By using technical means such as ceramic spiral filter coils, water cooling and regulating mechanisms in titanium and titanium alloy polishing sewage treatment devices, the problems of low sedimentation treatment efficiency and inability to completely discharge particulate matter in the existing technology have been solved, and titanium And the rapid separation and purification of titanium alloy polishing wastewater improves treatment efficiency and material utilization.
Patent Information
- Application Number
- CN202410795710.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2044-06-19
AI Technical Summary
Existing titanium and titanium alloy polishing sewage treatment equipment has fine particles that take a long time to settle during sedimentation treatment. Water body fluctuations lead to low sedimentation separation efficiency, and some fine particles cannot be completely discharged, affecting the treatment effect and material quality.
A titanium and titanium alloy polishing sewage treatment device including a ceramic spiral filter coil, a water liquid cooling mechanism, an electronic flow meter, a control mechanism and a filter assembly is designed. The water liquid is quickly separated by the centrifugal force of the ceramic spiral filter coil. The liquid cooling mechanism reduces the water temperature, the control mechanism separates the grinding wheel particles and titanium alloy particles, and the filter assembly performs multi-layer purification.
It achieves rapid separation and purification of titanium and titanium alloy polishing wastewater, improves treatment efficiency, avoids material waste, and ensures product surface quality and the reliability of the treatment device.
Smart Images

Figure CN118359247B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of solid-liquid separation and purification of processing wastewater, and in particular relates to a titanium and titanium alloy polishing wastewater treatment device. Background Art
[0002] In the industrial production process of titanium and titanium alloys, in order to make the surface of titanium and titanium alloy products smoother and flatter, improve the appearance quality, and meet specific process requirements and usage needs, the surface of titanium and titanium alloys needs to be polished. For example, in the aerospace field, titanium alloy parts that have been polished can better adapt to complex working environments and ensure flight safety. Titanium and titanium alloys will produce dust during polishing. Since titanium alloys have high chemical activity at high temperatures, water cooling is required on the surface of titanium alloys. This can not only avoid fire accidents caused by dust, but also ensure the quality of titanium and titanium alloy products. At the same time, in order to save water, the polishing wastewater needs to be treated and recycled.
[0003] Most of the existing titanium and titanium alloy polishing wastewater treatment adopts a sedimentation treatment method. For example, the authorization announcement number CN219440783U discloses a titanium and titanium alloy polishing wastewater treatment device. However, when the polishing wastewater treatment device is working, it takes a long time for fine particles in the polishing wastewater to precipitate, and the continuously added polishing wastewater is likely to cause continuous fluctuations in the water body, further reducing the efficiency of the polishing wastewater precipitation and separation of fine particles. At the same time, the water body fluctuation also causes some fine particles to be transported to the titanium and titanium alloy polishing position again along the water circulation pipeline, and it is easy to cause the surface of the titanium and titanium alloy products to be affected by fine particles and produce scratch defects, and even cause material waste due to the failure of titanium and titanium alloy polishing, affecting the qualified rate of titanium and titanium alloy polishing;
[0004] Moreover, in the process of the device transporting the precipitated and separated fine particles through the chain, there is a situation where the precipitated fine particles cannot be completely discharged. Some fine particles attached to the surface of the chain re-enter the water body with the returning chain and cause secondary pollution of the water body, affecting the reliability of the solid-liquid separation and purification operation of the titanium and titanium alloy polishing wastewater treatment device.
[0005] Therefore, we propose a titanium and titanium alloy polishing wastewater treatment device to solve the above problems. Summary of the invention
[0006] The purpose of the present invention is to provide a titanium and titanium alloy polishing wastewater treatment device in view of the above problems.
[0007] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a titanium and titanium alloy polishing wastewater treatment device, comprising a workbench, the upper surface of the workbench is fixedly connected to a water storage tank, the top of the water storage tank is fixedly connected to a water cooling mechanism and a water replenishment valve, the outer wall of the water storage tank is fixedly connected to a first treatment box and a second treatment box, the upper surface of the first treatment box is provided with a through hole, and the hole wall of the through hole is connected to a first sealed bearing, the inner wall of the inner ring of the first sealed bearing is connected to a connecting pipe, the bottom end of the connecting pipe is fixedly connected to a ceramic spiral filter coil, the top of the connecting pipe is fixedly connected to an electronic flow meter, the top of the electronic flow meter is fixedly connected to a water inlet hopper, the upper surface of the first treatment box A driving mechanism is fixedly connected, a drainage mechanism is fixedly connected to the inner wall of the bottom end of the first treatment box, a through hole is commonly opened on the lower surface of the first treatment box and the upper surface of the second treatment box, and a second sealing bearing is connected to the hole wall of the through hole, an inner wall of an inner ring of the second sealing bearing is fixedly connected to the bottom tube wall of the ceramic spiral filter coil, a first solenoid valve is fixedly connected to the bottom end of the ceramic spiral filter coil, a regulating mechanism is fixedly connected to the inner wall of the top end of the second treatment box, a frame ring is fixedly connected to the inner wall of the second treatment box, a hydrophobic lifting cylinder is movably connected to the inner wall of the frame ring, a recycling mechanism is fixedly connected to the bottom end of the hydrophobic lifting cylinder, and a PLC controller is fixedly connected to the upper surface of the water storage tank.
[0008] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the driving mechanism includes a driving motor fixedly connected to the upper surface of the first treatment box, the output end of the driving motor is fixedly connected to the first bevel gear, the pipe wall of the connecting pipe is fixedly sleeved with a second bevel gear, the outer wall of the second bevel gear is vertically meshed with the outer wall of the first bevel gear, and the outer walls of the first treatment box, the water inlet hopper and the driving motor are commonly fixedly connected to a fixing frame.
[0009] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the drainage mechanism includes a fixed ring fixedly connected to the inner wall of the bottom end of the first treatment box, the inner wall of the fixed ring is fixedly connected to a micro water pump, and the output end of the micro water pump is fixedly connected to a first drainage one-way valve, and the output end of the first drainage one-way valve passes through the inner wall of the water tank.
[0010] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the regulating mechanism includes a hollow ring fixedly connected to the inner wall of the top of the second treatment box, the inner wall of the hollow ring is fixedly connected to two symmetrically distributed connecting tubes, the opposite sides of the two connecting tubes are commonly fixedly connected with a connecting sleeve, the inner wall of the connecting sleeve is fixedly connected to two third sealed bearings, the inner walls of the inner rings of the two third sealed bearings are commonly fixedly connected with an annular hollow cylinder, the interior of the annular hollow cylinder is a polygonal cavity, the inner wall of the annular hollow cylinder is fixedly connected to the inner wall of the ceramic spiral filter coil, and the top outer wall of the annular hollow cylinder is provided with two A vent hole is provided on the lower surface of the annular hollow cylinder, and the inner wall of the open ring hole is movably connected to a moving cylinder, the bottom end of the moving cylinder is fixedly connected to a V-shaped vortex rod, the top outer wall of the moving cylinder is fixedly sleeved with a sealing ring, the outer wall of the sealing ring is sealingly and movably connected to the inner wall of the polygonal cavity of the annular hollow cylinder, the top outer wall of the second processing box is fixedly connected to an adjusting cylinder, the side end of the adjusting cylinder is fixedly embedded with a first electric push rod, the moving end of the first electric push rod is fixedly connected with a sealing block sealingly connected to the inner wall of the adjusting cylinder, and the lower surface of the frame ring is fixedly embedded with a double-control switch and two conductive rods.
[0011] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the recycling mechanism includes a bottom ring fixedly connected to the bottom end of the hydrophobic lifting cylinder, the inner wall of the bottom ring is movably connected with a conduit, the bottom end of the conduit is fixedly connected to the bottom end of the second treatment box, the top of the conduit is fixedly connected with a retaining ring that is movably connected to the inner wall of the hydrophobic lifting cylinder, the inner wall of the conduit is fixedly connected with a second solenoid valve, the bottom end of the second solenoid valve is fixedly connected with a delivery pipe, the outer wall of the second treatment box located at the frame ring is fixedly connected with a third solenoid valve, and the output ends of the delivery pipe and the third solenoid valve are both fixedly connected with a filter group Part, the output ends of the two filter components are commonly fixedly connected with a U-shaped hard tube, the bottom end of one of the filter components is fixedly connected to the upper surface of the workbench, the outer wall of the U-shaped hard tube is fixedly connected with a return pipe, the bottom end of the return pipe is fixedly connected with a liquid pump, the bottom end is fixedly connected to the outer wall of the bottom end of the workbench, the output end of the liquid pump is fixedly connected with a water pipe, the output end of the water pipe passes through the inner wall of the water tank and is fixedly connected with a second drainage one-way valve, the bottom end of the second processing box is fixedly embedded with a second electric push rod, and the moving end of the second electric push rod is fixedly connected to the lower surface of the bottom ring.
[0012] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the filter assembly includes a filter box and a box cover, the inner wall of the filter box is sealed with a U-shaped plate, the inner wall of the U-shaped plate is fixedly connected with a first interception mesh plate, a second interception mesh plate and a filter mesh plate, the outer wall of the filter mesh plate is fixedly connected with a filter cloth layer, and the outer wall of the filter cloth layer is fixedly connected with a sponge filter block.
[0013] In the above-mentioned titanium and titanium alloy polishing sewage treatment device, the top end of the U-shaped plate is fixedly connected with an arc-shaped handle rod, and the rod wall of the arc-shaped handle rod passes through the first interception mesh plate, the second interception mesh plate, the filter cloth layer, the sponge filter block and the filter mesh plate in sequence.
[0014] In the above-mentioned titanium and titanium alloy polishing wastewater treatment device, the water cooling mechanism includes a metal tube fixedly embedded in the top of the water tank, the outer wall of the metal tube is fixedly sleeved with a heat insulation cover, the outer wall of the heat insulation cover is fixedly embedded with a semiconductor refrigeration plate, the heat generating side of the semiconductor refrigeration plate is fixedly connected with a heat sink, the tube wall of the metal tube is fixedly sleeved with a heat conductive sleeve, and the fin side end of the heat conductive sleeve is in contact with the cooling side of the semiconductor refrigeration plate.
[0015] Compared with the existing technology, the advantages of a titanium and titanium alloy polishing wastewater treatment device are:
[0016] Through the set driving mechanism, ceramic spiral filter coil, water cooling mechanism and electronic flowmeter, when the wastewater generated by titanium and titanium alloy polishing flows into the electronic flowmeter through the water inlet hopper, the electronic flowmeter feeds back the signal to the PLC controller, and the PLC controller controls the driving mechanism, drainage mechanism and water cooling mechanism to start. First, the rotating ceramic spiral filter coil allows the titanium and titanium alloy polishing wastewater to quickly separate 70%-80% of the water into the first treatment tank under the action of centrifugal force. At the same time, the drainage mechanism promptly transports the clean water at the bottom of the first treatment tank to the water storage tank, and then the water cooling mechanism The structure cools down the water inside the metal pipe, thereby improving the working effect of the polishing water for titanium and titanium alloys. Moreover, as the instantaneous flow rate of the titanium and titanium alloy polishing wastewater detected by the electronic flowmeter increases, the working power of the drive motor, micro water pump and semiconductor refrigeration plate controlled by the PLC controller increases accordingly, so that the device can cope with higher-intensity polishing and grinding of titanium and titanium alloys. This mechanism enables the titanium and titanium alloy polishing and grinding wastewater treatment device to have the function of sewage pretreatment, ensuring that the device can obtain sufficient water supply. In addition, the device also has the function of cooling the titanium and titanium alloy polishing water, further ensuring the qualified rate of titanium and titanium alloy polishing and grinding.
[0017] By means of the control mechanism and the filter assembly, when the ceramic spiral filter coil is driven to rotate by the driving mechanism, the recycling mechanism can separate the grinding wheel particles and the particles generated by titanium and titanium alloy polishing in the sewage under the cooperation of the control mechanism, so as to avoid the waste of high-value titanium and titanium alloy materials. Moreover, after the double-control switch is squeezed, the two conductive rods can be energized. At this time, if the wastewater containing the grinding wheel particles contains too many titanium and titanium alloy particles, the conductivity between the two conductive rods will be increased, and the resistance between the two conductive rods will be reduced. After the electrical change signal between the two conductive rods is received by the PLC controller, the PLC controller accurately controls the position of the V-shaped vortex rod at the bottom of the control mechanism, so as to reduce the centrifugal force of the vortex generated by the high-concentration titanium and titanium alloy polishing sewage, and try to keep the titanium and titanium alloy particles in the high-concentration titanium and titanium alloy polishing sewage gathered above the retaining ring, so as to ensure the reliability of the recovery and reuse process of the titanium and titanium alloy particle materials. The mechanism can not only improve the sewage treatment effect of the titanium and titanium alloy polishing sewage treatment device, but also enable the device to have the function of recycling and reusing titanium and titanium alloy particles, so as to avoid the waste of high-value titanium and titanium alloy materials.
[0018] Through the set filtering components, after the titanium and titanium alloy polishing wastewater is transported to the titanium and titanium alloy polishing wastewater treatment device, the ceramic spiral filter coil can first perform preliminary purification on the titanium and titanium alloy polishing wastewater, and the purification effect is reliable. At the same time, the titanium and titanium alloy polishing wastewater formed after the preliminary purification is separated and purified again in the two filtering components, and the purified pure water is transported to the water storage tank for recycling. The device can ensure that the water entering the water storage tank does not contain particulate impurities, and ensure that the circulating water transported to the titanium and titanium alloy polishing place will not cause additional scratches on the surface of the titanium and titanium alloy products, further avoiding the failure of titanium and titanium alloy polishing due to additional scratches. The mechanism can effectively improve the reliability of the solid-liquid separation and purification operation of the titanium and titanium alloy polishing wastewater treatment device, and at the same time can improve the qualified rate of titanium and titanium alloy polishing processing. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a structural schematic diagram of a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0020] Figure 2 It is a structural schematic diagram of the drainage mechanism part of a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0021] Figure 3 It is a structural schematic diagram of a regulating mechanism in a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0022] Figure 4 It is a structural schematic diagram of a driving mechanism in a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0023] Figure 5 It is a structural schematic diagram of a local recycling mechanism in a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0024] Figure 6 It is a structural schematic diagram of a water cooling mechanism in a titanium and titanium alloy polishing wastewater treatment device provided by the present invention;
[0025] Figure 7 The present invention provides a structural schematic diagram of a filter assembly in a titanium and titanium alloy polishing wastewater treatment device.
[0026] In the figure: 1 workbench, 2 water storage tank, 3 water cooling mechanism, 31 metal pipe, 32 heat insulation cover, 33 semiconductor refrigeration plate, 34 heat sink, 35 heat conductive sleeve, 4 water supply valve, 5 driving mechanism, 51 driving motor, 52 first bevel gear, 53 second bevel gear, 54 fixed frame, 6 drainage mechanism, 61 fixed ring, 62 micro water pump, 63 first drainage check valve, 7 regulating mechanism, 71 hollow ring, 72 connecting cylinder, 73 connecting sleeve, 74 third sealing bearing, 75 annular hollow cylinder, 76 vent hole, 77 moving cylinder, 78 V-shaped vortex rod, 79 sealing ring, 710 regulating cylinder, 711 first electric push rod, 712 sealing block, 713 double control switch, 714 conductive rod, 8 recycling mechanism, 81 bottom ring, 8 2 conduit, 83 retaining ring, 84 second solenoid valve, 85 delivery pipe, 86 third solenoid valve, 87 U-shaped hard pipe, 88 reflux pipe, 89 suction pump, 810 water pipe, 811 second drainage check valve, 812 second electric push rod, 9 filter assembly, 91 filter box, 92 box cover, 93 U-shaped plate, 94 first interception mesh plate, 95 second interception mesh plate, 96 filter mesh plate, 97 filter cloth layer, 98 sponge filter block, 10 first treatment box, 11 second treatment box, 12 arc handle rod, 13 first sealed bearing, 14 connecting pipe, 15 ceramic spiral filter coil, 16 electronic flow meter, 17 water inlet bucket, 18 second sealed bearing, 19 first solenoid valve, 20 hydrophobic lifting cylinder, 21 PLC controller, 22 frame ring. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] like Figure 1-Figure 7As shown, a titanium and titanium alloy polishing wastewater treatment device comprises a workbench 1, the upper surface of the workbench 1 is fixedly connected to a water tank 2, the top of the water tank 2 is fixedly connected to a water cooling mechanism 3 and a water replenishing valve 4, the water cooling mechanism 3 comprises a metal tube 31 fixedly embedded with the top of the water tank 2, the outer wall of the metal tube 31 is fixedly sleeved with a heat insulation cover 32, the outer wall of the heat insulation cover 32 is fixedly embedded with a semiconductor refrigeration sheet 33, the heat generating side of the semiconductor refrigeration sheet 33 is fixedly connected with a heat sink 34, the tube wall of the metal tube 31 is fixedly sleeved with a heat conductive sleeve 35, the fin side end of the heat conductive sleeve 35 is in contact with the cooling side of the semiconductor refrigeration sheet 33, the mechanism can reduce the temperature of the water transported to the polishing position, and improve the effect of cooling the temperature of the water at the polishing position.
[0029] The outer wall of the water storage tank 2 is fixedly connected to the first treatment box 10 and the second treatment box 11. A through hole is opened on the upper surface of the first treatment box 10, and the hole wall of the through hole is connected to the first sealed bearing 13. The inner wall of the inner ring of the first sealed bearing 13 is connected to a connecting pipe 14. The bottom end of the connecting pipe 14 is fixedly connected to a ceramic spiral filter coil 15. The top of the connecting pipe 14 is fixedly connected to an electronic flow meter 16. The top of the electronic flow meter 16 is fixedly connected to a water inlet bucket 17. The upper surface of the first treatment box 10 is fixedly connected to a driving mechanism 5. The driving mechanism 5 includes a driving motor 51 fixedly connected to the upper surface of the first treatment box 10. The output end of the driving motor 51 is fixedly connected to a first bevel gear 52. The tube wall of the connecting pipe 14 is fixedly sleeved with a second bevel gear 53. The outer wall of the second bevel gear 53 is vertically meshed with the outer wall of the first bevel gear 52. The outer walls of the first treatment box 10, the water inlet bucket 17 and the driving motor 51 are commonly fixedly connected to a fixing frame 54.
[0030] The bottom inner wall of the first treatment box 10 is fixedly connected with a drainage mechanism 6, and the drainage mechanism 6 includes a fixed ring 61 fixedly connected to the bottom inner wall of the first treatment box 10, and the inner wall of the fixed ring 61 is fixedly connected with a micro water pump 62, and the output end of the micro water pump 62 is fixedly connected to a first drainage one-way valve 63, and the output end of the first drainage one-way valve 63 passes through the inner wall of the water storage tank 2. This mechanism can drain water in time to ensure that the water circulation process is timely and stable.
[0031] A through hole is commonly formed on the lower surface of the first processing box 10 and the upper surface of the second processing box 11, and a second sealed bearing 18 is connected to the hole wall of the through hole, the inner wall of the inner ring of the second sealed bearing 18 is fixedly connected to the bottom end tube wall of the ceramic spiral filter coil 15, the bottom end of the ceramic spiral filter coil 15 is fixedly connected to the first solenoid valve 19, the top inner wall of the second processing box 11 is fixedly connected to the regulating mechanism 7, the regulating mechanism 7 includes a hollow ring 71 fixedly connected to the top inner wall of the second processing box 11, the inner wall of the hollow ring 71 is fixedly connected to two symmetrically distributed connecting tubes 72, the opposite sides of the two connecting tubes 72 are commonly fixedly connected to a connecting sleeve 73, the inner wall of the connecting sleeve 73 is fixedly connected to two third sealed bearings 74, the inner ring inner walls of the two third sealed bearings 74 are commonly fixedly connected to an annular hollow cylinder 75, the interior of the annular hollow cylinder 75 is a polygonal cavity, the inner wall of the annular hollow cylinder 75 is connected to the ceramic spiral filter coil 15 is fixedly connected, two ventilation holes 76 are provided on the top outer wall of the annular hollow cylinder 75, an open ring hole is provided on the lower surface of the annular hollow cylinder 75, and a moving cylinder 77 is movably connected to the inner wall of the open ring hole, and a V-shaped vortex rod 78 is fixedly connected to the bottom end of the moving cylinder 77, and a sealing ring 79 is fixedly sleeved on the top outer wall of the moving cylinder 77, and the outer wall of the sealing ring 79 is sealingly and movably connected to the inner wall of the polygonal cavity of the annular hollow cylinder 75, and an adjusting cylinder 710 is fixedly connected to the top outer wall of the second processing box 11, and a first electric push rod 711 is fixedly embedded on the side end of the adjusting cylinder 710, and a sealing block 712 which is sealingly connected to the inner wall of the adjusting cylinder 710 is fixedly connected at the moving end of the first electric push rod 711, and a double-control switch 713 and two conductive rods 714 are fixedly embedded on the lower surface of the frame ring 22. This mechanism can automatically control the rotation speed of the V-shaped vortex rod 78 and ensure the reliability of the recycling and reuse process of titanium and titanium alloy particles.
[0032] The inner wall of the second treatment box 11 is fixedly connected with a frame ring 22, the inner wall of the frame ring 22 is movably connected with a drain lift cylinder 20, the bottom end of the drain lift cylinder 20 is fixedly connected with a recycling mechanism 8, the recycling mechanism 8 includes a bottom ring 81 fixedly connected to the bottom end of the drain lift cylinder 20, the inner wall of the bottom ring 81 is movably connected with a conduit 82, the bottom end of the conduit 82 is fixedly connected with the bottom end of the second treatment box 11, the top of the conduit 82 is fixedly connected with a retaining ring 83 which is movably connected to the inner wall of the drain lift cylinder 20, the inner wall of the conduit 82 is fixedly connected with a second solenoid valve 84, the bottom end of the second solenoid valve 84 is fixedly connected with a delivery pipe 85, and the second treatment box 11 is fixedly connected with a second solenoid valve 84. The outer wall of the sorting box 11 located at the frame ring 22 is fixedly connected with a third solenoid valve 86, and the output ends of the delivery pipe 85 and the third solenoid valve 86 are fixedly connected with a filter assembly 9, and the filter assembly 9 includes a filter box 91 and a box cover 92. The inner wall of the filter box 91 is sealed and connected with a U-shaped plate 93, and the inner wall of the U-shaped plate 93 is fixedly connected with a first interception mesh plate 94, a second interception mesh plate 95 and a filter mesh plate 96, and the outer wall of the filter mesh plate 96 is fixedly connected with a filter cloth layer 97, and the outer wall of the filter cloth layer 97 is fixedly connected with a sponge filter block 98, and the top of the U-shaped plate 93 is fixedly connected with an arc-shaped handle rod 12, and the rod wall of the arc-shaped handle rod 12 passes through the inner wall of the U-shaped plate 93 in sequence. The first intercepting mesh plate 94, the second intercepting mesh plate 95, the filter cloth layer 97, the sponge filter block 98 and the filter mesh plate 96, the mechanism and the ceramic spiral filter coil 15 can fully purify the sewage, avoid the particles in the sewage returning to the polishing place to cause additional scratches on the surface of the titanium and titanium alloy products, can improve the qualified rate of titanium and titanium alloy polishing processing, and further improve the reliability of the solid-liquid separation and purification operation of the titanium and titanium alloy polishing sewage treatment device. The output ends of the two filter components 9 are fixedly connected to a U-shaped hard pipe 87, the bottom end of one of the filter components 9 is fixedly connected to the upper surface of the workbench 1, and the outer wall of the U-shaped hard pipe 87 is fixedly connected to the backflow Tube 88, the bottom end of the reflux pipe 88 is fixedly connected to a liquid pump 89, and the bottom end is fixedly connected to the outer wall of the bottom end of the workbench 1, the output end of the liquid pump 89 is fixedly connected to a water pipe 810, the output end of the water pipe 810 passes through the inner wall of the water storage tank 2, and is fixedly connected to a second drainage check valve 811, and a second electric push rod 812 is fixedly embedded in the bottom end of the second treatment box 11, and the moving end of the second electric push rod 812 is fixedly connected to the lower surface of the bottom ring 81. This mechanism enables the device to have the function of recycling and reusing titanium and titanium alloy particles, thereby avoiding the waste of high-value titanium and titanium alloy materials. The upper surface of the water storage tank 2 is fixedly connected to a PLC controller 21.
[0033] The electronic flow meter 16 and the two conductive rods 714 are electrically connected to the input end of the PLC controller 21 through wires, the semiconductor refrigeration plate 33, the drive motor 51, the micro water pump 62, the first electric push rod 711 and the second electric push rod 812 are all electrically connected to the output end of the PLC controller 21 through wires, the first solenoid valve 16, the second solenoid valve 84, the third solenoid valve 86 and the liquid pump 89 are all electrically connected to the external power supply through the double-control switch 713. The above-mentioned electrical connection is a prior art and will not be repeated here.
[0034] The operating principle of the present invention is described as follows: before the device is used, the top of the metal pipe 31 is first connected to the water pumping end of the titanium and titanium alloy polishing equipment, and the pure water in the water storage tank 2 is sucked and transported to the titanium and titanium alloy polishing equipment to cool and dust the titanium and titanium alloy polishing area. Then, when the wastewater generated by the titanium and titanium alloy polishing flows into the electronic flow meter 16 through the water inlet hopper 17, the electronic flow meter 16 feeds back the wastewater flow signal to the PLC controller 21, and the PLC controller 21 controls the drive mechanism 5, the drainage mechanism 6 and the water cooling mechanism 3 to start, and first drives The motor 51 drives the connecting pipe 14 to rotate through the first bevel gear 52 and the second bevel gear 53, and the connecting pipe 14 drives the ceramic spiral filter coil 15 to rotate, so that the titanium and titanium alloy polishing wastewater flowing into the ceramic spiral filter coil 15 is quickly separated by centrifugal force by 70%-80% of the water liquid into the first treatment box 10, and a high concentration of titanium and titanium alloy polishing wastewater is formed at the bottom of the ceramic spiral filter coil 15, which is convenient for the subsequent recovery and reuse of titanium and titanium alloy materials in the polishing wastewater. At the same time, the PLC controller 21 controls the micro pump 62 and the first drainage check valve 63 to suck the bottom of the first treatment box 10 The clean water returns to the water tank 2 to ensure that the water tank 2 has sufficient pure water inside, which can ensure a reliable supply of water for polishing titanium and titanium alloys. At the same time, the semiconductor refrigeration sheet 33 cools the top area of the metal tube 31 through the heat-conducting tube. When the pure water inside the water tank 2 is discharged along the metal tube 31, the temperature of the polishing titanium and titanium alloys can be effectively reduced, thereby improving the working effect of the polishing titanium and titanium alloys. Moreover, as the instantaneous flow rate of the polishing wastewater of titanium and titanium alloys detected by the electronic flow meter 16 increases, the PLC controller 21 controls the working power of the drive motor 51, the micro water pump 62 and the semiconductor refrigeration sheet 33. The rate increases accordingly, so that the device can cope with higher-intensity polishing and grinding of titanium and titanium alloys. This mechanism enables the titanium and titanium alloy polishing and grinding wastewater treatment device to have the function of sewage pretreatment, thereby improving the effect of sewage treatment, and can timely separate and purify most of the water for recycling, ensuring that the device can obtain sufficient water supply. In addition, the device also has the function of cooling the titanium and titanium alloy polishing water. By lowering the water temperature, the cooling effect of the water on the polishing of titanium and titanium alloys is guaranteed, further ensuring the qualified rate of titanium and titanium alloy polishing and grinding. At the same time, the device also has the function of automatic adjustment and can ensure the energy saving of the device.
[0035] When the ceramic spiral filter coil 15 is driven to rotate by the driving mechanism 5, the air pressure inside the hollow ring 71 and the connecting cylinder 72 in the regulating mechanism 7 stabilizes the positions of the moving cylinder 77 and the sealing ring 79 inside the annular hollow cylinder 75, and the ceramic spiral filter coil 15 drives the moving cylinder 77 to rotate through the polygonal cavity inside the annular hollow cylinder 75, and the moving cylinder 77 drives the V-shaped vortex rod 78 to rotate, and the rotating V-shaped vortex rod 78 causes the high-concentration titanium and titanium alloy located at the top of the retaining ring 83 and the frame ring 22 to be polished. The sewage generates a vortex, and the centrifugal force generated by the vortex can throw out the grinding wheel particles generated by the heavy grinding wheel, so that the grinding wheel particles gather above the frame ring 22, while the lighter titanium and titanium alloy particles are above the retaining ring 83. After the V-shaped vortex rod 78 rotates for 30 seconds, the PLC controller 21 automatically controls the second electric push rod 812 to extend, and the second electric push rod 812 pushes the bottom ring 81 and the hydrophobic lifting cylinder 20 to move up. The surface of the hydrophobic lifting cylinder 20 is coated with a hydrophobic layer. The insulation effect of the part of the hydrophobic lifting cylinder 20 exposed to the water surface is ensured. The upward movement of the hydrophobic lifting cylinder 20 can completely insulate and isolate the sewage located above the frame ring 22 and the retaining ring 83, and the bottom ring 81 moves up to the highest position to squeeze the double-control switch 713. At this time, the double-control switch 713 closes the first electromagnetic valve 19, and at the same time, the second electromagnetic ring, the liquid pump 89 and the third electromagnetic valve 86 are powered on and opened. The liquid pump 89 puts the two filter components 9 in a negative pressure state through the return pipe 88 and the U-shaped hard pipe 87. Then, the sewage with grinding wheel particles flows into the top filter component 9 along the third electromagnetic valve 86 for filtration and separation, and the sewage with titanium and titanium alloy particles is transported to the bottom filter component 9 through the second electromagnetic valve 84 and the delivery pipe 85 for filtration and separation. The separated clean water is transported to the water storage tank 2 by the liquid pump 89 through the water pipe 810 and the second drainage check valve 811 for recycling, and the titanium and titanium alloy particles separated by the filter component 9 can be recycled and reused, avoiding the waste of high-value titanium and titanium alloy materials;
[0036] Moreover, after the double-control switch 713 is squeezed, the two conductive rods 714 can be energized. At this time, if the wastewater containing grinding wheel particles contains too many titanium and titanium alloy particles, the conductivity between the two conductive rods 714 will be increased, and the resistance between the two conductive rods 714 will be reduced. After the electrical change signal between the two conductive rods 714 is received by the PLC controller 21, the PLC controller 21 accurately controls the retraction amount of the first electric push rod 711, and the first electric push rod 711 pushes the sealing block 712 to move along the inner wall of the adjusting cylinder 710, so that the adjusting cylinder 710 sucks the connecting cylinder 72 and the connecting cylinder 710. The air in the socket 73 and the top of the annular hollow cylinder 75 makes the top of the annular hollow cylinder 75 in a negative pressure state. In order to maintain pressure balance, the sealing ring 79 carries the moving cylinder 77 to move upward, and the moving cylinder 77 drives the V-shaped vortex rod 78 to move upward, thereby reducing the depth and range of contact between the V-shaped vortex rod 78 and the sewage, thereby reducing the vortex generated in the high-concentration titanium and titanium alloy polishing sewage, further reducing the rotational centrifugal force of the vortex, and trying to keep the titanium and titanium alloy particles in the high-concentration titanium and titanium alloy polishing sewage gathered above the retaining ring 83, thereby ensuring the reliability of the titanium and titanium alloy particle material recovery and reuse process;
[0037] After the titanium and titanium alloy polishing wastewater is transported to the titanium and titanium alloy polishing wastewater treatment device, the ceramic spiral filter coil 15 can first perform preliminary purification on the titanium and titanium alloy polishing wastewater, and the purification effect is reliable. At the same time, the titanium and titanium alloy polishing wastewater formed after the preliminary purification is transported to the two filter components 9 for separation and purification again. The first interception mesh plate 94 and the second interception mesh plate 95 in the filter component 9 can intercept particulate matter in the water to avoid the situation where the filtered particles block the filter channel and cause the filter component 9 to be blocked and cannot be used reliably. In addition, the three-layer filtration of the filter cloth layer 97, the sponge filter block 98 and the filter mesh plate 96 can ensure the effect of sewage purification, and the purity after purification is The water is transported to the water tank 2 for recycling. The device can ensure that the water entering the water tank 2 does not contain particulate impurities, thereby ensuring that the circulating water transported to the titanium and titanium alloy polishing site will not cause additional scratches on the surface of the titanium and titanium alloy products, further avoiding the failure of titanium and titanium alloy polishing due to additional scratches. This mechanism can not only improve the wastewater treatment effect of the titanium and titanium alloy polishing wastewater treatment device, but also enable the device to have the function of recycling and reusing titanium and titanium alloy particles, avoiding the waste of high-value titanium and titanium alloy materials, and at the same time can improve the qualified rate of titanium and titanium alloy polishing processing, further improving the reliability of the solid-liquid separation and purification operation of the titanium and titanium alloy polishing wastewater treatment device.
[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A titanium and titanium alloy polishing wastewater treatment device, comprising a workbench (1), characterized in that: The upper surface of the workbench (1) is fixedly connected to a water storage tank (2), the top of the water storage tank (2) is fixedly connected to a water cooling mechanism (3) and a water replenishment valve (4), the outer wall of the water storage tank (2) is fixedly connected to a first treatment box (10) and a second treatment box (11), the upper surface of the first treatment box (10) is provided with a through hole, and the hole wall of the through hole is connected to a first sealed bearing (13), the inner wall of the inner ring of the first sealed bearing (13) is connected to a connecting pipe (14), the bottom end of the connecting pipe (14) is fixedly connected to a ceramic spiral filter coil (15), the top of the connecting pipe (14) is fixedly connected to an electronic flow meter (16), the top of the electronic flow meter (16) is fixedly connected to a water inlet bucket (17), the upper surface of the first treatment box (10) is fixedly connected to a driving mechanism (5), the first treatment box (10) The bottom inner wall of the first treatment box (10) is fixedly connected to a drainage mechanism (6); the lower surface of the first treatment box (10) and the upper surface of the second treatment box (11) are both provided with a through hole, and the hole wall of the through hole is connected to a second sealing bearing (18); the inner wall of the inner ring of the second sealing bearing (18) is fixedly connected to the bottom tube wall of the ceramic spiral filter coil (15); the bottom end of the ceramic spiral filter coil (15) is fixedly connected to a first solenoid valve (19); the top inner wall of the second treatment box (11) is fixedly connected to a regulating mechanism (7); the inner wall of the second treatment box (11) is fixedly connected to a frame ring (22); the inner wall of the frame ring (22) is movably connected to a drain lift cylinder (20); the bottom end of the drain lift cylinder (20) is fixedly connected to a recycling mechanism (8); and the upper surface of the water storage tank (2) is fixedly connected to a PLC controller (21); The regulating mechanism (7) comprises a hollow ring (71) fixedly connected to the inner wall of the top end of the second treatment box (11); the inner wall of the hollow ring (71) is fixedly connected to two symmetrically distributed connecting tubes (72); opposite sides of the two connecting tubes (72) are commonly fixedly connected to a connecting sleeve (73); the inner wall of the connecting sleeve (73) is fixedly connected to two third sealed bearings (74); the inner walls of the inner rings of the two third sealed bearings (74) are commonly fixedly connected to an annular hollow tube (75); the interior of the annular hollow tube (75) is a polygonal cavity; the inner wall of the annular hollow tube (75) is fixedly connected to the inner wall of the ceramic spiral filter coil (15); two vent holes (76) are provided on the outer wall of the top end of the annular hollow tube (75); the lower surface of the annular hollow tube (75) is An open ring hole is opened on the surface, and a moving cylinder (77) is movably connected to the inner wall of the open ring hole, a V-shaped vortex rod (78) is fixedly connected to the bottom end of the moving cylinder (77), a sealing ring (79) is fixedly sleeved on the top outer wall of the moving cylinder (77), the outer wall of the sealing ring (79) is sealingly and movably connected to the inner wall of the polygonal cavity of the annular hollow cylinder (75), an adjustment cylinder (710) is fixedly connected to the top outer wall of the second processing box (11), a first electric push rod (711) is fixedly embedded in the side end of the adjustment cylinder (710), and a sealing block (712) that is sealingly connected to the inner wall of the adjustment cylinder (710) is fixedly connected to the moving end of the first electric push rod (711), and a double-control switch (713) and two conductive rods (714) are fixedly embedded in the lower surface of the frame ring (22); The recycling mechanism (8) comprises a bottom ring (81) fixedly connected to the bottom end of the hydrophobic lifting cylinder (20); the inner wall of the bottom ring (81) is movably connected to a conduit (82); the bottom end of the conduit (82) is fixedly connected to the bottom end of the second processing box (11); the top end of the conduit (82) is fixedly connected to a retaining ring (83) which is sealingly and movably connected to the inner wall of the hydrophobic lifting cylinder (20); the inner wall of the conduit (82) is fixedly connected to a second solenoid valve (84); the bottom end of the second solenoid valve (84) is fixedly connected to a delivery pipe (85); the outer wall of the second processing box (11) located at the frame ring (22) is fixedly connected to a third solenoid valve (86); the output ends of the delivery pipe (85) and the third solenoid valve (86) are both fixedly connected to a filter assembly (9); the two filters are The output ends of the components (9) are fixedly connected to a U-shaped hard tube (87), wherein the bottom end of one of the filter components (9) is fixedly connected to the upper surface of the workbench (1), the outer wall of the U-shaped hard tube (87) is fixedly connected to a return pipe (88), the bottom end of the return pipe (88) is fixedly connected to a liquid pump (89), the bottom end is fixedly connected to the outer wall of the bottom end of the workbench (1), the output end of the liquid pump (89) is fixedly connected to a water pipe (810), the output end of the water pipe (810) passes through the inner wall of the water storage tank (2) and is fixedly connected to a second drainage check valve (811), the bottom end of the second treatment box (11) is fixedly embedded with a second electric push rod (812), the moving end of the second electric push rod (812) is fixedly connected to the lower surface of the bottom ring (81); The filter assembly (9) comprises a filter box (91) and a box cover (92); the inner wall of the filter box (91) is sealedly connected to a U-shaped plate (93); the inner wall of the U-shaped plate (93) is fixedly connected to a first interception mesh plate (94), a second interception mesh plate (95) and a filter mesh plate (96); the outer wall of the filter mesh plate (96) is fixedly connected to a filter cloth layer (97); and the outer wall of the filter cloth layer (97) is fixedly connected to a sponge filter block (98).
2. A titanium and titanium alloy polishing wastewater treatment device according to claim 1, characterized in that: The driving mechanism (5) comprises a driving motor (51) fixedly connected to the upper surface of the first processing box (10); the output end of the driving motor (51) is fixedly connected to a first bevel gear (52); the wall of the connecting pipe (14) is fixedly sleeved with a second bevel gear (53); the outer wall of the second bevel gear (53) is vertically meshed with the outer wall of the first bevel gear (52); and the outer walls of the first processing box (10), the water inlet hopper (17) and the driving motor (51) are fixedly connected to a fixing frame (54).
3. A titanium and titanium alloy polishing wastewater treatment device according to claim 1, characterized in that: The drainage mechanism (6) comprises a fixing ring (61) fixedly connected to the inner wall of the bottom end of the first treatment box (10); the inner wall of the fixing ring (61) is fixedly connected to a micro water pump (62); the output end of the micro water pump (62) is fixedly connected to a first drainage one-way valve (63); the output end of the first drainage one-way valve (63) passes through the inner wall of the water storage tank (2).
4. A titanium and titanium alloy polishing wastewater treatment device according to claim 1, characterized in that: The top end of the U-shaped plate (93) is fixedly connected to an arc-shaped handle rod (12), and the rod wall of the arc-shaped handle rod (12) passes through the first interception mesh plate (94), the second interception mesh plate (95), the filter cloth layer (97), the sponge filter block (98) and the filter mesh plate (96) in sequence.
5. The titanium and titanium alloy polishing wastewater treatment device according to claim 1 is characterized in that: The water cooling mechanism (3) comprises a metal tube (31) fixedly embedded in the top of the water storage tank (2); a heat insulating cover (32) is fixedly sleeved on the outer wall of the metal tube (31); a semiconductor cooling sheet (33) is fixedly embedded on the outer wall of the heat insulating cover (32); a heat generating side of the semiconductor cooling sheet (33) is fixedly connected to a heat sink (34); a heat conducting sleeve (35) is fixedly sleeved on the tube wall of the metal tube (31); and a fin side end of the heat conducting sleeve (35) is in contact with a cooling side of the semiconductor cooling sheet (33).