A method and system for automatically planning and deepening design tasks

Through the association between the BIM model and the detailed task work breakdown structure, the attributes of the work section are analyzed and recorded component by component, forming a system for automatically planning detailed design tasks, solving the problems of low efficiency and resource waste in traditional detailed design, and realizing efficient task planning and Resource optimization.

CN118505162BActive Publication Date: 2024-10-29CHINA CONSTR THIRD ENG BUREAU GRP CO LTD +1
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202410934700.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-10-29
Estimated Expiration
2044-07-12

AI Technical Summary

Technical Problem

In the traditional detailed design process, detailed task allocation and planning require a large amount of manual operations, resulting in low efficiency, waste of resources, and prone to task redundancy.

Method used

Through the association between the BIM model and the detailed task work breakdown structure, the attributes of the work sections are analyzed and recorded component by component, forming a system for automatically planning detailed design tasks, reducing manual intervention and improving task planning efficiency.

Benefits of technology

It realizes automated planning of detailed design tasks, reduces manual intervention and manual planning time, improves task planning efficiency, reduces human errors and improper resource allocation, and improves task execution accuracy and resource utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118505162B_ABST
    Figure CN118505162B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and device for automatically creating and associating master data based on a lightweight model. The method includes: associating component classification categories with deepening task items according to a pre-constructed BIM component classification standard and a deepening task work breakdown structure; parsing the BIM model component by component, classifying and saving each parsed component, and recording the section attributes of each component component by component according to the section division information; disassembling the deepening task work breakdown structure section by section according to the section division information, forming a deepening task item list for each deepening task in each section; according to the deepening task item list, in combination with the association relationship between the deepening task item and the component classification category, obtaining a component list included in the current deepening task item list, and forming a workspace for the current deepening task according to the component list.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of BIM technology, and in particular relates to a method and system for automatically planning and deepening design tasks. Background Art

[0002] In-depth design is an important part of a construction project. It involves detailed design and technical specifications, providing the necessary information and guidance for construction.

[0003] In the traditional in-depth design process, due to the complexity of construction projects, the in-depth task allocation and planning are often the responsibility of the project technical leader and the heads of various disciplines. This requires a lot of manual operation and time, and is prone to problems such as task redundancy and waste of resources. Summary of the invention

[0004] In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a method and system for automatically planning deepening design tasks, which realizes automatic planning and release of deepening design tasks by associating each component with the deepening task item and each component with the section attribute, combined with the decomposition of the deepening task work breakdown structure.

[0005] According to one aspect of the present invention, there is provided a method for automatically planning a detailed design task, comprising:

[0006] According to the pre-built BIM component classification standards and the work breakdown structure of the deepening task, the component classification categories are associated with the deepening task items;

[0007] Analyze the BIM model component by component, classify and save the analyzed components, and record the section attributes of each component component by component according to the section division information;

[0008] According to the work section division information, the work breakdown structure of the deepening task is disassembled section by section to form a list of deepening task items for each deepening task in each section;

[0009] According to the deepening task item list, combined with the association between the deepening task item and the component classification category, the component list included in the current deepening task item list is obtained, and the workspace of the current deepening task is formed according to the component list.

[0010] The above technical solution associates the component classification category with the deepening task item according to the characteristics of BIM model analysis and WBS work breakdown structure, so as to facilitate the subsequent query of the corresponding component classification category according to the deepening task item; it also records the section attributes of the BIM model component by component according to the section division information, so that when querying the components according to the deepening task item, a meaningful component list can be obtained in combination with the section attributes; and the deepening task work breakdown structure is disassembled according to the section information to form a task list for each deepening task under each section, and combined with the previously constructed association between components and deepening task items and the association between components and section attributes, automatic planning and allocation of deepening tasks are realized, which reduces the time and effort of human intervention and manual planning, and greatly improves the planning efficiency of deepening design tasks.

[0011] As a further technical solution, when pre-constructing the BIM component classification standard, it further includes: constructing the BIM component classification standard according to the sub-item logic.

[0012] As a further technical solution, when constructing the work breakdown structure for deepening tasks in advance, it further includes: forming a list of deepening task items in seven major professional categories: foundation and base, main structure, building decoration and decoration, roof, mechanical and electrical integration, building energy conservation and elevators, determining the divisions corresponding to each deepening task item and the classification categories of all components under the divisions, and forming a work breakdown structure for deepening tasks.

[0013] As a further technical solution, parsing the BIM model component by component also includes: parsing each professional BIM model involved in the engineering project component by component, extracting the component unique ID, component attributes for classification, geometric attributes and source file ID.

[0014] As a further technical solution, after the BIM model is parsed, it also includes: classifying the parsed components according to a pre-constructed BIM component classification standard and storing them in a database.

[0015] As a further technical solution, the engineering project is divided into sections, and the analyzed components are used as units, and the section attributes are recorded component by component.

[0016] As a further technical solution, the work breakdown structure of the deepening task is disassembled for each divided work section to form a list of deepening task items for the current engineering project for each deepening task of the current work section.

[0017] As a further technical solution, after obtaining the list of deepening task items, it further includes: according to each deepening task item in the list of deepening task items, combined with the association between the deepening task item and the component classification category, query the associated component classification category; according to the deepening requirements of the current work section, determine whether the associated component is included in the deepening task of the current engineering project; when the associated component is included in the deepening task of the current engineering project, save the associated component.

[0018] As a further technical solution, after forming the workspace of the current deepening task according to the component list, it also includes: querying the component list corresponding to each deepening task item in the workspace, and if the component list is not found, deleting the corresponding deepening task item.

[0019] According to one aspect of the present invention, a system for automatically planning a detailed design task is provided, comprising:

[0020] A module for associating deepening task items with component classification categories, which is used to associate component classification categories with deepening task items according to the pre-built BIM component classification standards and deepening task work breakdown structure;

[0021] The component analysis and work section association module is used to analyze the BIM model component by component, classify and save the analyzed components, and record the work section attributes of each component component by component according to the work section division information;

[0022] The work section disassembly module is used to disassemble the work breakdown structure of the deepening task section by section according to the work section division information, and form a list of deepening task items for each deepening task in each section;

[0023] The workspace forming module is used to obtain the component list included in the current deepening task item list according to the deepening task item list and the association between the deepening task item and the component classification category, and form the workspace of the current deepening task according to the component list.

[0024] Compared with the prior art, the present invention has the following beneficial effects:

[0025] The present invention associates component classification categories with deepening task items according to the analysis characteristics of the BIM model and the characteristics of the WBS work breakdown structure, so as to facilitate the subsequent query of the corresponding component classification categories according to the deepening task items; it also records the section attributes of the BIM model component by component according to the section division information, so that when querying components according to the deepening task items, a meaningful component list can be obtained in combination with the section attributes; and the deepening task work breakdown structure is disassembled according to the section information to form a task list for each deepening task under each section, and combined with the previously constructed association between components and deepening task items and the association between components and section attributes, automatic planning and allocation of deepening tasks are realized, which reduces the time and effort of human intervention and manual planning, and greatly improves the planning efficiency of deepening design tasks.

[0026] The present invention utilizes the BIM model and predefined rules to perform task allocation, thereby reducing problems caused by human errors and improper resource allocation and improving the accuracy of task execution. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a flowchart of a method for automatically planning in-depth design tasks according to an embodiment of the present invention. DETAILED DESCRIPTION

[0028] In view of the problems of low efficiency and waste of resources caused by manual planning of in-depth design tasks, the present invention proposes a method for automatically planning in-depth design tasks based on BIM model and WBS decomposition of in-depth design tasks. The method utilizes BIM model, combines the association relationship between pre-built components and in-depth task items and work section information, realizes the automated planning of in-depth design tasks, and improves the efficiency of task division.

[0029] It should be noted that:

[0030] Sub-items are engineering concepts. According to the logic of sub-items, the hierarchical structure of components is: sub-project-sub-project-sub-project-specific component category. The sub-projects are divided into: foundation and foundation, main structure, building decoration and renovation, roof, building water supply and drainage and heating, ventilation and air conditioning, building electrical, intelligent building, building energy conservation. Each sub-project is divided into multiple sub-projects. For example, the sub-project of foundation and foundation includes foundation, foundation, foundation pit support, groundwater control, earthwork, slope, and underground waterproofing. Each sub-project includes multiple sub-items. For example, the sub-project of underground waterproofing includes main structure waterproofing and roll waterproofing. The sub-project of roll waterproofing includes bottom plate waterproofing, exterior wall waterproofing, and top plate waterproofing. For example, bottom plate waterproofing can be divided into specific component categories such as cushion layer, waterproof layer, and protective layer.

[0031] The BIM component classification standard refers to the classification of BIM model components according to the engineering sub-item logic. Here, the engineering sub-item logic is used as a reference to facilitate adaptation to the in-depth task work breakdown structure.

[0032] The deepening task work breakdown structure, also known as the deepening task WBS (Work Breakdown Structure), refers to a list of deepening task items with a hierarchical structure formed by professional classification according to the deepening business.

[0033] In some processes described in the specification and claims of the present invention and the above-mentioned drawings, multiple operations appearing in a specific order are included, but it should be clearly understood that these operations may not be performed in the order in which they appear in this document or may be performed in parallel. For example, step 1, step 2, etc. are only used to distinguish different operations, and the sequence number itself does not represent any execution order. In addition, these processes may include more or fewer operations, and these operations may be performed in sequence or in parallel.

[0034] The following will clearly and completely describe the technical solutions of various embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention. Example 1

[0035] This embodiment provides a method for automatically planning a detailed design task, which is used to realize automatic planning of the detailed design task and improve the planning efficiency of the detailed design task.

[0036] like Figure 1 As shown, the method includes:

[0037] Step 1: Associate component classification categories with deepening task items based on the pre-built BIM component classification standards and deepening task work breakdown structure.

[0038] Before step 1, the method further includes: classifying BIM components in a standardized manner and formulating BIM component classification standards for the professions involved. In this embodiment, component classification can be achieved by referring to the sub-item standards of the project.

[0039] In addition, it is necessary to classify the task items of the BIM model in-depth design to form a work breakdown structure for the in-depth tasks.

[0040] Specifically, based on the review of the in-depth business, a list of in-depth task items is formed for seven major professional categories: foundation and base, main structure, building decoration and decoration, roof, mechanical and electrical integration, building energy conservation, and elevators, and then a work decomposition structure for the in-depth tasks is formed.

[0041] It should be noted that each major professional classification includes one or more deepening task items. For example, under the comprehensive classification of electromechanical, it can include comprehensive electromechanical deepening, electromechanical special deepening, PC deepening and other task items. Each task item corresponds to a different component classification category. For example, the component classification category corresponding to the comprehensive electromechanical deepening task item is all categories under the divisions such as "building water supply, drainage and heating", "ventilation and air conditioning", and "building electrical". It can also be seen here that classifying BIM model components according to the logic of sub-items is conducive to associating with deepening task items.

[0042] After building the BIM component classification standard and deepening the task work breakdown structure, it further includes:

[0043] Sort out the component classification categories required for each deepening task item in the deepening task item list, and associate the deepening task items with the component classification categories, so as to facilitate subsequent query of the associated component classification categories based on the deepening task items.

[0044] Step 2: parse the BIM model component by component, classify and save the parsed components, and record the section attributes of each component component by component according to the section division information.

[0045] After obtaining the engineering project to be further designed, the BIM model of all disciplines is analyzed first. Specifically, the BIM models of all disciplines involved in the engineering project are analyzed component by component, and the unique ID of the component, the component attributes for classification, the geometric attributes and the source file ID are extracted.

[0046] It should be noted that the extracted component unique ID is used to uniquely identify the component in the database, the component attributes used for classification are used for component classification, the geometric attributes are used to form a workspace, and the source file ID is used to distinguish which BIM source file the component comes from.

[0047] After parsing the components, they are classified according to the pre-built BIM component classification standards and stored in the database.

[0048] After analyzing each professional BIM model involved in the current engineering project component by component, it further includes: dividing the work section information, so as to facilitate the decomposition of in-depth design tasks according to the work section division results to form different in-depth design tasks.

[0049] Specifically, according to the practice of in-depth design, the current engineering project is divided into sections. After the sections are divided, the components are used as units, and the section attributes of each component are recorded and stored in the database.

[0050] After the above processing, each component has its own section information, so that the components can be classified according to the section information, which meets the needs of completing task splitting according to the section information. For example, if the section information has one level, two levels, and three levels, then after all components are classified according to these section information, the work breakdown structure of the deepening task can be disassembled according to the section information to form different deepening task item lists.

[0051] It should be noted that the BIM file of the entire project is usually very large. According to the practice of in-depth design, the entire in-depth design task will not be processed in one model, but will be divided into multiple sections for task decomposition, and then the in-depth design of each task will be carried out. For example, when carrying out in-depth design, the comprehensive in-depth task of pipelines on all floors will generally not be completed at one time, but the comprehensive task of pipelines will be decomposed into multiple tasks according to the section information such as above-ground, underground, and different floors. Therefore, the in-depth design practice here can be understood as the actual demand for in-depth design, which is a term familiar to technicians in this field.

[0052] Step 3: Decompose the work breakdown structure of the deepening task section by section according to the section division information to form a list of deepening task items for each deepening task in each section.

[0053] After dividing the work sections, the work breakdown structure of the deepening task is disassembled for each work section respectively, so that each work section forms multiple deepening tasks, and each deepening task contains multiple deepening task items, that is, a list of task items for the current engineering project for each deepening task under each work section is obtained.

[0054] Different engineering projects may have different requirements for in-depth design during in-depth design, and different in-depth design requirements may lead to inconsistent information of divided sections, and the corresponding in-depth task items are also inconsistent. Therefore, it is necessary to decompose the in-depth tasks according to the results of section division to obtain a meaningful in-depth task item list.

[0055] Step 4: According to the deepening task item list and in combination with the association between the deepening task item and the component classification category, obtain the component list included in the current deepening task item list, and form a workspace for the current deepening task according to the component list.

[0056] After obtaining the deepening task item list, it further includes: according to each deepening task item in the deepening task item list, combined with the association relationship between the deepening task item and the component classification category, query the associated component classification category; according to the deepening requirements of the current work section (that is, according to the work section attributes of the component), determine whether the associated component is included in the deepening task of the current engineering project; when the associated component is included in the deepening task of the current engineering project, save the associated component.

[0057] Furthermore, when the associated component is not included in the detailed task of the current engineering project, the associated component is deleted.

[0058] Optionally, after forming the workspace of the current deepening task according to the component list, the method further includes: querying the component list corresponding to each deepening task item in the workspace, and if the component list is not found, deleting the corresponding deepening task item. This is because different engineering projects may have different work section division information, and the deepening task items obtained by disassembling the work breakdown structure of the deepening task according to the work section division information may correspond to different component classification categories.

[0059] Furthermore, for the detailed task items obtained through decomposition, there may not be a corresponding component list in the current project, but there may be a corresponding component list in other projects.

[0060] After obtaining the work space for each deepening task, each professional deepening personnel can accept the deepening task as needed, carry out specific deepening task work, and close the item after completing the task.

[0061] Optionally, based on the deepening task item list and component database of this embodiment, the progress and completion status of the deepening tasks can be managed, and the task status and time nodes can be automatically updated.

[0062] Furthermore, the actual progress of detailed design tasks can be monitored and adjusted and reallocated as needed. Example 2

[0063] Based on the same inventive concept as that of Embodiment 1, this embodiment provides a system for automatically planning a detailed design task, including:

[0064] A module for associating deepening task items with component classification categories, which is used to associate component classification categories with deepening task items according to the pre-built BIM component classification standards and deepening task work breakdown structure;

[0065] The component analysis and work section association module is used to analyze the BIM model component by component, classify and save the analyzed components, and record the work section attributes of each component component by component according to the work section division information;

[0066] The work section disassembly module is used to disassemble the work breakdown structure of the deepening task section by section according to the work section division information, and form a list of deepening task items for each deepening task in each section;

[0067] The workspace forming module is used to obtain the component list included in the current deepening task item list according to the deepening task item list and the association between the deepening task item and the component classification category, and form the workspace of the current deepening task according to the component list.

[0068] The above modules can be implemented by referring to the method embodiment, which will not be described in detail here. It should be noted that:

[0069] The workspace forms a module and is also used to execute the following instructions:

[0070] According to each deepening task item in the deepening task item list, combined with the association between the deepening task item and the component classification category, query the associated component classification category; according to the deepening requirements of the current work section, determine whether the associated component is included in the deepening task of the current engineering project; when the associated component is included in the deepening task of the current engineering project, save the associated component.

[0071] After forming the workspace of the current deepening task according to the component list, the method further includes: querying the component list corresponding to each deepening task item in the workspace, and deleting the corresponding deepening task item if no component list is found.

[0072] It should be noted that the implementation solution provided by the device to solve the problem is similar to the implementation solution recorded in the above method. Therefore, the specific limitations in the implementation methods of the aforementioned modules can be referred to the limitations of a method for automatically planning and deepening design tasks in the above text, and will not be repeated here.

[0073] In summary, the present invention achieves the following technical effects:

[0074] Improve efficiency: Through automated task scheduling and allocation, the time and effort of human intervention and manual planning are reduced, greatly improving the planning efficiency of detailed design tasks.

[0075] Reduce errors: Using BIM models and predefined rules to assign tasks reduces problems caused by human errors and improper resource allocation, and improves the accuracy of task execution.

[0076] Optimize resource utilization: Design team members are properly scheduled and assigned according to task priority, workload, and resource availability, maximizing resource utilization efficiency.

[0077] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0078] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0079] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0080] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0081] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the technical solutions of the embodiments of the present invention.

Claims

1. A method for automatically planning a detailed design task, characterized in that: include: According to the pre-built BIM component classification standards and the work breakdown structure of the deepening task, sort out the component classification categories required for each deepening task item in the deepening task item list, and associate the component classification categories with the deepening task items; The BIM component classification standard refers to the classification of BIM model components according to the engineering sub-item logic; the deepening task work breakdown structure refers to the deepening task item list with a hierarchical structure formed by professional classification according to the deepening business; Analyze the BIM model component by component, classify and save the analyzed components, and record the section attributes of each component component by component according to the section division information; According to the work section division information, the work breakdown structure of the deepening task is disassembled section by section to form a list of deepening task items for each deepening task in each section; The work breakdown structure of the deepening task is disassembled for each divided section, forming a deepening task list for each deepening task of the current section and the current engineering project; After obtaining the deepening task item list, the method further includes: according to each deepening task item in the deepening task item list, in combination with the association relationship between the deepening task item and the component classification category, querying the associated component classification category; according to the deepening requirements of the current section, determining whether the associated component is included in the deepening task of the current engineering project; when the associated component is included in the deepening task of the current engineering project, saving the associated component; According to the deepening task item list, combined with the association between the deepening task item and the component classification category, the component list included in the current deepening task item list is obtained, and the workspace of the current deepening task is formed according to the component list.

2. A method for automatically planning a detailed design task according to claim 1, characterized in that: When pre-constructing the BIM component classification standard, it further includes: constructing the BIM component classification standard according to the sub-item logic.

3. The method for automatically planning a detailed design task according to claim 1, characterized in that: When constructing the work breakdown structure for deepening tasks in advance, it further includes: forming a list of deepening task items for seven major professional categories: foundation and base, main structure, building decoration and decoration, roof, mechanical and electrical integration, building energy conservation and elevators, determining the divisions corresponding to each deepening task item and the classification categories of all components under the divisions, and forming a work breakdown structure for deepening tasks.

4. The method for automatically planning a detailed design task according to claim 1, characterized in that: Parsing the BIM model component by component also includes: parsing each professional BIM model involved in the engineering project component by component, extracting the component unique ID, component attributes for classification, geometric attributes and source file ID.

5. A method for automatically planning a detailed design task according to claim 4, characterized in that: After the BIM model is parsed, the process also includes: classifying the parsed components according to a pre-built BIM component classification standard and storing them in a database.

6. The method for automatically planning a detailed design task according to claim 4, characterized in that: The engineering project is divided into work sections, and the analyzed components are used as units, and the attributes of the work sections are recorded component by component.

7. The method for automatically planning a detailed design task according to claim 1, characterized in that: After forming the workspace of the current deepening task according to the component list, the method further includes: querying the component list corresponding to each deepening task item in the workspace, and deleting the corresponding deepening task item if no component list is found.

8. A system for automatically planning and deepening design tasks, characterized in that: include: A module for associating deepening task items with component classification categories, which is used to sort out the component classification categories required for each deepening task item in the deepening task item list according to the pre-built BIM component classification standards and deepening task work breakdown structure, and associate the component classification categories with the deepening task items; The BIM component classification standard refers to the classification of BIM model components according to the engineering sub-item logic; the deepening task work breakdown structure refers to the deepening task item list with a hierarchical structure formed by professional classification according to the deepening business; The component analysis and work section association module is used to analyze the BIM model component by component, classify and save the analyzed components, and record the work section attributes of each component component by component according to the work section division information; The work section disassembly module is used to disassemble the work breakdown structure of the deepening task section by section according to the work section division information, and form a list of deepening task items for each deepening task in each section; The work breakdown structure of the deepening task is disassembled for each divided section, forming a deepening task list for each deepening task of the current section and the current engineering project; After obtaining the deepening task item list, the method further includes: according to each deepening task item in the deepening task item list, in combination with the association relationship between the deepening task item and the component classification category, querying the associated component classification category; according to the deepening requirements of the current section, determining whether the associated component is included in the deepening task of the current engineering project; when the associated component is included in the deepening task of the current engineering project, saving the associated component; The workspace forming module is used to obtain the component list included in the current deepening task item list according to the deepening task item list and the association between the deepening task item and the component classification category, and form the workspace of the current deepening task according to the component list.

Citation Information

Patent Citations

  • BIM-based construction engineering document classifying, storing and searching method and system

    CN107247757A

  • Fine and intelligent project management method based on multi-level management and control

    CN109299924A

  • BIM model and WBS task association method and device

    CN114329690A

  • Construction simulation method based on BIM

    CN114444175A

  • BIM component construction progress management method based on WBS standard library

    CN116579735A