A method and system for project cost progress management control
Using digital twin technology to build a model of the construction site solves the problem of difficult coordination between schedule and cost in existing technologies, achieves efficient management of the construction site, and improves management efficiency and convenience.
Patent Information
- Application Number
- CN202410491961.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-04-23
AI Technical Summary
The existing engineering construction management technology is difficult to achieve optimal progress control of the overall project, and cannot effectively coordinate the relationship between progress and cost, resulting in low management efficiency.
Use digital twin technology to build a model of the engineering construction site. Use multi-modal data acquisition and BIM engine to build a digital twin model to determine the construction progress and cost, and perform fitting under a unified coordinate system to assist managers in overall management and progress. control.
Through digital twin technology, global management of project progress and cost is achieved, which improves management efficiency, provides a convenient remote management method, coordinates the relationship between progress and cost, and improves the overall management effect of the construction site.
Smart Images

Figure CN118428651B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of digital twin technology, and in particular to a method and system for engineering cost progress management and control. Background Art
[0002] The management of the basis for project cost calculation and the management of the construction of a professional team for project cost calculation serve these two types of management. As the investment cost management of construction projects, it belongs to the scope of project construction investment management. Project construction investment cost management refers to the systematic activities of predicting, calculating, determining and monitoring the project cost and its changes under the conditions of the written planning and design scheme in order to achieve the expected investment goals.
[0003] There is a correlation between project progress and cost, which is neither positive nor negative. In some cases, speeding up the progress will increase the cost, while in other cases, speeding up the progress will reduce the cost. That is, there is both a positive linear or nonlinear relationship between progress and cost, and an inverse linear or nonlinear relationship between progress and cost. As key elements of project implementation, progress and cost are mutually constrained, interdependent, interactive, and interrelated.
[0004] Only when a reasonable and ideal progress rhythm, a critical point, is reached, can a balance be achieved between cost and progress, reaching a local optimum. That is, both speeding up and slowing down the progress will increase the cost.
[0005] In the existing technology, when managing project construction, multiple managers are usually arranged at the project construction site to carry out on-site management, while cost management is statistically analyzed separately, which makes it impossible to achieve better progress control of the entire project. Summary of the invention
[0006] The embodiments of the present application provide a method and system for project cost and progress management control, which are used to assist in the management of project cost and construction progress through digital twins. Digital twin technology can display the status of the project construction site to managers from a global perspective, thereby assisting managers in the global management of the project construction site and improving the overall management efficiency of the project.
[0007] The present application embodiment provides a method for project cost progress management and control, including:
[0008] After the display terminal reports a management request, obtaining multimodal data of multiple managers viewing the display terminal;
[0009] Determining a plurality of model building constraints based on the multimodal data of each of the managers;
[0010] Based on the BIM engine, a digital twin model of the project construction site is constructed that meets all the model construction constraints;
[0011] Determine the construction progress based on the constructed digital twin model, and determine the construction cost under the construction progress;
[0012] Fit the determined construction progress and cost in a unified coordinate system according to the required time nodes;
[0013] The fitting results and the digital twin model are sent to the display terminal for display on the display terminal to assist in completing the project cost progress management.
[0014] Optionally, also include:
[0015] Obtain a display frame in the display terminal for displaying the digital twin model, and obtain an operation sequence generated by each manager operating the display frame within a recently preset first time;
[0016] When the operation sequence meets the standard sequence condition, obtaining the first area of the display frame that was most recently exited in the digital twin model;
[0017] Obtaining a required value for retention of the first region;
[0018] When the required value for retention is greater than or equal to a preset required value threshold, obtaining a first boundary line that the first area in the display frame passes through when exiting the display frame;
[0019] Controlling the first boundary line to move toward a preset enlarged moving direction corresponding to the first boundary line;
[0020] During the movement of the first boundary line, a second boundary line in the display frame other than the first boundary line grows adaptively to keep continuous connection with the first boundary line and keep the connection point with the first boundary line unchanged, and the first boundary line and the second boundary line are connected to form a new display frame;
[0021] When the first area completely enters the new display frame, the first boundary line is controlled to stop moving.
[0022] Optionally, the standard sequence conditions include:
[0023] The operation sequence represents that any one of the managers continuously performs standard operation types on the display frame for a period greater than or equal to a preset first time period and does not perform non-standard operation types on the display frame for a period greater than or equal to a preset second time period.
[0024] Optionally, obtaining the required retention value of the first area includes:
[0025] Obtaining a second area in the digital twin that is currently located in the display frame;
[0026] Extracting the association relationship between the first area and the second area to obtain an association relationship set;
[0027] Based on a preset retention necessity evaluation library and according to the association relationship set, a retention necessity evaluation is performed on the first region to obtain the retention necessity value.
[0028] Optionally, based on the constructed digital twin model, the construction progress is determined including:
[0029] A pre-built project completion model is presented in a manner that is less transparent than the constructed digital twin model, and the constructed digital twin model is superimposed on the project completion model to compare and obtain the current construction progress;
[0030] The construction cost under the construction schedule includes:
[0031] According to the construction progress of each node, the related material consumption is calculated and the material cost is determined. In addition, the labor cost invested in the construction progress of each node is determined.
[0032] The construction cost is determined based on the material cost and labor cost calculated at each node.
[0033] Optionally, fitting the determined construction progress and construction cost in a unified coordinate system at specified time intervals includes:
[0034] Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding cost curve and progress curve are fitted for the determined material cost, labor cost, construction cost and construction progress respectively;
[0035] Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding planned progress curve and planned cost curve are fitted for the planned construction progress and planned construction cost.
[0036] Optionally, displaying on the display terminal includes: highlighting the gap between the construction progress curve and the planned progress curve, and the gap between the cost curve and the planned cost curve at the time node corresponding to each construction progress; and
[0037] At the time nodes corresponding to each construction progress, determine the material cost and labor cost under the unit construction progress, and at adjacent time nodes, mark the changes in material cost and labor cost under the unit construction progress on the corresponding curves.
[0038] Optionally, displaying on the display terminal further includes:
[0039] Obtaining a user's viewing instruction for the digital twin model, and determining the user's immediate viewing requirement based on the viewing instruction;
[0040] According to the instant visual requirement, a local instant visual model is intercepted from the digital twin model, and the local instant visual model is displayed to the user.
[0041] The embodiment of the present application also proposes a construction cost progress management and control system, including a processor and a memory, wherein the memory stores a computer program, and when the computer program is executed by the processor, the steps of the construction cost progress management and control method as described above are implemented.
[0042] The method of this application uses digital twins to assist in the management of project costs and construction progress. Digital twin technology can show managers the status of the project construction site from a global perspective, thereby assisting managers in the overall management of the project construction site and improving the overall management efficiency of the project. The digital twin model can also facilitate remote management of the project construction site, improving convenience and applicability.
[0043] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present invention are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0044] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:
[0045] Figure 1 The following is a schematic diagram of the basic process of the project cost progress management control method of this embodiment. DETAILED DESCRIPTION
[0046] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although the exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art.
[0047] This application embodiment proposes a method for project cost progress management and control, such as Figure 1 As shown, the following steps are included:
[0048] In step S101, after the display terminal reports the management request, the multimodal data of multiple managers who view the display terminal are obtained. The display terminal is a mobile smart device for managers to view information, such as: mobile phones, tablets, command large screens, etc.; managers are personnel who manage the project construction site; multimodal data includes: positions, responsible areas within the project construction site, areas that have been managed in the past, etc.
[0049] In step S102, multiple model construction constraints are determined based on the multimodal data of each manager. Model construction constraints are conditions that make the constructed digital twin model of the project construction site suitable for management personnel to view, for example: the responsible area in the project construction site in the multimodal data is area A, indicating that the manager is responsible for the project construction management of area A, then the production model construction constraint is that area A is included in the digital twin model; the BIM engine can be a BIM platform, BIM software, etc.
[0050] In step S103, based on the BIM engine, a digital twin model of the project construction site that meets all the model construction constraints is constructed. When constructing the digital twin model, the project construction site is digitally twinned, and the digital twin model must meet each model construction constraint.
[0051] In step S104, the construction progress is determined based on the constructed digital twin model, and the construction cost under the construction progress is determined. In some embodiments, based on the constructed digital twin model, determining the construction progress includes: pre-constructing a project completion model, and presenting it in a manner with less transparency than the constructed digital twin model, and superimposing the constructed digital twin model on the project completion model to obtain the current construction progress by comparison. In a specific example, an expected project completion model can be pre-constructed, and the transparency of the project completion model can be reduced. Further, the constructed digital twin model can be superimposed on the expected project completion model, and the construction progress can be calculated. In some specific examples, after determining the construction progress, the construction cost under the construction progress is further determined, so as to facilitate the subsequent correlation statistics between the progress and the construction cost.
[0052] In step S105, the determined construction progress and construction cost are fitted in a unified coordinate system according to the required time nodes. In some specific examples, fitting can be performed at each time node of the determined construction progress through the aforementioned related data to correlate and compare the progress with the construction cost, thereby achieving comprehensive management of cost and progress.
[0053] In step S106, the fitting result and the digital twin model are sent to the display terminal for display on the display terminal to assist in completing the project cost progress management. After the digital twin model and the associated progress and cost data are constructed, they are output to the display terminal. The management personnel can view the digital twin model and the related progress to manage the cost progress of the project at the project construction site.
[0054] The method of this application uses digital twins to assist in the management of project costs and construction progress. Digital twin technology can show managers the status of the project construction site from a global perspective, thereby assisting managers in the overall management of the project construction site and improving the overall management efficiency of the project. The digital twin model can also facilitate remote management of the project construction site, improving convenience and applicability.
[0055] In some embodiments, it also includes:
[0056] Obtain a display frame in the display terminal for displaying the digital twin model, and obtain an operation sequence generated by each manager operating the display frame within the most recently preset first time. Specifically, the display frame is used to display the digital twin model, but due to the limited screen area of the display terminal, the limited level of detail of the information displayed in the digital twin model, etc., the display frame cannot jointly display the entire area and all information of the digital twin model; the first time can be 20 seconds; the manager can drag and drop the display frame, zoom in / out, etc., and sort the generated operations according to the order in which the manager operates the display frame to obtain the operation sequence.
[0057] When the operation sequence meets the standard sequence conditions, the first area of the digital twin model that most recently exited the display frame is obtained. Specifically, when the operation sequence meets the standard sequence conditions, the representative manager operates the display frame so that part of the area in the digital twin model exits the display frame, and the first area of the digital twin model that most recently exited the display frame is obtained.
[0058] Obtain the necessary value for retaining the first area. The necessary value for retaining represents the degree to which the manager still needs to check the first area. The larger the necessary value for retaining, the greater the degree of necessity. The necessary value threshold may be 8. When the necessary value for retaining is greater than or equal to the necessary value threshold, it represents that the manager still needs to check the first area to a greater extent.
[0059] When the required value for retention is greater than or equal to a preset required value threshold, a first boundary line passed by the first area in the display frame when exiting the display frame is obtained.
[0060] The first boundary line is controlled to move toward the preset expansion movement direction corresponding to the first boundary line. Specifically, when the first area exits the display frame, it will pass through the first boundary line of the display frame. For example, if the display frame is a rectangular display frame, and the first area is originally located in the upper left corner area of the display frame, when the first area exits the display frame, it will pass through the two sides of the upper left right angle of the display frame, that is, the two first boundary lines; different boundary lines of the display frame are preset with corresponding expansion movement directions, and the expansion movement direction is the opposite direction from the midpoint of the first boundary line to the center point of the display frame.
[0061] During the movement of the first boundary line, the second boundary line in the display frame except the first boundary line grows adaptively to maintain a continuous connection with the first boundary line and keep the connection point with the first boundary line unchanged, and the first boundary line and the second boundary line are connected to form a new display frame.
[0062] When the first area completely enters the new display frame, the first boundary line is controlled to stop moving.
[0063] When the first boundary line moves in the direction of expansion, the second boundary line grows adaptively, keeping the connection point with the first boundary line unchanged and continuously connected with the first boundary line, so that the display area of the new display frame will become larger, and the first area will gradually enter the new display frame. When the first area completely enters the new display frame, the first boundary line is controlled to stop moving. The display frame can be set in the center area of the display screen of the display terminal to leave space for temporary expansion of the display frame.
[0064] When the manager drags the digital twin model, if it is found that the newly viewed area needs to be viewed together with the area that has just been viewed and exited the display frame, the display frame will be reduced so that the newly viewed area and the area that has just been viewed and exited the display frame enter the display frame together. This has problems: first, the manager needs to adjust the display frame by himself. Since the reduction operation has a certain error, the manager cannot quickly adjust the display frame to just display the newly viewed area and the area that has just been viewed and exited the display frame; second, after the display frame is reduced, the newly viewed area and the area that has just been viewed and exited the display frame can indeed be viewed together, but the detail of the information displayed in the display frame for the newly viewed area and the area that has just been viewed and exited the display frame will be reduced. If the manager wants to view it in more detail, he still needs to enlarge the display frame again. The embodiment of the present invention can solve two problems: temporarily expanding the first boundary line so that the administrator can view the newly viewed area together with the area that has just been viewed and exited the display frame, and the information displayed in these two areas is displayed in high detail, without the administrator having to determine by himself whether the newly viewed area needs to be viewed together with the area that has just been viewed and exited the display frame, and the new display frame can be quickly adjusted to the most suitable size without the administrator having to adjust it by himself, which greatly improves convenience and is more user-friendly.
[0065] In some embodiments, the standard sequence conditions include: the operation sequence represents that any of the managers continuously performs standard operation types on the display frame for a period greater than or equal to a preset first time and does not perform non-standard operation types on the display frame for a period greater than or equal to a preset second time. In some specific examples, the preset first time may be 5 seconds; the standard operation type may be a screen drag operation; the second time may be 8 seconds; when the standard sequence conditions are met, it means that the manager dragged the screen of the digital twin model in the display frame for a certain period of time to view the new screen, and stopped dragging the screen of the digital twin model, and it can be determined that the manager operated the display frame so that part of the area in the digital twin model exited the display frame.
[0066] In some embodiments, obtaining the required reservation value of the first area includes:
[0067] Obtaining a second area in the digital twin that is currently located in the display frame;
[0068] Extracting the association relationship between the first area and the second area to obtain an association relationship set;
[0069] Based on a preset retention necessity evaluation library and according to the association relationship set, a retention necessity evaluation is performed on the first region to obtain the retention necessity value.
[0070] In some specific examples, the associations in the association set may be belonging to the same area type (for example, a lifting area), there are construction personnel / operating equipment that are about to move from one area to another area, etc.; there are necessary weight values corresponding to different associations in the retention necessity evaluation library. The larger the necessary weight value, the degree to which the manager represented still needs to check the first area when the first area and the second area have this association relationship. For example, the association belongs to the same area type, which means that the manager can view the first area and the second area of the same area type at the same time, and the corresponding necessary weight value is 3; based on the retention necessity evaluation library, when determining the retention necessary value according to the association set, the necessary weight values corresponding to each association in the association set in the retention necessity evaluation library are accumulated and calculated to obtain the value.
[0071] In one embodiment, the conversations between the managers can be further collected through the display terminal, and a first conversation sequence generated by the conversations between the managers within the latest preset second time can be obtained. Further, a first semantic vector of the first conversation sequence is constructed, and the first semantic vector is matched with each second semantic vector in the preset first standard semantic vector library respectively;
[0072] When the match is met, the preset attention object determination rule and the preset acquisition time length corresponding to the standard semantic vector that matches the match are obtained;
[0073] Based on the attention object determination rule, the attention object that each of the managers pays attention to is determined from the second area.
[0074] In some embodiments, a second dialogue sequence generated by dialogues between the managers within the future acquisition time period may also be acquired;
[0075] constructing a third semantic vector of the second dialogue sequence;
[0076] Matching the third semantic vector with each fourth semantic vector in a preset second standard semantic vector library respectively;
[0077] When the match is confirmed, obtaining a preset shooting angle determination rule corresponding to the fourth semantic vector that matches the match;
[0078] Based on the shooting angle determination rule, determining a shooting angle for shooting the object of interest in the digital twin model;
[0079] Controlling a virtual camera to capture a perspective image of the object of interest at the shooting perspective in the digital twin model;
[0080] Fusing the perspective images to obtain a fused image;
[0081] The fused image is mapped next to the object of interest.
[0082] constructing a first semantic vector of the first dialogue sequence;
[0083] Matching the first semantic vector with each second semantic vector in a preset first standard semantic vector library respectively;
[0084] When the match is met, the preset attention object determination rule and the preset acquisition time length corresponding to the standard semantic vector that matches the match are obtained;
[0085] Based on the attention object determination rule, determining the attention object that each of the managers is paying attention to from the second area;
[0086] Acquire a second dialogue sequence generated by dialogues between the managers within the acquisition time period in the future;
[0087] constructing a third semantic vector of the second dialogue sequence;
[0088] Matching the third semantic vector with each fourth semantic vector in a preset second standard semantic vector library respectively;
[0089] When the match is confirmed, obtaining a preset shooting angle determination rule corresponding to the fourth semantic vector that matches the match;
[0090] Based on the shooting angle determination rule, determining a shooting angle for shooting the object of interest in the digital twin model;
[0091] Controlling a virtual camera to capture a perspective image of the object of interest at the shooting perspective in the digital twin model;
[0092] Fusing the perspective images to obtain a fused image;
[0093] The fused image is mapped next to the object of interest.
[0094] In some specific examples, the second time can be 100 seconds; when the managers view the digital twin model together, they will communicate and discuss, and generate dialogues. The dialogues are sorted in the order in which the dialogues are generated to obtain a first dialogue sequence; based on the semantic description technology, a first semantic vector of the first dialogue sequence is constructed; the first standard semantic vector library is preset with a second semantic vector, and the second semantic vector is preset with a corresponding focus object determination rule and acquisition duration. The second semantic vector is constructed based on the semantic description technology according to the dialogue representing that the manager has an object of interest in the digital twin model. When the first semantic vector matches the second semantic vector, it represents that the manager has an object of interest in the digital twin model. The focus object determination rule is how to determine the focus object in the digital twin model based on the dialogue reaction of the manager having an object of interest in the digital twin model. For example: the dialogue is "Look at equipment room B", "What's the matter", indicating that the focus object is equipment room B, then the focus object determination rule is to take equipment room B as the focus object, and the acquisition duration is how long it will take for the manager to react to the dialogue reaction of the manager having an object of interest in the digital twin model in the future. From which perspective does the manager want to view the focus a dialogue with the concerned object, such as: 300 seconds, etc.; obtain a second dialogue sequence generated by the dialogue between each manager in the future time; similarly, based on the semantic description technology, construct a third semantic vector of the second dialogue sequence; a fourth semantic vector is preset in the second standard semantic vector library, and the fourth semantic vector is preset with a corresponding shooting angle determination rule. The fourth semantic vector is constructed based on the semantic description technology according to the dialogue representing that the manager has a viewing angle requirement for the concerned object. When the third semantic vector matches the fourth semantic vector, it represents that the manager has a viewing angle requirement for the concerned object. The shooting angle determination rule is a rule for determining the perspective that the manager who represents the dialogue reaction that the manager has a viewing angle requirement for the concerned object wants to view the concerned object. For example: if the dialogue is "look at the inside of equipment room B from the northwest corner of equipment room B", the shooting angle determination rule is to determine the shooting angle as shooting the inside of equipment room B from the northwest corner of equipment room B; control the virtual camera to shoot the perspective image of the concerned object with the shooting perspective; fuse the perspective images to obtain a fused image; map the fused image next to the concerned object, specifically, it can be mapped to the idle area next to the concerned object closest to the concerned object. After mapping, the manager can view the fused image.
[0095] In actual application scenarios, when viewing the digital twin model, each manager will communicate and discuss. During the communication and discussion, it is generally inconvenient to operate the digital twin model. In addition, during the communication and discussion, an object of interest may be generated in the digital twin model, and it may be necessary to view the object of interest in the digital twin model from multiple perspectives. In the case where it is inconvenient to operate the digital twin model, it is even more inconvenient to perform complex operations such as multi-perspective adjustment and switching back and forth. Therefore, the embodiment of the present invention first determines whether each manager has an object of interest. When it is yes, the shooting perspective is adaptively determined, and the fused picture after the picture taken by the virtual camera is displayed to the manager. The manager does not need to operate by himself, which improves the comfort of the manager in communicating and discussing, is more humane, and improves the management efficiency of the manager to a certain extent, and is particularly applicable.
[0096] In some embodiments, determining the construction cost under the construction progress includes: calculating the associated material usage according to the obtained construction progress of each node and determining the material cost, and determining the labor cost invested in the construction progress under each node;
[0097] The construction cost is determined based on the material cost and labor cost calculated at each node.
[0098] In a specific example, the material cost can be determined based on the material usage reported by the construction site.
[0099] For labor costs, the actual amount of manpower and equipment invested in the current node can be summarized and calculated to determine the labor costs invested.
[0100] In some embodiments, fitting the determined construction progress and construction cost in a unified coordinate system according to a specified time interval includes:
[0101] Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding cost curve and progress curve are fitted for the determined material cost, labor cost, construction cost and construction progress respectively;
[0102] Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding planned progress curve and planned cost curve are fitted for the planned construction progress and planned construction cost.
[0103] In a specific example, by fitting the corresponding cost curve and progress curve, the cost-progress growth relationship can be intuitively represented at each node in a unified coordinate system. In some embodiments, the display terminal includes: at the time node corresponding to each construction progress, the gap between the construction progress curve and the planned progress curve, and the gap between the cost curve and the planned cost curve are highlighted. By highlighting the difference, the current construction progress gap and whether the cost is in excess can be highlighted, so that when managers view the digital twin model, they can combine the curve to determine the progress-cost management direction of the current node, providing convenience for managers.
[0104] At the time nodes corresponding to each construction progress, determine the material cost and labor cost under the unit construction progress, and at adjacent time nodes, mark the changes in material cost and labor cost under the unit construction progress on the corresponding curves.
[0105] That is to say, for any construction time node, determine the material cost and labor cost under the unit construction progress, and compare it with the unit cost of the previous time node in a similar year-on-year manner. This can further determine the changing relationship between the progress and the cost, making it easier for managers to clarify the management direction.
[0106] In some embodiments, displaying on the display terminal further includes:
[0107] Obtaining a user's viewing instruction for the digital twin model, and determining the user's immediate viewing requirement based on the viewing instruction;
[0108] According to the instant visual requirement, a local instant visual model is intercepted from the digital twin model, and the local instant visual model is displayed to the user.
[0109] In some specific examples, the local instant-visual model is a local model in the digital twin model that meets the user's instant-visual needs. In this example, the local instant-visual model can be displayed to the user according to the user's viewing needs. For example, if the user's instant-visual need is to view the on-site conditions of the high-altitude working area in the project site, the intercepted local instant-visual model is the local model corresponding to the high-altitude working area in the digital twin model. The local instant-visual model is displayed to the user, and the user can view the corresponding content immediately after the instant-visual need is generated. In this way, managers do not need to browse or retrieve the digital twin model according to their own instant-visual needs, which greatly improves convenience and is very user-friendly.
[0110] The embodiment of the present application also proposes a construction cost progress management and control system, including a processor and a memory, wherein the memory stores a computer program, and when the computer program is executed by the processor, the steps of the construction cost progress management and control method as described above are implemented.
[0111] In addition, although exemplary embodiments have been described herein, the scope includes any and all embodiments based on the present disclosure with equivalent elements, modifications, omissions, combinations (e.g., various embodiments intersecting schemes), adaptations or changes. It is not limited to the examples described in this specification or during the implementation of this application, and its examples will be interpreted as non-exclusive.
[0112] The above description is intended to be illustrative rather than restrictive. For example, the above examples (or one or more of them) can be used in combination with each other. For example, those of ordinary skill in the art may use other embodiments when reading the above description.
[0113] The above embodiments are merely exemplary embodiments of the present disclosure. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present disclosure, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.
Claims
1. A method for project cost progress management and control, characterized in that: include: After the display terminal reports a management request, obtaining multimodal data of multiple managers viewing the display terminal; Determining a plurality of model building constraints based on the multimodal data of each of the managers; Based on the BIM engine, a digital twin model of the project construction site is constructed that meets all the model construction constraints; Determine the construction progress based on the constructed digital twin model, and determine the construction cost under the construction progress; Fit the determined construction progress and cost in a unified coordinate system according to the required time nodes; Sending the fitting result and the digital twin model to the display terminal for display on the display terminal to assist in completing the project cost progress management; Also includes: Obtain a display frame in the display terminal for displaying the digital twin model, and obtain an operation sequence generated by each manager operating the display frame within a recently preset first time; When the operation sequence meets the standard sequence condition, obtaining the first area of the display frame that was most recently exited in the digital twin model; Obtaining a required value for retention of the first region; When the required value for retention is greater than or equal to a preset required value threshold, obtaining a first boundary line that the first area in the display frame passes through when exiting the display frame; Controlling the first boundary line to move toward a preset enlarged moving direction corresponding to the first boundary line; During the movement of the first boundary line, a second boundary line in the display frame other than the first boundary line grows adaptively to keep continuous connection with the first boundary line and keep the connection point with the first boundary line unchanged, and the first boundary line and the second boundary line are connected to form a new display frame; When the first area completely enters the new display frame, controlling the first boundary line to stop moving; The standard sequence conditions include: The operation sequence indicates that any one of the managers continuously performs standard operation types on the display frame for a period of time greater than or equal to a preset first time period and does not perform non-standard operation types on the display frame for a period of time greater than or equal to a preset second time period; Acquiring the required reserved value of the first area includes: Obtaining a second area in the digital twin model that is currently located in the display frame; Extracting the association relationship between the first area and the second area to obtain an association relationship set; Based on a preset retention necessity evaluation library and according to the association relationship set, a retention necessity evaluation is performed on the first region to obtain the retention necessity value.
2. The construction cost progress management and control method according to claim 1, characterized in that: Based on the constructed digital twin model, the construction progress is determined including: A pre-built project completion model is presented in a manner that is less transparent than the constructed digital twin model, and the constructed digital twin model is superimposed on the project completion model to compare and obtain the current construction progress; The construction cost under the construction schedule includes: According to the construction progress of each node, the related material consumption is calculated and the material cost is determined. In addition, the labor cost invested in the construction progress of each node is determined. The construction cost is determined based on the material cost and labor cost calculated at each node.
3. The construction cost progress management and control method according to claim 2, characterized in that: The determined construction progress and cost are fitted in a unified coordinate system at specified time intervals, including: Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding cost curve and progress curve are fitted for the determined material cost, labor cost, construction cost and construction progress respectively; Taking the time nodes corresponding to each construction progress as the coordinate axis, the corresponding planned progress curve and planned cost curve are fitted for the planned construction progress and planned construction cost.
4. The construction cost progress management and control method according to claim 3, characterized in that: Displaying on the display terminal includes: highlighting the gap between the construction progress curve and the planned progress curve, and the gap between the cost curve and the planned cost curve at the time node corresponding to each construction progress; and At the time nodes corresponding to each construction progress, determine the material cost and labor cost under the unit construction progress, and at adjacent time nodes, mark the changes in material cost and labor cost under the unit construction progress on the corresponding curves.
5. The construction cost progress management and control method according to claim 4, characterized in that: Displaying on the display terminal also includes: Obtaining a user's viewing instruction for the digital twin model, and determining the user's immediate viewing requirement based on the viewing instruction; According to the instant visual requirement, a local instant visual model is intercepted from the digital twin model, and the local instant visual model is displayed to the user.
6. A construction cost progress management and control system, characterized in that: The method comprises a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the steps of the project cost progress management control method as described in any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Construction progress calculation method and device
CN115049184A
Engineering management method and system
CN118134104A
Project construction management method and system based on BIM
CN118229225A