A rigid truss-arch-truss-beam composite bridge with three main trusses and six spans and a construction method thereof
Obtaining accurate coordinates and monitoring bridge changes through bridge-mounted GPS and GPS differential base stations, combined with intelligent computers and interception devices, solves the problems of position accuracy and extreme hazard monitoring during the construction of three-main truss six-span bridges, reducing the safety of drivers risk.
Patent Information
- Application Number
- CN202410567529.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-09
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-05-09
AI Technical Summary
During the construction of a rigid truss-arch-truss composite bridge with a three-main truss and six-span structure, it was difficult to ensure the position accuracy of the left and right arch ribs when the main span arch ribs were closed, and the monitoring delay caused the bridge to encounter extreme collisions. The risk to driver safety is high.
Bridge-mounted GPS and GPS differential base stations are used to obtain accurate coordinates through GPS satellites, and intelligent computers are used to monitor the Z-axis changes of the bridge. Interception devices and electronic warning signs are set up to monitor and respond to extreme dangerous situations in a timely manner, and elastic reset pieces and windshields are used Detect cross winds.
The position accuracy of the left and right arch ribs during the closing process is improved, and extreme dangerous conditions of the bridge are detected in a timely manner, which reduces safety risks for drivers and avoids misjudgments due to damage to the bridge-mounted GPS.
Smart Images

Figure CN118375061B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of long-span bridges, in particular to a rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure and a construction method. Background Art
[0002] For a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans, a method for synchronous installation of arch beams of a three main truss steel truss arch bridge disclosed in application number 20191027794.9 can be used for construction. The construction process is as follows: after the main pier support is longitudinally offset and locked, the arch beam erection equipment is moved forward to cantilever the main span steel truss arch; the sling tower is installed above the upper chord node of the steel truss beam at the top of the main pier; multiple layers of slings are hung and tensioned in sequence; after the steel truss beam is erected to the joint position, the longitudinal displacement of the main pier top is fine-tuned to achieve the joint of the main span arch rib; then the tie beam joint is opened to the designed length to complete the joint of the main span tie beam; the sling force is gradually released, the sling tower is dismantled, and the beam erection equipment is withdrawn to achieve the designed bridge state of the steel truss arch. This construction method speeds up the construction progress, eliminates the installation, anchoring and tensioning operations of temporary tie rods, saves the investment cost of beam erection equipment and operators, and has high economy and practicality.
[0003] When the main span arch ribs are closed during the above construction process, the position of the left and right arch ribs needs to be adjusted by fine-tuning the longitudinal displacement of the main pier top. At this time, the left and right arch ribs need to have a high position accuracy to better ensure the smooth closing of the main span arch ribs. In addition, in the combined bridge built using the above construction method, anti-collision structures are usually set at some piers to deal with possible collisions with ships at sea or on the river. However, the anti-collision structure cannot completely ensure the safety of the combined bridge. If it encounters a collision with a ship with a large mass and volume, the bridge may still be damaged or even deformed and collapsed. If the extreme danger of the bridge cannot be monitored in time, it will cause great safety risks to drivers passing through the bridge. Summary of the invention
[0004] In order to improve the position accuracy of the left arch rib and the right arch rib during the closure process and to enable timely monitoring of extremely dangerous situations of the bridge, thereby reducing the safety risks of drivers passing through the bridge, the present application provides a rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure and a construction method.
[0005] In a first aspect, the present invention provides a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans, which adopts the following technical solution:
[0006] A rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure comprises a composite bridge body, the composite bridge body comprises a sea surface section and two land sections on both sides of the sea surface section, the sea surface section comprises a main span, a secondary side span and a side span, the main span comprises a main span arch rib and a main span tie beam, the main span arch rib comprises two arch ribs, which are a left arch rib and a right arch rib respectively, the tops of the left arch rib and the right arch rib are both provided with bridge-borne GPS, which are a first bridge-borne GPS and a second bridge-borne GPS respectively, one of the land sections is provided with a GPS differential base station with known coordinates, the first bridge-borne GPS, the second bridge-borne GPS and the GPS differential base station obtain respective GPS observation values through GPS satellites, the GPS differential base station is respectively connected to the first bridge-borne GPS and the second bridge-borne GPS in communication, the GPS differential base station is used to send GPS differential signals to the first bridge-borne GPS and the second bridge-borne GPS, and the first bridge-borne GPS and the second bridge-borne GPS are both connected to an intelligent computer in communication.
[0007] Preferably, when the main span arch ribs are being closed, the first bridge-mounted GPS and the second bridge-mounted GPS are fixedly arranged on the top of the left arch rib and the right arch rib, respectively; after the closing is completed, with the width direction of the combined bridge as the Y-axis direction, one of the bridge-mounted GPS is movably arranged on the top of its arch rib along the Y-axis direction, and the bridge-mounted GPS is connected with an elastic reset part, and the bridge-mounted GPS is provided with a windshield facing the lateral wind of the combined bridge.
[0008] Preferably, when the main span arch ribs are being closed, the first bridge-mounted GPS and the second bridge-mounted GPS are fixedly arranged on the top of the left arch rib and the right arch rib, respectively; after the closing is completed, with the width direction of the combined bridge as the Y-axis direction, the first bridge-mounted GPS and the second bridge-mounted GPS are movably arranged on the top of the left arch rib and the right arch rib, respectively, along the Y-axis direction, the first bridge-mounted GPS and the second bridge-mounted GPS are both connected with elastic reset parts, and the first bridge-mounted GPS and the second bridge-mounted GPS are both provided with wind shields facing the lateral wind of the combined bridge.
[0009] Preferably, a connection hole is provided between the bridge-borne GPS and the arch rib, and a bolt is detachably provided in the connection hole; the elastic reset member is a spring, and the spring is connected between the two ends of the bridge-borne GPS along the Y-axis direction and the arch rib.
[0010] Preferably, taking the height direction of the combined bridge as the Z axis, the intelligent computer determines whether the combined bridge is in an extremely dangerous situation by monitoring the Z axis changes of the first bridge-borne GPS and the second bridge-borne GPS.
[0011] Preferably, interception devices are provided at the entrances of the two land sections, and the interception devices are communicatively connected with the intelligent computer. The intelligent computer controls the interception devices to intercept after detecting an extremely dangerous situation occurring in the combined bridge.
[0012] Preferably, electronic warning signs are provided at the entrances of the two land sections, and the electronic warning signs are arranged in front of the intercepting device. When the intelligent computer detects that an extremely dangerous situation occurs in the combined bridge or that the lateral wind is too strong, it controls the electronic warning signs to emit a warning screen.
[0013] Preferably, an auxiliary monitoring circuit is provided at the top of the main span arch rib, and the auxiliary monitoring circuit includes an auxiliary monitoring power supply, a power-consuming element and two wires connected between the auxiliary monitoring power supply and the power-consuming element. The auxiliary monitoring power supply and the power-consuming element are both fixedly arranged at the top of the main span arch rib, and the two wires pass through the first bridge-borne GPS and the second bridge-borne GPS respectively. The auxiliary monitoring power supply also includes a power-off sensor, and the power-off sensor is communicatively connected to the intelligent computer.
[0014] Preferably, the power-consuming element is a light-emitting element.
[0015] In a second aspect, the present invention provides a construction method for a rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure, which adopts the following technical solution:
[0016] A construction method for a rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure comprises the following steps: before the main span arch ribs are closed, a first bridge-borne GPS and a second bridge-borne GPS are fixedly arranged on the top of the left arch rib and the right arch rib respectively; after the main span arch ribs are closed, the first bridge-borne GPS and the second bridge-borne GPS are movably arranged on the top of the left arch rib and the right arch rib respectively; an auxiliary monitoring circuit is arranged on the top of the main span arch rib; and an interception device and an electronic warning sign are arranged on the land section.
[0017] The beneficial effects of the present invention are:
[0018] 1. Using the differential positioning principle, the first bridge-mounted GPS and the second bridge-mounted GPS can obtain their respective accurate coordinates by acquiring the observation values of GPS satellites and the GPS differential signals of GPS differential base stations. On the one hand, the first bridge-mounted GPS and the second bridge-mounted GPS can provide accurate coordinate information for the left arch rib and the right arch rib respectively, thereby improving the position accuracy of the left arch rib and the right arch rib during the closure process. On the other hand, when the bridge is in an extremely dangerous situation, the first bridge-mounted GPS and the second bridge-mounted GPS will produce coordinate changes. By acquiring the coordinate changes of the first bridge-mounted GPS and the second bridge-mounted GPS, the intelligent computer can monitor the bridge in a timely manner when it is in an extremely dangerous situation, so that it can be known to drivers passing through the bridge in a timely manner, thereby reducing the safety risks of drivers passing through the bridge;
[0019] 2. When the arch ribs of the main beam are closed, the first bridge-borne GPS and the second bridge-borne GPS are fixedly set on the left arch rib and the right arch rib respectively, so that the first bridge-borne GPS and the second bridge-borne GPS can accurately provide the closure coordinates of the left arch rib and the right arch rib. After the closure is completed, the first bridge-borne GPS or the second bridge-borne GPS is movably set along the Y-axis, and an elastic reset member is connected and a wind shield facing the transverse wind of the bridge is set, so that the first bridge-borne GPS or the second bridge-borne GPS can also detect the size of the transverse wind on the bridge, that is, the greater the change in the Y-axis coordinate, the greater the transverse wind. By acquiring the change signal of the Y-axis of the bridge-borne GPS, the intelligent computer can monitor the bridge in time when the transverse wind is large, so that it can be known in time by drivers passing by the bridge, thereby further reducing the safety risk of drivers passing by the bridge;
[0020] 3. By using the Y-axis coordinate changes of the first bridge-mounted GPS and the second bridge-mounted GPS at the same time to feedback the magnitude of the bridge's lateral wind, it is possible to avoid misjudgment of the situation caused by damage to one of the bridge-mounted GPS;
[0021] 4. When an extremely dangerous situation occurs in the combined bridge and causes the Z-axis of the first bridge-mounted GPS or the second bridge-mounted GPS to change, the wire of the auxiliary monitoring circuit will be torn off, causing the power-off sensor to generate a circuit-breaking signal. The intelligent computer can avoid misjudgment of the situation due to damage to one of the bridge-mounted GPS by whether it obtains the circuit-breaking signal of the power-off sensor. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is an overall structural diagram of a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans in an embodiment of the present application;
[0023] Figure 2 This is a monitoring principle diagram of a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans in an embodiment of the present application;
[0024] Figure 3 It is a partial structural diagram of a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans in an embodiment of the present application;
[0025] Figure 4 is a circuit diagram of an auxiliary monitoring circuit in an embodiment of the present application;
[0026] Figure 5 It is a flow chart of the construction method of a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans in an embodiment of the present application.
[0027] Explanation of the reference numerals: 11. Sea surface section; 12. Land section; 21. Left arch rib; 22. Right arch rib; 31. First bridge-mounted GPS; 32. Second bridge-mounted GPS; 33. GPS differential base station; 41. Wind shield; 42. Connecting hole; 43. Spring; 5. Interception device; 6. Electronic warning sign; 71. Auxiliary monitoring power supply; 72. Power-off sensor; 73. Light-emitting element. DETAILED DESCRIPTION
[0028] The following will be combined with the attached Figure 1-5 The present invention is further illustrated by the following embodiments.
[0029] This embodiment discloses a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans.
[0030] Reference Figure 1 and Figure 2A rigid truss-arch-truss-beam composite bridge with three main trusses and six spans includes a composite bridge body, which includes a sea surface section 11 and two land sections 12 on both sides of the sea surface section 11. The sea surface section 11 includes a main span, a secondary side span and a side span. The main span includes a main span arch rib and a main span tie beam. The main span arch rib includes a left arch rib 21 and a right arch rib 22. A first bridge-borne GPS 31 and a second bridge-borne GPS 32 are respectively arranged on the top of the left arch rib 21 and the top of the right arch rib 22. One of the land sections 12 is provided with a GPS differential base station 33 with known coordinates. The first bridge-borne GPS 31, the second bridge-borne GPS 32 and the GPS differential base station 33 obtain respective GPS observation values through GPS satellites. The GPS differential base station 33 is respectively connected to the first bridge-borne GPS 31 and the second bridge-borne GPS 32 for communication. The GPS differential base station 33 is used to send GPS differential signals to the first bridge-borne GPS 31 and the second bridge-borne GPS 32. Both the first bridge-borne GPS 31 and the second bridge-borne GPS 32 are connected to intelligent computers for communication. By using the differential positioning principle, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 can obtain their respective accurate coordinates by acquiring the observation values of the GPS satellite and the GPS differential signal of the GPS differential base station 33. On the one hand, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 can provide accurate coordinate information for the left arch rib 21 and the right arch rib 22 respectively, thereby improving the position accuracy of the left arch rib 21 and the right arch rib 22 during the jointing process. On the other hand, when the bridge is in an extremely dangerous situation, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 will produce coordinate changes. By acquiring the coordinate changes of the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32, the intelligent computer can monitor the bridge in a timely manner when it is in an extremely dangerous situation, so that it can be known to the drivers passing through the bridge in a timely manner, thereby reducing the safety risks of the drivers passing through the bridge.
[0031] It should be noted that in the remaining embodiments, in addition to using the Global Positioning System (GPS) to obtain accurate coordinates, satellite navigation systems such as the Beidou Satellite Navigation System (BDS) and the Galileo Satellite Navigation System (GAL I LEO) can also be used to obtain accurate coordinates. The specific selection is determined by the construction scenario of the bridge.
[0032] Reference Figure 1 When the main span arch ribs are closed, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are respectively fixed on the top of the left arch rib 21 and the right arch rib 22. When the main beam arch ribs are closed, by fixing the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 on the left arch rib 21 and the right arch rib 22, respectively, it can be ensured that the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 accurately provide the closure coordinates of the left arch rib 21 and the right arch rib 22.
[0033] Reference Figure 1 and Figure 3After the joint is closed, with the width direction of the combined bridge as the Y-axis direction, one of the bridge-borne GPS is movably set along the Y-axis direction on the top of its arch rib, the bridge-borne GPS is connected with an elastic reset member, and a windshield 41 facing the transverse wind of the combined bridge is arranged on the bridge-borne GPS. After the joint is closed, by movably setting the first bridge-borne GPS 31 or the second bridge-borne GPS 32 along the Y-axis, connecting the elastic reset member and setting the windshield 41 facing the transverse wind of the bridge, the first bridge-borne GPS 31 or the second bridge-borne GPS 32 can also detect the size of the transverse wind on the bridge, that is, the greater the change in the Y-axis coordinate, the greater the transverse wind. By acquiring the change signal of the Y-axis of the bridge-borne GPS, the intelligent computer can monitor the bridge in time when the transverse wind is large, so that it can be known in time by the drivers passing through the bridge, thereby further reducing the safety risk of the drivers passing through the bridge. In the remaining embodiments, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are movably arranged at the top of the left arch rib 21 and the right arch rib 22 along the Y-axis direction, and the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are both connected with elastic reset parts. The first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are both provided with windshields 41 facing the lateral wind of the combined bridge. By simultaneously using the Y-axis coordinate changes of the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 to feedback the size of the bridge lateral wind, it is possible to avoid misjudgment of the situation caused by damage to one of the bridge-mounted GPS. It should be noted that if the lateral wind of the bridge is too strong, it will increase the risk of vehicles passing through the bridge. By letting the driver know the lateral wind of the bridge in time, it can help the driver to judge whether it is necessary to pass the bridge according to the model and weight of the vehicle.
[0034] Reference Figure 3 Specifically, a connection hole 42 is provided between the bridge-borne GPS and the arch rib, and a bolt is detachably provided in the connection hole 42. When the bridge-borne GPS needs to be fixed on the arch rib, the connection hole 42 between the bridge-borne GPS and the arch rib is aligned and the bolt is connected. The elastic reset member is a spring 43, which is connected between the two ends of the bridge-borne GPS along the Y-axis direction and the arch rib, so that the bridge-borne GPS has a tendency to automatically reset after being moved by the lateral wind force of the bridge, so as to repeatedly monitor the lateral wind conditions of the bridge.
[0035] Reference Figure 1 and Figure 2, taking the height direction of the combined bridge as the Z axis, the intelligent computer determines whether the combined bridge is in an extremely dangerous situation by monitoring the Z-axis changes of the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32. Furthermore, interception devices 5 are provided at the entrances of the two land sections 12, and the interception devices 5 are communicatively connected to the intelligent computer. After the intelligent computer detects that the combined bridge is in an extremely dangerous situation, it controls the interception device 5 to intercept, so as to prevent vehicles from entering the bridge in time. The interception device 5 can select the vehicle interception device 5 in the existing road. The specific structure of the interception device 5 is not an improvement point of the present invention, so it will not be repeated. In addition, electronic warning signs 6 are provided at the entrances of the two land sections 12, and the electronic warning signs 6 are arranged in front of the interception devices 5. When the intelligent computer detects that the combined bridge is in an extremely dangerous situation or detects that the lateral wind is too strong, it controls the electronic warning signs 6 to send out a warning screen, so as to let the vehicle driver know the current situation of the bridge in time. It should be noted that the Y-axis coordinate change reference value and the Z-axis coordinate change reference value are input into the intelligent computer. Only when the Y-axis coordinate change of the bridge-borne GPS exceeds the Y-axis coordinate change reference value, the electronic warning sign 6 will issue a warning of excessive lateral wind. Only when the Z-axis coordinate change of the bridge-borne GPS exceeds the Z-axis coordinate change reference value, the electronic sign will issue a warning of an extremely dangerous situation on the bridge and the interception device 5 will intercept, so as to avoid the intelligent computer being overly sensitive to the monitoring results.
[0036] Reference Figure 1 , Figure 2 and Figure 4 , an auxiliary monitoring circuit is arranged at the top of the main span arch rib, the auxiliary monitoring circuit includes an auxiliary monitoring power supply 71, a power consumption element and two wires connected between the auxiliary monitoring power supply 71 and the power consumption element, the auxiliary monitoring power supply 71 and the power consumption element are fixedly arranged at the top of the main span arch rib, the two wires pass through the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 respectively, the auxiliary monitoring power supply 71 also includes a power failure sensor 72, and the power failure sensor 72 is connected to the intelligent computer for communication. When the combined bridge is in an extremely dangerous situation and causes the Z axis of the first bridge-mounted GPS 31 or the second bridge-mounted GPS 32 to change, the wire of the auxiliary monitoring circuit will be torn off, so that the power failure sensor 72 generates a circuit break signal, and the intelligent computer can avoid misjudgment caused by the damage of one of the bridge-mounted GPS by whether the circuit break signal of the power failure sensor 72 is obtained, that is, only when the intelligent computer detects that the bridge-mounted GPS generates a Z axis change and the power failure sensor 72 generates a circuit break signal, will it be determined that the bridge is in an extremely dangerous situation. Specifically, the power-consuming element is the light-emitting element 73. The advantage of using the light-emitting element 73 as the power-consuming element of the auxiliary monitoring circuit is that the light-emitting element 73 can intuitively display the current state of the bridge, making it easier for on-duty personnel to discover the situation at the first time on site.
[0037] This embodiment also discloses a construction method for a rigid truss-arch-truss-beam composite bridge with a three-main-truss six-span structure.
[0038] Reference Figure 1 and Figure 5 The construction method of a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans includes the following steps:
[0039] Before the main span arch ribs are connected, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are fixedly installed on the top of the left arch rib 21 and the right arch rib 22 respectively; after the main span arch ribs are connected, the first bridge-mounted GPS 31 and the second bridge-mounted GPS 32 are movably installed on the top of the left arch rib 21 and the right arch rib 22 respectively; an auxiliary monitoring circuit is installed on the top of the main span arch ribs; and an interception device 5 and an electronic warning sign 6 are installed on the land section 12.
[0040] The above are all preferred embodiments of the present invention, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A rigid truss-arch-truss-beam composite bridge with three main trusses and six spans, characterized by: The invention comprises a combined bridge body, wherein the combined bridge body comprises a sea surface section (11) and two land sections (12) on both sides of the sea surface section (11), wherein the sea surface section (11) comprises a main span, a secondary side span and a side span, wherein the main span comprises a main span arch rib and a main span tie beam, wherein the main span arch rib comprises two arch ribs, namely a left arch rib (21) and a right arch rib (22), wherein the tops of the left arch rib (21) and the right arch rib (22) are both provided with bridge-borne GPS, namely a first bridge-borne GPS (31) and a second bridge-borne GPS (32), wherein one of the land sections (12) is provided with a GPS having known coordinates. A PS differential base station (33), wherein the first bridge-borne GPS (31), the second bridge-borne GPS (32) and the GPS differential base station (33) obtain respective GPS observation values through GPS satellites, wherein the GPS differential base station (33) is respectively connected in communication with the first bridge-borne GPS (31) and the second bridge-borne GPS (32), wherein the GPS differential base station (33) is used to send GPS differential signals to the first bridge-borne GPS (31) and the second bridge-borne GPS (32), wherein the first bridge-borne GPS (31) and the second bridge-borne GPS (32) are both connected in communication with an intelligent computer; When the main span arch ribs are closed, the first bridge-borne GPS (31) and the second bridge-borne GPS (32) are fixedly arranged on the top of the left arch rib (21) and the right arch rib (22), respectively; after the closing is completed, with the width direction of the combined bridge as the Y-axis direction, one of the bridge-borne GPSs is movably arranged on the top of its arch rib along the Y-axis direction, the bridge-borne GPS is connected to an elastic reset member, and a windshield (41) facing the lateral wind of the combined bridge is arranged on the bridge-borne GPS; A connection hole (42) is provided between the bridge-mounted GPS and the arch rib, and a bolt is detachably provided in the connection hole (42); the elastic reset member is a spring (43), and the spring (43) is connected between the two ends of the bridge-mounted GPS along the Y-axis direction and the arch rib; Taking the height direction of the combined bridge as the Z axis, the intelligent computer determines whether the combined bridge is in an extremely dangerous situation by monitoring the Z axis changes of the first bridge-mounted GPS (31) and the second bridge-mounted GPS (32); An interception device (5) is provided at the entrance of the two land sections (12), and the interception device (5) is communicatively connected with the intelligent computer. After the intelligent computer detects an extremely dangerous situation in the combined bridge, it controls the interception device (5) to intercept.
2. The rigid truss-arch-truss-beam composite bridge with three main trusses and six spans according to claim 1, characterized in that: When the main span arch ribs are closed, the first bridge-mounted GPS (31) and the second bridge-mounted GPS (32) are fixedly arranged on the top of the left arch rib (21) and the right arch rib (22), respectively; after the closing is completed, with the width direction of the combined bridge as the Y-axis direction, the first bridge-mounted GPS (31) and the second bridge-mounted GPS (32) are movably arranged on the top of the left arch rib (21) and the right arch rib (22), respectively, along the Y-axis direction, the first bridge-mounted GPS (31) and the second bridge-mounted GPS (32) are both connected with elastic reset parts, and the first bridge-mounted GPS (31) and the second bridge-mounted GPS (32) are both provided with wind shields (41) facing the lateral wind of the combined bridge.
3. The rigid truss-arch-truss-beam composite bridge with three main trusses and six spans according to claim 1, characterized in that: An electronic warning sign (6) is provided at the entrance of the two land sections (12), and the electronic warning sign (6) is provided in front of the interception device (5). When the intelligent computer detects that an extremely dangerous situation occurs in the combined bridge or that the lateral wind is too strong, it controls the electronic warning sign (6) to issue a warning screen.
4. The rigid truss-arch-truss-beam composite bridge with three main trusses and six spans according to claim 3, characterized in that: An auxiliary monitoring circuit is arranged at the top of the main span arch rib, the auxiliary monitoring circuit comprising an auxiliary monitoring power supply (71), a power consumption element and two wires connected between the auxiliary monitoring power supply (71) and the power consumption element. The auxiliary monitoring power supply (71) and the power consumption element are both fixedly arranged at the top of the main span arch rib, the two wires respectively pass through the first bridge-borne GPS (31) and the second bridge-borne GPS (32), the auxiliary monitoring power supply (71) further comprising a power failure sensor (72), and the power failure sensor (72) is communicatively connected to the intelligent computer.
5. The rigid truss-arch-truss-beam composite bridge with three main trusses and six spans according to claim 4, characterized in that: The power consumption element is a light emitting element (73).
6. A construction method for a rigid truss-arch-truss-beam composite bridge with three main trusses and six spans, applied to the rigid truss-arch-truss-beam composite bridge with three main trusses and six spans as claimed in claim 5, characterized in that: The following steps are involved: Before the main span arch ribs are closed, a first bridge-borne GPS (31) and a second bridge-borne GPS (32) are fixedly arranged on the tops of the left arch rib (21) and the right arch rib (22), respectively; after the main span arch ribs are closed, the first bridge-borne GPS (31) and the second bridge-borne GPS (32) are movably arranged on the tops of the left arch rib (21) and the right arch rib (22), respectively; an auxiliary monitoring circuit is arranged on the tops of the main span arch ribs; and an interception device (5) and an electronic warning sign (6) are arranged on the land section (12).
Citation Information
Patent Citations
Arched girder synchronous mounting construction method of three-main-truss steel truss arch bridge
CN110042757A
Intelligent three-main-truss steel truss girder closure rising and falling beam control method
CN111708297A