A safety assessment method for existing tunnels next to additional tunnels
By introducing the disease characteristics of the supporting structure and combining static and dynamic analysis, the second excavation support model was established, which solved the problem in the existing technology that the safety assessment of the existing tunnel next to the additional tunnel was not reasonable and accurate enough, and realized the Improved accuracy of existing tunnel safety assessments.
Patent Information
- Application Number
- CN202410524649.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-10-18
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing technology fails to fully consider the comprehensiveness of supporting structure diseases and static and dynamic analysis in the safety assessment of the existing tunnel next to the additional tunnel, resulting in unreasonable and inaccurate assessment results.
By establishing the first excavation support model, obtain and introduce support structure disease characteristic data, combine static and dynamic analysis, establish the second excavation support model, perform static and dynamic calculations, and combine the disease characteristic data to evaluate the existing There is tunnel security.
This achieves a more accurate safety assessment of existing tunnels, improves the accuracy and rationality of the assessment results, and ensures the accuracy of the assessment of the impact of additional tunnel construction on existing tunnels.
Smart Images

Figure CN118428154B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of tunnel safety assessment, and in particular to a method for assessing the safety of an existing tunnel next to an additional tunnel. Background Art
[0002] In recent years, with the annual increase in the number of domestic cars, the traffic volume of some highways has reached saturation ahead of schedule, and even exceeded the original traffic volume forecast. It is imperative to widen existing roads. In the existing road widening project, building a new tunnel next to the existing old tunnel is the most commonly used solution for tunnel expansion, and it is also a key project in the road widening process.
[0003] Due to land restrictions, the distance between the additional tunnel and the existing tunnel is often greatly limited. The additional tunnel and the existing tunnel often appear in the form of a small clearance tunnel. The (drilling and blasting) excavation construction of the additional tunnel will inevitably have a great impact on the surrounding rock stability and support structure safety of the existing tunnel. Especially when the existing tunnel needs to remain in operation during the construction of the additional tunnel, it is crucial to conduct a reasonable and accurate safety assessment of the existing tunnel.
[0004] Up to now, researchers have proposed safety assessment methods for existing tunnels next to additional tunnels mainly from the static and dynamic levels, including the static method to simulate the entire process of excavation and support construction, and the dynamic method to simulate the entire process of drilling and blasting construction. However, the existing assessment methods fail to fully consider the support structure defects of existing tunnel projects, and the selected evaluation indicators are relatively single and clearly fragmented.
[0005] In summary, in order to make the safety assessment of the existing tunnel next to the additional tunnel more reasonable and accurate, it is urgent to propose a safety assessment method for the existing tunnel that introduces the characteristics of the existing tunnel support structure and can achieve an organic integration of static and dynamic analysis. Summary of the invention
[0006] The purpose of the present invention is to overcome the shortcomings of the prior art in conducting safety assessment of existing tunnels, such as poor rationality and insufficient accuracy of safety assessment due to insufficient consideration of the defects of the existing tunnel support structure and failure to comprehensively analyze the static and dynamic excavation effects in the construction of the additional tunnel. A method for safety assessment of an existing tunnel next to an additional tunnel is provided. By introducing the defects of the support structure into the calculation model and organically superimposing the static and dynamic analysis results, an effective assessment of the safety of the existing tunnel can be achieved.
[0007] During the long-term service of existing tunnels, support structure defects are bound to occur. After the support structure defects occur, the stress field and displacement field of the original "surrounding rock-support" system will change. This point has not been taken into account in the current structural safety analysis and evaluation, or only the equivalent simulation is performed by reducing the performance of the support structure.
[0008] Existing technologies mainly evaluate the safety of tunnels from two aspects: static and dynamic. For example, in static analysis methods, the stress of the support structure or the deformation of the surrounding rock is often used as a safety assessment indicator, while in dynamic analysis methods, the focus is mainly on vibration velocity control. Even if existing technologies use both static and dynamic analysis, the analysis of the two is often carried out independently. In actual situations, there must be mutual influence between static and dynamic analysis. The selected evaluation indicators fail to organically combine static and dynamic analysis, resulting in a gap and difference between the evaluation results and the actual situation.
[0009] The purpose of the present invention is mainly achieved through the following technical solutions:
[0010] A method for evaluating the safety of an existing tunnel next to an additional tunnel comprises the following steps:
[0011] S1. Obtaining geological data of the tunnel site and existing tunnel support structure data and establishing the first excavation support model;
[0012] By acquiring geological exploration data of existing tunnels and establishing a finite element model, the geological risk and stress state can be accurately assessed through model analysis, and the deformation trend and stability state of the support structure in the tunnel can be intuitively reflected.
[0013] S2, obtaining disease characteristic data of the existing tunnel support structure, introducing the obtained disease characteristic data into the first excavation support model, and calculating the existing displacement of the surrounding rock of the existing tunnel and the existing stress of the support structure;
[0014] Before building additional tunnels, the existing tunnel’s support structure will suffer from weathering, aging, water damage, frost damage and other diseases during its long-term service. After the support structure disease occurs, the stress field and displacement field of the original “surrounding rock-support” system will change.
[0015] The characteristics of the disease directly reflect the health status and potential risks of the tunnel structure. Introducing disease characteristic data into the first excavation and support model can more intuitively and accurately evaluate the degree and trend of tunnel deformation, understand the way and degree of influence of these factors on tunnel deformation, and also help improve the prediction and early warning capabilities of tunnel deformation. In order to make the existing tunnel model closer to the actual situation when adding tunnels and make the evaluation results more accurate, this application introduces disease characteristics into the first excavation and support model, and calculates the displacement and support stress of the existing tunnel, so that the model data is more accurate and closer to the actual situation.
[0016] S3, obtaining the support structure data of the additional tunnel, and establishing a second excavation support model in combination with the existing displacement of the surrounding rock of the existing tunnel, the existing stress of the support structure and the disease characteristic data;
[0017] A second excavation and support model is established in combination with the first excavation and support model that introduces disease characteristics. That is, the second excavation and support model is a model that includes both the existing tunnel and the additional tunnel, and is used to calculate the impact of the construction of the new tunnel on the stability of the existing tunnel surrounding rock and support structure.
[0018] S4, performing static analysis and dynamic analysis on the second excavation support model;
[0019] Static and dynamic calculations are performed on the second excavation support model to analyze the effects of static and dynamic forces on the surrounding rock and support structure of the existing tunnel.
[0020] On the basis of introducing support structure defects into the original finite element model, relevant data of the newly added tunnel were introduced, and dynamic analysis and static analysis were performed respectively. Combined with the changes in the stress field and displacement field of the original "surrounding rock-support" system, the final calculation results were more accurate.
[0021] S5. Calculate the surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress by combining the static analysis and the dynamic analysis;
[0022] The second excavation support model is used for static calculation, and dynamic calculation is performed based on the static calculation. The surrounding rock vibration velocity, displacement, support structure vibration velocity and stress of the existing tunnel are calculated, so that the final result fully reflects the influence of dynamic action, static action and the interaction between the two on the existing tunnel, thereby ensuring the accuracy of the calculation data and improving the accuracy of the evaluation results.
[0023] S6. Preset surrounding rock vibration velocity safety value, static and dynamic combined displacement safety value, support structure vibration velocity safety value and static and dynamic combined stress safety value, compare the surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress with the preset surrounding rock vibration velocity safety value, static and dynamic combined displacement safety value, support structure vibration velocity safety value and static and dynamic combined stress safety value, and judge the safety of the existing tunnel based on the comparison result.
[0024] The surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress are used as safety evaluation indicators of existing tunnels. The corresponding safety values are preset according to the safety evaluation indicators. The calculated safety evaluation indicators are compared with the safety values. When each safety evaluation indicator is less than the corresponding safety value, it means that the deformation and vibration of the existing tunnel caused by the construction of the new tunnel and the use of the existing tunnel will not affect the normal use of the existing tunnel.
[0025] Among them, the surrounding rock vibration velocity and the static-dynamic combined displacement are safety evaluation indicators of the surrounding rock, and the support structure vibration velocity and static-dynamic combined stress are safety evaluation indicators of the support structure.
[0026] Compared with the prior art, the present invention combines the disease characteristics of existing tunnels to calculate the structural deformation and stress changes of existing tunnels before the construction of new tunnels. In the process of new tunnel construction, dynamic calculation and static calculation are performed on the existing tunnel respectively, and the calculation results are organically combined to restore the dynamic and static effects of the new tunnel construction on the existing tunnel, obtain the real deformation data of the tunnel, and judge the safety of the tunnel.
[0027] Furthermore, in step S2, the disease characteristic data includes crack data, cavity data and thickness data.
[0028] Different types of defects, such as cracks, leakage, corrosion, etc., will cause deformation of the tunnel structure to varying degrees. This solution obtains at least three major characteristic defect data that affect the tunnel structure and safety: cracks, voids, and insufficient thickness.
[0029] Furthermore, in step S3: the second excavation support model includes a blasting simulation for the additional tunnel, the blasting simulation uses a blasting load, and the blasting load is represented by a groove charge. The calculation formula of the groove charge is as follows:
[0030]
[0031]
[0032] In the formula, P max To dig the amount of medicine, Z is the proportional distance, where R is the distance from the blasthole to the load application surface; Q Fill the blasthole with explosives.
[0033] First, the excavation of new tunnels inevitably involves blasting, clearing, and support processes. Blasting and excavation will cause deformation of the geological body, which will have a certain impact on the stability of the existing tunnel. The deformation of the geological body will cause displacement and stress concentration in the existing tunnel, thereby aggravating the settlement and deformation of the existing tunnel, and may even cause the destruction of the tunnel structure. Secondly, tunnel blasting will generate a lot of vibration and sound. This vibration and sound will not only affect the stability of the existing tunnel, but may also accelerate the aging and damage of the existing tunnel, reducing its bearing capacity and service life.
[0034] The impact of new tunnel blasting on existing tunnels is also affected by many factors, such as the length of operation of the existing tunnel, the degree of aging of structural materials, environmental corrosion conditions, etc. For tunnels with a long operation time, due to factors such as aging of structural materials and environmental corrosion, their ability to resist the impact of new tunnel blasting will be relatively weak.
[0035] This application establishes a first excavation support model based on the disease characteristics, operation conditions and geological conditions of the existing tunnel before the addition of the new tunnel, and calculates the deformation of the existing tunnel. Combined with the above information, blasting simulation is performed in the second excavation model, and the dynamic blasting load during the excavation of the additional tunnel is simulated by using the amount of grooving charges. The dynamic blasting load is used as a model parameter to bring into the second excavation support model to calculate the impact of blasting on the existing tunnel during the excavation of the additional tunnel.
[0036] Furthermore, in the step S4: using the dynamic elastic modulus and the dynamic Poisson's ratio to assign values to the process of the dynamic analysis;
[0037] The calculation formula of the dynamic elastic modulus is: ;
[0038] The calculation formula of the dynamic Poisson's ratio is: ;
[0039] In the formula, E d is the dynamic elastic modulus, E s is the static elastic modulus, μ d is the dynamic Poisson's ratio, μ s is the static Poisson's ratio.
[0040] After establishing the finite element models of the existing tunnel and the additional tunnel, the dynamic elastic modulus and dynamic Poisson's ratio are used to assign values to the dynamic analysis of the second excavation support model to determine the deformation capacity of the existing tunnel, thereby calculating the deformation of the existing tunnel during the construction of the additional tunnel.
[0041] Furthermore, in the step S4: a static analysis is performed on the second excavation support model and a static analysis model is established in combination with the stress condition of the existing tunnel support structure and / or the deformation condition of the surrounding rock during the construction of the additional tunnel;
[0042] A dynamic analysis is performed on the second excavation support model and a dynamic analysis model is established by simulating the deformation of the existing tunnel caused by vibration during the construction of the additional tunnel.
[0043] The stress on the supporting structure or deformation of the surrounding rock of the existing tunnel under the action of static load during the entire process of additional tunnel construction is simulated, and the influence of the static force generated by the additional tunnel on the strength, stiffness and stability of the existing tunnel structure is studied, so as to determine the static influence of the additional tunnel on the existing tunnel next to it.
[0044] Dynamic calculation is performed on the second excavation and support model to simulate the process of vibration of the existing tunnel due to dynamic load during the construction of the additional tunnel. The influence of the dynamics generated by the operation of the existing tunnel itself during the construction of the additional tunnel on the vibration velocity and force of the existing tunnel surrounding rock and support structure is studied, so as to determine the influence of the dynamics on the safety of the existing tunnel next to the additional tunnel.
[0045] Furthermore, in the step S5: the static analysis model is used to calculate the surrounding rock displacement and the first support structure stress of the existing tunnel;
[0046] The dynamic analysis model is used to calculate the surrounding rock amplitude, surrounding rock vibration velocity, second support structure stress, and support structure vibration velocity of the existing tunnel.
[0047] Specifically, the static analysis model is used to calculate the deformation data and structural stress of the existing tunnel caused by static interference, and the dynamic analysis model is used to calculate the vibration data and structural stress of the existing tunnel.
[0048] Furthermore, the static-dynamic combined displacement adopts the sum of the surrounding rock displacement of the existing tunnel and the surrounding rock amplitude of the existing tunnel; the static-dynamic combined stress adopts the sum of the first supporting structure stress and the second supporting structure stress.
[0049] The displacement caused by dynamic force is combined with the displacement caused by static force to calculate the total displacement caused by dynamic and static interference of the existing tunnel. The stress of the supporting structure caused by dynamic interference is combined with the stress of the supporting structure caused by static interference to calculate the stress of the supporting structure caused by dynamic and static forces of the existing tunnel.
[0050] Furthermore, in the step S6: comparing the surrounding rock vibration velocity with the safety value of the surrounding rock vibration velocity, the supporting structure vibration velocity with the safety value of the supporting structure vibration velocity, the static-dynamic superimposed displacement with the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress with the safety value of the static-dynamic superimposed stress;
[0051] If the conditions are met at the same time that the surrounding rock vibration velocity is less than the safety value of the surrounding rock vibration velocity, the support structure vibration velocity is less than the safety value of the support structure vibration velocity, the static-dynamic superimposed displacement is less than the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress is less than the safety value of the static-dynamic superimposed stress, then it is judged to be safe; otherwise, it is judged to be unsafe.
[0052] Compare all indicators with the corresponding safety values. If all indicators are lower than the preset safety values, the existing tunnel surrounding rock and support structure are safe. If one or several indicators are not lower than the safety value, there is a safety risk in the existing tunnel.
[0053] In summary, the present invention has the following beneficial effects compared with the prior art:
[0054] 1. Introduce the disease characteristics into the first excavation support model, and establish the second excavation support model and the third excavation support model in combination with the first excavation support model with the disease characteristics. Fully consider the influence of the disease characteristics of the existing tunnel during use on the surrounding rock and support structure of the existing tunnel, and the influence of the disease characteristics on the stress field and displacement field of the surrounding rock and support structure, so that the finally calculated parameters are more reliable.
[0055] 2. The second excavation and support model is a three-dimensional static excavation and support model, and the third excavation and support model is a three-dimensional dynamic excavation model, which respectively studies the static and dynamic effects of the excavation of the additional tunnel on the existing tunnel, and combines static analysis and dynamic analysis to study the influence of the additional tunnel on the vibration velocity, displacement and stress of the surrounding rock and support structure of the existing tunnel, so as to judge whether the existing tunnel is safe during the construction of the additional tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0056] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:
[0057] Figure 1 It is a flow chart of the present invention. DETAILED DESCRIPTION
[0058] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.
[0059] Example:
[0060] like Figure 1 As shown, this embodiment relates to a method for evaluating the safety of an existing tunnel next to an additional tunnel in the field of tunnel safety evaluation technology, comprising the following steps:
[0061] S1. Obtaining geological data of the tunnel site and existing tunnel support structure data and establishing the first excavation support model;
[0062] By acquiring geological exploration data of existing tunnels and establishing a finite element model, the geological risk and stress state can be accurately assessed through model analysis, and the deformation trend and stability state of the support structure in the tunnel can be intuitively reflected.
[0063] S2, obtaining disease characteristic data of the existing tunnel support structure, introducing the obtained disease characteristic data into the first excavation support model, and calculating the existing displacement of the surrounding rock of the existing tunnel and the existing stress of the support structure;
[0064] Before adding a tunnel, the existing tunnel’s support structure will be subject to weathering, aging, water damage, frost damage and other diseases during its long-term service. After the support structure disease occurs, the stress field and displacement field of the original "surrounding rock-support" system will change. In order to make the model of the existing tunnel when adding a tunnel closer to the actual situation and make the evaluation result more accurate, the disease characteristics are introduced into the first excavation support model, and the displacement and support stress of the existing tunnel are calculated, so that the model data is more accurate and closer to the actual situation.
[0065] S3, obtaining the support structure data of the additional tunnel, and establishing a second excavation support model in combination with the existing displacement of the surrounding rock of the existing tunnel, the existing stress of the support structure and the disease characteristic data;
[0066] A second excavation and support model is established in combination with the first excavation and support model that introduces disease characteristics. That is, the second excavation and support model is a model that includes both the existing tunnel and the additional tunnel, and is used to calculate the impact of the construction of the new tunnel on the stability of the existing tunnel surrounding rock and support structure.
[0067] S4, performing static analysis and dynamic analysis on the second excavation support model;
[0068] Static and dynamic calculations are performed on the second excavation support model to analyze the effects of static and dynamic forces on the surrounding rock and support structure of the existing tunnel.
[0069] On the basis of introducing support structure defects into the original finite element model, relevant data of the newly added tunnel were introduced, and dynamic analysis and static analysis were performed respectively. Combined with the changes in the stress field and displacement field of the original "surrounding rock-support" system, the final calculation results were more accurate.
[0070] S5. Calculate the surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress by combining the static analysis and the dynamic analysis;
[0071] The second excavation and support model is used to calculate the surrounding rock vibration velocity, displacement, support structure vibration velocity and stress of the existing tunnel, so that the final result fully reflects the influence of dynamic action, static action and the interaction between the two on the existing tunnel, thereby ensuring the accuracy of the calculation data and improving the accuracy of the evaluation results.
[0072] S6. Preset surrounding rock vibration velocity safety value, static and dynamic combined displacement safety value, support structure vibration velocity safety value and static and dynamic combined stress safety value, compare the surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress with the preset surrounding rock vibration velocity safety value, static and dynamic combined displacement safety value, support structure vibration velocity safety value and static and dynamic combined stress safety value, and judge the safety of the existing tunnel based on the comparison result.
[0073] The surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress are used as safety evaluation indicators of existing tunnels. The corresponding safety values are preset according to the safety evaluation indicators. The calculated safety evaluation indicators are compared with the safety values. When each safety evaluation indicator is less than the corresponding safety value, it means that the deformation and vibration of the existing tunnel caused by the construction of the new tunnel and the use of the existing tunnel will not affect the normal use of the existing tunnel.
[0074] Among them, the surrounding rock vibration velocity and the static-dynamic combined displacement are safety evaluation indicators of the surrounding rock, and the support structure vibration velocity and static-dynamic combined stress are safety evaluation indicators of the support structure.
[0075] The preset values of the surrounding rock vibration velocity and the support structure vibration velocity are the threshold values specified in the Safety Regulations for Blasting (GB6722-2021);
[0076] The preset value of the static and dynamic superposition stress is the design value of the lining concrete material;
[0077] The preset value of the static and dynamic superimposed displacement is a monitoring measurement control value during the construction of the existing tunnel.
[0078] Existing technologies mainly propose methods from two aspects: static and dynamic. For example, in static analysis methods, support structure stress or surrounding rock deformation is often used as a safety assessment indicator, while in dynamic analysis methods, vibration velocity control is the core. Even if existing technologies use both static and dynamic analysis, the two are actually carried out independently. In actual situations, static and dynamic analysis inevitably influence each other, and the selected evaluation indicators fail to organically combine static and dynamic analysis, resulting in a split and difference between the evaluation results and the actual situation.
[0079] Compared with the prior art, the present invention fully considers the structural deformation and stress changes of the existing tunnel before the construction of the new tunnel, analyzes the defects generated during the use of the existing tunnel, and simulates and calculates the impact of the defects on the existing tunnel structure. In addition, during the construction of the new tunnel, dynamic and static calculations are performed on the existing tunnel respectively, and the calculation results are combined to restore the dynamic and static impact of the construction of the new tunnel on the existing tunnel.
[0080] Furthermore, in step S2, the disease characteristic data includes crack data, cavity data and thickness data.
[0081] The defects of existing tunnels include at least three characteristics, namely cracks, voids and insufficient thickness, which affect the tunnel structure and safety.
[0082] This is a feasible implementation scheme for the above scheme, wherein the cracks are cracks in the second lining, the cavities are cavities behind the second lining, and the insufficient thickness is insufficient thickness of the second lining concrete.
[0083] Furthermore, in step S3: the second excavation support model includes a blasting simulation for the additional tunnel, the blasting simulation uses a blasting load, and the blasting load is represented by a groove charge. The calculation formula of the groove charge is as follows:
[0084]
[0085]
[0086] In the formula, P max To dig the amount of medicine, Z is the proportional distance, where R is the distance from the blasthole to the load application surface; Q Fill the blasthole with explosives.
[0087] First of all, the excavation of new tunnels will inevitably involve blasting, clearing, and support processes. Blasting excavation will cause deformation of the geological body, which will have a certain impact on the stability of the existing tunnel. The deformation of the geological body will cause displacement and stress concentration in the existing tunnel, thereby aggravating the settlement and deformation of the existing tunnel, and may even cause damage to the tunnel structure. Secondly, tunnel blasting will generate a lot of vibration and sound. This vibration and sound will not only affect the stability of the existing tunnel, but may also accelerate the aging and damage of the existing tunnel, reduce its bearing capacity and service life, so this application combines blasting simulation to perform dynamic and static analysis on the existing tunnel of the second excavation and support model, and restore the impact of the blasting construction process of the new tunnel on the existing tunnel.
[0088] The impact of new tunnel blasting on existing tunnels will also be affected by many factors, such as the length of operation of the existing tunnel, the degree of aging of structural materials, environmental corrosion conditions, etc. For tunnels with a long operation time, due to the influence of factors such as aging of structural materials and environmental corrosion, their ability to resist the impact of new tunnel blasting will be relatively weak. Therefore, the disease characteristics, address data and support structure data of the existing tunnel were introduced into the first excavation support model in the early stage to ensure the accuracy of the model calculation results.
[0089] The dynamic blasting load during the excavation of the additional tunnel is simulated by using the amount of charge for cutting. The dynamic blasting load is used as a model parameter to bring it into the second excavation support model to calculate the impact of blasting on the existing tunnel during the excavation of the additional tunnel.
[0090] Furthermore, in the step S4: using the dynamic elastic modulus and the dynamic Poisson's ratio to assign values to the process of the dynamic analysis;
[0091] The calculation formula of the dynamic elastic modulus is: ;
[0092] The calculation formula of the dynamic Poisson's ratio is: ;
[0093] In the formula, E d is the dynamic elastic modulus, E s is the static elastic modulus, μ d is the dynamic Poisson's ratio, μ s is the static Poisson's ratio.
[0094] After establishing the finite element models of the existing tunnel and the additional tunnel, the dynamic elastic modulus and dynamic Poisson's ratio are used to assign values to the dynamic analysis of the second excavation support model to determine the deformation capacity of the existing tunnel, thereby calculating the deformation of the existing tunnel during the construction of the additional tunnel.
[0095] Furthermore, in the step S4: a static analysis is performed on the second excavation support model and a static analysis model is established in combination with the stress condition of the existing tunnel support structure and / or the deformation condition of the surrounding rock during the construction of the additional tunnel;
[0096] A dynamic analysis is performed on the second excavation support model and a dynamic analysis model is established by simulating the deformation of the existing tunnel caused by vibration during the construction of the additional tunnel.
[0097] The stress on the supporting structure or deformation of the surrounding rock of the existing tunnel under the action of static load during the entire process of additional tunnel construction is simulated, and the influence of the static force generated by the additional tunnel on the strength, stiffness and stability of the existing tunnel structure is studied, so as to determine the static influence of the additional tunnel on the existing tunnel next to it.
[0098] Based on static calculation, dynamic calculation is performed on the second excavation and support model to simulate the process of vibration of the existing tunnel due to dynamic load during the construction of the additional tunnel. The influence of the dynamics generated by the operation of the existing tunnel itself during the construction of the additional tunnel on the vibration velocity and force of the surrounding rock and support structure of the existing tunnel is studied, so as to judge the influence of the dynamics on the safety of the existing tunnel next to the additional tunnel.
[0099] Furthermore, in the step S5: the static analysis model is used to calculate the surrounding rock displacement and the first support structure stress of the existing tunnel;
[0100] The dynamic analysis model is used to calculate the surrounding rock amplitude, surrounding rock vibration velocity, second support structure stress, and support structure vibration velocity of the existing tunnel.
[0101] Specifically, the static analysis model is used to calculate the deformation data and structural stress of the existing tunnel caused by static interference, and the dynamic analysis model is used to calculate the vibration data and structural stress of the existing tunnel.
[0102] Furthermore, the static-dynamic combined displacement adopts the sum of the surrounding rock displacement of the existing tunnel and the surrounding rock amplitude of the existing tunnel; the static-dynamic combined stress adopts the sum of the first supporting structure stress and the second supporting structure stress.
[0103] The displacement caused by dynamic force is combined with the displacement caused by static force to calculate the total displacement caused by dynamic and static interference of the existing tunnel. The stress of the supporting structure caused by dynamic interference is combined with the stress of the supporting structure caused by static interference to calculate the stress of the supporting structure caused by dynamic and static forces of the existing tunnel.
[0104] Furthermore, in the step S6: comparing the surrounding rock vibration velocity with the safety value of the surrounding rock vibration velocity, the supporting structure vibration velocity with the safety value of the supporting structure vibration velocity, the static-dynamic superimposed displacement with the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress with the safety value of the static-dynamic superimposed stress;
[0105] If the conditions are met at the same time that the surrounding rock vibration velocity is less than the safety value of the surrounding rock vibration velocity, the support structure vibration velocity is less than the safety value of the support structure vibration velocity, the static-dynamic superimposed displacement is less than the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress is less than the safety value of the static-dynamic superimposed stress, then it is judged to be safe; otherwise, it is judged to be unsafe.
[0106] Compare all indicators with the corresponding safety values. If all indicators are lower than the preset safety values, the existing tunnel surrounding rock and support structure are safe. If one or several indicators are not lower than the safety value, there is a safety risk in the existing tunnel.
[0107] As a specific implementation of the present invention, the following steps are included:
[0108] S1. Obtain geological data of the tunnel site and the existing tunnel support structure, establish a finite element model of the existing tunnel, i.e., the first excavation and support model, simulate the entire process of three-dimensional excavation and support of the existing tunnel, and perform excavation and support calculations for the existing tunnel.
[0109] The primary support concrete material of the first excavation support model is C25 shotcrete with a standard value of 18.5MPa; the secondary lining concrete material is C30 reinforced cast-in-place concrete with a design value of 14.3MPa;
[0110] The calculation parameters used are as follows:
[0111] Material Category E / GPa μ c / kPa φ / ° <![CDATA[γ / kg / m 3 ]]> Surrounding rock 5 0.37 1000 35 2500 Primary support (sprayed concrete + steel frame) 27.6 0.25 2000 35 2500 Second lining 30 0.3 / / 2500
[0112] S2. Obtaining disease characteristic data of the existing tunnel support structure, including but not limited to cracks, cavities, insufficient thickness, etc., and introducing the disease characteristic data into the first excavation support model to calculate the surrounding rock displacement and support structure force cloud map of the existing tunnel after the support structure disease data is introduced;
[0113] S3, obtaining the support structure data of the additional tunnel, and establishing a second excavation support model in combination with the existing displacement of the surrounding rock of the existing tunnel, the existing stress of the support structure and the disease characteristic data;
[0114] S4, performing static analysis on the second excavation support model and establishing a static analysis model by combining the stress condition of the existing tunnel support structure and / or the deformation condition of the surrounding rock during the construction of the additional tunnel;
[0115] A dynamic analysis is performed on the second excavation support model and a dynamic analysis model is established by simulating the deformation of the existing tunnel caused by vibration during the construction of the additional tunnel.
[0116] S5. Calculate the surrounding rock displacement and the first support structure stress of the existing tunnel using the static analysis model;
[0117] The dynamic analysis model is used to calculate the amplitude of the surrounding rock of the existing tunnel, the vibration velocity of the surrounding rock, the stress of the second supporting structure, and the vibration velocity of the supporting structure;
[0118] The tunnel surrounding rock displacement and the tunnel surrounding rock amplitude are added together to obtain the static-dynamic superimposed displacement, and the first supporting structure stress and the second supporting structure stress are added together to obtain the static-dynamic superimposed stress.
[0119] S6. Preset surrounding rock vibration velocity safety value, static and dynamic superimposed displacement safety value, support structure vibration velocity safety value and static and dynamic superimposed stress safety value, compare the surrounding rock vibration velocity, static and dynamic superimposed displacement, support structure vibration velocity and static and dynamic superimposed stress with the preset surrounding rock vibration velocity safety value, static and dynamic superimposed displacement safety value, support structure vibration velocity safety value and static and dynamic superimposed stress safety value, and judge the safety of the existing tunnel according to the comparison result;
[0120] The safety criterion for the vibration velocity is: the vibration velocity of the surrounding rock and the vibration velocity of the supporting structure are both less than the limit values of the Safety Regulations for Blasting (GB6722-2021);
[0121] The safety criterion for static and dynamic superposition stress is: the stress value is less than the design value of the lining concrete material;
[0122] The safety criterion for static and dynamic superimposed displacement is: the displacement value is less than the monitoring and measurement control value during the construction of the existing tunnel;
[0123] If the judgment results are all less than, then the surrounding rock and supporting structure of the existing tunnel have no excessive deformation and damage, and it is judged to be safe; otherwise, it is judged to be unsafe.
[0124] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for evaluating the safety of an existing tunnel next to an additional tunnel, characterized in that: The following steps are involved: S1. Obtaining geological data of the tunnel site and existing tunnel support structure data and establishing the first excavation support model; S2, obtaining disease characteristic data of the existing tunnel support structure, introducing the obtained disease characteristic data into the first excavation support model, and calculating the existing displacement of the surrounding rock of the existing tunnel and the existing stress of the support structure; S3, obtaining the support structure data of the additional tunnel, and establishing a second excavation support model in combination with the existing displacement of the surrounding rock of the existing tunnel, the existing stress of the support structure and the disease characteristic data; S4. Perform static analysis and dynamic analysis on the second excavation support model: Performing static analysis on the second excavation support model and establishing a static analysis model by combining the stress condition of the existing tunnel support structure and / or the deformation condition of the surrounding rock during the construction of the additional tunnel; Performing dynamic analysis on the second excavation support model and establishing a dynamic analysis model by combining the deformation of the existing tunnel caused by vibration during the construction of the additional tunnel; S5. Combining the static analysis and the dynamic analysis, calculate the surrounding rock vibration velocity, static and dynamic combined displacement, support structure vibration velocity and static and dynamic combined stress: The static analysis model is used to calculate the surrounding rock displacement and the first support structure stress of the existing tunnel; The dynamic analysis model is used to calculate the surrounding rock amplitude, surrounding rock vibration velocity, second support structure stress, and support structure vibration velocity of the existing tunnel; The static-dynamic superimposed displacement adopts the sum of the surrounding rock displacement of the existing tunnel and the surrounding rock amplitude of the existing tunnel; the static-dynamic superimposed stress adopts the sum of the first supporting structure stress and the second supporting structure stress; S6. Preset a safety value of surrounding rock vibration velocity, a safety value of static-dynamic superimposed displacement, a safety value of support structure vibration velocity, and a safety value of static-dynamic superimposed stress, and compare the surrounding rock vibration velocity with the safety value of the surrounding rock vibration velocity, the support structure vibration velocity with the safety value of the support structure vibration velocity, the static-dynamic superimposed displacement with the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress with the safety value of the static-dynamic superimposed stress; The safety of the existing tunnel is judged based on the comparison results: if the surrounding rock vibration velocity is less than the safety value of the surrounding rock vibration velocity, the support structure vibration velocity is less than the safety value of the support structure vibration velocity, the static-dynamic superimposed displacement is less than the safety value of the static-dynamic superimposed displacement, and the static-dynamic superimposed stress is less than the safety value of the static-dynamic superimposed stress, then it is judged to be safe; otherwise, it is judged to be unsafe.
2. A method for evaluating the safety of an existing tunnel next to an additional tunnel according to claim 1, characterized in that: In step S2, the disease characteristic data includes crack data, cavity data and thickness data.
3. The method for safety assessment of an existing tunnel next to an additional tunnel according to claim 1, characterized in that: In step S3, the second excavation support model includes a blasting simulation for the additional tunnel, the blasting simulation uses a blasting load, and the blasting load is represented by the amount of cutting charge. The calculation formula of the cutting charge is as follows: In the formula, P max To dig the amount of medicine, Z is the proportional distance, R is the distance from the blasthole to the load application surface, Q Fill the blasthole with explosives.
4. The method for safety assessment of an existing tunnel next to an additional tunnel according to claim 1, characterized in that: In the step S4: using the dynamic elastic modulus and the dynamic Poisson's ratio to assign values to the process of the dynamic analysis; The calculation formula of the dynamic elastic modulus is: ; The calculation formula of the dynamic Poisson's ratio is: ; In the formula, E d is the dynamic elastic modulus, E s is the static elastic modulus, μ d is the dynamic Poisson's ratio, μ s is the static Poisson's ratio.
Citation Information
Patent Citations
Safe construction method of left-right tunnel to be built newly next to existing disease tunnel
CN107391841A
Method for constructing blasting vibration safety criteria of tunnel surrounding rocks in different geologies based on FEM-DEM numerical calculation
CN116894291A
Cited By
Tunnel lining cavity reinforcement and leakage treatment structure and construction method
CN120906586A