A method and system for quickly building an application based on industry templates

By analyzing requirements, building and optimizing applications based on industry templates, the problems of long application development cycle and low efficiency in industry template utilization are solved, and efficient and accurate applications are quickly built.

CN118394333BActive Publication Date: 2024-11-19HUANENG INFORMATION TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410852773.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-28
Publication Date
2024-11-19
Estimated Expiration
2044-06-28

AI Technical Summary

Technical Problem

The application development cycle is long and cannot quickly meet market demand. The industry templates are not effectively utilized, resulting in low application construction efficiency and accuracy.

Method used

By analyzing the requirements of programs, obtaining industry template requirements, building applications based on industry template databases, optimizing the relationship between work modules and modules, generating evaluation reports and optimizing, and finally generating efficient and accurate applications.

Benefits of technology

Improve the efficiency and accuracy of rapid construction of applications based on industry templates, shorten the development cycle, and meet market demand.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118394333B_ABST
    Figure CN118394333B_ABST
Patent Text Reader

Abstract

The present invention provides a method and system for rapidly constructing an application based on an industry template, and relates to the field of application construction. The method comprises: obtaining corresponding industry template requirements based on program construction requirements; constructing a first application based on the industry template requirements and an industry template database; optimizing the first application based on all working modules and a module association-exclusion relationship comparison table in the first application to obtain a second application; evaluating the second application based on the program construction requirements to obtain an evaluation report; optimizing the second application based on the working modules to be optimized in the evaluation report to obtain a final application. The efficiency of rapidly constructing applications based on industry templates is improved, and the accuracy of rapidly constructing applications based on industry templates is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of application program construction, and in particular to a method and system for quickly constructing an application program based on an industry template. Background Art

[0002] At present, with the development of science and technology, various applications have become indispensable necessities for people and facilitate their lives.

[0003] However, the application development cycle is long, the development speed cannot keep up with people's needs, and the industry templates of various industries cannot be used well.

[0004] Therefore, the present invention provides a method and system for quickly constructing an application based on an industry template. Summary of the invention

[0005] The present invention provides a method and system for rapidly constructing applications based on industry templates, which are used to obtain corresponding industry template requirements by analyzing program construction requirements, construct a first application based on the industry template requirements and an industry template database, analyze all working modules in the first application and a module association-exclusion relationship comparison table, optimize the first application to obtain a second application, and also evaluate the second application by analyzing the program construction requirements to obtain an evaluation report, analyze the working modules to be optimized in the evaluation report, optimize the second application to obtain a final application, thereby improving the efficiency of rapidly constructing applications based on industry templates and improving the accuracy of rapidly constructing applications based on industry templates.

[0006] The present invention provides a method for quickly constructing an application based on an industry template, comprising:

[0007] Step 1: Based on the program construction requirements, obtain the corresponding industry template requirements;

[0008] Step 2: constructing a first application based on the industry template requirement and the industry template database;

[0009] Step 3: Based on all working modules in the first application and the module association-exclusion relationship comparison table, the first application is optimized to obtain a second application;

[0010] Step 4: Based on the program construction requirements, the second application program is evaluated to obtain an evaluation report;

[0011] Step 5: Based on the working modules to be optimized in the evaluation report, optimize the second application to obtain a final application.

[0012] Preferably, the present invention provides a method for quickly building an application based on an industry template, and based on the program building requirements, obtains the corresponding industry template requirements, including:

[0013] Parse program construction requirements to obtain corresponding content requirements;

[0014] Based on the content categories corresponding to the content requirements, obtaining a first industry to which each content category belongs;

[0015] Based on the first industry and the corresponding content requirements, corresponding industry template requirements are obtained.

[0016] Preferably, the present invention provides a method for quickly constructing an application based on an industry template, and the process of constructing a first application based on the industry template requirements and the industry template database includes:

[0017] Based on the proportion of content requirements corresponding to all industry template requirements, the second industry with the largest content proportion is obtained;

[0018] Get the third industry that is finally output based on all industry template requirements;

[0019] If the third industry is the same as the second industry, the industry template corresponding to the second industry in the industry template database is used as the structural template.

[0020] Preferably, the present invention provides a method for quickly constructing an application based on an industry template, and based on the industry template requirements and the industry template database, a first application is constructed, comprising:

[0021] Based on all industry template requirements and the industry template database, obtain the corresponding first industry template;

[0022] Obtaining a corresponding first template structure based on the structural template;

[0023] Based on the positional relationship between all industry templates and the first template structure, all first industry templates are placed to obtain a first application.

[0024] Preferably, the present invention provides a method for quickly building an application based on an industry template, which optimizes the first application based on all working modules in the first application and a module association-exclusion relationship comparison table to obtain a second application, including:

[0025] Based on all working modules in the first application, construct a first tree structure;

[0026] Obtaining a first working sequence of each workflow in the first tree structure under actual operation corresponding to the first tree structure;

[0027] Based on the standard working sequence of each workflow under the predefined standard operation, the standard functions that each working module in the standard working sequence needs to implement are obtained;

[0028] Determine a first function of each first working module of the first working sequence;

[0029] If the standard working sequence of the same working process and the standard function of the working module at the same position in the first working sequence are inconsistent with the first function, then obtaining the fourth industry corresponding to the first function;

[0030] Based on the standard functions corresponding to the fourth industry and the industry template database, a corresponding second working module is obtained;

[0031] All second working modules corresponding to each first working sequence replace the first working modules at the same position to obtain a second working sequence;

[0032] Based on every two adjacent third working modules in the second working sequence and the module association-exclusion relationship comparison table, a corresponding connection relationship is obtained;

[0033] Based on all the connection relationships of the second working sequences, construct a first connection sequence in order;

[0034] Based on the connection relationships in the first connection sequence, a first marking is performed on mutually exclusive connection relationships;

[0035] Based on all the first annotations and the replacement logic in the first connected sequence, a fourth working module to be replaced is obtained;

[0036] Based on the connection relationships in the first connection sequence, a second marking is performed on the connection relationships whose corresponding connection degrees are less than a preset connection degree;

[0037] Matching corresponding transition procedures based on two adjacent third working modules corresponding to the association relationship of the second annotation;

[0038] Adjust the second working sequence based on all fourth working modules and all transition programs to obtain a third working sequence;

[0039] Based on the entire working sequence, a second application is obtained.

[0040] Preferably, the present invention provides a method for quickly building an application based on an industry template, and based on the program building requirements, the second application is evaluated to obtain an evaluation report, including:

[0041] Matching corresponding functional requirements based on the industry template requirements corresponding to the second application;

[0042] Based on all functional requirements, match the corresponding verification data set;

[0043] Based on the verification data set, construct a corresponding program simulation model;

[0044] Inputting the second application program into the program simulation model to obtain actual parameters for each function implementation;

[0045] Calculating the degree of completion of the second application based on all actual parameters and standard parameters of each function;

[0046] Based on the degree of completion, a corresponding evaluation report is obtained.

[0047] Preferably, the present invention provides a method for quickly constructing an application based on an industry template, and based on all actual parameters and standard parameters that each function should achieve, the degree of completion of the second application is calculated, including:

[0048] ;

[0049] ;in, indicating the degree of completion of the second application; Indicates the number of functions that need to be completed corresponding to the second application; Indicates that the second application implements The actual parameters of the function; Indicates that the second application implements Standard parameters for each function; Indicates the number of functions whose actual parameters implemented by the second application program have a difference between the actual parameters and the standard parameters within a reasonable range; Indicates that the second application implements The calculation coefficient of each function is related to the importance of the function; Indicates that the second application implements The calculation weight of each function; Indicates all The actual parameter corresponding to the maximum difference in ; Indicates all The actual parameter corresponding to the minimum difference in ; Indicates all The standard parameter corresponding to the maximum difference in ; Indicates all The standard parameter corresponding to the minimum difference in ; Represents the completion analysis function.

[0050] The present invention provides an application rapid construction system based on industry templates, comprising:

[0051] Demand analysis module: based on program construction requirements, obtain corresponding industry template requirements;

[0052] A first program construction module: constructs a first application program based on the industry template requirement and the industry template database;

[0053] A second program construction module: based on all working modules in the first application and a module association-exclusion relationship comparison table, the first application is optimized to obtain a second application;

[0054] Evaluation module: based on the program construction requirements, evaluate the second application program to obtain an evaluation report;

[0055] Optimization module: Based on the working module to be optimized in the evaluation report, the second application is optimized to obtain a final application.

[0056] Compared with the prior art, the beneficial effects of the present application are as follows: by analyzing the program construction requirements, the corresponding industry template requirements are obtained, and based on the industry template requirements and the industry template database, a first application is constructed, and all working modules in the first application and the module association-exclusion relationship comparison table are analyzed to optimize the first application to obtain a second application, and by analyzing the program construction requirements, the second application is evaluated to obtain an evaluation report, and the working modules to be optimized in the evaluation report are analyzed to optimize the second application to obtain a final application, thereby improving the efficiency of rapid construction of applications based on industry templates and improving the accuracy of rapid construction of applications based on industry templates.

[0057] Other features and advantages of the present invention will be described in the following description, and partly become apparent from the description, or understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings.

[0058] The technical solution of the present invention is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0060] Figure 1 It is a flowchart of a method for quickly building an application based on an industry template provided by an embodiment of the present invention.

[0061] Figure 2 It is a structural diagram of a system for rapidly building an application based on an industry template provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0062] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0063] Embodiment 1:

[0064] The embodiment of the present invention provides a method for quickly building an application based on an industry template, such as Figure 1 As shown, including:

[0065] Step 1: Based on the program construction requirements, obtain the corresponding industry template requirements;

[0066] Step 2: constructing a first application based on the industry template requirement and the industry template database;

[0067] Step 3: Based on all working modules in the first application and the module association-exclusion relationship comparison table, the first application is optimized to obtain a second application;

[0068] Step 4: Based on the program construction requirements, the second application program is evaluated to obtain an evaluation report;

[0069] Step 5: Based on the working modules to be optimized in the evaluation report, optimize the second application to obtain a final application.

[0070] In this embodiment, the program construction requirement refers to the functional requirement to be achieved by the program to be built.

[0071] In this embodiment, the industry template requirement refers to a template for the functions of the industry involved in all functions required to be implemented, obtained by analyzing the program construction requirements.

[0072] In this embodiment, the industry template database refers to a database including templates of functions of all industries.

[0073] In this embodiment, the first application refers to an application that is initially obtained by constructing industry template requirements and an industry template database.

[0074] In this embodiment, the working module refers to a module in the application program that implements a certain function.

[0075] In this embodiment, the module association-exclusion relationship comparison table refers to a comparison table of associations and exclusion relationships between working modules.

[0076] In this embodiment, the second application refers to an application that is obtained by optimizing the working modules that need to be optimized in the first application.

[0077] In this embodiment, the evaluation report refers to a report obtained by evaluating the second application program according to the program construction requirements, indicating the degree to which the second application program meets the program construction requirements.

[0078] In this embodiment, the working module to be optimized refers to the working module whose function does not meet the program construction requirements in the evaluation report.

[0079] In this embodiment, the final application refers to the final application obtained after optimizing the second application.

[0080] The working principle and beneficial effects of the above technical solution are: by analyzing the program construction requirements, the corresponding industry template requirements are obtained, based on the industry template requirements and the industry template database, a first application is constructed, all working modules in the first application and the module association-exclusion relationship comparison table are analyzed, the first application is optimized to obtain a second application, and the second application is evaluated by analyzing the program construction requirements to obtain an evaluation report, the working modules to be optimized in the evaluation report are analyzed, the second application is optimized to obtain a final application, thereby improving the efficiency of rapid construction of applications based on industry templates and improving the accuracy of rapid construction of applications based on industry templates.

[0081] Embodiment 2:

[0082] According to the method provided in the first embodiment of the invention, based on the program construction requirements, the corresponding industry template requirements are obtained, including:

[0083] Parse program construction requirements to obtain corresponding content requirements;

[0084] Based on the content categories corresponding to the content requirements, obtaining a first industry to which each content category belongs;

[0085] Based on the first industry and the corresponding content requirements, corresponding industry template requirements are obtained.

[0086] In this embodiment, the content requirement refers to the functional content that needs to be completed obtained by analyzing the program construction requirements.

[0087] In this embodiment, the content category refers to the type of functional content that needs to be completed, which is obtained by analyzing the program construction requirements.

[0088] In this embodiment, the first industry refers to the industry to which the content category belongs.

[0089] The working principle and beneficial effect of the above technical solution are: by analyzing the program construction requirements, the corresponding industry template requirements are obtained, which is conducive to the analysis of the program construction requirements.

[0090] Embodiment 3:

[0091] According to the method provided in Embodiment 2 of the invention, the process of constructing the first application based on the industry template requirement and the industry template database includes:

[0092] Based on the proportion of content requirements corresponding to all industry template requirements, the second industry with the largest content proportion is obtained;

[0093] Get the third industry that is finally output based on all industry template requirements;

[0094] If the third industry is the same as the second industry, the industry template corresponding to the second industry in the industry template database is used as the structural template.

[0095] In this embodiment, the content proportion refers to the proportion of corresponding content requirements in all industry template requirements.

[0096] In this embodiment, the second industry refers to the industry corresponding to the content demand with the largest content proportion.

[0097] In this embodiment, the third industry refers to the industry corresponding to the final output content requirement of all industry template requirements.

[0098] In this embodiment, the structural template refers to the framework structure of the industry template corresponding to the second industry in the industry template database when the third industry is the same as the second industry.

[0099] The working principle and beneficial effect of the above technical solution are: by analyzing the content proportion of the corresponding content requirements in all industry template requirements, a structural template is obtained, which is conducive to the initial construction of the application.

[0100] Embodiment 4:

[0101] According to the method provided in the first embodiment of the invention, based on the industry template requirement and the industry template database, a first application is constructed, including:

[0102] Based on all industry template requirements and the industry template database, obtain the corresponding first industry template;

[0103] Obtaining a corresponding first template structure based on the structural template;

[0104] Based on the positional relationship between all industry templates and the first template structure, all first industry templates are placed to obtain a first application.

[0105] In this embodiment, the first industry template refers to the industry template corresponding to the industry template requirement in the industry template database.

[0106] In this embodiment, the first template structure refers to the structure of the structural template.

[0107] The working principle and beneficial effect of the above technical solution are: by analyzing the industry template requirements and the industry template database, a first application is constructed to improve the speed of initial construction of the application.

[0108] Embodiment 5:

[0109] According to the method provided in Embodiment 1 of the invention, based on all working modules in the first application and the module association-exclusion relationship comparison table, the first application is optimized to obtain a second application, including:

[0110] Based on all working modules in the first application, construct a first tree structure;

[0111] Obtaining a first working sequence of each workflow in the first tree structure under actual operation corresponding to the first tree structure;

[0112] Based on the standard working sequence of each workflow under the predefined standard operation, the standard functions that each working module in the standard working sequence needs to implement are obtained;

[0113] Determine a first function of each first working module of the first working sequence;

[0114] If the standard working sequence of the same working process and the standard function of the working module at the same position in the first working sequence are inconsistent with the first function, then obtaining the fourth industry corresponding to the first function;

[0115] Based on the standard functions corresponding to the fourth industry and the industry template database, a corresponding second working module is obtained;

[0116] All second working modules corresponding to each first working sequence replace the first working modules at the same position to obtain a second working sequence;

[0117] Based on every two adjacent third working modules in the second working sequence and the module association-exclusion relationship comparison table, a corresponding connection relationship is obtained;

[0118] Based on all the connection relationships of the second working sequences, construct a first connection sequence in order;

[0119] Based on the connection relationships in the first connection sequence, a first marking is performed on mutually exclusive connection relationships;

[0120] Based on all the first annotations and the replacement logic in the first connected sequence, a fourth working module to be replaced is obtained;

[0121] Based on the connection relationships in the first connection sequence, a second marking is performed on the connection relationships whose corresponding connection degrees are less than a preset connection degree;

[0122] Matching corresponding transition procedures based on two adjacent third working modules corresponding to the association relationship of the second annotation;

[0123] Adjust the second working sequence based on all fourth working modules and all transition programs to obtain a third working sequence;

[0124] Based on the entire working sequence, a second application is obtained.

[0125] In this embodiment, the first tree structure refers to a tree diagram that represents the structure of the functional flow of all working modules in the first application.

[0126] In this embodiment, the workflow refers to the flow of a working module that implements a function.

[0127] In this embodiment, the first working sequence refers to the sequence of working modules actually running in each workflow corresponding to the first tree structure.

[0128] In this embodiment, the standard working sequence refers to a sequence composed of working modules of each working process under a predefined standard.

[0129] In this embodiment, the first working module refers to the working module in the first working sequence.

[0130] In this embodiment, the first function refers to the function implemented by each first working module.

[0131] In this embodiment, the fourth industry refers to the industry to which the first function belongs.

[0132] In this embodiment, the second working module refers to a working module corresponding to the standard function obtained by analyzing the standard functions corresponding to the fourth industry and the industry template database.

[0133] In this embodiment, the second working sequence refers to a sequence obtained by replacing the first working modules at the same position with all the second working modules corresponding to each first working sequence.

[0134] In this embodiment, the third working module refers to a working module in the second working sequence.

[0135] In this embodiment, the connection relationship refers to the connection relationship between every two adjacent third working modules in the second working sequence, including: an association relationship and a corresponding degree of association, and an exclusive relationship.

[0136] In this embodiment, the first connected sequence refers to all the connected relationships of the second working sequence, and the sequence is constructed in order.

[0137] In this embodiment, the replacement logic refers to the logic that negative times negative equals positive in the mutual exclusion of working modules.

[0138] In this embodiment, the fourth working module refers to a working module that needs to be replaced, which is obtained by analyzing all first annotations and replacement logic in the first connected sequence.

[0139] In this embodiment, the preset association degree refers to a preset degree of direct association.

[0140] In this embodiment, the transition program refers to a transition connection program that requires matching between two working modules that are not directly connected to each other.

[0141] In this embodiment, the third working sequence refers to a working sequence obtained by adjusting the second working sequence based on all fourth working modules and all transition programs.

[0142] The working principle and beneficial effect of the above technical solution are: by analyzing all the working modules in the first application and the module association-exclusion relationship comparison table, the working modules that need to be replaced and optimized in the first application are optimized to obtain the second application, thereby improving the efficiency of rapid construction of applications based on industry templates and the accuracy of rapid construction of applications based on industry templates.

[0143] Embodiment 6:

[0144] According to the method provided in Embodiment 1 of the invention, based on the program construction requirements, the second application is evaluated to obtain an evaluation report, including:

[0145] Matching corresponding functional requirements based on the industry template requirements corresponding to the second application;

[0146] Based on all functional requirements, match the corresponding verification data set;

[0147] Based on the verification data set, construct a corresponding program simulation model;

[0148] Inputting the second application program into the program simulation model to obtain actual parameters for each function implementation;

[0149] Calculating the degree of completion of the second application based on all actual parameters and standard parameters of each function;

[0150] Based on the degree of completion, a corresponding evaluation report is obtained.

[0151] In this embodiment, the functional requirements refer to the functions that need to be implemented to realize the industry template requirements.

[0152] In this embodiment, the verification data set refers to a data set that can verify whether the functional requirements are met.

[0153] In this embodiment, the program simulation model refers to a model trained with a verification data set that can simulate the functions implemented by the program.

[0154] In this embodiment, the actual parameters refer to the parameters of each function actually output by running the program obtained by inputting the second application into the program simulation model.

[0155] In this embodiment, the standard parameters refer to the parameters of each functional output that are required to meet the functional requirements.

[0156] In this embodiment, the degree of completion refers to the degree to which the second application actually completes the functions in the program simulation model.

[0157] The working principle and beneficial effects of the above technical solution are: by analyzing the program construction requirements, evaluating the second application, obtaining an evaluation report, and accurately evaluating the second application, which is conducive to optimizing the application.

[0158] Embodiment 7:

[0159] According to the method provided in Embodiment 1 of the invention, the degree of completion of the second application is calculated based on all actual parameters and the standard parameters that each function should achieve, including:

[0160] ;

[0161] ;in, indicating the degree of completion of the second application; Indicates the number of functions that need to be completed corresponding to the second application; Indicates that the second application implements The actual parameters of the function; Indicates that the second application implements Standard parameters for each function; Indicates the number of functions whose actual parameters implemented by the second application program have a difference between the actual parameters and the standard parameters within a reasonable range; Indicates that the second application implements The calculation coefficient of each function is related to the importance of the function; Indicates that the second application implements The calculation weight of each function; Indicates all The actual parameter corresponding to the maximum difference in ; Indicates all The actual parameter corresponding to the minimum difference in ; Indicates all The standard parameter corresponding to the maximum difference in ; Indicates all The standard parameter corresponding to the minimum difference in ; Represents the completion analysis function.

[0162] In this embodiment, the calculation coefficient refers to a preset coefficient, which is related to the importance of the corresponding function.

[0163] In this embodiment, the calculation weight refers to a numerical value indicating the importance of each function set in advance.

[0164] The working principle and beneficial effect of the above technical solution are: by accurately evaluating the second application, it is helpful to optimize the application.

[0165] Embodiment 8:

[0166] A system for rapidly building applications based on industry templates, such as Figure 2 As shown, including:

[0167] Demand analysis module: based on program construction requirements, obtain corresponding industry template requirements;

[0168] A first program construction module: constructs a first application program based on the industry template requirement and the industry template database;

[0169] A second program construction module: based on all working modules in the first application and a module association-exclusion relationship comparison table, the first application is optimized to obtain a second application;

[0170] Evaluation module: based on the program construction requirements, evaluate the second application program to obtain an evaluation report;

[0171] Optimization module: Based on the working module to be optimized in the evaluation report, the second application is optimized to obtain a final application.

[0172] The working principle and beneficial effects of the above technical solution are: by analyzing the program construction requirements, the corresponding industry template requirements are obtained, based on the industry template requirements and the industry template database, a first application is constructed, all working modules in the first application and the module association-exclusion relationship comparison table are analyzed, the first application is optimized to obtain a second application, and the second application is evaluated by analyzing the program construction requirements to obtain an evaluation report, the working modules to be optimized in the evaluation report are analyzed, the second application is optimized to obtain a final application, thereby improving the efficiency of rapid construction of applications based on industry templates and improving the accuracy of rapid construction of applications based on industry templates.

[0173] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for quickly building an application based on an industry template, characterized in that: include: Step 1: Based on the program construction requirements, obtain the corresponding industry template requirements; Step 2: constructing a first application based on the industry template requirement and the industry template database; Step 3: Based on all working modules in the first application and the module association-exclusion relationship comparison table, the first application is optimized to obtain a second application; Step 4: Based on the program construction requirements, the second application program is evaluated to obtain an evaluation report; Step 5: Based on the working modules to be optimized in the evaluation report, the second application is optimized to obtain a final application; Based on all working modules in the first application and the module association-exclusion relationship comparison table, the first application is optimized to obtain a second application, including: Based on all working modules in the first application, construct a first tree structure; Obtaining a first working sequence of each workflow in the first tree structure under actual operation corresponding to the first tree structure; Based on the standard working sequence of each workflow under the predefined standard operation, the standard functions that each working module in the standard working sequence needs to implement are obtained; Determine a first function of each first working module of the first working sequence; If the standard working sequence of the same working process and the standard function of the working module at the same position in the first working sequence are inconsistent with the first function, then obtaining the fourth industry corresponding to the first function; Based on the standard functions corresponding to the fourth industry and the industry template database, a corresponding second working module is obtained; All second working modules corresponding to each first working sequence replace the first working modules at the same position to obtain a second working sequence; Based on every two adjacent third working modules in the second working sequence and the module association-exclusion relationship comparison table, a corresponding connection relationship is obtained; Based on all the connection relationships of the second working sequences, construct a first connection sequence in order; Based on the connection relationships in the first connection sequence, a first marking is performed on mutually exclusive connection relationships; Based on all the first annotations and the replacement logic in the first connected sequence, a fourth working module to be replaced is obtained; Based on the connection relationships in the first connection sequence, a second marking is performed on the connection relationships whose corresponding connection degrees are less than a preset connection degree; Matching corresponding transition procedures based on two adjacent third working modules corresponding to the association relationship of the second annotation; Adjust the second working sequence based on all fourth working modules and all transition programs to obtain a third working sequence; Based on the entire work sequence, a second application program is obtained; The first tree structure refers to a tree diagram representing the structure of the functional flow of all working modules in the first application program; The first working sequence refers to the sequence of working modules actually running in each working process corresponding to the first tree structure; The standard work sequence refers to the sequence of work modules in each workflow under predefined standards; The second working sequence refers to a sequence obtained by replacing the first working modules at the same position with all the second working modules corresponding to each first working sequence; The third working sequence refers to a working sequence obtained by adjusting the second working sequence based on all fourth working modules and all transition procedures; Among them, workflow refers to the process of implementing a working module of a function; The first function refers to the function implemented by each first working module; The connection relationship refers to the connection relationship between every two adjacent third working modules in the second working sequence, including: an association relationship and a corresponding degree of association, and an exclusive relationship; A transition program refers to a program in which two working modules that are not directly connected to each other need to be matched with each other.

2. The method according to claim 1, characterized in that Based on the program construction requirements, the corresponding industry template requirements are obtained, including: Parse program construction requirements to obtain corresponding content requirements; Based on the content categories corresponding to the content requirements, obtaining a first industry to which each content category belongs; Based on the first industry and the corresponding content requirements, corresponding industry template requirements are obtained.

3. The method according to claim 2, characterized in that Based on the industry template requirement and the industry template database, the process of constructing the first application includes: Based on the proportion of content requirements corresponding to all industry template requirements, the second industry with the largest content proportion is obtained; Get the third industry that is finally output based on all industry template requirements; If the third industry is the same as the second industry, the framework structure of the industry template corresponding to the second industry in the industry template database is used as the structural template.

4. The method according to claim 3, characterized in that Based on the industry template requirement and the industry template database, a first application is constructed, including: Based on all industry template requirements and the industry template database, obtain the corresponding first industry template; Obtaining a corresponding first template structure based on the structural template; Based on the positional relationship between all industry templates and the first template structure, all first industry templates are placed to obtain a first application.

5. The method according to claim 1, characterized in that Based on the program construction requirements, the second application program is evaluated to obtain an evaluation report, including: Matching corresponding functional requirements based on the industry template requirements corresponding to the second application; Based on all functional requirements, match the corresponding verification data set; Based on the verification data set, construct a corresponding program simulation model; Inputting the second application program into the program simulation model to obtain actual parameters for each function implementation; Calculating the degree of completion of the second application based on all actual parameters and standard parameters of each function; Based on the degree of completion, a corresponding evaluation report is obtained; Among them, the verification data set refers to the data set that can verify whether the functional requirements are achieved.

6. The method according to claim 5, characterized in that Based on all actual parameters and the standard parameters that each function should achieve, calculate the degree of completion of the second application program, including: ;in, indicating the degree of completion of the second application; Indicates the number of functions that need to be completed corresponding to the second application; Indicates that the second application implements The actual parameters of the function; Indicates that the second application implements Standard parameters for each function; Indicates the number of functions whose actual parameters implemented by the second application program have a difference between the actual parameters and the standard parameters within a reasonable range; Indicates that the second application implements The calculation coefficient of each function is related to the importance of the function; Indicates that the second application implements The calculation weight of each function; Indicates all The actual parameter corresponding to the maximum difference in ; Indicates all The actual parameter corresponding to the minimum difference in ; Indicates all The standard parameter corresponding to the maximum difference in ; Indicates all The standard parameter corresponding to the minimum difference in ; Represents the completion analysis function.

7. A rapid application building system based on industry templates, characterized in that: include: Demand analysis module: based on program construction requirements, obtain corresponding industry template requirements; A first program construction module: constructs a first application program based on the industry template requirement and the industry template database; A second program construction module: based on all working modules in the first application and a module association-exclusion relationship comparison table, the first application is optimized to obtain a second application; Evaluation module: based on the program construction requirements, evaluate the second application program to obtain an evaluation report; Optimization module: optimizing the second application program based on the working module to be optimized in the evaluation report to obtain a final application program; The second program building module is used to: Based on all working modules in the first application, construct a first tree structure; Obtaining a first working sequence of each workflow in the first tree structure under actual operation corresponding to the first tree structure; Based on the standard working sequence of each workflow under the predefined standard operation, the standard functions that each working module in the standard working sequence needs to implement are obtained; Determine a first function of each first working module of the first working sequence; If the standard working sequence of the same working process and the standard function of the working module at the same position in the first working sequence are inconsistent with the first function, then obtaining the fourth industry corresponding to the first function; Based on the standard functions corresponding to the fourth industry and the industry template database, a corresponding second working module is obtained; All second working modules corresponding to each first working sequence replace the first working modules at the same position to obtain a second working sequence; Based on every two adjacent third working modules in the second working sequence and the module association-exclusion relationship comparison table, a corresponding connection relationship is obtained; Based on all the connection relationships of the second working sequences, construct a first connection sequence in order; Based on the connection relationships in the first connection sequence, a first marking is performed on mutually exclusive connection relationships; Based on all the first annotations and the replacement logic in the first connected sequence, a fourth working module to be replaced is obtained; Based on the connection relationships in the first connection sequence, a second marking is performed on the connection relationships whose corresponding connection degrees are less than a preset connection degree; Matching corresponding transition procedures based on two adjacent third working modules corresponding to the association relationship of the second annotation; Adjust the second working sequence based on all fourth working modules and all transition programs to obtain a third working sequence; Based on the entire work sequence, a second application program is obtained; The first tree structure refers to a tree diagram representing the structure of the functional flow of all working modules in the first application program; The first working sequence refers to the sequence of working modules actually running in each working process corresponding to the first tree structure; The standard work sequence refers to the sequence of work modules in each workflow under predefined standards; The second working sequence refers to a sequence obtained by replacing the first working modules at the same position with all the second working modules corresponding to each first working sequence; The third working sequence refers to a working sequence obtained by adjusting the second working sequence based on all fourth working modules and all transition procedures; Among them, workflow refers to the process of implementing a working module of a function; The first function refers to the function implemented by each first working module; The connection relationship refers to the connection relationship between every two adjacent third working modules in the second working sequence, including: an association relationship and a corresponding degree of association, and an exclusive relationship; A transition program refers to a program in which two working modules that are not directly connected to each other need to be matched with each other.