A hybrid tower assembly tool and assembly method

By designing lifting spreaders and turning tables adapted to tower segments of different shapes, the problems of difficult flipping and high equipment usage costs during the transportation and assembly of wind power tower segments are solved, achieving efficient tower installation and reducing equipment costs. Cost of use.

CN118387743BActive Publication Date: 2024-10-22JIANGSU ZHENJIANG NEW ENERGY EQUIP
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202410850883.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-10-22
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

Existing wind power tower segments have problems such as difficulty in flipping during transportation and assembly, long hoisting time, and high equipment usage costs, which affects installation efficiency.

Method used

A hybrid tower assembly tooling is designed, including a lifting spreader and a turning table. The lifting spreader adapts to tower segments of different shapes through support columns and connecting components, simplifying the hoisting process, and realizing a single equipment through the turning table. Complete vertical flip.

Benefits of technology

It improves the efficiency of tower assembly installation, reduces equipment usage costs and work space usage, and simplifies the hoisting, positioning and flipping process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118387743B_ABST
    Figure CN118387743B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of wind turbine installation, and specifically provides an assembly tool and an assembly method for a hybrid tower, the tool comprising a lifting sling, the lifting sling comprising a lifting part, which is provided with a fixed head, a lifting interface is provided above the fixed head, and a lifting component extends out from the fixed head; a positioning part, which is provided with a connecting component, and the connecting component is fixedly connected to the lifting part; the lifting component comprises support columns arranged above and below the fixed head, the support columns are arranged at one end of a connecting column A and a connecting column B, and the other ends of the connecting column A and the connecting column B are arranged on the fixed head, and an angle is formed between the connecting column A and the connecting column B. The present invention installs tower segments through the lifting sling, and its support column structure can be suitable for the placement of various tower segments. During the process of unloading, placing and assembling the tower segments, there is no need to perform a 180° flipping step. At the same time, during the lifting process, the installation and positioning of the lifting sling is also simpler and faster, which effectively improves the efficiency of the tower assembly installation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of wind turbine installation, and specifically provides an assembly tool and an assembly method for a hybrid tower. Background Art

[0002] Wind energy is a clean renewable energy source. Wind power generation is the main form of wind energy utilization. It is also one of the most mature technologies, with the most scale development conditions and commercial development prospects among renewable energy sources except hydropower. Large-capacity and high-reliability wind turbines have always been the research and development direction of wind power equipment manufacturers. The tower is one of the key components of the wind turbine generator set, which is used to support other parts of the wind turbine. As the tower increases, the rigidity of the traditional steel tower is low, and the steel tower is prone to resonance and damage. At present, a new type of steel-concrete hybrid tower structure system has been deeply studied and widely used. The lower part of the tower structure system adopts a concrete tower and the upper part adopts a steel tower. The ratio of the height of the steel tower to the concrete tower is determined by its frequency and economy. The tower structure system can effectively improve the rigidity of the entire tower and ensure that the entire tower avoids resonance.

[0003] In the prior art, concrete tower sections are generally prefabricated in sections and pieces, and are transported in pieces when leaving the factory. After the truck transports the tower pieces to the designated location, it is necessary to use a crane to move them from the truck to the designated placement point of the tower. When they need to be combined for use later, multiple lifting equipment are used to vertically flip the tower pieces so that the axis of the tower pieces is perpendicular to the ground, and then they are lifted and moved to the machine platform for assembly. However, at present, when the tower segments are transported to the site for unloading and assembly, there are often the following problems: 1. Due to the transportation vehicle or other factors, some tower segments will be placed in a "⌒" shape on the truck. When arriving at the machine position, they need to be flipped 180° to facilitate the unloading, storage and subsequent vertical flipping of the tower segments. The existing technology generally lifts and then uses an external power source to flip the tower segments waiting to be flipped. The flipping is difficult and it also takes a lot of time to position and fix the lifting during lifting; 2. During the vertical flipping process, multiple lifting equipment are required to work together. In the case of limited lifting space, it is often extremely difficult to flip the tower segments vertically. At the same time, the re-lifting during the flipping also requires a lot of time for positioning and fixing the lifting. These problems have greatly affected the installation efficiency of the tower.

[0004] Therefore, a new assembly tool and assembly method of a hybrid tower are urgently needed. Summary of the invention

[0005] The present invention aims to provide an assembly tool and an assembly method for a hybrid tower, which is suitable for lifting tower segments placed in various ways, can reduce the steps when hoisting the tower, improve the efficiency of tower assembly and reduce the cost of equipment use.

[0006] The technical solution of the present invention is as follows:

[0007] An assembly tool for a hybrid tower includes a lifting sling, which includes a lifting part, which is provided with a fixed head, a lifting interface is arranged above the fixed head, and a lifting component extends from below the fixed head for lifting tower segments; a positioning part, which is provided with a connecting component, the connecting component is fixedly connected to the lifting part, and the connecting component is used to connect the tower segments.

[0008] Among them, the lifting assembly includes support columns arranged above and below the fixed head, the support columns are used to place the tower segment, the support columns are arranged at one end of the connecting column A and the connecting column B, the other ends of the connecting column A and the connecting column B are arranged on the fixed head, and there is an angle between the connecting column A and the connecting column B; it also includes a connecting column C arranged on the fixed head, when the tower segment is lifted, the connecting column is located on one side of the tower segment, and the connecting column A and the connecting column B are located on the other side of the tower segment.

[0009] In this solution, the support column is used to place and support the horizontal tower segment. Regardless of whether the tower segment is placed in a "⌒" shape or a "U" shape, the support column can be set at the bottom of the tower segment. The two support columns can well adapt to tower segments of different curvatures. When the support columns are symmetrically arranged at both ends of the tower segment, the tower segment can be lifted by lifting the lifting slings at both ends at the same time. At the same time, in order to ensure that the tower segment does not shake or deviate when it is lifted by the lifting sling, the tower segment can be positioned by connecting the flange or embedded connection buckle of the tower segment through the connection component.

[0010] Preferably, the connecting column A and the connecting column B are rotatably arranged on the fixed head, the rotation planes of the connecting column A and the connecting column B are parallel, locking cams are fixedly arranged on the rotating shafts of the connecting column A and the connecting column B, and a brake assembly is arranged on the locking cam.

[0011] In this solution, the angle between connecting column A and connecting column B can be adjusted, and the distance between the supporting columns on connecting column A and connecting column B can be expanded or reduced, so as to adapt to tower segments of different sizes and curvatures. The braking assembly can effectively lock the rotation of connecting column A and connecting column B, and also provide a certain friction force for the rotation of connecting column A and connecting column B, making the adjustment between connecting columns smoother and more convenient.

[0012] Preferably, the connecting column C is parallel to the bisector of the angle formed by the connecting column A and the connecting column B, and the supporting column is provided on the connecting column C. When the tower segment is placed on the lifting assembly, the supporting columns on the connecting column A and the connecting column B abut one side of the tower segment, and the supporting column on the connecting column C abuts the other side of the tower segment.

[0013] In this scheme, when hoisting the "U"-shaped tower segment, when the supporting columns on connecting column A and connecting column B support the bottom of the tower segment, when receiving the lifting force, the two connecting columns can automatically expand the angle according to the size and curvature of the tower segment, and at the same time shorten the distance between the supporting columns on connecting column C and the supporting columns on connecting column A and connecting column B in the vertical projection direction, so that the tower segment is clamped by the supporting columns, further ensuring the stability of the tower segment when it is lifted.

[0014] Preferably, the support column is rotatably arranged on the connecting column A and the connecting column B to facilitate rotation on the connecting column A and the connecting column B.

[0015] Preferably, the connecting column C is a hydraulic push rod, and a plurality of the supporting columns are arranged on the connecting column C.

[0016] In this scheme, for the tower segments placed in the shape of "⌒", it is impossible to rely on the direct force of the connecting columns to automatically adjust the clamping, so the connecting column C actively extends to abut and clamp the tower segments to ensure the stability of the lifting. At the same time, multiple supporting columns are arranged on the connecting column C to better contact and fit the tower segments.

[0017] Preferably, a pressure sensor is provided between the connecting column C and the fixed head, and the pressure sensor is electrically connected to the brake assembly. When the pressure on the connecting column C reaches a certain value, the brake assembly locks the locking cam to prevent the connecting column A and the connecting column B from rotating.

[0018] In this scheme, when the "U"-shaped tower is hoisted, since the connecting column A and the connecting column B will rotate away from each other, the connecting column C will drop relatively in the vertical direction. When the connecting column A and the connecting column B are separated to a certain extent, the connecting column C is forced to abut the inner side of the tower segment, and the pressure sensor generates a reading. When the reading exceeds the set value, the support columns on the surface of the connecting column have completely abutted and clamped the tower segment. At this time, an electrical signal is automatically generated to cause the brake assembly to lock the locking cam, thereby positioning the positions of the connecting columns A, B and C.

[0019] Preferably, the connecting component includes a positioning plate, a fixing position is provided on the positioning plate, a fixing plate is provided at the fixing position, a first through hole is provided on the fixing plate, a first connecting member is passed through the first through hole, a second slot hole is provided on the fixing plate, a second connecting member is provided in the second slot hole, the first connecting member and the second connecting member pass through the positioning plate, and the positioning part is connected to the tower segment through the first connecting member and the second connecting member.

[0020] In this solution, the fixing plate is non-fixedly connected to the positioning plate. The fixing plate is on one side of the positioning plate and is connected to the tower segment on the other side of the positioning plate. After being connected to the tower segment through the first connecting piece, the position of the fixing plate is adjusted on the fixed position, and the second connecting piece is connected to another position of the tower segment through the second slot. This arrangement can adapt to tower segments of different specifications. At the same time, compared with the existing method that requires multiple connections, this solution only needs to connect a small number of connecting pieces, greatly reducing labor intensity.

[0021] Preferably, the positioning plate is fixedly connected to the lifting part through a support plate, a flip axis column is fixedly provided on the support plate, and limiting protrusions are provided on both sides of the support plate to limit the minimum value of the angle formed by the connecting column A and the connecting column B.

[0022] In this solution, the support plate improves the strength of the positioning plate. At the same time, when the tower segments placed in a "⌒" shape are hoisted, the limiting protrusions can abut against the connecting columns A and B on both sides to prevent the force angle between the connecting columns A and B from becoming 0°, thereby ensuring the stability of the tower segments placed thereon. At the same time, the flip axis column can also be used for the subsequent vertical flipping of the tower segments.

[0023] Preferably, there is also a turning platform arranged on the ground, the turning platform includes a turning column snap-in and a supporting portion, when the tower segment performs a vertical turning action, the turning shaft column is snap-connected in the turning column snap-in, and the supporting portion is used to support the support plate after turning.

[0024] In this solution, the flip table is fixed on the ground. By connecting the lifting sling at one end of the tower segment, it can be used as a rotating fulcrum for flipping, thereby ensuring that one lifting equipment can complete the vertical flipping of the tower segment.

[0025] A method for assembling a hybrid tower, based on the assembly tool for a hybrid tower, comprises the following steps:

[0026] S1. Installation of tooling: The two lifting slings are relatively arranged at the ends of the tower segment to be lifted in the axial direction, ensuring that the tower segment is located between the supporting columns of the connecting column A, the connecting column B and the connecting column C in the thickness direction, and the lifting equipment connects the lifting interfaces of the two lifting slings.

[0027] S2. Lock the tooling, and the hoisting equipment slightly lifts the two lifting slings to make the lifting slings bear force, so that the connecting column A, the connecting column B and the connecting column C are brought close to each other to clamp the tower segment, and then the brake assembly locks the locking cam, and the positioning plate is connected to the tower segment through the first connecting piece and the second connecting piece.

[0028] S3. Lifting and hoisting: the hoisting equipment provides lifting force to the lifting equipment and lifts the tower segments.

[0029] S4. Rotate vertically and move the tower segment horizontally so that the lifting sling at one end of the tower segment is close to the flipping platform and the flipping shaft column is moved into the flipping column snap-in, the connection between the lifting sling and the lifting equipment at the flipping column snap-in is released, and the connection here is moved to the interface at the other end of the tower segment. The lifting equipment applies force to make the tower segment rotate vertically around the flipping column snap-in.

[0030] S5. Segment assembly: further lift the vertical tower segment to remove the lifting device at the lower end, then lift the tower segment to the assembly platform for assembly. After the assembly is completed, remove the lifting device at the upper end.

[0031] Beneficial effects of the present invention:

[0032] 1. The present invention uses a lifting hanger to install tower segments, and its support column structure can be applicable to various placement forms of tower segments. During the unloading, placement and assembly installation of the tower segments, there is no need to perform a 180° flipping step. At the same time, during the lifting process, the installation and positioning of the lifting hanger is also simpler and faster, which effectively improves the efficiency of the tower assembly installation.

[0033] 2. The present invention provides a flipping platform and uses it as a rotation fulcrum for flipping, thereby ensuring that one hoisting device can complete the vertical flipping of the tower segments, reducing the equipment use cost and work space usage. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the technical solution of the present invention, the drawings required for describing the embodiments are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0035] Figure 1 It is a three-dimensional schematic diagram of the lifting sling of the present invention;

[0036] Figure 2 It is a three-dimensional schematic diagram of the lifting device of the present invention from another direction;

[0037] Figure 3 It is a three-dimensional schematic diagram of the lifting assembly of the present invention;

[0038] Figure 4 is a three-dimensional schematic diagram of a connection assembly of the present invention;

[0039] Figure 5 It is a three-dimensional schematic diagram of the connection assembly of the present invention from another direction;

[0040] Figure 6 It is a schematic diagram of the cooperation between the turning platform and the lifting sling of the present invention;

[0041] Figure 7 is a schematic diagram of Embodiment 1 of the present invention;

[0042] Figure 8 It is a schematic diagram of the second embodiment of the present invention;

[0043] Fig. 9 Flow chart of the method of the present invention.

[0044] In the above drawings, the corresponding reference numerals are as follows:

[0045] 1-lifting sling, 11-fixed head, 12-lifting interface, 13-lifting assembly, 131-connecting column A, 132-connecting column B, 133-locking cam, 134-brake assembly, 135-connecting column C, 136-support column, 137-pressure sensor, 14-connecting assembly, 141-positioning plate, 142-fixing position, 143-fixing plate, 144-first through hole, 145-first connecting piece, 146-second slot, 147-second connecting piece, 15-support plate, 151-flipping shaft column, 152-limiting convex part, 153-second lifting interface, 2-flipping table, 21-flipping column bayonet, 22-support part, 3-tower segment. DETAILED DESCRIPTION

[0046] In conjunction with the accompanying drawings, the technical solution of the present invention is clearly and completely described through the specific implementation methods of the embodiments of the present invention.

[0047] The tower in the prior art is usually in a cylindrical form. For the convenience of transportation, the cylindrical tower needs to be cut into multiple tower sections in its axial direction, and each tower section is cut into multiple tower segments 3 along its circumference. The tower segment 3 is usually an arc-shaped sheet structure. The tower segment 3 has flange structures formed at both ends of its axial direction, and each flange structure is correspondingly provided with a connecting hole. The present invention provides an assembly tool for a hybrid tower, which is suitable for lifting tower segments 3 placed in various ways, can reduce the steps of the tower when hoisting, improve the efficiency of the tower assembly and reduce the cost of equipment use.

[0048] like Figure 1The assembly tool of a hybrid tower shown in the figure can lift and transfer the tower segment 3, including a lifting sling 1, the lifting sling 1 including a lifting part, a fixed head 11 is provided in the lifting part, a lifting interface 12 is provided above the fixed head 11, and a lifting component 13 extends from the bottom of the fixed head 11 for lifting the tower segment 3; a positioning part, provided with a connecting component 14, the connecting component 14 is fixedly connected to the lifting part, and the connecting component 14 is used to connect the tower segment 3; wherein, the lifting component 13 includes support columns 136 arranged above and below the fixed head 11, the support columns 136 are used to place the tower segment 3, the support columns 136 are arranged at one end of the connecting column A131 and the connecting column B132, and the other ends of the connecting column A131 and the connecting column B132 are arranged on the fixed head 11, and there is an angle between the connecting column A131 and the connecting column B132.

[0049] Specifically, the support column 136 is used to place and support the horizontal tower segment 3. Regardless of whether the tower segment 3 is placed in a "⌒" shape or a "U" shape, the support column 136 can be set at the bottom of the tower segment 3. At the same time, the support column 136 of the connecting column A131 and the connecting column B132 is kept on the same horizontal plane as much as possible, thereby ensuring the stability of the placed tower segment 3; the two support columns 136 can well adapt to the tower segments 3 of different curvatures, and when the support columns 136 are symmetrically arranged at both ends of the tower segment 3, the tower segment 3 can be lifted by lifting the lifting slings 1 at both ends at the same time. At the same time, in order to ensure that the tower segment 3 will not shake or deviate when it is lifted by the lifting sling 1, the connection assembly 14 can be used to connect the corresponding connection holes on the flange structure of the tower segment 3. It should be noted that only a few flange connection holes need to be connected to ensure the positioning of the three tower segments, which can greatly reduce the installation and positioning time compared with the existing slings.

[0050] The following embodiments of the present invention provide a lifting sling 1 that can be used to lift, transport, and unload tower segments 3 placed in different ways, optimize the positioning and installation method of the sling, make the installation and positioning simpler and faster, and effectively improve the efficiency of tower assembly installation.

[0051] Embodiment 1:

[0052] Further Figures 1 to 7 As shown, for the lifting of the "U"-shaped tower, the connecting column A131 and the connecting column B132 are rotatably arranged on the fixed head 11, and the rotation planes of the connecting column A131 and the connecting column B132 are parallel. A locking boss 133 is fixedly arranged on the rotating shaft of the connecting column A131 and the connecting column B132, and a brake assembly 134 is arranged on the locking boss 133.

[0053] Specifically, the angle between the connecting column A131 and the connecting column B132 can be adjusted, and the distance between the supporting columns 136 on the connecting column A131 and the connecting column B132 can be expanded or reduced, so as to adapt to tower segments 3 of different sizes and curvatures. The braking assembly 134 can effectively lock the rotation of the connecting column A131 and the connecting column B132, and also provide a certain friction force for the rotation of the connecting column A131 and the connecting column B132, so that the adjustment between the connecting columns is smoother and more convenient.

[0054] Furthermore, the clamping assembly also includes a connecting column C135, which is parallel to the bisector of the angle between the connecting column A131 and the connecting column B132. The supporting column 136 is arranged on the connecting column C135. When the tower segment 3 is placed on the lifting assembly 13, the supporting columns 136 on the connecting columns A131 and the connecting columns B132 abut against one side of the tower segment 3, and the supporting column 136 on the connecting column C135 abuts against the other side of the tower segment 3.

[0055] Specifically, when hoisting the "U"-shaped tower segment 3, when the support columns 136 on the connecting columns A131 and B132 support the bottom of the tower segment 3, when receiving the lifting force, the two connecting columns can automatically expand the angle according to the size and curvature of the tower segment 3, and at the same time shorten the distance between the support columns 136 on the connecting columns C135 and the support columns 136 on the connecting columns A131 and B132 in the vertical projection direction, so that the tower segment 3 is clamped by the support columns 136, further ensuring the stability of the tower segment 3 when it is lifted.

[0056] Furthermore, the support column 136 is rotatably disposed on the connecting column A131 and the connecting column B132 to facilitate rotation on the connecting column A131 and the connecting column B132.

[0057] Furthermore, a pressure sensor 137 is provided between the connecting column C135 and the fixed head 11, and the pressure sensor 137 is electrically connected to the brake assembly 134. When the pressure on the connecting column C135 reaches a certain value, the brake assembly 134 locks the locking flange 133 to prevent the connecting column A131 and the connecting column B132 from rotating.

[0058] In this scheme, when the "U"-shaped tower is hoisted, since the connecting column A131 and the connecting column B132 will rotate away from each other, the connecting column C135 will drop relatively in the vertical direction. When the connecting column A131 and the connecting column B132 are separated to a certain extent, the connecting column C is forced to abut against the inner side of the tower segment 3, and the pressure sensor 137 generates a reading. To avoid accidental touch, it should be set that when the reading exceeds a certain value (generally set to 50N~100N), it indicates that the support columns 136 on the connecting columns have completely abutted and clamped the tower segment 3. At this time, an electrical signal is automatically generated to cause the brake assembly 134 to lock the locking flange 133, thereby positioning the positions of the connecting columns A131, the connecting columns B132 and the connecting columns C135.

[0059] At the same time, in this embodiment, Figure 4 and Figure 5 As shown, the positioning plate 141 is fixedly arranged between the connecting column C135 and the connecting column A131 and the connecting column B132 through the supporting plate 15, the connecting component 14 includes a positioning plate 141, a fixing position 142 is arranged on the positioning plate 141, a fixing plate 143 is arranged at the fixing position 142, a first through hole 144 is arranged on the fixing plate 143, a first connecting member 145 is passed through the first through hole 144, a second slot 146 is arranged on the fixing plate 143, a second connecting member 147 is arranged in the second slot 146, the first connecting member 145 and the second connecting member 147 pass through the positioning plate 141, and the positioning portion is connected to the tower segment 3 through the first connecting member 145 and the second connecting member 147.

[0060] Specifically, multiple fixing positions 142 can be set on the positioning plate 141, and the fixing plate 143 is non-fixedly connected to the positioning plate 141. The fixing plate 143 is on one side of the positioning plate 141 and connected to the tower segment 3 on the other side of the positioning plate 141. After the first connecting member 145 is connected to a flange connection hole behind the tower segment 3, the position of the fixing plate 143 on the fixing position 142 is adjusted, and the second connecting member 147 is connected to another flange connection hole of the tower segment 3 through the second slot 146. This arrangement can adapt to tower segments 3 of different specifications. At the same time, compared with the existing method that requires multiple complete connections, this solution only needs to connect a small number of connecting members, greatly reducing labor intensity.

[0061] Embodiment 2:

[0062] On the basis of the first embodiment, by adding some structures and changing the implementation method of some structures, the hoisting of the tower segments 3 placed in a “⌒” shape can be realized, such as Figure 8As shown, the connecting column C135 is a hydraulic push rod, and a plurality of supporting columns 136 are arranged on the connecting column C135. For the tower segment 3 placed in a "⌒" shape, it is impossible to automatically adjust the clamping by directly receiving force from each connecting column, so the connecting column C135 actively extends to abut against and clamp the tower segment 3 to ensure the stability of the hoisting. At the same time, a plurality of supporting columns 136 are arranged on the connecting column C135, which can better contact and fit the tower segment 3. This arrangement can also be applied to the first embodiment.

[0063] It should be noted that before hoisting the tower segment 3 placed in the shape of "⌒", the angle between the connecting column A131 and the connecting column B132 is adjusted in advance, and the brake assembly 134 is locked to the locking convex plate 133; or the connecting column A131 and the connecting column B132 are adjusted so that the two sides of the limiting convex part 152 abut against the connecting column A131 and the connecting column B132, so that there is a minimum angle, and at the same time, the connecting column can also bear a part of the force. After the connecting column A131 and the connecting column B132 are placed, the length of the connecting column C135 is increased so that the supporting column 136 on the connecting column C135 abuts against the tower segment 3.

[0064] In this solution, the support plate 15 improves the strength of the positioning plate 141. At the same time, when the tower segment 3 placed in a "⌒" shape is hoisted, the limiting protrusion 152 can abut against the connecting column A131 and the connecting column B132 on both sides to prevent the force angle between the connecting column A131 and the connecting column B132 from becoming 0°, thereby ensuring the stability of the tower segment 3 placed thereon. At the same time, the flip axis column 151 can also be used for the subsequent vertical flipping of the tower segment 3.

[0065] The following embodiments of the present invention provide a lifting sling 1 and a turning table 2 that can be used to perform vertical turning operations on the tower segments 3 hoisted by the above embodiments. Using this tooling only requires one lifting device to perform the turning work, while reducing the turning difficulty and improving the turning efficiency.

[0066] Embodiment three:

[0067] Based on the above embodiments, Figure 6 As shown, a flip shaft column 151 is provided on the lifting sling 1, and is preferably fixedly arranged on the support plate 15. At the same time, a flip platform 2 is also provided on the ground, and the flip platform 2 includes a flip column snap-in 21 and a support portion 22. When the tower segment 3 performs a vertical flipping action, the flip shaft column 151 is snapped into the flip column snap-in 21, and the support portion 22 is used to support the support plate 15 after flipping.

[0068] Specifically, the turning platform 2 is fixed on the ground. After the tower segment 3 is lifted horizontally, the end that is placed vertically and in the lower position is used as the head, and it is moved horizontally toward the turning platform 2, so that the turning shaft column 151 in this section of the lifting sling 1 is engaged with the turning column snap-in 21 on the turning platform 2. At this time, the lifting height of the tower segment 3 can be slightly lowered, so that the turning platform 2 is supported by the lifting sling 1. At this time, the connection between the lifting sling 1 placed on the turning platform 2 and the lifting equipment and the connection with the positioning part are cancelled, and the cancelled connection can be selected to be set on the flange connection hole at the other end or the second lifting interface 153 of the lifting sling 1 at the other end. Then the lifting device is lifted again, and the shaft column engaged in the turning column snap-in 21 is used as the rotating fulcrum for the turning, thereby ensuring that one lifting equipment can complete the vertical turning of the tower segment 3.

[0069] It should be noted that the second lifting interface 153 is arranged on the lifting sling 1, close to the center position of the fixed plate 143, so that when the lifting sling 1 lifts the vertical tower segment 3, the force point of the second lifting interface 153 is as close as possible to the vertical extension line of the center of gravity of the tower segment 3, thereby ensuring the upright posture and stability of the vertically lifted tower segment 3. In this embodiment, the human lifting interface 12 is arranged on the flip shaft column 151, and can also be arranged at different positions according to the actual production situation.

[0070] Embodiment 4:

[0071] A method for assembling a hybrid tower, such as Fig. 9 As shown in the flowchart, based on all the above embodiments, the process includes the steps of:

[0072] S1. Installation of tooling: The two lifting slings 1 are relatively arranged at the ends of the tower segment 3 to be lifted in the axial direction, ensuring that the tower segment 3 is located between the connecting column A131, the connecting column B132 and the supporting column 136 of the connecting column C135 in the thickness direction. The lifting equipment connects the lifting interfaces 12 of the two lifting slings 1.

[0073] S2. Lock the tooling, and the hoisting equipment slightly lifts the two lifting slings 1 to make the lifting slings 1 bear force, so that the connecting column A131, the connecting column B132 and the connecting column C135 are brought close to each other to clamp the tower segment 3, and then the brake assembly 134 locks the locking flange 133, and the positioning plate 141 is connected to the tower segment 3 through the first connecting member 145 and the second connecting member 147.

[0074] In this step, the tower segment 3 placed in a "U" shape does not require external force to make the connecting column A131, the connecting column B132 and the connecting column C135 close to each other, while the tower segment 3 placed in a "⌒" shape needs to stretch the connecting column C135 to actively abut the tower segment 3.

[0075] S3. Lifting and hoisting: the hoisting equipment provides lifting force to the lifting device 1 and lifts the tower segment 3.

[0076] S4. Rotate vertically and move the tower segment 3 horizontally, so that the lifting sling 1 at one end of the tower segment 3 is close to the flip platform 2 and the flip shaft column 151 is moved to the flip column snap-in 21, and the connection between the lifting sling 1 and the lifting equipment at the flip column snap-in 21 is released, and the connection here is moved to the lifting end of the tower segment 3, and the lifting equipment applies force to make the tower segment 3 rotate vertically around the flip column snap-in 21.

[0077] In this step, after the lifting sling 1 is placed on the turning table 2, the lifting height of the tower segment 3 is slightly lowered so that the turning table 2 is supported by the lifting sling 1. At this time, the connection between the lifting sling 1 placed on the turning table 2 and the lifting equipment and the connection between the positioning part and the tower segment 3 are cancelled, and the connection between the lifting sling 1 and the lifting equipment that has been cancelled can be connected to the second lifting interface 153 of the rope sling at the other end or the flange interface of the tower segment 3.

[0078] S5. Segment assembly: further lift the vertical tower segment 3, so that the lifting sling 1 at the lower end falls off, lift the tower segment 3 to the assembly platform for assembly, and after the assembly is completed, detach the lifting sling 1 at the upper end.

[0079] By using this method to lift and install the tower segment 3, the installation and positioning are simple and quick, and there is no need to specially flip the tower segment 3 180 degrees, which greatly improves the efficiency of tower installation. At the same time, it does not require multiple lifting equipment, which better saves land and equipment costs.

[0080] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. An assembly tool for a hybrid tower, characterized in that: It comprises a lifting sling (1), wherein the lifting sling (1) comprises The hoisting part is provided with a fixed head (11), a hoisting interface (12) is provided above the fixed head (11), and a lifting assembly (13) extends from below the fixed head (11) and is used to lift the tower segment (3); The positioning part is provided with a connecting assembly (14), the connecting assembly (14) is fixedly connected to the hoisting part, and the connecting assembly (14) is used to connect the tower segment (3); The lifting assembly (13) comprises a support column (136) arranged on the fixed head (11), the support column (136) being used to place the tower segment (3), the support column (136) being arranged at one end of a connecting column A (131) and a connecting column B (132), the other ends of the connecting column A (131) and the connecting column B (132) being arranged on the fixed head (11), and an angle being formed between the connecting column A (131) and the connecting column B (132); and further comprising a connecting column C (135) arranged on the fixed head (11), which is used to support the tower segment (3) when the tower segment (3) is lifted. The connecting column C (135) is located on one side of the tower segment (3), and the supporting column (136) on the connecting column A (131) and the connecting column B (132) is located on the other side of the tower segment (3); the connecting column A (131) and the connecting column B (132) are rotatably arranged on the fixed head (11), the rotation planes of the connecting column A (131) and the connecting column B (132) are parallel, locking cams (133) are fixedly arranged on the rotation shafts of the connecting column A (131) and the connecting column B (132), and a brake assembly (134) is arranged on the locking cam (133); The connecting column C (135) is parallel to the bisector of the angle formed by the connecting column A (131) and the connecting column B (132); the supporting column (136) is arranged on the connecting column C (135); when the tower segment (3) is placed on the lifting assembly (13), the supporting columns (136) on the connecting column A (131) and the connecting column B (132) abut against one side of the tower segment (3), and the supporting column (136) on the connecting column C (135) abuts against the other side of the tower segment (3); A pressure sensor (137) is provided between the connecting column C (135) and the fixed head (11), and the pressure sensor (137) is electrically connected to the brake assembly (134). When the pressure on the connecting column C (135) reaches a certain value, the brake assembly (134) locks the locking cam (133) to prevent the connecting column A (131) and the connecting column B (132) from rotating. The connection assembly (14) comprises a positioning plate (141), a fixing position (142) is provided on the positioning plate (141), a fixing plate (143) is provided at the fixing position (142), a first through hole (144) is provided on the fixing plate (143), a first connecting member (145) is passed through the first through hole (144), a second slot hole (146) is provided on the fixing plate (143), a second connecting member (147) is provided in the second slot hole (146), the first connecting member (145) and the second connecting member (147) pass through the positioning plate (141), and the positioning portion is connected to the tower segment (3) via the first connecting member (145) and the second connecting member (147); The positioning plate (141) is fixedly connected to the hoisting portion via a support plate (15); a flip shaft column (151) is fixedly arranged on the support plate (15); and limiting protrusions (152) are arranged on both sides of the support plate (15) for limiting the minimum value of the angle formed by the connecting column A (131) and the connecting column B (132); It also includes a turning platform (2) arranged on the ground, the turning platform (2) comprising a turning column snap-in (21) and a support portion (22), when the tower segment (3) performs a vertical turning action, the turning shaft column (151) is snap-fitted into the turning column snap-in (21), and the support portion (22) is used to support the support plate (15) after turning.

2. The assembly tool for a hybrid tower according to claim 1, characterized in that: The support column (136) is rotatably disposed on the connecting column A (131) and the connecting column B (132).

3. The assembly tool for a hybrid tower according to claim 2, characterized in that: The connecting column C (135) is a hydraulic push rod, and a plurality of supporting columns (136) are arranged on the connecting column C (135).

4. A method for assembling a hybrid tower, based on the assembly tool for a hybrid tower according to claim 3, characterized in that: Included steps S1. Installation of tooling, wherein the two lifting slings (1) are relatively arranged at the ends of the tower segment (3) to be lifted in the axial direction, ensuring that the tower segment (3) is located between the support columns (136) of the connecting column A (131), the connecting column B (132) and the connecting column C (135) in the thickness direction, and the lifting equipment is connected to the lifting interfaces (12) of the two lifting slings (1); S2. The locking tooling is used, and the lifting equipment slightly lifts the two lifting slings (1) so that the lifting slings (1) are subjected to force, and the connecting column A (131), the connecting column B (132) and the connecting column C (135) are brought close to each other to clamp the tower segment (3), and then the brake assembly (134) locks the locking convex plate (133), and the positioning plate (141) is connected to the tower segment (3) through the first connecting member (145) and the second connecting member (147); S3. Lifting and hoisting, the hoisting equipment provides lifting force to the lifting device (1) and lifts the tower segment (3); S4. Rotate vertically and move the tower segment (3) horizontally, so that the lifting device (1) at one end of the tower segment (3) is close to the flip platform (2) and the flip shaft column (151) is moved into the flip column snap-in (21), the connection between the lifting device (1) and the lifting equipment that is snap-in at the flip column snap-in (21) is released, the connection between the positioning part and the tower segment (3) is released, and the connection of the lifting equipment after the release is moved to the other end of the tower segment (3), and the lifting equipment applies force to make the tower segment (3) rotate vertically around the flip column snap-in (21); S5. Segment assembly, further lifting the vertical tower segment (3) so that the lifting sling (1) at the lower end falls off, then lifting the tower segment (3) to the assembly platform for assembly, and after the assembly is completed, removing the lifting sling (1) at the upper end of the tower segment (3).

Citation Information

Cited By

  • Assembling tool and assembling method for wind turbine generator tower drum

    CN122106827A

  • Assembly fixture and assembly method for wind turbine tower

    CN122106827B