Self-bonded steel-concrete structure and construction method thereof

By arranging processing parts and connecting keys in the steel concrete structure, a self-bonding steel concrete structure is formed, which solves the problem of failure of the combination of steel and concrete, improves the durability and construction quality of the structure, and reduces costs.

CN118345990BActive Publication Date: 2024-10-08SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410783864.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2024-10-08
Estimated Expiration
2044-06-18

AI Technical Summary

Technical Problem

When the existing steel-concrete structure is damaged by force, the bond between the steel and concrete fails, resulting in increased structural deformation and affecting use. In addition, the existing shear connection method increases construction costs and reduces durability.

Method used

Using a self-bonding steel concrete structure, a connected area is formed by arranging processing parts such as openings or cut-off parts on the basic steel frame. The steel cage is set outside the basic steel frame, and the connecting key is connected to the steel cage. The cladding layer covers the On the outside, the welding process is avoided and the bonding ability between steel and concrete is enhanced.

Benefits of technology

It improves the bonding ability between steel and concrete, reduces construction costs, enhances the durability and reliability of the structure, ensures the integrity of the cladding layer and stable bonding, and avoids corrosion transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118345990B_ABST
    Figure CN118345990B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of composite structures, and in particular to a self-bonded steel-concrete structure and a construction method thereof. The present invention discloses a self-bonded steel-concrete structure and a construction method thereof, wherein the foundation steel frame has a web and a flange, and the flange and / or the web have a processing portion, and the processing portion is configured as an opening portion, and / or a truncation portion, and / or an additive portion, so that at least a portion of the foundation steel frame is configured as a connected region, and the connected region is suitable for concrete flow, and at least a portion of the steel bars of the steel cage are suitable for passing through the connected region; the steel bars of the steel cage are suitable for passing through connecting keys, so that the steel bars are spaced apart from the foundation steel frame and connected and fixed; the coating layer is coated on the outside of the steel cage and the foundation steel frame. Therefore, by setting the processing portion, not only the casting quality can be improved, but also the steel cage, the foundation steel frame, and the concrete can form a self-locking effect, and the coating layer is more complete, and the durability and reliability of the self-bonded steel-concrete structure can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of composite structures, in particular to a self-bonded steel concrete structure and a construction method thereof. Background Art

[0002] In the related technology, steel-concrete structure (abbreviated as SRC structure) is a composite structure of steel and reinforced concrete composed of steel sections arranged in the cross section of reinforced concrete components. The cross section mainly arranges steel sections, and a certain number of longitudinal force-bearing steel bars and transverse stirrups are arranged at the same time. SRC structure combines the advantages of steel structure and concrete structure, with high bearing capacity, high rigidity, good ductility and durability.

[0003] However, when the steel-concrete structure is damaged by stress, relative displacement will occur between the steel and the covering layer, the bond between the steel and the concrete will fail, the two cannot work together, the structural deformation will increase significantly, and the normal use of the steel-concrete structure will be affected, and it may even be damaged.

[0004] At the same time, existing research on SRC structures at home and abroad mainly focuses on the situation where the built-in steel is bidirectionally symmetrical about the longitudinal and transverse axes of the cross section, and the outer edge of the steel is close to the edge of the structural section, commonly known as the "symmetrical full type". The various regulations in the industry standards are also mainly aimed at the symmetrical full type, which is also the most common in engineering applications. This type of steel can be easily applied to industrial products, but the situation where the synergy between the steel and concrete cannot be fully exerted is particularly obvious, which also causes difficulties in concrete pouring, steel cage binding, and node area steel bar arrangement. How to select the cross section of the steel and its distribution in the entire SRC structure, improve the bonding ability of the steel and the cladding, and facilitate the steel bar arrangement and concrete pouring construction has become an urgent problem to be solved. Summary of the invention

[0005] The present invention aims to solve at least one of the technical problems existing in the prior art. To this end, one object of the present invention is to provide a self-bonded steel-concrete structure, which has a better bonding effect between the base steel frame and the concrete, a better restraint effect between the base steel frame and the cladding layer, more convenient steel bar arrangement and concrete pouring, high construction quality, and better overall performance.

[0006] The present invention further proposes a construction method of the self-bonded steel-concrete structure.

[0007] In a first aspect, the present invention provides a self-bonded steel-concrete structure, comprising: a foundation steel frame, a steel cage, a connecting key and a covering layer, wherein the foundation steel frame has a web and a flange, the flange and / or the web have a processed portion, the processed portion is configured as an opening portion, and / or a truncation portion, and / or an additive portion, so that at least a portion of the foundation steel frame is configured as a connected area, the connected area is suitable for concrete flow, the steel cage is sleeved outside the foundation steel frame, and at least part of the steel bars of the steel cage are suitable for passing through the connected area; the connecting key is connected to the foundation steel frame, and the steel bars of the steel cage are suitable for passing through the connecting key, so that the steel bars are spaced apart from the foundation steel frame and connected and fixed; the covering layer covers the outside of the steel cage and the foundation steel frame.

[0008] Further, the truncation portion is configured as a local fault formed on the web or the wing plate.

[0009] Furthermore, the perforated plate portion includes: a first opening formed in the flange, a plurality of the first openings are spaced apart along an extending direction of the flange, and adjacent first openings are respectively located on both sides of the web.

[0010] Furthermore, the opening portion further includes: a second opening formed in the web, a plurality of the second openings are arranged at intervals along the extension direction of the flange, and the shapes of the plurality of the second openings are the same or different.

[0011] Further, the material-added portion is constructed as a reinforcing plate, the reinforcing plate is connected to the web, and two ends of the reinforcing plate are connected to the flange, and the reinforcing plate is located on both sides of the second opening.

[0012] Furthermore, the steel cage includes: bending ribs, the bending ribs include: straight sections and inclined sections, a third opening is provided on the flange, the connecting key is provided in the third opening, and the inclined section passes through the connecting key located in the third opening, and the extension direction of the straight section is consistent with the extension direction of the flange.

[0013] Furthermore, the basic steel frame includes at least one web and one flange, and the projection profile of at least a part of the basic steel frame in the extension direction is constructed as an asymmetric shape.

[0014] Furthermore, the steel cage includes: longitudinal bars, annular stirrups and tension bars, wherein the annular stirrups are arranged around the longitudinal bars, and the tension bars are suitable for connecting the opposite edges of the annular stirrups and the longitudinal bars.

[0015] In a second aspect, an embodiment of the present invention discloses a method for constructing a self-bonded steel-concrete structure, comprising:

[0016] Step 1: Design the cross section of the basic steel frame to determine the appropriate position, and set a processing part at the appropriate position to change the cross-sectional profile of the local area of ​​the basic steel frame in the extension direction of the self-bonded steel concrete structure, and construct at least one connected area; wherein the appropriate position is a position determined along the extension direction of the self-bonded steel concrete structure based on the stress characteristics of the self-bonded steel concrete structure, and the connected area is suitable for concrete flow and steel bar penetration;

[0017] Step 2: Assemble the foundation steel frame, steel cage and connection keys, and cast the covering layer in a formwork to obtain a self-bonded steel concrete structure after forming.

[0018] Furthermore, the step 2 specifically includes:

[0019] Sub-step 1: Assemble the foundation steel frame, steel cage and connection key, and cast the first part of concrete in the formwork, the first part of concrete forms a part of the covering layer, and forms an assembled structure as a whole;

[0020] Sub-step 2: At the construction site, pour a second portion of concrete on the assembled structure. After the second portion of concrete is poured, it is assembled with the first portion of concrete to form a complete coating layer to obtain a self-bonded steel-concrete structure after molding.

[0021] According to the self-bonding steel-concrete structure of the present invention, on the one hand, by setting the processing part, not only can the concrete flow up and down or left and right along the processing part during the pouring process, which is convenient for the pouring of concrete and improves the pouring quality, so as to improve the quality of the self-bonding steel-concrete structure, but also the steel cage, the foundation steel frame and the concrete can be interlaced and entangled with each other to form a whole, forming a self-locking effect, so there is no need to set a welding nail structure for strengthening the combination, and no welding process is required, which can save materials and construction time, reduce costs, and the coating layer can be more complete, improve the restraining effect of the coating layer on the foundation steel frame, and ensure the stability of the bonding effect between the coating layer and the flange surface; on the other hand, the connecting key is set between the foundation steel frame and the steel cage, which can avoid the conduction of rust between the steel cage and the foundation steel frame, and can improve the durability and reliability of the self-bonding steel-concrete structure.

[0022] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0024] Figure 1is a schematic diagram of a self-bonded steel-concrete structure according to a first embodiment of the present invention from an angle;

[0025] Figure 2 is a schematic diagram of a basic steel frame according to a first embodiment of the present invention;

[0026] Figure 3 is a schematic diagram of a self-bonded steel-concrete structure according to a first embodiment of the present invention from another angle;

[0027] Figure 4 is a schematic diagram of a self-bonded steel-concrete structure according to a second embodiment of the present invention at an angle;

[0028] Figure 5 is a schematic diagram of a basic steel frame according to a second embodiment of the present invention;

[0029] Figure 6 is a schematic diagram of a steel cage according to an embodiment of the present invention;

[0030] Figure 7 is a schematic diagram of a first connection key according to an embodiment of the present invention;

[0031] Figure 8 is a schematic diagram of a second connection key according to an embodiment of the present invention;

[0032] Fig. 9 is a schematic diagram of a third connection key according to an embodiment of the present invention;

[0033] Fig.10 is a schematic diagram of a fourth connection key according to an embodiment of the present invention;

[0034] Fig.11 is a schematic diagram of a fifth connection key according to an embodiment of the present invention;

[0035] Fig.12 is a schematic diagram of a sixth connection key according to an embodiment of the present invention;

[0036] Fig.13 is a schematic diagram of the cooperation between the connecting key and the basic steel frame according to an embodiment of the present invention;

[0037] Fig.14 is a schematic diagram of a first basic steel frame according to an embodiment of the present invention;

[0038] Fig.15 is a schematic diagram of a second basic steel frame according to an embodiment of the present invention;

[0039] Fig.16 is a schematic diagram of a third basic steel frame according to an embodiment of the present invention;

[0040] Fig.17is a schematic diagram of a fourth basic steel frame according to an embodiment of the present invention;

[0041] Fig.18 is a schematic diagram of a fifth basic steel frame according to an embodiment of the present invention;

[0042] Fig.19 is a schematic diagram of a sixth basic steel frame according to an embodiment of the present invention;

[0043] Fig. 20 is a schematic diagram of a self-bonded steel-concrete structure according to a third embodiment of the present invention;

[0044] Fig.21 is a schematic diagram of the coordination between the first foundation steel frame and concrete according to an embodiment of the present invention;

[0045] Fig. 22 is a schematic diagram of the coordination between the second foundation steel frame and concrete according to an embodiment of the present invention;

[0046] Fig.23 is a schematic diagram of the coordination between the fourth foundation steel frame and concrete according to an embodiment of the present invention;

[0047] Fig.24 4 is a processing flow chart of a self-bonded steel concrete structure according to an embodiment of the present invention.

[0048] Reference numerals:

[0049] Self-bonded steel concrete structure 100,

[0050] Basic steel frame 10, web 11, second opening 111, flange 12, first opening 121, third opening 122, reinforcing plate 13,

[0051] Steel cage 20, longitudinal reinforcement 21, annular stirrups 22, tension reinforcement 23, bending reinforcement 24, straight section 241, inclined section 242,

[0052] Connecting key 30 and covering layer 40. DETAILED DESCRIPTION

[0053] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0054] Unless otherwise defined, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by technicians in the technical field of the present invention; the terms used in the specification of the present invention in the application are only for the purpose of describing specific embodiments and are not intended to limit the present invention; the terms "including" and "having" and any variations thereof in the specification and claims of the present invention and the above-mentioned drawings are intended to cover non-exclusive inclusions. The terms "first", "second", etc. in the specification and claims of the present invention or the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order or a primary and secondary relationship.

[0055] Reference to "embodiments" in the present invention means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present invention. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments.

[0056] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", and "attached" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0057] The term "and / or" in the present invention is only a description of the association relationship of the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in the present invention generally indicates that the associated objects before and after are in an "or" relationship.

[0058] In the embodiments of the present invention, the same reference numerals represent the same components, and for the sake of brevity, detailed descriptions of the same components are omitted in different embodiments. It should be understood that the thickness, length, width and other dimensions of various components in the embodiments of the present invention shown in the drawings, as well as the overall thickness, length, width and other dimensions of the integrated device are only exemplary and should not constitute any limitation to the present invention.

[0059] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0060] In the description of the present invention, a first feature being “on” or “under” a second feature may include that the first and second features are directly in contact with each other, or may include that the first and second features are not in direct contact with each other but are in contact with each other via another feature therebetween.

[0061] In the description of the present invention, “on”, “over” and “above” a first feature from a second feature includes the first feature being directly above and obliquely above the second feature, or simply means that the first feature is horizontally higher than the second feature.

[0062] The term “plurality” used in the present invention refers to two or more (including two).

[0063] First of all, it should be pointed out that the steel-concrete structure (abbreviated as SRC structure) is a composite structure of steel and reinforced concrete composed of steel sections configured in the cross section of reinforced concrete components. The cross section mainly configures steel sections, and a certain number of longitudinal force-bearing steel bars and transverse stirrups are configured at the same time. The SRC structure combines the advantages of steel structure and concrete structure, with high bearing capacity, high rigidity, good ductility and durability.

[0064] Therefore, it has been actively promoted in various industrial and civil buildings and transportation projects. However, when the SRC structure, especially the symmetrical full-type SRC structure commonly used in the industry, is subjected to stress close to destruction, there will be a significant relative slip between the steel and the outer concrete, and the steel and concrete can no longer work together. The structural deformation and other reactions will increase significantly, thus affecting the normal use of the SRC structure and even causing damage. Therefore, in order to give full play to the bearing capacity of the SRC structure, measures must be taken to enhance the bonding ability between the steel and the outer concrete.

[0065] In the prior art, the measures taken to ensure the coordinated work of the steel and the outer concrete to enhance the bonding ability of the two are mainly to set studs on the flange. The studs are cylindrical head studs for arc stud welding. The welding process is mature and the effect of resisting interface slip is good. It is the only shear connection part specified by the industry standard. However, there are many problems in setting studs as a shear connection method to enhance the bonding ability of SRC structures, which hinders its wider application, including:

[0066] 1. The increase of welding nail materials and welding procedures has increased the construction workload, increased the construction period, and increased the project cost;

[0067] 2. While increasing the shear bearing capacity of the welding nails, it reduces the contact area between the steel flange and the outer concrete, reduces the inherent bonding effect of the flange surface, and offsets part of the natural bonding capacity;

[0068] 3. The force of the welding studs causes local damage to the concrete on the contact surface, which affects the restraint effect of the outer concrete on the steel section, further offsetting part of the natural bonding capacity. As a result, the bonding capacity of the steel section with studs is significantly less than the sum of its natural bonding capacity and the shear capacity of the studs. When a stronger bonding capacity is required, the studs are difficult to meet the requirements;

[0069] 4. The studs on the outside of the flange weaken the integrity of the concrete cover of the steel. When the surface cracks cause the studs to rust, the studs will become corrosion channels for the steel, thereby reducing the durability of the SRC structure;

[0070] 5. According to industry specifications, SRC structures mainly use symmetrical full-type steel. Steel generally occupies a large space in the cross section. After adding studs, part of the space between the steel flange and the outer steel bar is occupied by the studs, which has a certain impact on concrete pouring and is likely to cause local vibration leakage of concrete, affecting the quality of concrete;

[0071] Of course, it is also possible to replace the studs with steel plates, angle steels and other smaller steels on the flanges to improve the shear bearing capacity of the interface. However, since this type of shear key is larger in size and stiffer than the studs, if it is used on the steel-concrete interface, not only will the above-mentioned problems of the studs also exist, but it will also greatly affect the integrity and pouring quality of the outer concrete. Therefore, for the existing SRC structure where the steel occupies a large space in the cross section, adding steel plates or smaller steels as shear keys on the steel flanges is less feasible in engineering.

[0072] Based on this, the present invention proposes a self-bonded steel concrete structure, which can ensure the integrity of the coating layer while improving the shear resistance.

[0073] Reference below Figure 1-Figure 24 A self-bonded steel concrete structure 100 and a construction method thereof according to an embodiment of the present invention are described.

[0074] like Figure 1 , Figure 2 , Figure 3 , Figure 4 and Figure 5As shown, the present invention provides a self-bonded steel concrete structure 100 , comprising: a basic steel frame 10 , a steel cage 20 , a connecting key 30 and a covering layer 40 .

[0075] The basic steel frame 10 has a web 11 and a flange 12 . The flange 12 and / or the web 11 have a processed portion so that at least a portion of the basic steel frame 10 is constructed as a connected area, and the connected area is suitable for concrete flow.

[0076] That is to say, the basic steel frame 10 is a structural insert obtained by further processing on the basis of the steel section. The steel section is further processed so that a processing part is formed on the flange 12 and the web 11, and the setting of the processing part can be based on the design of the cross-sectional distribution of the steel section. The processing part can be set at the force-allowed position of the basic steel frame 10, which does not affect the overall strength of the basic steel frame 10 and the overall strength of the self-bonded steel-concrete structure 100, so that at least part of the basic steel frame 10 is formed into a connecting area suitable for concrete flow; the steel cage 20 is sleeved outside the basic steel frame 10, and at least part of the steel bars of the steel cage 20 are suitable for passing through the connecting area; the connecting key 30 is connected to the basic steel frame 10, and the steel bars of the steel cage 20 are suitable for passing through the connecting key 30, and the connecting key 30 is located between the steel bars and the basic steel frame 10, so that the steel bars are separated from the basic steel frame 10; the covering layer 40 is entirely covered on the outside of the steel cage 20 and the basic steel frame 10.

[0077] Among them, the basic steel frame 10 can be formed in one piece, or constructed as multiple separate parts. The multiple separate parts can be plates or rods, which are connected into the basic steel frame 10 by welding or splicing. The basic steel frame 10 has a web 11 and a flange 12, and processing parts can be set on both the web 11 and the flange 12.

[0078] It should be pointed out that the processed portion can be configured as an opening portion, and / or a truncation portion, and / or an additive portion.

[0079] That is to say, the processed portion can be formed as an opening portion, and the opening can be formed on the flange 12 or the web 11 to define one or more connected areas through the opening. It can also be formed as a truncation portion, such as: in the extension direction, at least part of the flange 12 or the web 11 is cut off to form a local fault, so as to define one or more connected areas through one or more local faults. It can also be formed as an additive portion, such as: adding a plate parallel to the flange 12 or the web 11, or setting a plate perpendicular to the flange 12 and the web 11, etc.

[0080] In this way, the steel frame cross section of at least part of the basic steel frame 10 can be constructed as an asymmetric cross section, thereby facilitating the flow of concrete and the insertion of steel bars, reducing construction difficulty, and improving construction quality and construction effect.

[0081] The steel cage 20 can be composed of steel bars extending in the transverse direction, steel bars extending in the longitudinal direction and connecting steel bars. The steel cage 20 is formed as a frame as a whole and is sheathed outside the basic steel frame 10. The basic steel frame 10 and the steel cage 20 are connected by a connecting key 30.

[0082] Specifically, the shape of the connection key 30 is not specifically limited in the present invention, and the connection key 30 may include Figures 7 to 12 Any one of the above, such as: the connecting key 30 is set between the basic steel frame 10 and the steel cage 20, and is located on the upper and lower surfaces of the basic steel frame 10, but only plays a spacing role, separating the steel cage 20 from the basic steel frame 10, then it can be used Figure 7 The first type of connecting key 30 shown in the figure is provided between the basic steel frame 10 and the steel cage 20 and is located on the upper and lower surfaces of the basic steel frame 10. However, when the steel bars of the steel cage 20 need to be penetrated by the connecting key 30, the connecting key 30 can be used. Figure 8 and Fig. 9 The second and third connecting keys 30 shown in the figure are arranged in the openings on the basic steel frame 10, and when the steel bars of the steel cage 20 need to be penetrated by the connecting keys 30, the connecting keys 30 can be used. Fig.10 , Fig.11 and Fig.12 A fourth connecting key 30 , a fifth connecting key 30 , and a sixth connecting key 30 are shown.

[0083] That is to say, the connecting key 30 is fixed in the connecting area of ​​the basic steel frame 10 or on the surface of the basic steel frame 10. A steel bar hole or a steel bar groove can be opened on the connecting key 30. The steel bar passes through the connecting key 30. The connecting key 30 is connected to the basic steel frame 10 to achieve mutual interpenetration and connection between the basic steel frame 10 and the steel cage 20, and the basic steel frame 10 and the steel cage 20 can be spaced apart and have no contact.

[0084] Furthermore, the connecting key 30 is constructed as a prism or a cylinder, on which a steel bar hole or a steel bar groove can be set, and can be made of plain concrete, cement mortar, or pure cement slurry, and is arranged between the steel cage 20 and the basic steel frame 10 to achieve the connection between the basic steel frame 10 and the steel cage 20, so that the two can maintain a relatively fixed position, and see Fig.13 As shown, an adhesive can be applied between the connecting key 30 and the basic steel frame 10 ( Fig.13 In the figure, the arrow indicates the assembly direction, and the dot-dash section is the adhesive coating area) to achieve the fixation of the connecting key 30 to the basic steel frame 10. The connecting key 30 can not only achieve the fixation between the steel cage 20 and the basic steel frame 10, but also achieve the positioning between the steel cage 20 and the basic steel frame 10 to limit the displacement between the two.

[0085] That is to say, in the self-bonded steel-concrete structure 100 of the embodiment of the present invention, the basic steel frame 10 and the steel cage 20 are connected into an integral structure through multiple connecting keys 30 and are embedded in the covering layer 40. The covering layer 40 is constructed as a concrete layer, which can be poured on the periphery of the steel cage 20 and completely cover the basic steel frame 10 and the steel cage 20 therein.

[0086] It can be understood that in the embodiment of the present invention, a connecting area is opened on the flange 12 and the web 11 of the basic steel frame 10. During the pouring process, concrete can be injected into the connecting area to produce a pinning effect, thereby combining the basic steel frame 10 and the concrete into one. There is no need to set welding pins and welding processes, which can save materials and construction time, and will not affect the integrity of the coating layer 40. The coating layer 40 can be more complete to improve the restraining effect of the coating layer 40 on the basic steel frame 10, and the openings on the flange 12 and the web 11 can realize the flow of concrete during the pouring process, facilitate the concrete pouring operation, improve the pouring quality, and thus improve the quality of the self-bonded steel-concrete structure 100. The contact area between the flange 12 and the coating layer 40 is basically unchanged, and the bonding effect between the surface of the flange 12 and the coating layer 40 can remain stable without any impact.

[0087] The steel bars of the steel cage 20 can be passed through the connecting key 30, which is set between the basic steel frame 10 and the steel cage 20, and realizes the fixation of the steel cage 20 and the basic steel frame 10, that is, the connecting key 30 realizes the connection between the steel cage 20 and the basic steel frame 10, and can realize the isolation of the basic steel frame 10 and the steel cage 20. There is no direct contact between the steel cage 20 and the basic steel frame 10. Even if the steel bars are corroded, the basic steel frame 10 will not be involved in the conduction corrosion, which can improve the durability of the self-bonded steel concrete structure 100.

[0088] It should be pointed out that the basic steel frame 10 has the following characteristics: based on the reprocessing of the cross section of the steel section, by setting a processing part, such as: opening a hole or cutting or truncating or changing the thickness or adding a reinforcing plate, an opening or a cross-sectional change is formed on the web 11 or the flange 12, so that at least part of the basic steel frame 10 is constructed as an asymmetric full structure. At the same time, the opening or cross-sectional change makes the basic steel frame 10 have at least one connecting area in the extension direction to facilitate the insertion of steel bars and the flow of concrete. Therefore, based on the stress distribution characteristics of the steel section, the processing part can be set. On the one hand, concrete can flow from the area where the processing part is located to improve the processing quality. On the other hand, the basic steel frame 10 and the steel cage 20 can form an interwoven structure to produce a self-locking effect and improve the self-bonding effect.

[0089] According to the self-bonded steel-concrete structure 100 of the embodiment of the present invention, on the one hand, by setting the processing part, not only can the concrete flow up and down or left and right along the processing part during the pouring process, which facilitates the pouring of concrete and improves the pouring quality, so as to improve the quality of the self-bonded steel-concrete structure 100, but also the steel cage 20, the basic steel frame 10, and the concrete can be interlaced and intertwined with each other to form a whole, forming a self-locking effect, so there is no need to set a welding nail structure for strengthening the combination, and no welding process is required, which can save materials and construction period, reduce costs, and the coating layer 40 can be more complete, improve the restraining effect of the coating layer 40 on the basic steel frame 10, and ensure the stability of the bonding effect between the coating layer 40 and the surface of the flange 12; on the other hand, the connecting key 30 is set between the basic steel frame 10 and the steel cage 20, which can avoid the conduction of rust between the steel cage 20 and the basic steel frame 10, and can improve the durability and reliability of the self-bonded steel-concrete structure 100.

[0090] In other words, the self-bonded steel-concrete structure 100 of the embodiment of the present invention can improve the durability of the self-bonded steel-concrete structure 100, reduce costs, and improve cost-effectiveness while ensuring the bonding ability of concrete and foundation steel frame 10 and ensuring that the two can work synergistically. There is no need for additional shear-resistant links (such as welded nails). While achieving the above-mentioned technical effects, the performance of the self-bonded steel-concrete structure 100 can also be fully utilized.

[0091] First of all, it should be pointed out that in the embodiment where the processing portion is formed as an opening portion, the opening portion may include a first opening 121 and a second opening 111, and the shapes of the first opening 121 and the second opening 111 are not specifically limited by the present invention. After those skilled in the art are aware of the basic scheme of the present invention, they can open the first opening 121 and the second opening 111 of any shape according to usage requirements, such as circular, oblong, rectangular, elliptical, hexagonal, etc.

[0092] like Figure 2 and Figure 5 As shown, further, the opening portion on the basic steel frame 10 includes: a first opening 121 formed on the flange 12 , a plurality of first openings 121 are evenly spaced along the extension direction of the flange 12 , and adjacent first openings 121 are respectively located on both sides of the web 11 .

[0093] Specifically, the first opening 121 can be constructed as an opening and pass through one side edge of the flange 12. The first opening 121 can also be constructed as a hole. The first opening 121 can be obtained by cutting or drilling. The first opening 121 is located on both sides of the flange 12. The two sides of the flange 12 refer to the two sides of the flange 12 after the flange 12 is equally divided along the extension direction shown in the figure. The first opening 121 is formed in the flange 12, but is separated from the web 11.

[0094] In this way, the first openings 121 on both sides of the flange 12 can facilitate the flow of concrete during the pouring process, so as to further improve the vibration effect and improve the pouring quality. After the pouring is completed, the first openings 121 on both sides of the flange 12 can form a pin effect with the concrete, which improves the connection stability while making the force distribution on both sides of the flange 12 more uniform, and the force effect of the self-bonded steel concrete structure 100 is better.

[0095] Combination Figure 2 and Figure 5 As shown, further, the opening portion on the basic steel frame 10 also includes: a second opening 111 formed on the web 11, a plurality of second openings 111 are arranged at intervals along the extension direction of the flange 12, and the shapes of the plurality of second openings 111 can be the same or different.

[0096] Specifically, the second opening 111 can be obtained by truncation or cutting. The second opening 111 can be partially formed into a first shape and partially formed into a second shape, where the first shape is different from the second shape. The second opening 111 can also be formed into multiple shapes, all of which are different.

[0097] In this way, the second opening 111 can facilitate the flow of concrete during the pouring process, and in some areas where concrete is prone to stagnation, a second opening 111 with a larger opening area can be opened to further enhance the flow of concrete, thereby further improving the pouring effect and the molding quality while forming a pin effect.

[0098] like Figure 1 and Figure 2 As shown, in the first embodiment, the additive part of the basic steel frame 10 can be constructed as a reinforcing plate 13, which is connected to the web 11, and both ends of the reinforcing plate 13 are connected to the flange 12, and the reinforcing plate 13 is located on both sides of the second opening 111.

[0099] Specifically, the two ends of the reinforcing plate 13 are respectively connected to the flanges 12 located on the upper and lower sides of the web 11. For the basic steel frame 10 structure having only one flange 12, only one end of the reinforcing plate 13 is connected to the flange 12, and the other end is consistent with the extension dimension of the web 11 in the upper and lower directions. There are multiple reinforcing plates 13, and each second opening 111 is provided with a reinforcing plate 13 on both sides of the extension direction.

[0100] In this way, the structural strength of the foundation steel frame 10 can be improved by the reinforcement plate 13, and a pinning effect can be formed between the reinforcement plate 13 and the concrete between adjacent reinforcement plates 13, further improving the bonding effect between the foundation steel frame 10 and the concrete, so as to enhance the synergistic effect of the two.

[0101] like Figure 4 and Figure 5 As shown, in the second embodiment, the steel cage 20 includes: bending ribs 24 , and at least a portion of the bending ribs 24 extends obliquely along the height direction of the web 11 and is connected to the flange 12 .

[0102] Specifically, the bending ribs 24 are bent and obliquely pass through the flange 12, and are arranged opposite to the web 11, and the portion of the bending ribs 24 passing through the flange 12 is connected to the flange 12. In this way, the bending ribs 24 and the foundation steel frame 10 can be interlaced with each other and the concrete of the covering layer 40 can flow through the holes, so that the concrete, the steel bars, and the steel sections can be woven together, and the connection strength and reliability of the foundation steel frame 10 and the steel cage 20 can be further improved.

[0103] It can be understood that a connecting key 30 is provided on the bending rib 24 to separate the bending rib 24 from the flange 12. The bending rib 24 includes: a straight section 241 and an inclined section 242. The inclined section 242 is connected to the flange 12. The extension direction of the straight section 241 is consistent with the extension direction of the flange 12 and is connected to the steel cage 20.

[0104] That is to say, the straight section 241 is connected to other steel bars in the steel cage 20, and straight sections 241 are provided at both ends of the inclined section 242, or only one end is provided with a straight section 241, and the inclined section 242 can be connected to the flange 12 through a connecting key 30, and a third opening 122 is provided on the flange 12, and a connecting key 30 is provided in the third opening 122, and the inclined section 242 passes through the connecting key 30 located in the third opening 122.

[0105] The connecting key 30 in the third opening 122 may be configured as follows. Fig.12 The connecting key 30 shown in the figure, and the bending rib 24 is connected to the flange 12 through the connecting key 30, and the bending rib 24 is indirectly connected to the basic steel frame 10, and the bending rib 24 can be formed as a diagonal tie bar outside the steel cage 20, which is beneficial to increase the overall stability of the steel cage 20, the integrity and ductility of the structural member composed of the steel cage 20, the basic steel frame 10 and the connecting key 30.

[0106] Of course, it is understandable that the steel cage 20 may also include transverse reinforcement bars and longitudinal reinforcement bars, and the transverse reinforcement bars and longitudinal reinforcement bars may also be embedded in the connecting key 30 , which may further improve the overall stability of the steel cage 20 .

[0107] Specifically, if Figure 6 As shown, the steel cage 20 may include: longitudinal bars 21 , annular stirrups 22 and tension bars 23 . The annular stirrups 22 are arranged around the longitudinal bars 21 , and the tension bars 23 are suitable for connecting the opposite edges of the annular stirrups 22 and the longitudinal bars 21 .

[0108] The longitudinal ribs 21 extend along the extending direction shown in the figure, and the annular stirrups 22 are arranged around the longitudinal ribs 21 and are connected to the longitudinal ribs 21 and the straight sections 241 of the bent ribs 24 .

[0109] The tie bars 23 may be transverse tie bars or longitudinal tie bars, and are used to connect the annular stirrups 22, or to connect the straight sections 241 opposite to each other in the height direction, or to connect the longitudinal bars 21 opposite to each other in the height direction, or to connect the longitudinal bars 21 in the diagonal area, and the longitudinal bars 21 may be bent at their ends to connect the annular stirrups 22 and form the steel cage 20.

[0110] It may also include longitudinal ribs 21 and transverse ribs, which are arranged around the contact insert, the transverse ribs are connected to the longitudinal ribs 21, and transverse and longitudinal tensioning bars are also arranged to improve the connection strength and form a steel cage 20.

[0111] Furthermore, the tension bars 23 , the longitudinal bars 21 and the annular stirrups 22 may be provided with corresponding connection keys 30 , and connected to the basic steel frame 10 via the connection keys 30 , thereby improving the connection stability and reliability between the steel cage 20 and the basic steel frame 10 .

[0112] like Figure 2 , Figure 5 as well as Figure 14-Figure 19 As shown, further, the projection profile of the basic steel frame 10 in the extension direction can be constructed as a symmetrical figure, and includes a web 11 and two flanges 12 located at both ends of the web 11, or a web 11 and a flange 12 located at one end of the web 11. In other embodiments, according to the design of the steel section in the cross section and along the axial distribution of the SRC structure, the basic steel frame 10 includes at least one web 11 and one flange 12, and the projection profile of at least part of the basic steel frame 10 in the extension direction can be constructed as an asymmetrical figure.

[0113] Specifically, if Fig.14 As shown, the first basic steel frame 10 may include a web 11 and flanges 12 located at both ends of the web 11, and formed into an I-shaped structure, such as Fig.15 As shown, the second basic steel frame 10 may include two webs 11 and flanges 12 located at both ends of the webs 11, and is formed into a rectangular frame structure, such as Fig.16 As shown, the third basic steel frame 10 may include two webs 11 and a flange 12 located at one end of the same side of the two webs 11, and formed into a U-shaped structure, such as Fig.17As shown, the fourth basic steel frame 10 may include two webs 11, one end of the same side of the two webs 11 is provided with a flange 12, both ends of the flange 12 are respectively connected to the two webs 11, and the other end of the same side of the two webs 11 is respectively provided with a flange 12, and the two flanges 12 on the two webs 11 extend away from each other and form a U-shaped structure with a flange, such as Fig.18 As shown, the fifth basic steel frame 10 may include a web 11 and a flange 12, and is formed into an L-shaped structure. Fig.19 As shown, the sixth basic steel frame 10 may include a web 11 and a flange 12 and be formed into a T-shaped structure.

[0114] Combination Fig. 20 As shown, in the third embodiment, the basic steel frame 10 of the embodiment of the present invention can also be constructed in a π shape, including two webs 11 and a flange 12 .

[0115] It should be noted that the web 11 and the flange 12 are respectively provided with a second opening 111 and a first opening 121 , which are provided at appropriate positions to ensure structural strength.

[0116] It can be understood that the basic steel frame 10 is constructed as a symmetrical structure, which means that the basic steel frame 10 is symmetrical in both the height direction and the extension direction, and the basic steel frame 10 is constructed as an asymmetrical structure, which means that the basic steel frame 10 is asymmetrical in at least one of the height direction and the extension direction.

[0117] Therefore, by adopting a symmetrical structure, the circumferential force distribution of the self-bonded steel-concrete structure 100 can be more uniform, and when an asymmetrical structure, that is, an asymmetrical cross-section, the cross-section of the basic steel frame 10 can be integrated into a specific cross-section position of the self-bonded steel-concrete structure 100 according to the force or performance design requirements. There is no need for the basic steel frame 10 to fill the cross-section of the self-bonded steel-concrete structure 100, which is beneficial to saving materials and facilitating the pouring construction of concrete.

[0118] Understandably, see Fig. 20 , Fig.21 , Fig. 22 as well as Fig.23 As shown, the cross section of the basic steel frame 10 in the embodiment of the present invention can be a special-shaped insert or a conventional insert of one or more combinations of the above-mentioned I-shaped, U-shaped, L-shaped, T-shaped, π-shaped, or other structural shapes. The present invention does not make specific restrictions, and finally obtains the following Fig. 20 , Fig.21 , Fig. 22 as well as Fig.23 The self-bonded steel-concrete structures 100 are shown in different cross-sectional shapes.

[0119] It should be pointed out that the cross section of the basic steel frame 10 of the embodiment of the present invention has been reprocessed, and its cross section distribution is essentially different from that of conventional steel sections, and it should not be equated with a conventional steel structure.

[0120] like Fig.24 As shown, see Fig.24 The solid arrows in the middle indicate the steps in the process. The embodiment of the present invention discloses a method for constructing a self-bonded steel concrete structure, including:

[0121] Step 1: Design the cross section of the foundation steel frame to determine the appropriate position, and set a processing part at the appropriate position to change the cross-sectional profile of the local area of ​​the foundation steel frame in the extension direction of the self-bonded steel concrete structure, and construct at least one connected area; wherein the appropriate position is a position determined along the extension direction of the self-bonded steel concrete structure based on the stress characteristics of the self-bonded steel concrete structure, and the connected area is suitable for concrete flow and steel bar penetration;

[0122] Step 2: Assemble the foundation steel frame, steel cage and connecting keys, and cast the covering layer 4 in a formwork to obtain a self-bonded steel concrete structure after forming.

[0123] Specifically, in step 1, the steel section of the foundation steel frame 10 is designed, and based on the stress characteristics of the SRC structure, the distribution position of the processing part in the extension direction (i.e., the distribution along the longitudinal axis direction of the SRC structure) is determined under the premise of ensuring the coordinated work of the steel section and the concrete and the best overall performance of the SRC. After determining the appropriate position, the processing part is processed at the appropriate position (such as cutting, truncating, welding, etc.);

[0124] In step one, the steel frame cross section of the foundation steel frame 10 is reprocessed according to the appropriate position, and holes or cross-sectional changes are formed on the web 11 or flange 12 by opening holes, cutting, cutting, changing the thickness, or adding reinforcing plates, etc., to provide convenient conditions for the pouring of concrete and the arrangement of the steel cage 20, including the insertion of steel bars, the foundation steel frame 10 and concrete.

[0125] According to the construction method of the embodiment of the present invention, the self-bonding ability of the self-bonding steel concrete structure 100 can be improved.

[0126] Furthermore, if Fig.24 As shown, see Fig.24 In the step flow indicated by the dashed arrow, step 2 of the embodiment of the present invention may specifically include:

[0127] Sub-step 1: Assemble the foundation steel frame, steel cage and connection key, and cast the first part of concrete in the formwork, the first part of concrete forms a part of the covering layer, and forms an assembled structure as a whole;

[0128] Sub-step 2: At the construction site, pour the second part of concrete on the assembled structure. After the second part of concrete is poured, it is assembled with the first part of concrete to form a complete covering layer to obtain a self-bonded steel-concrete structure after molding.

[0129] That is, firstly, the reprocessed basic steel frame 10, the steel cage 20 and the connecting key 30 are assembled, and the first part of concrete is cast in the formwork, and the first part of concrete forms a part of the covering layer 40, and forms an assembled structure as a whole;

[0130] Then, at the construction site, a second portion of concrete is poured on the assembled structure, and after the second portion of concrete is poured, it is assembled with the first portion of concrete to form a complete covering layer 40 to obtain a self-bonded steel-concrete structure 100 after molding.

[0131] That is to say, the processing process of the self-bonded steel-concrete structure 100 of the present invention can be: first reprocess the steel to obtain the basic steel frame 10, and then assemble and assemble the basic steel frame 10, the steel cage 20 and the connecting key 30 in the pre-installation factory, and the first part of concrete can be cast in the formwork so that a coating layer 40 is partially formed on the outside of the steel cage 20, and the whole is formed into an assembled structure, so that the transportation difficulty of the assembled structure is lower, and then at the construction site, the second part of concrete is further cast to form a complete coating layer 40, and the steel cage 20, the connecting key 30 and the basic steel frame 10 are all coated inside the coating layer 40.

[0132] In this way, the foundation steel frame 10 and the steel cage 20 are fixedly connected by the connecting key 30, so that the installation of the foundation steel frame 10 and the steel cage 20 can be completed in the pre-installation workshop, forming a whole that is easy to carry, reducing the workload on the construction site, improving the industrialization level and efficiency of the construction, and ensuring the construction quality. In addition, pouring the first part of concrete during prefabrication can further reduce wet operations on the construction site. The formed assembled structure (i.e., prefabricated parts) has high structural strength and rigidity. After being transported to the construction site, there is no need for further formwork to pour the second part of concrete. The assembled structure can be seamlessly connected to the self-bonded steel concrete structure 100 at the construction site, thereby simplifying the processing steps, improving the processing efficiency, and reducing the processing cost.

[0133] In summary, the self-bonded steel-concrete structure 100 and its construction method of the embodiment of the present invention selects, drills and cuts the cross-section of the foundation steel frame 10, and uses the connecting key 30 to connect the steel cage 20, so that the foundation steel frame 10, the steel cage 20, and the covering layer 40 are combined with each other to form a complete whole.

[0134] Therefore, the method of the present invention does not need to add shear connectors and welding processes. Through refined design and reprocessing of steel sections, the effect of "addition" is achieved by "subtraction", and a "self-bonding" SRC structure is realized. The inherent bonding effect between concrete and the foundation steel frame 10 can be fully exerted, and the foundation steel frame 10 and concrete can be guaranteed to work together, reducing shear connectors, saving materials, facilitating construction, improving work efficiency, ensuring the durability of the SRC structure, and improving the cost performance of the SRC structure. The SRC structure can break through the limitations of previous industry applications, realize refined design and construction, and save materials and reduce carbon in construction projects, and has significant promotion and application value.

[0135] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "illustrative embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0136] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the claims and their equivalents.

Claims

1. A self-bonded steel-concrete structure, characterized in that: include: A basic steel frame (10), the basic steel frame (10) having a web (11) and a flange (12), the flange (12) and the web (11) having processed portions, the processed portions being configured as opening portions, and / or truncated portions, and / or material-added portions, so that at least a portion of the basic steel frame (10) is configured as a connected region, the connected region being suitable for concrete flow; A steel cage (20), wherein the steel cage (20) is sleeved outside the basic steel frame (10), and at least part of the steel bars of the steel cage (20) are suitable for passing through the connecting area; A connecting key (30), the connecting key (30) being connected to the foundation steel frame (10), the connecting key (30) being provided with a steel bar through hole or a steel bar through groove, and the steel bars of the steel bar cage (20) being suitable for passing through the steel bar through hole or the steel bar through groove, so that the steel bars are spaced apart from the foundation steel frame (10) and are connected and fixed, the connecting key (30) being made of plain concrete, cement mortar, or pure cement slurry, and being connected to the foundation steel frame (10) by an adhesive; A coating layer (40), the coating layer (40) coating the outer sides of the steel cage (20) and the basic steel frame (10); wherein The processing portion is designed based on the cross-sectional distribution of the steel section and is arranged at a position where the basic steel frame (10) allows for force.

2. The self-bonded steel-concrete structure according to claim 1, characterized in that: The cut-off portion is configured as a local fault formed on the web (11) or the flange (12).

3. The self-bonded steel-concrete structure according to claim 1, characterized in that: The opening portion comprises: a first opening (121) formed on the flange (12), a plurality of first openings (121) being arranged at intervals along an extension direction of the flange (12), and adjacent first openings (121) being respectively located on two sides of the web (11).

4. The self-bonded steel-concrete structure according to claim 1, characterized in that: The opening portion further comprises: a second opening (111) formed on the web (11), a plurality of the second openings (111) being arranged at intervals along the extension direction of the flange (12), and the shapes of the plurality of second openings (111) being the same or different.

5. The self-bonded steel-concrete structure according to claim 4, characterized in that: The material-added portion is constructed as a reinforcing plate (13), the reinforcing plate (13) is connected to the web (11), and both ends of the reinforcing plate (13) are connected to the flange (12), and the reinforcing plate (13) is located on both sides of the second opening (111).

6. The self-bonded steel-concrete structure according to claim 1, characterized in that: The steel cage (20) comprises a bending rib (24), the bending rib (24) comprising a straight section (241) and an inclined section (242), a third opening (122) is provided on the flange (12), the connecting key (30) is provided in the third opening (122), and the inclined section (242) penetrates the connecting key (30) located in the third opening (122), and the extension direction of the straight section (241) is consistent with the extension direction of the flange (12).

7. The self-bonded steel-concrete structure according to claim 1, characterized in that: The basic steel frame (10) comprises at least one web (11) and one flange (12), and the projection profile of at least a part of the basic steel frame (10) in the extension direction is constructed as an asymmetric figure.

8. The self-bonded steel-concrete structure according to claim 1, characterized in that: The steel cage (20) comprises: longitudinal bars (21), annular stirrups (22) and tension bars (23), wherein the annular stirrups (22) are arranged around the longitudinal bars (21), and the tension bars (23) are suitable for connecting opposite edges of the annular stirrups (22) and the longitudinal bars (21).

9. A method for constructing a self-bonded steel-concrete structure, the method being applicable to the self-bonded steel-concrete structure according to any one of claims 1 to 8, characterized in that: include: Step 1: Designing the cross section of the basic steel frame (10) to determine a suitable position, and arranging a processing portion at the suitable position to change the cross-sectional profile of a local area of ​​the basic steel frame (10) in the extension direction of the self-bonded steel concrete structure, and constructing at least one connected area; wherein the suitable position is a position determined along the extension direction of the self-bonded steel concrete structure based on the stress characteristics of the self-bonded steel concrete structure, and the connected area is suitable for concrete flow and steel bar penetration; Step 2: Assemble the foundation steel frame (10), the steel cage (20) and the connection key (30), and cast the covering layer (40) in a formwork to obtain a self-bonded steel concrete structure after forming.

10. The method for constructing a self-bonded steel-concrete structure according to claim 9, characterized in that: The step 2 specifically includes: Sub-step 1: Assembling the foundation steel frame (10), the steel cage (20) and the connecting key (30), and casting the first part of concrete with formwork, the first part of concrete forming a part of the covering layer (40), and forming an assembled structure as a whole; Sub-step 2: pouring a second portion of concrete on the assembled structure at the construction site, and the second portion of concrete is poured and assembled with the first portion of concrete to form a complete coating layer (40) to obtain a self-bonded steel-concrete structure after molding.