A wet cyclone double-layer spray magnesium desulfurization equipment and process
Through the design of wet cyclone double-layer spray magnesium desulfurization equipment, the problems of complex flue gas desulfurization process and inconvenient replacement of demister in the steel industry are solved. The rapid replacement and flushing of demister is realized, which improves safety and operation. Convenience and reduced costs.
Patent Information
- Application Number
- CN202410964432.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2044-07-18
AI Technical Summary
The existing flue gas desulfurization process in the steel industry is complex and difficult to operate, the by-product recovery and reuse costs are high, and the demister replacement is inconvenient, affecting safety.
A wet cyclone double-layer spray magnesium desulfurization equipment is designed. It adopts a double-layer spray layer and a demister, and is equipped with a replacement mechanism and a flushing mechanism. The buffer box and sealing plate are used to realize the rapid replacement and flushing of the demister. Prevent workers from entering the desulfurization tower.
It simplifies the replacement and flushing process of the mist eliminator, extends the service life of the mist eliminator, improves safety and ease of operation, and reduces cost and complexity.
Smart Images

Figure CN118491287B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of environmental protection equipment for smelting pellet ore, in particular to wet cyclone double-layer spraying magnesium desulfurization equipment and process. Background Art
[0002] With the rapid development of social economy, air pollution is becoming increasingly serious throughout the country. Air pollutants such as SO2, dust and NOX emitted by steel enterprises have increased significantly. Therefore, it is very important for the steel industry to carry out flue gas desulfurization on the flue gas of heavily polluting enterprises such as sintering pelletizing.
[0003] The existing desulfurization process for the production of oxidized pellets mainly consists of units such as adsorption (activated carbon desulfurization to produce acid), extraction (dilute sulfuric acid to decompose phosphate ore to extract phosphoric acid), neutralization (preparation of ammonium phosphate neutralization liquid), absorption (ammonium phosphate liquid desulfurization to produce fertilizer), oxidation (ammonium sulfite oxidation), and concentration and drying (preparation of solid fertilizer). The overall process flow is complex to control, the process operation is difficult, and the cost of recovering and reusing its by-products is increased. Summary of the invention
[0004] The purpose of the present invention is to provide a wet cyclone double-layer spray magnesium desulfurization equipment and process to solve the problems raised in the above background technology.
[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a wet cyclone double-layer spray magnesium desulfurization equipment, comprising a desulfurization tower, a double-layer spray layer is arranged in the desulfurization tower, a demister is arranged above the double-layer spray layer, a replacement mechanism is arranged on the side of the demister, the replacement mechanism is used to replace the demister, and a flushing mechanism is arranged on the lower side of the demister.
[0006] As a further solution of the present invention, the replacement mechanism includes a cache box; the cache box is fixedly installed on the outer wall of the desulfurization tower, the cache box is close to one end of the desulfurization tower and the top opening; a cover plate is detachably installed on the top of the cache box; a sealing plate is provided on the side of the cache box, and the sealing plate is elastically slidably connected to the desulfurization tower in the vertical direction; a first slide plate is slidably arranged in the cache box, a first traction rope is fixedly connected to the first slide plate, the first traction rope passes through the side wall of the desulfurization tower away from the first slide plate and is fixedly connected to the sealing plate; the first slide plate is fixedly connected to a pulling block, and the pulling block can drive the defogger to move.
[0007] As a further solution of the present invention, the demisters are configured to be two arranged up and down, a support plate is provided below the demister, and the support plate is elastically slidably connected to the desulfurization tower in the vertical direction; the front and rear side walls of the demister are fixedly connected with protrusions, and the protrusions are parallelogram-shaped.
[0008] As a further solution of the present invention, the flushing mechanism includes a flushing pipe, which is fixedly installed inside the desulfurization tower through a support frame; the flushing pipe is arranged in a grid shape, and a plurality of first spray heads are installed on the flushing pipe.
[0009] As a further solution of the present invention, the bottom of the cache box is fixedly connected to a first water pipe, the bottom of the first water pipe is fixedly connected to a water tank, the bottom of the water tank is fixedly connected to a second water pipe and a third water pipe, the second water pipe is fixedly connected to a flushing pipe; the third water pipe penetrates the side wall of the desulfurization tower at one end away from the water tank and extends into the desulfurization tower, and a switch assembly is provided on the side of the water tank; the switch assembly is used to open the second water pipe and the third water pipe.
[0010] As a further scheme of the present invention, the switch assembly includes a baffle, which is located in the water tank and can block the second water pipe and the third water pipe, the baffle is rotatably connected to the water tank, the first gear is fixedly connected to the rotating shaft of the baffle, the first gear is meshed with the second gear, and the second gear is meshed with the third gear; the second gear and the third gear are both rotatably connected to the water tank; the rotating shaft of the third gear is connected to a winding roller through a one-way bearing transmission, and a torsion spring is arranged inside the winding roller; a second traction rope is wound around the winding roller, and the second traction rope is fixedly connected to a first slider at one end away from the winding roller, the first slider is slidably connected to the water tank in a vertical direction, and the bottom end of the first slider extends into the water tank and is fixedly connected to a floating plate; a guide wheel is wrapped around the terminal end of the second traction rope, and a second slider is rotatably installed on the guide wheel, the second slider is elastically slidably connected to the water tank, and the second slider extends into the water tank at one end away from the guide wheel and abuts against the first slider.
[0011] As a further solution of the present invention, the third water pipe is configured to be an inverted S-shape.
[0012] A wet cyclone double-layer spray magnesium desulfurization process, the process comprising the following steps;
[0013] Step 1: The slurry in the circulation pool at the bottom of the desulfurization tower is circulated to the double-layer spray layer through two pumps installed below the desulfurization tower, and then the slurry is sprayed out through the double-layer spray layer. The magnesium hydroxide slurry contacts the exhaust gas and is oxidized into magnesium sulfate and part of magnesium sulfite to remove sulfur from the exhaust gas;
[0014] Step 2: The desulfurized exhaust gas will flow upward to contact the demister, which can remove the fine droplets brought out of the flue gas after desulfurization; the flushing mechanism set under the lower demister can flush the demister to increase the service life of the demister;
[0015] Step 3: When the demister needs to be replaced, the staff can operate the replacement mechanism to work. The replacement mechanism can quickly remove the lower demister from the desulfurization tower and replace it with a new demister.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] The present invention arranges a replacement mechanism, and the replacement structure can transport the demister that needs to be replaced into the cache box. After the demister is moved into the cache box, the sealing plate can replace the first slide plate to close the opening on the desulfurization tower, so as to prevent the flue gas from entering the cache box. Moreover, since the cover plate is detachably installed on the top of the cache box, when replacing the demister, it is only necessary to remove the cover plate and replace the demister in the cache box. The disassembly and replacement of the demister are easier to carry out, and there is no need for the staff to enter the desulfurization tower to operate, so the personal safety of the staff can be better protected. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0019] Figure 2 It is a schematic cross-sectional view of the overall structure of the present invention;
[0020] Figure 3 It is a schematic diagram of the structure of the demister, support plate and protrusion of the present invention;
[0021] Figure 4 It is a schematic cross-sectional view of a part of the structure of the switch assembly of the present invention;
[0022] Figure 5 for Figure 4 A partial enlarged view of the middle part;
[0023] Figure 6 It is a cross-sectional schematic diagram of the first water pipe, water tank, second water pipe, third water pipe and baffle structure of the present invention;
[0024] Figure 7 It is a process flow chart of the present invention.
[0025] In the accompanying drawings, the components represented by the reference numerals are listed as follows:
[0026] Desulfurization tower 1, double-layer spray layer 2, demister 3, cache box 4, cover plate 5, sealing plate 6, first slide plate 7, first traction rope 8, pull block 9, second slider 10, support plate 11, bump 12, flushing pipe 13, support frame 14, first spray head 15, first water pipe 16, water tank 17, second water pipe 18, third water pipe 19, baffle 20, first gear 21, second gear 22, third gear 23, winding roller 24, second traction rope 25, first slider 26, floating plate 27, guide wheel 28. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] See also Figure 1-Figure 7 The present invention provides a technical solution: a wet cyclone double-layer spray magnesium desulfurization equipment, comprising a desulfurization tower 1, a double-layer spray layer 2 is arranged in the desulfurization tower 1, a demister 3 is arranged above the double-layer spray layer 2, a replacement mechanism is arranged on the side of the demister 3, the replacement mechanism is used to replace the demister 3, and a flushing mechanism is arranged on the lower side of the demister 3;
[0029] The replacement mechanism includes a cache box 4; the cache box 4 is fixedly installed on the outer wall of the desulfurization tower 1, and the cache box 4 is close to one end of the desulfurization tower 1 and the top opening; a cover plate 5 is detachably installed on the top of the cache box 4; a sealing plate 6 is provided on the side of the cache box 4, and the sealing plate 6 is elastically slidably connected to the desulfurization tower 1 in the vertical direction; a first slide plate 7 is slidably provided in the cache box 4, and a first traction rope 8 is fixedly connected to the first slide plate 7, and the first traction rope 8 passes through the side wall of the desulfurization tower 1 at one end away from the first slide plate 7 and is fixedly connected to the sealing plate 6; the first slide plate 7 is fixedly connected to a pulling block 9, and the pulling block 9 can drive the defogger 3 to move.
[0030] When working, Figure 1-Figure 5As shown, a slurry circulation pool is arranged at the bottom of the desulfurization tower, and two slurry circulation pumps are arranged in the slurry pool. The slurry circulation pump can pump magnesium hydroxide slurry into the desulfurization tower and spray it out through the double-layer spray layer 2. The magnesium hydroxide slurry will be oxidized into magnesium sulfate and part of magnesium sulfite after contacting with the flue gas; the double-layer spray layer is made of fiberglass, and the empty tower spray nozzle material is silicon carbide hollow tangential nozzle, flange connection, and the external circulation pipeline is made of fiberglass pipe material, with a designed pipe diameter of DN700 and a designed flow rate of 2.4m / s. The single-layer desulfurization spray coverage rate is 300%. 100 nozzles are arranged on each layer; during the desulfurization operation, the flue gas passes through the sprayed slurry droplets and is discharged from the top of the absorption tower, during which it passes through the demister on the upper part of the desulfurization tower 1 to remove the fine droplets brought out by the flue gas after desulfurization. Since the demister is in poor working condition, the flushing mechanism under the demister can flush the demister to increase the service life of the demister; when the demister needs to be replaced, the linear drive mechanism arranged in the buffer box 4 drives the first slide plate 7 to move outward, and the first slide plate 7 will drive the demister to move outward synchronously through the pull block 9, and when the demister is completely moved into the buffer box 4, the first slide plate 7 will release the first traction rope 8, and after the first traction rope 8 is relaxed, the sealing plate 6 will move downward under the action of the spring to close the opening on the desulfurization tower; then the staff opens the cover plate 5 and then can operate the lifting. The mechanism takes the defogger 3 out of the cache box 4, and then places the new defogger 3 into the cache box 4; the linear drive mechanism then drives the first slide 7 to drive the defogger 3 to move into the desulfurization tower 1; the present invention replaces the setting of the mechanism, and the replacement structure can transport the defogger 3 to be replaced into the cache box 4. After the defogger 3 is moved into the cache box 4, the sealing plate 6 can replace the first slide 7 to close the opening on the desulfurization tower 1, so as to prevent the flue gas from entering the cache box 4, and because the cover plate 5 is detachably installed on the top of the cache box 4, when replacing the defogger 3, it is necessary to remove the cover plate 5 and replace the defogger in the cache box 4. The disassembly and replacement of the defogger is easier to carry out, and there is no need for the staff to enter the desulfurization tower to operate, which can better protect the personal safety of the staff.
[0031] As a further solution of the present invention, the demister 3 is configured to be two arranged in an upper and lower manner, a support plate 11 is provided below the demister 3, and the support plate 11 is elastically slidably connected to the desulfurization tower 1 in the vertical direction; the front and rear side walls of the demister 3 are fixedly connected with a protrusion 12, and the protrusion 12 is a parallelogram shape.
[0032] When working, Figure 2 and Figure 3As shown, the demister 3 is arranged in two in an upper and lower manner, which can better intercept the fine droplets brought out by the flue gas after desulfurization, and can ensure that the flue gas discharged from the desulfurization tower will not carry small droplets, and when the demister of the lower layer is replaced, the demister of the upper layer can continue to work, so that the desulfurization work of the flue gas can be carried out continuously; when the first slide plate 7 drives the demister 3 of the lower layer into the buffer box 4, the demister 3 of the upper layer will move downward under the action of gravity until it contacts with the support plate 11; when the first slide plate 7 pushes the new demister 3 from the buffer box 4 into the desulfurization tower, the protrusion 12 on the new demister 3 will drive the protrusion 12 on the demister 3 in the desulfurization tower to move downward, so that the new demister 3 can be placed on the upper layer; the demister 3 can work better.
[0033] As a further solution of the present invention, the flushing mechanism includes a flushing pipe 13, which is fixedly installed inside the desulfurization tower 1 through a support frame 14; the flushing pipe 13 is arranged in a grid shape, and a plurality of first spray heads 15 are installed on the flushing pipe 13.
[0034] When working, Figure 2 As shown, the flushing pipe 13 is externally connected to a pump head, and the pump head can pump the flushing liquid into the flushing pipe 13, and then spray the flushing liquid from the first spray head 15 to the demister 3 to flush the demister 3, which can greatly improve the service life of the demister 3.
[0035] As a further solution of the present invention, the bottom of the cache box 4 is fixedly connected to a first water pipe 16, the bottom of the first water pipe 16 is fixedly connected to a water tank 17, the bottom of the water tank 17 is fixedly connected to a second water pipe 18 and a third water pipe 19, the second water pipe 18 is fixedly connected to the flushing pipe 13; the end of the third water pipe 19 away from the water tank 17 passes through the side wall of the desulfurization tower 1 and extends into the desulfurization tower 1, and a switch assembly is arranged on the side of the water tank 17; the switch assembly is used to open the second water pipe 18 and the third water pipe 19.
[0036] The switch assembly includes a baffle 20, which is located in the water tank 17 and can block the second water pipe 18 and the third water pipe 19. The baffle 20 is rotatably connected to the water tank 17. A first gear 21 is fixedly connected to the rotating shaft of the baffle 20. The first gear 21 is meshed with a second gear 22, and the second gear 22 is meshed with a third gear 23. The second gear 22 and the third gear 23 are both rotatably connected to the water tank 17. A winding roller 24 is connected to the rotating shaft of the third gear 23 through a one-way bearing transmission, and a torsion spring is arranged inside the winding roller 24. A second traction rope 25 is wound around the winding roller 24, and the first slider 26 is fixedly connected to the end of the second traction rope 25 away from the winding roller 24. The first slider 26 is slidably connected to the water tank 17 in the vertical direction, and the bottom end of the first slider 26 extends into the water tank 17 and is fixedly connected to the floating plate 27; a guide wheel 28 is wrapped around the terminal end of the second traction rope 25, and the second slider 10 is rotatably installed on the guide wheel 28, the second slider 10 is elastically slidably connected to the water tank 17, and the end of the second slider 10 away from the guide wheel 28 extends into the water tank 17 and abuts against the first slider 7.
[0037] When working, Figure 2 , Figure 4-Figure 6 As shown, when the first slide 7 drives the defogger 3 to be replaced to move to the left into the cache box 4, the first slide 7 will move to contact with the second slide 10, and then the first slide 7 will drive the second slide 10 to move outward, and the second slide 10 will drive the guide wheel 28 to drive the middle part of the second traction rope 25 to move outward synchronously; it should be noted that, as Figure 5As shown, a pressure block is arranged between the second slider 10 and the first slider 26. When the guide wheel 28 moves and pulls the second traction rope 25, the pressure block will press the second traction rope 25 located above the guide wheel 28, so that the second traction rope 25 only moves a section below the guide wheel 28; the guide wheel 28 moves to the left and pulls the second traction rope 25, and the second traction rope 25 drives the winding roller 24 to rotate, and the winding roller 24 drives the third gear 23 to rotate through the one-way bearing, and the third gear 23 drives the first gear 21 and the baffle 20 to rotate through the second gear 22. At this time, the baffle 20 will rotate 180°, and the through hole opened on the baffle 20 will rotate to the top of the second water pipe 18, and then the flushing liquid in the flushing mechanism will flow into the water tank 17 through the second water pipe 18, and then enter the cache box 4 through the first water pipe 16. After the liquid level in the water tank gradually rises, the float 27 will move upward under the action of buoyancy, and the float 27 will drive the first slider 26 to rotate synchronously Move upward, at this time the first slider 26 will drive the winding roller 24 to rotate again through the second traction rope 25; at this time the liquid level in the water tank 17 submerges the demister 3; and the winding roller 24 drives the baffle 20 to rotate 180° again through the third gear 23, the second gear 22 and the first gear 21; at this time the through hole on the baffle 20 rotates to above the third water pipe 19, and then the cleaning liquid in the water tank 17 that has cleaned the demister 3 can flow into the desulfurization tower 1 through the third water pipe 19; the present invention is provided with the water tank 17, the second water pipe 18, the third water pipe 19 and the switch assembly, when replacing the demister, the demister entering the cache box 4 can be cleaned again with the cleaning liquid, and the small droplets adhering to the demister can be removed to avoid the small droplets falling on the staff when the demister is taken out, and after the cleaning liquid submerges the demister 3, the switch assembly can automatically discharge the cleaning liquid into the desulfurization tower, which can ensure that no cleaning liquid will flow out when the demister is taken out later.
[0038] As a further solution of the present invention, the third water pipe 19 is configured to be an inverted S-shape.
[0039] When working, Figure 2 As shown, the third water pipe 19 is arranged in an inverted S shape. When the waste cleaning liquid in the water tank 17 is discharged into the desulfurization tower from the third water pipe 19, a small amount of liquid can be retained at the bend of the third water pipe 19, thereby preventing the flue gas in the desulfurization tower from entering the water tank 17 and the buffer box 4.
[0040] A wet cyclone double-layer spray magnesium desulfurization process, the process comprising the following steps;
[0041] Step 1: The slurry in the circulation pool at the bottom of the desulfurization tower 1 is circulated to the double-layer spray layer 2 through two pumps arranged below the desulfurization tower 1, and then the slurry is sprayed out through the double-layer spray layer 2, and the magnesium hydroxide slurry is contacted with the exhaust gas and oxidized into magnesium sulfate and part of magnesium sulfite, thereby removing sulfur from the exhaust gas;
[0042] Step 2: The desulfurized exhaust gas will flow upward to contact the demister 3, which can remove the fine droplets brought out of the flue gas after desulfurization; the flushing mechanism arranged below the lower demister 3 can flush the demister 3 to increase the service life of the demister 3;
[0043] Step three: When the demister 3 needs to be replaced, the staff can operate the replacement mechanism to work, and the replacement mechanism can quickly take out the demister 3 on the lower layer from the desulfurization tower 1 and replace it with a new demister 3.
[0044] Working principle: Figure 1-Figure 5 As shown, a slurry circulation pool is arranged at the bottom of the desulfurization tower, and two slurry circulation pumps are arranged in the slurry pool. The slurry circulation pump can pump magnesium hydroxide slurry into the desulfurization tower and spray it out through the double-layer spray layer 2. The magnesium hydroxide slurry will be oxidized into magnesium sulfate and part of magnesium sulfite after contacting with the flue gas; the double-layer spray layer is made of fiberglass, and the empty tower spray nozzle material is silicon carbide hollow tangential nozzle, flange connection, and the external circulation pipeline is made of fiberglass pipe material, with a designed pipe diameter of DN700 and a designed flow rate of 2.4m / s. The single-layer desulfurization spray coverage rate is 300%. 100 nozzles are arranged on each layer; during the desulfurization operation, the flue gas passes through the sprayed slurry droplets and is discharged from the top of the absorption tower, during which it passes through the demister on the upper part of the desulfurization tower 1 to remove the fine droplets brought out by the flue gas after desulfurization. Since the demister is in poor working condition, the flushing mechanism under the demister can flush the demister to increase the service life of the demister; when the demister needs to be replaced, the linear drive mechanism arranged in the buffer box 4 drives the first slide plate 7 to move outward, and the first slide plate 7 will drive the demister to move outward synchronously through the pull block 9, and when the demister is completely moved into the buffer box 4, the first slide plate 7 will release the first traction rope 8, and after the first traction rope 8 is relaxed, the sealing plate 6 will move downward under the action of the spring to close the opening on the desulfurization tower; then the staff opens the cover plate 5 and then can operate the lifting. The mechanism takes the defogger 3 out of the cache box 4, and then places the new defogger 3 into the cache box 4; the linear drive mechanism then drives the first slide 7 to drive the defogger 3 to move into the desulfurization tower 1; the present invention replaces the setting of the mechanism, and the replacement structure can transport the defogger 3 to be replaced into the cache box 4. After the defogger 3 is moved into the cache box 4, the sealing plate 6 can replace the first slide 7 to close the opening on the desulfurization tower 1, so as to prevent the flue gas from entering the cache box 4, and because the cover plate 5 is detachably installed on the top of the cache box 4, when replacing the defogger 3, it is necessary to remove the cover plate 5 and replace the defogger in the cache box 4. The disassembly and replacement of the defogger is easier to carry out, and there is no need for the staff to enter the desulfurization tower to operate, which can better protect the personal safety of the staff.
Claims
1. A wet cyclone double-layer spray magnesium desulfurization equipment, comprising a desulfurization tower (1), characterized in that: The desulfurization tower (1) is provided with a double-layer spray layer (2), a demister (3) is provided above the double-layer spray layer (2), a replacement mechanism is provided on the side of the demister (3), the replacement mechanism is used to replace the demister (3), and a flushing mechanism is provided on the lower side of the demister (3); The replacement mechanism comprises a cache box (4); the cache box (4) is fixedly mounted on the outer wall of the desulfurization tower (1), the cache box (4) is close to one end of the desulfurization tower (1) and is open at the top; a cover plate (5) is detachably mounted on the top of the cache box (4); a sealing plate (6) is arranged on the side of the cache box (4), and the sealing plate (6) is elastically slidably connected to the desulfurization tower (1) in the vertical direction; a first slide plate (7) is slidably arranged inside the cache box (4), a first traction rope (8) is fixedly connected to the first slide plate (7), and the end of the first traction rope (8) away from the first slide plate (7) passes through the side wall of the desulfurization tower (1) and is fixedly connected to the sealing plate (6); the first slide plate (7) is fixedly connected to a pull block (9), and the pull block (9) can drive the demister (3) to move.
2. The wet cyclone double-layer spray magnesium desulfurization equipment according to claim 1 is characterized in that: The demisters (3) are provided in two pieces arranged up and down, a support plate (11) is provided below the demisters (3), and the support plate (11) is elastically slidably connected to the desulfurization tower (1) in the vertical direction; and protrusions (12) are fixedly connected to the front and rear side walls of the demisters (3), and the protrusions (12) are in the shape of a parallelogram.
3. The wet cyclone double-layer spray magnesium desulfurization equipment according to claim 1 is characterized in that: The flushing mechanism comprises a flushing pipe (13), wherein the flushing pipe (13) is fixedly installed inside the desulfurization tower (1) via a support frame (14); the flushing pipe (13) is arranged in a grid shape, and a plurality of first spray heads (15) are installed on the flushing pipe (13).
4. The wet cyclone double-layer spray magnesium desulfurization equipment according to claim 3 is characterized in that: The bottom of the cache box (4) is fixedly connected to a first water pipe (16), the bottom of the first water pipe (16) is fixedly connected to a water tank (17), the bottom of the water tank (17) is fixedly connected to a second water pipe (18) and a third water pipe (19), the second water pipe (18) is fixedly connected to a flushing pipe (13); the end of the third water pipe (19) away from the water tank (17) passes through the side wall of the desulfurization tower (1) and extends into the desulfurization tower (1), and a switch assembly is arranged on the side of the water tank (17); the switch assembly is used to open the second water pipe (18) and the third water pipe (19).
5. The wet cyclone double-layer spray magnesium desulfurization equipment according to claim 4 is characterized in that: The switch assembly comprises a baffle (20), the baffle (20) being located in the water tank (17) and being capable of shielding the second water pipe (18) and the third water pipe (19), the baffle (20) being rotatably connected to the water tank (17), a first gear (21) being fixedly connected to the rotating shaft of the baffle (20), the first gear (21) being meshed with a second gear (22), the second gear (22) being meshed with a third gear (23); the second gear (22) and the third gear (23) being rotatably connected to the water tank (17); a winding roller (24) being connected to the rotating shaft of the third gear (23) via a one-way bearing, the winding roller (24) being provided with a torsion spring; A second traction rope (25) is wound around the winding roller (24); one end of the second traction rope (25) away from the winding roller (24) is fixedly connected to a first slider (26); the first slider (26) is slidably connected to the water tank (17) in the vertical direction; the bottom end of the first slider (26) extends into the water tank (17) and is fixedly connected to a floating plate (27); a guide wheel (28) is wound around the terminal end of the second traction rope (25); a second slider (10) is rotatably mounted on the guide wheel (28); the second slider (10) is elastically slidably connected to the water tank (17); one end of the second slider (10) away from the guide wheel (28) extends into the water tank (17) and abuts against the first slider (7).
6. The wet cyclone double-layer spray magnesium desulfurization equipment according to claim 4 is characterized in that: The third water pipe (19) is configured to be in an inverted S shape.
7. A wet cyclone double-layer spray magnesium desulfurization process, applicable to the wet cyclone double-layer spray magnesium desulfurization equipment according to any one of claims 1 to 6, characterized in that: The process comprises the following steps; Step 1: The slurry in the circulation pool at the bottom of the desulfurization tower (1) is circulated to the double-layer spray layer (2) through two pumps arranged below the desulfurization tower (1), and then the slurry is sprayed out through the double-layer spray layer (2), and the magnesium hydroxide slurry is contacted with the waste gas and oxidized into magnesium sulfate and part of magnesium sulfite, thereby removing sulfur from the waste gas; Step 2: the desulfurized exhaust gas will flow upward to contact the demister (3), and the demister (3) can remove fine droplets brought out of the flue gas after desulfurization; a flushing mechanism arranged below the lower demister (3) can flush the demister (3), thereby increasing the service life of the demister (3); Step 3: When the demister (3) needs to be replaced, the staff can operate the replacement mechanism to operate, and the replacement mechanism can quickly remove the demister (3) on the lower layer from the desulfurization tower (1) and replace it with a new demister (3).
Citation Information
Cited By
Anti-corrosion environment-friendly circulating hydrogen desulfurization tower
CN121371864A