Project data online management system based on the Internet

Through the Internet-based project data online management system, the distributed project monitoring network and project department status tree are used to monitor and regulate the construction progress and quality in real time, solving the problems of untimely information transmission and poor accuracy in the existing technology, and achieving high efficiency. construction project supervision.

CN118469522BActive Publication Date: 2024-10-18NINGBO MENGCHUANG INFORMATION TECH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202410932225.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-18
Estimated Expiration
2044-07-12

AI Technical Summary

Technical Problem

Existing construction project supervision technology has problems such as untimely information transmission, poor data accuracy and low efficiency, making it difficult to achieve real-time and accuracy.

Method used

The Internet-based project data online management system includes a cloud computing platform, project process analysis module, project process supervision module and project regulation and decision-making module. It can monitor and regulate construction progress and quality in real time by generating a distributed project monitoring network and project department status tree. , generate project execution exception records and make decisions.

Benefits of technology

It improves the real-time and accuracy of construction project supervision, reduces the error rate, and improves supervision efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118469522B_ABST
    Figure CN118469522B_ABST
Patent Text Reader

Abstract

The present invention discloses an Internet-based project data online management system, which relates to the technical field of project supervision and effectively improves the real-time and accuracy of the supervision process. The present invention generates a number of project events according to a project plan and establishes a distributed project monitoring network, obtains the departmental functions of the project department to generate a project department status tree, inputs the currently executable project events into the distributed project monitoring network, and then determines whether the current departmental resources execute the project events, executes the project events according to the judgment results and collects real-time image data, and determines the current completion progress of the project events and the project completion quality according to the real-time image data, and then generates a project execution exception record, generates a project control decision according to the project execution exception record, and generates an event completion result after the project event is executed and inputs it into the distributed project monitoring network, and then determines the currently executable project events.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of project supervision, and in particular to an Internet-based online project data management system. Background Art

[0002] Construction project supervision is increasingly moving towards data-driven development. Regulatory authorities and enterprises collect, analyze and utilize a large amount of regulatory data to achieve real-time monitoring and management of project progress, quality, safety and other aspects. However, existing construction project supervision technologies have the following defects:

[0003] Traditional supervision methods: This includes traditional methods such as manual inspections, document records, and regular reports. Although these methods have been used for a long time, they have problems such as untimely information transmission, poor data accuracy, and low efficiency.

[0004] Building Information Model (BIM): BIM is a digital modeling technology that can provide visual data and information at all stages of a project. Although BIM can improve the efficiency of design and construction, its timeliness and accuracy are limited by data updating and maintenance.

[0005] Therefore, how to improve the efficiency of construction project supervision while improving the real-time and accuracy of the supervision process is a difficulty in the existing technology. For this purpose, an Internet-based project data online management system is developed. Summary of the invention

[0006] In order to solve the above technical problems, the purpose of the present invention is to provide an Internet-based project data online management system.

[0007] In order to achieve the above object, the present invention provides the following technical solutions:

[0008] An Internet-based project data online management system includes a cloud computing platform, wherein the cloud computing platform is communicatively connected to a project process analysis module, a project progress monitoring module, and a project control and decision-making module;

[0009] The project process analysis module is used to generate a number of project events according to the preset project plan, and obtain the correlation between each project event to establish a number of local project event chains, thereby establishing a distributed project monitoring network, and at the same time obtain the departmental functions of the project department to generate a project department status tree;

[0010] The project progress monitoring module is used to input the currently executable project events into the distributed project monitoring network, and then determine whether the current department resources execute the project events, execute the project events and collect real-time image data according to the determination results, and determine the current completion progress of the project events and the quality of project completion according to the real-time image data, and then generate a project execution exception record;

[0011] The project control decision module is used to generate project control decisions based on project execution exception records, and generate event completion results after project event execution is completed and input them into the distributed project monitoring network, thereby determining the currently executable project events.

[0012] Furthermore, the process of generating the project event includes:

[0013] The staff uploads the project plan to the project process analysis module. The project plan includes the project construction duration, project goals and project construction site. The project goal records the expected construction status of each location of the project construction site.

[0014] The project process analysis module generates a corresponding project site 3D image model according to the project construction site, and then establishes a project target 3D image model according to the project target and the project site 3D image model, and overlaps the project target 3D image model with the project site 3D image model to obtain a project detection 3D image model;

[0015] At the same time, the project process analysis module generates Num project events according to the project goals in the project plan, and sets the project process timeline, where the time length on the project process timeline is equal to the project construction time, and Num is a natural number greater than 0;

[0016] The project event includes the event name, event execution location, event maximum execution time and event execution process, wherein the event execution process includes event start conditions, event completion results and resources required for event execution.

[0017] Furthermore, the generation process of the local project event chain includes:

[0018] Match the event start conditions and event completion results of each project event with each other, set Num project event nodes, input various data of each project event into the project event nodes in sequence, and set numbers for each project event node;

[0019] According to the matching results, the project event nodes corresponding to the project events whose start conditions and event completion results match each other are connected, thereby generating several local project event chains;

[0020] Each local project event chain is mapped on the left side of the project process timeline, and the project detection three-dimensional image model is mapped on the right side of the project process timeline. At the same time, according to the project goals and project construction sites, each project event node is connected to the corresponding position on the project detection three-dimensional image model to obtain a distributed project monitoring network.

[0021] Furthermore, the process of establishing the project department status tree includes:

[0022] The staff uploads the project department information to the project process analysis module, wherein the project department information includes the department name, department function and department resources;

[0023] Set n department status nodes, where n is a natural number greater than 0 and represents the total number of department types, and then connect the department status nodes to each other to obtain the project department status tree, and mark the corresponding department name, department function, and department resources in the department status nodes.

[0024] Furthermore, the process of determining whether a project event is executed includes:

[0025] The project process supervision module determines the executable project event nodes at the current time node according to the project process timeline in the distributed project monitoring network, and then obtains the corresponding event name and the resources required for event execution from the project event node, and finds the location connected to the project event node in the project detection 3D image model, and then generates the project construction site;

[0026] Generate multiple event resource requests according to the resources required for event execution in the project event node, wherein the event resources include event name, required resource name and quantity;

[0027] Input the event resource request into the project department status tree, and then match the required resource name in the event resource request with the department function contained in the tree node in the project department status tree. If the match is successful, determine whether the required resource quantity in the event resource request is in the same size relationship as the department resource in the tree node, and determine whether the corresponding event resource request is approved based on the determination result;

[0028] If all event resource requests corresponding to the project event node are passed and any of the event start conditions are not met, the project event corresponding to the project event node will not be started temporarily;

[0029] When all event resource requests corresponding to the project event node are passed and all event start conditions are met, the project event corresponding to the project event node is started.

[0030] Furthermore, the current completion progress of the project event and the judgment process of the project completion quality include:

[0031] When a project event is initiated, according to the matching result between the required resource request corresponding to the project event and the project department status tree, the corresponding construction resources are transferred to the event execution position corresponding to the project event, and the event execution position is marked on the project detection 3D image model;

[0032] During the execution of a project event, real-time image data of the event execution location is collected, and the corresponding location of the three-dimensional image model of the project site is updated according to the real-time image data;

[0033] Divide the maximum execution time of the project event into h time segments of equal length, and record each time segment as the project monitoring cycle, where h is a natural number greater than 0;

[0034] A number of model voxels of the same size are respectively divided in the project site three-dimensional image model and the project target three-dimensional image model, and are recorded as site model voxels and target model voxels respectively;

[0035] The pixel values ​​of the six surface planes of each site model voxel and the target model voxel are obtained. At the end of each project monitoring cycle, the updated part of the project site 3D image model during the project monitoring cycle is compared with the corresponding part of the project target 3D image model. The current completion progress of the project event and the quality of project completion are determined based on the comparison results.

[0036] Furthermore, the process of generating the project execution exception record includes:

[0037] Compare the pixel values ​​of each surface plane of the site model voxels and the target model voxels in the corresponding relationship on the updated part of the project site three-dimensional image model and the corresponding part of the project target three-dimensional image model, and then obtain the voxel difference value between the site model voxels and the target model voxels;

[0038] Set a voxel difference threshold, and obtain a similarity value according to the relationship between the voxel difference value between the site model voxel and the target model voxel and the voxel difference threshold;

[0039] Then, the relationship between the similarity value and the total number of site model voxels contained in the three-dimensional image model of the project site corresponding to the project monitoring period is determined; based on the determination result, the inconsistent parts of the site model voxels and the target model voxels are marked in the project site three-dimensional image model and the project target three-dimensional image model, and a project execution exception record is generated.

[0040] Furthermore, the process of generating the project regulation decision includes:

[0041] When the project control decision module receives a project execution exception record, it marks the corresponding position on the three-dimensional image model of the project site according to the content contained in the project execution exception record, and then generates a project control decision and sends it to the project progress supervision module;

[0042] The project control decision is executed by executing the process of project events, and the three-dimensional image model of the project site is updated after the execution of the project control decision is completed. When the project event is completed, the project control decision module generates the corresponding event completion result according to the project event, and inputs the event completion result into the distributed project monitoring network, and then sends the currently executable project event to the project process supervision module until all project events are executed.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] 1. The present invention generates several project events according to the project plan and establishes a distributed project monitoring network, obtains the department functions of the project department to generate a project department status tree, inputs the currently executable project events into the distributed project monitoring network, and then determines whether the current department resources execute the project events, executes the project events and collects real-time image data according to the judgment results, and determines the current completion progress of the project events and the quality of project completion according to the real-time image data, and then generates a project execution exception record. Compared with the traditional technology of real-time supervision of construction projects through BIM technology, the present invention generates a distributed project monitoring network and then performs multi-segment distributed monitoring of construction projects, which effectively improves the real-time and accuracy of the supervision process;

[0045] 2. The present invention generates project control decisions based on project execution exception records, and generates event completion results after the project event is executed and inputs them into the distributed project monitoring network, thereby judging the currently executable project events, thereby achieving the goal of ensuring the efficiency of construction project supervision while reducing the error rate in the construction process to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention.

[0047] Figure 1 It is a schematic diagram of the present invention. DETAILED DESCRIPTION

[0048] To make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the present invention.

[0049] like Figure 1As shown, the Internet-based project data online management system includes a cloud computing platform, and the cloud computing platform is communicatively connected with a project process analysis module, a project process supervision module and a project control decision module;

[0050] The project process analysis module is used to generate several project events according to the preset project plan, and obtain the correlation between each project event to establish several local project event chains, and then establish a distributed project monitoring network, and at the same time obtain the department functions of the project department, and then generate a project department status tree, and mark each tree node with the corresponding department functions and department resources;

[0051] The project progress monitoring module is used to input the currently executable project events into the distributed project monitoring network, and then determine whether the current department resources execute the project events, execute the project events and collect real-time image data according to the determination results, and determine the current completion progress of the project events and the quality of project completion according to the real-time image data, and then generate a project execution exception record;

[0052] The project control decision module is used to generate project control decisions based on project execution exception records, and generate event completion results after project event execution is completed and input them into the distributed project monitoring network, thereby determining the currently executable project events.

[0053] Further, the working principle of the present invention is described below by way of examples:

[0054] The staff uploads the project plan to the project process analysis module. The project plan includes the project construction duration, project goals and project construction site. The project goal records the expected construction status of each location of the project construction site.

[0055] The project process analysis module generates a corresponding project site 3D image model according to the project construction site, and then establishes a project target 3D image model according to the project target and the project site 3D image model, and overlaps the project target 3D image model with the project site 3D image model to obtain a project detection 3D image model. It should be noted that the project target 3D image model is in a virtual state;

[0056] At the same time, the project process analysis module generates Num project events according to the project goals in the project plan, and sets the project process timeline, where the time length on the project process timeline is equal to the project construction time, and Num is a natural number greater than 0;

[0057] The project event includes the event name, event execution location, event maximum execution time and event execution process, wherein the event execution process includes the event start conditions, event completion results and event execution required resources, wherein the event execution required resources include the number of construction personnel, construction equipment, etc.;

[0058] Match the event start conditions and event completion results of each project event, set Num project event nodes, input the data of each project event into the project event node in sequence, and set the number s1, s2, s3, ..., s Num ;

[0059] According to the matching results, the project event nodes corresponding to the project events whose start conditions and event completion results match each other are connected, thereby generating several local project event chains;

[0060] Map each local project event chain to the left side of the project process timeline, and map the project detection three-dimensional image model to the right side of the project process timeline. At the same time, set connection lines between each project event node and the corresponding position on the project detection three-dimensional image model according to the project goal and the project construction site, thereby obtaining a distributed project monitoring network;

[0061] For example, if a project event is to build a bridge at a certain location on the project construction site, a connection line is set between the project event node corresponding to the project event and the corresponding location on the project detection three-dimensional image model;

[0062] It should be noted that the local project event chains are intertwined with each other. For example, the event completion result of the 8th project event node in one local project event chain is the event start condition of the first project event node in another local project event chain, or the event start condition of the 8th project event node in a local project event chain is the event completion result of the 10th and 19th project event nodes in the other two local project event chains.

[0063] Furthermore, the staff uploads the project department information to the project process analysis module. The project department information includes the department name, department function and department resources. The department function includes personnel deployment, construction vehicle deployment, etc. The department resources represent the amount of resources corresponding to the department function. For example, if the department function is personnel deployment, the corresponding department resources represent the number of personnel remaining to be deployed in the department.

[0064] Set n department status nodes, where n is a natural number greater than 0 and represents the total number of department types, and then connect each department status node to obtain a project department status tree, and annotate the corresponding department name, department function, and department resource in the department status node;

[0065] It should be noted that the department resources change dynamically with the workload assigned to the corresponding department.

[0066] Further, the project process analysis module sends the distributed project monitoring network and the project department status tree to the project process supervision module;

[0067] The project process supervision module determines the executable project event nodes at the current time node according to the project process timeline in the distributed project monitoring network, and then obtains the corresponding event name and the resources required for event execution from the project event node, and finds the location connected to the project event node in the project detection 3D image model, and then generates the project construction site;

[0068] Generate multiple event resource requests according to the resources required for event execution in the project event node, wherein the event resources include event name, required resource name and quantity;

[0069] It should be noted that the required resource names in the generated event resource request corresponding to the same project event node are different, and the required resource names include personnel, construction vehicles, etc.;

[0070] The project process analysis module inputs the event resource request into the project department status tree, and then matches the required resource name in the event resource request with the department functions contained in the tree node in the project department status tree. If the match is successful, it determines whether the required resource quantity in the event resource request is in a size relationship with the department resources in the tree node;

[0071] If the required resource quantity in the event resource request is less than or equal to the department resource in the tree node, the corresponding event resource request is judged to be passed;

[0072] If the required resource quantity in the event resource request is greater than the department resource in the tree node, the corresponding event resource request is judged to be rejected;

[0073] If all event resource requests corresponding to the project event node are passed and any of the event start conditions are not met, the project event corresponding to the project event node will not be started temporarily;

[0074] When all event resource requests corresponding to the project event node are passed and all event start conditions are met, the project event corresponding to the project event node is started.

[0075] Furthermore, the project process monitoring module is provided with a plurality of cameras, and the cameras are evenly distributed in the construction site. When a project event is initiated, according to the matching result between the required resource request corresponding to the project event and the project department status tree, the corresponding construction resources are transferred to the event execution position corresponding to the project event, and the event execution position is marked on the project detection three-dimensional image model;

[0076] During the execution of the project event, the project process monitoring module retrieves the real-time image data of the event execution location collected by the camera, and then updates the corresponding position of the project site three-dimensional image model in the project detection three-dimensional image model according to the real-time image data;

[0077] Divide the maximum execution time of the project event into h time segments of equal length, and record each time segment as the project monitoring cycle, where h is a natural number greater than 0;

[0078] A number of small identical model voxels are respectively divided in the project site three-dimensional image model and the project target three-dimensional image model, and are recorded as site model voxels and target model voxels respectively. It should be noted that the site model voxels and target model voxels in the project site three-dimensional image model and the project target three-dimensional image model are in a one-to-one correspondence;

[0079] Obtain pixel values ​​of six surface planes of each site model voxel and target model voxel. At the end of each project monitoring cycle, compare the updated part of the project site 3D image model during the project monitoring cycle with the corresponding part of the project target 3D image model. The comparison process includes:

[0080] The updated part of the project site 3D image model and the corresponding part of the project target 3D image model are compared with the pixel values ​​of each surface plane of the corresponding site model voxels and target model voxels, wherein the comparison formula is: , where α represents the voxel difference value between any pair of voxels in the relational site model and the target model, and The pixel values ​​of the jth surface plane of the site model voxel and the target model voxel respectively;

[0081] Set a voxel difference threshold. If the voxel difference value between the site model voxel and the target model voxel is greater than or equal to the voxel difference threshold, the pair of site model voxels and the target model voxel are judged to be consistent, and a similarity value is recorded.

[0082] If the voxel difference value between the site model voxel and the target model voxel is less than the voxel difference threshold, no operation is performed;

[0083] If the similarity value is less than or equal to 95% of the total number of site model voxels contained in the three-dimensional image model of the project site corresponding to the project monitoring period, it is judged that the project event execution in the corresponding project monitoring period has not met the standards, and then based on the inconsistent parts of the site model voxels and the target model voxels marked in the three-dimensional image model of the project site and the project target three-dimensional image model during the project monitoring period, a project execution abnormality record is generated and sent to the project control decision module;

[0084] If the similarity value is greater than 95% of the total number of site model voxels contained in the portion of the three-dimensional image model of the project site corresponding to the project monitoring period, the next project monitoring period will be carried out.

[0085] Furthermore, when the project control decision module receives a project execution exception record, the corresponding position is marked on the three-dimensional image model of the project site according to the content contained in the project execution exception record, and then a project control decision is generated and sent to the project progress supervision module;

[0086] The project control decision includes project execution exception records, annotated parts of the three-dimensional image model of the project site, and resources required for event execution;

[0087] Then, the project process supervision module executes the project control decision by executing the process of the project event, and updates the project site three-dimensional image model after the execution of the project control decision is completed, until the similarity value is greater than 95% of the total number of site model voxels contained in the part of the project site three-dimensional image model corresponding to the project monitoring period;

[0088] When the project event is executed, the project control decision module generates the corresponding event completion result based on the project event, and inputs the event completion result into the distributed project monitoring network, and then sends the currently executable project event to the project process supervision module until all project events are executed.

[0089] The above embodiments are only used to illustrate the technical method of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical method of the present invention may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present invention.

Claims

1. Internet-based project data online management system, including cloud computing platform, characterized by: The cloud computing platform is communicatively connected to a project process analysis module, a project progress monitoring module, and a project control and decision-making module; The project process analysis module is used to generate a number of project events according to the preset project plan, and obtain the correlation between each project event to establish a number of local project event chains, thereby establishing a distributed project monitoring network, and at the same time obtain the departmental functions of the project department to generate a project department status tree; The process of generating the project event includes: The staff uploads the project plan to the project process analysis module, wherein the project plan includes the project construction time, project objectives and project construction site; Generate a corresponding project site 3D image model according to the project construction site, then establish a project target 3D image model according to the project target and the project site 3D image model, overlap the project target 3D image model with the project site 3D image model, and then obtain a project detection 3D image model; At the same time, the project process analysis module generates Num project events according to the project goals in the project plan, and sets the project process timeline, where the time length on the project process timeline is equal to the project construction time, and Num is a natural number greater than 0; The project event includes the event name, event execution location, event maximum execution time and event execution process, wherein the event execution process includes event start conditions, event completion results and resources required for event execution; The generation process of the local project event chain includes: Match the event start conditions and event completion results of each project event with each other, set Num project event nodes, and input various data of each project event into the project event nodes in sequence; According to the matching results, the project event nodes corresponding to the project events whose start conditions and event completion results match each other are connected, thereby generating several local project event chains; Map each local project event chain to the left side of the project process timeline, and map the project detection three-dimensional image model to the right side of the project process timeline. At the same time, set connection lines between each project event node and the corresponding position on the project detection three-dimensional image model according to the project goal and the project construction site, thereby obtaining a distributed project monitoring network; The process of establishing the project department status tree includes: The staff uploads the project department information to the project process analysis module, wherein the project department information includes the department name, department function and department resources; Set n department status nodes, where n is a natural number greater than 0 and represents the total number of department types. Connect each department status node to obtain a project department status tree, and annotate the corresponding department name, department function, and department resource on the department status node. The project progress monitoring module is used to input the currently executable project events into the distributed project monitoring network, and then determine whether the current department resources execute the project events, execute the project events and collect real-time image data according to the determination results, and determine the current completion progress of the project events and the quality of project completion according to the real-time image data, and then generate a project execution exception record; The process of determining whether a project event is executed includes: According to the project process timeline in the distributed project monitoring network, the executable project event nodes at the current time node are determined, and then the corresponding event name and resources required for event execution are obtained from the project event node, and the location connected to the project event node is found in the project detection three-dimensional image model, and then the project construction site is generated; Generate multiple event resource requests according to the resources required for event execution in the project event node, wherein the event resources include event name, required resource name and quantity; Input the event resource request into the project department status tree, and then match the required resource name in the event resource request with the department function contained in the tree node in the project department status tree. If the match is successful, determine whether the required resource quantity in the event resource request is in the same size relationship as the department resource in the tree node, and determine whether the corresponding event resource request is approved based on the determination result; If all event resource requests corresponding to the project event node are passed and any of the event start conditions are not met, the project event corresponding to the project event node will not be started temporarily; When all event resource requests corresponding to the project event node are passed and all event start conditions are met, the project event corresponding to the project event node is started; The current completion progress of the project event and the judgment process of the project completion quality include: When a project event is initiated, according to the matching result between the required resource request corresponding to the project event and the project department status tree, the corresponding construction resources are transferred to the event execution position corresponding to the project event, and the event execution position is marked on the project detection 3D image model; During the execution of a project event, real-time image data of the event execution location is collected, and the corresponding location of the three-dimensional image model of the project site is updated according to the real-time image data; Divide the maximum execution time of the project event into h time segments of equal length, and record each time segment as the project monitoring cycle, where h is a natural number greater than 0; A number of model voxels of the same size are respectively divided in the project site three-dimensional image model and the project target three-dimensional image model, and are recorded as site model voxels and target model voxels respectively; Obtain pixel values ​​of six surface planes of each site model voxel and target model voxel. When a project monitoring cycle ends, compare the updated part of the project site 3D image model during the project monitoring cycle with the corresponding part of the project target 3D image model. According to the comparison results, determine the current completion progress of the project event and the quality of project completion. The process of generating the project execution exception record includes: Compare the pixel values ​​of each surface plane of the site model voxels and the target model voxels in the corresponding relationship on the updated part of the project site three-dimensional image model and the corresponding part of the project target three-dimensional image model, and then obtain the voxel difference value between the site model voxels and the target model voxels; Set a voxel difference threshold, and obtain a similarity value according to the relationship between the voxel difference value between the site model voxel and the target model voxel and the voxel difference threshold; Determine the size relationship between the similarity value and the total number of site model voxels contained in the project site three-dimensional image model portion corresponding to the project monitoring period, and mark the inconsistent parts of the site model voxels and the target model voxels in the project site three-dimensional image model and the project target three-dimensional image model according to the determination result, and generate a project execution abnormality record; The project control decision module is used to generate a project control decision based on the project execution exception record, and generate an event completion result after the project event is executed and input it into the distributed project monitoring network, thereby determining the currently executable project event; The process of generating the project regulation decision includes: When the project control decision module receives a project execution exception record, it marks the corresponding position on the three-dimensional image model of the project site according to the content contained in the project execution exception record, and then generates a project control decision and sends it to the project progress supervision module; The project control decision is executed by executing the process of project events, and the three-dimensional image model of the project site is updated after the execution of the project control decision is completed. When the project event is completed, the project control decision module generates the corresponding event completion result according to the project event, and inputs the event completion result into the distributed project monitoring network, and then sends the currently executable project event to the project process supervision module until all project events are executed.

Citation Information

Patent Citations

  • Engineering construction progress management and control system and method based on three-dimensional panoramic image

    CN113177783A

  • Intelligent management method and system for organizational structure and medium

    CN114548914A

  • Intelligent engineering management system and method based on GIS

    CN115660567A

  • Engineering construction project construction period management method and system based on BIM and GIS

    CN117391640A

  • Interactive factory management system based on three-dimensional visualization technology

    CN117764541A