A long-distance directional ultra-high pressure cutting and caving equipment and construction process

The long-distance directional ultra-high pressure cutting and caving equipment addresses the inefficiencies of short drill caving by using high-pressure water cutting to form seams in boreholes, enhancing efficiency and safety in deep mining operations.

CN118462168BActive Publication Date: 2024-12-03CHINA COAL TECH & ENG GRP SHENYANG ENG CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410625028.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-20
Publication Date
2024-12-03
Estimated Expiration
2044-05-20

AI Technical Summary

Technical Problem

Existing short drill caving technologies face challenges in deep mining due to increased complexity, requiring frequent transportation, high personnel and time costs, and difficulty in standardizing processes, which are not suitable for intelligent system design.

Method used

A long-distance directional ultra-high pressure cutting and caving equipment using a cutting drill bit, non-magnetic guide control system, hose, pressure pump, and double-layer directional drill rod, with high-pressure water cutting to form cutting seams in boreholes, allowing for efficient roof caving without occupying the mining construction space.

Benefits of technology

Reduces manpower and material costs, improves construction efficiency, and ensures complete roof caving without incomplete blasting or disorderly collapse, suitable for intelligent system integration.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118462168B_ABST
    Figure CN118462168B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of roof caving technology, and in particular provides a long-distance directional ultra-high pressure cutting and caving equipment and a construction process. A long-distance directional ultra-high pressure cutting and caving equipment, including a cutting drill bit, a non-magnetic guide control system, a hose, a pressure pump, a double-layer directional drill rod and a directional drilling rig. A long-distance directional ultra-high pressure cutting and caving construction process includes: preparing a directional drilling site at the outermost end of the goaf, deploying a pressure pump and a directional drilling rig, and assembling a cutting drill bit, a non-magnetic guide control system, a hose and a double-layer directional drill rod in the directional drilling site to form a drilling assembly; marking the drilling positions of multiple boreholes on the top plate rock layer; assembling the drilling assembly assembled in step one to the directional drilling rig to implement drilling construction, and drilling the multiple boreholes marked in step two one by one; and implementing cutting construction according to the caving distance. The long drill caving technology of the present invention occupies a small construction space, does not need to frequently move the drilling site, and reduces the number of boreholes required.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of roof caving, and in particular provides a long-distance directional ultra-high pressure cutting roof caving device and a construction process. Background Art

[0002] The problem of deep goaf disaster management has become one of the difficult problems in deep mine disaster management, mainly manifested in goaf fire and goaf gas disasters. The most direct and effective way to deal with goaf disasters is to eliminate the goaf. Goaf caving technology is one of the most direct ways to eliminate goaf.

[0003] At present, the commonly used goaf caving technologies are short drill blasting caving and short drill hydraulic fracturing caving. Short drill caving technology has the advantages of simple construction operation, simple drilling design, suitable for coal and rock formations with simple roof occurrence, wide application range of drilling construction parameters, small drilling site space occupation, and high single hole drilling rate and hole completion rate.

[0004] However, as the mining depth gradually increases, the occurrence of coal and rock shows multi-structure complexity, the mining equipment is intelligent and the mining efficiency is improved, the disadvantages of short drilling and top caving construction gradually emerge, mainly manifested in the frequent transportation of the drilling site, the need for a large number of construction personnel, the difficulty of drilling quality control, the total transportation time is long, the difficulty of drilling construction is increased, the construction is not in place, the top caving is not timely and sufficient, and the overall personnel cost and time cost are high. At the same time, considering the many random factors in the process of repeatedly transporting the drilling site and the unfixed transportation distance, many processes of the short drilling and top caving process cannot be standardized, which is not conducive to the design of the subsequent intelligent system. Summary of the invention

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a long-distance directional ultra-high pressure cutting and caving equipment, including a cutting drill bit, a non-magnetic guide control system, a hose, a pressure pump, a double-layer directional drill rod and a directional drilling rig, the cutting drill bit is assembled at the front end of the non-magnetic guide control system, the non-magnetic guide control system is assembled at the front end of the double-layer directional drill rod, the rear end of the double-layer directional drill rod is connected to the directional drilling rig, a water outlet is provided on the side wall of the cutting drill bit, and a pipe interface is provided at the rear end of the cutting drill bit, the water outlet and the pipe interface are connected through a built-in pipe cavity, a hose channel is provided in the interlayer of the double-layer directional drill rod, the hose is arranged in the hose channel, and the two ends of the hose are respectively connected to the pipe interface and the pressure pump.

[0006] Furthermore, the pressure pump is a pressure pump with ultra-high pressure output capability, and the rubber hose is a high-pressure resistant tube type.

[0007] A long-distance directional ultra-high pressure cutting and caving construction process uses a long-distance directional ultra-high pressure cutting and caving equipment, and the specific steps include:

[0008] Step 1: prepare a directional drilling site at the outermost end of the goaf, deploy a pressure pump and a directional drilling rig, and assemble a cutting drill bit, a non-magnetic guidance control system, a hose and a double-layer directional drill rod in the directional drilling site to form a drilling assembly;

[0009] Step 2: Mark the drilling positions of multiple boreholes on the roof rock layer;

[0010] Step 3: Assemble the drilling assembly assembled in step 1 onto a directional drilling rig to carry out drilling construction, and drill multiple holes marked in step 2 one by one;

[0011] Step 4: Determine the top release distance based on the advancement distance of the working surface, and implement cutting construction according to the top release distance.

[0012] Furthermore, in step 2, the plurality of drill holes are distributed in rows parallel to the roof rock layer at equal intervals, and the plurality of rows of drill holes are set according to the thickness of the roof rock layer, and the positions of two adjacent rows of drill holes are staggered.

[0013] Furthermore, in step 4, the top distance is determined as follows:

[0014] According to the progress of mining construction, the goaf area can be divided into goaf section, mining construction section and waiting mining section. The safe working area of ​​the mining equipment is the mining construction section, the area where the mining work has been completed and is located outside the mining construction section is the goaf section, and the area where the working face where the mining construction has not yet been completed is the waiting mining section.

[0015] The top caving distance is the length of the goaf section.

[0016] Furthermore, in step 4, the steps of cutting construction are as follows:

[0017] When the caving distance reaches the caving construction requirements, lower the drilling assembly into the borehole until the cutting drill bit reaches the end of the borehole;

[0018] Execute the cutting operation, connect the port of the hose to the pressure pump, start the pressure pump, deliver high-pressure water to the water outlet, and the high-pressure water column will spray out from the water outlet to control the withdrawal of the drilling assembly. During the withdrawal process, the high-pressure water column will axially cut the inner wall of the borehole to form a cutting seam;

[0019] When the cutting seam extends to the edge of the top distance, the pressure pump is stopped, the cutting drill bit is lowered to the end point of the drilling hole again, the cutting angle is adjusted, and the pressure pump is restarted to repeat the cutting operation;

[0020] The above operation process is repeatedly performed, and after cutting multiple cutting slits on the inner wall of the borehole, the drilling equipment is withdrawn, and the cutting operation is performed on the next borehole until the cutting operation is completed on all the boreholes.

[0021] The beneficial effects of using the present invention are:

[0022] Compared with the short drill caving technology, during the construction process of the long drill caving technology of the present invention, the drilling rig equipment does not need to enter the mining construction area, does not occupy its construction space, and does not need to be frequently transported to the drilling site, which greatly saves the man-hours and manpower and material costs consumed by drilling site transportation;

[0023] It reduces the number of drilling holes required, reduces the construction difficulty, and improves the construction efficiency in disguise;

[0024] The use of ultra-high pressure hydraulic directional cutting of the roof rock layer eliminates the hidden danger of incomplete blasting during the blasting and roof release process, and there is no problem of disorderly collapse of the roof rock layer caused by unsatisfactory local blasting effects. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A schematic diagram of the present invention located in a borehole;

[0026] Figure 2 It is a schematic diagram of the relative relationship between the borehole, goaf and mining face;

[0027] Figure 3 for Figure 2 Cross-sectional view at AA in the middle;

[0028] Figure 4 This is a schematic diagram of the fracture trend of the roof rock layer;

[0029] Reference numerals include: 1, roof rock layer; 2, borehole;

[0030] 3. Cutting drill bit;

[0031] 301, water outlet; 302, pipe interface;

[0032] 4. Non-magnetic guidance control system; 5. Rubber hose; 6. Pressure pump; 7. Double-layer directional drill rod; 8. Directional drilling rig;

[0033] 9. Cutting seams;

[0034] 901, horizontal cutting seam; 902, vertical cutting seam.

[0035] 10. Collapsed rock roof; 11. Mining working face; 12. Mining equipment. DETAILED DESCRIPTION

[0036] The present invention is described in detail below with reference to the accompanying drawings.

[0037] Embodiment 1

[0038] Reference Figure 1-Figure 4A long-distance directional ultra-high pressure cutting and caving equipment comprises a cutting drill bit 3, a non-magnetic guidance control system 4, a hose 5, a pressure pump 6, a double-layer directional drill rod 7 and a directional drilling rig 8. The cutting drill bit 3 is assembled at the front end of the non-magnetic guidance control system 4, the non-magnetic guidance control system 4 is assembled at the front end of the double-layer directional drill rod 7, the rear end of the double-layer directional drill rod 7 is connected to the directional drilling rig 8, a water outlet 301 is arranged on the side wall of the cutting drill bit 3, and a pipe interface 302 is arranged at the rear end of the cutting drill bit 3, the water outlet 301 is communicated with the pipe interface 302 through a built-in pipe cavity, a hose channel is arranged in the interlayer of the double-layer directional drill rod 7, the hose 5 is arranged in the hose channel, and the two ends of the hose 5 are respectively connected to the pipe interface 302 and the pressure pump 6.

[0039] Preferably, the pressure pump 6 is a pressure pump with ultra-high pressure output capability;

[0040] The hose 5 is of high pressure resistant type;

[0041] The water outlet 301, the pipe interface 302 and the hose 5 are arranged in a group.

[0042] Embodiment 2

[0043] Compared with the first embodiment, the present embodiment is different in that:

[0044] Specifically, the cutting drill bit 3 is a directional drill bit with a directional cutting function.

[0045] Two groups of water outlet holes 301 , a pipe interface 302 and a rubber hose 5 are symmetrically arranged on the cutting drill bit 3 , that is, the angle between the two water outlet holes 301 is 180°.

[0046] Embodiment 3

[0047] Compared with the first embodiment, the present embodiment is different in that:

[0048] Specifically, the cutting drill bit 3 adopts a conventional directional drill bit.

[0049] Four groups of water outlet holes 301 , pipe interfaces 302 and rubber hoses 5 are centrally symmetrically arranged on the cutting drill bit 3 , that is, the angle between two water outlet holes 301 is 90°.

[0050] Embodiment 4

[0051] A long-distance directional ultra-high pressure cutting and caving construction process, which uses the long-distance directional ultra-high pressure cutting and caving equipment described in Example 1, and the specific steps include:

[0052] Step 1: prepare a directional drilling site at the outermost end of the goaf, deploy a pressure pump 6 and a directional drilling rig 8, and assemble a cutting drill bit 3, a non-magnetic guidance control system 4, a hose 5 and a double-layer directional drill rod 7 in the directional drilling site to form a drilling assembly.

[0053] Specifically, the assembly process is as follows:

[0054] Assemble the cutting drill bit 3 onto the non-magnetic guidance control system 4;

[0055] Connect the hose 5 to the cutting drill bit 3;

[0056] The double-layer directional drilling rod 7 is assembled on the non-magnetic guidance control system 4, and the rubber hose 5 is inserted into the rubber hose channel.

[0057] Step 2: Mark the drilling positions of multiple boreholes 2 on the roof rock layer 1.

[0058] Specifically, refer to Figure 3 , multiple drill holes 2 are arranged in rows at equal intervals and parallel to the roof rock layer 1, multiple rows of drill holes 2 are set according to the thickness of the roof rock layer 1, and the positions of two adjacent rows of drill holes 2 are staggered;

[0059] The spacing between adjacent boreholes 2 is specifically calculated based on the structural hardness of the roof rock layer 1. It is necessary to ensure that the roof rock layer 1 will not collapse after the boreholes 2 are completed and before the cutting process is carried out.

[0060] Step 3: Assemble the drilling assembly assembled in step 1 onto the directional drilling rig 8 to carry out drilling construction, and drill the multiple boreholes 2 marked in step 2 one by one.

[0061] Step 4: Determine the top release distance according to the advancement distance of the working surface 11, and implement the cutting construction according to the top release distance.

[0062] Specifically, according to the progress of mining construction, the goaf area can be divided into the goaf section, the mining construction section and the waiting mining section. Among them, the safe working area of ​​the mining equipment 12 is the mining construction section, the area where the mining work is completed and located outside the mining construction section is the goaf section, and the area where the working face where the mining construction has not yet been completed is the waiting mining section.

[0063] When the distance of the goaf section reaches the requirements of the top caving construction (the distance is set according to the mining construction environment, and is usually preferably a cycle of pressure step), the drilling assembly is lowered into the borehole until the cutting drill bit 3 is lowered into the end point of the borehole 2;

[0064] Execute the cutting operation, connect the port of the hose 5 to the pressure pump 6, start the pressure pump 6, deliver high-pressure water to the water outlet 301, and the high-pressure water column sprays out from the water outlet 301 to control the drilling assembly to withdraw. During the withdrawal process, the high-pressure water column axially cuts the inner wall of the borehole 2 to form a cutting seam 9;

[0065] When the cutting seam 9 extends to the edge of the goaf section, the pressure pump 6 is stopped, the cutting drill bit 3 is lowered into the end point of the borehole 2 again, and the cutting angle is adjusted and then the pressure pump 6 is restarted to repeat the cutting operation.

[0066] The above operation process is repeatedly performed, and after a plurality of cutting slits 9 are cut on the inner wall of the borehole 2 , the drilling equipment is withdrawn, and the cutting operation is performed on the next borehole 2 until the cutting operation is completed on all the boreholes 2 .

[0067] Preferably, four cutting slits 9 are cut on the inner wall of the borehole 2, including a horizontal cutting slit 901 and a vertical cutting slit 902, and the four cutting slits 9 are distributed in a "cross" shape.

[0068] As the cutting construction proceeds, under the combined effects of the vibration of the roof rock stratum 1 caused by the mining of the working face 11, the impact force of the water column on the borehole wall during the cutting construction, and the ground stress, the roof rock stratum 1 of the goaf section will collapse piece by piece to form a collapsed rock roof 10.

[0069] This process is mainly suitable for goaf areas where the hardness of the roof rock layer 1 is relatively high.

[0070] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, many changes can be made in the specific implementation methods and application scopes based on the ideas of the present invention. As long as these changes do not deviate from the concept of the present invention, they all belong to the protection scope of the present invention.

Claims

1. A long-distance directional ultra-high pressure cutting and caving construction process, using a long-distance directional ultra-high pressure cutting and caving equipment, including a cutting drill bit, a non-magnetic guide control system, a hose, a pressure pump, a double-layer directional drill pipe and a directional drilling rig, the cutting drill bit is assembled at the front end of the non-magnetic guide control system, the non-magnetic guide control system is assembled at the front end of the double-layer directional drill pipe, the rear end of the double-layer directional drill pipe is connected to the directional drilling rig, a water outlet is arranged on the side wall of the cutting drill bit, and a pipe interface is arranged at the rear end of the cutting drill bit, the water outlet is connected to the pipe interface through a built-in pipe cavity, a hose channel is arranged in the interlayer of the double-layer directional drill pipe, the hose is arranged in the hose channel, and both ends of the hose are respectively connected to the pipe interface and the pressure pump; The specific steps include: Step 1: prepare a directional drilling site at the outermost end of the goaf, deploy a pressure pump and a directional drilling rig, and assemble a cutting drill bit, a non-magnetic guidance control system, a hose and a double-layer directional drill rod in the directional drilling site to form a drilling assembly; Step 2: Mark the drilling positions of multiple boreholes on the roof rock layer; The plurality of drill holes are arranged in rows at equal intervals and parallel to the roof rock layer. The plurality of rows of drill holes are arranged according to the thickness of the roof rock layer, and the positions of two adjacent rows of drill holes are staggered. Step 3: Assemble the drilling assembly assembled in step 1 onto a directional drilling rig to carry out drilling construction, and drill multiple holes marked in step 2 one by one; Step 4: Determine the top-release distance according to the advancement distance of the working surface, and implement the cutting construction according to the top-release distance; When the caving distance reaches the caving construction requirements, lower the drilling assembly into the borehole until the cutting drill bit reaches the end of the borehole; Execute the cutting operation, connect the port of the hose to the pressure pump, start the pressure pump, deliver high-pressure water to the water outlet, and the high-pressure water column will spray out from the water outlet to control the withdrawal of the drilling assembly. During the withdrawal process, the high-pressure water column will axially cut the inner wall of the borehole to form a cutting seam; Four cutting slits are cut on the inner wall of the borehole, including a horizontal cutting slit and a vertical cutting slit, and the four cutting slits are distributed in a "cross" shape; When the cutting seam extends to the edge of the top distance, the pressure pump is stopped, the cutting drill bit is lowered to the end point of the drilling hole again, the cutting angle is adjusted, and the pressure pump is restarted to repeat the cutting operation; Repeat the above operation process, withdraw the drilling equipment after cutting multiple cutting slits on the inner wall of the borehole, and then perform the cutting operation on the next borehole until the cutting operation is completed on all the boreholes; As the cutting construction proceeds, under the combined effects of the roof rock strata vibration caused by the mining of the working face, the impact force of the water column on the borehole wall during the cutting construction, and the ground stress, the roof rock strata of the mined section will collapse piece by piece to form a collapsed rock roof.

2. A long-distance directional ultra-high pressure cutting and caving construction process according to claim 1, characterized in that: The pressure pump is a pressure pump with ultra-high pressure output capability, and the rubber hose is a high-pressure resistant tube type.

3. According to the long-distance directional ultra-high pressure cutting and caving construction process described in claim 1, it is characterized by: In step 4, the top distance is determined as follows: According to the progress of mining construction, the goaf area can be divided into goaf section, mining construction section and waiting mining section. The safe working area of ​​the mining equipment is the mining construction section, the area where the mining work has been completed and is located outside the mining construction section is the goaf section, and the area where the working face where the mining construction has not yet been completed is the waiting mining section. The top caving distance is the length of the goaf section.