Test method and test system for storage and charging system
Through the testing methods and testing systems of the storage and charging system, we ensure that the storage and charging system can automatically charge when the remaining power of the energy storage device is less than or equal to the threshold, and supports three charging methods, which solves the difficulty of testing the storage and charging system before it is put into use. The problem of the system improves the reliability and stability.
Patent Information
- Application Number
- CN202410925624.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2044-07-11
AI Technical Summary
How to conduct sufficient testing before the storage and charging integrated system is put into market to ensure that it can operate normally after it is put into use.
Provide a test method and test system for the storage and charging system. Through the test machine, the energy management system, energy storage device and charging conversion device of the storage and charging system are tested, including the testing of energy storage functions, charging functions and communication functions to ensure that The system can automatically charge when the remaining power of the energy storage device is less than or equal to the threshold, and supports three charging methods. The test system includes a test machine and a storage system. The test machine is used to obtain charging data and message data to determine whether the system functions. normal.
Effectively improve the reliability and stability of the use of the storage and charging system, ensure that the system can operate normally under different states, including the testing of automatic energy storage and charging functions, ensure that the communication function between the battery management unit and the energy management system is normal, and improve the The system's security and charging reliability are provided.
Smart Images

Figure CN118465417B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of battery technology, and in particular to a testing method and a testing system for a storage and charging system. Background Art
[0002] At present, with the gradual application of integrated storage and charging systems, how to fully test the integrated storage and charging systems before they are put into market use to ensure that they can operate normally after being put into use is an urgent problem to be solved. Summary of the invention
[0003] The embodiments of the present application provide a testing method and a testing system for a storage and charging system, which can effectively test the functions of the storage and charging system and improve the reliability of the use of the storage and charging system.
[0004] The technical solution of the embodiment of the present application is implemented as follows:
[0005] In a first aspect, an embodiment of the present application provides a test method for a storage and charging system, which is applied to a test machine; the storage and charging system includes an energy management system, an energy storage device, and a charging conversion device; the energy storage device includes a battery management unit; the method includes:
[0006] When the remaining power of the energy storage device is less than or equal to the first threshold, obtaining first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device, and determining whether the energy storage function of the storage and charging system is normal based on the first charging data;
[0007] When the device to be charged is connected to the charging conversion device, second charging data of the energy management system controlling the AC-DC converter and / or the energy storage device to charge the device to be charged is obtained, and whether the charging function of the storage and charging system is normal based on the second charging data;
[0008] Among them, the charging conversion device is connected to the AC-to-DC converter and the energy storage device respectively; the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
[0009] In this embodiment, when the energy storage function of the storage and charging system is normal, the energy management system will instruct the AC-DC converter to charge the energy storage device when it detects that the remaining power of the energy storage device is less than or equal to the first threshold. Therefore, when the tester tests the energy storage function, it can obtain the first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold, thereby determining whether the energy storage function of the storage and charging system is normal through the first charging data, that is, determining whether the storage and charging system can automatically charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold; and for the charging function of the storage and charging system, under normal circumstances, three charging methods can be supported, including charging the charging device only by using the AC-DC converter, charging the charging device only by using the energy storage device And the AC-to-DC converter and the energy storage device are used to charge the charging device at the same time. Therefore, when testing the charging function of the storage and charging system, the test machine can obtain the second charging data of the energy management system controlling the AC-to-DC converter and / or the energy storage device to charge the charging device when the charging device is connected, so as to determine whether the storage and charging system can normally perform the three charging methods according to the second charging data; thereby achieving effective testing of the automatic energy storage function and charging function of the storage and charging system; in addition, before testing the energy storage function and charging function, the communication function between the battery management unit and the energy management system can be tested based on the message data received by the energy management system and the message data sent by the battery management unit to ensure that the communication function between the battery management unit and the energy management system is normal; based on the above test, the reliability of the use of the storage and charging system can be effectively improved.
[0010] In some embodiments of the present application, the second charging data includes third charging information, fourth charging information, and fifth charging information; and the method further includes:
[0011] Sending first charging instruction information to the energy management system, so that the energy management system controls the AC-DC converter to charge the device to be charged in response to the first charging instruction information, and obtains third charging information; wherein the first charging instruction information is used to instruct the device to be charged to be charged through the AC-DC converter;
[0012] Sending second charging indication information to the energy management system, so that the energy management system controls the energy storage device to charge the device to be charged through the battery management unit in response to the second charging indication information, and obtains fourth charging information;
[0013] Sending third charging indication information to the energy management system so that the energy management system responds to the third charging indication information, controls the AC-DC converter and the battery management unit to charge the device to be charged through the AC-DC converter and the energy storage device, and obtains fifth charging information.
[0014] In this embodiment, the test machine can send a first charging indication message to the energy management system to instruct the shielding of the energy storage device, and only use the AC-to-DC converter to charge the device to be charged, and obtain relevant information of the charging process, i.e., the third charging information, thereby realizing an effective test of the charging function of charging only using the AC-to-DC converter; the test machine can send a second charging indication message to the energy management system to instruct the shielding of the AC-to-DC converter, and only use the energy storage device to charge the device to be charged, and obtain relevant information of the charging process, i.e., the fourth charging information, thereby realizing an effective test of the charging function of charging only using the energy storage device; the test machine can also send a third charging indication message to the energy management system to instruct the simultaneous use of the AC-to-DC converter and the energy storage device to charge the device to be charged, and obtain relevant information of the charging process, i.e., the fifth charging information, thereby realizing an effective test of the charging function of charging the device to be charged using the AC-to-DC converter and the energy storage device at the same time.
[0015] In some embodiments of the present application, the energy storage device includes a battery management unit; and the method further includes:
[0016] Before testing the energy storage function and the charging function, obtain the first message data of the energy management system and the second message data of the battery management unit; wherein the second message data represents the message data generated by the battery management unit and sent to the energy management system; and the first message data represents the message data received by the energy management system from the battery management unit;
[0017] Comparing the first message data with the second message data to obtain a comparison result;
[0018] When the comparison result shows that the first message data and the second message data are the same, it is determined that the communication function between the battery management unit and the energy management system passes the test.
[0019] In this embodiment, before testing the storage and charging function of the entire storage and charging system, a communication test can be performed first; when testing the communication function between the battery management unit in the energy storage device and the energy management system, the first message data received by the energy management system from the battery management unit and the second message data generated by the battery management unit and sent to the energy management system can be obtained, and the first message data and the second message data are compared. If the first message data and the second message data are the same, it means that the communication between the battery management unit and the energy management system is correct, that is, the communication function has passed the test, thereby improving the stability and reliability of communication of the storage and charging system during use.
[0020] In some embodiments of the present application, when the comparison result is that the first message data and the second message data are the same, after determining that the communication function between the battery management unit and the energy management system passes the test, the method further includes:
[0021] Obtaining a protection instruction generated by the energy management system in response to a fault message sent by the battery management unit;
[0022] Obtain a fault message from a battery management unit and determine a fault level of the fault message;
[0023] In the case where it is determined that the protection instruction is a protection instruction corresponding to the fault level, it is determined that the protection function of the energy storage device passes the test.
[0024] In this embodiment, the protection function of the energy storage device can also be tested before the storage and charging function of the entire storage and charging system is tested. When the battery management unit sends a fault message to the energy management system, the protection instruction generated by the energy management system in response to the fault message is obtained, and the fault level of the fault message sent by the battery management unit is determined. If the protection instruction generated by the energy management system is an instruction for processing a fault at this fault level, it is determined that the protection function of the energy storage device has passed the test, thereby improving the storage and charging system's ability to handle faults in the energy storage device and improving the safety of the storage and charging system.
[0025] In some embodiments of the present application, when the comparison result is that the first message data and the second message data are the same, after determining that the communication function between the battery management unit and the energy management system passes the test, the method further includes:
[0026] Acquire first voltage data of the energy storage device at different remaining capacities and second voltage data of a battery in the energy storage device;
[0027] When the first voltage data conforms to the first voltage range and the second voltage data conforms to the second voltage range, it is determined that the voltage of the energy storage device passes the test.
[0028] In this embodiment, after the communication function test is passed, the voltage range of the energy storage device can also be tested. The tester can obtain the first voltage data of the energy storage device at different remaining powers, and the second voltage data of the battery in the energy storage device. When it is determined that the first voltage data and the second voltage data are in accordance with their respective corresponding first voltage ranges and second voltage ranges, it is determined that the voltage of the energy storage device has passed the test, so as to improve the stability of the energy storage device during use.
[0029] In some embodiments of the present application, the charging conversion device includes a charging control unit; the method further includes:
[0030] Acquire first charging request information of the device to be charged and second charging request information sent by the device to be charged and received by the charging control unit when the device to be charged is connected to the charging conversion device;
[0031] In a case where the first charging request information is identical to the second charging request information, it is determined that the charging control unit passes the test of the charging request response.
[0032] In this embodiment, it is also possible to test whether the charging control unit in the charging conversion device can correctly respond to the charging request of the device to be charged; the testing machine can obtain the first charging request information of the device to be charged and the second charging request information received by the charging control unit from the device to be charged when the device to be charged is connected to the charging conversion device. If the first charging request information and the second charging request information are the same, it is determined that the charging control unit can correctly respond to the charging request, thereby improving the reliability of the storage and charging system.
[0033] In some embodiments of the present application, when the first charging request information is the same as the second charging request information, after determining that the charging control unit passes the test of the charging request response, the method further includes:
[0034] Acquire a first charging capacity parameter sent by the energy management system and received by the charging control unit; wherein the first charging capacity parameter is calculated by the energy management system based on the received charging capacity parameter of the energy storage device and the charging capacity parameter of the AC-DC converter;
[0035] When the first charging capability parameter is the same as the second charging capability parameter, it is determined that the charging capability parameter matching test has passed; wherein the second charging parameter represents the charging capability parameter calculated based on the measured charging capability parameter of the energy storage device and the measured charging capability parameter of the AC-to-DC converter.
[0036] In this embodiment, after the charging control unit passes the test of the charging request response, the matching of the charging capacity parameters can be tested. The test machine can obtain the first charging capacity parameter received by the charging control unit from the energy management system, and the first charging capacity parameter is calculated by the energy management system based on the charging capacity parameter of the energy storage device and the charging capacity parameter of the AC-DC converter obtained by it. Then, the test machine can measure the charging capacity parameters of the energy storage device and the AC-DC converter to obtain the measured second charging capacity parameter. If the first charging capacity parameter is the same as the second charging capacity parameter, it is determined that the matching of the charging capacity parameters has passed the test, which can improve the reliability of the storage and charging system during charging.
[0037] In some embodiments of the present application, when the first charging capability parameter is the same as the second charging capability parameter, after determining that the charging capability parameter matching test is passed, the method further includes:
[0038] When charging the device to be charged through the charging conversion device, obtaining the output parameter of the charging conversion device sent by the charging control unit;
[0039] When the output parameter is less than or equal to the target parameter, it is determined that the charging conversion device passes the test of the output parameter; wherein the target parameter is the minimum value of the first charging request information and the first charging capability parameter.
[0040] In this embodiment, the output parameters of the charging conversion device can also be tested after passing the charging capability parameter matching test. The test machine can obtain the output parameters of the charging conversion device during the process of charging the charging device using the charging conversion device through the charging control unit, and compare the output parameters with the target parameters. The target parameter is the minimum value between the first charging request information and the first charging capability parameter. If it is determined that the output parameter is less than or equal to the target parameter, it is determined that the charging conversion device has passed the output parameter test, which can improve the charging reliability of the storage and charging system.
[0041] In some embodiments of the present application, when the output parameter is less than or equal to the target parameter, after determining that the charging conversion device passes the output parameter test, the method further includes:
[0042] When the device to be charged is charged by the AC-DC converter, obtaining a first discharge parameter of the AC-DC converter;
[0043] When the device to be charged is charged by the energy storage device, obtaining a second discharge parameter of the energy storage device;
[0044] In the case where the device to be charged is charged by the AC-DC converter and the energy storage device, obtaining a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device;
[0045] When the first discharge parameter and the third discharge parameter are less than or equal to the charging capacity parameter of the AC-DC converter, and the second discharge parameter and the fourth discharge parameter are less than or equal to the charging capacity parameter of the energy storage device, it is determined that the AC-DC converter and the energy storage device pass the discharge parameter test.
[0046] In this embodiment, after determining that the charging conversion device passes the output parameter test, the discharge parameter test of the AC-DC converter and the energy storage device can also be performed. The test machine can obtain the first discharge parameter of the AC-DC converter in the process of charging the device to be charged using only the AC-DC converter, and obtain the first discharge parameter of the energy storage device in the process of charging the device to be charged using only the energy storage device, and obtain the third discharge parameter of the AC-DC converter and the fourth discharge parameter of the energy storage device in the process of charging the device to be charged using both the AC-DC converter and the energy storage device; and then judge whether the discharge parameters of the AC-DC converter, including the first discharge parameter and the third discharge parameter, are both less than or equal to the charging capacity parameter of the AC-DC converter, and whether the discharge parameters of the energy storage device, including the second discharge parameter and the fourth discharge parameter, are both less than or equal to the charging capacity parameter of the energy storage device. If the discharge parameters all meet the condition, it can be determined that the AC-DC converter and the energy storage device pass the discharge parameter test, thereby improving the stability of the storage and charging system in charging the device to be charged using three charging methods.
[0047] In some embodiments of the present application, the charging conversion device includes at least two DC-to-DC converters connected in parallel; the method further includes:
[0048] When the charging conversion device supplies power to the device to be charged, obtaining output data of at least two DC-to-DC converters;
[0049] Determining output difference information according to the output data; wherein the output difference information represents difference information between currents outputted by at least two DC-to-DC converters;
[0050] When the output difference information is less than or equal to the second threshold, it is determined that the charging conversion device passes the circulating current test.
[0051] In this embodiment, a circulation test can also be performed on at least two DC-to-DC converters connected in parallel in the charging conversion device. The tester can obtain the output data of each of the at least two DC-to-DC converters in the process of supplying power to the device to be charged through the charging conversion device, and determine the output difference information between the currents output by the at least two DC-to-DC converters based on the output data. If the output difference information is less than or equal to the second threshold, it can be determined that the charging conversion device can improve the balance of the output current of at least two DC-to-DC converters in the charging conversion device by passing the circulation test.
[0052] In some embodiments of the present application, the method further comprises:
[0053] Writing the first software version information into the battery management unit so that the battery management unit sends the first software version information to the energy management system;
[0054] Receiving second software version information sent by the energy management system;
[0055] When the first software version information is identical to the second software version information, it is determined that the energy management system passes the test of software version reading.
[0056] In this embodiment, after the storage and charging system has passed multiple hardware tests, software testing can also be performed on the storage and charging system. The testing machine can write the first software version information to the battery management unit, and then after the battery management unit sends the first software version information to the energy management system, obtain the second software version information sent by the energy management system. If the first software version information and the second software version information are the same, it is determined that the energy management system has passed the software version reading test, which can improve the stability of software operation in the storage and charging system.
[0057] In some embodiments of the present application, the method further comprises:
[0058] Send high voltage instruction to the energy management system;
[0059] In the case of determining that the energy management system controls the battery management unit to complete the high-voltage operation of the energy storage device in response to the high-voltage instruction, determining that the energy storage device passes the high-voltage test;
[0060] Send high voltage command to the energy management system;
[0061] When it is determined that the energy management system controls the battery management unit to complete the lower high voltage operation of the energy storage device in response to the lower high voltage instruction, it is determined that the energy storage device passes the lower high voltage test.
[0062] In this embodiment, the energy storage device can also be tested for upper high voltage and lower high voltage. The tester can send an upper high voltage instruction to the energy management system to determine whether the energy management system can control the battery management unit to complete the upper high voltage operation of the energy storage device in response to the upper high voltage instruction. If the upper high voltage operation can be completed, it is determined that the upper high voltage test has passed. The tester can also send a lower high voltage instruction to the energy management system to determine whether the energy management system can control the battery management unit to complete the lower high voltage operation of the energy storage device in response to the lower high voltage instruction. If the lower high voltage operation can be completed, it is determined that the lower high voltage test has passed, thereby improving the stability of the upper and lower high voltage operations.
[0063] In some embodiments of the present application, the method further comprises:
[0064] When the energy storage device is turned off, the energy management system obtains the status detection information of the battery management unit;
[0065] When the status detection information indicates that the battery management unit is in an offline state, it is determined that the battery management unit passes the offline function test.
[0066] In this embodiment, the testing machine can also obtain the status detection information of the battery management unit by the energy management system when the energy storage device is turned off, so as to determine whether the energy management system can accurately detect that the battery management unit in the energy storage device is in an offline state, thereby effectively testing the offline function of the software in the battery management unit.
[0067] In a second aspect, an embodiment of the present application provides a test system, the test system comprising a test machine and a storage and charging system connected to the test machine; wherein the storage and charging system comprises an energy management system, an energy storage device and a charging conversion device; the energy storage device comprises a battery management unit; the charging conversion device is respectively connected to an AC to DC converter and the energy storage device;
[0068] A testing machine, used to obtain first charging data of the energy management system controlling the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold value, so as to determine whether the energy storage function of the storage and charging system is normal based on the first charging data;
[0069] The test machine is also used to obtain second charging data when the energy management system controls the AC-to-DC converter and / or the energy storage device to charge the device to be charged when the device to be charged is connected to the charging conversion device, and determine whether the charging function of the storage and charging system is normal based on the second charging data; wherein the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
[0070] In this embodiment, when the energy storage function of the storage and charging system is normal, the energy management system will instruct the AC-DC converter to charge the energy storage device when it detects that the remaining power of the energy storage device is less than or equal to the first threshold. Therefore, when the tester tests the energy storage function, it can obtain the first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold, thereby determining whether the energy storage function of the storage and charging system is normal through the first charging data, that is, determining whether the storage and charging system can automatically charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold; and for the charging function of the storage and charging system, under normal circumstances, three charging methods can be supported, including charging the charging device only by using the AC-DC converter, charging the charging device only by using the energy storage device And the AC-to-DC converter and the energy storage device are used to charge the charging device at the same time. Therefore, when testing the charging function of the storage and charging system, the test machine can obtain the second charging data of the energy management system controlling the AC-to-DC converter and / or the energy storage device to charge the charging device when the charging device is connected, so as to determine whether the storage and charging system can normally perform the three charging methods according to the second charging data; thereby achieving effective testing of the automatic energy storage function and charging function of the storage and charging system; in addition, before testing the energy storage function and charging function, the communication function between the battery management unit and the energy management system can be tested based on the message data received by the energy management system and the message data sent by the battery management unit to ensure that the communication function between the battery management unit and the energy management system is normal; based on the above test, the reliability of the use of the storage and charging system can be effectively improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below.The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application.
[0072] Figure 1 A schematic diagram of the implementation flow of the test method for the storage and charging system proposed in the embodiment of the present application;
[0073] Figure 2 The structure of the test system proposed in this application is shown in FIG. Figure 1 ;
[0074] Figure 3 A schematic diagram of the structure of the storage and charging system proposed in the embodiment of the present application;
[0075] Figure 4 The structure of the test system proposed in this application is shown in FIG. Figure 2 . DETAILED DESCRIPTION
[0076] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. It is understood that the specific embodiments described herein are only used to explain the related applications, rather than to limit the applications. It should also be noted that, for ease of description, only the parts related to the related applications are shown in the drawings.
[0077] New energy batteries are increasingly used in life and industry. For example, new energy vehicles equipped with batteries have been widely used. In addition, batteries are increasingly used in energy storage, etc. New energy batteries are not only used in energy storage power supply systems such as hydropower, thermal power, wind power and solar power stations, but also widely used in electric vehicles such as electric bicycles, electric motorcycles, electric cars, as well as aerospace and other fields. With the continuous expansion of the application field of power batteries, the market demand is also constantly expanding; for example, they can be used in integrated storage and charging systems.
[0078] At present, with the gradual application of integrated storage and charging systems, how to fully test the integrated storage and charging systems before they are put into market use to ensure that they can operate normally after being put into use is an urgent problem to be solved.
[0079] In order to solve the problems existing in the testing of the current storage and charging system, the embodiment of the present application provides a testing method and a testing system for the storage and charging system; the testing system may include a testing machine and a storage and charging system, and the storage and charging system may include an energy management system, an energy storage device and a charging conversion device; the energy storage device includes a battery management unit; the testing machine may obtain first charging data in which the energy management system instructs the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold, and determine whether the energy storage function of the storage and charging system is normal based on the first charging data; when the device to be charged is connected to the charging conversion device, obtain second charging data in which the energy management system controls the AC-DC converter and / or the energy storage device to charge the device to be charged, and determine whether the charging function of the storage and charging system is normal based on the second charging data; the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit; thereby, the function of the storage and charging system can be effectively tested, and the reliability of the use of the storage and charging system can be improved.
[0080] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.
[0081] The description of the system in the embodiment of the present application is similar to the description of the method embodiment described below, and has similar beneficial effects as the method embodiment. For technical details not disclosed in the embodiment of the system, please refer to the description of the method embodiment of the present application for understanding.
[0082] An embodiment of the present application provides a test method for a storage and charging system, which is applied to a test machine in a test system. The test system also includes a storage and charging system, which may include an energy management system, an energy storage device, and a charging conversion device; Figure 1 As shown, the testing method of the storage and charging system of the testing machine may include the following steps:
[0083] Step 101: When the remaining power of the energy storage device is less than or equal to a first threshold, obtain first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device, and determine whether the energy storage function of the storage and charging system is normal based on the first charging data.
[0084] In an embodiment of the present application, the testing machine can obtain first charging data in which the energy management system (EMS) instructs the AC-to-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to a first threshold value, and determine whether the energy storage function of the charging and storage system is normal based on the first charging data.
[0085] In the embodiment of the present application, the test machine may be a host computer, which can be used to issue control instructions and has a screen display function.
[0086] In the embodiments of the present application, the energy storage device may include multiple batteries; the battery may be assembled from one or more battery cells; the battery may be a battery cell. A battery cell refers to a basic unit that can realize the mutual conversion of chemical energy and electrical energy, and can be used to make a battery module or a battery pack, so as to supply power to an electrical device. A battery cell may be a secondary battery, which refers to a battery cell that can be activated by charging the active material after the battery cell is discharged and can continue to be used. The battery cell may be a lithium-ion battery, a sodium-ion battery, a sodium-lithium-ion battery, a lithium metal battery, a sodium metal battery, a lithium-sulfur battery, a magnesium-ion battery, a nickel-hydrogen battery, a nickel-cadmium battery, a lead-acid battery, etc., and the embodiments of the present application do not limit this.
[0087] In the embodiment of the present application, the battery may also be a single physical module including one or more battery cells to provide higher voltage and capacity. When there are multiple battery cells, the multiple battery cells are connected in series, in parallel or in hybrid connection through a busbar component.
[0088] In an embodiment of the present application, the remaining power of the battery may be determined by the state of charge (SOC) of the battery, or the remaining power of the energy storage device may be determined based on the state of charge of each battery in the energy storage device.
[0089] In the embodiments of the present application, the numerical value of the first threshold value is not limited in the present application. For example, the first threshold value may be 5%. When the remaining power of the energy storage device is 5% or less, it can be determined that the energy storage device is in a low-power state. At this time, the storage and charging system may automatically charge the energy storage device. In other words, the storage and charging system in the present application has the function of automatically replenishing power for the energy storage device.
[0090] In an embodiment of the present application, the AC-to-DC converter may be a bidirectional AC-to-DC converter, i.e., a bidirectional AC (Alternating Current, AC) / DC (Direct Current, DC) converter, wherein the number of bidirectional AC-to-DC converters is not limited in the present application and may be at least one; the test system also includes a DC bus, one end of the AC-to-DC converter may be connected to the DC bus, and the other end may be connected to a transformer, and the transformer may be connected to a power grid to output AC power to the AC-to-DC converter through the power grid.
[0091] In an embodiment of the present application, the first charging data can be used to describe the process of charging the energy storage device based on the AC-to-DC converter; the first charging data may include status information of each device in the storage and charging system during the process of charging the energy storage device based on the AC-to-DC converter, as well as current, voltage, power and other information of the charging process.
[0092] In some embodiments of the present application, the tester can determine that the charging process is normal based on the status information of each device of the storage and charging system in the first charging data, and that the energy storage function of the storage and charging system is normal if there is no fault in each device.
[0093] In the embodiment of the present application, charging the energy storage device through an AC-to-DC converter means charging the energy storage device by obtaining electric energy from a power grid.
[0094] Step 102: When the device to be charged is connected to the charging conversion device, obtain the second charging data of the energy management system controlling the AC-DC converter and / or the energy storage device to charge the device to be charged, and determine whether the charging function of the storage and charging system is normal based on the second charging data; wherein the charging conversion device is connected to the AC-DC converter and the energy storage device respectively; the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
[0095] In an embodiment of the present application, the tester can, when the device to be charged is connected to the charging conversion device, obtain the second charging data of the energy management system controlling the AC-to-DC converter and / or the energy storage device to charge the device to be charged, and determine whether the charging function of the storage and charging system is normal based on the second charging data; wherein the charging conversion device is connected to the AC-to-DC converter and the energy storage device, respectively; the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
[0096] In the embodiments of the present application, the execution order of the energy storage function test and the charging function test is not limited in the present application. The charging function test may be performed after the energy storage function test, or the energy storage function test may be performed after the charging function test.
[0097] In the embodiments of the present application, the device to be charged refers to a device connected to the storage and charging system for charging. The present application does not limit the device to be charged. For example, the device to be charged may be an electric vehicle.
[0098] In an embodiment of the present application, the charging conversion device may include at least two DC-to-DC converters, i.e., bidirectional DC / DC converters. The number of bidirectional DC / DC converters is not limited in this application. For example, 8 bidirectional DC / DC converters may be included. The charging conversion device may also include a charging control unit (Charge Control Unit, CCU), which may be used to control the charging conversion device.
[0099] In an embodiment of the present application, the energy storage device may include a battery management unit (Battery Management System, BMS), and the battery management unit may control the energy storage device.
[0100] In an embodiment of the present application, the energy management system can be used to control various devices or sub-modules in the storage and charging system. For example, the energy management system can be used to control the battery management unit and the charging control unit to achieve control of the energy storage device and the charging conversion device.
[0101] In some embodiments of the present application, the second charging data can be used to describe the process of charging the charging device based on the AC-to-DC converter and / or the energy storage device; the second charging data may include status information of each device in the charging and storage system during the process of charging the charging device based on the AC-to-DC converter and / or the energy storage device, as well as current, voltage, power and other information of the charging process.
[0102] In some embodiments of the present application, the second charging data may include third charging information, fourth charging information, and fifth charging information.
[0103] In some embodiments of the present application, the testing machine can send first charging indication information to the energy management system, so that the energy management system responds to the first charging indication information, controls the AC-to-DC converter to charge the device to be charged, and obtains third charging information; wherein the first charging indication information is used to indicate that the device to be charged is charged through the AC-to-DC converter.
[0104] In the embodiment of the present application, charging the device to be charged by using an AC-to-DC converter means charging the device to be charged by acquiring electric energy from a power grid.
[0105] In an embodiment of the present application, when testing a charging method in which the charging device is charged only through an AC-to-DC converter, the testing machine can send a first charging indication message to the energy management system to shield the energy storage device and charge the charging device only through the AC-to-DC converter.
[0106] In an embodiment of the present application, the third charging information can be used to describe the process of charging the charging device based on the AC-to-DC converter; the third charging information may include status information of each device in the charging and storage system during the process of charging the charging device based on the AC-to-DC converter, as well as information such as current, voltage, power, etc. of the charging process.
[0107] In some embodiments of the present application, the test machine can send second charging indication information to the energy management system, so that the energy management system responds to the second charging indication information, controls the energy storage device to charge the charging device through the battery management unit, and obtains fourth charging information.
[0108] In an embodiment of the present application, the second charging indication information is used to instruct to charge the device to be charged by the energy storage device.
[0109] In some embodiments of the present application, when it is determined based on the third charging information that during the process of charging the device to be charged based on the AC-to-DC converter, no faults occur in the various devices in the storage and charging system, and the current, voltage, and power of the charging process do not exceed their respective load values, it can be determined that the charging method of charging the device to be charged through the AC-to-DC converter has passed the test.
[0110] In an embodiment of the present application, when testing a charging method in which the device to be charged is charged only through an energy storage device, the test machine can send a second charging indication message to the energy management system to shield the AC-to-DC converter and charge the device to be charged only through the energy storage device.
[0111] In an embodiment of the present application, the fourth charging information can be used to describe the process of charging the device to be charged based on the energy storage device; the fourth charging information may include, during the process of charging the device to be charged based on the energy storage device, status information of each device in the storage and charging system, as well as information such as current, voltage, power, etc. of the charging process.
[0112] In some embodiments of the present application, when it is determined based on the fourth charging information that during the process of charging the device to be charged based on the energy storage device, no faults occur in the various devices in the storage and charging system, and the current, voltage, and power of the charging process do not exceed their respective load values, it can be determined that the charging method of charging the device to be charged through the energy storage device has passed the test.
[0113] In some embodiments of the present application, the testing machine can send third charging indication information to the energy management system, so that the energy management system responds to the third charging indication information, controls the AC-to-DC converter and the battery management unit, so as to charge the charging device through the AC-to-DC converter and the energy storage device, and obtain fifth charging information.
[0114] In an embodiment of the present application, the third charging indication information is used to instruct that the device to be charged is charged through the AC-to-DC converter and the energy storage device.
[0115] In an embodiment of the present application, the fifth charging information can be used to describe the process of charging the charging device based on the AC-to-DC converter and the energy storage device; the fifth charging information may include the status information of each device in the charging and storage system during the process of charging the charging device based on the AC-to-DC converter and the energy storage device, as well as the current, voltage, power and other information of the charging process.
[0116] In some embodiments of the present application, when it is determined according to the fifth charging information that in the process of charging the device to be charged based on the AC-to-DC converter and the energy storage device, no fault occurs in the various devices in the storage and charging system, and the current, voltage, and power of the charging process do not exceed their respective load values, it can be determined that the charging method of charging the device to be charged through the AC-to-DC converter and the energy storage device has passed the test.
[0117] In an embodiment of the present application, the energy storage device may include a battery management unit; and the test method of the storage and charging system of the test machine may further include the following steps:
[0118] Step 201, before testing the energy storage function and the charging function, obtain the first message data of the energy management system and the second message data of the battery management unit; wherein the second message data represents the message data generated by the battery management unit and sent to the energy management system; the first message data represents the message data received by the energy management system from the battery management unit.
[0119] In an embodiment of the present application, the testing machine can obtain first message data of the energy management system and second message data of the battery management unit before testing the energy storage function and the charging function; wherein the second message data represents the message data generated by the battery management unit and sent to the energy management system; and the first message data represents the message data received by the energy management system from the battery management unit.
[0120] In some embodiments of the present application, the test of the energy storage function and the test of the charging function are both whole-machine test items of the storage and charging system. Before the whole-machine test items, hardware test items and software test items are required, and the test of the communication function is a hardware test item.
[0121] In some embodiments of the present application, when testing the communication function of the storage and charging system, the testing machine may test the communication function between the battery management unit and the energy management system.
[0122] In some embodiments of the present application, when the battery management unit is unable to send message data to the energy management system, it can be directly determined that the test of the communication function between the battery management unit and the energy management system has failed.
[0123] Step 202: Compare the first message data and the second message data to obtain a comparison result.
[0124] In an embodiment of the present application, after acquiring the first message data of the energy management system and the second message data of the battery management unit, the test machine may compare the first message data with the second message data to obtain a comparison result.
[0125] Step 203: When the comparison result shows that the first message data and the second message data are the same, it is determined that the communication function between the battery management unit and the energy management system passes the test.
[0126] In an embodiment of the present application, the testing machine can compare the first message data and the second message data, and after obtaining the comparison result, if the comparison result is that the first message data and the second message data are the same, it is determined that the communication function between the battery management unit and the energy management system has passed the test.
[0127] In an embodiment of the present application, when the comparison result is that the first message data and the second message data are different, it is determined that the test of the communication function between the battery management unit and the energy management system has failed.
[0128] In an embodiment of the present application, when the comparison result is that the first message data and the second message data are the same, after the test machine determines that the communication function between the battery management unit and the energy management system passes the test, that is, after step 203, the following steps may also be included:
[0129] Step 301: Obtain a protection instruction generated by an energy management system in response to a fault message sent by a battery management unit.
[0130] In an embodiment of the present application, when the comparison result is that the first message data and the second message data are the same, the testing machine determines that the communication function between the battery management unit and the energy management system has passed the test, and can also obtain the protection instructions generated by the energy management system in response to the fault message sent by the battery management unit.
[0131] In an embodiment of the present application, the fault message may correspond to the fault level of the battery management unit; the battery management unit may have faults of levels 1 to 7, that is, the fault level may be any level from 1 to 7, so that the generated fault message may include first level information for indicating the fault level.
[0132] In an embodiment of the present application, the protection instruction is used to instruct the storage and charging system to execute protection measures of a corresponding level, and the protection instruction may include second level information for indicating the fault level.
[0133] Step 302: Obtain a fault message from the battery management unit and determine the fault level of the fault message.
[0134] In an embodiment of the present application, after obtaining the protection instruction generated by the energy management system in response to the fault message sent by the battery management unit, the test machine can obtain the fault message of the battery management unit and determine the fault level of the fault message.
[0135] Step 303: When it is determined that the protection instruction is a protection instruction corresponding to the fault level, it is determined that the protection function of the energy storage device passes the test.
[0136] In an embodiment of the present application, after obtaining a fault message from the battery management unit and determining the fault level of the fault message, the test machine can determine that the protection function of the energy storage device has passed the test if it is determined that the protection instruction is a protection instruction corresponding to the fault level.
[0137] Exemplarily, a level 2 fault occurs in the battery management unit and generates a corresponding fault message and sends it to the energy management system. The energy management system responds to the fault message and triggers a level 2 fault protection instruction, then it can be determined that the protection function of the energy storage device has passed the test.
[0138] In some embodiments of the present application, the testing machine can also test the protection function of the storage and charging system. During the charging of the energy storage device, the testing machine can trigger a fault in the battery management unit, and then, upon receiving the trigger information of the energy management system triggering corresponding protection measures, determine that the protection function of the energy storage device during charging has passed the test.
[0139] For example, during the process of charging the energy storage device, the faults of the battery management unit may include battery cell overvoltage, system overvoltage, overcurrent, battery cell overtemperature, system overtemperature, SOC exceeding the upper limit, etc.
[0140] In some embodiments of the present application, the testing machine can also trigger a fault in the battery management unit during the process of charging the charging device using the storage and charging system, and then determine that the protection function of the charging device during the charging process has passed the test when receiving the trigger information of the energy management system triggering the corresponding protection measures.
[0141] For example, in the process of charging a charging device using a storage and charging system, the faults of the battery management unit may include battery cell undervoltage, system undervoltage, battery cell overtemperature, system overtemperature, SOC exceeding the lower limit, etc.
[0142] In some embodiments of the present application, the storage and charging system may also include a liquid cooling module and a fire protection module; when the energy management system receives a fault message, it can control all devices or sub-modules in the storage and charging system, including the liquid cooling module and the fire protection module, to execute corresponding protection measures.
[0143] In some embodiments of the present application, when the comparison result shows that the first message data and the second message data are the same, after the test machine determines that the communication function between the battery management unit and the energy management system passes the test, that is, after step 203, the following steps may also be included:
[0144] Step 401: Acquire first voltage data of an energy storage device at different remaining capacities and second voltage data of a battery in the energy storage device.
[0145] In an embodiment of the present application, when the comparison result is that the first message data and the second message data are the same, the testing machine determines that the communication function between the battery management unit and the energy management system has passed the test, and then obtains the first voltage data of the energy storage device under different remaining powers and the second voltage data of the battery in the energy storage device.
[0146] In some embodiments of the present application, the hardware test items may also include a voltage test of the energy storage device.
[0147] In an embodiment of the present application, the first voltage data may include voltage data of the energy storage device at different remaining capacities.
[0148] In an embodiment of the present application, the second voltage data may include voltage data of each battery inside the energy storage device at different remaining capacities.
[0149] Step 402: When the first voltage data conforms to the first voltage range and the second voltage data conforms to the second voltage range, determine that the voltage of the energy storage device passes the test.
[0150] In an embodiment of the present application, after obtaining first voltage data of the energy storage device at different remaining powers and second voltage data of a battery in the energy storage device, the testing machine can determine that the voltage of the energy storage device has passed the test if the first voltage data conforms to the first voltage range and the second voltage data conforms to the second voltage range.
[0151] In an embodiment of the present application, the first voltage range may include a voltage range for measuring the voltage condition of the energy storage device under different remaining powers, and the numerical value is not limited in the present application. For example, the first voltage range may include a voltage range a1 to b1 for measuring the voltage of the energy storage device when the SOC of the energy storage device is 10%, and a voltage range a2 to b2 for measuring the voltage of the energy storage device when the SOC of the energy storage device is 50%.
[0152] In an embodiment of the present application, the second voltage range may include a voltage range for measuring the voltage condition of the battery in the energy storage device under different remaining powers, and the numerical value is not limited in the present application. For example, the second voltage range may include a voltage range a3 to b3 for measuring the battery voltage in the energy storage device when the SOC of the energy storage device is 10%, and a voltage range a4 to b4 for measuring the battery voltage in the energy storage device when the SOC of the energy storage device is 50%.
[0153] Exemplarily, the voltage of the energy storage device obtained by the test machine when the SOC is 10% is c1, a1<c1<b1; the voltage of the energy storage device when the SOC is 50% is c2, a2<c2<b2; the internal battery voltage of the energy storage device when the SOC is 10% is c3, a3<c3<b3, and the internal battery voltage of the energy storage device when the SOC is 50% is c4, a4<c4<b4, then it can be determined that the voltage of the energy storage device passes the test.
[0154] In an embodiment of the present application, the charging conversion device may include a charging control unit; and the testing method of the storage and charging system of the testing machine may further include the following steps:
[0155] Step 501: Acquire first charging request information of the device to be charged when the device to be charged is connected to a charging conversion device, and obtain second charging request information sent by the device to be charged and received by a charging control unit.
[0156] In an embodiment of the present application, the test machine can obtain first charging request information of the device to be charged when the device to be charged is connected to the charging conversion device, and second charging request information sent by the device to be charged and received by the charging control unit.
[0157] In an embodiment of the present application, the hardware test items may further include a test of the charging control unit responding to a charging request.
[0158] In an embodiment of the present application, the first charging request information may include information on the charging current, power, and voltage requested by the device to be charged.
[0159] In an embodiment of the present application, the second charging request information represents the charging request information sent by the device to be charged and received by the charging control unit.
[0160] Step 502: When the first charging request information is the same as the second charging request information, determine that the charging control unit passes a charging request response test.
[0161] In an embodiment of the present application, the testing machine can obtain first charging request information of the device to be charged when the device to be charged is connected to the charging conversion device, and second charging request information sent by the device to be charged and received by the charging control unit, and if the first charging request information is the same as the second charging request information, determine that the charging control unit has passed the charging request response test.
[0162] In some embodiments of the present application, when the first charging request information and the second charging request information are the same, after the tester determines that the charging control unit passes the test of the charging request response, that is, after step 502, the tester may further include the following steps:
[0163] Step 601, obtaining a first charging capacity parameter sent by an energy management system and received by a charging control unit; wherein the first charging capacity parameter is calculated by the energy management system based on the received charging capacity parameter of the energy storage device and the charging capacity parameter of the AC-DC converter.
[0164] In an embodiment of the present application, when the first charging request information is the same as the second charging request information, the testing machine can obtain the first charging capacity parameter sent by the energy management system and received by the charging control unit after determining that the charging control unit has passed the charging request response test; wherein the first charging capacity parameter is calculated by the energy management system based on the received charging capacity parameters of the energy storage device and the charging capacity parameters of the AC-to-DC converter.
[0165] In some embodiments of the present application, the hardware test items may also include a test of the matching of charging capability parameters.
[0166] In some embodiments of the present application, the energy management system may perform an addition operation on the received charging capacity parameter of the energy storage device and the charging capacity parameter of the AC-to-DC converter to obtain a first charging capacity parameter.
[0167] In the embodiment of the present application, the charging capacity parameter of the energy storage device represents the maximum charging capacity that the energy storage device can support.
[0168] In the embodiment of the present application, the charging capacity parameter of the AC-to-DC converter represents the maximum charging capacity that the AC-to-DC converter can support.
[0169] Step 602: When the first charging capability parameter is the same as the second charging capability parameter, determine whether the charging capability parameter matching test has passed; wherein the second charging capability parameter represents a charging capability parameter calculated based on a measured charging capability parameter of the energy storage device and a measured charging capability parameter of the AC-to-DC converter.
[0170] In an embodiment of the present application, after obtaining the first charging capacity parameter sent by the energy management system and received by the charging control unit, the testing machine can determine that the charging capacity parameter matching test has passed when the first charging capacity parameter is the same as the second charging capacity parameter; wherein the second charging parameter represents the charging capacity parameter calculated based on the measured charging capacity parameter of the energy storage device and the measured charging capacity parameter of the AC-to-DC converter.
[0171] In some embodiments of the present application, the testing machine may perform an addition operation on the measured charging capacity parameter of the energy storage device and the measured charging capacity parameter of the AC-to-DC converter to obtain a second charging parameter.
[0172] In some embodiments of the present application, when the first charging capability parameter is different from the second charging capability parameter, it is determined that the charging capability parameter matching test fails.
[0173] In some embodiments of the present application, when the first charging capability parameter is the same as the second charging capability parameter, after determining that the charging capability parameter matching test is passed, that is, after step 602, the test machine may further include the following steps:
[0174] Step 701: When charging a device to be charged through a charging conversion device, obtain an output parameter of the charging conversion device sent by a charging control unit.
[0175] In an embodiment of the present application, when the first charging capability parameter is the same as the second charging capability parameter, after the testing machine determines that the charging capability parameter matching test has passed, it can obtain the output parameters of the charging conversion device sent by the charging control unit when charging the device to be charged through the charging conversion device.
[0176] In some embodiments of the present application, the hardware test items may also include testing of output parameters.
[0177] In an embodiment of the present application, the output parameter may include information of charging current, power, and voltage output by the charging conversion device.
[0178] Step 702: When the output parameter is less than or equal to the target parameter, determine that the charging conversion device passes the test of the output parameter; wherein the target parameter is the minimum value of the first charging request information and the first charging capability parameter.
[0179] In an embodiment of the present application, when the testing machine charges the device to be charged through the charging conversion device, after obtaining the output parameters of the charging conversion device sent by the charging control unit, it can determine that the charging conversion device has passed the output parameter test when the output parameter is less than or equal to the target parameter; wherein the target parameter is the minimum value of the first charging request information and the first charging capability parameter.
[0180] In some embodiments of the present application, after the test machine determines that the charging conversion device passes the output parameter test when the output parameter is less than or equal to the target parameter, that is, after step 702, the following steps may also be included:
[0181] Step 801: When charging a device to be charged through an AC-to-DC converter, obtain a first discharge parameter of the AC-to-DC converter.
[0182] In an embodiment of the present application, after the testing machine determines that the charging conversion device has passed the output parameter test when the output parameter is less than or equal to the target parameter, it can obtain the first discharge parameter of the AC-to-DC converter when charging the charging device through the AC-to-DC converter.
[0183] In an embodiment of the present application, the first discharge parameter may include information such as discharge current, voltage, and power during the process of charging the device to be charged through the AC-to-DC converter.
[0184] Step 802: When charging the device to be charged through the energy storage device, obtain a second discharge parameter of the energy storage device.
[0185] In an embodiment of the present application, the test machine can obtain the second discharge parameter of the energy storage device when charging the device to be charged through the energy storage device.
[0186] In an embodiment of the present application, the second discharge parameter may include information such as discharge current, voltage, and power during the process of charging the device to be charged by the energy storage device.
[0187] Step 803: When charging the device to be charged through the AC-DC converter and the energy storage device, obtain a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device.
[0188] In an embodiment of the present application, the test machine can obtain a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device when charging the device to be charged through the AC-DC converter and the energy storage device.
[0189] In an embodiment of the present application, the fourth discharge parameter may include information such as discharge current, voltage, and power during the process of charging the device to be charged through the AC-to-DC converter and the energy storage device.
[0190] Step 804: When the first discharge parameter and the third discharge parameter are less than or equal to the charging capacity parameter of the AC-DC converter, and the second discharge parameter and the fourth discharge parameter are less than or equal to the charging capacity parameter of the energy storage device, determine that the AC-DC converter and the energy storage device pass the discharge parameter test.
[0191] In an embodiment of the present application, the testing machine obtains a first discharge parameter of the AC-DC converter when charging the charging device through the AC-DC converter, obtains a second discharge parameter of the energy storage device when charging the charging device through the energy storage device, and obtains a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device when charging the charging device through the AC-DC converter and the energy storage device. After that, it can be determined that the AC-DC converter and the energy storage device have passed the discharge parameter test when the first discharge parameter and the third discharge parameter are less than or equal to the charging capacity parameter of the AC-DC converter, and the second discharge parameter and the fourth discharge parameter are less than or equal to the charging capacity parameter of the energy storage device.
[0192] In an embodiment of the present application, the charging conversion device includes at least two DC-to-DC converters connected in parallel; the test method of the storage and charging system of the test machine may further include the following steps:
[0193] Step 901: When a charging conversion device supplies power to a device to be charged, obtain output data of at least two DC-to-DC converters.
[0194] In an embodiment of the present application, the test machine can obtain the output data of each of at least two DC-to-DC converters when power is supplied to the device to be charged through the charging conversion device.
[0195] In an embodiment of the present application, the hardware test items may also include a circulation test; since common fast charging piles are usually 120kW to 200kW, the power is relatively low and no circulation test is required; in the application itself, since at least two DC-to-DC converters are set in the charging conversion device, it has the characteristics of high power, for example, it can be 480kW, so there may be a problem of current imbalance between the DC-to-DC converters. In order to verify the current balance performance, the test machine can perform a circulation test.
[0196] In an embodiment of the present application, the output data may be information related to the current output by the DC-to-DC converter.
[0197] Step 902: Determine output difference information according to the output data; wherein the output difference information represents difference information between currents outputted by at least two DC-to-DC converters.
[0198] In an embodiment of the present application, the testing machine can obtain the output data of each of at least two DC-to-DC converters when power is supplied to the device to be charged through a charging conversion device, and then determine the output difference information based on the output data; wherein the output difference information represents the difference information between the currents output by each of the at least two DC-to-DC converters.
[0199] Step 903: When the output difference information is less than or equal to the second threshold, determine that the charging conversion device passes the circulating current test.
[0200] In an embodiment of the present application, after determining the output difference information according to the output data, the tester may determine that the charging conversion device passes the circulating current test if the output difference information is less than or equal to the second threshold.
[0201] In the embodiment of the present application, the value of the second threshold is not limited in this application. For example, the second threshold is 3%. If the difference information of the output current of the DC-to-DC converter is less than or equal to 3%, it can be determined that the charging conversion device has passed the circulating current test.
[0202] In some embodiments of the present application, when the output difference information is greater than the second threshold, it is determined that the charging conversion device fails the circulating current test.
[0203] In an embodiment of the present application, the testing method of the storage and charging system of the testing machine may further include the following steps:
[0204] Step 1001: write first software version information into a battery management unit so that the battery management unit sends the first software version information to an energy management system.
[0205] In an embodiment of the present application, the test machine may also write the first software version information into the battery management unit so that the battery management unit sends the first software version information to the energy management system.
[0206] In some embodiments of the present application, the first software version information may be a software version number of the battery management unit.
[0207] Step 1002: Receive second software version information sent by the energy management system.
[0208] In an embodiment of the present application, the test machine may receive second software version information sent by the energy management system after writing the first software version information to the battery management unit so that the battery management unit sends the first software version information to the energy management system.
[0209] In an embodiment of the present application, the second software version information represents software version information received by the energy management system from the battery management unit.
[0210] Step 1003: When the first software version information is identical to the second software version information, determine whether the energy management system passes the test of software version reading.
[0211] In an embodiment of the present application, after receiving the second software version information sent by the energy management system, the test machine can determine that the energy management system passes the software version reading test if the first software version information is the same as the second software version information.
[0212] In an embodiment of the present application, when the first software version information is different from the second software version information, it is determined that the energy management system does not pass the test of software version reading.
[0213] In an embodiment of the present application, the testing method of the storage and charging system of the testing machine may further include the following steps:
[0214] Step 1101: Send a high voltage instruction to the energy management system.
[0215] In an embodiment of the present application, the test machine may also send a high voltage instruction to the energy management system.
[0216] Step 1102: When it is determined that the energy management system controls the battery management unit to complete the high-voltage operation of the energy storage device in response to the high-voltage instruction, determine that the energy storage device passes the high-voltage test.
[0217] In an embodiment of the present application, after sending a high-voltage instruction to the energy management system, the tester can determine that the energy storage device has passed the high-voltage test if it determines that the energy management system controls the battery management unit to complete the high-voltage operation of the energy storage device in response to the high-voltage instruction.
[0218] In an embodiment of the present application, if the energy management system fails to control the battery management unit to complete the high-voltage operation of the energy storage device after the test machine sends a high-voltage instruction to the energy management system, it can be determined that the energy storage device fails the high-voltage test.
[0219] Step 1103: Send a high voltage instruction to the energy management system.
[0220] In an embodiment of the present application, the test machine may also send a high voltage instruction to the energy management system.
[0221] Step 1104 , when it is determined that the energy management system controls the battery management unit to complete the lower high voltage operation of the energy storage device in response to the lower high voltage instruction, determine that the energy storage device passes the lower high voltage test.
[0222] In an embodiment of the present application, after sending a lower high voltage instruction to the energy management system, the testing machine can determine that the energy storage device has passed the lower high voltage test if it determines that the energy management system controls the battery management unit to complete the lower high voltage operation of the energy storage device in response to the lower high voltage instruction.
[0223] In an embodiment of the present application, if the energy management system fails to control the battery management unit to complete the low-voltage operation of the energy storage device after the test machine sends a high-voltage instruction to the energy management system, it can be determined that the energy storage device fails the high-voltage test.
[0224] In an embodiment of the present application, the testing method of the storage and charging system of the testing machine may further include the following steps:
[0225] Step 1201: When the energy storage device is turned off, obtain the status detection information of the battery management unit by the energy management system.
[0226] In an embodiment of the present application, the test machine can also obtain the status detection information of the battery management unit by the energy management system when the energy storage device is turned off.
[0227] In an embodiment of the present application, the status detection information may be used to determine the status of the battery management unit, where the status includes an online status and an offline status.
[0228] Step 1202: When the status detection information indicates that the battery management unit is in an offline state, determine whether the battery management unit passes an offline function test.
[0229] In an embodiment of the present application, the testing machine can obtain status detection information of the battery management unit from the energy management system when the energy storage device is turned off, and if the status detection information shows that the battery management unit is in an offline state, determine that the battery management unit has passed the offline functional test.
[0230] In an embodiment of the present application, after the testing machine obtains status detection information of the battery management unit from the energy management system when the energy storage device is turned off, if the status detection information shows that the battery management unit is not in an offline state, it determines that the battery management unit fails the offline function test.
[0231] In an embodiment of the application, a test method for a storage and charging system is provided. When the energy storage function of the storage and charging system is normal, the test machine can instruct the AC-DC converter to charge the energy storage device when the energy management system monitors that the remaining power of the energy storage device is less than or equal to a first threshold value. Therefore, when the test machine tests the energy storage function, when the remaining power of the energy storage device is less than or equal to the first threshold value, obtain the first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device, thereby determining whether the energy storage function of the storage and charging system is normal through the first charging data, that is, determining whether the storage and charging system can automatically charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold value; and for the charging function of the storage and charging system, under normal circumstances, three charging methods can be supported, including only using the AC-DC converter to charge the charging device, only using the AC-DC converter to charge the charging device, and only using the AC-DC converter to charge the charging device. The charging device is charged by the energy storage device and the charging device is charged by the AC-DC converter and the energy storage device at the same time. Therefore, when the tester tests the charging function of the storage and charging system, it can obtain the second charging data of the energy management system controlling the AC-DC converter and / or the energy storage device to charge the charging device when the charging device is connected, so as to determine whether the storage and charging system can normally perform the three charging methods according to the second charging data; thereby achieving effective testing of the automatic energy storage function and the charging function of the storage and charging system; in addition, before testing the energy storage function and the charging function, the communication function between the battery management unit and the energy management system can be tested based on the message data received by the energy management system and the message data sent by the battery management unit to ensure that the communication function between the battery management unit and the energy management system is normal; based on the above test, the reliability of the use of the storage and charging system can be effectively improved.
[0232] Based on the above embodiment, in another embodiment of the present application, a testing system is provided, such as Figure 2 As shown, the test system 0 may include a test machine 1 and a storage and charging system 2 connected to the test machine 1; Figure 3 As shown, the storage and charging system 2 may include an energy management system 21 , an energy storage device 22 , a charging conversion device 23 and an AC to DC converter 24 .
[0233] In an embodiment of the present application, the charging conversion device is connected to the AC-to-DC converter and the energy storage device respectively.
[0234] The test machine can be used to obtain first charging data of the energy management system controlling the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold value, so as to determine whether the energy storage function of the storage and charging system is normal based on the first charging data;
[0235] The test machine can also be used to obtain second charging data when the energy management system controls the AC-to-DC converter and / or the energy storage device to charge the device to be charged when the device to be charged is connected to the charging conversion device, and determine whether the charging function of the storage and charging system is normal based on the second charging data; wherein the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
[0236] In an embodiment of the present application, the energy storage device may include a battery management unit; and the charging conversion device may include a charging control unit.
[0237] A battery management unit can be used to control the energy storage device to charge the device to be charged;
[0238] The charging control unit can be used to control the charging conversion device to output charging current to the device to be charged.
[0239] In an embodiment of the present application, the storage and charging system may further include a charging gun; the charging gun is connected to the charging conversion device; the AC-to-DC converter, the energy storage device and the charging conversion device are connected to the DC bus.
[0240] In an embodiment of the present application, the AC-to-DC converter may include an AC-to-DC converter.
[0241] In some embodiments of the present application, the second charging data may include third charging information, fourth charging information and fifth charging information; the test machine can also be used to send first charging indication information to the energy management system, so that the energy management system responds to the first charging indication information, controls the AC-to-DC converter to charge the device to be charged, and obtains the third charging information; wherein the first charging indication information is used to indicate that the device to be charged is charged through the AC-to-DC converter.
[0242] In some embodiments of the present application, the testing machine can also be used to send a second charging indication message to the energy management system, so that the energy management system responds to the second charging indication message, controls the energy storage device to charge the device to be charged through the battery management unit, and obtains fourth charging information; wherein the second charging indication message is used to indicate that the device to be charged is charged through the energy storage device.
[0243] In some embodiments of the present application, the testing machine can also be used to send third charging indication information to the energy management system, so that the energy management system responds to the third charging indication information, controls the AC-to-DC converter and the battery management unit, charges the charging device through the AC-to-DC converter and the energy storage device, and obtains fifth charging information.
[0244] In some embodiments of the present application, the testing machine can also be used to obtain first message data of the energy management system and second message data of the battery management unit before testing the energy storage function and the charging function; wherein the second message data represents the message data generated by the battery management unit and sent to the energy management system; the first message data represents the message data received by the energy management system from the battery management unit; and the first message data and the second message data are compared to obtain a comparison result; and when the comparison result is that the first message data and the second message data are the same, it is determined that the communication function between the battery management unit and the energy management system has passed the test.
[0245] In some embodiments of the present application, the testing machine can also be used to obtain protection instructions generated by the energy management system in response to a fault message sent by the battery management unit; and to obtain the fault message of the battery management unit and determine the fault level of the fault message; and when it is determined that the protection instruction is a protection instruction corresponding to the fault level, determine that the protection function of the energy storage device has passed the test.
[0246] In some embodiments of the present application, the storage and charging system may also include a liquid cooling module and a fire protection module; when the energy management system receives a fault message, it can control all devices or sub-modules in the storage and charging system, including the liquid cooling module and the fire protection module, to execute corresponding protection measures.
[0247] In some embodiments of the present application, the testing machine can also be used to obtain first voltage data of the energy storage device at different remaining powers and second voltage data of the battery in the energy storage device; and determine that the voltage of the energy storage device passes the test when the first voltage data meets the first voltage range and the second voltage data meets the second voltage range.
[0248] In some embodiments of the present application, the testing machine can also be used to obtain first charging request information of the device to be charged when the device to be charged is connected to the charging conversion device, and second charging request information sent by the device to be charged and received by the charging control unit; and when the first charging request information is the same as the second charging request information, determine that the charging control unit passes the charging request response test.
[0249] In some embodiments of the present application, the testing machine can also be used to obtain a first charging capacity parameter sent by an energy management system and received by the charging control unit; wherein the first charging capacity parameter is calculated by the energy management system based on the received charging capacity parameter of the energy storage device and the charging capacity parameter of the AC-to-DC converter; and when the first charging capacity parameter is the same as the second charging capacity parameter, determine whether the charging capacity parameter matching test has passed; wherein the second charging parameter represents the charging capacity parameter calculated based on the measured charging capacity parameter of the energy storage device and the measured charging capacity parameter of the AC-to-DC converter.
[0250] In some embodiments of the present application, the testing machine can also be used to obtain the output parameters of the charging conversion device sent by the charging control unit when charging the device to be charged through the charging conversion device; and when the output parameter is less than or equal to the target parameter, determine that the charging conversion device passes the output parameter test; wherein the target parameter is the minimum value of the first charging request information and the first charging capability parameter.
[0251] In some embodiments of the present application, the testing machine can also be used to obtain a first discharge parameter of the AC-DC converter when the charging device is charged through the AC-DC converter; and to obtain a second discharge parameter of the energy storage device when the charging device is charged through the energy storage device; and to obtain a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device when the charging device is charged through the AC-DC converter and the energy storage device; and to determine that the AC-DC converter and the energy storage device pass the discharge parameter test when the first discharge parameter and the third discharge parameter are less than or equal to the charging capacity parameter of the AC-DC converter, and the second discharge parameter and the fourth discharge parameter are less than or equal to the charging capacity parameter of the energy storage device.
[0252] In some embodiments of the present application, the charging conversion device may include at least two DC-to-DC converters connected in parallel; the testing machine may also be used to obtain the output data of each of the at least two DC-to-DC converters when power is supplied to the charged device through the charging conversion device; and determine the output difference information based on the output data; wherein the output difference information represents the difference information between the currents output by each of the at least two DC-to-DC converters; and when the output difference information is less than or equal to a second threshold value, it is determined that the charging conversion device has passed the circulating current test.
[0253] In some embodiments of the present application, the testing machine can also be used to write first software version information to the battery management unit so that the battery management unit sends the first software version information to the energy management system; and receive second software version information sent by the energy management system; and when the first software version information is the same as the second software version information, determine that the energy management system passes the software version reading test.
[0254] In some embodiments of the present application, the testing machine can also be used to send an upper high-voltage instruction to the energy management system; and when it is determined that the energy management system controls the battery management unit to complete the upper high-voltage operation of the energy storage device in response to the upper high-voltage instruction, determine that the energy storage device has passed the upper high-voltage test; and send a lower high-voltage instruction to the energy management system; and when it is determined that the energy management system controls the battery management unit to complete the lower high-voltage operation of the energy storage device in response to the lower high-voltage instruction, determine that the energy storage device has passed the lower high-voltage test.
[0255] In some embodiments of the present application, the testing machine can also be used to obtain status detection information of the battery management unit by the energy management system when the energy storage device is turned off; and when the status detection information indicates that the battery management unit is in an offline state, determine that the battery management unit has passed the offline functional test.
[0256] An embodiment of the present application provides a test system, which includes a test machine and a storage and charging system. The test machine can be used to obtain first charging data when the remaining power of the energy storage device is less than or equal to a first threshold, and the energy management system controls the AC-to-DC converter to charge the energy storage device, so as to determine whether the energy storage function of the storage and charging system is normal based on the first charging data; the test machine can also be used to obtain second charging data when the energy management system controls the AC-to-DC converter and / or the energy storage device to charge the device to be charged when the device to be charged is connected to the charging conversion device, and determine whether the charging function of the storage and charging system is normal based on the second charging data. It can be seen that when the energy storage function of the storage and charging system is normal, the energy management system will instruct the AC-DC converter to charge the energy storage device when it detects that the remaining power of the energy storage device is less than or equal to the first threshold. Therefore, when the tester tests the energy storage function, it can obtain the first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold, so as to determine whether the energy storage function of the storage and charging system is normal through the first charging data, that is, determine whether the storage and charging system can automatically charge the energy storage device when the remaining power of the energy storage device is less than or equal to the first threshold; and for the charging function of the storage and charging system, under normal circumstances, three charging methods can be supported, including charging the charging device only by using the AC-DC converter, charging the charging device only by using the energy storage device, and charging the charging device only by using the energy storage device. And simultaneously use the AC-to-DC converter and the energy storage device to charge the charging device. Therefore, when testing the charging function of the storage and charging system, the test machine can obtain the second charging data of the energy management system controlling the AC-to-DC converter and / or the energy storage device to charge the charging device when the charging device is connected, so as to determine whether the storage and charging system can normally perform the three charging methods according to the second charging data; thereby realizing effective testing of the automatic energy storage function and charging function of the storage and charging system; in addition, before testing the energy storage function and charging function, the communication function between the battery management unit and the energy management system can be tested based on the message data received by the energy management system and the message data sent by the battery management unit to ensure that the communication function between the battery management unit and the energy management system is normal; based on the above test, the reliability of the use of the storage and charging system can be effectively improved.
[0257] Based on the above embodiment, in another embodiment of the present application, illustratively, as Figure 4As shown, the storage and charging system in the test system may include an energy management system 21, an energy storage device 22, a charging conversion device 23 and an AC-to-DC converter 24; wherein, the AC-to-DC converter 24 may be a bidirectional AC / DC converter, the charging conversion device 23 may be a bidirectional DC / DC converter, the energy storage device 22 may be controlled by a BMS, and the charging conversion device 23 may be controlled by a CCU; the storage and charging system may also include a wireless communication device 25 for communication between various devices or submodules in the storage and charging system; the storage and charging system may also include a charging gun 26; the test system may also include a DC bus 31; the energy storage device 22 and the charging conversion device 23 may be connected to the DC bus 31; the charging gun 26 may be connected to the charging conversion device 23; the test system may also include a transformer 32, and the AC-to-DC converter 24 is connected to the power grid 33 through the transformer 32 to obtain the electric energy output by the power grid 33; the storage and charging system may charge the device to be charged connected to the charging gun, such as an electric car 34.
[0258] In the embodiment of the present application, when testing the storage and charging system, the testing machine can fully test the function, status, and communication of each module, then verify the coordination and cooperation between the modules, and finally test the entire storage and charging system.
[0259] In some embodiments of the present application, the energy storage device in the storage and charging system is equipped with a high-power battery, which can achieve small power input, such as drawing electricity from the power grid at a power of 40kW to 50kW, and high power output, such as charging electric vehicles at a power of 480kW or even greater than 480kW; therefore, it is necessary to focus on testing the communication, function, protection, and power performance of the battery.
[0260] Exemplarily, the test items of the storage and charging system may include hardware test items, software test items and whole machine test items; among which, the hardware test items may include appearance inspection, basic function test, protocol consistency and interoperability test, safety test, protection function test, accuracy performance test, environmental adaptability test, and electromagnetic compatibility test; the software test items may include interactive screen function test, control module communication test, micromotor system protection function test, pile debugging software function, basic peripheral function test, whole pile function test, cloud platform function test, software function test and fault code test.
[0261] Exemplarily, the appearance inspection can inspect the appearance, logo, nameplate and product specifications of each device. Basic function testing can include checking the communication function between submodules in the storage and charging system, basic charging functions, including insulation detection function, vehicle plug locking function, charging control function detection, storage and charging system interaction function detection, and charging metering function detection. Protocol consistency and interoperability testing can include charging coordination control inspection, communication status inspection, charging voltage range inspection, protective grounding verification inspection, energy storage device protection function inspection, energy storage device voltage inspection, energy storage device protection function inspection, output parameter matching inspection; wherein, charging coordination control inspection can include charging status, connection timing, connection confirmation, etc.; communication status inspection can include communication success, communication failure, communication interruption, etc.; protective grounding verification inspection can include protective grounding verification of energy storage device; output parameter matching inspection can include charging request response inspection of charging control unit, charging capacity parameter matching inspection and output parameter inspection of charging conversion device. Safety testing can include insulation withstand voltage inspection, dielectric strength inspection, impulse withstand voltage inspection and ground resistance compliance inspection. The protection function test may include the inspection of the charging system's charging protection measures, the charging system's discharge protection measures, the door opening protection, the emergency stop function, and the battery polarity. The accuracy performance test may include the output parameter accuracy test, the start-stop control accuracy test, the startup output instantaneous peak voltage and current test, the standby power consumption test, and the circulating current test; among them, the output parameter accuracy test may include the setting and error measurement of the output current or voltage, and the start-stop control accuracy test may include the current adjustment time test during the start command and the output current stop time test during the stop. The environmental adaptability test may include high temperature test, low temperature test, alternating damp heat test, extreme temperature rise test, enclosure protection level test, noise test, salt spray test, and high temperature and high humidity operation test; among them, the high temperature test may include the inspection of the start-stop control and the operation in each working mode, such as the inspection of the operation at a temperature of 45°C; the low temperature test may include the inspection of the start-stop control and the operation in each working mode, such as the inspection of the operation at a temperature of -20°C; the enclosure protection level test may include the rain test, etc. Electromagnetic compatibility testing may include radiated emission tests, conducted emission tests, electrostatic discharge tests, radio frequency electromagnetic field radiation immunity tests, electrical fast transient pulse group immunity tests, surge immunity tests, conducted disturbance immunity tests, and immunity tests to voltage sags, short interruptions, and voltage variations.
[0262] Exemplarily, the interactive screen function test may include basic function test, basic information test, and other function test; wherein the basic function test may include test of display, operation, and content integrity; the basic information test may include test of basic information during charging, historical orders, equipment information, fault information, rate information, interactive QR code, etc.; and other function test may include test of display screen network configuration and vehicle identification code configuration function. The control module communication test may include communication test between storage and charging system submodule and control module and control module information accuracy test, wherein the control module may include EMS, BMS, and CCU. The micro-motor system protection function test may include overvoltage protection test, undervoltage protection test, AC / DC converter fault protection test, SOC lower limit protection test, water immersion protection test, overcurrent protection test, overtemperature protection test, access control protection test, emergency stop function test, relay adhesion diagnosis and control test, and energy storage device fault protection test. The functions of the pile body debugging software may include debugging software and pile body connection function inspection, software version reading inspection, automatic mode and manual mode switching inspection, main contactor control and feedback inspection, auxiliary power relay control inspection, power control output inspection, automatic charging inspection, end charging inspection, meter data reading function inspection, high-precision module data reading inspection, gun status and gun return status inspection, gun electronic lock unlocking and feedback inspection, gun temperature reading inspection, gun connection voltage reading inspection, pile body configuration parameter reading and writing inspection, charging module setting and output information inspection, insulation function start and control test inspection, insulation test information reading inspection, liquid cooling module target temperature setting inspection, liquid cooling module mode setting inspection, liquid cooling gun opening inspection, liquid cooling gun closing inspection, liquid cooling cell module fault injection inspection, liquid cooling gun module data fault injection inspection, fire module data information inspection, fire module fault injection test inspection, pile body fault information monitoring inspection, control module air download technology function inspection, software version reading inspection, upper high voltage test, lower high voltage test and offline function test. Basic peripheral function tests can include battery communication test, real vehicle test gun connection signal change test, real vehicle test electronic lock unlocking test, AC / DC converter power on / off test, AC / DC converter real-time data acquisition test, AC / DC converter fault reporting test, battery data collection test, and battery fault reporting test. The whole pile function test can include real vehicle charging function test, current limit function test, pulse current time test, small program start charging test, small program stop charging test, small program charging information verification, emergency stop charging function test during charging, and access control trigger stop charging function test during charging.The cloud platform functional test may include charging pile login authentication test, login authentication response test, charging pile heartbeat packet test, billing model verification request test, billing model verification request response test, offline monitoring data test, charging process BMS demand and output test, remote start command response test, operation platform remote control start test, remote shutdown command response test, operation platform remote shutdown test, transaction record test, transaction record confirmation test, time setting response test, time setting test, billing model response test, billing model setting test and remote upgrade program test. Software functional test may include code scanning charging test, demand current / actual current consistency test, demand voltage / actual voltage consistency test, order amount and duration rule test, software display device status and pile end actual measurement consistency test, account recharge use test, SOC display and actual data matching test, software remote stop test, charging record display consistency test.
[0263] Exemplarily, the whole machine test may include a test of the energy storage function, a test of the charging function, and an aging test; wherein, the aging test may set up multiple groups of operation experiments in the storage and charging system at different SOCs to verify whether the storage and charging system can automatically adjust the charging control strategy according to the requested power information in the vehicle's charging request under different battery SOCs; the storage and charging system may also be run for a long period of time to conduct experiments, such as running for 3 to 7 consecutive days, to verify whether the storage and charging system can still automatically adjust the charging control strategy.
[0264] The above description is only a preferred embodiment of the present application and is not intended to limit the protection scope of the present application.
Claims
1. A method for testing a storage and charging system, characterized in that: Applied to a test machine; the storage and charging system includes an energy management system, an energy storage device and a charging conversion device; the energy storage device includes a battery management unit; the method includes: When the remaining power of the energy storage device is less than or equal to a first threshold, obtaining first charging data of the energy management system instructing the AC-DC converter to charge the energy storage device, and determining whether the energy storage function of the storage and charging system is normal based on the first charging data; When the device to be charged is connected to the charging conversion device, the second charging data of the energy management system controlling the AC-to-DC converter and / or the energy storage device to charge the device to be charged is obtained, and based on the second charging data, it is determined whether the charging function of the storage and charging system is normal; wherein the charging conversion device is connected to the AC-to-DC converter and the energy storage device respectively; the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
2. The method for testing the storage and charging system according to claim 1, characterized in that: The second charging data includes third charging information, fourth charging information and fifth charging information; the method further includes: Sending first charging indication information to the energy management system, so that the energy management system controls the AC-DC converter to charge the device to be charged in response to the first charging indication information, and obtains the third charging information; wherein the first charging indication information is used to indicate that the device to be charged is charged by the AC-DC converter; Sending second charging indication information to the energy management system, so that the energy management system controls the energy storage device to charge the device to be charged through the battery management unit in response to the second charging indication information, and obtains the fourth charging information; wherein the second charging indication information is used to indicate that the device to be charged is charged through the energy storage device; Sending third charging indication information to the energy management system so that the energy management system responds to the third charging indication information, controls the AC-to-DC converter and the battery management unit, charges the device to be charged through the AC-to-DC converter and the energy storage device, and obtains the fifth charging information.
3. The method for testing the storage and charging system according to claim 2, characterized in that: The method further comprises: Before testing the energy storage function and the charging function, obtaining first message data of the energy management system and second message data of the battery management unit; wherein the second message data represents message data generated by the battery management unit and sent to the energy management system; and the first message data represents message data received by the energy management system from the battery management unit; Comparing the first message data with the second message data to obtain a comparison result; When the comparison result is that the first message data and the second message data are the same, it is determined that the communication function between the battery management unit and the energy management system passes the test.
4. The method for testing the storage and charging system according to claim 3, characterized in that: When the comparison result is that the first message data and the second message data are the same, after determining that the communication function between the battery management unit and the energy management system passes the test, the method further includes: Obtaining a protection instruction generated by the energy management system in response to a fault message sent by the battery management unit; Obtaining a fault message of the battery management unit, and determining a fault level of the fault message; In the case where it is determined that the protection instruction is a protection instruction corresponding to the fault level, it is determined that the protection function of the energy storage device passes the test.
5. The method for testing the storage and charging system according to claim 3, characterized in that: When the comparison result is that the first message data and the second message data are the same, after determining that the communication function between the battery management unit and the energy management system passes the test, the method further includes: Acquire first voltage data of the energy storage device at different remaining capacities and second voltage data of a battery in the energy storage device; When the first voltage data conforms to a first voltage range and the second voltage data conforms to a second voltage range, it is determined that the voltage of the energy storage device passes the test.
6. The method for testing the storage and charging system according to claim 4 or 5, characterized in that: The charging conversion device includes a charging control unit; the method further includes: Acquire first charging request information of the device to be charged when the device to be charged is connected to the charging conversion device, and second charging request information sent by the device to be charged and received by the charging control unit; In a case where the first charging request information is identical to the second charging request information, it is determined that the charging control unit passes a test of a charging request response.
7. The method for testing the storage and charging system according to claim 6, characterized in that: In the case where the first charging request information is the same as the second charging request information, after determining that the charging control unit passes the charging request response test, the method further includes: Acquire a first charging capability parameter sent by the energy management system and received by the charging control unit; wherein the first charging capability parameter is calculated by the energy management system according to the received charging capability parameter of the energy storage device and the charging capability parameter of the AC-DC converter; When the first charging capacity parameter is the same as the second charging capacity parameter, it is determined that the charging capacity parameter matching test has passed; wherein the second charging capacity parameter represents a charging capacity parameter calculated based on the measured charging capacity parameter of the energy storage device and the measured charging capacity parameter of the AC-to-DC converter.
8. The method for testing the storage and charging system according to claim 7, characterized in that: In the case where the first charging capability parameter is the same as the second charging capability parameter, after determining that the charging capability parameter matching test has passed, the method further includes: When the device to be charged is charged by the charging conversion device, obtaining an output parameter of the charging conversion device sent by the charging control unit; When the output parameter is less than or equal to the target parameter, it is determined that the charging conversion device passes the test of the output parameter; wherein the target parameter is the minimum value of the first charging request information and the first charging capability parameter.
9. The method for testing the storage and charging system according to claim 8, characterized in that: After determining that the charging conversion device passes the output parameter test when the output parameter is less than or equal to the target parameter, the method further includes: When the device to be charged is charged by the AC-DC converter, obtaining a first discharge parameter of the AC-DC converter; When the device to be charged is charged by the energy storage device, obtaining a second discharge parameter of the energy storage device; When the device to be charged is charged by the AC-DC converter and the energy storage device, obtaining a third discharge parameter of the AC-DC converter and a fourth discharge parameter of the energy storage device; When the first discharge parameter and the third discharge parameter are less than or equal to the charging capacity parameter of the AC-to-DC converter, and the second discharge parameter and the fourth discharge parameter are less than or equal to the charging capacity parameter of the energy storage device, it is determined that the AC-to-DC converter and the energy storage device pass the discharge parameter test.
10. The method for testing the storage and charging system according to claim 9, characterized in that: The charging conversion device includes at least two DC-to-DC converters connected in parallel; the method further includes: When the charging conversion device supplies power to the device to be charged, obtaining output data of each of the at least two DC-to-DC converters; Determine output difference information according to the output data; wherein the output difference information represents difference information between currents outputted by the at least two DC-to-DC converters; When the output difference information is less than or equal to the second threshold, it is determined that the charging conversion device passes the circulating current test.
11. The testing method according to any one of claims 3 to 5 and 7 to 10, characterized in that: The method further comprises: Writing first software version information into the battery management unit so that the battery management unit sends the first software version information to the energy management system; Receiving second software version information sent by the energy management system; When the first software version information is identical to the second software version information, it is determined that the energy management system passes a test of software version reading.
12. The testing method according to claim 11, characterized in that: The method further comprises: Sending a high voltage instruction to the energy management system; In the case where it is determined that the energy management system controls the battery management unit to complete the high-voltage operation of the energy storage device in response to the high-voltage instruction, determining that the energy storage device passes the high-voltage test; Sending a high voltage instruction to the energy management system; In the case where it is determined that the energy management system controls the battery management unit to complete the lower high voltage operation of the energy storage device in response to the lower high voltage instruction, it is determined that the energy storage device passes the lower high voltage test.
13. The testing method according to claim 12, characterized in that: The method further comprises: When the energy storage device is turned off, obtaining status detection information of the energy management system on the battery management unit; When the status detection information indicates that the battery management unit is in an offline state, it is determined that the battery management unit passes an offline function test.
14. A testing system, characterized in that: The test system includes a test machine and a storage and charging system connected to the test machine; wherein the storage and charging system includes an energy management system, an energy storage device and a charging conversion device; the energy storage device includes a battery management unit; the charging conversion device is respectively connected to an AC to DC converter and the energy storage device; The testing machine is used to obtain first charging data of the energy management system controlling the AC-DC converter to charge the energy storage device when the remaining power of the energy storage device is less than or equal to a first threshold, so as to determine whether the energy storage function of the storage and charging system is normal based on the first charging data; The testing machine is also used to obtain second charging data when the energy management system controls the AC-to-DC converter and / or the energy storage device to charge the device to be charged when the device to be charged is connected to the charging conversion device, so as to determine whether the charging function of the storage and charging system is normal based on the second charging data; wherein the energy storage function and the charging function are performed when the communication function between the battery management unit and the energy management system passes the test; the test of the communication function is completed based on the message data received by the energy management system and the message data sent by the battery management unit.
15. The test system according to claim 14, characterized in that: The energy storage device includes a battery management unit; the charging conversion device includes a charging control unit; The battery management unit is used to control the energy storage device to charge the device to be charged; The charging control unit is used to control the charging conversion device to output a charging current to the device to be charged.
16. The test system according to claim 14 or 15, characterized in that: The storage and charging system also includes a charging gun; the charging gun is connected to the charging conversion device; The AC-to-DC converter, the energy storage device and the charging conversion device are connected to a DC bus.
Citation Information
Cited By
Test method for energy storage and charging system, and test system
EP4700399A1