A high-permeability deep foundation pit excavation construction technology without drainage
Through the construction process of high-permeable water-free drainage excavation of deep foundation pits, the use of sand suction pump drainage operations and bagged sand protection surface filling, the serious problem of water seepage in the construction of foundation pits in the sea area is solved, and the cost and safety risks are reduced. Improve construction efficiency and environmental protection effect.
Patent Information
- Application Number
- CN202410781248.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-18
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-06-18
AI Technical Summary
In the construction of foundation pits near the sea area, since the foundation soil is medium coarse sand and medium fine sand, the groundwater level is high and is greatly affected by tides, it is difficult for traditional foundation pit support and drainage processes to effectively control water seepage, resulting in high construction difficulty , high cost, great safety hazards, and difficult to meet subsequent water supply requirements.
Adopt the construction technology of high-permeable water-free drainage excavation of deep foundation pits. Through the sand-sucking pump, the water discharge operation is carried out, and the excavation is divided into sections, sections and layers, combined with the sand-sucking pump and bagged sand protection surface filling technology to reduce construction machinery and process, control slope stability, avoid dust and dust, and reduce construction costs and safety risks.
It effectively reduces construction costs and safety hazards, reduces dust and dust, improves construction efficiency and safety, meets subsequent water supply requirements, and provides a good working environment and personnel protection.
Smart Images

Figure CN118360985B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of foundation pit construction, and in particular relates to a high-permeability deep foundation pit free-drainage excavation construction process. Background Art
[0002] In order to prevent the slope from becoming unstable and ensure construction safety during foundation pit construction, the commonly used guarantee measures include setting a reasonable slope, setting up slope protection, steel sheet pile foundation pit support and lowering the groundwater level. During the construction process, as the excavation depth of the foundation pit increases, the stability protection of the slope and the drainage of the foundation pit become increasingly difficult, and the excavation and transportation of earthwork become increasingly difficult, which can easily lead to safety accidents.
[0003] As one side of the foundation pit is adjacent to the sea, the foundation soil is mainly medium-coarse sand and medium-fine sand, the groundwater level is high and is greatly affected by the tide, water seepage is serious, and pipe bursts are very likely to occur during construction. If traditional foundation pit support and drainage technology is used for dry land construction, excavation, support and drainage will be difficult, the cost will be high, the safety hazards will be greater, the construction period will be long, and it will be difficult to meet the water requirements of other subsequent processes. Summary of the invention
[0004] The present invention aims at the problem that in the prior art, due to the fact that one side of the foundation pit close to the sea is adjacent to the sea, the foundation soil is mainly medium-coarse sand and medium-fine sand, the groundwater level is high and is greatly affected by the tide, the water seepage is serious, and pipe bursts are very likely to occur during construction. If the traditional foundation pit support and drainage process is used for dry land construction, the excavation, support and drainage are difficult, the cost is high, the safety hazard is large, the required construction period is long, and it is difficult to meet the water supply requirements of other subsequent processes. The following technical solutions are proposed:
[0005] A high-permeability deep foundation pit free-drainage excavation construction process comprises the following steps:
[0006] Construction preparation: Before excavation of the foundation pit, according to the elevation control points provided by the construction unit, after re-measurement and verification, the survey is conducted near the foundation pit excavation site to establish a construction elevation control network. The surveying technicians will measure and lay out the lines and turning points of the water intake on site according to the design drawings, and place wooden stakes with flags at the turning points of the foundation pit excavation lines;
[0007] Dry land excavation of foundation pit: The suction pump needs to carry water to operate. The upper layer of the foundation pit is dry land. First, the surface layer of the foundation pit is excavated to a certain depth of groundwater by using a crane and a forklift;
[0008] The sand suction pump row is in place and the construction is started: the sand suction pump row is composed of a centrifugal sand suction pump, a water pump, a diesel engine, and a light floating row. The sand suction pump row is in place and the construction is laid out using RTK, and the strips divided by the sand suction pump row construction are marked with buoys;
[0009] Excavation under drainage with sand suction pump: Excavation under drainage with sand suction pump is mainly carried out in one or more ways of zoning, segmentation, striping or layering according to soil quality, designed excavation depth and different external construction conditions;
[0010] Sand suction pump shallow sweeping construction: During the shallow sweeping construction with sand suction pump, a depth sounder should be used to increase the measurement frequency. The surveyor will divide the shallow measurement points into different blocks, and use RTK to locate the shallow point area to guide the sand suction pump to sweep the shallow construction at a fixed point and depth;
[0011] Measurement acceptance: measurement technicians conduct measurement and layout according to the design drawings;
[0012] Proceed to the next step: complete the overall excavation of the foundation pit and enter the foundation pit support step.
[0013] Preferably, the onshore dry excavation of the foundation pit also includes earth excavation and slope trimming;
[0014] Earthwork excavation: Use excavators to dig directly, and forklifts to transport earthwork over short distances. Dump trucks are used for long-distance transportation. During construction, the excavation section dimensions are regularly measured and corrected.
[0015] Slope trimming: Follow the excavation closely, and adopt the method of digging a layer and trimming the slope a layer at a time.
[0016] Preferably, the parameters of the sand suction pump and the diesel engine are selected according to actual construction needs. The light floating row is a steel frame structure with foam filling inside. The size of the light floating row is: 6m*6m*1.5m.
[0017] Preferably, the sand suction pump drainage excavation also includes sand suction pump upper layer excavation, sand suction pump lower layer excavation, slope area excavation and sand suction pump excavation combined with bagged sand protection filling process;
[0018] Upper excavation with sand suction pump: During the upper excavation, increase the flushing pressure of the sand suction pipe head water pump, and try to reduce the lowering height of the sand suction pipe head without blocking the pipe, so as to increase the sand suction concentration of the sand suction pump and improve construction efficiency;
[0019] Sand suction pump lower excavation: The lower excavation is mainly based on fixed depth control, leaving the bottom 2.0m mud layer as the last layer for fine excavation. During the bottom excavation, the excavation depth should be monitored by using water sluice and depth sounder measurement;
[0020] Slope area excavation: The slope area excavation mainly adopts the construction technology of undercutting at the top and overcutting at the bottom, excavating the foundation pit slope into a step shape, taking advantage of the fact that sandy soil is prone to collapse, to form a natural slope;
[0021] Combination of sand suction pump excavation and bagged sand revetment filling technology: While using a sand suction pump to drain the water intake foundation pit, the excavated mud and sand mixture is directly filled into the bagged sand bags of the revetment through the mud discharge pipeline.
[0022] A high-permeability deep foundation pit drainage excavation construction device includes a light floating row; a diesel engine is fixedly installed on the top of the light floating row, and the output end of the diesel engine is clamped and connected with the driving shaft of a centrifugal sand suction pump through a flat key; a water pump is installed on the top of the light floating row at one end of the centrifugal sand suction pump; a water tank is installed on the top of the light floating row at one end of the diesel engine, the water tank is connected to the water inlet of the water pump through a pipeline, the water outlet of the water pump is connected to a high-pressure water gun through a pipeline, the water outlet end of the centrifugal sand suction pump is connected to a mud discharge pipe, floating cylinders are equidistantly installed on the outside of the mud discharge pipe, the water inlet end of the centrifugal sand suction pump is connected to the mud suction pipe, and a positioning pipe is fixedly installed on one end of the mud suction pipe.
[0023] Preferably, a steel wire rope is wound around the outside of the positioning tube, a pulley is closely connected to the outside of the steel wire rope, a support frame is movably installed on the outside of the pulley and the support frame is fixedly installed on the top of the light floating row, and one end of the steel wire rope is wound around and connected to a take-up frame and the take-up frame is fixedly installed on the light floating row.
[0024] Preferably, four support seats are symmetrically and equidistantly installed on the top of the light floating row, the top of the support seat is movably connected with a fixing sleeve, the inside of the fixing sleeve is movably connected with a rectangular rod, the top of the rectangular rod is movably connected with a connecting seat, the inside of the connecting seat is movably connected with a rotating rod, the top of the rotating rod is movably connected with a fixed seat, and a tarpaulin is fixedly installed between the tops of the four fixing seats.
[0025] Preferably, fixed blocks are symmetrically welded on both end surfaces of the fixing seat, a manual telescopic column is embedded and installed inside the fixed block, an L-shaped rod is clamped and installed at one end of the manual telescopic column, a clamping rod is welded on one end surface of the L-shaped rod, a manual telescopic rod is embedded and installed inside the clamping rod, a cross rod is clamped and connected to the outside of the manual telescopic rod and the cross rod is slidably connected to the inside of the clamping rod.
[0026] Preferably, the support seat and the fixed sleeve are fixed by a bayonet pin, the fixed sleeve and the rectangular rod are fixed by a bayonet pin, the rectangular rod and the connecting seat are fixed by a bayonet pin, the connecting seat and the rotating rod are fixed by a bayonet pin, and the rotating rod and the fixed seat are fixed by a bayonet pin.
[0027] The beneficial effects of the present invention are:
[0028] (1) This method uses a completely different construction process from traditional deep foundation pit excavation. The main construction methods are: surface land excavation + lower layer excavation with water in the deep foundation pit using a sand suction pump. Compared with traditional deep foundation pit dry land excavation and earthwork transportation, the number and types of construction machinery are less, and the pressure on on-site traffic and safety management is less. In addition, since all construction contents are carried out with water, the occurrence of dust and dust is effectively avoided, which has good environmental protection significance.
[0029] (2) As the excavated soil is medium-coarse sand and medium-fine sand with a large permeability coefficient, and the foundation pit is close to the sea, the water level in the foundation pit is basically the same as the external sea level. The permeability pressure between the outside of the foundation pit and the foundation pit is small, the seepage is small, and the stability of the foundation pit slope is good. During the construction period, as long as the reasonable slope is controlled, there is no need for additional foundation pit support, which effectively reduces the construction cost;
[0030] (3) In the subsequent construction of foundation pit excavation, the underwater excavation of the sand suction pump can be combined with the bagged sand filling process. The sand suction pump is used to directly fill the sand bags for the surface filling, which effectively reduces the construction process and reduces the construction cost.
[0031] (4) The tilt angle of the tarpaulin can be adjusted, so that the tarpaulin can block the inclined sunlight, reduce the heat absorption of the light floating surface, reduce the surface temperature, provide a cool working environment, and improve the comfort of the staff. In addition, adjusting the angle of the tarpaulin can reduce the reflection and glare of the sun, improve the vision and work efficiency of the staff, reduce eye fatigue and discomfort, and can also be used to prevent rain and wind, provide additional protection, and ensure the comfort of the staff in different weather conditions;
[0032] (5) It can effectively prevent the impact of wind on the tarpaulin, reduce the shaking and loosening caused by wind, maintain the stability of the structure, and the firm connection can reduce the friction and movement between the tarpaulin and the lightweight floating row, reduce the risk of accidental detachment, and further prevent the outside wind from blowing on the tarpaulin and causing rainwater to enter the outside of the electrical structure, thereby protecting the electrical structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 It shows a flow chart of a construction process of high permeability deep foundation pit without drainage excavation;
[0034] Figure 2 It shows a structural schematic diagram of a high-permeability deep foundation pit drainage excavation construction device;
[0035] Figure 3 What is shown is a schematic diagram of the installation structure of the floating tube;
[0036] Figure 4 Shown is a schematic diagram of the installation structure of the take-up frame;
[0037] Figure 5 Shown is a schematic diagram of the installation structure of the tarpaulin;
[0038] Figure 6 Shown is a schematic diagram of the installation structure of the cross rod.
[0039] In the figure: 1. Light floating row; 2. Diesel engine; 3. Centrifugal sand suction pump; 4. Water pump; 5. Mud discharge pipe; 6. Floating cylinder; 7. Mud suction pipe; 8. Positioning pipe; 9. Support frame; 10. Pulley; 11. Wire rope; 12. Take-up frame; 13. Water tank; 14. High-pressure water gun; 15. Support seat; 16. Fixed sleeve; 17. Rectangular rod; 18. Rotating rod; 19. Fixed seat; 20. Fixed block; 21. Manual telescopic column; 22. L-shaped rod; 23. Clamping rod; 24. Manual telescopic rod; 25. Cross rod; 26. Tarpaulin; 27. Connecting seat. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments.
[0041] Example 1
[0042] The present invention provides a high permeability deep foundation pit free drainage excavation construction process, such as Figure 1 As shown, the following steps are included:
[0043] Construction preparation: Before excavation of the foundation pit, according to the elevation control points provided by the construction unit, after re-measurement and verification, the survey is conducted near the foundation pit excavation site to establish a construction elevation control network. The surveying technicians will measure and lay out the lines and turning points of the water intake on site according to the design drawings, and place wooden stakes with flags at the turning points of the foundation pit excavation lines;
[0044] Dry land excavation of foundation pit: The suction pump needs to carry water to operate. The upper layer of the foundation pit is dry land. First, the surface layer of the foundation pit is excavated to a certain depth of groundwater by using a crane and a forklift;
[0045] The sand suction pump row is in place and the construction is started: the sand suction pump row is composed of a centrifugal sand suction pump 3, a water pump 4, a diesel engine 2, and a light floating row 1. The sand suction pump row is in place using RTK (real-time differential positioning) for construction and layout, and the strips divided by the sand suction pump row construction are marked with buoys;
[0046] Excavation under drainage with sand suction pump: Excavation under drainage with sand suction pump is mainly carried out according to soil quality, designed excavation depth and different external construction conditions. One or more methods of zoning, segmentation, striping or layering are adopted for excavation. The 9-inch sand suction pump row is divided into strips with a width of 6m and layers according to the mud layer with a thickness of 3-5m;
[0047] Shallow sweeping construction with sand suction pump: During the shallow sweeping construction with sand suction pump, a depth sounder should be used to increase the measurement frequency. The surveyor divides the shallow measurement points into different blocks, and uses RTK (real-time differential positioning) to locate the shallow area, guiding the sand suction pump to carry out shallow sweeping construction at a fixed point and depth. Since the mud layer thickness of the shallow sweeping is relatively thin, the depth is controlled during the construction to control the lowering depth of the sand suction pipe head, and the excavation depth is checked in time by using water sluice and depth sounder;
[0048] Measurement and acceptance: Surveying technicians conduct measurement and layout according to the design drawings to ensure the accuracy and precision of the foundation pit excavation line;
[0049] Proceed to the next step: complete the overall excavation of the foundation pit and enter the foundation pit support step.
[0050] Dry land excavation of foundation pit also includes earth excavation and slope modification;
[0051] Earthwork excavation: Use excavators to dig directly, and forklifts to transport earthwork over short distances. Dump trucks are used for long-distance transportation. During construction, the excavation section dimensions are regularly measured and corrected.
[0052] Slope trimming: Follow the excavation closely, and adopt the method of digging a layer and trimming the slope a layer at a time.
[0053] The parameters of the sand suction pump and the diesel engine 2 are selected according to the actual construction needs. The light floating row 1 is a steel frame structure with foam filling inside. The size of the light floating row is: 6m*6m*1.5m. The assembly process of the sand suction pump row is: launching and anchoring the light floating row → fixing the floating row → installing the sand suction unit → installing the pipeline. During the construction of the sand suction pump row, each floating row is equipped with 4 to 5 workers, who are mainly responsible for the positioning, movement, excavation depth control, and adjustment of the blowing and filling pipeline of the floating row.
[0054] The excavation under the drainage of sand suction pump also includes the upper excavation of sand suction pump, the lower excavation of sand suction pump, the excavation of slope area and the combination of sand suction pump excavation and bagged sand face filling technology;
[0055] Upper excavation with sand suction pump: During the upper excavation, increase the flushing pressure of the water pump of the sand suction pipe head, and try to reduce the lowering height of the sand suction pipe head without blocking the pipe, so as to increase the sand suction concentration of the sand suction pump and improve the construction efficiency. During the construction, the sand suction pump operator adjusts the sand suction concentration according to different soil conditions. When the excavated soil particles are large coarse sand and clay, lift the sand suction pipe head to reduce the sand suction concentration and reduce the risk of sand suction pump blocking. When the excavated soil is silt, fine sand and fine-grained soil, the height of the sand suction pipe head can be appropriately lowered to increase the excavation concentration to improve construction efficiency.
[0056] Lower layer excavation with sand suction pump: The lower layer excavation is mainly based on fixed depth control, and the bottom 2.0m mud layer is reserved as the last layer for fine excavation. During the bottom layer excavation, the excavation depth should be monitored by using water pumps and depth sounders, and the measurement frequency should be increased. When the excavation elevation is close to the base elevation, the flushing pressure of the water pump should be reduced, and the height of the sand suction pipe head should be raised to control the excavation elevation, ensure that the excavation bottom elevation and excavation flatness meet the design requirements, and reduce over-excavation and waste;
[0057] Excavation of slope area: Excavation of slope area mainly adopts the construction technology of underfilling at the top and overfilling at the bottom, excavating the slope of foundation pit into steps, taking advantage of the easy collapse of sandy soil to form a natural slope. During the excavation of foundation pit slope, avoid excavating the steps too wide or too high at one time, which will cause large-scale landslides on the upper part of the slope and affect the stability of the excavated slope. The height of the slope excavation steps is controlled at about 2m and the width is controlled at about 5m. The specific excavation size is controlled according to the excavation slope ratio of the slope.
[0058] Example 2
[0059] The present invention provides a high permeability deep foundation pit free drainage excavation construction device, such as Figure 2-6 As shown, it includes a light floating row 1; a diesel engine 2 is fixedly installed on the top of the light floating row 1, and the output end of the diesel engine 2 is clamped and connected with the driving shaft of the centrifugal sand suction pump 3 through a flat key; a water pump 4 is installed at the top of the light floating row 1 at one end of the centrifugal sand suction pump 3; a water tank 13 is installed at the top of the light floating row 1 at one end of the diesel engine 2, the water tank 13 is connected to the water inlet of the water pump 4 through a pipeline, the water outlet of the water pump 4 is connected to a high-pressure water gun 14 through a pipeline, the water outlet end of the centrifugal sand suction pump 3 is connected to a mud discharge pipe 5, and floating cylinders 6 are equidistantly installed on the outside of the mud discharge pipe 5, the water inlet end of the centrifugal sand suction pump 3 is connected to a mud suction pipe 7, and a positioning pipe 8 is fixedly installed at one end of the mud suction pipe 7.
[0060] like Figure 3 and Figure 4 As shown, a steel wire rope 11 is wound around the outside of the positioning tube 8, a pulley 10 is closely connected to the outside of the steel wire rope 11, a support frame 9 is movably installed on the outside of the pulley 10, and the support frame 9 is fixedly installed on the top of the light floating row 1, one end of the steel wire rope 11 is wound around and connected to a take-up frame 12, and the take-up frame 12 is fixedly installed on the light floating row 1, and is used to reel in the steel wire rope 11, thereby achieving the purpose of adjusting the height of the positioning tube 8, changing the difficulty of adjusting the height of the positioning tube 8, and then being able to adsorb mud at different depths inside the foundation pit.
[0061] like Figure 2 and Figure 5As shown, four support seats 15 are symmetrically installed at the top of the light floating raft 1, and a fixing sleeve 16 is movably connected to the top of the support seat 15, and a rectangular rod 17 is movably connected inside the fixing sleeve 16, and a connecting seat 27 is movably connected to the top of the rectangular rod 17, and a rotating rod 18 is movably connected inside the connecting seat 27, and a fixed seat 19 is movably connected to the top of the rotating rod 18, and a tarpaulin 26 is fixedly installed between the tops of the four fixing seats 19, which can facilitate the adjustment of the height and angle of the tarpaulin 26, thereby achieving the purpose of blocking sunlight and rain, thereby increasing the comfort of personnel on the light floating raft 1, and reducing the interference of rainwater on the devices on the light floating raft 1.
[0062] like Figure 5 and Figure 6 As shown, fixed blocks 20 are symmetrically welded on both end surfaces of the fixing seat 19, a manual telescopic column 21 is embedded and installed inside the fixed block 20, an L-shaped rod 22 is clamped and installed at one end of the manual telescopic column 21, a clamping rod 23 is welded on one end surface of the L-shaped rod 22, a manual telescopic rod 24 is embedded and installed inside the clamping rod 23, a cross rod 25 is clamped and connected to the outside of the manual telescopic rod 24, and the cross rod 25 is slidably connected to the inside of the clamping rod 23, which is used to press the edge of the tarpaulin 26 after storage to prevent the tarpaulin 26 from shaking due to the blowing of external wind, and further cause rainwater to enter the outside of the electrical equipment along the gap of the shaking tarpaulin 26.
[0063] like Figure 2 and Figure 5 As shown, the support seat 15 and the fixed sleeve 16 are fixed by a bayonet pin, the fixed sleeve 16 and the rectangular rod 17 are fixed by a bayonet pin, the rectangular rod 17 and the connecting seat 27 are fixed by a bayonet pin, the connecting seat 27 and the rotating rod 18 are fixed by a bayonet pin, and the rotating rod 18 and the fixed seat 19 are fixed by a bayonet pin. Positioning holes are provided at the positions of the support seat 15, the fixed sleeve 16, the rectangular rod 17, the connecting seat 27, the rotating rod 18 and the fixed seat 19 corresponding to one end of the bayonet pin, which can facilitate the fixation of the fixed sleeve 16, the rectangular rod 17, the connecting seat 27, the rotating rod 18 and the fixed seat 19 after the angle is adjusted, thereby changing the difficulty of fixing the fixed sleeve 16, the rectangular rod 17, the connecting seat 27, the rotating rod 18 and the fixed seat 19 after the angle is adjusted.
[0064] Working principle: In actual use of the device, personnel assemble the diesel engine 2, the centrifugal sand suction pump 3 and the water pump 4 with the light floating row 1, and place the assembled objects on the water surface, then connect the mud discharge pipe 5 with the centrifugal sand suction pump 3, at this time, the buoyancy of the floating cylinder 6 outside the mud discharge pipe 5 and the water surface drives the mud discharge pipe 5 to float on the water surface, then connect the positioning pipe 8 with the mud suction pipe 7, and connect the mud suction pipe 7 with the centrifugal sand suction pump 3, at this time, by rotating the take-up frame 12, the take-up frame 12 rotates The steel wire rope 11 is wound or unwound. The steel wire rope 11 moves along the outer side of the pulley 10 during winding and unwinding, and drives the pulley 10 to rotate. At this time, the steel wire rope 11 drives the positioning tube 8 to move up and down on the water surface during winding and unwinding, thereby adjusting the positioning tube 8 to absorb the sediment at different depths inside the foundation pit, which is used to realize the upper excavation, lower excavation and slope area excavation technology inside the foundation pit, and prevents the problem of blockage of the positioning tube 8 due to sediment, thereby ensuring the stable operation of the positioning tube 8;
[0065] Then the personnel install the support seat 15 and the light floating row 1, and then make the fixing sleeve 16, the rectangular rod 17, the rotating rod 18, the fixing seat 19 and the connecting seat 27 vertical, and fix them by means of a bayonet. At this time, the vertical fixing sleeve 16, the rectangular rod 17, the rotating rod 18, the fixing seat 19 and the connecting seat 27 make the tarpaulin 26 cover the top of the diesel engine 2, the centrifugal sand suction pump 3 and the water pump 4, thereby achieving the purpose of blocking the top of the diesel engine 2, the centrifugal sand suction pump 3 and the water pump 4. When it is necessary to tilt the tarpaulin 26, it is only necessary to pull the rectangular rod 17, which moves along the inside of the fixing sleeve 16 and is fixed by means of a bayonet. Then, the two sides of the light floating row 1 are changed. The spacing at the top of the side fixing seat 19 is sufficient, and the inclination angle of the tarpaulin 26 can be adjusted, so that the tarpaulin 26 can block the inclined sunlight, which can reduce the heat absorption of the surface of the light floating row 1, reduce the surface temperature, provide a cool working environment, improve the comfort of the staff, and adjust the angle of the tarpaulin 26 to reduce the reflection and glare of the sun, improve the vision and work efficiency of the staff, reduce eye fatigue and discomfort, and can also be used to prevent rain and wind, provide additional protection, and ensure the comfort of the staff under different weather conditions. When the tarpaulin 26 is no longer in use, the personnel pull the rectangular rod 17 so that the rectangular rod 17 is completely fixed. The fixing sleeve 16 is inserted into the interior of the fixing sleeve 16 and fixed by a bayonet, and then the bayonet is separated from the rotating rod 18, the fixing seat 19, the supporting seat 15 and the connecting seat 27 respectively. At this time, the rotating rod 18 is folded along the inside of the connecting seat 27 so that the fixing sleeve 16, the rectangular rod 17 and the rotating rod 18 overlap. Then the fixing sleeve 16 is rotated so that the fixing sleeve 16 and the top of the light floating row 1 fit together. Then the fixing seat 19 is rotated so that the fixing seat 19 and the light floating row 1 are perpendicular. Then the fixing sleeve 16, the rectangular rod 17, the rotating rod 18, the fixing seat 19 and the connecting seat 27 are fixed by the bayonet respectively. At this time, the tarpaulin 26 covers the top of the diesel engine 2, the centrifugal sand suction pump 3 and the water pump 4. Then the personnel push The L-shaped rod 22 drives the clamping rod 23 to enter the top of the tarpaulin 26, and the manual telescopic column 21 contracts at this time, and then the person pulls the cross rod 25, the cross rod 25 drives the manual telescopic rod 24 to extend and retract, and squeezes the rest of the top of the tarpaulin 26, so that the connection between the tarpaulin 26 and the light floating row 1 is fixed, which can effectively prevent the influence of wind on the tarpaulin 26, reduce the shaking and loosening caused by wind, maintain the stability of the structure, and the firm connection can reduce the friction and movement between the tarpaulin 26 and the light floating row 1, reduce the risk of accidental falling off, and further prevent the outside wind from blowing on the tarpaulin 26 and causing rainwater to enter the outside of the electrical structure, thereby protecting the electrical structure.
[0066] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them.
Claims
1. A high-permeability deep foundation pit free-drainage excavation construction process, characterized in that: The following steps are involved: Construction preparation: Before excavation of the foundation pit, according to the elevation control points provided by the construction unit, after re-measurement and verification, the survey is conducted near the foundation pit excavation site to establish a construction elevation control network. The surveying technicians will measure and lay out the lines and turning points of the water intake on site according to the design drawings, and place wooden stakes with flags at the turning points of the foundation pit excavation lines; Dry excavation of foundation pit on land: excavate the surface of the foundation pit to a certain depth of groundwater by using a crane and a forklift; The sand suction pump row is put in place and deployed for construction: the sand suction pump row is composed of a centrifugal sand suction pump (3), a water pump (4), a diesel engine (2), and a light floating row (1). The sand suction pump row is put in place for construction and layout, and the strips divided by the sand suction pump row construction are marked with buoys; Excavation under drainage with sand suction pump: Excavation under drainage with sand suction pump is carried out in one or more ways, including zoning, segmentation, striping or layering, according to the soil quality, designed excavation depth and different external construction conditions; Sand suction pump shallow sweeping construction: During the shallow sweeping construction with sand suction pump, the depth sounder is used to increase the measurement frequency. The surveyor divides the shallow measurement points into different blocks, and uses RTK to locate the shallow point area to guide the sand suction pump to sweep the shallow construction at a fixed point and depth; Measurement acceptance: measurement technicians conduct measurement and layout according to the design drawings; Proceed to the next step: complete the excavation of the foundation pit as a whole and enter the foundation pit support step; The light floating raft (1) comprises four support seats (15) symmetrically and equidistantly mounted on the top of the light floating raft (1); the top of the support seat (15) is movably connected to a fixing sleeve (16); the fixing sleeve (16) is movably connected to a rectangular rod (17) inside; the top of the rectangular rod (17) is movably connected to a connecting seat (27); the connecting seat (27) is movably connected to a rotating rod (18); the top of the rotating rod (18) is movably connected to a fixing seat (19); and a tarpaulin (26) is fixedly mounted between the tops of the four fixing seats (19); The two end surfaces of the fixing seat (19) are symmetrically welded with fixing blocks (20), a manual telescopic column (21) is embedded and installed inside the fixing block (20), an L-shaped rod (22) is clamped and installed at one end of the manual telescopic column (21), a clamping rod (23) is welded at one end of the L-shaped rod (22), a manual telescopic rod (24) is embedded and installed inside the clamping rod (23), the outer side of the manual telescopic rod (24) is clamped and connected with a cross rod (25), and the cross rod (25) is slidably connected to the inside of the clamping rod (23); The support seat (15) and the fixing sleeve (16) are fixed by a bayonet pin, the fixing sleeve (16) and the rectangular rod (17) are fixed by a bayonet pin, the rectangular rod (17) and the connecting seat (27) are fixed by a bayonet pin, the connecting seat (27) and the rotating rod (18) are fixed by a bayonet pin, and the rotating rod (18) and the fixing seat (19) are fixed by a bayonet pin. Positioning means are provided at positions corresponding to one end of the bayonet pin on the support seat (15), the fixing sleeve (16), the rectangular rod (17), the connecting seat (27), the rotating rod (18) and the fixing seat (19); The support base (15) and the light floating row (1) are installed, and then the fixing sleeve (16), the rectangular rod (17), the rotating rod (18), the fixing seat (19) and the connecting seat (27) are vertically arranged and fixed by means of a bayonet. At this time, the fixing sleeve (16), the rectangular rod (17), the rotating rod (18), the fixing seat (19) and the connecting seat (27) are vertically arranged so that the tarpaulin (26) covers the top of the diesel engine (2), the centrifugal sand suction pump (3) and the water pump (4); When the tarpaulin (26) needs to be tilted, the rectangular rod (17) only needs to be pulled, and the rectangular rod (17) moves along the inside of the fixing sleeve (16) and is fixed by the bayonet, and then the distance between the top ends of the fixing seats (19) on both sides of the light floating row (1) is changed; When the tarpaulin (26) is no longer in use, the personnel pull the rectangular rod (17) so that the rectangular rod (17) completely enters the interior of the fixing sleeve (16) and is fixed by means of a bayonet. The bayonet is then separated from the rotating rod (18), the fixing seat (19), the supporting seat (15) and the connecting seat (27). The rotating rod (18) is then folded along the interior of the connecting seat (27) so that the fixing sleeve (16), the rectangular rod (17) and the rotating rod (18) overlap. The fixing sleeve (16) is then rotated so that the fixing sleeve (16) and the top of the light floating raft (1) fit together. The fixing seat (19) is then rotated so that the fixing seat (19) and the light floating raft (1) are perpendicular to each other. The fixing sleeve (16), the rectangular rod (17), the rotating rod (18), the fixing seat (19) and the connecting seat (27) are fixed respectively by means of a bayonet pin, so that the tarpaulin (26) covers the top of the diesel engine (2), the centrifugal sand suction pump (3) and the water pump (4). Then, a person pushes the L-shaped rod (22), and the L-shaped rod (22) drives the clamping rod (23) to enter the top of the tarpaulin (26). At this time, the manual telescopic column (21) contracts. Then, the person pulls the cross rod (25), and the cross rod (25) drives the manual telescopic rod (24) to extend and retract, and squeezes the remaining parts of the top of the tarpaulin (26), so that the connection between the tarpaulin (26) and the light floating row (1) is fixed.
2. A high permeability deep foundation pit free drainage excavation construction process according to claim 1, characterized in that: A diesel engine (2) is fixedly mounted on the top of the light floating row (1), and the output end of the diesel engine (2) is clamped and connected to the driving shaft of the centrifugal sand suction pump (3) through a flat key. A water pump (4) is mounted on the top of the light floating row (1) at one end of the centrifugal sand suction pump (3). A water tank (13) is mounted on the top of the light floating row (1) at one end of the diesel engine (2). The water tank (13) is connected to the water inlet of the water pump (4) through a pipeline. The water outlet of the water pump (4) is connected to a high-pressure water gun (14) through a pipeline. The water outlet of the centrifugal sand suction pump (3) is connected to a mud discharge pipe (5), and floating cylinders (6) are equidistantly mounted on the outside of the mud discharge pipe (5). The water inlet end of the centrifugal sand suction pump (3) is connected to a mud suction pipe (7), and a positioning pipe (8) is fixedly mounted on one end of the mud suction pipe (7).
3. A high permeability deep foundation pit free drainage excavation construction process according to claim 2, characterized in that: A steel wire rope (11) is wound around the outside of the positioning tube (8), a pulley (10) is closely connected to the outside of the steel wire rope (11), a support frame (9) is movably mounted on the outside of the pulley (10), and the support frame (9) is fixedly mounted on the top of the light floating row (1), and one end of the steel wire rope (11) is wound around and connected to a take-up frame (12), and the take-up frame (12) is fixedly mounted on the light floating row (1).
4. A high permeability deep foundation pit free drainage excavation construction process according to claim 1, characterized in that: The onshore dry land excavation of the foundation pit also includes earth excavation and slope modification; Earthwork excavation: Use excavators to dig directly, and forklifts to transport earthwork over short distances. Dump trucks are used for long-distance transportation. During construction, the excavation section dimensions are regularly measured and corrected. Slope trimming: Follow the excavation closely, and adopt the method of digging a layer and trimming the slope a layer at a time.
5. A high permeability deep foundation pit free drainage excavation construction process according to claim 2, characterized in that: The parameters of the centrifugal sand suction pump (3) and the diesel engine (2) are selected according to actual construction requirements. The light floating row (1) is a steel frame structure with foam filling inside. The size of the light floating row is 6m*6m*1.5m.
Citation Information
Patent Citations
Telescopic machine shed for mini excavator
CN109930898A
Sediment suction conveying and sand washing method
CN115162442A
Multifunctional umbrella for automobile
CN1356219A
Earth and sand excavating suction equipment
JP2004324358A