An intelligent control system for directional drilling equipment

Through the intelligent control system of directional drilling equipment, geological distribution characteristics and operating parameters are collected and analyzed in real time to realize real-time adjustment of drilling paths and parameters, solving the problem of non-real-time and inaccurate adjustment of drilling parameters in the existing technology, and improving drilling efficiency and The accuracy of project quality analysis ensures construction safety.

CN118517256BActive Publication Date: 2024-10-22SHANDONG JIUSHANG DIRECTIONAL DRILLING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410588347.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-05-13
Publication Date
2024-10-22
Estimated Expiration
2044-05-13

AI Technical Summary

Technical Problem

Existing directional drilling equipment lacks real-time performance and accuracy when adjusting drilling parameters, resulting in low efficiency, heavy equipment wear, and affected project progress. The lack of closed-loop analysis results in inaccurate construction quality control and difficulty in accident handling.

Method used

Design an intelligent control system for directional drilling equipment, including drilling data planning module, execution module, path adjustment module, operating parameter analysis module, parameter adjustment module, quality analysis module and data storage library. By collecting geological distribution characteristics and operating parameters in real time, Adjust drilling paths and parameters in real time to form a closed-loop analysis.

Benefits of technology

It improves the accuracy and real-timeness of drilling parameter adjustment, reduces the probability of accidents, improves the accuracy of drilling efficiency and project quality analysis, and ensures construction safety and resource utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118517256B_ABST
    Figure CN118517256B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of drilling equipment control, and discloses an intelligent control system for directional drilling equipment. The system comprises a drilling data planning module, a drilling execution module, a drilling path adjustment module, an operating drilling parameter analysis module, a planned drilling parameter analysis module, a drilling parameter adjustment module, a drilling quality analysis module, an exploration quality analysis module, an abnormal tendency analysis module and a data storage library. The present invention avoids the occurrence of accidents affecting construction safety caused by parameter misadjustment by comprehensively analyzing the operating errors between actual operating parameters and planned drilling parameters and the planning errors between planned drilling parameters and required drilling parameters, improves the efficiency of drilling operations and the accuracy of drilling parameter adjustment, reduces the probability of accidents caused by exploration errors, and improves the accuracy of construction quality analysis of exploration operations and drilling operations during construction by analyzing the abnormal orientation of construction, thereby improving the pertinence of engineering improvements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of drilling equipment control and relates to an intelligent control system for directional drilling equipment. Background Art

[0002] Drilling equipment refers to mechanical devices and equipment used in specific working conditions such as drilling construction. Drilling equipment plays a vital role in geological exploration, mineral resource development, civil engineering construction, scientific research and other fields. The intelligent control of directional drilling equipment plays an important role in improving drilling efficiency and accuracy, coping with complex geological conditions and improving the overall level of drilling operations.

[0003] In the existing drilling operation, the drilling parameters of directional drilling equipment are determined based on the geological distribution characteristics of the exploration and the experience of the staff. In the actual drilling process, the parameters are adjusted by observing whether there are abnormal conditions. This drilling parameter adjustment method will reduce the real-time adjustment of the drilling parameters. When there are differences due to geological distribution characteristics, using inappropriate drilling parameters will reduce drilling efficiency, increase drilling equipment wear and tear, and affect the progress of the project.

[0004] When adjusting drilling parameters, existing directional drilling equipment usually only relies on the geological conditions of the drilling location, ignoring the impact of the drilling equipment's operating accuracy on the drilling operation, reducing the accuracy of the analysis of the drilling parameter adjustment amount, affecting the efficiency and effectiveness of the drilling operation, reducing the quality of the project, and even leading to drilling failures or drilling accidents, reducing the safety of the drilling operation.

[0005] Existing directional drilling equipment can only obtain drilling parameters by analyzing geological distribution characteristics and then conduct drilling operations. It lacks evaluation of engineering exploration and drilling based on drilling process analysis, and has not formed a closed loop. As a result, there is a lack of precise basis for controlling engineering design and construction quality, which reduces the accuracy of engineering quality analysis and the targeted nature of improvements. When an operational accident occurs, it is impossible to accurately determine responsibility. Summary of the invention

[0006] In view of this, in order to solve the problems raised in the above background technology, an intelligent control system for directional drilling equipment is proposed.

[0007] The purpose of the present invention can be achieved through the following technical solutions: an intelligent control system for directional drilling equipment, comprising: a drilling data planning module, which is used to establish a coordinate system at the exploration location, and conduct geological exploration based on the planned drilling path to obtain a geological distribution image, wherein the geological distribution image includes the geological distribution location and geological distribution characteristics, and then perform drilling parameter planning for different drilling locations.

[0008] The drilling execution module is used to set a locator and a drilling camera on the drill bit, and when the drill bit is exploring along the planned drilling path, the locator locates the real-time drilling position, and the drilling camera collects real-time geological images of the corresponding drilling position.

[0009] The drilling path adjustment module is used to analyze the position deviation of the real-time drilling position, and then determine whether the drilling direction of the drill bit needs to be adjusted. If necessary, the path adjustment direction and the drill bit adjustment range are analyzed to adjust the drilling path.

[0010] The operating drilling parameter analysis module is used to set a speed sensor and a pressure sensor on the drill bit to collect the operating drilling parameters, wherein the speed sensor is used to collect the operating drill bit speed, and the pressure sensor is used to collect the operating extrusion force, and then analyze the deviation of the operating drilling parameters.

[0011] The planned drilling parameter analysis module is used to extract real-time geological distribution characteristics from real-time geological images, analyze required drilling parameters, and further analyze the deviation of planned drilling parameters.

[0012] The drilling parameter adjustment module is used to analyze the deviation of drilling parameters based on the deviation of running drilling parameters and the deviation of planned drilling parameters and determine whether the drilling parameters need to be adjusted. If necessary, the real-time drilling position is recorded as an abnormal drilling position and the drilling parameters are adjusted.

[0013] The drilling quality analysis module is used to count and analyze the frequency of abnormal drilling parameters and the abnormal operation index at each abnormal drilling position, and then analyze the drilling abnormality.

[0014] The exploration quality analysis module is used to count and analyze the frequency of abnormal planned drilling parameters and the planned anomaly index at each abnormal drilling location, and then analyze the exploration anomaly situation.

[0015] The abnormal tendency analysis module is used to analyze the construction abnormality direction based on the drilling abnormality index and the exploration abnormality index, where the construction abnormality specifically includes the exploration abnormality and the drilling abnormality.

[0016] Data repository for storing rock type impact index information tables.

[0017] In a preferred embodiment of the present invention, the geological distribution characteristics are specifically rock type and rock thickness, and the drilling parameters are specifically drill bit rotation speed and extrusion force.

[0018] The steps of planning drilling parameters for different drilling positions are as follows: extracting the rock types and corresponding rock thicknesses at various geological distribution positions in the planned drilling path of the exploration from the geological distribution image.

[0019] The planned drilling location is matched with the geological distribution location to obtain the rock type and corresponding rock thickness corresponding to the planned drilling location.

[0020] The rock type corresponding to each planned drilling location is matched with the rock type impact index information table in the data storage library to obtain the rock impact index corresponding to each planned drilling location.

[0021] Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned drill speed N for each planned drilling position 规划 (x, y, z), where e represents a natural constant.

[0022] Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned extrusion force F of each planned drilling position 规划 (x,y,z), where the unit extrusion force refers to the extrusion force corresponding to the unit rock influence index.

[0023] The planned drilling position corresponding to each drilling time is obtained according to the planned drill speed.

[0024] In a preferred embodiment of the present invention, the analysis of the position deviation of the real-time drilling position is specifically as follows: extract the real-time drilling position located by the locator and record the position coordinates (x, y, z) 实时 , and at the same time obtain the drilling time corresponding to the real-time drilling position.

[0025] Extract the planned drilling position coordinates (x, y, z) corresponding to the drilling time 规划 , substitute into the formula Get the position deviation θ corresponding to each real-time drilling position (x,y,z) , where x 规划 ,y 规划 、z 规划 They represent the horizontal, vertical and vertical coordinates of the planned drilling position, respectively. 实时 ,y 实时 、z 实时 They represent the horizontal coordinate, vertical coordinate and ordinate corresponding to the real-time drilling position respectively, and L0 represents the reference distance.

[0026] In a preferred embodiment of the present invention, the judgment on whether the drilling direction of the drill bit needs to be adjusted is specifically as follows: the position deviation corresponding to each real-time drilling position is compared with the preset allowable drilling position deviation. When the position deviation corresponding to a real-time drilling position is greater than the preset allowable drilling position deviation, the drilling direction corresponding to the real-time drilling position needs to be adjusted; otherwise, no adjustment is required.

[0027] The analysis of the path adjustment direction and the drill bit adjustment amplitude is specifically as follows: extract the coordinates of the corresponding real-time drilling position that is judged to need to be adjusted in the drilling direction, and extract the coordinates of the planned drilling position corresponding to the drilling time, and then adjust the drill bit direction so that the path adjustment direction points to the planned drilling position.

[0028] The real-time position coordinates (x 实时 ,y 实时 ,z 实时 ) and the planned drilling position coordinates (x t ,y t ,z t ) into the calculation formula The path offset distance is obtained, and then the drill adjustment amplitude is obtained according to the path offset distance.

[0029] In a preferred embodiment of the present invention, the step of analyzing the deviation of the running drilling parameters is as follows: the running drill speed N corresponding to each real-time drilling position 运行 (x,y,z), running force F 运行 (x,y,z), planning drill speed N 规划 (x,y,z) and the planned squeeze force F 规划 Substitute (x,y,z) into the calculation formula Get the deviation of the operating drilling parameters λ of each real-time drilling position 运行 (x, y, z), where α1 and α2 represent the weights of the operating drill speed and the operating extrusion force, respectively.

[0030] In a preferred embodiment of the present invention, the analysis of planned drilling parameter deviation is specifically as follows: extracting real-time geological distribution features from real-time geological images.

[0031] Based on the real-time geological distribution characteristics, the real-time rock type and corresponding rock thickness are obtained, and the required drill speed N corresponding to each real-time drilling position is analyzed. 需求 (x,y,z) and the required crowding force F 需求 (x,y,z), and then jointly plan the drill speed N 规划 (x,y,z) and the planned squeeze force F 规划 Substitute (x,y,z) into the calculation formula Get the planned drilling parameter deviation λ of each real-time drilling position 规划 (x, y, z), where β1 and β2 represent the weights of the planned drill speed and the planned extrusion force, respectively.

[0032] In a preferred embodiment of the present invention, the steps of obtaining the drilling parameter deviation and determining whether the drilling parameters need to be adjusted are as follows: the operating drilling parameter deviation corresponding to each real-time drilling position and the planned drilling parameter deviation are summed and calculated to obtain the drilling parameter deviation corresponding to each real-time drilling position.

[0033] The drilling parameter deviation corresponding to each real-time drilling position is compared with the preset allowable drilling parameter deviation. When the drilling parameter deviation corresponding to a real-time drilling position is greater than the preset allowable drilling parameter deviation, the drilling parameters of the real-time drilling position need to be adjusted, otherwise the drilling parameters of the real-time drilling position do not need to be adjusted.

[0034] The drilling parameter adjustment step is as follows: performing difference calculation on the planned drilling parameters and the operating drilling parameters corresponding to each abnormal drilling position to obtain an operating correction amount, and performing an operating correction on the drilling parameters.

[0035] The required drilling parameters and planned drilling parameters corresponding to each abnormal drilling position are calculated by difference to obtain the planned correction amount, and the planned correction is performed on the drilling parameters after operation correction.

[0036] In a preferred embodiment of the present invention, the analysis of drilling abnormalities is specifically as follows: extracting the operating drilling parameters corresponding to each abnormal drilling position and substituting them into the analysis formula The deviation amplitude of the operating drilling parameters is obtained, specifically including the deviation amplitude of the operating drill bit speed and the deviation amplitude of the operating extrusion force, and then compared with the preset allowable deviation amplitude of the operating drilling parameters. When the deviation amplitude of the operating drilling parameters corresponding to an abnormal drilling position is greater than the allowable deviation amplitude of the operating drilling parameters, the abnormal drilling position has an operating drilling parameter abnormality, otherwise there is no operating drilling parameter abnormality.

[0037] The abnormal drilling positions with abnormal operation drilling parameters are recorded as abnormal operation drilling positions, and the frequency of abnormal operation is recorded.

[0038] The deviation amplitudes of the operation drilling parameters corresponding to each abnormal operation drilling position are averaged to obtain the operation abnormality index.

[0039] The drilling anomaly index is obtained using the formula drilling anomaly index = operation anomaly frequency * operation anomaly index.

[0040] In a preferred embodiment of the present invention, the steps of analyzing the abnormal exploration are as follows: extracting the required drilling parameters corresponding to each abnormal drilling position and substituting them into the analysis formula The planned drilling parameter deviation amplitude is obtained, specifically including the planned drill speed deviation amplitude and the planned extrusion force deviation amplitude, and then compared with the preset allowable planned drilling parameter deviation amplitude. When the planned drilling parameter deviation amplitude corresponding to an abnormal drilling position is greater than the allowable planned drilling parameter deviation amplitude, the abnormal drilling position has a planned drilling parameter abnormality, otherwise there is no planned drilling parameter abnormality.

[0041] The abnormal drilling positions with abnormal operating drilling parameters are recorded as planned abnormal drilling positions, and the planned abnormal frequency is recorded.

[0042] The planning anomaly index is obtained by calculating the mean deviation of the planned drilling parameters corresponding to each planned abnormal drilling position.

[0043] The exploration anomaly index is obtained using the formula exploration anomaly index = planned anomaly frequency * planned anomaly index.

[0044] In a preferred embodiment of the present invention, the step of analyzing the construction anomaly is as follows: comparing the drilling anomaly index and the exploration anomaly index obtained by analysis, when the drilling anomaly index is greater than the exploration anomaly index, the construction anomaly is directed to the drilling anomaly, and when the drilling anomaly index is less than the exploration anomaly index, the construction anomaly is directed to the exploration anomaly.

[0045] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention collects real-time geological distribution characteristics during the actual drilling process, and then adjusts the planned drilling parameters by analyzing the required drilling parameters. This analysis method fully considers the differences between the actual geological distribution characteristics and the exploration geological distribution characteristics, improves the accuracy and real-time performance of the drilling parameter adjustment, reduces the probability of accidents caused by exploration errors, and improves the efficiency of drilling operations.

[0046] (2) The present invention comprehensively analyzes the operating errors caused by reduced equipment accuracy and the planning errors caused by errors in the exploration geological distribution, thereby accurately obtaining the errors of equipment parameters during the drilling process. Based on the actual error conditions, the drilling parameters can be more accurately adjusted, thus avoiding the occurrence of accidents caused by parameter misadjustment due to equipment parameter errors that affect the safety of construction operations.

[0047] (3) The present invention adjusts the drilling path in real time by calculating the deviation between the actual position of the drill bit and the planned drilling position during the drilling process. Timely adjustments can avoid repeated drilling or correction work caused by deviation from the planned path, thereby saving drilling time, improving drilling efficiency, and avoiding drilling failure or waste of resources caused by excessive deviation.

[0048] (4) The present invention analyzes the deviation of equipment operating parameters during the drilling process and the deviation between exploration and actual geological distribution characteristics, and then analyzes the direction of construction anomalies to form a closed-loop analysis, which can more accurately obtain the construction quality of exploration operations and drilling operations during the construction process, thereby improving the accuracy of engineering quality analysis and the targetedness of improvement. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0050] Figure 1 It is a schematic diagram of the connection of each module of the system of the present invention. DETAILED DESCRIPTION

[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0052] See also Figure 1 As shown, the present invention provides an intelligent control system for directional drilling equipment, which includes a drilling data planning module, a drilling execution module, a drilling path adjustment module, an operating drilling parameter analysis module, a planned drilling parameter analysis module, a drilling parameter adjustment module, a drilling quality analysis module, an exploration quality analysis module, an abnormal tendency analysis module and a data storage library, wherein the drilling data planning module is respectively connected to the drilling execution module, the operating drilling parameter analysis module and the planned drilling parameter analysis module, the drilling execution module is respectively connected to the drilling path adjustment module, the operating drilling parameter analysis module and the planned drilling parameter analysis module, the operating drilling parameter analysis module and the planned drilling parameter analysis module are both connected to the drilling parameter adjustment module, the drilling parameter adjustment module is respectively connected to the drilling quality analysis module and the exploration quality analysis module, the drilling quality analysis module and the exploration quality analysis module are both connected to the abnormal tendency analysis module, and the data storage library is respectively connected to the drilling data planning module and the planned drilling parameter analysis module.

[0053] The drilling data planning module is used to establish a coordinate system at the exploration location, and perform geological exploration based on the planned drilling path to obtain a geological distribution image, wherein the geological distribution image includes the geological distribution location and geological distribution characteristics, and then perform drilling parameter planning for different drilling locations.

[0054] It should be added that the drilling starting point is taken as the origin, the direction of the drilling path corresponding to the starting point is taken as the horizontal axis, the direction of the horizontal plane perpendicular to the horizontal axis is taken as the longitudinal axis, the direction perpendicular to the ground is taken as the vertical axis, and the direction perpendicular to the ground and downward is taken as the positive direction of the vertical axis.

[0055] Preferably, the geological distribution characteristics are specifically rock type and rock thickness, and the drilling parameters are specifically drill bit rotation speed and penetration force.

[0056] It should be noted that the reasons for selecting rock type and rock thickness as geological distribution characteristics are as follows: rock type has an important influence on the selection and setting of drilling parameters. Different rock types have different physical and mechanical properties, such as hardness, strength, brittleness, toughness, etc. These properties directly affect the selection of drill bits, drilling speed, drilling pressure and other drilling parameter settings; secondly, rock thickness is also an important factor affecting drilling parameters. The size and distribution of rock thickness directly affect the drilling efficiency of drilling equipment. During the drilling process, if thicker rocks are encountered, drilling parameters may need to be adjusted to adapt to different formation conditions.

[0057] It should be added that the rock thickness data analysis is to extract the rock contours corresponding to each drilling location from the geological distribution image, and then analyze the thickness information of the rock on the drilling path.

[0058] It should be noted that the reasons for selecting drill bit speed and extrusion force as drilling parameters are as follows: for drill bit speed, the drill bit speed directly determines the drilling speed. At an appropriate speed, the drill bit can more effectively break the rock and improve the drilling efficiency. The drill bit will wear under constant friction and collision. An appropriate speed can reduce the wear of the drill bit and extend its service life. An appropriate speed can improve the diameter accuracy and roughness of the borehole, making the borehole more uniform and smooth. For extrusion force, the extrusion force directly determines the drill bit pressure. During the drilling process, when the drill bit pressure reaches or exceeds the compressive strength of the drilled rock, the diamond or other cutting tools can effectively break the rock. Reasonable drilling pressure can ensure that the diamond or other cutting tools work in a thickness crushing mode, thereby obtaining a higher drilling efficiency. Reasonable drilling pressure can reduce the wear of the diamond or other cutting tools and extend their service life. When the drilling pressure exceeds the compressive limit of the diamond or other cutting tools, they may break and fall off, resulting in a decrease in drilling speed. Stability during the drilling process is crucial to ensuring drilling efficiency and drilling quality. Reasonable drilling pressure can ensure the stability of the drilling process and reduce the occurrence of accidents such as drill sticking and drill falling.

[0059] Further preferably, the rock type and corresponding rock thickness of each geological distribution position in the planned drilling path of the exploration are extracted.

[0060] The planned drilling location is matched with the geological distribution location to obtain the rock type and corresponding rock thickness corresponding to the planned drilling location.

[0061] Please refer to Table 1, and match the rock type corresponding to each planned drilling position with the rock type impact index information table in the data storage library to obtain the rock impact index of the rock corresponding to each planned drilling position.

[0062] It should be noted that the rock impact index corresponding to the rock type impact index information table refers to the hardness impact.

[0063] Table 1

[0064] Rock Type Rock Impact Index granite 17 Limestone 12 sandstone 9 shale 3 Marble 18

[0065] Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned drill speed N for each planned drilling position 规划 (x, y, z), where e represents a natural constant.

[0066] Exemplarily, the reference rotation speed is 1500 rpm, which is the factory setting rotation speed of the drill bit.

[0067] Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned extrusion force F of each planned drilling position 规划 (x,y,z), where the unit extrusion force refers to the extrusion force corresponding to the unit rock influence index.

[0068] Exemplarily, the unit extrusion force is 8000N.

[0069] The planned drilling position corresponding to each drilling time is obtained according to the planned drill speed.

[0070] It should be added that the planned drilling position corresponding to each drilling time is obtained by calculating the product of the planned drill speed and the drilling time, wherein the drilling time refers to the time interval between the drilling time and the start drilling time.

[0071] The drilling execution module is used to set a locator and a drilling camera on the drill bit, and when the drill bit is exploring along the planned drilling path, the locator locates the real-time drilling position, and the drilling camera collects real-time geological images of the corresponding drilling position.

[0072] The drilling path adjustment module is used to analyze the position deviation of the real-time drilling position, and then determine whether the drilling direction of the drill bit needs to be adjusted. If necessary, the path adjustment direction and the drill bit adjustment range are analyzed to adjust the drilling path.

[0073] Preferably, the real-time drilling position located by the locator is extracted and the position coordinates (x, y, z) are recorded. 实时 , and at the same time obtain the drilling time corresponding to the real-time drilling position.

[0074] Extract the planned drilling position coordinates (x, y, z) corresponding to the drilling time 规划 , substitute into the formula Get the position deviation θ corresponding to each real-time drilling position (x,y,z) , where x 规划 ,y 规划 、z 规划 They represent the horizontal, vertical and vertical coordinates of the planned drilling position, respectively. 实时 ,y 实时 、z 实时 They represent the horizontal coordinate, vertical coordinate and ordinate corresponding to the real-time drilling position respectively, and L0 represents the reference distance.

[0075] Exemplarily, L0=0.12 m.

[0076] Preferably, the position deviation corresponding to each real-time drilling position is compared with the preset allowable drilling position deviation. When the position deviation corresponding to a real-time drilling position is greater than the preset allowable drilling position deviation, the drilling direction corresponding to the real-time drilling position needs to be adjusted, otherwise no adjustment is required.

[0077] Exemplarily, the allowable drilling position deviation is 0.08.

[0078] Further preferably, the coordinates of the corresponding real-time drilling position determined to need to be adjusted in drilling direction are extracted, and the coordinates of the planned drilling position corresponding to the drilling time are extracted, and then the drill direction is adjusted so that the path adjustment direction points to the planned drilling position.

[0079] The real-time position coordinates (x 实时 ,y 实时 ,z 实时 ) and the planned drilling position coordinates (x t ,y t ,z t ) into the calculation formula The path offset distance is obtained, and then the drill adjustment amplitude is obtained according to the path offset distance.

[0080] It should be noted that the present invention adjusts the drilling path in real time by calculating the deviation between the actual position of the drill bit and the planned drilling position during the drilling process. Timely adjustment can avoid repeated drilling or correction work caused by deviation from the planned path, thereby saving drilling time, improving drilling efficiency, and avoiding drilling failure or waste of resources caused by excessive deviation.

[0081] The operating drilling parameter analysis module is used to set a rotation speed sensor and a pressure sensor on the drill bit to collect operating drilling parameters, wherein the rotation speed sensor is used to collect the operating drill bit rotation speed, and the pressure sensor is used to collect the operating extrusion force, and then analyze the deviation of the operating drilling parameters.

[0082] Preferably, the operating drill bit speed N corresponding to each real-time drilling position is 运行 (x,y,z), running force F 运行 (x,y,z), planning drill speed N 规划 (x,y,z) and the planned squeeze force F 规划 Substitute (x,y,z) into the calculation formula Get the deviation of the operating drilling parameters λ of each real-time drilling position 运行 (x, y, z), where α1 and α2 represent the weights of the operating drill speed and the operating extrusion force, respectively.

[0083] Exemplarily, α1=0.4, α2=0.6.

[0084] It should be noted that the deviation of operating drilling parameters is caused by reduced equipment accuracy or program errors.

[0085] The planned drilling parameter analysis module is used to extract real-time geological distribution features from real-time geological images, analyze required drilling parameters, and further analyze deviations of planned drilling parameters.

[0086] It should be noted that the analysis of required drilling parameters refers to the analysis steps of the above-mentioned planned drilling parameters.

[0087] Preferably, real-time geological distribution features are extracted from real-time geological images.

[0088] Based on the real-time geological distribution characteristics, the real-time rock type and corresponding rock thickness are obtained, and the required drill speed N corresponding to each real-time drilling position is analyzed. 需求 (x,y,z) and the required crowding force F 需求 (x,y,z), and then jointly plan the drill speed N 规划 (x,y,z) and the planned squeeze force F 规划 Substitute (x,y,z) into the calculation formula Get the planned drilling parameter deviation λ of each real-time drilling position 规划 (x, y, z), where β1 and β2 represent the weights of the planned drill speed and the planned extrusion force, respectively.

[0089] Exemplarily, β1=0.55, β2=0.45.

[0090] It should be noted that the present invention collects real-time geological distribution characteristics during the actual drilling process, and then adjusts the planned drilling parameters by analyzing the planned drilling parameters. This analysis method fully considers the differences between the actual geological distribution characteristics and the exploration geological distribution characteristics, improves the accuracy and real-time adjustment of the drilling parameters, reduces the probability of accidents caused by exploration errors, and improves the efficiency of drilling operations.

[0091] The drilling parameter adjustment module is used to analyze the drilling parameter deviation based on the running drilling parameter deviation and the planned drilling parameter deviation and determine whether the drilling parameters need to be adjusted. If necessary, the real-time drilling position is recorded as an abnormal drilling position and the drilling parameters are adjusted.

[0092] Preferably, the deviation of the operating drilling parameters and the deviation of the planned drilling parameters corresponding to each real-time drilling position are summed up to obtain the deviation of the drilling parameters corresponding to each real-time drilling position.

[0093] The drilling parameter deviation corresponding to each real-time drilling position is compared with the preset allowable drilling parameter deviation. When the drilling parameter deviation corresponding to a real-time drilling position is greater than the preset allowable drilling parameter deviation, the drilling parameters of the real-time drilling position need to be adjusted, otherwise the drilling parameters of the real-time drilling position do not need to be adjusted.

[0094] Exemplarily, the drilling parameter deviation is allowed to be 0.05.

[0095] Further preferably, the planned drilling parameters and the operating drilling parameters corresponding to each abnormal drilling position are difference calculated to obtain an operating correction amount, and the operating correction is performed on the drilling parameters.

[0096] The required drilling parameters and planned drilling parameters corresponding to each abnormal drilling position are calculated by difference to obtain the planned correction amount, and the planned correction is performed on the drilling parameters after operation correction.

[0097] It should be noted that the present invention comprehensively analyzes the operating errors caused by reduced equipment accuracy and the planning errors caused by errors in the exploration geological distribution, and thus accurately obtains the errors of equipment parameters during the drilling process. Based on the actual error conditions, the drilling parameters can be more accurately adjusted, avoiding the occurrence of accidents caused by parameter misadjustment due to equipment parameter errors that affect the safety of construction operations.

[0098] The drilling quality analysis module is used to count and analyze the frequency of abnormal drilling parameters and abnormal operation index at each abnormal drilling position, and then analyze the drilling abnormality.

[0099] Preferably, the operating drilling parameters corresponding to each abnormal drilling position are extracted and substituted into the analysis formula The deviation amplitude of the operating drilling parameters is obtained, specifically including the deviation amplitude of the operating drill bit speed and the deviation amplitude of the operating extrusion force, and then compared with the preset allowable deviation amplitude of the operating drilling parameters. When the deviation amplitude of the operating drilling parameters corresponding to an abnormal drilling position is greater than the allowable deviation amplitude of the operating drilling parameters, the abnormal drilling position has an operating drilling parameter abnormality, otherwise there is no operating drilling parameter abnormality.

[0100] The abnormal drilling positions with abnormal operation drilling parameters are recorded as abnormal operation drilling positions, and the frequency of abnormal operation is recorded.

[0101] The deviation amplitudes of the operation drilling parameters corresponding to each abnormal operation drilling position are averaged to obtain the operation abnormality index.

[0102] The drilling anomaly index is obtained using the formula drilling anomaly index = operation anomaly frequency * operation anomaly index.

[0103] The exploration quality analysis module is used to count and analyze the frequency of abnormal planned drilling parameters and the planned abnormality index at each abnormal drilling position, and then analyze the exploration abnormality.

[0104] Preferably, the required drilling parameters corresponding to each abnormal drilling position are extracted and substituted into the analysis formula The planned drilling parameter deviation amplitude is obtained, specifically including the planned drill speed deviation amplitude and the planned extrusion force deviation amplitude, and then compared with the preset allowable planned drilling parameter deviation amplitude. When the planned drilling parameter deviation amplitude corresponding to an abnormal drilling position is greater than the allowable planned drilling parameter deviation amplitude, the abnormal drilling position has a planned drilling parameter abnormality, otherwise there is no planned drilling parameter abnormality.

[0105] The abnormal drilling positions with abnormal operating drilling parameters are recorded as planned abnormal drilling positions, and the planned abnormal frequency is recorded.

[0106] The planning anomaly index is obtained by calculating the mean deviation of the planned drilling parameters corresponding to each planned abnormal drilling position.

[0107] The exploration anomaly index is obtained using the formula exploration anomaly index = planned anomaly frequency * planned anomaly index.

[0108] The abnormal tendency analysis module is used to analyze the construction abnormality orientation based on the drilling abnormality index and the exploration abnormality index, wherein the construction abnormality specifically includes the exploration abnormality and the drilling abnormality.

[0109] Preferably, the drilling anomaly index and the exploration anomaly index obtained by analysis are compared. When the drilling anomaly index is greater than the exploration anomaly index, the construction anomaly points to the drilling anomaly. When the drilling anomaly index is less than the exploration anomaly index, the construction anomaly points to the exploration anomaly.

[0110] It should be noted that drilling anomalies refer to anomalies caused by reduced equipment accuracy or inability to operate the equipment during the drilling process, and exploration anomalies refer to anomalies caused by the deviation between the geological information explored in the preliminary exploration process and the actual geological information.

[0111] It should be noted that the present invention analyzes the deviation of equipment operating parameters during the drilling process and the deviation between exploration and actual geological distribution characteristics, and then analyzes the direction of construction anomalies to form a closed-loop analysis, which can more accurately obtain the construction quality of exploration and drilling operations during the construction process, thereby improving the accuracy of engineering quality analysis and the targeted nature of improvement.

[0112] The data repository is used to store the rock type impact index information table.

[0113] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. An intelligent control system for directional drilling equipment, characterized in that: The system includes: The drilling data planning module is used to establish a coordinate system at the exploration location and perform geological exploration based on the planned drilling path to obtain a geological distribution image, wherein the geological distribution image includes the geological distribution location and geological distribution characteristics, and then perform drilling parameter planning for different drilling locations; The drilling parameters are specifically the drill bit speed and the penetration force; A drilling execution module is used to set a locator and a drilling camera on the drill bit, and when the drill bit is conducting exploration along the planned drilling path, the locator locates the real-time drilling position, and the drilling camera collects real-time geological images of the corresponding drilling position; The drilling path adjustment module is used to analyze the position deviation of the real-time drilling position, and then determine whether the drilling direction of the drill bit needs to be adjusted. If necessary, the path adjustment direction and the drill bit adjustment range are analyzed to adjust the drilling path. The drilling parameter analysis module is used to set a rotation speed sensor and a pressure sensor on the drill bit to collect the drilling parameters, wherein the rotation speed sensor is used to collect the drilling speed, and the pressure sensor is used to collect the extrusion force, so as to analyze the deviation of the drilling parameters; The planned drilling parameter analysis module is used to extract the real-time geological distribution characteristics from the real-time geological image and analyze the required drilling parameters, and then analyze the deviation of the planned drilling parameters; A drilling parameter adjustment module is used to analyze the deviation of drilling parameters based on the deviation of running drilling parameters and the deviation of planned drilling parameters and determine whether the drilling parameters need to be adjusted. If necessary, the real-time drilling position is recorded as an abnormal drilling position and the drilling parameters are adjusted; The drilling quality analysis module is used to count and analyze the frequency of abnormal drilling parameters and abnormal operation index at each abnormal drilling location, and then analyze the drilling abnormality; The exploration quality analysis module is used to count and analyze the frequency of abnormal planned drilling parameters and the planned abnormality index at each abnormal drilling location, and then analyze the exploration abnormality; The abnormal tendency analysis module is used to analyze the construction abnormality direction based on the drilling abnormality index and the exploration abnormality index, where the construction abnormality specifically includes the exploration abnormality and the drilling abnormality; A data repository for storing rock type impact index information tables; The steps of analyzing the deviation of drilling parameters are as follows: The running drill speed corresponding to each real-time drilling position , Operation squeeze force , planning drill speed and planning squeeze force Substitute into the calculation formula Get the deviation of the operating drilling parameters at each real-time drilling position ,in Respectively represent the weights of the operating drill bit speed and the operating extrusion force; The deviation of the analysis and planning drilling parameters is as follows: Extract real-time geological distribution features from real-time geological images; Based on the real-time geological distribution characteristics, the real-time rock type and corresponding rock thickness are obtained, and the required drill speed corresponding to each real-time drilling position is analyzed. and demand crowding out , and then jointly plan the drill speed and planning squeeze force Substitute into the calculation formula Get the deviation of planned drilling parameters at each real-time drilling position ,in They represent the weights of planned drill speed and planned penetration force respectively; The analysis of the drilling anomaly is as follows: Extract the operating drilling parameters corresponding to each abnormal drilling position and substitute them into the analysis formula Obtaining the deviation range of the operating drilling parameters, specifically including the deviation range of the operating drill bit speed and the deviation range of the operating extrusion force, and then comparing it with the preset allowable deviation range of the operating drilling parameters. When the deviation range of the operating drilling parameters corresponding to a certain abnormal drilling position is greater than the allowable deviation range of the operating drilling parameters, the abnormal drilling position has an abnormal operating drilling parameter, otherwise, the abnormal operating drilling parameter does not exist; Record the abnormal drilling position with abnormal operation drilling parameters as the abnormal operation drilling position, and record the abnormal operation frequency; The deviation amplitudes of the operation drilling parameters corresponding to each operation abnormal drilling position are averaged to obtain the operation abnormality index; Using the formula Obtain drilling anomaly index; The steps of analyzing the abnormal exploration situation are as follows: Extract the required drilling parameters corresponding to each abnormal drilling location and substitute them into the analysis formula Obtain the planned drilling parameter deviation range, specifically including the planned drill speed deviation range and the planned extrusion force deviation range, and then compare it with the preset allowable planned drilling parameter deviation range. When the planned drilling parameter deviation range corresponding to a certain abnormal drilling position is greater than the allowable planned drilling parameter deviation range, the abnormal drilling position has a planned drilling parameter abnormality, otherwise, there is no planned drilling parameter abnormality; The abnormal drilling positions with abnormal operating drilling parameters are recorded as planned abnormal drilling positions, and the planned abnormal frequency is recorded; The deviation amplitudes of the planned drilling parameters corresponding to each planned abnormal drilling position are averaged to obtain a planning abnormality index; Using the formula Get the exploration anomaly index.

2. The intelligent control system for directional drilling equipment according to claim 1, characterized in that: The geological distribution characteristics are specifically rock types and rock thickness; The steps for planning drilling parameters for different drilling positions are as follows: Extract the rock types and corresponding rock thicknesses at each geological distribution location in the planned drilling path of the exploration; Match the planned drilling location with the geological distribution location to obtain the rock type and corresponding rock thickness corresponding to the planned drilling location; Matching the rock type corresponding to each planned drilling position with the rock type impact index information table in the data storage library to obtain the rock impact index of the rock corresponding to each planned drilling position; Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned drill speed for each planned drilling position , where represents a natural constant; Substitute the rock impact index and rock thickness corresponding to each planned drilling location into the formula Get the planned penetration force of each planned drilling position , where unit extrusion force refers to the extrusion force corresponding to unit rock influence index; The planned drilling position corresponding to each drilling time is obtained according to the planned drill speed.

3. The intelligent control system for directional drilling equipment according to claim 1, characterized in that: The position deviation of the analysis of the real-time drilling position is specifically as follows: Extract the real-time drilling position located by the locator and record the coordinates of the position , and simultaneously obtain the drilling time corresponding to the real-time drilling position; Extract the planned drilling position coordinates corresponding to the drilling time , substitute into the formula Get the position deviation corresponding to each real-time drilling position ,in They represent the horizontal, vertical and vertical coordinates corresponding to the planned drilling position, respectively. Respectively represent the horizontal coordinate, vertical coordinate and vertical coordinate corresponding to the real-time drilling position, Indicates the reference distance.

4. The intelligent control system for directional drilling equipment according to claim 3, characterized in that: The determination of whether the drilling direction of the drill bit needs to be adjusted is specifically as follows: The position deviation corresponding to each real-time drilling position is compared with the preset allowable drilling position deviation. When the position deviation corresponding to a real-time drilling position is greater than the preset allowable drilling position deviation, the drilling direction corresponding to the real-time drilling position needs to be adjusted, otherwise it does not need to be adjusted; The analysis path adjustment direction and drill bit adjustment range are specifically as follows: Extracting the coordinates of the corresponding real-time drilling position for which the drilling direction needs to be adjusted, and extracting the coordinates of the planned drilling position corresponding to the drilling time, and then adjusting the drill direction so that the path adjustment direction points to the planned drilling position; The real-time position coordinates of the drill bit that need to be adjusted according to the drilling direction The planned drilling position coordinates corresponding to the drilling time Substitute into the calculation formula The path offset distance is obtained, and then the drill adjustment amplitude is obtained according to the path offset distance.

5. The intelligent control system for directional drilling equipment according to claim 1, characterized in that: The steps of analyzing the deviation of drilling parameters and determining whether the drilling parameters need to be adjusted are as follows: The deviation of the operating drilling parameters and the deviation of the planned drilling parameters corresponding to each real-time drilling position are summed up to calculate the deviation of the drilling parameters corresponding to each real-time drilling position; The drilling parameter deviation corresponding to each real-time drilling position is compared with the preset allowable drilling parameter deviation. When the drilling parameter deviation corresponding to a real-time drilling position is greater than the preset allowable drilling parameter deviation, the drilling parameter of the real-time drilling position needs to be adjusted, otherwise the drilling parameter of the real-time drilling position does not need to be adjusted; The steps for adjusting the drilling parameters are as follows: The planned drilling parameters and the operating drilling parameters corresponding to each abnormal drilling position are calculated by difference to obtain an operating correction amount, and the drilling parameters are corrected in operation; The required drilling parameters and planned drilling parameters corresponding to each abnormal drilling position are calculated by difference to obtain the planned correction amount, and the planned correction is performed on the drilling parameters after operation correction.

6. The intelligent control system for directional drilling equipment according to claim 1, characterized in that: The steps of analyzing construction abnormality are as follows: The drilling anomaly index and exploration anomaly index obtained by analysis are compared. When the drilling anomaly index is greater than the exploration anomaly index, the construction anomaly points to the drilling anomaly. When the drilling anomaly index is less than the exploration anomaly index, the construction anomaly points to the exploration anomaly.