and Calculate the average value of pile diameter from the detected pile section Analyze the abnormality of the pile diameter of the acoustic test line and obtain the first Detection section The degree of anomaly in the pile diameter of the acoustic test line in the depth cross section; The acoustic line integrity analysis module is used to: Detection section The degree of abnormal sound velocity of the acoustic line in the deep cross section and the Detection section The abnormality of the pile diameter of the acoustic test line in the deep cross section is used to obtain the target existing foundation pile Detection section The value of the acoustic line integrity function for the depth cross section ; The pile integrity category analysis module is used to: Detection section The value of the acoustic line integrity function for the depth cross section , and obtain the first The pile body integrity category index of the deep cross section is calculated, and the pile body integrity category analysis is performed according to the pile body integrity category index of all cross sections of the target existing foundation pile to obtain the pile body integrity category of the target existing foundation pile.

7. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the existing foundation pile detection method based on the pile outer cross hole as described in any one of claims 1 to 5 is implemented.

Citation Information

Patent Citations

  • Method for detecting data aggregation judgment by foundation pile sound wave transmission method

    CN101226170A

  • Method for determining pile bottom depths of existing engineering piles

    CN105971037A

  • Existing foundation pile integrity detection method based on cross hole outside pile

    CN113404097A

  • Foundation pile detection method and system

    CN115404920A

  • Automatic excitation hammer for pile foundation detection by side hole transmission wave method

    CN117306611A