A construction method for large-span irregular steel structure roof

By deepening the connection between the support cylinder and the steel structure roof, assemble and use V-shaped converters and inlay roofs in blocks, combining reverse simulation and lifting technology, traditional steel structure roofs in complex curved roofs are solved. The unstable support points on the cover and the difficulty of construction have achieved safe and stable construction and high-quality molding.

CN118498739BActive Publication Date: 2024-12-06BEIJING URBAN CONSTR SIXTH GRP
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202410802044.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2024-12-06
Estimated Expiration
2044-06-20

AI Technical Summary

Technical Problem

The traditional three-way mesh single-layer mesh shell steel structure is difficult to support complex curved roofs, resulting in unstable support points and difficult construction, which poses safety hazards.

Method used

A construction method for large-span irregular steel structure roof was designed. By deepening the connection between the support cylinder and the steel structure roof, the support cylinder and the steel structure roof were assembled in pieces and installed, using V-shaped converters and inlay roofing, combined with reverse simulation and hoisting technology, adjust the length and angle of the connecting beams to meet support needs at different heights.

Benefits of technology

It reduces the safety hazards of the support column, enhances the stability of the bottom support node, reduces construction difficulty and safety hazards, improves installation accuracy and molding quality, and meets the design needs of complex curved roofs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118498739B_ABST
    Figure CN118498739B_ABST
Patent Text Reader

Abstract

The invention discloses a construction method for a large-span irregular steel structure roof, comprising the following steps: step 1, building a model of the roof structure by basic design and modeling, and deepening the connection position of the support tube in the roof structure and the steel structure roof, and deepening the connection position of the support tube and the building structure; step 2, dividing the model of the roof structure into blocks; step 3, assembling the blocks and installing the support tube; step 4, assembling the blocks and installing the steel structure roof; step 5, stretching the membrane, and the construction is completed. The invention deepens the connection position of the support tube in the roof structure and the steel structure roof, and can connect the steel structure roof with the bottom support tube as a whole, reducing the potential safety hazards in the construction process. By dividing the model in advance, it solves the problems of difficulty in controlling the installation precision of large and complex curved roofs, difficulty in adjusting the spatial position, and difficulty in assembly and welding construction, so that the final molding quality of the roof is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building construction, and in particular to a construction method for a large-span irregular steel structure roof. Background Art

[0002] With the development of the construction industry in recent years, traditional buildings have been given new requirements. While meeting the functional requirements, they must also be able to reflect the unique culture in their design. Therefore, the number of buildings with complex designs and various shapes is increasing.

[0003] The roof steel structure generally adopts a three-dimensional grid single-layer lattice shell steel structure. The traditional three-dimensional grid single-layer lattice shell steel structure is mostly used for flat roofs, and the support is relatively simple. The roof of a large museum project has a complex design and a curved surface with large up and down fluctuations. As a result, the three-dimensional grid single-layer lattice shell steel structure of the roof has large up and down fluctuations. The top support points may not be on the same horizontal plane, which makes it difficult to support. If the structure of the support tube is changed, the bottom support node may be unstable, which poses many safety hazards. In addition, the construction of the curved lattice shell steel structure is difficult. Therefore, a construction method for a large-span irregular steel structure roof is urgently needed. Summary of the invention

[0004] In view of the shortcomings of the prior art, the present invention designs a construction method for a large-span irregular steel structure roof, comprising the following steps: step 1, establishing a model of the roof structure through basic design and modeling, and deepening the connection position of the support tube in the roof structure and the steel structure roof, and deepening the connection position of the support tube and the building structure; step 2, dividing the model of the roof structure into blocks, wherein the steel structure roof is divided into edge beam units, connecting beam units, inlaid roofs and connecting beams, and the supporting tube is divided into ring beam units, supporting beams and V-shaped conversion parts; step 3, assembling the blocks and installing the supporting tube; step 4, assembling the blocks and installing the steel structure roof; step 5, pulling the membrane, and the construction is completed.

[0005] Preferably, in step 1, the connection position between the support tube in the roof structure and the steel structure roof is deepened, including the following steps: a hole is opened at a predetermined support position of the steel structure roof, and the hole is extended downward, wherein the downward extension is a structure in which the inclination angle gradually increases with decreasing height, and a patched roof is arranged above the hole; the support tube is extended upward, wherein the upward extension is a structure in which the inclination angle gradually decreases with increasing height.

[0006] Preferably, in step 1, the connection position between the support tube and the building structure is further processed, including the following steps: a V-shaped conversion member is arranged at the bottom of the support tube, wherein the top of the V-shaped conversion member is connected to the support beam of the support tube, and the bottom of the V-shaped conversion member is installed on a beam or a column in the building structure; a beam reinforcement member is arranged at the position where the V-shaped conversion member is installed on the beam, and a column reinforcement member is arranged at the position where the V-shaped conversion member is installed on the column.

[0007] Preferably, in step 3, the support tube is assembled and installed in blocks, including the following steps: installing the V-shaped conversion piece on a beam or a column in the building structure; assembling the ring beam unit on the ground, and hoisting the ring beam unit to the installation position, fixing the ring beam unit with the support beam, and repeating this step until all the ring beam units are installed; installing a layer of support beams above the topmost ring beam unit.

[0008] Preferably, in step 4, the steel structure roof is assembled and installed in blocks, including the following steps: assembling the side beam units, the connecting beam units and the patched roof on the ground by means of an assembly bracket; installing the steel structure roof in the order of the side beam units, the connecting beam units, the connecting beams and the patched roof by means of a lifting device, wherein during the installation process, installation brackets are provided underneath the side beam units and the connecting beam units.

[0009] Preferably, before assembling and installing the steel structure roof in blocks, a reverse simulation is also included, wherein the reverse simulation includes the following steps: establishing a lifting component model on the edge beam unit, the connecting beam unit and the patched roof, simulating the lifting through the lifting rope model and the lifting fixture model, recording the length of the lifting rope model at this time as D1, adjusting the horizontality of the edge beam unit, the connecting beam unit or the patched roof by adjusting the length of the lifting rope model, when the horizontality of the edge beam unit, the connecting beam unit or the patched roof reaches the highest, recording the length of the lifting rope model at this time as D2, and recording the position of the lifting fixture model relative to the edge beam unit, the connecting beam unit or the patched roof at this time.

[0010] Preferably, the steel structure roof is installed in the order of edge beam units, connecting beam units, connecting beams, and patched roofs by means of lifting equipment, comprising the following steps: installing lifting parts on the edge beam units, connecting beam units, or patched roofs; installing the lifting equipment and the lifting rope according to the recorded position of the lifting equipment model and the length of the lifting rope model, wherein the length of the lifting rope is D2; lifting the edge beam units, connecting beam units, or patched roofs, and during the lifting process, changing the aerial posture of the edge beam units, connecting beam units, or patched roofs by changing the length of the lifting ropes; when the length of the lifting ropes is adjusted to D1, lifting the edge beam units, connecting beam units, or patched roofs onto the installation bracket.

[0011] Preferably, the assembling bracket includes: a base, a support rod, a first rotating member, a first shaft head and a first fixed member; the support rod is installed on the base; the support rod is a structure with adjustable length; the first rotating member is installed on the support rod; the first shaft head is rotatably installed on the first rotating member; the first fixed member is installed on the first shaft head; the side beam connector and the connecting beam connector of the steel structure roof are both installed on the first fixed member.

[0012] Preferably, the mounting bracket includes: a first bracket, a second bracket, a third bracket, a second rotating member, a second shaft head and a second fixed member; there are multiple second brackets, wherein the multiple second brackets are connected in sequence, and the lowest second bracket is mounted on the first bracket; the third bracket is mounted on the highest second bracket; the third bracket is a structure with adjustable length; the second rotating member is mounted on the third bracket; the second shaft head is rotatably mounted on the second rotating member; the second fixed member is mounted on the second shaft head; the side beam connector and the connecting beam connector of the steel structure roof are both mounted on the second fixed member.

[0013] Preferably, the roof structure comprises: a support tube and a steel structure roof; wherein, the steel structure roof has a hole reserved at a predetermined support position of the support tube, and the hole is a downward extending structure, and the downward extending structure is a structure whose inclination angle gradually increases with decreasing height; the support tube is a structure whose inclination angle gradually decreases with increasing height; the bottom of the support tube is installed on the top of the building structure, and the top of the support tube is supported below the downward extending structure of the steel structure roof; the support tube comprises: a ring beam unit, a support beam and a V-shaped conversion piece; the number of the ring beam units is multiple, and the ring beam units are evenly arranged in the longitudinal direction, and two adjacent ring beam units are connected by the support beam; the ring beam unit gradually expands with increasing height, and the inclination angle of the support beam gradually decreases with increasing height; the topmost support beam is supported below the downward extending structure of the steel structure roof, and the bottommost support beam is installed on the top of the building structure through the V-shaped conversion piece. The ring beam unit comprises: a ring beam and a ring beam connection assembly; the number of ring beams and ring beam connection assemblies is multiple and equal, and multiple ring beams and multiple ring beam connection assemblies are spaced and connected to form a ring structure; the support beam is connected to the ring beam connection assembly; the ring beam connection assembly comprises: a plug plate assembly, a ring beam connector and a support beam connector; wherein the plug plate assembly is a cross structure; the number of ring beam connectors is two, and the two ring beam connectors are respectively fixedly installed on both sides of the plug plate assembly, and the ring beam connector is connected to the ring beam; the number of support beam connectors is four, and the four support beam connectors are respectively fixedly installed on the outside of the four corners of the plug plate assembly, and the ring beam connector and the plug plate assembly are both connected to one end of the support beam connector, and the other end of the support beam connector is connected to the support beam. A patched roof is provided above the reserved holes in the steel structure roof, and the patched roof includes: patched beams and patched beam connectors; the number of the patched beams and the patched beam connectors are both multiple, and the multiple patched beams and the multiple patched beam connectors are arranged in a mesh structure, and adjacent patched beams are connected by the patched beam connectors, and the patched beams at the edge position are fixedly installed above the reserved holes. The steel structure roof also includes: side beam units and connecting beam units, wherein the side beam units include: side beams, side beam connectors and connecting beams, and the connecting beam units include: connecting beams and connecting beam connectors; the number of side beams and side beam connectors is multiple and equal, and multiple side beams and multiple side beam connectors are connected at intervals; the number of connecting beams and connecting beam connectors is multiple, and multiple connecting beams and multiple connecting beam connectors are arranged in a mesh structure, and adjacent connecting beams are connected through connecting beam connectors; the connecting beams at the edge positions are connected to the side beam connectors; the connecting beam connectors at the downwardly extending structural position are connected to the supporting tube; the connecting beam connectors include: inserts, inserts and beam connectors; wherein the number of inserts and beam connectors is multiple and equal; multiple inserts are fixedly installed on the outside of the inserts, and the beam connector is installed between two adjacent inserts at an adjustable angle; the beam connector is connected to the connecting beam or the supporting tube.

[0014] Compared with the closest prior art, the beneficial effects of the present invention are:

[0015] 1. The present invention opens holes at predetermined supporting positions of the steel structure roof, and extends the holes downward so that the steel structure roof can be connected to the supporting tube at the bottom as a whole, reducing the potential safety hazards of the supporting columns during construction. The ring beam assemblies at different layers are connected by supporting beams, and the ring beam assemblies at the top are connected by supporting beams. In actual construction, only the length and angle of the connecting beams need to be changed to support steel structures of roofs of different heights, thus solving the problem that the supporting points are not on the same horizontal plane and are difficult to support.

[0016] 2. The present invention enhances the stability of the bottom support node by installing the V-shaped conversion member on the beam or column, and arranges the beam reinforcement member and the column reinforcement member at the position of the V-shaped conversion member, thereby ensuring the safety of the construction.

[0017] 3. The present invention arranges a patched roof at the downward extension structure of the steel structure roof, which fills the holes of the steel structure roof at the predetermined supporting position of the supporting tube, reduces the construction difficulty of subsequent membrane drawing and ensures the forming effect of the membrane drawing, and designs the patched roof as a mesh structure, which is easiest to be made into a structure matching the design shape during construction, thus meeting the design shape requirements of the roof.

[0018] 4. The present invention first uses reverse simulation and then performs forward hoisting construction, so that the angle of the blocks can be flexibly adjusted to the installation angle during the hoisting process. This not only solves the problems of difficulty in controlling the installation accuracy of large and complex curved roofs, difficulty in adjusting the spatial position, and difficulty in assembly and welding construction, but also ensures the final molding quality of the roof and reduces safety hazards during the construction process.

[0019] 5. Whether the steel structure lattice shell of the present invention is assembled in blocks on the ground or in the air, when supporting at the bottom, it can meet the adjustment of the height of the support frame and the adjustment of the angle of the support point, which not only increases the efficiency of construction, but also facilitates adjustment and reduces the error of each control point, ensuring the final molding quality of the cover. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 The figure is a schematic flow chart of the construction method of the large-span irregular steel structure roof of the present invention.

[0021] Figure 2 It is a schematic structural diagram of the support tube of the present invention.

[0022] Figure 3 It is a schematic diagram of the first installation structure of the V-shaped conversion member of the present invention.

[0023] Figure 4It is a schematic diagram of the second installation structure of the V-shaped conversion member of the present invention.

[0024] Figure 5 It is a first structural schematic diagram of the connection node of the ring beam connection assembly of the present invention.

[0025] Figure 6 It is a second structural schematic diagram of the connection node of the ring beam connection assembly of the present invention.

[0026] Figure 7 It is a schematic structural diagram of the ring beam connection assembly of the present invention.

[0027] Figure 8 It is a schematic diagram of the connection structure between the ring beam connection assembly and the ring beam of the present invention.

[0028] Fig. 9 It is a structural schematic diagram of the assembling bracket of the present invention.

[0029] Fig.10 It is a schematic diagram of the structure of the side beam unit blocks of the present invention.

[0030] Fig.11 It is a schematic structural diagram of the edge beam unit of the present invention.

[0031] Fig.12 It is a schematic structural diagram of the connecting beam unit blocks of the present invention.

[0032] Fig.13 It is a structural schematic diagram of the connecting beam unit of the present invention.

[0033] Fig.14 It is a structural schematic diagram of the connecting beam connecting member of the present invention.

[0034] Fig.15 It is a schematic diagram of the structure of the mounting bracket of the present invention.

[0035] Fig.16 This is a schematic diagram of the first installation structure of the steel structure roof of the present invention.

[0036] Fig.17 This is a schematic diagram of a second installation structure of the steel structure roof of the present invention.

[0037] Fig.18 This is a schematic diagram of the third installation structure of the steel structure roof of the present invention.

[0038] Fig.19 It is a schematic diagram of the connection structure between the steel structure roof and the supporting tube of the present invention.

[0039] Fig. 20 This is a structural schematic diagram of the steel structure roof of the present invention after installation.

[0040] Fig.21 It is a structural schematic diagram of the inlaid roof of the present invention.

[0041] Fig. 22 It is a schematic diagram of the connection structure of the patched beam and the patched beam connecting member of the present invention.

[0042] Fig.23 It is a schematic diagram of the connection structure between the patched roof and the steel structure roof of the present invention.

[0043] Fig.24 This is a structural schematic diagram of the roof structure of the present invention after installation.

[0044] Fig.25 It is a schematic diagram of the structure of the film drawing completed in the present invention.

[0045] Reference numerals:

[0046] 1-building structure, 11-crossbeam, 12-crossbeam reinforcement, 13-column, 14-column reinforcement, 2-roof structure, 3-support tube, 31-support beam, 32-ring beam, 33-ring beam connection assembly, 331-plug plate assembly, 332-ring beam connection piece, 333-support beam connection piece, 34-V-shaped conversion piece, 4-assembly bracket, 41-base, 42-support rod, 43-first rotating piece, 44-first shaft head, 45-first fixing piece, 5- Steel structure roof, 51-side beam unit, 511-side beam, 512-side beam connector, 513-connecting beam, 52-connecting beam unit, 53-connecting beam connector, 531-insert core, 532-insert plate, 533-beam connector, 6-installation bracket, 61-first bracket, 62-second bracket, 63-third bracket, 64-second rotating member, 65-second shaft head, 66-second fixing member, 7-embedded roof, 71-embedded beam, 72-embedded beam connector. DETAILED DESCRIPTION

[0047] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

[0048] Example 1

[0049] like Figure 1-Figure 25As shown, the present invention provides a construction method for a large-span irregular steel structure roof, comprising the following steps: S1, establishing a model of a roof structure 2 based on basic design and modeling, and deepening the connection position between the support tube 3 in the roof structure 2 and the steel structure roof 5, and deepening the connection position between the support tube 3 and the building structure 1. Among them, the roof structure 2 includes: a support tube 3 and a steel structure roof 5; wherein the steel structure roof 5 has a hole reserved at a predetermined support position of the support tube 3, and the hole is a downward extending structure, and the downward extending structure is a structure whose inclination angle gradually increases with decreasing height; the support tube 3 is a structure whose inclination angle gradually decreases with increasing height; the bottom of the support tube 3 is installed on the top of the building structure 1, and the top of the support tube 3 is supported below the downward extending structure of the steel structure roof 5; the support tube 3 includes: a ring beam unit, a support beam 31 and a V-shaped conversion member 34; the number of the ring beam units is multiple, and the ring beam units are evenly arranged in the longitudinal direction, and two adjacent ring beam units are connected by the support beam 31; the ring beam unit gradually expands with increasing height, and the inclination angle of the support beam 31 gradually decreases with increasing height; the top support beam 31 is supported below the downward extending structure of the steel structure roof 5, and the bottom support beam 31 is installed on the top of the building structure 1 through the V-shaped conversion member 34. The ring beam unit includes: a ring beam 32 and a ring beam connecting assembly 33; the number of the ring beam 32 and the ring beam connecting assembly 33 is multiple and equal, and the multiple ring beams 32 and the multiple ring beam connecting assemblies 33 are connected at intervals to form a ring structure; the support beam 31 is connected to the ring beam connecting assembly 33; the ring beam connecting assembly 33 includes: a plug plate assembly 331, a ring beam connecting member 332 and a support beam connecting member 333; wherein the plug plate assembly 331 is a cross structure; the number of the ring beam connecting members 332 is two, and the two ring beam connecting members 332 are respectively fixedly installed on both sides of the plug plate assembly 331, and the ring beam connecting member 332 is connected to the ring beam 32; the number of the support beam connecting members 333 is four, and the four support beam connecting members 333 are respectively fixedly installed on the outside of the four corners of the plug plate assembly 331, and the ring beam connecting member 332 and the plug plate assembly 331 are both connected to one end of the support beam connecting member 333, and the other end of the support beam connecting member 333 is connected to the support beam 31. The steel structure roof 5 is provided with a patched roof 7 above the reserved hole, and the patched roof 7 includes: a patched beam 71 and a patched beam connector 72; the number of the patched beams 71 and the patched beam connector 72 is multiple, and the multiple patched beams 71 and the multiple patched beam connectors 72 are arranged in a mesh structure, and adjacent patched beams 71 are connected by the patched beam connectors 72, and the patched beams 71 at the edge position are fixedly installed above the reserved hole.The steel structure roof 5 further includes: an edge beam unit 51 and a connecting beam unit 52, wherein the edge beam unit includes: an edge beam 511, an edge beam connector 512 and a connecting beam 513, and the connecting beam unit 52 includes: a connecting beam 513 and a connecting beam connector 53; the number of the edge beams 511 and the edge beam connector 512 is multiple and equal, and the multiple edge beams 511 and the multiple edge beam connectors 512 are connected at intervals; the number of the connecting beams 513 and the connecting beam connectors 53 is multiple, and the multiple connecting beams 513 and the multiple connecting beam connectors 53 are arranged in a mesh structure, and adjacent connecting beams 513 are connected by connecting The connecting beam connector 53 is connected; the connecting beam 513 at the edge position is connected to the side beam connector 512; the connecting beam connector 53 at the downward extending structure position is connected to the support tube 3; the connecting beam connector 53 includes: a core 531, a plug plate 532 and a beam connector 533; wherein the number of plug plates 532 and beam connectors 533 is multiple and equal; multiple plug plates 532 are fixedly installed on the outside of the core 531, and the beam connector 533 is installed between two adjacent plug plates 532 at an adjustable angle; the beam connector 533 is connected to the connecting beam 513 or the support tube 3. The connection position of the support tube 3 and the steel structure roof 5 in the roof structure 2 is deepened, including the following steps: a hole is opened at the predetermined support position of the steel structure roof 5, and the hole is extended downward, wherein the downward extension is a structure in which the angle of inclination gradually increases with the decrease of the height, and an embedded roof 7 is arranged above the hole; the support tube 3 is extended upward, wherein the upward extension is a structure in which the angle of inclination gradually decreases with the increase of the height. The connection position of the support tube 3 and the building structure 1 is deepened, including the following steps: a V-shaped conversion member 34 is arranged at the bottom of the support tube 3, wherein the top of the V-shaped conversion member 34 is connected to the support beam 31 of the support tube 3, and the bottom of the V-shaped conversion member 34 is installed on the crossbeam 11 or the column 13 in the building structure 1; a crossbeam reinforcement member 12 is arranged at the position where the V-shaped conversion member 34 is installed on the crossbeam 11, and a column reinforcement member 14 is arranged at the position where the V-shaped conversion member 34 is installed on the column 13. Holes are opened at the predetermined support positions of the steel structure roof, and the holes are extended downward so that the steel structure roof can be connected to the bottom support tube as a whole, reducing the potential safety hazards of the support columns during construction. The ring beam assemblies of different layers are connected by support beams, and the top ring beam assemblies are connected by support beams. In actual construction, only the length and angle of the connecting beams need to be changed to meet the support of steel structures of roofs of different heights, solving the problem of difficulty in supporting when the support points are not on the same horizontal plane. By installing the V-shaped conversion piece on the beam or column, and setting the beam reinforcement and column reinforcement at the position of the V-shaped conversion piece, the stability of the bottom support node is enhanced, and the safety of construction is guaranteed.By installing the V-shaped conversion piece on the beam or column and setting the beam reinforcement and column reinforcement at the position of the V-shaped conversion piece, the stability of the bottom support node is enhanced and the construction safety is guaranteed.

[0050] S2, dividing the model of the roof structure 2 into blocks, wherein the steel structure roof 5 is divided into edge beam units 51, connecting beam units 52, patched roof 7 and connecting beams 513, and the support tube 3 is divided into ring beam units, supporting beams 31 and V-shaped conversion parts 34. After the block division is completed, reverse simulation is also included, and the reverse simulation includes the following steps: establishing a lifting component model on the edge beam unit 51, the connecting beam unit 52 and the patched roof 7, simulating the lifting through the lifting rope model and the lifting device model, recording the length of the lifting rope model at this time as D1, adjusting the horizontality of the edge beam unit 51, the connecting beam unit 52 or the patched roof 7 by adjusting the length of the lifting rope model, when the horizontality of the edge beam unit 51, the connecting beam unit 52 or the patched roof 7 reaches the highest, recording the length of the lifting rope model at this time as D2, and recording the position of the lifting device model relative to the edge beam unit 51, the connecting beam unit 52 or the patched roof 7 at this time.

[0051] S3, assemble and install the support tube 3 in blocks. Install the V-shaped conversion piece 34 on the beam 11 or column 13 in the building structure 1; assemble the ring beam unit on the ground, hoist the ring beam unit to the installation position, and fix the ring beam unit with the support beam 31. Repeat S until all the ring beam units are installed; install a layer of support beams 31 above the top ring beam unit.

[0052] S4, assembling and installing the steel structure roof 5 in blocks. Assembling and installing the steel structure roof 5 in blocks includes the following steps: assembling the edge beam unit 51, the connecting beam unit 52 and the embedded roof 7 on the ground through the assembling bracket 4; installing the steel structure roof 5 in the order of the edge beam unit 51, the connecting beam unit 52, the connecting beam 513 and the embedded roof 7 through the hoisting equipment, wherein during the installation process, the side beam unit 51 and the connecting beam unit 52 are supported by the installation bracket 6 below. The steel structure roof 5 is installed in the order of the side beam unit 51, the connecting beam unit 52, the connecting beam 513, and the embedded roof cover 7 by means of the lifting equipment, which includes the following steps: installing the lifting parts on the side beam unit 51, the connecting beam unit 52 or the embedded roof cover 7; installing the lifting device and the lifting rope according to the recorded position of the lifting device model and the length of the lifting rope model, and the length of the lifting rope at this time is D2; lifting the side beam unit 51, the connecting beam unit 52 or the embedded roof cover 7, and during the lifting process, changing the aerial posture of the side beam unit 51, the connecting beam unit 52 or the embedded roof cover 7 by changing the length of the lifting rope, and when the length of the lifting rope is adjusted to D1, lifting the side beam unit 51, the connecting beam unit 52 or the embedded roof cover 7 onto the installation bracket 6. The assembling bracket 4 includes: a base 41, a support rod 42, a first rotating member 43, a first shaft head 44 and a first fixing member 45; the support rod 42 is installed on the base 41; the support rod 42 is a structure with adjustable length; the first rotating member 43 is installed on the support rod 42; the first shaft head 44 is rotatably installed on the first rotating member 43; the first fixing member 45 is installed on the first shaft head 44; the side beam connector 512 and the connecting beam connector 53 of the steel structure roof 5 are both installed on the first fixing member 45. The mounting bracket 6 includes: a first bracket 61, a second bracket 62, a third bracket 63, a second rotating member 64, a second shaft head 65 and a second fixing member 66; there are multiple second brackets 62, wherein multiple second brackets 62 are connected in sequence, the bottom second bracket 62 is mounted on the first bracket 61; the third bracket 63 is mounted on the top second bracket 62; the third bracket 63 is a structure with adjustable length; the second rotating member 64 is mounted on the third bracket 63; the second shaft head 65 is rotatably mounted on the second rotating member 64; the second fixing member 66 is mounted on the second shaft head 65; the side beam connector 512 and the connecting beam connector 53 of the steel structure roof 5 are both mounted on the second fixing member 66. First, reverse simulation is performed, and then forward hoisting construction is performed, so that the angle of the block can be flexibly adjusted to the installation angle during the hoisting process, which not only solves the problems of difficulty in controlling the installation accuracy of large and complex curved roofs, difficulty in adjusting the spatial position, and difficulty in assembly and welding construction, but also ensures the final molding quality of the roof and reduces the safety hazards during the construction process.Whether the steel structure lattice shell is assembled in blocks on the ground or in the air, when supporting at the bottom, it can meet the adjustment of the support frame height and the adjustment of the support point angle, which not only increases the efficiency of construction, but also facilitates adjustment and reduces the error of each control point, ensuring the final molding quality of the cover.

[0053] S5, pull the membrane and the construction is completed.

[0054] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention are included in the scope of the claims of the present invention to be approved.

Claims

1. A construction method for a large-span irregular steel structure roof, characterized in that: The following steps are involved: Step 1: Establish a model of the roof structure (2) based on the basic design model, deepen the connection position between the support tube (3) in the roof structure (2) and the steel structure roof (5), and deepen the connection position between the support tube (3) and the building structure (1); Step 2, dividing the model of the roof structure (2) into blocks, wherein the steel structure roof (5) is divided into edge beam units (51), connecting beam units (52), patched roof (7) and connecting beams (513), and the supporting tube (3) is divided into ring beam units, supporting beams (31) and V-shaped conversion parts (34); Step 3, assemble the blocks and install the support tube (3); Step 4: Assemble and install the steel structure roof in blocks (5); Step 5: Pull the film and the construction is completed; In step 1, the connection position between the support tube (3) in the roof structure (2) and the steel structure roof (5) is further processed, including the following steps: A hole is opened at a predetermined supporting position of the steel structure roof (5), and the hole is extended downward, wherein the downward extension is a structure in which the angle of inclination gradually increases as the height decreases, and an inlaid roof (7) is arranged above the hole; The support tube (3) is extended upward, wherein the upward extension is a structure in which the inclination angle gradually decreases as the height increases; In step 4, the steel structure roof (5) is assembled and installed in blocks, including the following steps: Assembling the edge beam unit (51), the connection beam unit (52) and the patched roof (7) on the ground by means of an assembly bracket (4); The steel structure roof (5) is installed in the order of the edge beam unit (51), the connection beam unit (52), the connection beam (513), and the patched roof (7) by means of a hoisting device, wherein during the installation process, the side beam unit (51) and the connection beam unit (52) are supported by installation brackets (6) below, and before the steel structure roof (5) is assembled and installed in sections, a reverse simulation is also performed, wherein the reverse simulation comprises the following steps: A lifting component model is established on the edge beam unit (51), the connecting beam unit (52) and the embedded roof (7), and the lifting is simulated by using a lifting rope model and a lifting fixture model. The length of the lifting rope model at this time is recorded as D1. The horizontality of the edge beam unit (51), the connecting beam unit (52) or the embedded roof (7) is adjusted by adjusting the length of the lifting rope model. When the horizontality of the edge beam unit (51), the connecting beam unit (52) or the embedded roof (7) reaches the highest, the length of the lifting rope model at this time is recorded as D2, and the position of the lifting fixture model relative to the edge beam unit (51), the connecting beam unit (52) or the embedded roof (7) is recorded. The steel structure roof (5) is installed in the order of the edge beam unit (51), the connecting beam unit (52), the connecting beam (513) and the embedded roof (7) by using a lifting device, including the following steps: Installing hanging parts on the edge beam unit (51), the connecting beam unit (52) or the patched roof (7); According to the recorded position of the sling model and the length of the sling rope model, install the sling and the sling rope. The length of the sling rope at this time is D2; Hoisting the edge beam unit (51), the connecting beam unit (52) or the patched roof (7), and during the hoisting process, changing the aerial posture of the edge beam unit (51), the connecting beam unit (52) or the patched roof (7) by changing the length of the hoisting rope, and when the length of the hoisting rope is adjusted to D1, hoisting the edge beam unit (51), the connecting beam unit (52) or the patched roof (7) onto the mounting bracket (6); The steel structure roof (5) is provided with a patched roof (7) above the reserved hole, and the patched roof (7) comprises: a patched beam (71) and a patched beam connector (72); the number of the patched beams (71) and the patched beam connector (72) is multiple, the multiple patched beams (71) and the multiple patched beam connectors (72) are arranged in a mesh structure, adjacent patched beams (71) are connected by the patched beam connectors (72), and the patched beams (71) at the edge are fixedly installed above the reserved hole; The side beam unit (51) comprises: a side beam (511), a side beam connector (512) and a connecting beam (513); the number of the side beams (511) and the side beam connector (512) is multiple and equal, and the multiple side beams (511) and the multiple side beam connectors (512) are connected at intervals; the connecting beam unit (52) comprises: a connecting beam (513) and a connecting beam connector (53); the number of the connecting beams (513) and the connecting beam connector (53) is multiple, and the multiple connecting beams (513) and the multiple connecting beam connectors (53) are arranged in a mesh structure; adjacent connecting beams (513) are connected via the connecting beam connector (53); the connecting beam (513) at the edge position is connected to the side beam connector (512); and the connecting beam connector (53) at the downwardly extending structural position is connected to the support tube (3).

2. The construction method of the large-span irregular steel structure roof according to claim 1, characterized in that: In step 1, the connection position between the support tube (3) and the building structure (1) is further processed, including the following steps: A V-shaped conversion member (34) is arranged at the bottom of the support tube (3), wherein the top of the V-shaped conversion member (34) is connected to the support beam (31) of the support tube (3), and the bottom of the V-shaped conversion member (34) is installed on a crossbeam (11) or a column (13) in the building structure (1); A crossbeam reinforcement member (12) is arranged at a position where the V-shaped conversion member (34) is installed on the crossbeam (11), and a column reinforcement member (14) is arranged at a position where the V-shaped conversion member (34) is installed on the column (13).

3. The construction method of the large-span irregular steel structure roof according to claim 1, characterized in that: In step 3, the support tube (3) is assembled and installed in blocks, including the following steps: Installing the V-shaped conversion member (34) on a beam (11) or a column (13) in the building structure (1); Assembling the ring beam units on the ground, hoisting the ring beam units to the installation position, fixing and installing the ring beam units by means of support beams (31), and repeating this step until all the ring beam units are installed; A layer of support beams (31) is installed above the topmost ring beam unit.

4. The construction method of the large-span irregular steel structure roof as claimed in claim 3, characterized in that: The assembling bracket (4) comprises: a base (41), a support rod (42), a first rotating member (43), a first shaft head (44) and a first fixing member (45); The support rod (42) is mounted on the base (41); The support rod (42) is a structure with adjustable length; The first rotating member (43) is mounted on the supporting rod (42); The first shaft head (44) is rotatably mounted on the first rotating member (43); The first fixing member (45) is mounted on the first shaft head (44); The side beam connector (512) and the connecting beam connector (53) of the steel structure roof (5) are both mounted on the first fixing member (45).

5. The construction method of the large-span irregular steel structure roof as claimed in claim 3, characterized in that: The mounting bracket (6) comprises: a first bracket (61), a second bracket (62), a third bracket (63), a second rotating member (64), a second shaft head (65) and a second fixing member (66); There are a plurality of second brackets (62), wherein the plurality of second brackets (62) are connected in sequence, and the bottom second bracket (62) is mounted on the first bracket (61); The third bracket (63) is mounted on the uppermost second bracket (62); The third bracket (63) is a structure with adjustable length; The second rotating member (64) is mounted on the third bracket (63); The second shaft head (65) is rotatably mounted on the second rotating member (64); The second fixing member (66) is mounted on the second shaft head (65); The side beam connector (512) and the connecting beam connector (53) of the steel structure roof (5) are both mounted on the second fixing member (66).

6. The construction method of the large-span irregular steel structure roof according to claim 1, characterized in that: The roof structure (2) comprises: a support tube (3) and a steel structure roof (5); Wherein, the steel structure roof (5) is provided with a hole at a predetermined support position of the support tube (3), and the hole is a downward extending structure, and the downward extending structure is a structure whose inclination angle gradually increases as the height decreases; The support tube (3) is a structure whose inclination angle gradually decreases as the height increases; The bottom of the support cylinder (3) is installed on the top of the building structure (1), and the top of the support cylinder (3) is supported below the downwardly extending structure of the steel structure roof (5); The support cylinder (3) comprises: a ring beam unit, a support beam (31) and a V-shaped conversion member (34); There are a plurality of ring beam units, and the ring beam units are evenly arranged in the longitudinal direction, and two adjacent ring beam units are connected via the support beam (31); The ring beam unit gradually expands as the height increases, and the inclination angle of the support beam (31) gradually decreases as the height increases; The topmost support beam (31) is supported below the downwardly extending structure of the steel structure roof (5), and the bottommost support beam (31) is installed on the top of the building structure (1) via the V-shaped conversion member (34); The ring beam unit comprises: a ring beam (32) and a ring beam connection assembly (33); The number of the ring beams (32) and the ring beam connection assemblies (33) is multiple and equal, and the multiple ring beams (32) and the multiple ring beam connection assemblies (33) are connected at intervals to form a ring structure; The support beam (31) is connected to the ring beam connection assembly (33); The ring beam connection assembly (33) comprises: a plug plate assembly (331), a ring beam connection piece (332) and a support beam connection piece (333); Wherein, the plugboard assembly (331) is a cross structure; The number of the ring beam connecting members (332) is two, and the two ring beam connecting members (332) are respectively fixedly mounted on two sides of the plug board assembly (331), and the ring beam connecting members (332) are connected to the ring beam (32); The number of the support beam connectors (333) is four, and the four support beam connectors (333) are respectively fixedly mounted on the outsides of the four corners of the plug plate assembly (331), and the ring beam connector (332) and the plug plate assembly (331) are both connected to one end of the support beam connector (333), and the other end of the support beam connector (333) is connected to the support beam (31).

7. The construction method of the large-span irregular steel structure roof according to claim 1, characterized in that: The connecting beam connector (53) comprises: an insert (531), an insert plate (532) and a beam connector (533); Wherein, the number of the plug plates (532) and the number of the beam connectors (533) are multiple and equal; The plurality of plug plates (532) are all fixedly mounted on the outside of the plug core (531), and the beam connector (533) is mounted between two adjacent plug plates (532) at an adjustable angle; The beam connecting member (533) is connected to the connecting beam (513) or the supporting cylinder (3).

Citation Information

Patent Citations

  • Construction method of large-scan single-layer latticed shell steel structure

    CN104652831A

  • Wavy woven latticed shell structure and construction method thereof

    CN109469206A

  • Steel roof box girder connecting structure of three-way grid single-layer latticed shell structure system

    CN220565450U