Multi-layer PP cutting and drilling system
By using the exhaust roller to eliminate the air gap layer in the multi-layer PP cutting and drilling system, the problems of position deviation and inaccurate hole shape during the drilling process are solved, and the product yield rate and the applicable scope of the device are improved.
Patent Information
- Application Number
- CN202410813827.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-06-24
AI Technical Summary
The existing multi-layer PP cutting and drilling system has problems in the drilling process, such as the air gap layer causing drilling position deviation, inaccurate hole shape and material damage, which reduces the product yield.
By setting up an exhaust roller in the drilling equipment, the drive motor is used to drive the exhaust roller to roll to eliminate the air gap layer between the multi-layer PP sheets, and the initial pressing force of the exhaust roller is adjusted by adjusting the screw to ensure the air gap layer of complete elimination.
It effectively avoids the problems of drilling position deviation, inaccurate hole shape and material damage, improves the product yield, and expands the applicable scope of the device.
Smart Images

Figure CN118382215B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of PCB processing equipment, and in particular relates to a multi-layer PP cutting and drilling system. Background Art
[0002] In the electronics manufacturing industry, PCB (also called printed circuit board) is one of the indispensable core components in the electronics industry. It provides an electrical connection platform between electronic components for various electronic devices. It is mainly composed of multiple core boards and PP prepregs stacked alternately, and then processed by etching, fusion, riveting, drilling, plating, assembly and other processes. Among them, PP prepreg is an indispensable component for connecting multiple core boards and maintaining the insulation state between core boards. In the process of processing PP prepreg, it is necessary to use the cutting and drilling system to perform cutting and drilling processes on the PP coil to ensure that the PP prepreg and the core board can be adapted.
[0003] The existing cutting and drilling system mainly includes a cutting process and a drilling process, wherein the cutting process can cut the PP coil into PP sheets of suitable size according to the size of the core board and stack the PP sheets, and the drilling process can drill holes in the multi-layer stacked PP sheets according to the positioning holes of the core board, so that the PP sheets and the core board can be quickly and accurately positioned and adapted when they are alternately stacked. However, the existing multi-layer PP cutting and drilling system still has some process defects when performing the drilling process on the multi-layer stacked PP sheets. During the stacking process of the multi-layer PP sheets, due to various factors (such as surface roughness, uneven material thickness or improper operation, etc.), an irregular air gap layer will be formed between adjacent PP sheets. These air gap layers will cause the multi-layer material to be unable to achieve an ideal flat state. When the drill bit penetrates the multi-layer PP semi-cured sheet, the drill bit squeezes the PP sheet. Due to the presence of air, the impact force may produce inconsistent responses between different layers, resulting in quality problems such as drilling position offset, inaccurate hole shape and even material damage, thereby reducing the product yield. Based on the above problems, this application document proposes a multi-layer PP cutting and drilling system to improve the above problems. Summary of the invention
[0004] The purpose of the present invention is to provide a multi-layer PP cutting and drilling system. After the transport pallet carries the multi-layer PP sheets and moves them into the main body of the drilling equipment, the multi-layer PP sheets are positioned by a positioning plate, and the drive motor is started. The air gap layer between the multi-layer PP sheets can be eliminated by an exhaust roller, thereby avoiding quality problems such as drilling position deviation, inaccurate hole shape and even material damage, thereby improving the product yield. At the same time, the initial pressing force of the exhaust roller can be adjusted according to the number of multi-layer PP sheets by rotating the adjusting screw, thereby avoiding the air gap layer from being unable to be completely eliminated.
[0005] The technical solution adopted by the present invention is as follows:
[0006] A multi-layer PP cutting and drilling system, comprising:
[0007] A cutting module, on which the PP coil is assembled, wherein the cutting module is used to cut and stack the PP coil to obtain a multi-layer PP sheet;
[0008] A feeding module, which is arranged at the next level of the cutting module and is used to convey multi-layer PP sheets;
[0009] A drilling module, which is arranged at the next level of the feeding module and is used to drill holes in the multi-layer PP sheet;
[0010] A material receiving module, which is arranged at the next level of the drilling module and is used to receive the multi-layer PP sheet after drilling;
[0011] A transport pallet, the transport pallet being used to carry the multi-layer PP sheet;
[0012] The drilling module comprises a drilling equipment body, a workbench is arranged inside the drilling equipment body, a feed port and a discharge port are arranged at both ends of the workbench, a plurality of feeding rollers are arranged on the upper end of the workbench, a power module for driving the feeding rollers to rotate is arranged inside the drilling equipment body, an XYZ three-axis moving module is arranged on the upper end of the workbench and located on the upper end of the feeding rollers, a drilling unit is arranged on the XYZ three-axis moving module, and further comprises:
[0013] A positioning part, which is mounted on one end of the upper end of the workbench close to the discharge port, and can position the multi-layer PP sheet;
[0014] An exhaust unit, the exhaust unit is mounted on the upper end of the workbench, the exhaust unit comprises an exhaust roller, the exhaust roller is mounted on the upper end of the workbench, and after the exhaust unit is operated, the exhaust roller can roll along the surface of the transport pallet;
[0015] An elastic force adjustment unit, wherein the elastic force adjustment unit is assembled between the positioning portion and the exhaust unit;
[0016] Wherein, in the initial state, the lower end of the exhaust roller is in contact with the upper surface of the transport pallet.
[0017] In a preferred embodiment, the positioning part includes a crossbeam, a positioning drive element and a positioning plate. The crossbeam is fixed to one end of the upper end of the workbench close to the discharge port, a plurality of positioning drive elements are fixed to the upper end of the crossbeam, and the positioning plate is fixed to the output end of the crossbeam and is located at the lower end of the positioning drive element.
[0018] In a preferred embodiment, the exhaust unit also includes multiple drive motors, multiple threaded shafts, multiple flange blocks and multiple sliders. The multiple drive motors are respectively fixed on both sides of the upper end of the workbench, and the drive motors are fixedly connected to the main body of the drilling equipment. The multiple threaded shafts are respectively fixed to the output ends of the multiple drive motors. The multiple flange blocks are respectively fixed to the four end corners of the top of the workbench, and the threaded shafts and flange blocks on the same side are rotatably connected through ball bearings. The multiple sliders are threadedly connected to the outside of the multiple threaded shafts and are located on both sides of the exhaust roller. The sliders and the elastic force adjustment unit as well as the exhaust roller and the elastic force adjustment unit are all connected.
[0019] In a preferred embodiment, the elastic force adjustment unit includes a bracket, a first pin, a second pin, a movable pin, a linkage arm and an elastic element. The bracket is fixed to a side of the slider close to the exhaust roller, and the first pin and the second pin are fixed at both ends of the bracket respectively. The movable pin is slidably connected to the inside of the bracket and is located between the first pin and the second pin. The linkage arm is rotatably connected to the outside of the first pin. A third pin is fixed to the inside of the linkage arm and located at the upper end of the first pin. The elastic element is assembled between the third pin and the movable pin. The exhaust roller and the linkage arm are rotatably connected, and the exhaust roller is located at the lower end of the first pin.
[0020] In a preferred embodiment, an adjusting screw is rotatably connected inside the second pin, a threaded section is provided at one end of the outer side of the adjusting screw, and the movable pin and the adjusting screw are threadedly connected via the threaded section.
[0021] In a preferred embodiment, an adjusting end is provided at one end of the adjusting screw away from the movable pin rod, and an anti-slip boss is provided at one end of the adjusting screw away from the adjusting end.
[0022] In a preferred embodiment, a plurality of scale marks are evenly arranged on the upper end of the bracket and located at the upper end of the guide groove, an indication mark is opened on the upper end of the outer side of the movable pin rod, and the indication mark and the scale mark are matched.
[0023] In a preferred solution, a driving rod is fixed between the multiple flange blocks close to the discharge port, the driving rod is matched with the linkage arm, and the driving rod is located at the lower end of the first pin rod.
[0024] The technical effects achieved by the present invention are:
[0025] After the transport pallet carries the multi-layer PP sheet and moves it into the main body of the drilling equipment, the present invention starts the crossbeam, positions one end of the multi-layer PP sheet through the positioning plate, starts the driving motor, and drives the exhaust roller to roll on the surface of the multi-layer PP sheet through the driving motor. The exhaust roller can eliminate the air gap layer between the multi-layer PP sheet during the rolling process, thereby avoiding inconsistent response of the impact force between different layers when the XYZ three-axis moving module is drilling, resulting in quality problems such as drilling position deviation, inaccurate hole shape and even material damage, thereby improving the product yield;
[0026] The present invention drives the movable pin to move by rotating the adjusting screw rod, and adjusts the initial resilience of the elastic element by the movable pin rod, so that the device can adjust the initial pressing force of the exhaust roller according to the number of multi-layer PP sheets, thereby avoiding that the air gap layer at the lower end cannot be completely eliminated when the number of PP sheets stacked is large, thereby improving the application scope of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0028] Figure 2 It is a schematic diagram of the overall structure of the main body of the drilling equipment of the present invention;
[0029] Figure 3 It is a rear view of the overall structure of the main body of the drilling equipment of the present invention;
[0030] Figure 4 It is a sectional view of the overall structure of the main body of the drilling equipment of the present invention;
[0031] Figure 5 The present invention Figure 4 The enlarged schematic diagram of point A in the middle;
[0032] Figure 6 It is a structural schematic diagram of the positioning part of the present invention;
[0033] Figure 7 It is a schematic structural diagram of the exhaust unit of the present invention;
[0034] Figure 8 is a structural schematic diagram of the elastic force adjustment unit of the present invention;
[0035] Fig. 9 It is a structural exploded diagram of the elastic force adjustment unit of the present invention;
[0036] Fig.10 is a schematic diagram of the exhaust roller of the present invention in a working state;
[0037] Fig.11 It is a schematic diagram of the exhaust roller of the present invention in a raised state.
[0038] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0039] 1. Cutting module; 2. Feeding module; 3. Drilling module; 4. Receiving module; 5. Transport pallet;
[0040] 10. Drilling equipment body; 11. Feeding roller; 12. XYZ three-axis moving module; 13. Drilling unit;
[0041] 20. Positioning unit;
[0042] 21. crossbeam; 22. positioning drive element; 23. positioning plate;
[0043] 30. Exhaust unit;
[0044] 31. Exhaust roller; 32. Drive motor; 33. Threaded shaft; 34. Flange block; 35. Slider; 36. Drive rod;
[0045] 40. Elastic force adjustment unit;
[0046] 41. Bracket; 42. First pin rod; 43. Second pin rod; 44. Movable pin rod; 45. Linkage arm; 46. Elastic element; 47. Third pin rod; 48. Adjusting screw rod; 49. Anti-slip boss. DETAILED DESCRIPTION
[0047] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0048] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0049] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure or characteristic that may be included in at least one implementation of the present invention. The phrase "in a preferred embodiment" that appears in different places in this specification does not refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
[0050] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the embodiments of the present invention in detail, for the sake of convenience, the cross-sectional diagrams showing the device structure will not be partially enlarged according to the general scale, and the schematic diagrams are only examples, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.
[0051] Please refer to the attached Figures 1 to 5 As shown, the present invention provides a multi-layer PP cutting and drilling system, comprising:
[0052] A cutting module 1, wherein the interior of the cutting module 1 is detachably equipped with a PP coil, and the cutting module 1 is used to cut and stack the PP coil according to the size of the core board to obtain a multi-layer PP sheet;
[0053] Feeding module 2, which is arranged at the next level of cutting module 1, and is used to convey multi-layer PP sheets;
[0054] Drilling module 3, which is arranged at the next level of feeding module 2, and is used to drill holes in the multi-layer PP sheet according to the hole positions on the core plate;
[0055] The receiving module 4 is arranged at the next level of the drilling module 3, and is used to receive the multi-layer PP sheet after drilling;
[0056] The transport tray 5 is used to carry the multi-layer PP sheet and drive the multi-layer PP sheet to move between the cutting module 1, the feeding module 2, the drilling module 3 and the receiving module 4 through the transport tray 5;
[0057] The drilling module 3 includes a drilling equipment body 10, a workbench is arranged inside the drilling equipment body 10, a feed port and a discharge port are arranged at both ends of the workbench, and the feed port is adapted to the feeding module 2, and the discharge port is adapted to the receiving module 4. A plurality of feeding rollers 11 are sequentially arranged on the upper end of the workbench from the feed port to the discharge port, a power module for driving the feeding roller 11 to rotate and a limit module for limiting the transport pallet 5 are arranged inside the drilling equipment body 10, the feeding roller 11 can drive the transport pallet 5 located inside the drilling equipment body 10 to move, an XYZ three-axis moving module 12 is arranged on the upper end of the workbench and on the upper end of the feeding roller 11, and a drilling unit 13 is arranged on the XYZ three-axis moving module 12, and also includes:
[0058] A positioning part 20, which is mounted on the upper end of the workbench near the discharge port, and can position the multi-layer PP sheet;
[0059] An exhaust unit 30 is mounted on the upper end of the workbench. The exhaust unit 30 includes an exhaust roller 31. The exhaust roller 31 is mounted on the upper end of the workbench. After the exhaust unit 30 is running, the exhaust roller 31 can roll along the surface of the transport pallet 5.
[0060] The elastic force adjustment unit 40 is assembled between the positioning portion 20 and the exhaust unit 30;
[0061] In the initial state, the lower end of the exhaust roller 31 is in contact with the upper surface of the transport pallet 5 .
[0062] Specifically, in the present embodiment, a plurality of U-shaped grooves are provided on both sides of the transport pallet 5, and the limiting module and the U-shaped grooves are matched with each other. When the limiting module and the U-shaped grooves are in contact, the limiting module can limit the transport pallet 5. The limiting module is an existing mature application. As long as it can achieve the purpose of limiting the transport pallet 5, its structural form and working method can refer to the existing technology and are not specifically limited here.
[0063] In this embodiment, the PP coil is placed inside the cutting module 1, the PP coil is cut by the cutting module 1, and the cut cutting module 1 is stacked on the upper end of the transport pallet 5, and the transport pallet 5 stacked with multiple layers of PP is transported to the inside of the drilling module 3 by the feeding module 2 until the transport pallet 5 moves to the upper end of the loading roller 11, and the loading roller 11 is driven by the power module to operate so that the loading roller 11 drives the transport pallet 5 to move to a suitable position, and the transport pallet 5 is limited by the limiting module, and the positioning part 20 is started, and one end of the multi-layer PP sheet is pressed and positioned by the positioning part 20, and the exhaust unit 30 is started so that the exhaust roller 31 Rolling along the surface of the transport pallet 5, the exhaust roller 31 rolls, and during the rolling process, the air gap layer between the multi-layer PP sheets is squeezed by the exhaust roller 31, and the air between the multi-layer PP sheets is driven out, so that adjacent PP sheets can fit together. After eliminating the air gap layer, the XYZ three-axis moving module 12 is started, and the position of the drilling unit 13 is adjusted according to the hole position of the core plate, and the multi-layer PP sheets are drilled by the drilling unit 13. Since the air gap layer is eliminated, the impact force is prevented from producing inconsistent responses between different layers, thereby avoiding quality problems such as drilling position offset, inaccurate hole shape and even material damage, thereby improving the product yield.
[0064] Next, please refer to Figure 3 and Figure 6 The positioning part 20 includes a crossbeam 21, a positioning drive element 22 and a positioning plate 23. The crossbeam 21 is fixed to one end of the upper end of the workbench close to the discharge port, and multiple positioning drive elements 22 are fixed to the upper end of the crossbeam 21. The positioning plate 23 is fixed to the output end of the crossbeam 21 and is located at the lower end of the positioning drive element 22.
[0065] Furthermore, a protective pad is fixed at the lower end of the positioning plate 23. The material of the protective pad is a flexible material to prevent the crossbeam 21 from crushing the surface of the PP sheet. Specifically, in this embodiment, the material of the protective pad is preferably rubber.
[0066] It should be noted that, in the present embodiment, the positioning drive element 22 may be any one of the following elements: an electric cylinder or a pneumatic cylinder. When the positioning drive element 22 is a pneumatic cylinder, it needs to be used in conjunction with an air pump module.
[0067] In this embodiment, when the transport pallet 5 moves to a suitable position on the upper end of the loading roller 11, the limiting module is started to limit the transport pallet 5, and the positioning drive element 22 is started to move the output end of the positioning drive element 22. Through the fixed connection between the positioning drive element 22 and the positioning plate 23, the positioning drive element 22 drives the positioning plate 23 to move toward the direction close to the PP sheet. When the positioning plate 23 contacts the PP sheet, the positioning plate 23 is used to position the end of the PP sheet close to the discharge port to prevent the PP sheet from moving, thereby facilitating the elimination of the air gap layer in the subsequent process.
[0068] Secondly, please also refer to Figure 5 and Figure 7 The exhaust unit 30 also includes multiple drive motors 32, multiple threaded shafts 33, multiple flange blocks 34 and multiple sliders 35. The multiple drive motors 32 are respectively fixed on both sides of the upper end of the workbench, and the drive motors 32 are fixedly connected to the drilling equipment body 10. The multiple threaded shafts 33 are respectively fixed to the output ends of the multiple drive motors 32. The multiple flange blocks 34 are respectively fixed to the four end corners of the top of the workbench, and the threaded shafts 33 and the flange blocks 34 on the same side are rotatably connected through ball bearings. The multiple sliders 35 are threadedly connected to the outside of the multiple threaded shafts 33 and are located on both sides of the exhaust roller 31. The sliders 35 and the elastic force adjustment unit 40 are connected as well as the exhaust roller 31 and the elastic force adjustment unit 40.
[0069] It should be noted that, in the initial state, the exhaust roller 31 is located at one end of the positioning plate 23 close to the feed port, and in the vertical direction, the projections of the exhaust roller 31 and the positioning plate 23 are in contact with each other. Through the above-mentioned arrangement, it is possible to avoid the exhaust roller 31 blocking the positioning plate 23 during the descending process of the positioning plate 23.
[0070] Here, a rubber bushing is provided on the outer side of the exhaust roller 31, and the surface of the rubber bushing is smooth.
[0071] In this embodiment, when the positioning drive element 22 is running, the positioning plate 23 presses and positions one end of the PP sheet close to the discharge port, and the driving motor 32 is started to rotate the output end of the driving motor 32. The driving motor 32 and the threaded shaft 33 are fixedly connected, so that the driving motor 32 drives the threaded shaft 33 to rotate. The threaded connection between the threaded shaft 33 and the slider 35 drives the slider 35 to move. Since the slider 35 and the elastic force adjustment unit 40 and the exhaust roller 31 and the elastic force adjustment unit 40 are interconnected, the slider 35 drives the elastic force adjustment unit 40 and the exhaust roller 31 to move synchronously, so that the exhaust roller 31 rolls on the surface of the transport pallet 5. When the exhaust roller 31 contacts the multi-layer PP sheet, the air between the multi-layer PP sheet is driven out by the exhaust roller 31, thereby eliminating the air gap layer, avoiding the impact force of the drilling unit 13 to produce inconsistent responses between different layers during the drilling process, thereby avoiding quality problems such as drilling position offset, inaccurate hole shape and even material damage, and improving the product yield.
[0072] Next, please refer to Figures 8 to 9 As shown, the elastic force adjustment unit 40 includes a bracket 41, a first pin 42, a second pin 43, a movable pin 44, a linkage arm 45 and an elastic element 46. The bracket 41 is fixed to the side of the slider 35 close to the exhaust roller 31. The first pin 42 and the second pin 43 are fixed to the two ends of the bracket 41 respectively. A guide groove is provided inside the bracket 41 and between the first pin 42 and the second pin 43. The movable pin 44 is slidably connected to the inside of the guide groove. The linkage arm 45 is rotatably connected to the outside of the first pin 42. A third pin 47 is fixed inside the linkage arm 45 and located at the upper end of the first pin 42. The elastic element 46 is assembled between the third pin 47 and the movable pin 44. The exhaust roller 31 and the linkage arm 45 are rotatably connected, and the exhaust roller 31 is located at the lower end of the first pin 42.
[0073] In this embodiment, when eliminating the air gap layer in the multi-layer PP sheet, the exhaust roller 31 is started to move the slider 35. The slider 35 is fixedly connected to the bracket 41, so that the slider 35 drives the bracket 41 to move. The bracket 41 and the first pin 42 are fixedly connected and the first pin 42 is rotatably connected to the linkage arm 45, so that the bracket 41 drives the first pin 42 and the linkage arm 45 to move synchronously. The linkage arm 45 and the exhaust roller 31 are rotatably connected, so that the linkage arm 45 drives the exhaust roller 31 to move. At the same time, the third pin 47 is pulled by the elastic element 46 to rotate the third pin 47, so that the exhaust roller 31 can fit tightly with the PP sheet, thereby eliminating the air gap layer in the multi-layer PP sheet.
[0074] In a preferred embodiment, the second pin 43 is internally rotatably connected with an adjusting screw 48, an outer end of the adjusting screw 48 is provided with a threaded section, and the movable pin 44 and the adjusting screw 48 are threadedly connected via the threaded section.
[0075] In this embodiment, the adjusting screw 48 is rotated, and the adjusting screw 48 drives the movable pin 44 to move through the threaded connection between the adjusting screw 48 and the movable pin 44, and the stretching amount of the elastic element 46 is adjusted by the movable pin 44, thereby adjusting the pressing force of the exhaust roller 31 on the multi-layer PP sheet. When the number of stacked PP sheets is large, the elastic force of the elastic element 46 in the initial state is increased by increasing the stretching amount of the elastic element 46 in the initial state, thereby increasing the pressing force of the exhaust roller 31 on the multi-layer PP sheet, thereby avoiding the air gap layer at the lower end from being unable to be completely eliminated, thereby improving the scope of application of the device.
[0076] In a preferred embodiment, an adjusting end is provided at one end of the adjusting screw 48 away from the movable pin 44, and an anti-slip boss 49 is provided at one end of the adjusting screw 48 away from the adjusting end.
[0077] Here, the form of the adjustment end can be any of the following styles: an internal hexagonal adjustment hole, an external hexagonal adjustment cap, a straight groove, a cross groove or other styles that can drive the adjustment screw 48 to rotate. It should be noted that the adjustment end needs to be used with suitable tools, such as: an internal hexagonal wrench, a spanner, a flat-blade screwdriver, a plum blossom screwdriver or other tools.
[0078] In this embodiment, the setting of the adjustment end facilitates the staff to apply force when rotating the adjustment screw 48, and the setting of the anti-detachment boss 49 can facilitate the detachment of the movable pin 44 and the adjustment screw 48.
[0079] In a preferred embodiment, a plurality of scale marks are evenly arranged on the upper end of the bracket 41 and located at the upper end of the guide groove, and an indicator mark is opened on the upper end of the outer side of the movable pin 44, and the indicator mark and the scale mark are matched.
[0080] It should be noted that the scale mark is used to indicate the stretching amount or resilience of the elastic element 46 in the initial state. In this embodiment, the scale mark is used to indicate the resilience of the elastic element 46 in the initial state.
[0081] In this embodiment, the coordination of the scale mark and the indicator mark facilitates the staff to adjust the rebound force of the elastic element 46 in the initial state, and then accurately adjust the initial rebound force of the elastic element 46 according to the thickness or number of the multi-layer PP sheet.
[0082] In a preferred embodiment, a driving rod 36 is fixed between the two flange blocks 34 near the discharge port, the driving rod 36 is matched with the linkage arm 45 , and the driving rod 36 is located at the lower end of the first pin rod 42 .
[0083] In this embodiment, after the drilling of the multi-layer PP sheet is completed, the positioning drive element 22 is started, so that the positioning drive element 22 runs in the reverse direction, and the positioning plate 23 is driven by the positioning drive element 22 to move upward, so that the positioning plate 23 and the PP sheet are separated, and then the positioning of the PP sheet by the positioning plate 23 is released, and the driving motor 32 is started, and the exhaust roller 31, the slider 35 and the elastic adjustment unit 40 are driven by the driving motor 32 to move synchronously in the direction close to the discharge port. When the linkage arm 45 and the driving rod 36 are in contact, the linkage arm 45 is driven by the driving rod 36 to drive the exhaust roller 31 to rotate upward, so that the exhaust roller 31 is changed from a working state to a lifted state, so that the exhaust roller 31 and the transport pallet 5 are separated, so as to avoid the exhaust roller 31 causing the PP sheet to be offset, stacked misaligned, etc. when the transport pallet 5 moves toward the receiving module 4.
[0084] It should be noted that, in this embodiment, the exhaust roller 31 has the following two states: a working state and a raised state. When the exhaust roller 31 is in the working state (such as Fig.10 As shown in FIG. 1 ), the lower end of the exhaust roller 31 is in contact with the transport pallet 5 or the PP sheet, and the linkage arm 45 and the drive rod 36 are separated from each other; when the exhaust roller 31 is in the raised state (as shown in FIG. Fig.11 As shown in the figure, the lower end of the exhaust roller 31 is separated from the transport pallet 5 or the PP sheet, and the linkage arm 45 and the driving rod 36 are in contact with each other. Specifically, when the transport pallet 5 drives the multi-layer PP sheet to enter or move out of the drilling equipment body 10, the exhaust roller 31 is in a raised state; when the multi-layer PP sheet is drilled and the air gap layer is eliminated, the exhaust roller 31 is in a working state.
[0085] The working principle of the present invention is:
[0086] After the transport pallet 5 transports the stacked multi-layer PP sheets to the inside of the drilling equipment body 10, the transport pallet 5 is limited by the limiting module, the positioning drive element 22 is started, the positioning drive element 22 drives the positioning plate 23 to move, and the positioning plate 23 is used to press and position the end of the multi-layer PP sheet close to the discharge port, and the driving motor 32 is started, and the driving motor 32 drives the exhaust roller 31, the slider 35 and the elastic force adjustment unit 40 to move synchronously, so that the exhaust roller 31 rolls along the surface of the uppermost PP sheet. During the rolling of the exhaust roller 31, the exhaust roller 31 squeezes the air gap layer between the multi-layer PP sheets, drives out the air between the multi-layer PP sheets, so that adjacent PP sheets can fit together, and the air gap between the multi-layer PP sheets is compressed. The air gap layer is eliminated, the XYZ three-axis moving module 12 is started, the position of the drilling unit 13 is adjusted according to the hole position of the core plate, and the multi-layer PP sheet is drilled by the drilling unit 13. Since the air gap layer is eliminated, the impact force is prevented from producing inconsistent responses between different layers, thereby avoiding quality problems such as drilling position offset, inaccurate hole shape and even material damage, thereby improving the product yield rate. Among them, when there are a large number of stacked PP sheets, the adjusting screw 48 is rotated to drive the movable pin 44 to move, and the initial rebound force of the elastic element 46 is adjusted by the movable pin 44, so that the device can adjust the initial clamping force of the exhaust roller 31 according to the number of multi-layer PP sheets, thereby avoiding the air gap layer at the lower end cannot be completely eliminated when the number of stacked PP sheets is large, thereby improving the application range of the device.
[0087] The above are only preferred embodiments of the present invention. It should be noted that, for those skilled in the art, several improvements and modifications can be made without departing from the principles of the present invention, and these improvements and modifications should also be considered as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to conventional means in the art unless otherwise specified and limited.
Claims
1. A multi-layer PP cutting and drilling system, characterized by: include: A cutting module (1), wherein the PP coil is assembled on the cutting module (1), and the cutting module (1) is used to cut and stack the PP coil to obtain a multi-layer PP sheet; A feeding module (2), the feeding module (2) being arranged at a level below the cutting module (1), and the feeding module (2) being used to convey multi-layer PP sheets; A drilling module (3), the drilling module (3) being arranged at a level below the feeding module (2), and the drilling module (3) being used to drill holes in the multi-layer PP sheet; A material receiving module (4), the material receiving module (4) being arranged at a level below the drilling module (3), and the material receiving module (4) being used to receive the multi-layer PP sheet after drilling; A transport pallet (5), the transport pallet (5) being used to carry the multi-layer PP sheet; The drilling module (3) comprises a drilling equipment body (10), a workbench is arranged inside the drilling equipment body (10), a feed port and a discharge port are arranged at two ends of the workbench respectively, a plurality of feeding rollers (11) are arranged on the upper end of the workbench, a power module for driving the feeding rollers (11) to rotate is arranged inside the drilling equipment body (10), an XYZ three-axis moving module (12) is arranged on the upper end of the workbench and located above the feeding rollers (11), a drilling unit (13) is arranged on the XYZ three-axis moving module (12), and further comprises: A positioning portion (20), the positioning portion (20) being mounted on an end of the upper end of the workbench close to the discharge port, the positioning portion (20) being capable of positioning the multi-layer PP sheet; an exhaust unit (30), the exhaust unit (30) being mounted on the upper end of the workbench, the exhaust unit (30) comprising an exhaust roller (31), the exhaust roller (31) being mounted on the upper end of the workbench, and after the exhaust unit (30) is in operation, the exhaust roller (31) can roll along the surface of the transport pallet (5); An elastic force adjustment unit (40), the elastic force adjustment unit (40) being assembled between the positioning portion (20) and the exhaust unit (30), the elastic force adjustment unit (40) comprising a bracket (41), a first pin rod (42), a second pin rod (43), a movable pin rod (44), a linkage arm (45) and an elastic element (46), the bracket (41) being fixed to a side of the slider (35) close to the exhaust roller (31), the first pin rod (42) and the second pin rod (43) being fixed at two ends inside the bracket (41), the movable pin rod (44) being slidably connected to the inside of the bracket (41) and being located between the first pin rod (42) and the second pin rod (43), the linkage arm (45) being rotatably connected to the outside of the first pin rod (42), and a third pin rod (47) being fixed inside the linkage arm (45) and being located at the upper end of the first pin rod (42), The elastic element (46) is mounted between the third pin (47) and the movable pin (44); the exhaust roller (31) and the linkage arm (45) are rotatably connected, and the exhaust roller (31) is located at the lower end of the first pin (42); an adjusting screw (48) is rotatably connected inside the second pin (43); a threaded section is provided at one end of the outer side of the adjusting screw (48); the movable pin (44) and the adjusting screw (48) are threadedly connected via the threaded section; an adjusting end is provided at one end of the adjusting screw (48) away from the movable pin (44); an anti-slip boss (49) is provided at one end of the adjusting screw (48) away from the adjusting end; a plurality of scale marks are evenly arranged at the upper end of the bracket (41) and at the upper end of the guide groove; an indication mark is provided at the upper end of the outer side of the movable pin (44); and the indication mark and the scale mark are matched; Wherein, in the initial state, the lower end of the exhaust roller (31) is in contact with the upper surface of the transport pallet (5).
2. A multi-layer PP cutting and drilling system according to claim 1, characterized in that: The positioning portion (20) comprises a crossbeam (21), a positioning drive element (22) and a positioning plate (23); the crossbeam (21) is fixed to an end of the upper end of the workbench close to the discharge port; a plurality of positioning drive elements (22) are fixed to the upper end of the crossbeam (21); and the positioning plate (23) is fixed to the output end of the crossbeam (21) and is located at the lower end of the positioning drive element (22).
3. A multi-layer PP cutting and drilling system according to claim 1, characterized in that: The exhaust unit (30) further comprises a plurality of drive motors (32), a plurality of threaded shafts (33), a plurality of flange blocks (34) and a plurality of sliders (35); the plurality of drive motors (32) are respectively fixed to both sides of the upper end of the workbench, and the drive motors (32) are fixedly connected to the drilling equipment body (10); the plurality of threaded shafts (33) are respectively fixed to the output ends of the plurality of drive motors (32); the plurality of flange blocks (34) are respectively fixed to the four end corners of the top of the workbench, and the threaded shafts (33) and flange blocks (34) located on the same side are rotatably connected via ball bearings; the plurality of sliders (35) are threadedly connected to the outer sides of the plurality of threaded shafts (33) and are located on both sides of the exhaust roller (31); the sliders (35) and the elastic force adjustment unit (40) are connected as well as the exhaust roller (31) and the elastic force adjustment unit (40).
4. A multi-layer PP cutting and drilling system according to claim 3, characterized in that: A driving rod (36) is fixed between the plurality of flange blocks (34) near the discharge port, the driving rod (36) and the linkage arm (45) are matched, and the driving rod (36) is located at the lower end of the first pin rod (42).
