A suspension guide device for bridge rotation

By using a combination device of steel cable connectors, swing arm elevation detection components and bridge pier positioning components during the bridge rotation construction, the problems of hanging verticality detection and bridge docking stability are solved, and the precise installation and closure of the bridge elevation is achieved. Improved flatness.

CN118515170BActive Publication Date: 2024-10-29CHINA RAILWAY GUIZHOU ENG CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202410990560.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-23
Publication Date
2024-10-29
Estimated Expiration
2044-07-23

AI Technical Summary

Technical Problem

During the bridge rotation construction, it is difficult for the existing hanging guide device to ensure the verticality of the hanging rope, resulting in reverse force when the bridge rotates, affecting stability, and the shielding of the bridge piers leads to unstable docking, and it is difficult to detect the elevation installation accuracy. Low accuracy.

Method used

A hanging guide device for bridge rotation is designed. It uses steel cable connectors, swing arm height detection parts and bridge pier positioning parts. It detects verticality through six skew extrusion parts. LED light strips indicate the offset direction and lift drive auxiliary elevation detection, and automatic positioning and limiting of bridge pier positioning components to ensure bridge docking stability and elevation accuracy.

Benefits of technology

It improves the hanging accuracy, avoids reverse forces, enhances the stability of the bridge rotation and docking stability, ensures the precise installation of the bridge elevation, and improves the flatness of the Helong pouring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118515170B_ABST
    Figure CN118515170B_ABST
Patent Text Reader

Abstract

The present invention provides a suspension and guiding device for a bridge rotation, which relates to the technical field of bridge suspension equipment, including a suspension mounting member, on which a suspension connecting member is mounted; on which a steel cable connecting member is mounted; the suspension mounting member is used to clamp the end of a rotating bridge; on which six skewed extrusion members are mounted. The steel cable connecting member is adopted to improve the suspension accuracy, and to facilitate the crane operator to perform adaptation and adjustment work according to the movement of the bridge rotation, so as to avoid the bridge rotating while the position of the crane does not change, resulting in a non-perpendicularity between the suspension steel cable and the bridge and generating a reverse force, thus affecting the rotation stability of the bridge; the problem is solved that the current suspension and guiding devices for bridge rotation mostly adopt direct suspension and traction, which is not convenient for detecting the verticality of the suspension rope and is very likely to generate a reverse force in the rotation direction of the bridge.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge hangers, and in particular to a hanging and guiding device for a bridge rotation. Background Art

[0002] Bridge rotation construction refers to a construction method in which the bridge structure is formed at a non-design axis position and then rotated into place. In the actual bridge rotation process, the stability of the bridge needs to be ensured, and traction protection is usually required. The cranes at both ends of the bridge are hung. Because it involves the installation and rotation accuracy of the bridge, it is necessary to ensure that the angle of the bridge is accurate after rotation. The current hanging and guiding devices for bridge rotation mostly use direct hanging and traction, which is not convenient for detecting the verticality of the hanging rope. As the rotation angle of the bridge changes, the crane operator relies on naked eye observation to follow and adjust the crane position, which is very easy to form a reverse force in the direction of the bridge rotation, which in turn affects the stability of the bridge. At the same time, due to the obstruction of basic components such as piers, it is not convenient to perform automatic limit protection work. When the bridge is connected to the pier, the stability is not good. It is also inconvenient to detect the elevation installation accuracy of the bridge, and the hoisting guidance accuracy is low. Summary of the invention

[0003] The disclosed embodiment relates to a hanging and guiding device for a bridge rotation, wherein the pier positioning member thereof can be automatically flipped up during hanging and pulling without affecting the connection between the bridge piers and the bridge piers. At the same time, the piers can be automatically positioned after the hanging is completed, thereby improving the stability of the connection between the piers and the bridge. At the same time, it can also assist in measuring the elevation accuracy of the bridge, thereby improving the flatness of the joint casting when multiple bridge rotations are connected.

[0004] In a first aspect of the present disclosure, a suspension guiding device for a bridge rotation is provided, which specifically comprises a suspension mounting part, on which a suspension connecting part is mounted; on which a steel cable connecting part is mounted; the suspension mounting part is used to clamp the end of the rotating bridge; on the steel cable connecting part, six skewed extrusion parts are mounted; the six skewed extrusion parts are used to fit the steel cable connecting part to detect the verticality of the suspension; the six skewed extrusion parts are evenly spaced and mounted on the steel cable connecting part; the steel cable connecting part is used to connect a crane; on the suspension connecting part, a lifting drive part is mounted; the suspension connecting part is used to The lifting and lowering driving member is moved upward; a swing arm elevation detection member is installed on the hanging mounting member; the swing arm elevation detection member is used to display the elevation of the end of the rotating bridge; the lifting driving member is used to drive the swing arm elevation detection member to rotate; a pier positioning member is installed on the swing arm elevation detection member; the pier positioning member is used to position and fit both sides of the pier; the hanging mounting member includes: a hanging I-beam, a distance adjusting slider and a wing plate limit block, two distance adjusting sliders are slidably installed on the hanging I-beam, and wing plate limit blocks are respectively fixedly installed on the bottom of the two distance adjusting sliders; the wing plate limit blocks are used to limit the bridge wing plates.

[0005] In at least some embodiments, the hanging connection member includes: a hanging connection tube, a hanging slide shaft and a reset spring, the hanging connection tube is fixedly installed on the top of the hanging I-beam; a hanging slide shaft is slidably installed inside the hanging connection tube; a reset spring is fixedly installed on the bottom of the hanging slide shaft; the reset spring is located inside the hanging connection tube; the other end of the reset spring is connected to the top of the hanging I-beam.

[0006] In at least some embodiments, the hanging mounting parts also include: a ruler, a hanging threaded rod, a rotating connecting sleeve and an offset direction mark, two rulers are fixedly installed on the top of the hanging I-beam; scale lines are respectively provided on the two rulers; a rotating connecting sleeve is fixedly installed on the side of the hanging I-beam, and a hanging threaded rod is rotatably installed inside the rotating connecting sleeve; reverse threads are provided on both sides of the hanging threaded rod; distance adjusting sliders are respectively threadedly connected on both sides of the hanging threaded rod; a handwheel is provided at the end of the hanging threaded rod; six offset direction marks are respectively fixedly installed on the two wing plate limit blocks, and LED light strips are respectively provided in the twelve offset direction marks; the offset direction mark is used to indicate the offset direction of the hanging verticality.

[0007] In at least some embodiments, the pier positioning member includes: a positioning and distance-adjusting cylinder and an opposing threaded rod, the positioning and distance-adjusting cylinder is fixedly mounted on the two swing arms; a slide groove is provided in the positioning and distance-adjusting cylinder; an opposing threaded rod is rotatably mounted on the positioning and distance-adjusting cylinder, and the opposing threaded rod has reverse threads on both sides; and hand wheels are provided on both sides of the opposing threaded rod.

[0008] In at least some embodiments, the swing arm elevation detection component also includes: a swing arm, on which swing arms are fixedly mounted at both ends of the rotating shaft on the meshing gear; two sides of the two swing arms are respectively attached to two rulers; and marking arrow blocks are respectively provided on the two swing arms.

[0009] In at least some embodiments, the skewed extrusion part includes: a sliding column, a thrust spring and a fitting arc plate, the sliding column is a rectangular column structure; six sliding columns are slidably installed on the steel cable connecting shell, and thrust springs are fixedly installed at the tails of the six sliding columns; the other end of the thrust spring is fixedly installed on the inner side of the detection mounting frame; fitting arc plates are fixedly installed on the six sliding columns; the six fitting arc plates elastically fit the hanging steel cables respectively.

[0010] In at least some embodiments, the pier locating member also includes: a positioning arm and an elevation limit shaft, two positioning arms are slidably installed on the positioning and distance adjusting cylinder; the two positioning arms are respectively threadedly connected on both sides of the opposite threaded rod; the two positioning arms are respectively fixedly installed with elevation limit shafts; the two positioning arms are used for positioning and fitting on both sides of the pier; the two elevation limit shafts are used for limiting the position and being erected on the top of the pier.

[0011] In at least some embodiments, the steel cable connecting member includes: a steel cable connecting shell, a hanging steel cable, a detection mounting frame and a micro switch, the steel cable connecting shell is fixedly installed on the hanging slide shaft; the hanging steel cable is fixedly installed inside the steel cable connecting shell; the hanging steel cable is used to connect the crane; six detection mounting frames are fixedly installed on the steel cable connecting shell; the six detection mounting frames are respectively "L"-shaped structures; micro switches are respectively fixedly sleeved inside the six detection mounting frames, and the pressing ends of the six micro switches respectively pass through the six detection mounting frames; the six micro switches are respectively electrically connected to the LED light strips on the twelve offset direction marks; the LED light strips on the two offset direction marks in the same direction on the two wing plate limit blocks are electrically connected to the same micro switch.

[0012] In at least some embodiments, the swing arm elevation detection component includes: a rotating mounting block and a meshing gear, the rotating mounting block is fixedly mounted on the hanging I-beam; the meshing gear is rotatably mounted on the rotating mounting block; a rotating shaft is provided on the meshing gear, and the rotating shaft on the meshing gear passes through the rotating mounting block; the meshing rack is meshed with the meshing gear; the meshing rack is used to mesh and drive the meshing gear to rotate.

[0013] In at least some embodiments, the lifting drive component includes: a lifting drive cylinder and an engaging rack, the lifting drive cylinder is slidably installed on the suspension connecting cylinder; the lifting drive cylinder is fixedly sleeved on the suspension sliding shaft; a meshing rack is fixedly installed on the side of the lifting drive cylinder; the meshing rack is used for moving upward when the bridge is lifted.

[0014] The present invention provides a suspension guide device for a bridge rotation, which has the following beneficial effects:

[0015] The steel cable connector adopted in the present invention can improve the hanging accuracy and facilitate the crane operator to carry out adaptive adjustment work according to the movement of the bridge swivel, so as to avoid the problem that the bridge rotates while the position of the crane does not change, resulting in a reverse force between the hanging steel cable and the bridge, thus affecting the rotation stability of the bridge. The LED light strip can be used to light up to indicate the deviation direction for timely operation and adjustment.

[0016] In addition, the use of the swing arm elevation detection component in conjunction with the lifting drive component can assist in automatically controlling the swing arm elevation detection component to rotate upward when the crane is lifting, which can help improve the adaptability of the structure to the hanging of rotating bridges, and avoid the swing arm elevation detection component driving the pier positioning component to collide with the pier or the adjacent bridge body when the bridge rotates, and prevent the problem of traditional bridge rotation only rotating radially and the axial direction remaining unchanged, resulting in difficulty in positioning between the pier and the bridge. The control of this structure is simple and convenient, and the flip positioning is more stable. At the same time, the swing arm elevation detection component can be used to detect the height position of the pier positioning component after it falls, that is, the elevation error of the bridge, which can facilitate subsequent adjustments by subsequent staff and improve the quality of subsequent jointing and leveling.

[0017] In addition, the hanging threaded rod is used in conjunction with the distance-adjusting slider, which can be moved and adjusted in opposite directions to ensure that the hanging center of gravity is in the middle of the bridge. The pier positioning parts are used, and this structure can be used to perform limiting work after the bridge is rotated, thereby improving the safety of the bridge during rotation. At the same time, the pier positioning parts can be used to adjust and adapt to the pier width. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the technical solution of the embodiment of the present invention, the drawings of the embodiment are briefly introduced below.

[0019] The drawings described below are only related to some embodiments of the present invention, but are not intended to limit the present invention.

[0020] In the attached picture:

[0021] Figure 1 A schematic diagram showing the overall structure of the present application;

[0022] Figure 2 A schematic diagram showing the rear side structure of the present application is shown;

[0023] Figure 3 A cross-sectional view showing the overall structure of the present application;

[0024] Figure 4 A schematic diagram showing the structure of the hanging installation member of the present application is shown;

[0025] Figure 5 A schematic diagram showing the structure of the hanging connector of the present application is shown;

[0026] Figure 6 This application shows Figure 3 A magnified view of the structure of the middle B region;

[0027] Figure 7 This application shows Figure 1 A magnified view of the structure of the middle C region;

[0028] Figure 8 This application shows Figure 2 A magnified view of the structure of the middle D region;

[0029] Fig. 9 A schematic diagram showing the pier positioning member structure of the present application is shown;

[0030] Fig.10 This application shows Figure 3 A magnified view of the structure of the middle E region;

[0031] Fig.11 A schematic diagram of the bottom structure of the present application is shown.

[0032] Reference numerals list

[0033] 1. Suspension installation parts; 101. Suspension I-beam; 102. Adjustable distance slider; 1021. Wing plate limit block; 103. Ruler; 104. Suspension threaded rod; 1041. Rotation connection sleeve; 105. Offset direction indicator; 2. Suspension connection parts; 201. Suspension connection tube; 202. Suspension sliding shaft; 203. Reset tension spring; 3. Steel cable connection parts; 301. Steel cable connection shell; 302. Suspension steel cable; 303. Detection installation frame; 30 4. Micro switch; 4. Tilt extrusion part; 401. Sliding column; 402. Propulsion spring; 403. Fitting arc plate; 5. Lifting drive part; 501. Lifting drive cylinder; 502. Meshing rack; 6. Swing arm elevation detection part; 601. Rotating mounting block; 602. Meshing gear; 603. Swing arm; 7. Pier positioning part; 701. Positioning distance adjusting cylinder; 702. Opposite threaded rod; 703. Positioning arm; 704. Elevation limit axis. DETAILED DESCRIPTION

[0034] In order to make the purpose, technical solution and advantages of the embodiment of the present invention clearer, the technical solution of the embodiment of the present invention will be clearly and completely described below in conjunction with the accompanying drawings of the embodiment of the present invention. Obviously, the described embodiment is a part of the embodiment of the present invention, not all of the embodiments. Based on the described embodiment of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0035] Example 1: Please refer to Figures 1 to 11 :

[0036] The present invention proposes a suspension guiding device for a bridge rotation, comprising a suspension mounting part 1, on which a suspension connecting part 2 is mounted; on which a steel cable connecting part 3 is mounted; the suspension mounting part 1 is used to clamp the end of the rotating bridge; on the steel cable connecting part 3, six skewed extrusion parts 4 are mounted; the six skewed extrusion parts 4 are used to fit the steel cable connecting part 3 to detect the verticality of the suspension; the six skewed extrusion parts 4 are evenly spaced and mounted on the steel cable connecting part 3; the steel cable connecting part 3 is used to connect a crane; on the suspension connecting part 2, a lifting driving part 5 is mounted; the suspension connecting part 2 is used to pull the lifting driving part 5 upward; the suspension mounting part 1 is used to clamp the end of the rotating bridge; on the steel cable connecting part 3, six skewed extrusion parts 4 are mounted; the six skewed extrusion parts 4 are used to fit the steel cable connecting part 3 to detect the verticality of the suspension; the six skewed extrusion parts 4 are evenly spaced and mounted on the steel cable connecting part 3; the steel cable connecting part 3 is used to connect a crane; the suspension connecting part 2 is used to pull the lifting driving part 5 upward; the suspension mounting part 1 is used to clamp the end of the rotating bridge; on the steel cable connecting part 3, ... A swing arm elevation detection component 6 is installed on the mounting component 1; the swing arm elevation detection component 6 is used to display the elevation of the end of the rotating bridge; the lifting drive component 5 is used to drive the swing arm elevation detection component 6 to rotate; a pier positioning component 7 is installed on the swing arm elevation detection component 6; the pier positioning component 7 is used to position and fit both sides of the pier; the hanging mounting component 1 includes: a hanging I-beam 101, a distance adjusting slider 102 and a wing plate limit block 1021, and two distance adjusting sliders 102 are slidably installed on the hanging I-beam 101, and the bottom of the two distance adjusting sliders 102 are respectively fixedly installed with wing plate limit blocks 1021; the wing plate limit blocks 1021 are used to limit the bridge wing plates.

[0037] In the embodiment of the present disclosure, the hanging installation part 1 also includes: a ruler 103, a hanging threaded rod 104, a rotating connection sleeve 1041 and an offset direction mark 105. Two rulers 103 are fixedly installed on the top of the hanging I-beam 101; scale lines are respectively provided on the two rulers 103; a rotating connection sleeve 1041 is fixedly installed on the side of the hanging I-beam 101, and a hanging threaded rod 104 is rotatably installed inside the rotating connection sleeve 1041; reverse threads are provided on both sides of the hanging threaded rod 104; the distance adjustment slider 102 is respectively threadedly connected on both sides of the hanging threaded rod 104; a hand wheel is provided at the end of the hanging threaded rod 104; Six offset direction marks 105 are fixedly installed on the two wing limit blocks 1021, and LED light strips are respectively provided in the twelve offset direction marks 105; the offset direction mark 105 is used to prompt the vertical offset direction of the suspension, and the bridge can be quickly clamped and connected through the suspension mounting part 1. At the same time, the suspension threaded rod 104 is used in conjunction with the distance adjustment slider 102 to be able to move and adjust in opposite directions, which can ensure that the suspension center of gravity is in the middle of the bridge. The structure is more reasonable, the docking is fast and accurate, and the vertical offset direction of the current suspension cable 302 can be quickly identified through the offset direction mark 105, which can facilitate the crane operator to quickly adjust.

[0038] In the embodiment of the present disclosure, the hanging connection member 2 includes: a hanging connection tube 201, a hanging slide shaft 202 and a reset spring 203. The hanging connection tube 201 is fixedly installed on the top of the hanging I-beam 101; the hanging slide shaft 202 is slidably installed inside the hanging connection tube 201; the reset spring 203 is fixedly installed at the bottom of the hanging slide shaft 202; the reset spring 203 is located inside the hanging connection tube 201; the other end of the reset spring 203 is connected to the top of the hanging I-beam 101; the steel cable connection member 3 includes: a steel cable connection shell 301, a hanging steel cable 302, a detection mounting frame 303 and a micro switch 304, and the steel cable connection shell 301 is fixedly installed on the hanging slide shaft 202 01; a hanging steel cable 302 is fixedly installed inside the steel cable connection shell 301; the hanging steel cable 302 is used to connect the crane; six detection mounting frames 303 are fixedly installed on the steel cable connection shell 301; the six detection mounting frames 303 are respectively "L"-shaped structures; micro switches 304 are respectively fixedly sleeved inside the six detection mounting frames 303, and the pressing ends of the six micro switches 304 pass through the six detection mounting frames 303 respectively; the six micro switches 304 are respectively electrically connected to the LED light strips on the twelve offset direction marks 105; the LED light strips on the two offset direction marks 105 in the same direction on the two wing plate limit blocks 1021 are electrically connected to the same micro switch 3 04; The skewed extrusion piece 4 includes: a sliding column 401, a propulsion spring 402 and a fitting arc plate 403, wherein the sliding column 401 is a rectangular column structure; six sliding columns 401 are slidably mounted on the steel cable connection shell 301, and the tails of the six sliding columns 401 are respectively fixedly mounted with propulsion springs 402; the other end of the propulsion spring 402 is fixedly mounted on the inner side of the detection mounting frame 303; the six sliding columns 401 are respectively fixedly mounted with fitting arc plates 403; the six fitting arc plates 403 are respectively elastically fitted with the hanging steel cables 302, and the use of the steel cable connector 3 can improve the hanging accuracy, and can facilitate the crane operator to adapt and adjust according to the movement of the bridge swivel, In order to avoid the problem that the bridge rotates while the position of the crane does not change, resulting in the suspension cable 302 and the bridge being not perpendicular and generating a reverse force, thus affecting the rotational stability of the bridge, six skew extrusion members 4 are used in conjunction with six micro switches 304, so that the skew direction of the suspension cable 302 can be detected more accurately, thereby providing prompt correction work, thereby improving the suspension accuracy of the bridge rotation. The micro switch 304 can control the corresponding LED light strip on the offset direction mark 105 to light up and indicate the offset direction, so that the crane operator can accurately operate and control the crane for reverse compensation until the suspension cable 302 no longer squeezes any fitting arc plate 403.

[0039] In the embodiment of the present disclosure, the lifting drive member 5 includes: a lifting drive cylinder 501 and a meshing rack 502, the lifting drive cylinder 501 is slidably mounted on the hanging connecting cylinder 201; the lifting drive cylinder 501 is fixedly sleeved on the hanging sliding shaft 202; a meshing rack 502 is fixedly mounted on the side of the lifting drive cylinder 501; the meshing rack 502 is used to move up when the bridge is lifted; the swing arm elevation detection member 6 includes: a rotating mounting block 601 and a meshing gear 602, the rotating mounting block 601 is fixedly mounted on the hanging I-beam 101; the rotating mounting block 60 1 is rotatably mounted with a meshing gear 602; a rotating shaft is provided on the meshing gear 602, and the rotating shaft on the meshing gear 602 penetrates the rotating mounting block 601; the meshing rack 502 is meshed with the meshing gear 602; the meshing rack 502 is used to mesh and drive the meshing gear 602 to rotate; the swing arm height detection member 6 also includes: a swing arm 603, and the two ends of the rotating shaft on the meshing gear 602 are respectively fixedly mounted with the swing arms 603; the sides of the two swing arms 603 are respectively attached to the two scales 103; the two swing arms 603 are respectively provided with marking arrow blocks The swing arm height detection member 6 is used in conjunction with the lifting drive member 5, which can assist in automatically controlling the swing arm height detection member 6 to rotate upward when the crane is lifting, which can assist in improving the suspension adaptability of the present structure to the rotating bridge, and avoid the swing arm height detection member 6 driving the pier positioning member 7 to collide with the pier or the adjacent bridge body when the bridge rotates. The present structure is simple and convenient to control, and the flip positioning is more stable. At the same time, the swing arm height detection member 6 can be used to detect the height position of the pier positioning member 7 after it falls, thereby improving the subsequent jointing and leveling quality, making the structure more reasonable, and improving To improve the accuracy of bridge elevation detection, when the crane is lifting, the hanging slide shaft 202 moves up and the reset spring 203 is stretched. At this time, the hanging slide shaft 202 drives the meshing rack 502 to move, and the meshing drive meshing gear 602 drives the swing arm 603 to rotate upward. At this time, the pier positioning member 7 is also driven to flip up, which can prevent the pier positioning member 7 from interfering with the rotation of the bridge. Observe the arrow block on the swing arm 603 and the scale mark corresponding to the ruler 103, and observe the deviation between the reading and the reference value. If the deviation exceeds the standard, adjust the elevation of the bridge end.

[0040] Embodiment 2, on the basis of embodiment 1, the pier positioning member 7 comprises: a positioning distance adjusting cylinder 701 and a counter threaded rod 702, the positioning distance adjusting cylinder 701 is fixedly mounted on the two swing arms 603; a slide groove is arranged in the positioning distance adjusting cylinder 701; a counter threaded rod 702 is rotatably mounted on the positioning distance adjusting cylinder 701, and the two sides of the counter threaded rod 702 are reverse threads; hand wheels are respectively arranged on the two sides of the counter threaded rod 702; the pier positioning member 7 also comprises: a positioning arm 703 and an elevation limit shaft 704, two positioning arms 703 are slidably mounted on the positioning distance adjusting cylinder 701; the two positioning arms 703 are respectively threadedly connected to the counter threaded rod 7 02 on both sides; the two positioning arms 703 are respectively fixed with elevation limit shafts 704; the two positioning arms 703 are used for positioning and fitting on both sides of the pier; the two elevation limit shafts 704 are used for limiting and erected on the top of the pier, and the pier positioning piece 7 is adopted. By using this structure, the limiting work after the bridge is rotated can be carried out, which improves the safety of the bridge during rotation and the stability of subsequent construction. At the same time, the pier positioning piece 7 can be adjusted to adapt to the width of the pier, which is more flexible to use. The two positioning arms 703 of the copper lock are fitted and positioned on both sides of the pier to avoid rotation deviation of the rotating bridge under the action of wind force, etc., and improve the stability of subsequent work such as joint closure.

[0041] The working principle of this embodiment is as follows: First, by rotating the opposite threaded rods 702, the two positioning arms 703 can be driven to adjust the spacing, which is more flexible and convenient. By placing the hanging I-beam 101 on the bridge, rotating the hanging threaded rod 104, and using the reverse threads on both sides, the two distance-adjusting sliders 102 can be driven to move inward, driving the two wing plate limit blocks 1021 to clamp the bridge wing plates. After installing the hanging mounting parts 1 at both ends of the bridge, the two cranes are respectively connected to the hanging steel cables 302 to guide the hanging at both ends of the bridge. When the bridge rotates When the speed is inconsistent with the speed that the crane is adapted to follow, the hanging steel cable 302 becomes skewed and squeezes the fitting curved plate 403. At this time, the fitting curved plate 403 drives the sliding column 401 to squeeze the micro switch 304. The micro switch 304 can control the corresponding LED light strip on the offset direction mark 105 to light up to indicate the offset direction, so as to facilitate the crane operator to operate accurately until the hanging steel cable 302 no longer squeezes any fitting curved plate 403. When the crane is hoisted, the hanging sliding shaft 202 moves up and the tension spring 20 is reset. 3 is stretched, at this time, the hanging sliding shaft 202 drives the meshing rack 502 to move, meshing and driving the meshing gear 602, driving the swing arm 603 to rotate upward, and at this time, the pier positioning member 7 is also driven to flip up, which can prevent the pier positioning member 7 from interfering with the bridge rotation. When the bridge swivel rotates into place, the crane gradually lowers the hanging steel cable 302. Under the pull of the reset tension spring 203 and the deadweight of the pier positioning member 7, the meshing rack 502 meshes and drives the meshing gear 602 to rotate in the opposite direction, driving the swing arm 603 to rotate downward. At this time, The pier positioning piece 7 can be rotated downward, and the inner sides of the two positioning arms 703 are inserted into the pier for positioning. The elevation limit shaft 704 is used to set the limit at the top of the pier. At this time, observe the arrow block on the swing arm 603 and the scale mark corresponding to the ruler 103, and observe the deviation between the reading and the reference value. If the deviation exceeds the standard, adjust the elevation of the bridge end. After the overall accuracy adjustment is completed, rotate the hanging threaded rod 104 to drive the two wing plate limit blocks 1021 to be separated and disassembled from the bridge, and then the subsequent joint casting work can be carried out.

[0042] In this article, there are a few points to note:

[0043] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.

[0044] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.

[0045] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.

Claims

1. A suspension guide device for a bridge rotation, comprising a suspension mounting member (1), on which a suspension connecting member (2) is mounted; characterized in that: A steel cable connector (3) is installed on the hanging connector (2); the hanging mounting member (1) is used to clamp the end of the rotating bridge; Six skewed extrusion pieces (4) are installed on the steel cable connector (3); the six skewed extrusion pieces (4) are used to fit the steel cable connector (3) to detect the verticality of the suspension; the six skewed extrusion pieces (4) are installed on the steel cable connector (3) at equal intervals; the steel cable connector (3) is used to connect the crane; A lifting drive component (5) is mounted on the hanging connection component (2); the hanging connection component (2) is used to pull the lifting drive component (5) upward; The hanging mounting member (1) is provided with a swing arm elevation detection member (6); the swing arm elevation detection member (6) is used to display the elevation of the end of the rotating bridge; the lifting driving member (5) is used to drive the swing arm elevation detection member (6) to rotate; A pier positioning member (7) is installed on the swing arm elevation detection member (6); the pier positioning member (7) is used to position and fit the two sides of the pier; The hanging installation component (1) comprises: a hanging I-beam (101), a distance-adjusting slider (102) and a wing plate limiting block (1021); two distance-adjusting sliders (102) are slidably mounted on the hanging I-beam (101), and wing plate limiting blocks (1021) are fixedly mounted on the bottoms of the two distance-adjusting sliders (102); the wing plate limiting blocks (1021) are used to limit the bridge wing plates; The hanging installation component (1) further comprises: a ruler (103), a hanging threaded rod (104), a rotating connection sleeve (1041) and an offset direction mark (105); two rulers (103) are fixedly mounted on the top of the hanging I-beam (101); scale lines are respectively provided on the two rulers (103); a rotating connection sleeve (1041) is fixedly mounted on the side of the hanging I-beam (101), and a hanging threaded rod (104) is rotatably mounted inside the rotating connection sleeve (1041); reverse threads are provided on both sides of the hanging threaded rod (104); a hand wheel is provided at the end of the hanging threaded rod (104); a distance adjustment slider (102) is respectively threadedly connected on both sides of the hanging threaded rod (104); six offset direction marks (105) are respectively fixedly mounted on the two wing plate limit blocks (1021), and LED light strips are respectively provided in the twelve offset direction marks (105); the offset direction mark (105) is used to indicate the offset direction of the hanging verticality; The hanging connection member (2) comprises: a hanging connection tube (201), a hanging sliding shaft (202) and a reset tension spring (203); the hanging connection tube (201) is fixedly mounted on the top of the hanging I-beam (101); the hanging sliding shaft (202) is slidably mounted inside the hanging connection tube (201); the reset tension spring (203) is fixedly mounted on the bottom of the hanging sliding shaft (202); the reset tension spring (203) is located inside the hanging connection tube (201); the other end of the reset tension spring (203) is connected to the top of the hanging I-beam (101); The steel cable connector (3) comprises: a steel cable connection shell (301), a hanging steel cable (302), a detection mounting frame (303) and a micro switch (304); the steel cable connection shell (301) is fixedly mounted on the hanging sliding shaft (202); a hanging steel cable (302) is fixedly mounted inside the steel cable connection shell (301); the hanging steel cable (302) is used to connect to the crane; six detection mounting frames (303) are fixedly mounted on the steel cable connection shell (301); the six detection mounting frames (303) are fixedly mounted on the 03) are respectively "L"-shaped structures; micro switches (304) are respectively fixedly sleeved inside the six detection mounting frames (303), and the pressing ends of the six micro switches (304) respectively pass through the six detection mounting frames (303); the six micro switches (304) are respectively electrically connected to the LED light strips on the twelve offset direction markers (105); the LED light strips on the two offset direction markers (105) in the same direction on the two wing plate limit blocks (1021) are electrically connected to the same micro switch (304).

2. A suspension and guiding device for bridge rotation according to claim 1, characterized in that: The skewed extrusion member (4) comprises: a sliding column (401), a propulsion spring (402) and a fitting arc plate (403), wherein the sliding column (401) is a rectangular column structure; six sliding columns (401) are slidably mounted on the steel cable connection shell (301), and propulsion springs (402) are fixedly mounted on the tails of the six sliding columns (401); the other end of the propulsion spring (402) is fixedly mounted on the inner side of the detection mounting frame (303); a fitting arc plate (403) is fixedly mounted on the six sliding columns (401); and the six fitting arc plates (403) elastically fit the hanging steel cables (302) respectively.

3. The suspension and guiding device for bridge rotation according to claim 1, characterized in that: The lifting drive member (5) comprises: a lifting drive cylinder (501) and a meshing rack (502); the lifting drive cylinder (501) is slidably mounted on the suspension connection cylinder (201); the lifting drive cylinder (501) is fixedly sleeved on the suspension sliding shaft (202); a meshing rack (502) is fixedly mounted on the side of the lifting drive cylinder (501); the meshing rack (502) is used for upward movement when the bridge is lifted.

4. A suspension and guiding device for bridge rotation according to claim 3, characterized in that: The swing arm elevation detection component (6) comprises: a rotating mounting block (601) and a meshing gear (602); the rotating mounting block (601) is fixedly mounted on the hanging I-beam (101); the meshing gear (602) is rotatably mounted on the rotating mounting block (601); a rotating shaft is provided on the meshing gear (602), and the rotating shaft on the meshing gear (602) passes through the rotating mounting block (601); the meshing rack (502) is meshed with the meshing gear (602); and the meshing rack (502) is used to mesh and drive the meshing gear (602) to rotate.

5. A suspension and guiding device for bridge rotation according to claim 4, characterized in that: The swing arm elevation detection component (6) further comprises: a swing arm (603), wherein the two ends of the rotating shaft on the meshing gear (602) are respectively fixedly mounted with the swing arms (603); the sides of the two swing arms (603) are respectively attached to two scales (103); and the two swing arms (603) are respectively provided with marking arrow blocks.

6. A suspension and guiding device for bridge rotation according to claim 5, characterized in that: The bridge pier positioning member (7) comprises: a positioning and spacing adjusting cylinder (701) and a counter-threaded rod (702); the positioning and spacing adjusting cylinder (701) is fixedly mounted on the two swing arms (603); a slide groove is provided in the positioning and spacing adjusting cylinder (701); the counter-threaded rod (702) is rotatably mounted on the positioning and spacing adjusting cylinder (701), and both sides of the counter-threaded rod (702) are reversely threaded; and hand wheels are respectively provided on both sides of the counter-threaded rod (702).

7. A suspension and guiding device for bridge rotation according to claim 6, characterized in that: The pier positioning member (7) further comprises: a positioning arm (703) and an elevation limiting shaft (704); two positioning arms (703) are slidably mounted on the positioning and spacing adjusting cylinder (701); the two positioning arms (703) are respectively threadedly connected to two sides of the opposite threaded rod (702); the two positioning arms (703) are respectively fixedly mounted with an elevation limiting shaft (704); the two positioning arms (703) are used for positioning and fitting the two sides of the pier; and the two elevation limiting shafts (704) are used for limiting the position and being erected on the top of the pier.

Citation Information

Patent Citations

  • Construction method of large-span through type rigid tied bar steel arch bridge

    CN107905116A

  • Construction method for beam-column type support of fish-bellied box girder

    CN112854004A