A river bank protection paving construction method for water conservancy projects

By using the U-shaped base plate and shock-absorbing main plate design of the slope protection frame, combined with the stone slab inlay structure, the problems of water erosion and cement pollution in river slope protection have been solved, thereby improving the stability and environmental friendliness of the slope protection.

CN118326900BActive Publication Date: 2024-11-22GUANGDONG GUANGJIAN CONSTR ENG GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410568130.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-09
Publication Date
2024-11-22
Estimated Expiration
2044-05-09

AI Technical Summary

Technical Problem

Existing riverbank protection is susceptible to erosion by water flow during seasonal or severe weather, which can weaken the slope's effectiveness or even cause it to collapse. Furthermore, cement pouring may cause pollution by flowing into the river, impacting the ecological environment.

Method used

The slope protection frame design, combined with a U-shaped base plate and a shock-absorbing main plate, and the structure of shock-absorbing baffles and stone slab inlay plates, ensures the stability of the slope protection and reduces cement flow into the river. On-site surveys and measurements are used to improve the accuracy of construction.

Benefits of technology

It improves the stability and durability of riverbank protection, reduces the impact of water flow, prevents cement from polluting the river, and enhances construction efficiency and environmental friendliness.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118326900B_ABST
    Figure CN118326900B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of water conservancy engineering, and specifically to a river channel slope protection paving construction method for water conservancy engineering, comprising a river channel slope protection, wherein a slope protection frame is fixedly connected to an inner wall of an upper front side of the river channel slope protection, and a plurality of stone slabs are fixedly connected to an inner wall of a front side of the slope protection frame, wherein the river channel slope protection comprises a river channel slope protection body, a slope is arranged on an upper front side of the river channel slope protection body, a slope is arranged on the front side of the slope, a slope U-shaped groove is arranged on an inner wall of the slope groove, and the slope protection frame comprises a U-shaped bottom plate, a shock-absorbing main board is fixedly connected to the inner wall of the shock-absorbing main board, and a shock-absorbing baffle is movably connected to the inner wall of the shock-absorbing main board. The present invention combines the river channel slope protection with the slope protection frame by providing a river channel slope protection paving frame, and the slope protection frame adopts the design of the U-shaped bottom plate and the shock-absorbing main board, and the shock-absorbing baffle in the shock-absorbing main board is used to damp the impact of water flow, thereby reducing the impact force of water flow on the slope protection, and improving the stability and durability of the slope protection.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of water conservancy engineering, and more specifically, to a river channel slope protection paving construction method for water conservancy engineering. Background Art

[0002] Slope protection refers to the general term for various paving and planting on the slope surface to prevent the slope from being eroded. In the river section where the bridge is located, the concave bank of the river bank is eroded by water flow year by year, which will cause the river bank to collapse continuously. In order to protect the safety of bridges and embankments, protective buildings must be built on the concave bank. In addition, when the river flow direction changes due to the construction of the bridge, the river bank is eroded and endangers farmland and villages, protective buildings must also be built on the river bank.

[0003] According to the patent document: CN113216088A, a river slope protection construction method for water conservancy projects disclosed herein relates to the technical field of water conservancy projects. The river slope protection includes a plurality of frame plates laid in an array on the slope surface, and a plurality of bricks are arranged in an array in each of the frame plates, and a caulking structure is arranged under the gap between adjacent frame plates; the river slope protection construction method includes the following steps: Step 1, dividing the slope surface into a plurality of units, and laying bricks in each unit; Step 2, laying the caulking structure between adjacent units; Step 3, laying and fixing the frame plates in each unit, and the frame plates cover the gaps between the bricks, and the edges of the frame plates overlap the caulking structure. In the present invention, the river slope protection protects the river bank slope surface and prevents soil erosion from causing pollution and turbidity of the river water. Since the frame plates are fixed, the bricks pressed by the frame plates and the caulking structure are also fixed on the slope surface. Overall, the river slope protection is laid firmly and the construction is convenient.

[0004] When laying river bank protection, generally only stone slabs are pasted on the slope of the river bank protection. However, in some seasons or bad weather, the water flow is too large and will wash the bank protection, resulting in a weakened slope protection effect and even the risk of slope collapse. However, the existing slope protection cannot reduce the impact of water flow on the shore. Therefore, when laying river bank protection, a more solid and reliable construction method is needed to ensure the stability and safety of the slope.

[0005] When using cement to pour stone slabs, due to its own characteristics, cement may flow down the slope during pouring and flow into the river, causing river pollution and affecting the river's ecological environment. Therefore, how to ensure the slope protection effect while reducing the impact of construction on the river environment is also an important issue that needs to be solved in the current water conservancy project slope protection construction. Summary of the invention

[0006] In order to overcome the above-mentioned defects of the prior art, the present invention provides a river channel slope protection paving construction method for water conservancy projects. The technical problem to be solved by the present invention is that excessive water flow in seasonal or severe weather conditions will wash away the slope protection, resulting in a weakened slope protection effect and even a risk of slope collapse. However, the existing slope protection cannot reduce the impact force of the water flow hitting the shore. Therefore, when laying the river channel slope protection, a more solid and reliable construction method is required to ensure the stability and safety of the slope. In addition, when using cement to pour stone slabs, the cement may flow down the slope due to its own characteristics during pouring, and flow into the river to cause river pollution and affect the river ecological environment. Therefore, how to reduce the impact of construction on the river environment while ensuring the slope protection effect.

[0007] In order to solve the above technical problems, the technical solution adopted by the present invention is:

[0008] In the first aspect, a river bank protection paving construction method for a water conservancy project is composed of the following steps:

[0009] Step 1: Before laying the river bank protection, conduct on-site investigation and measurement to determine the laying scope and construction requirements of the bank protection, including the height, width, slope and other parameters of the bank protection, and select appropriate materials and equipment according to the actual situation;

[0010] Step 2: Clean the riverbed before construction, remove debris and garbage, etc., to ensure that the paving surface is flat and clean;

[0011] Step 3: Lay slope protection materials. Select appropriate slope protection materials according to design requirements, such as concrete, stone, brick, etc., and lay them according to requirements to ensure the flatness and stability of the laying;

[0012] Step 4: After the slope protection materials are laid, maintenance and reinforcement treatments are carried out, such as watering maintenance, reinforcement support, etc., to ensure the stability and durability of the slope protection.

[0013] In the second aspect, a river channel slope protection frame for water conservancy projects is proposed: comprising a river channel slope protection, wherein the upper front inner wall of the river channel slope protection is fixedly connected to a slope protection frame, and the front inner wall of the slope protection frame is fixedly connected to a plurality of stone slabs;

[0014] The river channel slope protection comprises a river channel slope protection body, a slope is provided on the upper front side of the river channel slope protection body, a slope groove is provided on the front side of the slope, and a slope U-shaped groove is provided on the inner wall of the slope groove;

[0015] The slope protection frame comprises a U-shaped bottom plate, the inner wall of the U-shaped bottom plate is fixedly connected with a shock-absorbing main board, the inner wall of the shock-absorbing main board is movably connected with a shock-absorbing baffle, and the front inner wall of the shock-absorbing baffle is fixedly connected with a stone inlay plate.

[0016] As a further solution of the present invention: the U-shaped bottom plate includes a U-shaped plate body, a U-shaped connecting rod is fixedly connected to the rear side of the U-shaped plate body, a U-shaped groove is opened on the inner wall of the U-shaped plate body, and a plurality of fixing grooves are respectively opened on the left and right sides and the bottom of the front side of the U-shaped plate body.

[0017] As a further solution of the present invention: the outer wall of the U-shaped plate body is fixedly connected to the inner wall of the slope groove, and the outer wall of the U-shaped connecting rod is fixedly connected to the inner wall of the slope U-shaped groove.

[0018] As a further solution of the present invention: the shock-absorbing mainboard includes a shock-absorbing mainboard mainboard body, and the left and right sides and the bottom of the shock-absorbing mainboard main body are respectively fixedly connected with shock-absorbing mainboard connecting rods, and the left and right sides of the rear side of the inner wall of the shock-absorbing mainboard main body are respectively provided with shock-absorbing mainboard slide grooves, and the top and the bottom of the inner walls of the two shock-absorbing mainboard slide grooves are respectively fixedly connected with springs, and the opposite surfaces of the two groups of springs are fixedly connected with sliders, and the outer walls of the two groups of sliders are slidably connected to the inner walls of the shock-absorbing mainboard slide grooves, and the front sides of the two groups of sliders are rotatably connected with rotating rods, and the two groups of rotating rods are rotatably connected with connecting plates on the side away from the sliders.

[0019] As a further solution of the present invention: the outer wall of the shock-absorbing mainboard body is fixedly connected to the inner wall of the U-shaped plate body, and the outer walls of the three shock-absorbing mainboard connecting rods are fixedly connected to the inner wall of the U-shaped groove.

[0020] As a further solution of the present invention: the shock-absorbing baffle includes a shock-absorbing baffle back plate, the front side of the shock-absorbing baffle back plate is fixedly connected to a baffle, the rear side of the shock-absorbing baffle back plate is fixedly connected to the front sides of two connecting plates, and the outer wall of the shock-absorbing baffle back plate is slidably connected to the inner wall of the shock-absorbing main board body.

[0021] As a further solution of the present invention: the stone inlay panel includes a inlay panel body, the outer wall of the inlay panel body is fixedly connected to the inner wall of the baffle, a inlay groove is provided on the front side of the inlay panel body, and inlay panel sliding grooves are respectively provided on the left and right sides of the inlay groove, the inner wall of the inlay groove is slidably connected with a inlay panel, a plurality of the stone slabs are fixedly connected to the front side of the inlay panel, and a telescopic baffle body is fixedly connected to the bottom of the inlay panel body.

[0022] As a further solution of the present invention: the inner wall of the telescopic baffle body is slidably connected with an extension plate, the inner wall of the extension plate is slidably connected with a second extension plate, the left and right sides of the second extension plate are respectively fixedly connected with transmission blocks, the inner walls of the two transmission blocks are threadedly connected with bidirectional screw rods, the front ends of the two bidirectional screw rods are fixedly connected with a turning handle, the outer walls of the two bidirectional screw rods extending to the rear side of the transmission blocks are movably connected with connecting shafts, the outer walls of the two bidirectional screw rods extending to the rear side of the connecting shafts are threadedly connected with inlaid plate push-pull rods, the outer walls of the two connecting shafts are fixedly connected to the left and right sides of the telescopic baffle body, and the rear ends of the two bidirectional screw rods are respectively movably connected to the left and right sides of the baffle;

[0023] As a further solution of the present invention: the upper and lower sides of the rear sides of the two inlay panel push-pull rods are respectively fixedly connected with inlay panel push-pull L-shaped rods, the two groups of inlay panel push-pull L-shaped rods are fixedly connected with inlay panel sliding rods on the side away from the inlay panel push-pull rods, the opposite sides of the two groups of inlay panel sliding rods are fixedly connected with inlay panels, and the two inlay panel sliding rods are respectively slidably connected to the inner walls of the inlay panel sliding grooves opened on the left and right sides of the inlay groove.

[0024] The beneficial effects of the present invention are:

[0025] 1. The present invention combines the river slope protection with the slope protection frame by providing a river slope protection frame. The slope protection frame adopts the design of a U-shaped bottom plate and a shock-absorbing main board. The shock-absorbing baffle in the shock-absorbing main board is used to dampen the impact of water flow, thereby reducing the impact of water flow on the slope protection and improving the stability and durability of the slope protection.

[0026] 2. By providing a telescopic baffle body and a bidirectional screw rod and other structures, the position and height of the mosaic plate can be easily adjusted to meet the requirements of slope protection laying of different heights and slopes, thereby improving the construction efficiency and quality. The present invention also ensures the accuracy and reliability of slope protection laying through on-site investigation and measurement, thereby reducing the impact of construction on the river environment. The design of the stone mosaic plate enables the stone plate to be firmly embedded in the slope protection frame, thereby avoiding the problem of stone plate flowing into the river and causing river pollution during cement pouring;

[0027] 3. In summary, the present invention provides a river channel slope protection paving construction method and river channel slope protection paving frame for water conservancy projects, which has the advantages of simple structure, convenient construction, good shock absorption effect, environmental protection, etc., and can be widely used in the paving construction of river channel slope protection of water conservancy projects, providing strong support for ensuring river safety and promoting ecological environmental protection. At the same time, the implementation of the present invention can also promote the innovation and development of water conservancy engineering technology and promote the sustainable development of the water conservancy industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the steps of the present invention;

[0029] Figure 2 It is a schematic diagram of the main three-dimensional structure of the present invention;

[0030] Figure 3 It is a schematic diagram of the three-dimensional structure of the river slope protection of the present invention;

[0031] Figure 4 It is a schematic diagram of the three-dimensional structure of the slope protection frame and the stone slab of the present invention;

[0032] Figure 5 It is a three-dimensional schematic diagram of the slope protection frame structure of the present invention;

[0033] Figure 6 It is a schematic diagram of the three-dimensional structure of the U-shaped bottom plate of the present invention;

[0034] Figure 7 It is a three-dimensional schematic diagram of the shock-absorbing mainboard structure of the present invention;

[0035] Figure 8 It is a schematic diagram of the three-dimensional structure of the shock-absorbing baffle of the present invention;

[0036] Fig. 9 It is a schematic diagram of the three-dimensional structure of the stone mosaic panel of the present invention;

[0037] Fig.10 This is a schematic diagram of the unfolded structure of the telescopic baffle body of the present invention;

[0038] Fig.11 It is a schematic diagram of the three-dimensional structure of the mosaic panel and the mosaic panel push-pull rod of the present invention.

[0039] In the figure: 1, river slope protection; 11, river slope protection body; 12, slope; 13, slope groove; 14, slope U-shaped groove; 2, slope protection frame; 21, U-shaped bottom plate; 211, U-shaped plate body; 212, U-shaped connecting rod; 213, U-shaped groove; 214, fixed groove; 22, shock-absorbing main board; 221, shock-absorbing main board body; 222, shock-absorbing main board connecting rod; 223, shock-absorbing main board sliding groove; 224, spring; 225, slider; 226, rotating rod; 227, connecting plate; 23, shock-absorbing stop Plate; 231, shock-absorbing baffle back plate; 232, baffle; 24, stone slab inlay plate; 241, inlay plate body; 242, inlay groove; 243, telescopic baffle body; 244, extension plate; 245, second extension plate; 246, transmission block; 247, two-way screw rod; 248, turning handle; 249, connecting shaft; 2410, inlay plate slide groove; 2411, inlay plate; 2412, inlay plate push-pull rod; 2413, inlay plate push-pull L-shaped rod; 2414, inlay plate slide rod; 3, stone slab. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] like Figure 1-10 As shown, the present invention provides a river bank protection paving construction method for water conservancy projects, which consists of the following steps:

[0042] Step 1: Before laying the river bank protection, conduct on-site investigation and measurement to determine the laying scope and construction requirements of the bank protection, including the height, width, slope and other parameters of the bank protection, and select appropriate materials and equipment according to the actual situation;

[0043] Step 2: Clean the riverbed before construction, remove debris and garbage, etc., to ensure that the paving surface is flat and clean;

[0044] Step 3: Lay slope protection materials. Select appropriate slope protection materials according to design requirements, such as concrete, stone, brick, etc., and lay them according to requirements to ensure the flatness and stability of the laying;

[0045] Step 4: After the slope protection materials are laid, maintenance and reinforcement treatments are carried out, such as watering maintenance, reinforcement support, etc., to ensure the stability and durability of the slope protection;

[0046] In addition, a river channel slope protection frame for water conservancy projects is proposed, including a river channel slope protection 1, a slope protection frame 2 is fixedly connected to the upper front inner wall of the river channel slope protection 1, and a plurality of stone slabs 3 are fixedly connected to the front inner wall of the slope protection frame 2.

[0047] like Figure 1-11As shown, the river slope protection 1 includes a river slope protection body 11, a slope 12 is provided on the upper front side of the river slope protection body 11, a slope groove 13 is provided on the front side of the slope 12, and a slope U-shaped groove 14 is provided on the inner wall of the slope groove 13. The slope protection frame 2 includes a U-shaped bottom plate 21, a shock-absorbing main plate 22 is fixedly connected to the inner wall of the U-shaped bottom plate 21, a shock-absorbing baffle 23 is movably connected to the inner wall of the shock-absorbing main plate 22, a stone slab inlay plate 24 is fixedly connected to the inner wall of the front side of the shock-absorbing baffle 23, and the U-shaped bottom plate 21 includes a U-shaped plate body 211 The rear side of the U-shaped plate body 211 is fixedly connected with a U-shaped connecting rod 212, the inner wall of the U-shaped plate body 211 is provided with a U-shaped groove 213, the left and right sides and the bottom of the front side of the U-shaped plate body 211 are respectively provided with a plurality of fixing grooves 214, the outer wall of the U-shaped plate body 211 is fixedly connected to the inner wall of the slope groove 13, the outer wall of the U-shaped connecting rod 212 is fixedly connected to the inner wall of the slope U-shaped groove 14, the shock absorbing main board 22 includes a shock absorbing main board body 221, the left and right sides of the shock absorbing main board body 221 are respectively fixed to the bottom A shock-absorbing mainboard connecting rod 222 is connected, and shock-absorbing mainboard sliding grooves 223 are respectively opened on the left and right sides of the rear side of the inner wall of the shock-absorbing mainboard main body 221. The top and bottom of the inner walls of the two shock-absorbing mainboard sliding grooves 223 are respectively fixedly connected with springs 224, and the opposite surfaces of the two groups of springs 224 are fixedly connected with sliders 225. The outer walls of the two groups of sliders 225 are slidably connected to the inner walls of the shock-absorbing mainboard sliding grooves 223. The front sides of the two groups of sliders 225 are rotatably connected with rotating rods 226, and the two groups of rotating rods 226 are away from the side of the sliders 225. The outer wall of the shock absorbing main board body 221 is fixedly connected to the inner wall of the U-shaped plate body 211, and the outer walls of the three shock absorbing main board connecting rods 222 are fixedly connected to the inner wall of the U-shaped groove 213. The shock absorbing baffle 23 includes a shock absorbing baffle rear plate 231, and the front side of the shock absorbing baffle rear plate 231 is fixedly connected to the baffle 232. The rear side of the shock absorbing baffle rear plate 231 is fixedly connected to the front sides of the two connecting plates 227, and the outer wall of the shock absorbing baffle rear plate 231 is slidably connected to the inner wall of the shock absorbing main board body 221;

[0048] First, the slope protection frame 2 is fixedly installed on the slope 12 of the river slope protection 1 through the U-shaped bottom plate 21, and the U-shaped plate body 211 and the U-shaped connecting rod 212 of the U-shaped bottom plate 21 are respectively embedded in the slope groove 13 and the slope U-shaped groove 14 to ensure the stability of the slope protection frame 2, and then fillers such as cement or sand are injected into the U-shaped groove 213 to fix the slope protection frame 2 and the river slope protection 1. Then, the shock-absorbing main board 22 is fixedly connected to the U-shaped bottom plate 21 through the shock-absorbing main board body 221 and the shock-absorbing main board connecting rod 222, and cement is injected to form a stable supporting structure;

[0049] The design of the damping mainboard slide groove 223 enables the slider 225 to slide therein, and the spring 224 plays a role of damping and buffering. When the river slope protection is subjected to external impact, the damping mainboard 22 can effectively absorb and disperse the impact force, thereby reducing damage to the main body of the river slope protection;

[0050] The shock-absorbing baffle 23 is connected to the connecting plate 227 through the shock-absorbing baffle rear plate 231, and can undergo a certain degree of elastic deformation when impacted, further increasing the shock-absorbing effect and ensuring the safety and stability of the slope;

[0051] In summary, the river channel slope protection laying construction method and river channel slope protection frame of the present invention improve the stability and durability of the river channel slope protection through reasonable structural design and vibration reduction measures, reduce the frequency and cost of maintenance and repair, and at the same time improve the efficiency and flexibility of laying, providing strong support and guarantee for the construction and maintenance of water conservancy projects.

[0052] like Figure 9-11 As shown, the stone inlay plate 24 includes an inlay plate body 241, the outer wall of the inlay plate body 241 is fixedly connected to the inner wall of the baffle plate 232, an inlay groove 242 is provided on the front side of the inlay plate body 241, and the left and right sides of the inlay groove 242 are respectively provided with inlay plate slide grooves 2410, the inner wall of the inlay groove 242 is slidably connected with an inlay plate 2411, and a plurality of stone slabs 3 are fixedly connected to the front side of the inlay plate 2411, and the bottom of the inlay plate body 241 is fixedly connected with a telescopic baffle body 243, and the inner wall of the telescopic baffle body 243 is slidably connected with an extension plate 244, and the inner wall of the extension plate 244 is slidably connected with a second extension plate 245, and the left and right sides of the second extension plate 245 are respectively fixedly connected with transmission blocks 246, and the inner walls of the two transmission blocks 246 are both threadedly connected with bidirectional screw rods 247, and the front ends of the two bidirectional screw rods 247 are fixedly connected with a turning handle 248, and the two bidirectional screw rods 248 are fixedly connected with the turning handle 248. The outer wall of the screw rod 247 extending to the rear side of the transmission block 246 is movably connected with a connecting shaft 249, and the outer walls of the two bidirectional screw rods 247 extending to the rear side of the connecting shaft 249 are threadedly connected with the inlay plate push-pull rod 2412, and the outer walls of the two connecting shafts 249 are fixedly connected to the left and right sides of the telescopic baffle body 243, and the rear ends of the two bidirectional screw rods 247 are movably connected to the left and right sides of the baffle 232, and the upper and lower sides of the rear sides of the two inlay plate push-pull rods 2412 are respectively fixedly connected with the inlay plate push-pull L-shaped rods 2413, and the two groups of inlay plate push-pull L-shaped rods 2413 are fixedly connected to the side away from the inlay plate push-pull rod 2412. The opposite sides of the two groups of inlay plate slide rods 2414 are fixedly connected with the inlay plate 2411, and the two inlay plate slide rods 2414 are respectively slidably connected to the inner walls of the inlay plate slide groove 2410 opened on the left and right sides of the inlay groove 242.

[0053] The stone slab 3 is fixed on the slope protection frame 2 through the stone slab inlay plate 24. The design of the inlay plate body 241 enables the stone slab 3 to be firmly inlaid in the front side of the inlay plate 2411 in the inlay groove 242, ensuring the flatness and stability of the stone slab;

[0054] When the stone slab 3 is inlaid and cement is injected, in order to prevent the cement from flowing into the river, the handle 248 is first turned. After the handle 248 is turned, the bidirectional screw rod 247 is driven to move forward to drive the second extension plate 245 and the extension plate 244 to extend and unfold on the inner wall of the telescopic baffle body 243. At this time, the extension plate 244 and the second extension plate 245 form a baffle, which can effectively prevent the cement from flowing into the river from the inlaid part of the stone slab 3, ensuring the cleanliness of the river channel and the normal flow of the river. At the same time, the bidirectional screw rod 247 is connected to the second extension plate 245 through the transmission block 246, so that the second extension plate 245 can be easily unfolded and retracted, which is convenient for construction personnel to operate and maintain;

[0055] In addition, before pouring, the two bidirectional screw rods 247 rotate and drive the two inlay plate push-pull rods 2412 to move at the same time. Since the upper and lower sides of the rear sides of the two inlay plate push-pull rods 2412 are respectively fixedly connected with the inlay plate push-pull L-shaped rods 2413, the two inlay plate push-pull L-shaped rods 2413 will simultaneously push the two sets of inlay plate slide rods 2414 to slide in the inlay plate slide grooves 2410, thereby driving the inlay plate 2411 to move back and forth in the inlay grooves 242, so that the position of the stone slab 3 can be easily adjusted, avoiding the problem of loose installation or difficult installation caused by the thickness of the stone slab being too small or too large, thereby improving the flexibility and efficiency of installation.

[0056] In summary, the river bank protection stone slab mosaic panel of the present invention ensures the stability and construction efficiency of the stone slab through reasonable structural design and convenient operation mode, and also effectively prevents cement from flowing into the river, protecting the ecological environment of the river. This design not only improves the stability and durability of the river bank protection, but also provides a more comprehensive and reliable guarantee for the construction and maintenance of water conservancy projects;

[0057] In addition, the present invention also takes into account the safety and environmental protection during the construction process. During the construction process, the construction personnel can conveniently adjust the positions of the extension plate 244 and the second extension plate 245 by turning the handle 248 to adapt to stone slabs of different sizes and different construction environments. At the same time, the design of the extension plate 244 and the second extension plate 245 also enables cement to be better dispersed and flowed during the pouring process, thereby avoiding cement waste and environmental pollution.

[0058] In summary, the river channel slope protection paving construction method and the design of the river channel slope protection frame and the stone slab mosaic plate of the present invention not only improve the stability and durability of the river channel slope protection, but also reduce the construction cost and maintenance cost, improve the construction efficiency, and also protect the ecological environment of the river channel, providing strong support and guarantee for the construction and maintenance of water conservancy projects.

[0059] Working principle of the present invention: first, the slope protection frame 2 is fixedly installed on the slope 12 of the river slope protection 1 through the U-shaped bottom plate 21, and the U-shaped plate body 211 and the U-shaped connecting rod 212 of the U-shaped bottom plate 21 are respectively embedded in the slope groove 13 and the slope U-shaped groove 14 to ensure the stability of the slope protection frame 2, and then fillers such as cement or sand are injected into the U-shaped groove 213 to fix the slope protection frame 2 and the river slope protection 1. Then, the shock-absorbing main board 22 is fixedly connected to the U-shaped bottom plate 21 through the shock-absorbing main board body 221 and the shock-absorbing main board connecting rod 222 , and cement is injected to form a stable supporting structure. The design of the damping mainboard slide groove 223 enables the slider 225 to slide therein, and the spring 224 plays a role of shock absorption and buffering. When the river slope protection is subjected to external impact, the damping mainboard 22 can effectively absorb and disperse the impact force, reducing the damage to the main body of the river slope protection. The damping baffle 23 is connected with the connecting plate 227 through the damping baffle rear plate 231, and can undergo a certain degree of elastic deformation when subjected to impact, further increasing the shock absorption effect and ensuring the safety and stability of the slope;

[0060] The stone slab 3 is fixed on the slope protection frame 2 through the stone slab inlay plate 24. The design of the inlay plate body 241 enables the stone slab 3 to be firmly inlaid on the front side of the inlay plate 2411 in the inlay groove 242, ensuring the flatness and stability of the stone slab. When the stone slab 3 is inlaid and cement is injected, in order to prevent the cement from flowing into the river, the turning handle 248 is first turned. After the turning handle 248 is turned, the transmission bidirectional screw rod 247 moves to the front side to drive the second extension plate 245 and the extension plate 244 to extend and unfold on the inner wall of the telescopic baffle body 243. At this time, the extension plate 244 and the second extension plate 245 form a baffle, which can effectively prevent the cement from flowing into the river from the inlay of the stone slab 3, ensuring the cleanliness of the river channel and the normal flow of the river. At the same time, the bidirectional screw rod 247 is connected to the first extension plate 245 through the transmission block 246. The connection of the two extension plates 245 allows the second extension plate 245 to be easily unfolded and folded, making it convenient for construction personnel to operate and maintain. In addition, before pouring, the two bidirectional screw rods 247 rotate and drive the two inlay plate push-pull rods 2412 to move simultaneously. Since the two inlay plate push-pull rods 2412 are fixedly connected to the upper and lower sides of the rear side with inlay plate push-pull L-shaped rods 2413, the two inlay plate push-pull L-shaped rods 2413 will simultaneously push the two groups of inlay plate slide rods 2414 to slide in the inlay plate slide groove 2410, thereby driving the inlay plate 2411 to move back and forth in the inlay groove 242. In this way, the position of the stone slab 3 can be easily adjusted, avoiding the problem of loose installation or difficult installation due to the thickness of the stone slab being too small or too large, thereby improving the flexibility and efficiency of installation.

[0061] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;

[0062] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;

[0063] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A river slope protection frame for water conservancy projects, characterized in that: It comprises a river channel slope protection (1), wherein the upper front inner wall of the river channel slope protection (1) is fixedly connected to a slope protection frame (2), and the front inner wall of the slope protection frame (2) is fixedly connected to a plurality of stone slabs (3); The river channel slope protection (1) comprises a river channel slope protection body (11), a slope (12) is provided on the upper front side of the river channel slope protection body (11), a slope groove (13) is provided on the front side of the slope (12), and a slope U-shaped groove (14) is provided on the inner wall of the slope groove (13); The slope protection frame (2) comprises a U-shaped bottom plate (21), the inner wall of the U-shaped bottom plate (21) is fixedly connected to a shock-absorbing main plate (22), the inner wall of the shock-absorbing main plate (22) is movably connected to a shock-absorbing baffle (23), and the front inner wall of the shock-absorbing baffle (23) is fixedly connected to a stone inlay plate (24); The U-shaped bottom plate (21) comprises a U-shaped plate body (211), a U-shaped connecting rod (212) is fixedly connected to the rear side of the U-shaped plate body (211), a U-shaped groove (213) is provided on the inner wall of the U-shaped plate body (211), and a plurality of fixing grooves (214) are respectively provided on the left and right sides and the bottom of the front side of the U-shaped plate body (211); The outer wall of the U-shaped plate body (211) is fixedly connected to the inner wall of the slope groove (13), and the outer wall of the U-shaped connecting rod (212) is fixedly connected to the inner wall of the slope U-shaped groove (14); The shock absorbing main board (22) comprises a shock absorbing main board main body (221), the left and right sides and the bottom of the shock absorbing main board main body (221) are respectively fixedly connected with shock absorbing main board connecting rods (222), the left and right sides of the rear side of the inner wall of the shock absorbing main board main body (221) are respectively provided with shock absorbing main board sliding grooves (223), the inner wall tops and the bottoms of the two shock absorbing main board sliding grooves (223) are respectively fixedly connected with springs (224), the opposite surfaces of the two groups of the springs (224) are both fixedly connected with sliders (225), the outer walls of the two groups of the sliders (225) are both slidably connected to the inner walls of the shock absorbing main board sliding grooves (223), the front sides of the two groups of the sliders (225) are both rotatably connected with rotating rods (226), and the sides of the two groups of the rotating rods (226) away from the sliders (225) are both rotatably connected with connecting plates (227); The outer wall of the shock-absorbing mainboard body (221) is fixedly connected to the inner wall of the U-shaped plate body (211), and the outer walls of the three shock-absorbing mainboard connecting rods (222) are fixedly connected to the inner wall of the U-shaped groove (213); The shock-absorbing baffle plate (23) comprises a shock-absorbing baffle plate rear plate (231), the front side of the shock-absorbing baffle plate rear plate (231) is fixedly connected to a baffle plate (232), the rear side of the shock-absorbing baffle plate rear plate (231) is fixedly connected to the front sides of two connecting plates (227), and the outer wall of the shock-absorbing baffle plate rear plate (231) is slidably connected to the inner wall of the shock-absorbing main plate body (221); The stone slab inlay plate (24) comprises an inlay plate body (241), the outer wall of the inlay plate body (241) is fixedly connected to the inner wall of the baffle plate (232), a inlay groove (242) is provided on the front side of the inlay plate body (241), and inlay plate sliding grooves (2410) are provided on the left and right sides of the inlay groove (242), an inlay plate (2411) is slidably connected to the inner wall of the inlay groove (242), a plurality of the stone slabs (3) are fixedly connected to the front side of the inlay plate (2411), and a telescopic baffle body (243) is fixedly connected to the bottom of the inlay plate body (241).

2. A river slope protection frame for water conservancy projects according to claim 1, characterized in that: The inner wall of the telescopic baffle body (243) is slidably connected to an extension plate (244), the inner wall of the extension plate (244) is slidably connected to a second extension plate (245), the left and right sides of the second extension plate (245) are respectively fixedly connected to transmission blocks (246), the inner walls of the two transmission blocks (246) are both threadedly connected to bidirectional screw rods (247), the front ends of the two bidirectional screw rods (247) are both fixedly connected to a turning handle (248), the outer walls of the two bidirectional screw rods (247) extending to the rear side of the transmission block (246) are both movably connected to a connecting shaft (249), the outer walls of the two bidirectional screw rods (247) extending to the rear side of the connecting shaft (249) are both threadedly connected to an inlaid plate push-pull rod (2412), the outer walls of the two connecting shafts (249) are both fixedly connected to the left and right sides of the telescopic baffle body (243), and the rear ends of the two bidirectional screw rods (247) are respectively movably connected to the left and right sides of the baffle (232).

3. A river slope protection frame for water conservancy projects according to claim 2, characterized in that: The upper and lower sides of the rear sides of the two inlay panel push-pull rods (2412) are respectively fixedly connected with inlay panel push-pull L-shaped rods (2413); the sides of the two groups of inlay panel push-pull L-shaped rods (2413) away from the inlay panel push-pull rods (2412) are fixedly connected with inlay panel slide rods (2414); the opposite sides of the two groups of inlay panel slide rods (2414) are fixedly connected with inlay panels (2411); the two inlay panel slide rods (2414) are respectively slidably connected to the inner walls of inlay panel slide grooves (2410) opened on the left and right sides of the inlay groove (242).