Composite production line processing management method and system for rubber gloves production

By identifying abnormal indicators of composite production line nodes and Nash equilibrium algorithm optimization strategies, the problem of inaccurate abnormal management of composite production lines in rubber glove production is solved and production quality is improved.

CN118313736BActive Publication Date: 2024-10-15ZHANGJIAGANG DAYU RUBBER PRODS
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410737979.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-07
Publication Date
2024-10-15
Estimated Expiration
2044-06-07

Smart Images

  • Figure CN118313736B_ABST
    Figure CN118313736B_ABST
Patent Text Reader

Abstract

The present invention discloses a composite production line processing management method and system for rubber gloves production, which relates to the field of rubber gloves production management. The method comprises: performing node anomaly identification according to multiple node status monitoring blocks, and outputting multiple node anomaly indicators; judging according to multiple node anomaly indicators, and determining the first abnormal node; outputting the first pure strategy set according to the first abnormal node; taking the corresponding nodes on the first abnormal production line except the first abnormal node as the candidate node set, and outputting the candidate pure strategy set of each candidate node to form a candidate pure strategy set combination; performing Nash equilibrium optimization on the first pure strategy set and the candidate pure strategy set combination by using the Nash equilibrium algorithm, and outputting the production line management strategy. The method solves the technical problems in the prior art that the abnormal management accuracy of the composite production line for rubber gloves production is low, the adaptability is poor, and the composite production line processing management effect of rubber gloves production is poor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of rubber glove production management, and in particular to a composite production line processing management method and system for rubber glove production. Background Art

[0002] Rubber gloves are mass-produced products. As the uses of rubber gloves increase, the production lines of rubber gloves are gradually becoming more complicated. Generally, multiple production lines are used to produce rubber gloves. Once a production line fails or stops suddenly, it is easy to cause discontinuity of all production lines, resulting in reduced coordination of other production lines, thus affecting the production quality of rubber gloves. At present, in the relevant technology, there are technical problems such as low accuracy and poor adaptability of abnormal management of composite production lines for rubber gloves, resulting in poor processing management effect of composite production lines for rubber gloves. Summary of the invention

[0003] This application solves the technical problem in the prior art that the abnormal management accuracy and adaptability of the composite production line for rubber gloves production are low, resulting in poor processing management effect of the composite production line for rubber gloves production, by providing a composite production line processing management method and system for rubber gloves production. The technical effect of improving the abnormal management accuracy and adaptability of the composite production line for rubber gloves production, improving the processing management effect of the composite production line for rubber gloves production, and improving the production quality of rubber gloves is achieved.

[0004] The present application provides a composite production line processing management method for rubber gloves production, the method is applied to a composite production line processing management system for rubber gloves production, the method comprising: obtaining composite production line nodes for producing rubber gloves, each production line node corresponding to a processing flow; identifying the processing conditions of each production line node in the composite production line nodes, outputting a plurality of node status monitoring blocks, each node status monitoring block storing processing operation monitoring data of the corresponding node; performing node abnormality identification according to the plurality of node status monitoring blocks, and outputting a plurality of node abnormality indicators; determining a first abnormal node according to the plurality of node abnormality indicators, the first abnormal node being a production line node corresponding to a maximum value among the plurality of node abnormality indicators; outputting a first pure strategy set according to the first abnormal node; determining a first abnormal production line where the first abnormal node is located, taking the nodes corresponding to the first abnormal production line except the first abnormal node as a candidate node set, and outputting a candidate pure strategy set of each candidate node to form a candidate pure strategy set combination; performing Nash equilibrium optimization on the first pure strategy set and the candidate pure strategy set combination by using a Nash equilibrium algorithm, and outputting a production line management strategy.

[0005] The present application also provides a composite production line processing management system for rubber glove production, the system comprising: a composite production line node acquisition module, the composite production line node acquisition module is used to acquire composite production line nodes for producing rubber gloves, each production line node corresponds to a processing flow; a node processing condition identification module, the node processing condition identification module is used to identify the processing condition of each production line node in the composite production line node, output a plurality of node status monitoring blocks, each node status monitoring block stores processing operation monitoring data of the corresponding node; a node abnormality identification module, the node abnormality identification module is used to identify node abnormalities according to the plurality of node status monitoring blocks, and output a plurality of node abnormality indicators; an abnormal node determination module, the abnormal node determination module is used to identify the processing condition of each production line node in the composite production line node, and output a plurality of node abnormality indicators; a node abnormality identification ... Multiple node abnormality indicators are judged to determine the first abnormal node, and the first abnormal node is the production line node corresponding to the maximum value of the multiple node abnormality indicators; a pure strategy set output module, the pure strategy set output module is used to output the first pure strategy set according to the first abnormal node; a candidate combination construction module, the candidate combination construction module is used to determine the first abnormal production line where the first abnormal node is located, and take the nodes corresponding to the first abnormal production line except the first abnormal node as the candidate node set, and output the candidate pure strategy set of each candidate node to form a candidate pure strategy set combination; a Nash equilibrium optimization module, the Nash equilibrium optimization module is used to use the Nash equilibrium algorithm to perform Nash equilibrium optimization on the first pure strategy set and the candidate pure strategy set combination, and output the production line management strategy.

[0006] The present application proposes a composite production line processing management method and system for rubber gloves production, which identifies the processing conditions of each production line node in the composite production line nodes for producing rubber gloves, outputs multiple node status monitoring blocks, and performs node anomaly identification on multiple node status monitoring blocks, outputs multiple node anomaly indicators; determines the first abnormal node based on multiple node anomaly indicators; matches the first pure strategy set and the candidate pure strategy set combination based on the first abnormal node; uses the Nash equilibrium algorithm to perform Nash equilibrium optimization on the first pure strategy set and the candidate pure strategy set combination, and outputs the production line management strategy. The present application solves the technical problem that the abnormal management accuracy and adaptability of the composite production line for rubber gloves production in the prior art are low, resulting in poor processing management effect of the composite production line for rubber gloves production. The present application achieves the technical effect of improving the abnormal management accuracy and adaptability of the composite production line for rubber gloves production, improving the processing management effect of the composite production line for rubber gloves production, and improving the production quality of rubber gloves. BRIEF DESCRIPTION OF THE DRAWINGS

[0007] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the accompanying drawings of the embodiment of the present invention will be briefly introduced below. A flow chart is used in the present application to illustrate the operations performed by the system according to the embodiment of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or one or more operations can be removed from these processes.

[0008] Figure 1 A schematic diagram of a process flow of a composite production line processing management method for rubber gloves production provided in an embodiment of the present application;

[0009] Figure 2 A schematic diagram of the structure of a composite production line processing management system for rubber glove production provided in an embodiment of the present application.

[0010] Explanation of the accompanying drawings: composite production line node acquisition module 1, node processing condition identification module 2, node anomaly identification module 3, abnormal node determination module 4, pure strategy set output module 5, candidate combination construction module 6, Nash equilibrium optimization module 7. DETAILED DESCRIPTION

[0011] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below.

[0012] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0013] In the following description, reference is made to "some embodiments", which describe a subset of all possible embodiments, but it is understood that "some embodiments" may be the same subset or different subsets of all possible embodiments, and may be combined with each other without conflict, and the terms "first\second" involved are merely to distinguish similar objects and do not represent a specific ordering of objects. The terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product, or server that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or modules that are not clearly listed or inherent to these processes, methods, products, or devices. Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of this application. The terms used herein are for the purpose of describing the embodiments of the present application only.

[0014] The embodiment of the present application provides a composite production line processing management method for rubber gloves production, and the method is applied to a composite production line processing management system for rubber gloves production, such as Figure 1 As shown, the method includes:

[0015] First, execute step S100 to obtain the composite production line node for producing rubber gloves, and each production line node corresponds to a processing flow. Specifically, connect a composite production line processing management system for rubber gloves production in the present application to read the composite production line node. The production and processing line of rubber gloves consists of multiple composite production lines. Multiple composite production lines include a mixing and batching production line, a glove forming production line, a glove vulcanization production line, a glove post-processing production line, a glove quality inspection production line, etc. Each composite production line includes multiple glove production nodes. For example, the glove post-processing production line includes a glove cleaning node, a glove trimming node, a glove polishing node, etc. The composite production line node includes multiple production line nodes for producing rubber gloves. Each production line node is a glove production node, and multiple production line nodes are all glove production nodes corresponding to multiple composite production lines. Each production line node corresponds to a processing flow. The processing flow is the production line processing step corresponding to each production line node. For example, the processing flow corresponding to the glove cleaning node includes glove cleaning steps such as water rinsing, soaking cleaning, brushing, and rinsing.

[0016] Further, after obtaining the composite production line node, step S200 is executed to identify the processing conditions of each production line node in the composite production line node, output multiple node status monitoring blocks, and store the processing operation monitoring data of the corresponding node in each node status monitoring block. Specifically, each production line node in the composite production line node is monitored in real time to obtain multiple node status monitoring blocks. Each node status monitoring block includes the processing operation monitoring data corresponding to each production line node. The processing operation monitoring data includes multiple real-time processing parameters corresponding to each production line node. For example, the node status monitoring block corresponding to the glove vulcanization processing node includes real-time vulcanization temperature, real-time vulcanization time and other real-time vulcanization processing parameters.

[0017] Further, on the basis of obtaining multiple node status monitoring blocks, step S300 is executed: node anomaly identification is performed according to the multiple node status monitoring blocks, and multiple node anomaly indicators are output. Specifically, node anomaly detection is performed on each node status monitoring block respectively to obtain multiple node anomaly indicators. Among them, each node anomaly indicator is data information used to characterize the degree of abnormality of the processing conditions corresponding to each production line node. The greater the degree of abnormality of the processing conditions of the production line node, the higher the corresponding node anomaly indicator. By performing node anomaly detection on each node status monitoring block respectively, multiple accurate node anomaly indicators are obtained, which improves the comprehensiveness and accuracy of anomaly detection on the composite production line of rubber gloves production, and at the same time, lays the foundation for subsequent abnormal management of the composite production line of rubber gloves production.

[0018] Preferably, when performing node anomaly detection on each node status monitoring block, based on big data, node anomaly detection record data corresponding to multiple production line nodes are collected respectively to obtain multiple node anomaly detection record sets. Each node anomaly detection record set includes multiple node anomaly detection record groups corresponding to each production line node. Each node anomaly detection record group includes historical node processing schemes, historical node status monitoring blocks, and historical node anomaly indicators corresponding to each production line node. Then, each node anomaly detection record set is continuously self-trained and learned to a convergence state according to the BP neural network to obtain multiple node anomaly detection models corresponding to multiple production line nodes. The BP neural network is a multi-layer feedforward neural network trained according to the error back propagation algorithm. The error back propagation algorithm means that the BP neural network can perform forward calculation and reverse calculation. During forward calculation, the input information is processed layer by layer from the input layer through multiple layers of neurons and turned to the output layer. The state of each layer of neurons only affects the state of the next layer of neurons. If the expected output cannot be obtained in the output layer, reverse calculation is performed, and the error signal is returned along the original connection path. The error signal is minimized by modifying the weights of each neuron. Each node anomaly detection model includes an input layer, a hidden layer, and an output layer. Then, a composite production line processing management system for rubber glove production in the present application is connected to retrieve multiple node processing plans corresponding to multiple production line nodes. The node processing plan and node status monitoring block corresponding to each production line node are used as input information, and the corresponding node anomaly detection model is input to obtain the node anomaly index corresponding to each production line node.

[0019] After outputting multiple node abnormality indicators, continue to execute step S400, judge according to the multiple node abnormality indicators, and determine the first abnormal node, where the first abnormal node is the production line node corresponding to the maximum value among the multiple node abnormality indicators. Specifically, in a possible implementation, when judging multiple node abnormality indicators, the production line node corresponding to the maximum value among the multiple node abnormality indicators is set as the first abnormal node.

[0020] After determining the first abnormal node, continue to execute step S500 and step S600. Among them, step S500 includes: outputting a first pure strategy set according to the first abnormal node. Specifically, the node abnormality index, node processing scheme, and node status monitoring block corresponding to the first abnormal node are set as the first node abnormal feature data. Then, the first node abnormal feature data is input into the first node abnormal operation and maintenance library, and the first node abnormal operation and maintenance library matches the first node abnormal feature data with abnormal operation and maintenance decisions to obtain the first pure strategy set. The first node abnormal operation and maintenance library includes multiple node abnormal operation and maintenance records corresponding to the first abnormal node. Each node abnormal operation and maintenance record includes historical node abnormal feature data and historical node abnormal operation and maintenance decisions corresponding to the first abnormal node. The historical node abnormal feature data includes sample node abnormal indicators, sample node processing schemes, and sample node status monitoring blocks corresponding to the first abnormal node. The historical node abnormal operation and maintenance decision includes the sample node processing adjustment parameters corresponding to the historical node abnormal feature data. The first pure strategy set includes multiple node abnormal operation and maintenance decisions corresponding to the first node abnormal feature data. Each node abnormal operation and maintenance decision includes the node processing adjustment parameters corresponding to the first node abnormal feature data.

[0021] Step S600 includes: determining the first abnormal production line where the first abnormal node is located, taking the corresponding nodes on the first abnormal production line except the first abnormal node as the candidate node set, and outputting the candidate pure strategy set of each candidate node to form a candidate pure strategy set combination. Specifically, the composite production line corresponding to the first abnormal node is set as the first abnormal production line. Multiple glove production nodes on the first abnormal production line except the first abnormal node are recorded as multiple candidate nodes, and the multiple candidate nodes are output as a candidate node set. The candidate node set includes multiple candidate nodes. Then, a composite production line processing management system for rubber glove production in the present application is connected, multiple candidate pure strategy sets corresponding to multiple candidate nodes are read, and multiple candidate pure strategy sets are traversed for multiple random selections to obtain a candidate pure strategy set combination. Among them, each candidate pure strategy set includes multiple candidate management strategies corresponding to each candidate node. Multiple candidate management strategies include multiple node processing control schemes that meet the current adjustment requirements of each candidate node. The candidate pure strategy set combination includes multiple candidate node management strategy combinations. Each candidate node management strategy combination includes a random candidate management strategy in each candidate pure strategy set.

[0022] After obtaining the combination of the first pure strategy set and the candidate pure strategy set, execute step S700, use the Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set, and output the production line management strategy. In a possible implementation, step S700 further includes step S710, establishing a cost function, using the cost function to perform equilibrium identification on the combination of the first pure strategy set and the candidate pure strategy set, and when the equilibrium convergence condition is reached, outputting the Nash equilibrium optimization result, the Nash equilibrium optimization result includes the management strategy corresponding to each node on the first abnormal production line; wherein the goal of reaching the equilibrium convergence condition is to minimize the sum of the loss costs of all nodes on the first abnormal production line. Specifically, the present application uses the Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set, determine the production line management strategy, and perform abnormal management on the abnormal production line according to the production line management strategy, thereby improving the accuracy and adaptability of abnormal management of the composite production line for rubber glove production, and improving the production quality of rubber gloves.

[0023] Preferably, the specific implementation process of performing Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set according to the Nash equilibrium algorithm includes: performing equilibrium identification on the combination of the first pure strategy set and the candidate pure strategy set according to the cost function, obtaining the Nash equilibrium optimization result when the equilibrium convergence condition is reached, and outputting the Nash equilibrium optimization result as the production line management strategy. Among them, the Nash equilibrium optimization result includes the management strategy corresponding to each node on the first abnormal production line when the equilibrium convergence condition is reached. The equilibrium convergence condition is that the sum of the loss costs of all nodes on the first abnormal production line is minimized. The cost function is:

[0024] ;

[0025] in, The first abnormal node Based on the first pure strategy set Combined with the candidate pure strategy set The loss cost and. is the first pure strategy set, The first abnormal node The number of strategies, that is, is the total number of abnormal operation and maintenance decisions for multiple nodes in the first pure strategy set.

[0026] is a candidate pure strategy set combination, is the total number of nodes, which is the total number of glove production nodes corresponding to the first abnormal production line. The candidate pure strategy set combination is a strategy combination with one missing. The strategy combination with one missing is a combination of management strategy sets corresponding to the remaining candidate nodes other than the first abnormal node. There are k-1 candidate pure strategy sets. , The management strategy selected for the jth candidate node, The set of management policies that are selected for all candidate nodes. express Next candidate node Select strategy The probability of Characterizes any combination of candidate node management strategies. The first abnormal node The payment required to adjust all nodes on the first abnormal production line to generate losses, including the first abnormal node The cost corresponding to the loss incurred by adjusting all nodes on the first abnormal production line.

[0027] In a possible implementation, step S400 further includes step S410 and step S420. Among them, step S410 includes: judging the multiple node abnormality indicators, obtaining N abnormal nodes whose abnormality indicators are greater than the preset abnormality indicators, wherein N is a positive integer greater than or equal to 1. Specifically, after obtaining multiple node abnormality indicators, each node abnormality indicator is compared with the preset abnormality indicator. If the node abnormality indicator is greater than the preset abnormality indicator, the production line node corresponding to the node abnormality indicator is recorded as an abnormal node, thereby obtaining N abnormal nodes. N is a positive integer greater than or equal to 1. The preset abnormality indicator includes a node abnormality indicator threshold value pre-set and determined by a composite production line processing management system for rubber glove production of the present application. Each of the N abnormal nodes is a production line node corresponding to a node abnormality indicator greater than the preset abnormality indicator.

[0028] In a possible implementation, step S410 further includes step S411, obtaining the N abnormal production lines corresponding to the N abnormal nodes; step S412, judging whether there is any overlap of production lines among the N abnormal production lines, and if there is any overlap of production lines, outputting the merged M abnormal production lines, wherein M is a positive integer greater than or equal to 1, and M is less than N, performing Nash equilibrium optimization on the M abnormal production lines respectively, outputting M production line management strategies, and managing them with the M production line management strategies. Specifically, the composite production line corresponding to each abnormal node in the N abnormal nodes is recorded as an abnormal production line, and N abnormal production lines are obtained. Further, judging whether there is any overlap of production lines among the N abnormal production lines, that is, judging whether there is the same composite production line among the N abnormal production lines. If there is no same composite production line among the N abnormal production lines, then there is no overlap of production lines among the N abnormal production lines, and executing step S420. Step S420 includes: performing Nash equilibrium optimization on the N abnormal nodes respectively, and outputting N production line management strategies. That is, when there is no overlap among the N abnormal production lines, the Nash equilibrium algorithm is used to search for Nash equilibrium on the N abnormal nodes respectively, and N production line management strategies are obtained, and the N production line management strategies are added to the production line management strategy. The specific implementation process of "searching for Nash equilibrium on the N abnormal nodes respectively according to the Nash equilibrium algorithm" is similar to the specific implementation process of "searching for Nash equilibrium on the combination of the first pure strategy set and the candidate pure strategy set according to the Nash equilibrium algorithm", and for the sake of brevity of the specification, it will not be repeated here.

[0029] If there is an identical composite production line among the N abnormal production lines, then there is overlap among the N abnormal production lines, and step S412 is continued to be executed to merge the N abnormal production lines, that is, the identical composite production line among the N abnormal production lines is recorded as one abnormal production line, and M abnormal production lines are obtained. M is a positive integer greater than or equal to 1, and M is less than N. Further, performing Nash equilibrium optimization on the M abnormal production lines includes step S412-a1 and step S412-a2. Step S412-a1 includes: performing Nash equilibrium optimization on the M abnormal production lines includes a priority allocator, wherein the priority allocator is used to extract features from the M abnormal production lines, including the node abnormality level, the number of nodes involved in the production line, and the importance of the production line. Specifically, feature extraction is performed on the M abnormal production lines according to the feature extraction unit in the priority allocator, and the features of the M abnormal production lines are determined. The characteristics of each abnormal production line include the node abnormality level coefficient corresponding to each abnormal production line, the node quantity coefficient involved in the production line, and the importance coefficient of the production line. The node abnormality level coefficient includes the sum of the node abnormality indicators corresponding to each abnormal production line. The node quantity coefficient involved in the production line includes the total number parameter of the glove production nodes corresponding to each abnormal production line. The importance coefficient of the production line is data information used to characterize the importance of the glove production and processing corresponding to each abnormal production line. The greater the importance of the glove production and processing corresponding to the abnormal production line, the higher the node quantity coefficient involved in the corresponding production line.

[0030] Step S412-a2 includes: using the priority allocator to assign the priority of Nash equilibrium optimization to the M abnormal production lines, and performing Nash equilibrium optimization according to the assigned priority order to output M production line management strategies. Specifically, the M abnormal production line features are input into the priority calculation unit in the priority allocator, and the priority calculation unit performs weighted calculation on the M abnormal production line features according to the preset priority weight allocation conditions to obtain M production line priority coefficients. Among them, the priority allocator includes a feature extraction unit and a priority calculation unit. The feature extraction unit has the function of extracting the node abnormality level of the abnormal production line, the number of nodes involved in the production line, the importance of the production line, and other features. The priority calculation unit has the function of performing weighted calculation on the abnormal production line features according to the preset priority weight allocation conditions. The preset priority weight allocation conditions include the node abnormality level coefficient weight, the number of nodes involved in the production line, and the importance coefficient weight of the production line pre-set and determined by a composite production line processing management system for rubber gloves production of the present application. Then, the M abnormal production lines are arranged in descending order according to the M production line priority coefficients to generate a priority order. The larger the production line priority coefficient is, the higher the ranking of the corresponding abnormal production line is. The priority order includes the ranking of M abnormal production lines in descending order according to the M production line priority coefficients. Then, according to the priority order, the M abnormal production lines are respectively subjected to Nash equilibrium optimization according to the Nash equilibrium algorithm to obtain M production line management strategies, and the M production line management strategies are added to the production line management strategy to improve the accuracy of abnormal management of the composite production line for rubber gloves production.

[0031] Exemplarily, when performing Nash equilibrium optimization on M abnormal production lines respectively according to the Nash equilibrium algorithm, first, according to the priority order, the abnormal production line with the highest priority ranking (that is, the production line with the largest priority coefficient) is recorded as the first Nash equilibrium optimization production line. Then, the first production line pure strategy set and the first production line candidate pure strategy set combination corresponding to the first Nash equilibrium optimization production line are constructed. The first production line pure strategy set has a similar meaning and a similar construction method to the first pure strategy set, which will not be repeated here. The first production line candidate pure strategy set combination has a similar meaning and a similar construction method to the candidate pure strategy set combination, which will not be repeated here. Then, the Nash equilibrium algorithm is used to perform Nash equilibrium optimization on the first production line pure strategy set and the first production line candidate pure strategy set combination to obtain the first production line management strategy corresponding to the first Nash equilibrium optimization production line. By analogy, according to the priority order, the Nash equilibrium algorithm is used to continue to perform Nash equilibrium optimization on the M abnormal production lines, and combined with the first production line management strategy, M production line management strategies are obtained. Moreover, the specific implementation process of "using the Nash equilibrium algorithm to find the Nash equilibrium of the first production line pure strategy set and the first production line candidate pure strategy set combination" is similar to "using the Nash equilibrium algorithm to find the Nash equilibrium of the first pure strategy set and the candidate pure strategy set combination" and will not be repeated here.

[0032] In one possible implementation, after obtaining M abnormal production lines, execute step S412-b1. Step S412-b1 includes: analyzing the M abnormal production lines, determining mixed abnormal production lines and non-mixed abnormal production lines, and performing mixed Nash equilibrium optimization on the mixed abnormal production lines; wherein the mixed abnormal production line is a production line containing at least 2 abnormal nodes, and the non-mixed abnormal production line is a production line containing 1 abnormal node. Specifically, after obtaining M abnormal production lines, the production line containing 1 abnormal node among the M abnormal production lines is recorded as a non-mixed abnormal production line. The production line containing at least 2 abnormal nodes among the M abnormal production lines is recorded as a mixed abnormal production line. Perform mixed Nash equilibrium optimization on the mixed abnormal production lines according to the Nash equilibrium algorithm to obtain a mixed abnormal production line management strategy, and add the mixed abnormal production line management strategy to the production line management strategy to improve the accuracy and comprehensiveness of the production line management strategy. Moreover, the specific implementation process of "searching for mixed Nash equilibrium for mixed abnormal production lines according to the Nash equilibrium algorithm" is similar to "searching for Nash equilibrium for the combination of the first pure strategy set and the candidate pure strategy set according to the Nash equilibrium algorithm", which will not be repeated here.

[0033] In the above, refer to Figure 1 A composite production line processing management method for rubber gloves production according to an embodiment of the present invention is described in detail. Figure 2 A composite production line processing management system for rubber glove production according to an embodiment of the present invention is described.

[0034] A composite production line processing management system for rubber gloves production according to an embodiment of the present invention solves the technical problem that the abnormal management accuracy and adaptability of the composite production line for rubber gloves production in the prior art are low, resulting in poor composite production line processing management effect for rubber gloves production. The technical effect of improving the abnormal management accuracy and adaptability of the composite production line for rubber gloves production, improving the composite production line processing management effect for rubber gloves production, and improving the production quality of rubber gloves is achieved.

[0035] A composite production line processing management system for rubber glove production according to an embodiment of the present invention comprises: a composite production line node acquisition module 1, a node processing condition identification module 2, a node abnormality identification module 3, an abnormal node determination module 4, a pure strategy set output module 5, a candidate combination construction module 6, and a Nash equilibrium optimization module 7.

[0036] The composite production line node acquisition module 1 is used to acquire the composite production line nodes for producing rubber gloves, and each production line node corresponds to a processing flow;

[0037] The node processing condition identification module 2 is used to identify the processing condition of each production line node in the composite production line node, and output a plurality of node status monitoring blocks, each of which stores the processing operation monitoring data of the corresponding node;

[0038] The node anomaly identification module 3 is used to identify node anomalies according to the multiple node status monitoring blocks and output multiple node anomaly indicators;

[0039] The abnormal node determination module 4 is used to determine a first abnormal node according to the plurality of node abnormal indicators, where the first abnormal node is a production line node corresponding to a maximum value among the plurality of node abnormal indicators;

[0040] The pure policy set output module 5 is used to output a first pure policy set according to the first abnormal node;

[0041] The candidate combination construction module 6 is used to determine the first abnormal production line where the first abnormal node is located, take the corresponding nodes on the first abnormal production line except the first abnormal node as the candidate node set, and output the candidate pure strategy set of each candidate node to form a candidate pure strategy set combination;

[0042] The Nash equilibrium optimization module 7 is used to use the Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set, and output the production line management strategy.

[0043] Furthermore, the Nash equilibrium optimization module 7 is also used to: establish a cost function, use the cost function to perform equilibrium identification on the first pure strategy set and the candidate pure strategy set combination, and when the equilibrium convergence condition is reached, output the Nash equilibrium optimization result, and the Nash equilibrium optimization result includes the management strategy corresponding to each node on the first abnormal production line; wherein, the goal of reaching the equilibrium convergence condition is to minimize the sum of the loss costs of all nodes on the first abnormal production line.

[0044] The cost function has the following expression:

[0045] ;

[0046] in, The first abnormal node Based on the first pure strategy set Combined with the candidate pure strategy set the cost of losses and;

[0047] is the first pure strategy set, The first abnormal node The number of strategies; is a candidate pure strategy set combination, is the total number of nodes, and the candidate pure strategy set combination is a strategy combination lacking one;

[0048] , The management strategy selected for the jth candidate node, The set of management policies selected for all candidate nodes;

[0049] express Next candidate node Select strategy The probability of The first abnormal node The cost required to pay for the losses caused by adjusting all nodes on the first abnormal production line.

[0050] Furthermore, the abnormal node determination module 4 is also used to: judge the abnormal indicators of the multiple nodes, obtain N abnormal nodes whose abnormal indicators are greater than the preset abnormal indicators, where N is a positive integer greater than or equal to 1; perform Nash equilibrium optimization on the N abnormal nodes respectively, and output N production line management strategies.

[0051] Furthermore, the abnormal node determination module 4 is also used to: obtain the N abnormal production lines corresponding to the N abnormal nodes; determine whether there is any overlap in the N abnormal production lines, and if there is any overlap, output the merged M abnormal production lines, where M is a positive integer greater than or equal to 1, and M is less than N, perform Nash equilibrium optimization on the M abnormal production lines respectively, output M production line management strategies, and manage them with the M production line management strategies.

[0052] Furthermore, the abnormal node determination module 4 is also used for: performing Nash equilibrium optimization on the M abnormal production lines respectively, including a priority allocator, wherein the priority allocator is used to extract features of the M abnormal production lines, including the node abnormality level, the number of nodes involved in the production line, and the importance of the production line; using the priority allocator to assign Nash equilibrium optimization priorities to the M abnormal production lines, and performing Nash equilibrium optimization according to the assigned priority order to output M production line management strategies.

[0053] Furthermore, the abnormal node determination module 4 is also used to: analyze the M abnormal production lines, determine mixed abnormal production lines and non-mixed abnormal production lines, and perform mixed Nash equilibrium optimization on the mixed abnormal production lines; wherein the mixed abnormal production line is a production line containing at least 2 abnormal nodes, and the non-mixed abnormal production line is a production line containing 1 abnormal node.

[0054] A composite production line processing management system for rubber gloves production provided by an embodiment of the present invention can execute a composite production line processing management method for rubber gloves production provided by any embodiment of the present invention, and has functional modules and beneficial effects corresponding to the execution method.

[0055] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, and the various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of the present invention.

[0056] The above specific implementations do not constitute a limitation on the protection scope of this application. It should be understood by those skilled in the art that various modifications, combinations and substitutions can be made according to design requirements and other factors. Any modifications, equivalent substitutions and improvements made within the spirit and principles of this application should be included in the protection scope of this application.

Claims

1. Composite production line processing management method for rubber gloves production, It is characterized in that The method comprises: Get the composite production line nodes for producing rubber gloves. Each production line node corresponds to a processing flow. By identifying the processing conditions of each production line node in the composite production line node, a plurality of node status monitoring blocks are output, each of which stores processing operation monitoring data of the corresponding node; Perform node anomaly identification according to the multiple node status monitoring blocks, and output multiple node anomaly indicators; Determine a first abnormal node by judging according to the multiple node abnormality indicators, where the first abnormal node is a production line node corresponding to a maximum value among the multiple node abnormality indicators; Outputting a first pure strategy set according to the first abnormal node; Determine a first abnormal production line where the first abnormal node is located, take corresponding nodes on the first abnormal production line except the first abnormal node as a candidate node set, and output a candidate pure strategy set for each candidate node to form a candidate pure strategy set combination; Using a Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set, and outputting a production line management strategy; Judging according to the multiple node abnormality indicators, the method also includes: The abnormality indicators of the multiple nodes are judged to obtain N abnormal nodes whose abnormality indicators are greater than the preset abnormality indicators, where N is a positive integer greater than or equal to 1; Perform Nash equilibrium optimization on the N abnormal nodes respectively, and output N production line management strategies; Before performing Nash equilibrium optimization on the N abnormal nodes respectively, the method further includes: Obtaining N abnormal production lines corresponding to the N abnormal nodes; Determine whether there is any overlap among the N abnormal production lines. If there is any overlap, output the merged M abnormal production lines, where M is a positive integer greater than or equal to 1 and M is less than N. Perform Nash equilibrium optimization on the M abnormal production lines respectively, output M production line management strategies, and manage them according to the M production line management strategies; After outputting the merged M abnormal production lines, the method further includes: Analyze the M abnormal production lines, determine mixed abnormal production lines and non-mixed abnormal production lines, and perform mixed Nash equilibrium optimization on the mixed abnormal production lines; The mixed abnormal production line is a production line including at least two abnormal nodes, and the non-mixed abnormal production line is a production line including one abnormal node.

2. The method according to claim 1, It is characterized in that Using a Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set includes: Establishing a cost function, using the cost function to perform equilibrium identification on the first pure strategy set and the candidate pure strategy set combination, and outputting a Nash equilibrium optimization result when a equilibrium convergence condition is reached, wherein the Nash equilibrium optimization result includes a management strategy corresponding to each node on the first abnormal production line; The goal of achieving equilibrium convergence conditions is to minimize the sum of the loss costs of all nodes on the first abnormal production line.

3. The method according to claim 2, It is characterized in that The cost function has the following expression: Among them, E i (σ i |σ -i ) is the first abnormal node i based on the first pure strategy set σ i Combined with the candidate pure strategy set σ -i the cost of losses and; σ i =(s 1 ,……,s n ) is the first pure strategy set, n is the number of strategies of the first abnormal node i; σ -i =(σ 1 ,…,σ i-1 ,σ i+1 …,σ k ) is a candidate pure strategy set combination, k is the total number of nodes, and the candidate pure strategy set combination is a strategy combination lacking one; σ i σ -i =(σ 1 ,…,σ i-1 ,σ i ,σ i+1 …,σ k ), s j is the management strategy selected for the jth candidate node, and S is the management strategy set selected for all candidate nodes; σ j [s j ] represents σ j Next candidate node j selection strategy s j The probability of u i (s) is the price that the first abnormal node i needs to pay for the loss caused by adjusting all nodes on the first abnormal production line.

4. The method according to claim 1, It is characterized in that Performing Nash equilibrium optimization on the M abnormal production lines respectively and outputting M production line management strategies, the method further includes: Performing Nash equilibrium optimization on the M abnormal production lines respectively includes a priority allocator, wherein the priority allocator is used to extract features of the M abnormal production lines, including node abnormality levels, the number of nodes involved in the production lines, and the importance of the production lines; The priority allocator is used to assign Nash equilibrium optimization priorities to the M abnormal production lines, and Nash equilibrium optimization is performed according to the assigned priority order to output M production line management strategies.

5. Composite production line processing management system for rubber gloves production, It is characterized in that The system is used to execute the method according to any one of claims 1 to 4, and the system comprises: A composite production line node acquisition module, wherein the composite production line node acquisition module is used to acquire composite production line nodes for producing rubber gloves, each production line node corresponding to a processing flow; A node processing condition identification module, the node processing condition identification module is used to identify the processing condition of each production line node in the composite production line node, and output a plurality of node status monitoring blocks, each of which stores processing operation monitoring data of the corresponding node; A node anomaly identification module, the node anomaly identification module is used to identify node anomalies according to the multiple node status monitoring blocks and output multiple node anomaly indicators; An abnormal node determination module, the abnormal node determination module is used to determine a first abnormal node according to the multiple node abnormality indicators, the first abnormal node being a production line node corresponding to a maximum value among the multiple node abnormality indicators; A pure policy set output module, the pure policy set output module is used to output a first pure policy set according to the first abnormal node; a candidate combination construction module, the candidate combination construction module being used to determine a first abnormal production line where the first abnormal node is located, taking nodes corresponding to the first abnormal production line except the first abnormal node as a candidate node set, and outputting a candidate pure strategy set of each candidate node to form a candidate pure strategy set combination; A Nash equilibrium optimization module is used to use a Nash equilibrium algorithm to perform Nash equilibrium optimization on the combination of the first pure strategy set and the candidate pure strategy set, and output a production line management strategy.