Intelligent energy consumption management system and method for AI computing equipment based on big data

Through the big data management system and base station optimization algorithm, the energy consumption of AI computing power equipment is optimized, which solves the problem of high power consumption of AI computing power equipment and achieves the improvement of power utilization and efficient allocation of base station resources.

CN118350548BActive Publication Date: 2024-10-29CORTELCO SHANGHAI INFORMATION TECH CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410549038.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-06
Publication Date
2024-10-29
Estimated Expiration
2044-05-06

AI Technical Summary

Technical Problem

With the development of artificial intelligence, the energy consumption problem of AI computing equipment has become increasingly prominent. Existing technologies are difficult to effectively manage and optimize, resulting in high power consumption and low efficiency.

Method used

The intelligent energy consumption management system of AI computing equipment based on big data is used to optimize base station resource allocation and achieve demand response indicators through the calculation module, comparison module, first processing module and second processing module, combined with the base station construction model and clustering algorithm. Management, reducing unnecessary power consumption, and optimizing base station construction and installation strategies through neural network models and genetic algorithms.

Benefits of technology

It achieves a reasonable distribution of power for AI computing equipment, reduces total power consumption, improves power utilization, ensures the reliability of the power grid and data accuracy, and improves the accuracy of the base station optimization model.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118350548B_ABST
    Figure CN118350548B_ABST
Patent Text Reader

Abstract

The present invention provides an intelligent energy consumption management system and method for AI computing power equipment based on big data, including a calculation module, a comparison module, a first processing module and a second processing module; the calculation module is used to calculate the current computing power energy consumption allocated to the AI ​​computing power equipment based on the current demand response index; the comparison module is used to compare the current computing power energy consumption with the computing power energy consumption threshold; the first processing module is used to input candidate base station information, existing base station information and base station construction information into a base station construction model when the current computing power energy consumption is greater than the computing power energy consumption threshold, and the base station construction model outputs the information of the base station to be built and the information of the base station to be installed; the second processing module is used to use a clustering algorithm and a base station optimization model to determine the information of the base station to be built and the information of the base station to be installed when the current computing power energy consumption is less than the computing power energy consumption threshold; so as to manage the energy consumption of the AI ​​computing power equipment and use AI-assisted work more reasonably.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of AI energy consumption management technology, and specifically, to an intelligent energy consumption management system and method for AI computing power equipment based on big data. Background Art

[0002] Artificial intelligence can process large amounts of data, and learn and predict through algorithms and models. It can complete a large amount of work in a short period of time and improve production efficiency. Therefore, compared with humans, artificial intelligence can work and predict more accurately. AI can process large amounts of data, discover the patterns and associations therein, and make accurate judgments in future predictions. In addition, the algorithm has high stability, which can ensure that it can work under large amounts of data and complex situations, reducing the error rate. However, with the rise of AI applications, on the one hand, it has improved work efficiency, and on the other hand, it has also consumed a lot of electricity. Therefore, with the rapid development of artificial intelligence, the problem of energy consumption has become increasingly prominent.

[0003] In view of this, the present invention discloses an intelligent energy consumption management system and method for AI computing power equipment based on big data, which manages the energy consumption of AI computing power equipment to use AI-assisted work more reasonably. Summary of the invention

[0004] The purpose of the present invention is to provide an intelligent energy consumption management system for AI computing power equipment based on big data, including a calculation module, a comparison module, a first processing module and a second processing module; the calculation module is used to calculate the current computing power energy consumption allocated to the AI ​​computing power equipment based on the current demand response index; the comparison module is used to compare the current computing power energy consumption with the computing power energy consumption threshold; the first processing module is used to input the candidate base station information, the existing base station information and the base station construction information into the base station construction model when the current computing power energy consumption is greater than the computing power energy consumption threshold, and the base station construction model outputs the base station information to be built and the base station information to be installed; the second processing module is used to use the clustering algorithm and the base station optimization model to determine the base station information to be built and the base station information to be installed when the current computing power energy consumption is less than the computing power energy consumption threshold; the base station optimization model is used to optimize the clustering results to obtain the base station information to be built. Managing AI power consumption through demand response indicators can reduce unnecessary power consumption, respond to power grid requirements, achieve the purpose of peak shaving and valley filling, and improve power utilization.

[0005] Furthermore, the first processing module at least includes a base station construction model training unit; the base station construction model training unit is used to process the candidate base station information, the existing base station information and the base station construction information to obtain a current coverage feature matrix, a base station location feature matrix and a service point location feature matrix; the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix are input into a neural network model, and the neural network model outputs a selected initial first-class base station and an initial second-class base station; based on the initial first-class base station and the initial second-class base station, an initial individual is constructed; based on a genetic algorithm, the initial individual is optimized to obtain an optimal individual; the optimal coverage of the optimal individual is calculated, and an optimal coverage matrix is ​​generated. An optimal coverage feature matrix; inputting the optimal coverage feature matrix, the base station location feature matrix and the service point location feature matrix into the neural network model, the neural network model outputting an optimal first-class base station and an optimal second-class base station; determining initial base station information to be constructed and initial base station information to be installed based on the optimal first-class base station and the optimal second-class base station; constructing a construction loss function based on the difference between the initial base station information to be constructed and the initial base station information to be installed and the labeled base station information to be constructed and the labeled base station information to be installed, and updating the parameters of the neural network model and the fitness function of the genetic algorithm based on the construction loss function, repeating the update operation until the loop termination condition is reached to obtain a trained base station construction model.

[0006] Furthermore, the calculation formula of the initial fitness function is:

[0007]

[0008] Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of a base station, the selected value is 1, and the unselected value is 0; R II Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; R I Indicates the coverage radius of the first type of base station; represents the repeated coverage of the first type of base station; the calculation formula of the construction loss function is:

[0009] LOSS=LOSS1+LOSS2:

[0010]

[0011]

[0012] Wherein, LOSS represents the value of the construction loss function; LOSS1 represents the value of the first loss function, which is related to the base station to be constructed; LOSS2 represents the value of the second loss function, which is related to the base station to be installed; j1 represents the variable of the initial base station to be constructed; m1 represents the total number of base stations selected in the initial base station to be constructed information; j s1 Indicates the variable of the base station to be built; m s1 Indicates the total number of base stations selected in the tag Base Stations to be Built information; represents the j1th initial base station to be constructed; Indicates the jth s1 The number of base stations to be built is tagged; k1 represents the variable of the initial base stations to be installed; n1 represents the total number of base stations selected from the initial base station information to be installed; k s1 Indicates the base station variable to be installed with the tag; n s1 Indicates the total number of base stations selected in the base station information to be installed with the tag; represents the k1th initial base station to be installed; Indicates the kth s1 The base station to be installed with tags; the calculation formula for updating the fitness function is:

[0013]

[0014] Among them, F′ represents the updated fitness function; σ1 represents the first penalty coefficient; σ2 represents the second penalty coefficient.

[0015] Further, the second processing module includes a first clustering unit, a first construction unit, an optimization unit, a coverage calculation unit, a service point determination unit, a second clustering unit, a second construction unit and a final construction unit; the first clustering unit is used to cluster the first type of service points to obtain a first clustering result; the first construction unit is used to determine multiple initial first base station information to be built and base station information to be installed based on the first clustering result; the optimization unit is used to input the initial first base station information to be built into a first base station optimization model, and the first base station optimization model outputs the first base station information to be built; the coverage calculation unit is used to determine the initial network coverage based on the first base station information to be built, the base station information to be installed and the second base station information; the service point determination unit is used to determine the second type of service points not covered by the network based on the initial network coverage; the second clustering unit is used to cluster the second type of service points not covered by the network to obtain a second clustering result; the second construction unit is used to determine the second base station information to be built based on the second clustering result; the final construction unit is used to use the first base station information to be built and the second base station information to be built as the final base station information to be built.

[0016] Furthermore, the optimization unit also includes an updating subunit; the updating subunit is used to process the information of the base stations to be constructed and the base stations to be installed obtained by the clustering algorithm and the base station optimization model to obtain an updated coverage feature matrix; based on the updated coverage feature matrix, the updated information of the base stations to be constructed and the updated information of the base stations to be installed are obtained through the base station construction model; the updated first base station to be constructed information in the updated information of the base stations to be constructed is extracted; based on the updated first base station to be constructed information and the first base station to be constructed information, a first optimization loss function is established, and the parameters of the first base station optimization model are updated based on the optimization loss function to obtain the updated first base station optimization model; wherein the expression of the first optimization loss function is:

[0017]

[0018] Among them, LOSS o1 represents the first optimization loss function, which is related to the first base station to be built; ij1 represents the base station variable of the first base station information to be built output by the first base station optimization model; mn1 represents the total number of base stations in the first base station information to be built; ij s1 mn represents a base station variable for updating the information of the first base station to be constructed; s1 Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the position of the ij1th first base station to be constructed in the first base station to be constructed information; Indicates updating the ijth base station in the first base station to be built information s1The location of the first base station to be built.

[0019] The object of the present invention is to also provide an intelligent energy consumption management method for AI computing power equipment based on big data, including: calculating the current computing power energy consumption amount allocated to the AI ​​computing power equipment based on the current demand response index;

[0020] The current computing power energy consumption is compared with the computing power energy consumption threshold; when the current computing power energy consumption is greater than the computing power energy consumption threshold, the candidate base station information, the existing base station information and the base station construction information are input into the base station construction model, and the base station construction model outputs the information of the base stations to be constructed and the base stations to be installed; when the current computing power energy consumption is less than the computing power energy consumption threshold, the clustering algorithm and the base station optimization model are used to determine the information of the base stations to be constructed and the information of the base stations to be installed; the base station optimization model is used to optimize the clustering results to obtain the information of the base stations to be constructed.

[0021] Furthermore, the base station construction model is obtained through training, including: processing the candidate base station information, the existing base station information and the base station construction information to obtain a current coverage feature matrix, a base station location feature matrix and a service point location feature matrix; inputting the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix into a neural network model, and the neural network model outputs a selected initial first-class base station and an initial second-class base station; constructing an initial individual based on the initial first-class base station and the initial second-class base station; optimizing the initial individual based on a genetic algorithm to obtain an optimal individual; calculating the optimal coverage of the optimal individual and generating an optimal coverage feature matrix; The optimal coverage feature matrix, the base station location feature matrix and the service point location feature matrix are input into the neural network model, and the neural network model outputs the optimal first-category base station and the optimal second-category base station; based on the optimal first-category base station and the optimal second-category base station, the initial base station information to be constructed and the initial base station information to be installed are determined; based on the difference between the initial base station information to be constructed and the initial base station information to be installed and the labeled base station information to be constructed and the labeled base station information to be installed, a construction loss function is constructed, and based on the construction loss function, the parameters of the neural network model and the fitness function of the genetic algorithm are updated, and the update operation is repeated until the loop termination condition is reached to obtain a trained base station construction model.

[0022] Furthermore, the calculation formula of the initial fitness function is:

[0023]

[0024] Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of a base station, the selected value is 1, and the unselected value is 0; R II Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; R I Indicates the coverage radius of the first type of base station; Indicates the repeated coverage of the first type of base station;

[0025] The calculation formula of the construction loss function is:

[0026] LOSS=LOSS1+LOSS2:

[0027]

[0028]

[0029] Wherein, LOSS represents the value of the construction loss function; LOSS1 represents the value of the first loss function, which is related to the base station to be constructed; LOSS2 represents the value of the second loss function, which is related to the base station to be installed; j1 represents the variable of the initial base station to be constructed; m1 represents the total number of base stations selected in the initial base station to be constructed information; j s1 Indicates the variable of the base station to be built; m s1 Indicates the total number of base stations selected in the tag Base Stations to be Built information; represents the j1th initial base station to be constructed; Indicates the jth s1 The number of base stations to be built is tagged; k1 represents the variable of the initial base stations to be installed; n1 represents the total number of base stations selected from the initial base station information to be installed; k s1 Indicates the base station variable to be installed with the tag; n s1 Indicates the total number of base stations selected in the base station information to be installed with the tag; represents the k1th initial base station to be installed; Indicates the kth s1 Tags are to be installed on the base station;

[0030] The calculation formula for updating the fitness function is:

[0031]

[0032] Among them, F′ represents the updated fitness function; σ1 represents the first penalty coefficient; σ2 represents the second penalty coefficient. By updating the fitness function, the convergence rate of the model can be improved.

[0033] Further, using a clustering algorithm and a base station optimization model, determining the information of the base station to be constructed and the information of the base station to be installed, including: clustering the first type of service points to obtain a first clustering result;

[0034] Based on the first clustering result, multiple initial first base station information to be built and base station information to be installed are determined; the initial first base station information to be built is input into the first base station optimization model, and the first base station optimization model outputs the first base station information to be built; based on the first base station information to be built, the base station information to be installed, and the second base station information, the initial network coverage is determined; based on the initial network coverage, the second type of service points not covered by the network are determined; the second type of service points not covered by the network are clustered to obtain a second clustering result; based on the second clustering result, the second base station information to be built is determined; the first base station information to be built and the second base station information to be built are used as the final base station information to be built. By clustering the base stations and then optimizing the clustered base stations to be built, the number and process of data processed by the machine learning model can be reduced, further reducing power consumption.

[0035] Further, the parameters of the first base station optimization model are the parameters of the neural network model in the base station construction model, wherein updating the first base station optimization model includes: processing the information of the base stations to be constructed and the base stations to be installed obtained by the clustering algorithm and the base station optimization model to obtain an updated coverage feature matrix; based on the updated coverage feature matrix, obtaining the updated information of the base stations to be constructed and the updated information of the base stations to be installed through the base station construction model; extracting the updated first base station to be constructed information from the updated information of the base stations to be constructed; establishing a first optimization loss function based on the updated information of the first base station to be constructed and the first base station to be constructed, and updating the parameters of the first base station optimization model based on the optimization loss function to obtain the updated first base station optimization model; wherein the expression of the first optimization loss function is: Among them, LOSS o1 represents the first optimization loss function, which is related to the first base station to be built; ij1 represents the base station variable of the first base station information to be built output by the first base station optimization model; mn1 represents the total number of base stations in the first base station information to be built; ij s1 mn represents a base station variable for updating the information of the first base station to be constructed; s1 Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the position of the ij1th first base station to be constructed in the first base station to be constructed information; Indicates updating the ijth base station in the first base station to be built information s1 The location of the first base station to be built is determined by updating the first base station optimization model through the base station construction model, which can reduce power consumption and improve output accuracy.

[0036] The technical solution of the embodiment of the present invention has at least the following advantages and beneficial effects:

[0037] The present invention performs data processing on the power allocation of AI computing power equipment based on demand response indicators, which can improve the efficiency of power utilization, achieve the purpose of peak shaving and valley filling, reduce the total power consumption, and improve the reliability of the line.

[0038] The present invention outputs information about base stations to be constructed and base stations to be installed through a base station construction model when power is sufficient, and outputs information about base stations to be constructed and base stations to be installed through a clustering algorithm and a base station optimization model when power is insufficient, thereby improving data accuracy while ensuring reduced power consumption.

[0039] The base station optimization model is obtained by castrating the base station construction model, and when the power consumption is sufficient, the base station construction model is first enabled to update the information of base stations to be constructed and the information of base stations to be installed obtained by the base station optimization model, and the base station optimization model is updated based on the updated results, thereby further improving the accuracy of the base station optimization model. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 An exemplary module diagram of the intelligent energy consumption management system for AI computing equipment based on big data provided by the present invention;

[0041] Figure 2 An exemplary flow chart of the intelligent energy consumption management method for AI computing equipment based on big data provided by the present invention. DETAILED DESCRIPTION

[0042] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0043] Figure 1 This is an exemplary module diagram of the intelligent energy consumption management system for AI computing equipment based on big data provided by the present invention. Figure 1As shown, the intelligent energy consumption management system for AI computing equipment based on big data includes a calculation module 110, a comparison module 120, a first processing module 130 and a second processing module 140.

[0044] The calculation module 110 is used to calculate the current computing power energy consumption allocated to the AI ​​computing power device based on the current demand response index.

[0045] The comparison module 120 is used to compare the current computing power energy consumption with the computing power energy consumption threshold.

[0046] The first processing module 130 is used to input candidate base station information, existing base station information and base station construction information into a base station construction model when the current computing power energy consumption is greater than the computing power energy consumption threshold, and the base station construction model outputs information about base stations to be constructed and information about base stations to be installed.

[0047] The first processing module 130 at least includes a base station construction model training unit. The base station construction model training unit is used to process the candidate base station information, the existing base station information and the base station construction information to obtain the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix; input the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix into a neural network model, and the neural network model outputs the selected initial first-class base station and initial second-class base station; construct an initial individual based on the initial first-class base station and the initial second-class base station; optimize the initial individual based on a genetic algorithm to obtain an optimal individual; calculate the optimal coverage of the optimal individual and generate an optimal coverage feature matrix; input the optimal The coverage feature matrix, the base station location feature matrix and the service point location feature matrix are input into the neural network model, and the neural network model outputs the optimal first-class base station and the optimal second-class base station; based on the optimal first-class base station and the optimal second-class base station, the initial base station information to be built and the initial base station information to be installed are determined; based on the difference between the initial base station information to be built and the initial base station information to be installed and the labeled base station information to be built and the labeled base station information to be installed, a construction loss function is constructed, and the parameters of the neural network model and the fitness function of the genetic algorithm are updated based on the construction loss function, and the update operation is repeated until the loop termination condition is reached to obtain a trained base station construction model. Among them, the calculation formula of the initial fitness function is:

[0048]

[0049] Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of a base station, the selected value is 1, and the unselected value is 0; R II Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; R I Indicates the coverage radius of the first type of base station; Indicates the overlapping coverage of the first type of base station.

[0050] The calculation formula of the construction loss function is:

[0051] LOSS=LOSS1+LOSS2:

[0052]

[0053]

[0054] Wherein, LOSS represents the value of the construction loss function; LOSS1 represents the value of the first loss function, which is related to the base station to be constructed; LOSS2 represents the value of the second loss function, which is related to the base station to be installed; j1 represents the variable of the initial base station to be constructed; m1 represents the total number of base stations selected in the initial base station to be constructed information; j s1 Indicates the variable of the base station to be built; m s1 Indicates the total number of base stations selected in the tag Base Stations to be Built information; represents the j1th initial base station to be constructed; Indicates the jth s1 The number of base stations to be built is tagged; k1 represents the variable of the initial base stations to be installed; n1 represents the total number of base stations selected from the initial base station information to be installed; k s1 Indicates the base station variable to be installed with the tag; n s1 Indicates the total number of base stations selected in the base station information to be installed with the tag; represents the k1th initial base station to be installed; Indicates the kth s1 Tags are waiting to be installed on the base station.

[0055] The calculation formula for updating the fitness function is:

[0056]

[0057] Among them, F′ represents the updated fitness function; σ1 represents the first penalty coefficient; σ2 represents the second penalty coefficient.

[0058] The second processing module 140 is used to use a clustering algorithm and a base station optimization model to determine the information of the base station to be built and the information of the base station to be installed when the current computing power energy consumption is less than the computing power energy consumption threshold; the base station optimization model is used to optimize the clustering results to obtain the information of the base station to be built.

[0059] The second processing module 140 includes a first clustering unit, a first construction unit, an optimization unit, a coverage calculation unit, a service point determination unit, a second clustering unit, a second construction unit and a final construction unit.

[0060] The first clustering unit is used to cluster the first type of business points to obtain a first clustering result.

[0061] The first construction unit is used to determine a plurality of initial first base stations to be constructed and information of base stations to be installed based on the first clustering result.

[0062] The optimization unit is used to input the initial first base station to be built information into the first base station optimization model, and the first base station optimization model outputs the first base station to be built information.

[0063] The optimization unit also includes an updating subunit; the updating subunit is used to process the information of the base stations to be constructed and the base stations to be installed obtained by the clustering algorithm and the base station optimization model to obtain an updated coverage feature matrix; based on the updated coverage feature matrix, the updated information of the base stations to be constructed and the updated information of the base stations to be installed are obtained through the base station construction model; the updated first base station to be constructed information in the updated information of the base stations to be constructed is extracted; based on the updated first base station to be constructed information and the first base station to be constructed information, a first optimization loss function is established, and the parameters of the first base station optimization model are updated based on the optimization loss function to obtain the updated first base station optimization model. Among them, the expression of the first optimization loss function is:

[0064]

[0065] Among them, LOSS o1 represents the first optimization loss function, which is related to the first base station to be built; ij1 represents the base station variable of the first base station information to be built output by the first base station optimization model; mn1 represents the total number of base stations in the first base station information to be built; ij s1 mn represents a base station variable for updating the information of the first base station to be constructed; s1 Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the position of the ij1th first base station to be constructed in the first base station to be constructed information; Indicates updating the ijth base station in the first base station to be built information s1 The location of the first base station to be built.

[0066] The coverage range calculation unit is used to determine the initial network coverage range based on the first base station information to be built, the base station information to be installed and the second base station information.

[0067] The service point determination unit is used to determine a second type of service point that is not covered by the network based on the initial network coverage.

[0068] The second clustering unit is used to cluster the second type of service points that are not covered by the network to obtain a second clustering result.

[0069] The second construction unit is used to determine information of a second base station to be constructed based on the second clustering result.

[0070] The final construction unit is used to use the first base station information to be constructed and the second base station information to be constructed as the final base station information to be constructed.

[0071] Figure 2 This is an exemplary flow chart of the intelligent energy consumption management method of AI computing equipment based on big data provided by the present invention. Figure 2 As shown in the figure, the intelligent energy consumption management method of AI computing equipment based on big data includes:

[0072] Step 210, based on the current demand response index, calculate the current computing power energy consumption allocated to the AI ​​computing power device.

[0073] The demand response index refers to the amount of power load response demand allocated by the power grid to users. The demand response index can be a load standard line or a load response amount, including the upper limit and lower limit of the demand response for each time period. The current demand response index is the demand response index corresponding to the current time, including the current upper limit and lower limit of the demand response. AI (Artificial Intelligence) computing power equipment refers to the general term for equipment that uses artificial intelligence for various types of calculations. AI computing power equipment may include TPU (Tensor Processing Unit), GPU (Graphics Processing Unit), DPU (Deep learning Processing Unit), NPU (Neural network Processing Unit), BPU (Brain Processing Unit) and ICT (Information Communication Technology) and other equipment. Computing power energy consumption may refer to the amount of electrical energy consumption required for AI computing power equipment to perform calculations. The current computing power energy consumption may refer to the amount of electrical energy consumption available for AI computing power equipment at the current time. The calculation formula for the current computing power energy consumption is:

[0074] E=D min k+D max -Dm in ;

[0075] Among them, E represents the current computing power energy consumption; D min represents the lower limit of the current demand response; k represents the power allocation coefficient of the AI ​​computing power device; D max Indicates the current demand response upper limit.

[0076] Step 220: compare the current computing power energy consumption with the computing power energy consumption threshold.

[0077] The computing power energy consumption threshold refers to the pre-set amount of power consumption required by the AI ​​computing power device to perform calculations. When the computing power energy consumption allocated to the AI ​​computing power device does not reach the computing power energy consumption threshold, the AI ​​computing power device cannot perform the entire calculation process.

[0078] Step 230, when the current computing power energy consumption is greater than the computing power energy consumption threshold, the candidate base station information, the existing base station information and the base station construction information are input into the base station construction model, and the base station construction model outputs the information of the base stations to be constructed and the information of the base stations to be installed.

[0079] Candidate base station information refers to information about areas where base stations can be built. Candidate base station information may include information such as the location of the candidate base station, the area of ​​the candidate base station, and the environment of the candidate base station. Existing base station information refers to information about established base stations. Existing base station information may include the location of the existing base station, the area of ​​the existing base station, the coverage of the existing base station, and the type of the existing base station. Base station construction information refers to information related to base station construction and modification. Base station construction information may include the number of newly built base stations, the number of modified base stations, the location of service points, the type of service points, the coverage of the first type of base stations, and the coverage of the second type of base stations. Among them, the type of service points may include 4G service points and 5G service points; correspondingly, the first type of base station may be a 5G base station, and the second type of base station may be a 4G base station. Base station construction model refers to an artificial intelligence model used to calculate base stations to be built and base stations to be installed. Information about base stations to be built refers to information related to newly built base stations. Information about base stations to be built may include the location of base stations to be built and the type of base stations to be built. Information about base stations to be installed may refer to information related to modified base stations. Information about base stations to be installed may include the location and installation type of base stations to be installed. The base stations to be constructed may include first-class base stations and second-class base stations; the base stations to be installed may refer to base stations that need to be installed with first communication equipment. The first-class base stations can perform first-class and second-class communications; the second-class base stations can perform second-class communications.

[0080] The base station construction model is obtained through training, including:

[0081] The candidate base station information, the existing base station information and the base station construction information are processed to obtain a current coverage feature matrix, a base station location feature matrix and a service point location feature matrix. The current coverage feature matrix can be used to characterize the current coverage situation. The current coverage situation refers to the coverage situation of the existing base stations. The current coverage situation may include the coverage situation of the first type of communication and the coverage situation of the second type of communication. For example, the situation where the first type of base station covers the first type of service point; the situation where the second type of base station covers the second type of service point. The base station location feature matrix can be used to characterize the base station location information. The base station location information refers to the location of the candidate base station and the existing base station. For example, the base station location information may include the longitude and latitude, altitude and environmental conditions of the candidate base station and the longitude and latitude, altitude and environmental conditions of the existing base station. The service point location feature matrix can be used to characterize the service point location information. The service point location information may refer to the location of the first type of service point and the location of the second type of service point. For example, the service point location information may include the location set of the first type of service point and the location set of the second type of service point.

[0082] The current coverage feature matrix, the base station location feature matrix and the service point location feature matrix are input into a neural network model, and the neural network model outputs the selected initial first-class base station and initial second-class base station. A first-class base station may refer to a base station that provides first-class communications. For example, a first-class base station may be a 5G base station. The initial first-class base station refers to the location of a base station that needs to be equipped with first-class communication equipment and has not been optimized by a genetic algorithm and is output by a neural network model. A second-class base station may refer to a base station that provides second-class communications. For example, a second-class base station may be a 4G base station. The initial second-class base station refers to the location of a second-class communication base station that has not been optimized by a genetic algorithm and is output by a neural network.

[0083] Based on the initial first-category base station and the initial second-category base station, an initial individual is constructed. The initial individual refers to an individual used for genetic algorithm optimization. The initial individual retains the selection conditions of the initial first-category base station and the initial second-category base station.

[0084] The initial individuals are optimized based on a genetic algorithm to obtain an optimal individual. The optimal individual refers to an individual with the largest coverage. The optimal individual retains the selection of the first type of base station and the selection of the second type of base station when the coverage is the largest.

[0085] The optimal coverage of the optimal individual is calculated, and an optimal coverage feature matrix is ​​generated. The optimal coverage refers to the communication coverage formed by the selection of the first type of base station and the second type of base station and their reachable communication distance when the communication coverage is the largest. For example, the optimal coverage may include the coverage when the base station uses the first type of equipment and the second type of equipment for communication and the coverage when the base station only uses the second type of equipment for communication.

[0086] The optimal coverage feature matrix, the base station location feature matrix and the service point location feature matrix are input into the neural network model, and the neural network model outputs the optimal first-class base station and the optimal second-class base station. The optimal first-class base station refers to the location of the base station that needs to be equipped with the first-class communication equipment after being optimized by the genetic algorithm output by the neural network model. The optimal second-class base station refers to the location of the second-class communication base station that is optimized by the genetic algorithm output by the neural network model.

[0087] Based on the optimal first-category base station and the optimal second-category base station, the initial base station information to be constructed and the initial base station information to be installed are determined. The initial base station information to be constructed refers to the information of the base station to be constructed output by the initial base station construction model. The initial base station construction model refers to a base station construction model that has not yet been trained. The initial base station information to be installed refers to the information of the base station to be installed with the first-category communication equipment output by the initial base station construction model.

[0088] Based on the difference between the initial base station information to be constructed and the initial base station information to be installed and the labeled base station information to be constructed and the labeled base station information to be installed, a construction loss function is constructed, and the parameters of the neural network model and the fitness function of the genetic algorithm are updated based on the construction loss function, and the update operation is repeated until the loop termination condition is reached to obtain a trained base station construction model. The labeled base station information to be constructed refers to the location information of a standard base station to be constructed. The labeled base station information to be constructed can be obtained by manual annotation. The labeled base station information to be installed refers to the location information of a standard base station to be installed. The labeled base station information to be installed can be obtained by manual annotation. The construction loss function refers to the loss function of training the initial base station construction model. The loop termination condition may include that the value of the loss function is less than a preset threshold or the number of cycles is greater than the maximum number of cycles, etc.

[0089] Among them, the calculation formula of the initial fitness function is:

[0090]

[0091] Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of a base station, the selected value is 1, and the unselected value is 0; R II Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; R I Indicates the coverage radius of the first type of base station; Indicates the overlapping coverage of the first type of base station.

[0092] The calculation formula of the construction loss function is:

[0093] LOSS = LOSS1 + LOSS2;

[0094]

[0095]

[0096] Wherein, LOSS represents the value of the construction loss function; LOSS1 represents the value of the first loss function, which is related to the base station to be constructed; LOSS2 represents the value of the second loss function, which is related to the base station to be installed; j1 represents the variable of the initial base station to be constructed; m1 represents the total number of base stations selected in the initial base station to be constructed information; j s1 Indicates the variable of the base station to be built; m s1 Indicates the total number of base stations selected in the tag Base Stations to be Built information; represents the j1th initial base station to be constructed; Indicates the jth s1 The number of base stations to be built is tagged; k1 represents the variable of the initial base stations to be installed; n1 represents the total number of base stations selected from the initial base station information to be installed; k s1 Indicates the base station variable to be installed with the tag; n s1 Indicates the total number of base stations selected in the base station information to be installed with the tag; represents the k1th initial base station to be installed; Indicates the kth s1 Tags are to be installed on the base station;

[0097] The calculation formula for updating the fitness function is:

[0098]

[0099] Among them, F′ represents the updated fitness function; σ1 represents the first penalty coefficient; σ2 represents the second penalty coefficient.

[0100] Step 240: When the current computing power energy consumption is less than the computing power energy consumption threshold, the clustering algorithm and the base station optimization model are used to determine the information of the base station to be built and the information of the base station to be installed; the base station optimization model is used to optimize the clustering results to obtain the information of the base station to be built. The base station optimization model refers to an artificial intelligence model that optimizes the results obtained by the clustering algorithm. The base station optimization model includes at least a first base station optimization model.

[0101] Using a clustering algorithm and a base station optimization model, determining the information of the base station to be constructed and the information of the base station to be installed includes:

[0102] Clustering the first type of service points to obtain a first clustering result. The first type of service points refer to service points that require first type of communication. For example, 5G service points. The first clustering result refers to a set of multiple first service points around the base station obtained by clustering the first service points. Clustering the first type of service points to obtain the first clustering result includes:

[0103] Step 2401: determine a target first-category base station. The target first-category base station refers to a base station that needs to be clustered with the base station as the center.

[0104] Step 2402, obtain the first type of service points and their number within the first transmission distance from the target first type base station. The first transmission distance refers to the distance from the base station within a certain range, within which communication is smooth and latency is low. The calculation formula of the first transmission distance is:

[0105] Among them, R 1i represents the first transmission distance, i is the base station type variable, R 11 represents the first transmission distance of the first type of base station, R 12 represents the first transmission distance of the second type of base station; d i Indicates the transmission distance of the electromagnetic wave emitted by the i-th type base station; PL i represents the propagation loss of the i-th type base station; D ti represents the antenna gain of the i-th type base station; D r represents the antenna gain of the terminal; λ i represents the wavelength of the electromagnetic wave emitted by the i-th type base station; R mi represents the maximum transmission distance of the i-th type base station, that is, the second transmission distance.

[0106] Step 2403: determine whether the number of the first type of service points is greater than a first communication threshold. The first communication threshold refers to a preset minimum value of corresponding communication service points within a first transmission distance of a base station.

[0107] Step 2404-1: If the number of the first type of service points is less than the first communication threshold, the target first type base station is discarded and steps 2401 to 2403 are repeated.

[0108] Step 2404-2: if the number of the first type of service points is greater than the first communication threshold, first and second type of service points within the first transmission distance from the first type of service points are respectively obtained.

[0109] Step 2405, determining whether the number of the first second type service points is greater than the first communication threshold.

[0110] Step 2406-1: If the number of the first-class-II service points is less than the first communication threshold, the first-class-I service point is determined to be a boundary point of the target first-class base station.

[0111] Step 2406-2: If the number of the first-class second service points is greater than the first communication threshold, the first-class first service point is determined to be a core point of the target first-class base station.

[0112] Step 2407: determine whether the distance between the first and second service points of the core point of the target first-category base station and the target first-category base station is less than a second transmission distance. The second transmission distance refers to the maximum transmission distance of the base station.

[0113] Step 2408-1: If the distance between the first or second category service point and the target first or second category base station is greater than a second transmission distance, the first or second category service point is regarded as a non-coverage point.

[0114] Step 2408-2: If the distance between the first or second category service point and the target first or second category base station is less than the second transmission distance, the first or second category service point is used as a semi-coverage point.

[0115] Step 2409, determining whether the semi-covered point is covered by other first-category base stations at the same time.

[0116] Step 2410-1, if the semi-covered point is not covered by other first-class base stations, the semi-covered point and the remaining first-class service points are taken as clustering objects, and steps 2401-2410 are repeated until all first-class service points are clustered into the first-class base stations.

[0117] Step 2410-2: If the semi-covered point is covered by other first-category base stations, the point is marked as a covered point and does not need to participate in the next clustering.

[0118] Based on the first clustering result, multiple initial first base station information to be built and base station information to be installed are determined. The initial first base station information to be built refers to the location of the candidate base station where the base station needs to be built first and then the first type of communication equipment needs to be installed. The base station information to be installed refers to the location of the base station where the first type of communication equipment needs to be installed among the existing and candidate base stations.

[0119] The initial first base station information to be constructed is input into the first base station optimization model, and the first base station optimization model outputs the first base station information to be constructed. The first base station optimization model refers to a machine learning model for optimizing the base station to be constructed that needs to be equipped with the first type of communication equipment. The first base station information to be constructed refers to the location where the base station needs to be established first and then the first type of communication equipment needs to be installed in the candidate base stations optimized by the first base station optimization model.

[0120] The parameters of the first base station optimization model are the parameters of the neural network model in the base station construction model, wherein updating the first base station optimization model includes:

[0121] The information of the base stations to be built and the base stations to be installed obtained by the clustering algorithm and the base station optimization model is processed to obtain an updated coverage feature matrix. The updated coverage feature matrix is ​​used to characterize the communication signal coverage of the base station obtained by the clustering algorithm and the base station optimization model.

[0122] Based on the updated coverage feature matrix, the updated information of the base stations to be constructed and the updated information of the base stations to be installed are obtained through the base station construction model. The updated information of the base stations to be constructed refers to the information of the base stations to be constructed output by the base station construction model obtained by taking the updated coverage feature matrix as input. The updated information of the base stations to be installed refers to the information of the base stations to be installed output by the base station construction model obtained by taking the updated coverage feature matrix as input.

[0123] Extracting the updated first base station information to be constructed from the updated base station information to be constructed. The updated first base station information to be constructed refers to the location of the base station that needs to be equipped with the first type of communication equipment among the candidate base stations output by the base station construction model.

[0124] Based on the updated first base station information to be built and the first base station information to be built, a first optimization loss function is established, and the parameters of the first base station optimization model are updated based on the optimization loss function to obtain an updated first base station optimization model; the first optimization loss function refers to the loss function of updating the first base station optimization model. The expression of the first optimization loss function is:

[0125] Among them, LOSS o1 represents the first optimization loss function, which is related to the first base station to be built; ij1 represents the base station variable of the first base station information to be built output by the first base station optimization model; mn1 represents the total number of base stations in the first base station information to be built; ij s1 mn represents a base station variable for updating the information of the first base station to be constructed; s1 Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the position of the ij1th first base station to be constructed in the first base station to be constructed information; Indicates updating the ijth base station in the first base station to be built information s1 The location of the first base station to be built.

[0126] Based on the information of the first base station to be constructed, the information of the base station to be installed, and the information of the second base station, the initial network coverage is determined. The second base station information refers to the information of the base station that only provides the second type of communication among the existing base stations. The second base station information may include the location information, coverage information, and environmental information of the base station. The initial network coverage refers to the coverage of the communication network when the base station sends out the first type of communication and the second type of communication; wherein the information of the base station to be installed sends out the first type of communication signal, and other existing base stations send out the second type of communication signal.

[0127] Based on the initial network coverage, determine the second type of service point that is not covered by the network. The second type of service point refers to a service point that needs to perform second type communication, for example, a 4G service point.

[0128] The second type of service points not covered by the network are clustered to obtain a second clustering result. The second clustering result refers to a set of multiple second service points surrounding the base station obtained by clustering the second service points not covered.

[0129] Based on the second clustering result, the second base station information to be built is determined. The second base station information to be built refers to the location of the base station that needs to be built and only provides the second type of communication information among the candidate base stations.

[0130] The first base station to be constructed information and the second base station to be constructed information are used as final base station to be constructed information.

[0131] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An intelligent energy consumption management system for AI computing equipment based on big data, characterized in that: It includes a calculation module, a comparison module, a first processing module and a second processing module; The calculation module is used to calculate the current computing power energy consumption allocated to the AI ​​computing power device based on the current demand response indicator; The comparison module is used to compare the current computing power energy consumption with the computing power energy consumption threshold; The first processing module is used for inputting candidate base station information, existing base station information and base station construction information into a base station construction model when the current computing power energy consumption is greater than the computing power energy consumption threshold, and the base station construction model outputs information of base stations to be constructed and information of base stations to be installed; The first processing module at least includes a base station construction model training unit; The base station construction model training unit is used to process the candidate base station information, the existing base station information and the base station construction information to obtain a current coverage feature matrix, a base station location feature matrix and a service point location feature matrix; Inputting the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix into a neural network model, the neural network model outputting the selected initial first-category base stations and initial second-category base stations; constructing initial individuals based on the initial first-category base stations and the initial second-category base stations; The initial individuals are optimized based on a genetic algorithm to obtain an optimal individual; the optimal coverage of the optimal individual is calculated, and an optimal coverage feature matrix is ​​generated; the optimal coverage feature matrix, the base station location feature matrix, and the service point location feature matrix are input into the neural network model, and the neural network model outputs an optimal first-class base station and an optimal second-class base station; based on the optimal first-class base station and the optimal second-class base station, initial base station information to be constructed and initial base station information to be installed are determined; Based on the difference between the initial base station information to be constructed and the initial base station information to be installed and the labeled base station information to be constructed and the labeled base station information to be installed, a construction loss function is constructed, and the parameters of the neural network model and the fitness function of the genetic algorithm are updated based on the construction loss function, and the updating operation is repeated until the loop termination condition is reached to obtain a trained base station construction model; the calculation formula of the initial fitness function is: ; Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of each base station, the selected value is 1, and the unselected value is 0; Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; Indicates the coverage radius of the first type of base station; Indicates the repeated coverage of the first type of base station; The calculation formula of the construction loss function is: ; ; ; Among them, LOSS represents the value of the construction loss function; represents the value of the first loss function, which is related to the base station to be constructed; represents the value of the second loss function, which is related to the base station to be installed; Indicates the initial base station variable to be constructed; Indicates the total number of base stations selected from the initial base station information to be constructed; Indicates the variable of the base station to be built; Indicates the total number of base stations selected in the tag Base Stations to be Built information; Indicates Initial base stations to be built; Indicates Tags are waiting to build base stations; Indicates the initial base station variable to be installed; Indicates the total number of base stations selected from the initial information of base stations to be installed; Indicates the base station variable to be installed with the tag; Indicates the total number of base stations selected in the base station information to be installed with the tag; Indicates Initial base stations to be installed; Indicates Tags are to be installed on the base station; The calculation formula for updating the fitness function is: ; in, represents the updated fitness function; represents the first penalty coefficient; represents the second penalty coefficient; The second processing module is used to determine the information of the base station to be built and the information of the base station to be installed using a clustering algorithm and a base station optimization model when the current computing power energy consumption is less than the computing power energy consumption threshold; the base station optimization model is used to optimize the clustering result to obtain the information of the base station to be built; the second processing module includes a first clustering unit, a first construction unit, an optimization unit, a coverage calculation unit, a service point determination unit, a second clustering unit, a second construction unit and a final construction unit; The first clustering unit is used to cluster the first type of business points to obtain a first clustering result; The first construction unit is used to determine a plurality of initial first base stations to be constructed and information of base stations to be installed based on the first clustering result; The optimization unit is used to input the initial first base station to be built information into a first base station optimization model, and the first base station optimization model outputs the first base station to be built information; the optimization unit also includes an updating subunit; The updating subunit is used to process the information of the base stations to be constructed and the base stations to be installed obtained by the clustering algorithm and the base station optimization model to obtain an updated coverage feature matrix; based on the updated coverage feature matrix, the updated information of the base stations to be constructed and the updated information of the base stations to be installed are obtained through the base station construction model; the updated first base station to be constructed information in the updated information of the base stations to be constructed is extracted; based on the updated first base station to be constructed information and the first base station to be constructed information, a first optimization loss function is established, and the parameters of the first base station optimization model are updated based on the first optimization loss function to obtain the updated first base station optimization model; wherein the expression of the first optimization loss function is: ; in, represents a first optimization loss function, which is related to the first base station to be constructed; A base station variable representing information of a first base station to be constructed output by a first base station optimization model; Indicates the total number of base stations in the first base station information to be constructed; A base station variable representing updating information of the first base station to be constructed; Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the first base station to be built. The location of the first base station to be built; Indicates updating the first base station information to be built. The location of the first base station to be built; The coverage range calculation unit is used to determine the initial network coverage range based on the first base station information to be built, the base station information to be installed, and the second base station information; The service point determination unit is used to determine the second type of service points not covered by the network based on the initial network coverage; The second clustering unit is used to cluster the second type of service points not covered by the network to obtain a second clustering result; The second construction unit is used to determine information of a second base station to be constructed based on the second clustering result; The final construction unit is used to use the first base station information to be constructed and the second base station information to be constructed as final base station information to be constructed.

2. An intelligent energy consumption management method for AI computing equipment based on big data, characterized in that: include: Based on the current demand response indicators, calculate the current computing power energy consumption allocated to the AI ​​computing power device; Compare the current computing power energy consumption with a computing power energy consumption threshold; When the current computing power energy consumption is greater than the computing power energy consumption threshold, the candidate base station information, the existing base station information and the base station construction information are input into the base station construction model, and the base station construction model outputs the information of the base station to be constructed and the information of the base station to be installed; The base station construction model is obtained through training, including: Processing the candidate base station information, the existing base station information and the base station construction information to obtain a current coverage feature matrix, a base station location feature matrix and a service point location feature matrix; Inputting the current coverage feature matrix, the base station location feature matrix and the service point location feature matrix into a neural network model, the neural network model outputting the selected initial first-category base station and initial second-category base station; constructing an initial individual based on the initial first-category base station and the initial second-category base station; Optimizing the initial individuals based on a genetic algorithm to obtain an optimal individual; Calculating the optimal coverage of the optimal individual and generating an optimal coverage feature matrix; Inputting the optimal coverage feature matrix, the base station location feature matrix and the service point location feature matrix into the neural network model, the neural network model outputting the optimal first-category base station and the optimal second-category base station; Based on the optimal first-category base station and the optimal second-category base station, determining initial base station information to be constructed and initial base station information to be installed; Based on the difference between the initial base station information to be constructed and the initial base station information to be installed and the labeled base station information to be constructed and the labeled base station information to be installed, a construction loss function is constructed, and the parameters of the neural network model and the fitness function of the genetic algorithm are updated based on the construction loss function, and the updating operation is repeated until the loop termination condition is reached to obtain a trained base station construction model; the calculation formula of the initial fitness function is: ; Among them, F represents the fitness function; max(*) means taking the maximum value; Indicates the base station variable when all base stations use the second type of communication equipment; N indicates the total number of base stations; Indicates that the second type of communication equipment is enabled in the base station The selected status of each base station, the selected value is 1, and the unselected value is 0; Indicates the coverage radius of the second type of base station; Indicates the overlapping coverage of the second type of base station; A base station variable indicating that the base station equipped with the first type of communication equipment activates the first type of communication equipment and the other selected base stations activate the second type of communication equipment; Indicates If a base station is selected as the first communication base station, the value is 1, and if it is not selected, the value is 0; Indicates the coverage radius of the first type of base station; Indicates the repeated coverage of the first type of base station; The calculation formula of the construction loss function is: ; ; ; Among them, LOSS represents the value of the construction loss function; represents the value of the first loss function, which is related to the base station to be constructed; represents the value of the second loss function, which is related to the base station to be installed; Indicates the initial base station variable to be constructed; Indicates the total number of base stations selected from the initial base station information to be constructed; Indicates the variable of the base station to be built; Indicates the total number of base stations selected in the tag Base Stations to be Built information; Indicates Initial base stations to be built; Indicates Tags are waiting to build base stations; Indicates the initial base station variable to be installed; Indicates the total number of base stations selected from the initial information of base stations to be installed; Indicates the base station variable to be installed with the tag; Indicates the total number of base stations selected in the base station information to be installed with the tag; Indicates Initial base stations to be installed; Indicates Tags are to be installed on the base station; The calculation formula for updating the fitness function is: ; in, represents the updated fitness function; represents the first penalty coefficient; represents the second penalty coefficient; When the current computing power energy consumption is less than the computing power energy consumption threshold, using a clustering algorithm and a base station optimization model to determine the information of the base station to be built and the information of the base station to be installed; the base station optimization model is used to optimize the clustering result to obtain the information of the base station to be built; using a clustering algorithm and a base station optimization model to determine the information of the base station to be built and the information of the base station to be installed, including: Clustering the first type of business points to obtain a first clustering result; Determine multiple initial first base station information to be built and base station information to be installed based on the first clustering result; Inputting the initial first base station to be constructed information into a first base station optimization model, the first base station optimization model outputting the first base station to be constructed information; the parameters of the first base station optimization model are the parameters of the neural network model in the base station construction model, wherein updating the first base station optimization model comprises: Processing the information of base stations to be built and base stations to be installed obtained through the clustering algorithm and the base station optimization model to obtain an updated coverage feature matrix; Based on the updated coverage feature matrix, the updated base station information to be constructed and the updated base station information to be installed are obtained through the base station construction model; Extracting updated first base station to be constructed information from the updated base station to be constructed information; Based on the updated first base station information to be built and the first base station information to be built, a first optimization loss function is established, and the parameters of the first base station optimization model are updated based on the first optimization loss function to obtain an updated first base station optimization model; wherein the expression of the first optimization loss function is: ;in, represents a first optimization loss function, which is related to the first base station to be constructed; A base station variable representing information of a first base station to be constructed output by a first base station optimization model; Indicates the total number of base stations in the first base station information to be constructed; A base station variable representing updating information of the first base station to be constructed; Indicates updating the total number of base stations in the first base station to be constructed information; Indicates the first base station to be built. The location of the first base station to be built; Indicates updating the first base station information to be built. The location of the first base station to be built; Determine an initial network coverage range based on the first base station to be constructed information, the base station to be installed information, and the second base station information; Based on the initial network coverage, determining a second type of service point that is not covered by the network; Clustering the second type of service points not covered by the network to obtain a second clustering result; Based on the second clustering result, determine the second base station information to be built; The first base station to be constructed information and the second base station to be constructed information are used as final base station to be constructed information.

Citation Information

Patent Citations

  • 5G base station site selection optimization model for unmanned aerial vehicle communication and solving algorithm of 5G base station site selection optimization model

    CN115130257A

  • Urban base station construction method based on 5G technology and electronic equipment

    CN117041992A

  • Base station energy-saving policy determining method and apparatus, and storage medium

    WO2022057268A1