Energy storage strategy scheduling method and system for smart grid
Through load monitoring, intelligent scheduling, real-time control, anomaly diagnosis, and scheduling optimization modules, the shortcomings of existing technologies in grid load forecasting and battery life monitoring have been solved, enabling efficient management of energy storage devices and grid load optimization.
Patent Information
- Application Number
- CN202410895736.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-05
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-05
AI Technical Summary
Existing technologies have failed to effectively formulate energy storage dispatch strategies by predicting grid load, while simultaneously monitoring battery life and implementing anomaly correction strategies, resulting in insufficient real-time optimization of energy storage dispatch.
The system employs a load monitoring module to predict grid load and battery life in real time, combined with an intelligent scheduling module to generate energy storage scheduling strategies, a real-time control module to monitor and execute the strategies, an anomaly diagnosis module to monitor and execute anomaly corrections, and a scheduling optimization module to optimize the strategies, including temperature management, discharge management, anomaly detection, and correction.
It enables precise control of grid load, improves the utilization rate of energy storage equipment, reduces energy consumption costs, extends battery life, reduces failure rate, and enhances the adaptability and flexibility of energy storage dispatch.
Smart Images

Figure CN118432090B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of energy storage scheduling, and in particular to an energy storage strategy scheduling method and system for a smart grid. Background Art
[0002] With the development of science and technology, the use of technologies such as big data and machine learning to predict grid loads can optimize the scheduling strategy of energy storage equipment, improve the reliability and stability of the grid, reduce energy costs and emissions, or use technologies such as artificial intelligence and deep learning to achieve intelligent control and adaptive scheduling of energy storage equipment, improve the response speed and adaptability of the power system, and respond to fluctuations and changes in the power market. However, most of them do not formulate energy storage scheduling strategies by predicting grid loads, monitor battery life anomalies, execute discharge strategies, and execute anomaly correction strategies, and optimize energy storage scheduling strategies in real time.
[0003] For example, the patent with publication number CN115378003A discloses a method for dispatching electric energy, including: step S10, the electrochemical energy storage device creates a local charging dispatching strategy and a local discharging dispatching strategy; step S20, obtains the grid access status, the current period, and the power source access status, and controls the charging and discharging of the battery based on the grid access status, the current period, the power source access status, the local charging dispatching strategy, and the local discharging dispatching strategy; step S30, the electrochemical energy storage device detects the current working mode; step S40, the cloud creates a cloud dispatching rule; step S50, the cloud communicates with the electrochemical energy storage device to obtain the working mode, and generates a cloud electric energy dispatching strategy based on the working mode and the cloud dispatching rule and sends it to the electrochemical energy storage device; step S60, the electrochemical energy storage device uses the cloud electric energy dispatching strategy to control the charging and discharging of the battery. The advantage is that it not only simplifies the difficulty of local dispatching, but also greatly improves the timeliness of electric energy dispatching of the electrochemical energy storage device.
[0004] For example, a Chinese patent with authorization announcement number CN115833208B discloses a method and electronic device for obtaining an operation scheduling strategy for a battery energy storage system, which belongs to the field of battery energy storage technology. The method includes obtaining and constructing an objective function that characterizes system losses based on the operation restriction data of a target battery energy storage system; optimizing and solving the objective function based on iterative calculation according to a preset optimization algorithm with the function value of the objective function as the minimum, and obtaining an optimal solution for control variables that characterize the system scheduling configuration; constructing and generating an operation scheduling strategy for the target battery energy storage system according to the system scheduling configuration corresponding to the optimal solution; and using a new optimization algorithm to quickly and effectively obtain the required operation scheduling strategy, which is beneficial to the actual control and management of the battery energy storage system.
[0005] The above patents have the problems raised by this background technology: the above electric energy scheduling method obtains the working mode through the electrochemical energy storage device, and generates a cloud-based electric energy scheduling strategy in combination with the cloud-based scheduling rules to control the battery charging and discharging; the above-mentioned battery energy storage system operation scheduling strategy method is to obtain the operation restriction data to construct an objective function that characterizes the system loss, and obtain the optimal solution of the control variables that characterize the system scheduling configuration according to the preset optimization algorithm, and finally generate the operation scheduling strategy of the target battery energy storage system. The above patents do not solve the problem of how to formulate an energy storage scheduling strategy by predicting the grid load, while monitoring the battery life anomalies to execute the discharge strategy and execute the anomaly correction strategy, and optimize the energy storage scheduling strategy in real time. To solve this problem, the present invention proposes an energy storage strategy scheduling method and system for smart grids. Summary of the invention
[0006] The purpose of this section is to summarize some aspects of the embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0007] In view of the above-mentioned problems existing in the existing energy storage strategy scheduling method and system for smart grid, the present invention is proposed.
[0008] Therefore, the object of the present invention is to provide a method and system for energy storage strategy scheduling for smart grids.
[0009] In order to solve the above technical problems, the present invention provides an energy storage strategy scheduling system for smart grid: a load monitoring module, an intelligent scheduling module, a real-time control module, an abnormal diagnosis module and a scheduling optimization module;
[0010] The load monitoring module is used to predict the grid load and battery life in real time, and to perform temperature management and discharge management on energy storage equipment;
[0011] The intelligent dispatching module is used to generate energy storage dispatching strategies based on load forecasting results;
[0012] The real-time control module is used to monitor and control the energy storage equipment that executes the energy storage scheduling strategy in real time;
[0013] The abnormal diagnosis module is used to monitor the status of energy storage equipment and battery life in real time during energy storage scheduling, and implement abnormal correction strategies according to actual conditions;
[0014] The dispatch optimization module is used to optimize the energy storage dispatch strategy according to the abnormal correction results.
[0015] As a preferred solution of the energy storage strategy dispatching system for smart grid described in the present invention, the load monitoring module includes a load prediction unit, a life prediction unit and an equipment management unit;
[0016] The life prediction unit predicts the battery life by monitoring the abnormality of the temperature, voltage and internal resistance of the battery in the energy storage device and generates a battery life prediction result;
[0017] The function expression for predicting battery life is as follows:
[0018] ;
[0019] In the formula, represents the predicted value of battery life in energy storage equipment, Indicates the initial battery life, Represents the weight value of the battery temperature, Indicates the abnormality of battery temperature. Represents the weight value of the battery voltage, Indicates the abnormality of the battery voltage. Represents the weight value of the battery internal resistance, Indicates the abnormal degree of battery internal resistance;
[0020] The device management unit is used to manage energy storage devices, including cooling strategies and discharge strategies;
[0021] Cooling strategies include:
[0022] Setting a temperature threshold, including a first temperature threshold and a second temperature threshold. If the battery temperature in the energy storage device is monitored to be greater than the first temperature threshold and less than or equal to the second temperature threshold, the flow rate of the liquid refrigerant releasing cold air is small and the time for the liquid refrigerant to release cold air is long;
[0023] If it is monitored that the battery temperature in the energy storage device is greater than the second temperature threshold, the flow rate of the liquid refrigerant releasing cold air is large and the time for the liquid refrigerant to release cold air is short. The cold air released by the liquid refrigerant cools the battery in the energy storage device through the operation of the exhaust fan.
[0024] As a preferred solution of the energy storage strategy scheduling system for smart grid described in the present invention, the discharge strategy includes power discharge logic and power distribution logic. The power discharge logic is used to sort the batteries in the energy storage device and control the batteries to supply power during energy storage peak regulation. The power discharge logic specifically includes:
[0025] Sort the batteries in the energy storage device and form a battery list, configure the discharge sequence and discharge voltage during energy storage peak shaving, and allocate battery groups for power supply according to the battery list when performing energy storage peak shaving. If the power supply voltage of the battery group for power supply is abnormal, determine the battery life of the battery group. If the battery life is normal, determine that the voltage of the battery group is falsely abnormal during power supply, and adjust the actual voltage of the battery group to the discharge voltage;
[0026] If the battery life of the battery pack that is supplying power is abnormal, the battery list is traversed and the battery packs in the adjacent sequence are assigned to assist in power supply. At this time, the battery packs in the adjacent sequence assigned are the battery packs that are at the next level of the battery pack that is supplying power when the battery list is traversed in sequence;
[0027] Configure a voltage threshold, and judge the abnormality of the actual voltage according to the voltage threshold, configure a difference threshold, and form a difference voltage by subtracting the actual voltage from the voltage threshold. If the voltage value of the difference voltage is less than the difference threshold, a local power distribution signal is generated; if the voltage value of the difference voltage is greater than or equal to the difference threshold, a global power distribution signal is generated;
[0028] The power distribution logic includes obtaining a local power distribution signal or a global power distribution signal, and allocating battery groups in a battery list to assist in adjusting the supply voltage based on the local power distribution signal or the global power distribution signal;
[0029] The power distribution logic specifically includes:
[0030] When receiving a local power distribution signal, configure an incremental threshold and a power distribution quantity, the incremental threshold includes a basic threshold, a median threshold and an extreme threshold, the power distribution quantity includes a quantity value one, a quantity value two and a quantity value three, and the power distribution quantity represents the number of batteries allocated when the auxiliary battery is allocated to assist the battery group that is powered;
[0031] The difference voltage is subtracted from the difference threshold to generate a threshold difference. If the threshold difference is less than or equal to the basic threshold, the allocated battery pack is traversed to extract the discharge sequence of the batteries in the allocated battery pack, and a battery pack with a corresponding number of batteries of value one is selected according to the discharge sequence to supply power, so as to adjust the power supply voltage of the power supply battery pack to meet the discharge voltage requirement;
[0032] If the threshold difference is greater than the basic threshold and less than or equal to the median threshold, a battery group of battery auxiliary power supply corresponding to the quantity value two is selected for power supply according to the discharge sequence;
[0033] If the threshold difference is greater than the median threshold and less than or equal to the extreme threshold, a battery group of battery auxiliary power supply corresponding to the number value three is selected for power supply according to the discharge sequence.
[0034] As a preferred solution of the energy storage strategy scheduling system for smart grid described in the present invention, the power distribution logic specifically includes:
[0035] When receiving a global power distribution signal, the adjacent battery pack is allocated for auxiliary power supply;
[0036] Discharge strategies also include:
[0037] In the monitoring history process, it is determined whether a local power distribution signal or a global power distribution signal appears. If a local power distribution signal or a global power distribution signal appears, an auxiliary mark is formed for the battery group that performs auxiliary power supply. When the battery list is traversed to the battery group with the auxiliary mark for power supply, it is determined whether the voltage of the battery group during actual power supply reaches the discharge voltage requirement.
[0038] If the discharge voltage requirement is met, the power supply is normally supplied and when the power supply is completed, the next battery pack is traversed according to the battery list for power supply;
[0039] If the battery pack cannot reach the discharge voltage, the battery life of the battery pack is determined. If the battery life of the battery pack is normal, it is determined that the voltage of the battery pack is falsely abnormal when supplying power. At this time, the actual voltage of the battery pack is adjusted to the discharge voltage.
[0040] If the battery life becomes abnormal, the battery will be allocated to assist in power supply according to the power discharge logic and power distribution logic.
[0041] As a preferred solution of the energy storage strategy dispatching system for smart grid described in the present invention, wherein: the abnormal diagnosis module includes an abnormality detection unit and an abnormality correction unit;
[0042] The abnormality detection unit uses the detection strategy to determine the abnormality of the battery's temperature, voltage and internal resistance during the energy storage scheduling process;
[0043] The detection strategies include temperature strategy, voltage strategy and internal resistance strategy;
[0044] The internal resistance strategy includes judging the abnormal degree of battery internal resistance during energy storage dispatch by the internal resistance increase rate;
[0045] The calculation formula of internal resistance increase rate is as follows:
[0046] ;
[0047] In the formula, Indicates the rate of increase of the internal resistance of the battery during the energy storage dispatch process, represents the internal resistance of the battery after energy storage scheduling, Indicates the internal resistance of the battery before energy storage dispatch;
[0048] An internal resistance change threshold is set. If the increase rate of the battery's internal resistance during the energy storage scheduling process is greater than the internal resistance change threshold, it means that the battery's internal resistance is abnormal during the energy storage scheduling process; if the increase rate of the battery's internal resistance during the energy storage scheduling process is less than or equal to the internal resistance change threshold, it means that the battery's internal resistance is not abnormal during the energy storage scheduling process.
[0049] As a preferred solution of the energy storage strategy scheduling system for smart grid described in the present invention, the energy storage scheduling strategy includes: when the load prediction value is greater than the warning threshold, starting the discharge strategy to release the electric energy stored in the battery pack to the grid;
[0050] The energy storage scheduling strategy also includes adjusting the charging and discharging voltage and charging and discharging time of the batteries in the energy storage equipment according to the load forecast value. If the grid load is in a high load period, the charging voltage is reduced and the charging time is increased; if the grid load is in a low load period, the discharge voltage is increased and the discharge time is increased.
[0051] As a preferred solution of the energy storage strategy scheduling system for smart grid described in the present invention, wherein: the abnormal correction unit performs abnormal correction according to the abnormal degree of the temperature, voltage and internal resistance of the battery in the energy storage scheduling process determined by the abnormal detection unit;
[0052] The anomaly correction strategy is as follows:
[0053] Determine the abnormality of battery temperature, voltage and internal resistance during energy storage scheduling;
[0054] If the battery temperature is abnormal during the energy storage scheduling process, the low-temperature cold air of the liquid refrigerant is released through the cooling strategy of the equipment management unit to reduce the battery temperature in the energy storage device;
[0055] If the internal resistance of the battery is abnormal during the energy storage dispatch process, the next level of battery pack will be dispatched;
[0056] The abnormality correction strategy also includes correlation logic, which is used to correlate the battery internal resistance and the battery life to determine the abnormal category of the battery life. The correlation logic includes:
[0057] Set the internal resistance threshold. If the battery internal resistance is lower than the internal resistance threshold and the battery life is abnormal, the battery life abnormality is determined to be true.
[0058] If the battery internal resistance is lower than the internal resistance threshold and the battery life is not abnormal, the battery life is judged to be false;
[0059] Monitor the abnormal degree of battery life after the abnormality is corrected. If the battery life is still abnormal after the abnormality is corrected, optimize the energy storage scheduling strategy.
[0060] As a preferred solution of the energy storage strategy scheduling system for smart grid described in the present invention, wherein: the optimization energy storage scheduling strategy includes voltage optimization and time optimization;
[0061] Voltage optimization is used to dynamically adjust the charge and discharge voltage. The function expression for dynamically adjusting the charge voltage is as follows:
[0062] ;
[0063] In the formula, Indicates the charging voltage of the battery after dynamic adjustment. Indicates the target charging voltage of the battery, The correction factor indicating the state of charge, Indicates the current battery charging status. Indicates the current target charging state of the battery;
[0064] The function expression for dynamically adjusting the discharge voltage is as follows:
[0065] ;
[0066] In the formula, Indicates the discharge voltage of the battery after dynamic adjustment. Indicates the target discharge voltage of the battery, Indicates the correction factor of battery life;
[0067] Time optimization is used to dynamically adjust the charge and discharge time. The function expression for dynamically adjusting the charge time is as follows:
[0068] ;
[0069] In the formula, Indicates the charging time of the battery after dynamic adjustment. Indicates the capacity of the battery. Indicates the battery charging rate;
[0070] The function expression for dynamically adjusting the discharge time is as follows:
[0071] ;
[0072] In the formula, Indicates the discharge time of the battery after dynamic adjustment. Indicates the maximum designed discharge time of the battery.
[0073] As a preferred solution of the energy storage strategy dispatching system for smart grid described in the present invention, the load prediction unit predicts the load condition of the power grid through the load prediction strategy, and the load prediction strategy includes:
[0074] Collect historical grid load data and historical meteorological data, normalize them, build a load forecasting model, input real-time grid load data and real-time meteorological data into the load forecasting model, obtain the load forecast value, and set the warning threshold. If the load forecast value is greater than the warning threshold, generate a dispatch signal, and the intelligent dispatch module generates an energy storage dispatch strategy based on the dispatch signal.
[0075] A method for scheduling energy storage strategies for smart grids, comprising: S1, real-time prediction of grid load and battery life, and temperature management and discharge management of energy storage equipment;
[0076] S2. Generate energy storage dispatch strategy based on load forecast results;
[0077] S3, real-time monitoring and control of energy storage equipment that executes energy storage scheduling strategies;
[0078] S4: Real-time monitoring of the energy storage equipment status and battery life during energy storage scheduling, and implementation of abnormal correction strategies based on actual conditions;
[0079] S5. Optimize the energy storage dispatch strategy based on the abnormal correction results.
[0080] Beneficial effects of the present invention: The present invention predicts the grid load and battery life in real time through the load monitoring module, and performs temperature management and discharge management on the energy storage device, thereby achieving precise control of the grid load, preventing the energy storage device from affecting the battery life due to temperature anomalies, and better managing the discharge of the energy storage device; the intelligent scheduling module generates an energy storage scheduling strategy according to the load prediction results, improves the utilization rate of the energy storage device, optimizes the grid load distribution, and reduces energy consumption costs; the real-time control module monitors and controls the energy storage device that executes the energy storage scheduling strategy in real time; the abnormal diagnosis module monitors the energy storage device status and battery life during the energy storage scheduling process in real time, and executes the abnormal correction strategy according to the abnormal degree and the discharge strategy, thereby reducing the failure rate of the energy storage device and extending the battery life; the scheduling optimization module optimizes the energy storage scheduling strategy according to the abnormal correction results, thereby improving the adaptability and flexibility of energy storage scheduling. BRIEF DESCRIPTION OF THE DRAWINGS
[0081] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for describing the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:
[0082] Figure 1 A system structure diagram of an energy storage strategy dispatching system for a smart grid according to the present invention;
[0083] Figure 2 A cooling strategy flow chart of an energy storage strategy dispatching system for a smart grid according to the present invention;
[0084] Figure 3 A discharge strategy flow chart of an energy storage strategy dispatching system for a smart grid according to the present invention;
[0085] Figure 4 A related logic flow chart of an energy storage strategy dispatching system for a smart grid according to the present invention;
[0086] Figure 5 The present invention is a method flow chart of a method for energy storage strategy scheduling for smart grids. DETAILED DESCRIPTION
[0087] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0088] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention can also be implemented in other ways different from those described herein, and those skilled in the art can make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0089] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor does it refer to a separate or selective embodiment that is mutually exclusive with other embodiments.
[0090] Example 1
[0091] In this embodiment, a system structure diagram of an energy storage strategy scheduling system for a smart grid is provided, such as Figure 1 As shown, an energy storage strategy dispatching system for a smart grid includes:
[0092] Load monitoring module, intelligent dispatching module, real-time control module, abnormal diagnosis module and dispatching optimization module;
[0093] The intelligent dispatching module generates an energy storage dispatching strategy based on the grid load conditions predicted by the load monitoring module. The real-time control module controls the energy storage equipment in real time according to the energy storage dispatching strategy of the intelligent dispatching module. The abnormal diagnosis module monitors the energy storage dispatching process of the real-time control module and corrects the abnormality according to the degree of abnormality and the discharge strategy in the load monitoring module. The dispatching optimization module optimizes the energy storage dispatching strategy according to the abnormality correction results of the abnormal diagnosis module.
[0094] The load monitoring module is used to predict the grid load and battery life in real time, and to perform temperature management and discharge management on energy storage equipment.
[0095] The load monitoring module includes a load prediction unit, a life prediction unit and an equipment management unit.
[0096] The load forecasting unit predicts the power grid load through load forecasting strategies, which include:
[0097] Collect historical grid load data and historical meteorological data, normalize them, build a load forecasting model, input real-time grid load data and real-time meteorological data into the load forecasting model, obtain the load forecast value, and set the warning threshold. If the load forecast value is greater than the warning threshold, generate a dispatch signal, and the intelligent dispatch module generates an energy storage dispatch strategy based on the dispatch signal.
[0098] The function expression of the load forecasting model is as follows:
[0099] ;
[0100] In the formula, Indicates the time period The load forecast value, represents the LSTM model, Indicates that in the current time period The input data includes historical grid load data and historical meteorological data. Indicates the hidden state of the previous time period, Indicates the cell state in the previous time period, Represents the parameter set of the LSTM model, including all weights and bias terms.
[0101] For example, the grid load data of a target industrial park is collected, including hourly load conditions, and meteorological data of the same time period is obtained, including temperature, humidity, wind speed, etc.; the collected grid load data is smoothed to eliminate seasonality and trend, and the meteorological data is aligned with the grid load data according to the time period and normalized; the load forecasting model is built based on the LSTM model, by inputting the grid load data and meteorological data of the current time period, as well as the hidden state and cell state of the previous time period, and using the LSTM model parameters to calculate the load forecast value in the current time period, which can better capture the nonlinear characteristics and seasonal changes of the grid load, improve the accuracy of the grid load forecast, and thus provide more accurate load forecasting results for the subsequent energy storage scheduling strategy. When the load forecast value is greater than the warning threshold, the intelligent scheduling module is executed.
[0102] The life prediction unit predicts the battery life by monitoring the abnormality of the temperature, voltage and internal resistance of the battery in the energy storage device and generates a battery life prediction result.
[0103] The function expression for predicting battery life is as follows:
[0104] ;
[0105] In the formula, represents the predicted value of battery life in energy storage equipment, Indicates the initial battery life, Represents the weight value of the battery temperature, Indicates the abnormality of battery temperature. Represents the weight value of the battery voltage, Indicates the abnormality of the battery voltage. Represents the weight value of the battery internal resistance, Indicates the abnormal degree of battery internal resistance.
[0106] It needs to be explained that the initial battery life is generally set to , where the weight values of battery temperature, battery voltage and battery internal resistance need to be set according to actual conditions; Indicates that the battery temperature is normal. Indicates that the battery temperature is abnormal. Indicates that the battery voltage is normal. Indicates that the battery voltage is abnormal. Indicates that the battery internal resistance is normal. It indicates that the battery internal resistance is abnormal. When the predicted value of the battery life is less than the life threshold, it means that the battery life is abnormal.
[0107] The device management unit is used to manage energy storage devices, including cooling strategies and discharge strategies.
[0108] Cooling strategies such as Figure 2 As shown, including:
[0109] Setting a temperature threshold, including a first temperature threshold and a second temperature threshold, wherein the first temperature threshold is less than the second temperature threshold, and if it is monitored that the battery temperature in the energy storage device is greater than the first temperature threshold and less than or equal to the second temperature threshold, the flow rate of the liquid refrigerant releasing the low-temperature cold air is small and the time for the liquid refrigerant to release the low-temperature cold air is long;
[0110] If it is monitored that the battery temperature in the energy storage device is greater than the second temperature threshold, the flow rate of the liquid refrigerant releasing the low-temperature cold air is large and the time for the liquid refrigerant to release the low-temperature cold air is short. The low-temperature cold air released by the liquid refrigerant cools the batteries in the energy storage device through the operation of the exhaust fan.
[0111] During the operation of energy storage equipment in the industrial park, it is necessary to ensure that the battery temperature in the energy storage equipment is stable within a safe range to prevent damage to the energy storage equipment due to overheating and overcooling. Therefore, it is necessary to install a temperature sensor to monitor the battery temperature in the energy storage equipment in real time. When it is detected that the battery temperature in the energy storage equipment exceeds the temperature threshold, the liquid refrigerant releases low-temperature cold air, and the flow rate of low-temperature cold air released by the liquid refrigerant is automatically adjusted according to the degree of battery temperature exceeding the threshold. The low-temperature cold air released by the liquid refrigerant is used to cool the energy storage equipment through the operation of the exhaust fan, thereby maintaining the battery temperature in the energy storage equipment stable within a safe range, thereby effectively managing the energy storage equipment.
[0112] The discharge strategy includes discharge logic and distribution logic. The discharge logic is used to sort the batteries in the energy storage device and control the batteries to supply power during energy storage peak load regulation. The discharge logic specifically includes:
[0113] Sort the batteries in the energy storage device and form a battery list. Here, the batteries are sorted by columns or rows. The discharge sequence and discharge voltage during energy storage peak shaving are configured. When energy storage peak shaving is performed, the battery group is allocated for power supply according to the battery list. If the power supply voltage of the battery group for power supply is abnormal, the battery life of the battery group is judged. If the battery life is not abnormal, it is determined that the voltage of the battery group is falsely abnormal during power supply, and the actual voltage of the battery group is adjusted to the discharge voltage.
[0114] If the battery life of the battery pack providing power is abnormal, the battery list is traversed and the battery packs in the adjacent sequence are assigned to assist in power supply. At this time, the battery packs in the adjacent sequence assigned are the battery packs at the next level of the battery pack providing power when traversing the battery list in sequence.
[0115] like Figure 3 As shown, a voltage threshold is configured, and the degree of abnormality of the actual voltage is judged based on the voltage threshold. A difference threshold is configured, and the actual voltage is differentiated from the voltage threshold to form a difference voltage. If the voltage value of the difference voltage is less than the difference threshold, a local power distribution signal is generated. If the voltage value of the difference voltage is greater than or equal to the difference threshold, a global power distribution signal is generated.
[0116] The power distribution logic includes obtaining a local power distribution signal or a global power distribution signal, and adjusting the battery groups in the battery list to assist in regulating the supply voltage based on the local power distribution signal or the global power distribution signal.
[0117] The power distribution logic specifically includes:
[0118] When receiving a local power distribution signal, configure an incremental threshold and a power distribution quantity, the incremental threshold includes a basic threshold, a median threshold and an extreme threshold, the power distribution quantity includes a quantity value one, a quantity value two and a quantity value three, and the power distribution quantity represents the number of batteries allocated when the auxiliary battery is allocated to assist the battery group that is powered;
[0119] The difference voltage is subtracted from the difference threshold to generate a threshold difference. If the threshold difference is less than or equal to the basic threshold, the allocated battery pack is traversed to extract the discharge sequence of the batteries in the allocated battery pack, and a battery pack with a corresponding number of batteries of value one is selected according to the discharge sequence to supply power, so as to adjust the power supply voltage of the power supply battery pack to meet the discharge voltage requirement;
[0120] If the threshold difference is greater than the basic threshold and less than or equal to the median threshold, a battery group of battery auxiliary power supply corresponding to the quantity value two is selected for power supply according to the discharge sequence;
[0121] If the threshold difference is greater than the median threshold and less than or equal to the extreme threshold, a battery group of batteries corresponding to the number value three is selected for auxiliary power supply according to the discharge sequence;
[0122] When the threshold difference is greater than the extreme value threshold, the voltage value of the difference voltage is greater than or equal to the difference threshold, and no local power distribution signal is generated, but a global power distribution signal is generated.
[0123] The power distribution logic also includes:
[0124] When a global power distribution signal is received, adjacent battery groups are allocated for auxiliary power supply.
[0125] Discharge strategies also include:
[0126] In the monitoring history process, it is determined whether a local power distribution signal or a global power distribution signal appears. If a local power distribution signal or a global power distribution signal appears, an auxiliary mark is formed for the battery group that performs auxiliary power supply. When the battery list is traversed to the battery group with the auxiliary mark for power supply, it is determined whether the voltage of the battery group during actual power supply reaches the discharge voltage requirement.
[0127] If the discharge voltage requirement is met, the power supply is normally supplied and when the power supply is completed, the next battery pack is traversed according to the battery list for power supply;
[0128] If the battery pack cannot reach the discharge voltage, the battery life of the battery pack is determined. If the battery life of the battery pack is normal, it is determined that the voltage of the battery pack is falsely abnormal when supplying power. At this time, the actual voltage of the battery pack is adjusted to the discharge voltage.
[0129] If the battery life becomes abnormal, the battery will be allocated to assist in power supply according to the power discharge logic and power distribution logic.
[0130] The discharge strategy of the batteries in the energy storage device is set. The discharge sequence is to discharge by column or row. For example, the batteries in the energy storage device are divided into ten groups. The number of batteries in a battery group is 10. At this time, the battery group that supplies power is the fifth group, and the battery group in the adjacent sequence is the sixth group. Among them, the batteries with the corresponding number value of one selected according to the discharge sequence are the two batteries with the highest voltage in the sixth group, the batteries with the corresponding number value of two selected according to the discharge sequence are the four batteries with the highest voltage in the sixth group, and the batteries with the corresponding number value of three selected according to the discharge sequence are the six batteries with the highest voltage in the sixth group.
[0131] The intelligent scheduling module is used to generate energy storage scheduling strategies based on load forecasting results.
[0132] The energy storage scheduling strategy includes: when the load forecast value is greater than the warning threshold, the discharge strategy is activated to release the reserved electric energy to meet the high load demand, and the electric energy stored in the battery pack is released to the power grid of the industrial park.
[0133] The energy storage scheduling strategy also includes adjusting the charging and discharging voltage and charging and discharging time of the battery in the energy storage device according to the load forecast value. If the grid load is in a high load period, the charging voltage is reduced and the charging time is increased; if the grid load is in a low load period, the discharge voltage is increased and the discharge time is increased. By adjusting the charging and discharging voltage, the flow and storage of electric energy can be controlled, the charging and discharging efficiency can be improved, and the charging and discharging time can be adjusted to effectively respond to changes in the grid load and better meet the grid demand. At the same time, the device management unit is executed in the process of adjusting the charging and discharging voltage to ensure the safe operation of the energy storage equipment. After the energy storage scheduling strategy is generated, the real-time control module is performed.
[0134] The real-time control module is used to monitor and control the energy storage equipment that executes the energy storage scheduling strategy in real time.
[0135] According to the energy storage scheduling strategy, the discharge, charge and discharge voltage and charge and discharge time of the battery pack in the energy storage equipment in the industrial park are controlled to realize the flow and storage of electric energy, and monitor the load prediction value, charge and discharge status, temperature, voltage and internal resistance of the battery during the charge and discharge process to ensure that the energy storage equipment effectively participates in power scheduling and operation according to the generated energy storage scheduling strategy, executes the abnormal diagnosis module, and executes the equipment management unit at the same time.
[0136] The abnormality diagnosis module is used to monitor the status of energy storage equipment and battery life in real time during the energy storage scheduling process, and execute abnormality correction strategies according to actual conditions.
[0137] The above-mentioned energy storage device status refers to the charging and discharging status, which is used to indicate whether the energy storage equipment in the industrial park is in a charging state or a discharging state in the current time period.
[0138] The abnormality diagnosis module includes an abnormality detection unit and an abnormality correction unit.
[0139] When the predicted value of the battery life is less than the life threshold, it indicates that the battery life is abnormal and needs to be further identified. The abnormal situation is entered into the abnormality detection unit and the device management unit is executed at the same time.
[0140] The abnormality detection unit uses the detection strategy to determine the abnormality of the battery's temperature, voltage and internal resistance during the energy storage scheduling process.
[0141] Detection strategies include temperature strategy, voltage strategy and internal resistance strategy.
[0142] The temperature strategy includes judging the abnormal degree of battery temperature during the energy storage scheduling process by the degree of change of battery temperature during the energy storage scheduling process. If the degree of change of battery temperature during the energy storage scheduling process is large, it means that the battery temperature during the energy storage scheduling process is abnormal; if the degree of change of battery temperature during the energy storage scheduling process is small, it means that the battery temperature during the energy storage scheduling process is not abnormal.
[0143] The voltage strategy includes monitoring the deviation between the battery voltage and the expected battery voltage during the energy storage scheduling process. If the deviation between the battery voltage and the expected battery voltage during the energy storage scheduling process is large, it means that the battery voltage is abnormal during the energy storage scheduling process; if the deviation between the battery voltage and the expected battery voltage during the energy storage scheduling process is small, it means that the battery voltage is not abnormal during the energy storage scheduling process.
[0144] The internal resistance strategy includes judging the abnormal degree of battery internal resistance during energy storage scheduling by the internal resistance increase rate.
[0145] The calculation formula of internal resistance increase rate is as follows:
[0146] ;
[0147] In the formula, Indicates the rate of increase of the internal resistance of the battery during the energy storage dispatch process, represents the internal resistance of the battery after energy storage scheduling, Represents the internal resistance of the battery before energy storage dispatch.
[0148] An internal resistance change threshold is set. If the increase rate of the battery's internal resistance during the energy storage scheduling process is greater than the internal resistance change threshold, it means that the battery's internal resistance is abnormal during the energy storage scheduling process; if the increase rate of the battery's internal resistance during the energy storage scheduling process is less than or equal to the internal resistance change threshold, it means that the battery's internal resistance is not abnormal during the energy storage scheduling process.
[0149] When the battery temperature is abnormal during the energy storage scheduling process, it may be due to the ambient temperature being too high, the charge and discharge rate being too fast, and the battery being aged, which will lead to the degradation of battery performance and safety, and even cause serious problems such as thermal runaway; when the battery voltage is abnormal during the energy storage scheduling process, it may be due to unstable charge and discharge, which will lead to incomplete charging and uneven discharge, and even damage the internal chemical structure of the battery, affecting the battery life and performance; when the battery internal resistance is abnormal during the energy storage scheduling process, it may be due to internal damage to the battery, which will lead to reduced battery discharge efficiency and increased heat generation, and may cause safety hazards in severe cases; when it is found that the battery temperature, voltage and internal resistance are abnormal during the energy storage scheduling process, it is necessary to correct the abnormality, execute the abnormality correction unit, and execute the equipment management unit at the same time.
[0150] The abnormality correction unit performs abnormality correction according to the abnormal degree of the temperature, voltage and internal resistance of the battery determined by the abnormality detection unit during the energy storage scheduling process.
[0151] The anomaly correction strategy is as follows:
[0152] Determine the abnormality of battery temperature, voltage and internal resistance during energy storage scheduling;
[0153] If the battery temperature is abnormal during the energy storage scheduling process, the device management unit will release the liquid refrigerant to reduce the battery temperature in the energy storage device;
[0154] If the battery voltage is abnormal during the energy storage dispatch process, the battery voltage during the energy storage dispatch process is compared with the expected battery voltage. If the battery voltage during the energy storage dispatch process is greater than the expected battery voltage, the charging current is reduced or charging is stopped;
[0155] If the battery voltage during energy storage dispatch is less than or equal to the expected battery voltage, the charging current is increased or the discharge is stopped;
[0156] If the internal resistance of the battery is abnormal during the energy storage scheduling process, the next level of battery pack will be dispatched.
[0157] The abnormal correction strategy also includes correlation logic, which is used to correlate the battery internal resistance and battery life to determine the abnormal category of battery life. The correlation logic is as follows: Figure 4 As shown, including:
[0158] Set the internal resistance threshold. If the battery internal resistance is lower than the internal resistance threshold and the battery life is abnormal, the battery life abnormality is determined to be true.
[0159] If the battery internal resistance is lower than the internal resistance threshold and the battery life is not abnormal, the battery life is determined to be false.
[0160] Monitor the abnormal degree of battery life after the abnormality is corrected. If the battery life is still abnormal after the abnormality is corrected, optimize the energy storage scheduling strategy.
[0161] The abnormal degree of battery temperature, voltage and internal resistance in the energy storage scheduling process is judged, and the corresponding abnormal correction operation is performed, and the corrected battery life is monitored again. When abnormalities still occur during the energy storage scheduling process, the scheduling optimization module is executed, and the equipment management unit is executed at the same time.
[0162] The dispatch optimization module is used to optimize the energy storage dispatch strategy according to the abnormal correction results.
[0163] Optimizing energy storage scheduling strategies includes voltage optimization and time optimization.
[0164] Voltage optimization is used to dynamically adjust the charge and discharge voltage. The function expression for dynamically adjusting the charge voltage is as follows:
[0165] ;
[0166] In the formula, Indicates the charging voltage of the battery after dynamic adjustment. Indicates the target charging voltage of the battery, The correction factor indicating the state of charge, Indicates the current battery charging status. Indicates the current target charging state of the battery.
[0167] It should be explained that the state of charge correction factor increases as the battery's state of charge decreases to compensate for the change in charging voltage requirement caused by the decrease in battery capacity.
[0168] The function expression for dynamically adjusting the discharge voltage is as follows:
[0169] ;
[0170] In the formula, Indicates the discharge voltage of the battery after dynamic adjustment. Indicates the target discharge voltage of the battery, Indicates the correction factor for battery life.
[0171] It should be explained that the battery life correction factor will increase as the battery life decreases to compensate for the change in discharge voltage requirement caused by the decrease in battery life.
[0172] Time optimization is used to dynamically adjust the charge and discharge time. The function expression for dynamically adjusting the charge time is as follows:
[0173] ;
[0174] In the formula, Indicates the charging time of the battery after dynamic adjustment. Indicates the capacity of the battery. Indicates the battery charging rate.
[0175] The dynamically adjusted charging time is calculated based on the current battery charging state, target charging state and charging rate to ensure that the charging time is controlled during the charging process to avoid overcharging or undercharging.
[0176] The function expression for dynamically adjusting the discharge time is as follows:
[0177] ;
[0178] In the formula, Indicates the discharge time of the battery after dynamic adjustment. Indicates the maximum designed discharge time of the battery;
[0179] The battery discharge time needs to be shortened according to the reduction of battery life to ensure that over-discharge is avoided when approaching the discharge cutoff, thereby maximizing the battery service life. When the battery life decreases, the adjusted discharge time will also be reduced accordingly to adapt to the change in battery life and ensure that the battery is not excessively damaged.
[0180] According to the state of the energy storage device monitored in the abnormal diagnosis module, it is determined whether it is in the charging state or the discharging state, and then the charging and discharging voltage and charging and discharging time are dynamically adjusted to better protect the batteries in the energy storage device, thereby better performing energy storage scheduling.
[0181] Example 2
[0182] In this embodiment, a method flow chart of a method for energy storage strategy scheduling for a smart grid is provided, such as Figure 5 As shown, a method for scheduling energy storage strategies for smart grids includes:
[0183] S1. Real-time prediction of grid load and battery life, and temperature and discharge management of energy storage equipment;
[0184] S2. Generate energy storage dispatch strategy based on load forecast results;
[0185] S3, real-time monitoring and control of energy storage equipment that executes energy storage scheduling strategies;
[0186] S4: Real-time monitoring of the energy storage equipment status and battery life during energy storage scheduling, and implementation of abnormal correction strategies based on actual conditions;
[0187] S5. Optimize the energy storage dispatch strategy according to the abnormal correction results;
[0188] For the specific content of an energy storage strategy scheduling method for smart grid, please refer to an energy storage strategy scheduling system for smart grid, which will not be repeated here.
[0189] Example 3
[0190] In this embodiment, a computer device is provided, including a memory and a processor, the memory is used to store instructions, and the processor is used to execute the instructions, so that the computer device executes the steps of implementing the above-mentioned energy storage strategy scheduling method for smart grids.
[0191] Example 4
[0192] In this embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed, the steps of the above-mentioned energy storage strategy scheduling method for smart grid are implemented.
[0193] The computer-readable storage medium includes: a U disk, a mobile hard disk, a read-only memory, a random access memory, a magnetic disk or an optical disk, and other media for storing program codes.
[0194] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should all be included in the protection scope of the present invention.
Claims
1. An energy storage strategy dispatching system for a smart grid, characterized in that: include: Load monitoring module, intelligent dispatching module, real-time control module, abnormal diagnosis module and dispatching optimization module; The load monitoring module is used to predict the grid load and battery life in real time, and to perform temperature management and discharge management on energy storage equipment; The load monitoring module includes a load prediction unit, a life prediction unit and an equipment management unit; The device management unit is used to manage energy storage devices, including cooling strategies and discharge strategies; The discharge strategy includes discharge logic and distribution logic. The discharge logic is used to sort the batteries in the energy storage device and control the batteries to supply power during energy storage peak load regulation. The discharge logic specifically includes: Sort the batteries in the energy storage device and form a battery list, configure the discharge sequence and discharge voltage during energy storage peak shaving, and allocate battery groups for power supply according to the battery list when performing energy storage peak shaving. If the power supply voltage of the battery group for power supply is abnormal, determine the battery life of the battery group. If the battery life is normal, determine that the voltage of the battery group is falsely abnormal during power supply, and adjust the actual voltage of the battery group to the discharge voltage; If the battery life of the battery pack that is supplying power is abnormal, the battery list is traversed and the battery packs in the adjacent sequence are assigned to assist in power supply. At this time, the battery packs in the adjacent sequence assigned are the battery packs that are at the next level of the battery pack that is supplying power when the battery list is traversed in sequence; Configure a voltage threshold, and judge the abnormality of the actual voltage according to the voltage threshold, configure a difference threshold, and form a difference voltage by subtracting the actual voltage from the voltage threshold. If the voltage value of the difference voltage is less than the difference threshold, a local power distribution signal is generated; if the voltage value of the difference voltage is greater than or equal to the difference threshold, a global power distribution signal is generated; The intelligent dispatching module is used to generate energy storage dispatching strategies based on load forecasting results; The real-time control module is used to monitor and control the energy storage equipment that executes the energy storage scheduling strategy in real time; The abnormal diagnosis module is used to monitor the status of energy storage equipment and battery life in real time during energy storage scheduling, and implement abnormal correction strategies according to actual conditions; The dispatch optimization module is used to optimize the energy storage dispatch strategy according to the abnormal correction results.
2. The energy storage strategy dispatching system for smart grid according to claim 1, characterized in that: The life prediction unit predicts the battery life by monitoring the abnormality of the temperature, voltage and internal resistance of the battery in the energy storage device and generates a battery life prediction result; The function expression for predicting battery life is as follows: ; In the formula, represents the predicted value of battery life in energy storage equipment, Indicates the initial battery life, Represents the weight value of the battery temperature, Indicates the abnormality of battery temperature. Represents the weight value of the battery voltage, Indicates the abnormality of the battery voltage. Represents the weight value of the battery internal resistance, Indicates the abnormal degree of battery internal resistance; Cooling strategies include: Setting a temperature threshold, including a first temperature threshold and a second temperature threshold. If the battery temperature in the energy storage device is monitored to be greater than the first temperature threshold and less than or equal to the second temperature threshold, the flow rate of the liquid refrigerant releasing cold air is small and the time for the liquid refrigerant to release cold air is long; If it is monitored that the battery temperature in the energy storage device is greater than the second temperature threshold, the flow rate of the liquid refrigerant releasing cold air is large and the time for the liquid refrigerant to release cold air is short. The cold air released by the liquid refrigerant cools the battery in the energy storage device through the operation of the exhaust fan.
3. The energy storage strategy dispatching system for smart grid according to claim 2, characterized in that: The power distribution logic includes obtaining a local power distribution signal or a global power distribution signal, and allocating battery groups in a battery list to assist in adjusting the supply voltage based on the local power distribution signal or the global power distribution signal; The power distribution logic specifically includes: When receiving a local power distribution signal, configure an incremental threshold and a power distribution quantity, the incremental threshold includes a basic threshold, a median threshold and an extreme threshold, the power distribution quantity includes a quantity value one, a quantity value two and a quantity value three, and the power distribution quantity represents the number of batteries allocated when the auxiliary battery is allocated to assist the battery group that is powered; The difference voltage is subtracted from the difference threshold to generate a threshold difference. If the threshold difference is less than or equal to the basic threshold, the allocated battery pack is traversed to extract the discharge sequence of the batteries in the allocated battery pack, and a battery pack with a corresponding number of batteries of value one is selected according to the discharge sequence to supply power, so as to adjust the power supply voltage of the power supply battery pack to meet the discharge voltage requirement; If the threshold difference is greater than the basic threshold and less than or equal to the median threshold, a battery group of battery auxiliary power supply corresponding to the quantity value two is selected for power supply according to the discharge sequence; If the threshold difference is greater than the median threshold and less than or equal to the extreme threshold, a battery group of battery auxiliary power supply corresponding to the number value three is selected for power supply according to the discharge sequence.
4. The energy storage strategy dispatching system for smart grid according to claim 3, characterized in that: The power distribution logic also includes: When receiving a global power distribution signal, the adjacent battery pack is allocated for auxiliary power supply; Discharge strategies also include: In the monitoring history process, it is determined whether a local power distribution signal or a global power distribution signal appears. If a local power distribution signal or a global power distribution signal appears, an auxiliary mark is formed for the battery group that performs auxiliary power supply. When the battery list is traversed to the battery group with the auxiliary mark for power supply, it is determined whether the voltage of the battery group during actual power supply reaches the discharge voltage requirement. If the discharge voltage requirement is met, the power supply is normally supplied and when the power supply is completed, the next battery pack is traversed according to the battery list for power supply; If the battery pack cannot reach the discharge voltage, the battery life of the battery pack is determined. If the battery life of the battery pack is normal, it is determined that the voltage of the battery pack is falsely abnormal when supplying power. At this time, the actual voltage of the battery pack is adjusted to the discharge voltage. If the battery life becomes abnormal, the battery will be allocated to assist in power supply according to the power discharge logic and power distribution logic.
5. The energy storage strategy dispatching system for smart grid according to claim 4, characterized in that: The abnormality diagnosis module includes an abnormality detection unit and an abnormality correction unit; The abnormality detection unit uses the detection strategy to determine the abnormality of the battery's temperature, voltage and internal resistance during the energy storage scheduling process; The detection strategies include temperature strategy, voltage strategy and internal resistance strategy; The internal resistance strategy includes judging the abnormal degree of battery internal resistance during energy storage dispatch by the internal resistance increase rate; The calculation formula of internal resistance increase rate is as follows: ; In the formula, Indicates the rate of increase of the internal resistance of the battery during the energy storage dispatch process, represents the internal resistance of the battery after energy storage scheduling, Represents the internal resistance of the battery before energy storage dispatch; Set the internal resistance change threshold. If the internal resistance increase rate of the battery during the energy storage scheduling process is greater than the internal resistance change threshold, it means that the battery internal resistance is abnormal during the energy storage scheduling process; If the rate of increase of the internal resistance of the battery during the energy storage scheduling process is less than or equal to the internal resistance change threshold, it means that there is no abnormality in the internal resistance of the battery during the energy storage scheduling process.
6. The energy storage strategy dispatching system for smart grid according to claim 5, characterized in that: The energy storage dispatch strategy includes: when the load forecast value is greater than the warning threshold, the discharge strategy is activated to release the electric energy stored in the battery pack to the grid; The energy storage scheduling strategy also includes adjusting the charging and discharging voltage and charging and discharging time of the batteries in the energy storage equipment according to the load forecast value. If the grid load is in a high load period, the charging voltage is reduced and the charging time is increased; if the grid load is in a low load period, the discharge voltage is increased and the discharge time is increased.
7. The energy storage strategy dispatching system for smart grid according to claim 6, characterized in that: The abnormality correction unit performs abnormality correction according to the abnormal degree of the temperature, voltage and internal resistance of the battery in the energy storage scheduling process determined by the abnormality detection unit; The anomaly correction strategy is as follows: Determine the abnormality of battery temperature, voltage and internal resistance during energy storage scheduling; If the battery temperature is abnormal during the energy storage scheduling process, the low-temperature cold air of the liquid refrigerant is released through the cooling strategy of the equipment management unit to reduce the battery temperature in the energy storage device; If the internal resistance of the battery is abnormal during the energy storage dispatch process, the next level of battery pack will be dispatched; The abnormality correction strategy also includes correlation logic, which is used to correlate the battery internal resistance and the battery life to determine the abnormal category of the battery life. The correlation logic includes: Set the internal resistance threshold. If the battery internal resistance is lower than the internal resistance threshold and the battery life is abnormal, the battery life abnormality is determined to be true. If the battery internal resistance is lower than the internal resistance threshold and the battery life is not abnormal, the battery life is judged to be false; Monitor the abnormal degree of battery life after the abnormality is corrected. If the battery life is still abnormal after the abnormality is corrected, optimize the energy storage scheduling strategy.
8. The energy storage strategy dispatching system for smart grid according to claim 7, characterized in that: Optimizing energy storage dispatch strategies includes voltage optimization and time optimization; Voltage optimization is used to dynamically adjust the charge and discharge voltage. The function expression for dynamically adjusting the charge voltage is as follows: ; In the formula, Indicates the charging voltage of the battery after dynamic adjustment. Indicates the target charging voltage of the battery, The correction factor indicating the state of charge, Indicates the current battery charging status. Indicates the current target charging state of the battery; The function expression for dynamically adjusting the discharge voltage is as follows: ; In the formula, Indicates the discharge voltage of the battery after dynamic adjustment. Indicates the target discharge voltage of the battery, Indicates the correction factor of battery life; Time optimization is used to dynamically adjust the charge and discharge time. The function expression for dynamically adjusting the charge time is as follows: ; In the formula, Indicates the charging time of the battery after dynamic adjustment. Indicates the capacity of the battery. Indicates the battery charging rate; The function expression for dynamically adjusting the discharge time is as follows: ; In the formula, Indicates the discharge time of the battery after dynamic adjustment. Indicates the maximum designed discharge time of the battery.
9. The energy storage strategy dispatching system for smart grid according to claim 8, characterized in that: The load forecasting unit predicts the power grid load through load forecasting strategies, which include: Collect historical grid load data and historical meteorological data, normalize them, build a load forecasting model, input real-time grid load data and real-time meteorological data into the load forecasting model, obtain the load forecast value, and set the warning threshold. If the load forecast value is greater than the warning threshold, generate a dispatch signal, and the intelligent dispatch module generates an energy storage dispatch strategy based on the dispatch signal.
10. A method for energy storage strategy scheduling for smart grid, implemented based on an energy storage strategy scheduling system for smart grid according to any one of claims 1 to 9, characterized in that: include: S1. Real-time prediction of grid load and battery life, and temperature and discharge management of energy storage equipment; S2. Generate energy storage dispatch strategy based on load forecast results; S3, real-time monitoring and control of energy storage equipment that executes energy storage scheduling strategies; S4: Real-time monitoring of the energy storage equipment status and battery life during energy storage scheduling, and implementation of abnormal correction strategies based on actual conditions; S5. Optimize the energy storage dispatch strategy based on the abnormal correction results.