A fan start-stop and early warning control system based on mine gas detection
By deploying data acquisition equipment and mobile wearable equipment in the mine, combining the mine twin model to simulate the gas exhaust path and optimize fan control, the problem of traditional systems being unable to predict gas diffusion and poor ventilation control in a timely manner, and efficient and safe gas is achieved emission.
Patent Information
- Application Number
- CN202410982504.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-22
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2044-07-22
AI Technical Summary
Traditional mine gas detection and ventilation control systems cannot predict the gas diffusion trend in a timely manner, and lack of intelligent ventilation control, resulting in poor control of harmful gas concentrations, increasing the safety risks of miners.
Using a fan start-stop and early warning control system based on mine gas detection, collect environmental and equipment data through the data acquisition module, mobile wearable equipment tracks personnel locations, and use mine twin models to simulate gas exhaust paths, combining exhaust efficiency and energy consumption planning. Optimize exhaust paths and adjust fan control parameters in real time to optimize ventilation strategies.
Accurate monitoring and prediction of gas concentration changes is achieved, fan control strategies are optimized, exhaust efficiency and safety are improved, miners are ensured, and accident risks are reduced.
Smart Images

Figure CN118517293B_ABST
Abstract
Description
Technical Field
[0001] The present application belongs to the field of mine safety and relates to mine ventilation and early warning control technology, specifically a fan start-stop and early warning control system based on mine gas detection. Background Art
[0002] The mine working environment, due to its closed and complex characteristics, has become a high-incidence area for accidents caused by abnormal gas concentration. There are many types of gases in the mine, mainly including gas (methane), carbon dioxide, carbon monoxide, etc. Traditional artificial gas detection and manual ventilation control methods are difficult to effectively protect the lives of miners due to their inherent limitations, such as slow response speed, limited coverage, and untimely warning. Especially in the early stage of abnormal gas diffusion, manual detection often cannot be detected in time, resulting in delayed warning. In addition, the inefficiency of manual control ventilation equipment causes the concentration of harmful gases to rise rapidly, posing great danger to mine workers.
[0003] Although the current gas detection and early warning system can monitor the changes in gas concentration to a certain extent, it has obvious deficiencies in predicting gas diffusion trends, intelligent ventilation control, and personnel safety protection. For example, when the system detects gas anomalies, it can issue an early warning, but the prediction of the gas diffusion path is often not accurate enough, making it difficult to effectively guide personnel to avoid risks; at the same time, the lack of linkage control with ventilation equipment leads to poor control of harmful gas concentrations, increasing the risk of personnel being exposed to dangerous environments.
[0004] Therefore, there is an urgent need for a fan start-stop and early warning control system based on mine gas detection to solve the above problems. Summary of the invention
[0005] The present application aims to solve at least one of the technical problems existing in the prior art; to this end, the present application proposes a fan start-stop and early warning control system based on mine gas detection, which is used to solve the problem that the prior art solves the impact of harmful gases inside the mine on the workers during the exhaust process, as well as the lack of exhaust path planning based on exhaust path, exhaust efficiency and exhaust energy consumption factors. The present invention collects environmental data, detection data and equipment data through data acquisition equipment arranged in the mine, and at the same time, uses mobile wearable devices to track the location, working hours and activity trajectory of the workers in real time. Gases with concentrations exceeding the threshold are marked as risk gases, and the exhaust path of risk gases is simulated through the mine twin model. According to the exhaust path, exhaust efficiency and exhaust energy consumption of risk gases, as well as the status data, an optimal exhaust path is finally selected to solve the above problems.
[0006] To achieve the above objectives, the first aspect of the present application provides a fan start-stop and early warning control system based on mine gas detection, comprising:
[0007] Data acquisition module: used to collect basic data through data acquisition equipment set in the mine; wherein the basic data includes environmental data, detection data and equipment data; and,
[0008] Collecting status data of workers through mobile wearable devices; wherein the status data includes location, working hours and activity trajectory, and the detection data includes gas concentration and detection location;
[0009] Data processing module: used to determine whether the gas concentration is greater than the gas concentration threshold; if yes, the gas at the corresponding detection position is marked as risky gas; if no, the gas at the corresponding detection position is marked as non-risky gas;
[0010] When there is risk gas at the detection location, the exhaust process of risk gas is simulated based on the mine twin model to obtain several original exhaust paths; the several original exhaust paths are sorted according to the path planning principle to obtain a path sorting table; wherein, the mine twin model is constructed based on basic data and digital twin technology;
[0011] Risk control module: used to combine the status data to determine in sequence whether the exhaust of several original exhaust paths in the path sorting table will have an impact on the staff; if so, determine the next original exhaust path; if not, mark the corresponding path as the optimal exhaust path and exhaust according to the optimal exhaust path.
[0012] This application deploys a high-density, multi-parameter sensor network to collect key indicator data such as gas concentration, temperature, wind speed, etc. in the mine in real time, accurately predict the changing trend of the gas environment in the future, and promptly identify potential safety risks. With the help of digital twin technology, a virtual simulation model of the internal environment of the mine can be created to accurately simulate the gas diffusion process under different working conditions, providing intuitive and accurate data support for risk assessment and emergency plan formulation. By analyzing the gas diffusion effect under different ventilation strategies, the fan control strategy is optimized to ensure personnel safety and production efficiency.
[0013] Preferably, the mine twin model is constructed based on basic data and digital twin technology, including:
[0014] Extracting the mine layout map and environmental data and equipment data from the basic data; the equipment data includes the location of the data acquisition equipment and fan data, and the fan data includes fan displacement and fan position;
[0015] Based on the mine layout map, environmental data and equipment data, a digital twin model of the mine is obtained based on digital twin technology and marked as a mine twin model.
[0016] This application builds a mine twin model based on digital twin technology and the basic data collected in the mine. Before exhaust, the mine twin model is updated through the basic data collected in real time to ensure that it can truly reflect the current environmental status of the mine. When exhaust is required, the air pressure is adjusted by adjusting the fan speed or rotation direction of multiple fans, and the status data of the staff is collected through mobile wearable devices. It is possible to intuitively observe the changes in gas flow and personnel distribution inside the mine, providing data support for risk prevention.
[0017] Preferably, the obtaining of a plurality of original exhaust paths includes:
[0018] Update the mine twin model based on environmental data and extract fan displacement from fan data;
[0019] According to the fan displacement and the updated mine twin model, several original exhaust paths for risky gases are planned; among them, several original exhaust paths are planned and obtained under the normal working condition of the fan.
[0020] When the gas concentration exceeds the gas concentration threshold, the gas at the corresponding detection position will be marked as a risky gas, that is, the risky gas needs to be discharged in time to avoid causing safety problems. The present application adjusts the fan through the mine twin model to simulate and obtain multiple paths for the discharge of risky gases, namely the original exhaust paths. When the fans in the mine are working normally, these original exhaust paths can discharge the risky gases out of the mine, thereby eliminating safety hazards. It should be noted that the gases in the detection data collected by the data acquisition equipment in the present application refer to gases that may affect the internal safety of the mine or the health of the workers, such as methane, carbon monoxide, etc.
[0021] Preferably, the sorting of the plurality of original exhaust paths according to the path planning principle includes:
[0022] During the simulation of the mine twin model, the exhaust efficiency and exhaust energy consumption of several original exhaust paths are extracted and marked as PX and PN respectively;
[0023] The exhaust evaluation coefficient PPX is calculated by the formula PPX=α1×PX+α2 / PN; several original exhaust paths are sorted from large to small according to the exhaust evaluation coefficient PPX to obtain a path sorting table; wherein α1 and α2 are weight coefficients, and α1≥α2+0.2.
[0024] When the internal passages of a mine are more complex, multiple original exhaust paths will be planned for risk gases at the same detection location based on the sufficiently accurate twin model of the mine. However, during the exhaust process, it is necessary to consider the efficiency of discharging risk gases from the mine and the energy consumption required. Therefore, several original exhaust paths are sorted from the perspective of exhaust efficiency and energy consumption to obtain a path sorting table. In the path sorting table, the higher the ranking of the original exhaust path, the better the comprehensive performance of exhaust efficiency and energy consumption. When evaluating from the two perspectives of exhaust efficiency and exhaust energy consumption, the exhaust efficiency accounts for a larger proportion, and the energy consumption required for exhaust accounts for a smaller proportion.
[0025] Preferably, the combined state data is used to sequentially determine whether the exhaust of several original paths in the path sorting table will have an impact on the staff, including:
[0026] Select an original exhaust path from the path sorting table in order, and mark it as the target exhaust path;
[0027] According to the status data, it is determined whether there is a worker on the target exhaust path; if yes, proceed to the next step; if no, it is determined that exhausting according to the target exhaust path will not affect the worker;
[0028] Determine whether the staff will encounter risky gases during the process of evacuating to a safe location; if so, determine that exhaust according to the target exhaust path will have an impact on the staff; otherwise, determine that there is no impact.
[0029] The exhaust in the mine must not only ensure high exhaust efficiency and low energy consumption, but also ensure that the risk gases in the exhaust process will not affect the workers in the mine. Therefore, this application selects the original exhaust path from the path sorting table in turn to determine whether the original exhaust path will intersect with the workers in the mine. Once the workers are on the original exhaust path, it will have an impact on the workers. Otherwise, the original exhaust path can be used as the optimal exhaust path.
[0030] Preferably, the step of determining whether the worker encounters the risk gas during the process of evacuating to a safe location includes:
[0031] S1: Mark the path for the staff to evacuate from their current location to a safe location as the evacuation path;
[0032] S2: Determine whether the evacuation path overlaps with the target exhaust path; if yes, mark the end point of the overlapping path as the reference position and jump to S3; if no, jump to S5;
[0033] S3: Calculate the time required for the risk gas to reach the reference position along the target exhaust path, marked as BS1; and the time required for the staff to reach the reference position along the evacuation path, marked as CS1;
[0034] S4: When BS1≥CS1+RS, it is determined that the staff did not encounter the risk gas during the evacuation process; otherwise, it is determined that the staff did encounter the risk gas during the evacuation process; RS is the sum of the response time of the warning equipment and the staff;
[0035] S5: Calculate the time required for the risk gas to reach the worker's position along the target exhaust path, marked as BS2;
[0036] S6: When BS2≥RS, it is determined that the staff has no intersection with the risk gas during the evacuation process; otherwise, it is determined that the staff has intersection with the risk gas during the evacuation process.
[0037] When risky gases are detected in the mine, an early warning will be issued. After receiving the early warning, the staff should evacuate to a safe location immediately. In order to ensure the exhaust efficiency of risky gases, exhaust must be completed as soon as possible. Therefore, during the evacuation of staff, that is, the fan is controlled to start exhausting. At this time, it is necessary to pay attention to the fact that risky gases and staff cannot intersect during the exhaust process. This application determines the reference position through the overlapping area of the evacuation path and the target exhaust path, and calculates whether the risky gas will intersect with the staff based on the reference position, so as to achieve further evaluation of the target exhaust path.
[0038] Preferably, the exhausting according to the optimal exhaust path includes:
[0039] Extracting the fan control parameters corresponding to the optimal exhaust path during the mine twin model simulation process; wherein the fan control parameters include rotation direction and fan speed;
[0040] The fans in the mine are controlled according to the fan control parameters so that the risky gases are discharged along the optimal exhaust path.
[0041] After determining the optimal exhaust path, the present application extracts the fan control parameters in the process of obtaining the optimal exhaust path. That is, in the digital twin model, the fan can be adjusted according to the fan control parameters to achieve efficient discharge of risky gases, and the discharge process will not affect the workers in the mine.
[0042] Compared with the prior art, the beneficial effects of this application are:
[0043] 1. This application realizes accurate monitoring of gas concentration changes by collecting mine environmental data in real time. The exhaust path of harmful gases is determined by simulating ventilation equipment using digital twin technology, and the accurate prediction of the exhaust path of harmful gases lays the foundation for subsequent path selection; the exhaust path is comprehensively measured from the perspective of exhaust efficiency and exhaust energy consumption, making the exhaust path more economical and efficient; finally, an economical, efficient and safe exhaust path is selected by considering the impact of the exhaust path on the staff.
[0044] 2. This application combines the location, working hours and activity trajectory of the staff, which can not only intelligently assess the risks, but also guide the safe evacuation of personnel, ensure the safety of personnel, and improve the overall safety of mine operations. At the same time, through continuous collection and analysis of data, it provides a solid data foundation for accident prevention and emergency response. BRIEF DESCRIPTION OF THE DRAWINGS
[0045] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0046] Figure 1 A fan start / stop and early warning control system based on mine gas detection according to an embodiment of the present application;
[0047] Figure 2 A schematic diagram of the flow chart of the intersection of the evaluation and risk gas of the embodiment of the present application;
[0048] Figure 3 This is a schematic diagram of the risk gas emission path of an embodiment of the present application. DETAILED DESCRIPTION
[0049] The technical solution of the present application will be described clearly and completely in conjunction with the embodiments below. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
[0050] See also Figure 1 The first aspect of the present application provides a fan start-stop and early warning control system based on mine gas detection, including:
[0051] Data acquisition module: used to collect basic data through data acquisition equipment set in the mine; wherein the basic data includes environmental data, detection data and equipment data; and,
[0052] Collecting status data of workers through mobile wearable devices; wherein the status data includes location, working hours and activity trajectory, and the detection data includes gas concentration and detection location;
[0053] Data processing module: used to determine whether the gas concentration is greater than the gas concentration threshold; if yes, the gas at the corresponding detection position is marked as risky gas; if no, the gas at the corresponding detection position is marked as non-risky gas;
[0054] When there is risk gas at the detection location, the exhaust process of risk gas is simulated based on the mine twin model to obtain several original exhaust paths; the several original exhaust paths are sorted according to the path planning principle to obtain a path sorting table; wherein, the mine twin model is constructed based on basic data and digital twin technology;
[0055] Risk control module: used to combine the status data to determine whether the exhaust of several original paths in the path sorting table will have an impact on the staff; if yes, determine the next original exhaust path; if not, mark the corresponding path as the optimal exhaust path and exhaust according to the optimal exhaust path.
[0056] The data processing module is connected to the data acquisition module and the risk control module respectively. The data acquisition module collects basic data through the data acquisition equipment installed in the mine, and sends the basic data to the data processing module in real time. The data processing module builds and updates the mine twin model based on the basic data, and at the same time judges the gas concentration and simulates the path sorting table. The risk control module determines whether the original exhaust path in the path sorting table will affect the workers in the mine, and then selects the optimal exhaust path, controls the fan according to the optimal exhaust path, and completes the exhaust work.
[0057] Data collection equipment refers to various sensors installed in the mine, such as air pressure sensors, temperature sensors, humidity sensors, etc. that collect environmental data, and gas detectors that collect detection data; equipment data includes fan (ventilation equipment) location, fan displacement and speed data. Mobile wearable devices include smart watches, smart bracelets and other devices, which are mainly used to collect the real-time location and activity trajectory of staff members. Data collected by smart wearable devices can also be used to determine whether staff members are in working condition.
[0058] In this embodiment, the mine twin model is constructed based on basic data and digital twin technology, and is mainly used to simulate the state in the mine and obtain several original exhaust paths by adjusting the input parameters. Specifically, before establishing the mine twin model, it is necessary to obtain basic data and mine layout diagrams, which include all shafts, working faces, ventilation systems, transportation systems, equipment and facilities, etc. These data are parameterized and combined with the digital twin construction software to construct a mine twin model of the mine. By adjusting the input parameters of the mine twin model, the corresponding changes in the mine can be simulated.
[0059] Discharging risky gases in a mine along an optimal path means performing exhaust control using fan control parameters obtained when simulating the optimal discharge path using a mine twin model. That is, according to the fan control parameters (including the rotation speed and direction of each fan, etc.), risky gases in a mine can be discharged from the mine without affecting the health of the workers.
[0060] In a preferred embodiment, several original exhaust paths for the discharge of risky gases are simulated by adjusting the input parameters of the mine twin model. Specifically:
[0061] The detection data collected in real time by the data acquisition equipment is used to determine whether the gas concentration in the mine exceeds the set gas concentration threshold; if it exceeds, the gas is marked as a risk gas. It should be noted that risk gas specifically refers to the current concentration of the gas that can affect the safety of the mine or the health of the workers in the mine, and the ventilation equipment needs to be controlled to discharge the risk gas.
[0062] After determining the risk gas, the mine twin model is updated through the corresponding basic data, and then the parameters of the fan (ventilation equipment) are adjusted to control the discharge of risk gas. After continuous simulation, several original exhaust paths of risk gas can be obtained. During the simulation process, it is necessary to continuously adjust the fan speed, direction, etc. to simulate and adjust the air pressure changes in the mine, and then discharge the risk gas from the mine. It should be noted that the simulation adjustment of the fan is based on the current actual parameters, which helps to adjust the fan according to the simulation results. If the current fan speed is 730r / min, and the simulation requires 1480r / min to discharge the risk gas, then in the subsequent actual adjustment process, the fan speed can be adjusted from 730r / min to 1480r / min. Of course, there is also the duration of the fan speed during the simulation process.
[0063] It is worth noting that there may be risk gases at multiple detection locations in the mine at the same time. When planning the exhaust path of risk gases in the digital twin model, the risk gases at multiple detection locations should be comprehensively considered. The planning goal is to complete the exhaust of risk gases at multiple detection locations through a set of adjustment actions, which can save energy and improve exhaust efficiency. Of course, when the risk gases at multiple detection locations cannot be exhausted through a set of adjustment actions, multiple sets of adjustment actions can also be planned to exhaust the risk gases at several detection locations separately. The adjustment action here refers to adjusting the rotation speed and direction of the fan.
[0064] In a preferred embodiment, a plurality of original exhaust paths are sorted according to the path planning principle. Specifically:
[0065] During the simulation of the mine twin model, the exhaust efficiency and exhaust energy consumption of several original exhaust paths are extracted and marked as PX and PN respectively;
[0066] The exhaust evaluation coefficient PPX is calculated by the formula PPX=α1×PX+α2 / PN; several original exhaust paths are sorted from large to small according to the exhaust evaluation coefficient PPX to obtain a path sorting table; wherein α1 and α2 are weight coefficients, and α1≥α2+0.2.
[0067] It should be noted that the exhaust efficiency directly affects whether the mine can escape the influence of risky gases and resume production operations; the exhaust energy consumption will increase the operating costs inside the mine. Compared with the operating costs, the exhaust efficiency is more important.
[0068] In a preferred embodiment, by combining the state data, it is determined in sequence whether the exhaust of several original paths in the path sorting table will have an impact on the staff, including:
[0069] Select an original exhaust path from the path sorting table in order, and mark it as the target exhaust path;
[0070] It is determined based on the status data whether there are workers on the target exhaust path; if yes, proceed to the next step; if not, it is determined that exhausting according to the target exhaust path will not affect the workers.
[0071] Determine whether the staff will encounter risky gases during the process of evacuating to a safe location; if so, determine that exhaust according to the target exhaust path will have an impact on the staff; otherwise, determine that there is no impact.
[0072] It should be noted that the choice of exhaust path is ultimately based on the safety of the staff. Therefore, it is necessary to determine whether the staff is on the exhaust path. If so, it is necessary to determine whether it will affect the staff, and then further screen the exhaust path. The fact that the staff is on the exhaust path at the current moment does not mean that the risk gas will definitely have an impact on the health of the staff. If the risk gas overlaps with the normal working trajectory of the staff in space during the exhaust process along the target exhaust path, but does not overlap in time, then in this case the risk gas will not affect the staff. Therefore, this situation needs to be further analyzed to improve the accuracy of fan control.
[0073] When workers receive a warning of risky gas, they need to evacuate to a safe location immediately. If they encounter risky gas in time and space during the evacuation process, it is likely to have an impact on the health of the workers. Therefore, it is necessary to further determine whether the workers will be affected by risky gas during the entire evacuation process.
[0074] See also Figure 2 , evaluate process steps that interact with risk gases, including:
[0075] S1: Mark the path for the staff to evacuate from their current location to a safe location as the evacuation path;
[0076] S2: Determine whether the evacuation path overlaps with the target exhaust path; if yes, mark the end point of the overlapping path as the reference position and jump to S3; if no, jump to S5;
[0077] S3: Calculate the time required for the risk gas to reach the reference position along the target exhaust path, marked as BS1; and the time required for the staff to reach the reference position along the evacuation path, marked as CS1;
[0078] S4: When BS1≥CS1+RS, it is determined that the staff did not encounter the risk gas during the evacuation process; otherwise, it is determined that the staff did encounter the risk gas during the evacuation process; RS is the sum of the response time of the warning equipment and the staff;
[0079] S5: Calculate the time required for the risk gas to reach the worker's position along the target exhaust path, marked as BS2;
[0080] S6: When BS2≥RS, it is determined that the staff has no intersection with the risk gas during the evacuation process; otherwise, it is determined that the staff has intersection with the risk gas during the evacuation process.
[0081] The evacuation process of the staff mainly consists of two time periods: one is the detection of risk gas and alarm, and the other is the staff receiving the alarm signal and starting to evacuate. Therefore, when judging whether there is an intersection in time, it is necessary to take into account the time of detecting the risk gas alarm and the reaction time of the staff receiving the warning signal and starting to evacuate.
[0082] The safe position in this embodiment can be a safe area pre-set in the mine, which is fixed; of course, it can be a safe area relative to the target exhaust path corresponding to the risk gas, that is, when the staff evacuates from the target exhaust path, they evacuate to the safe area.
[0083] See also Figure 3 , schematic diagram of risk gas emission pathways, including:
[0084] The location where risky gas is generated is random, so there are many possibilities for the location of risky gas and personnel. The following three situations are the most common, namely situation one, situation two and situation three.
[0085] Case 1: The risk gas is at position one, the staff is at position three, and the overlapping part of the exhaust path of the risk gas and the evacuation path of the staff is from the reference position to position three.
[0086] Case 2: The risk gas is at position one, the staff is at position, and the overlapping part of the exhaust path of the risk gas and the evacuation path of the staff is from position two to the reference position.
[0087] Case 3: The risk gas is at position one, the staff is at the reference position, and the overlapping part of the exhaust path of the risk gas and the evacuation path of the staff is the reference position.
[0088] For these three situations, RS is fixed; the difference is that in situations one and two, the evacuation path of the staff partially overlaps with the target exhaust path of the risk gas; while in situation three, the staff only needs to go directly to a safe position.
[0089] Therefore, for situations one and two, after the staff receives the signal from the early warning device and responds, they enter a safe position before the risk gas reaches the reference position. In this case, the staff will not come into contact with the risk gas, and the target discharge path of the risk gas will not affect the staff.
[0090] Therefore, for situation three, as long as RS is less than BS2, the workers will not come into contact with the risk gas.
[0091] It is worth noting that mines are generally equipped with dedicated ventilation channels. If risky gases appear in the ventilation channels, then in theory there is no overlapping path between the discharge of risky gases and the workers. However, if risky gases are not generated in the ventilation channels, there is a high probability that they will intersect with the workers during the discharge process and then be discharged through the ventilation channels.
[0092] Part of the data in the above formula is calculated by removing the dimension and taking its numerical value. The formula is a formula closest to the actual situation obtained by software simulation of a large amount of collected data; the preset parameters and preset thresholds in the formula are set by technical personnel in this field according to actual conditions or obtained through simulation of a large amount of data.
[0093] The working principle of this application is to collect environmental data, detection data and equipment data through data acquisition equipment arranged in the mine, and use mobile wearable devices to track the location, working hours and activity trajectory of the staff in real time. The presence of risky gas is determined based on the gas concentration. If risky gas is present, the discharge path of the risky gas is simulated through the mine twin model. The discharge path and status data are used to determine whether it affects the staff, and then an optimal exhaust path is selected to discharge the risky gas in the mine.
[0094] The above embodiments are only used to illustrate the technical method of the present application and are not intended to limit it. Although the present application has been described in detail with reference to the preferred embodiments, a person of ordinary skill in the art should understand that the technical method of the present application may be modified or replaced by equivalents without departing from the spirit and scope of the technical method of the present application.
Claims
1. A fan start-stop and early warning control system based on mine gas detection, characterized in that: Data acquisition module: used to collect basic data through data acquisition equipment set in the mine; wherein the basic data includes environmental data, detection data and equipment data; and, Collecting status data of workers through mobile wearable devices; wherein the status data includes location, working hours and activity trajectory, and the detection data includes gas concentration and detection location; Data processing module: used to determine whether the gas concentration is greater than the gas concentration threshold; if yes, the gas at the corresponding detection position is marked as risky gas; if no, the gas at the corresponding detection position is marked as non-risky gas; When there is risk gas at the detection location, the exhaust process of risk gas is simulated based on the mine twin model to obtain several original exhaust paths; the several original exhaust paths are sorted according to the path planning principle to obtain a path sorting table; wherein, the mine twin model is constructed based on basic data and digital twin technology; Risk control module: used to determine in sequence, based on the status data, whether exhaust along several original exhaust paths in the path sorting table will have an impact on the staff; if so, determine the next original exhaust path; if not, mark the corresponding path as the optimal exhaust path and exhaust according to the optimal exhaust path; The step of sorting the plurality of original exhaust paths according to the path planning principle includes: During the simulation of the mine twin model, the exhaust efficiency and exhaust energy consumption of several original exhaust paths are extracted and marked as PX and PN respectively; The exhaust evaluation coefficient PPX is calculated by the formula PPX=α1×PX+α2 / PN; a number of original exhaust paths are sorted from large to small according to the exhaust evaluation coefficient PPX to obtain a path sorting table; wherein α1 and α2 are weight coefficients, and α1≥α2+0.2; The combined state data is used to sequentially determine whether the exhaust of several original paths in the path sorting table will have an impact on the staff, including: Select an original exhaust path from the path sorting table in order, and mark it as the target exhaust path; According to the status data, it is determined whether there is a worker on the target exhaust path; if yes, proceed to the next step; if no, it is determined that exhausting according to the target exhaust path will not affect the worker; Determine whether the staff will encounter risky gases during the process of evacuating to a safe location; if so, it is determined that exhausting according to the target exhaust path will have an impact on the staff; otherwise, it is determined that there is no impact; The determination of whether the staff encounters hazardous gases during the process of evacuating to a safe location includes: S1: Mark the path for the staff to evacuate from their current location to a safe location as the evacuation path; S2: Determine whether the evacuation path overlaps with the target exhaust path; if yes, mark the end point of the overlapping path as the reference position and jump to S3; if no, jump to S5; S3: Calculate the time required for the risk gas to reach the reference position along the target exhaust path, marked as BS1; and the time required for the staff to reach the reference position along the evacuation path, marked as CS1; S4: When BS1≥CS1+RS, it is determined that the staff did not encounter the risk gas during the evacuation process; otherwise, it is determined that the staff did encounter the risk gas during the evacuation process; RS is the sum of the response time of the warning equipment and the staff; S5: Calculate the time required for the risk gas to reach the worker's position along the target exhaust path, marked as BS2; S6: When BS2 ≥ RS, it is determined that the staff has no intersection with the risk gas during the evacuation process; otherwise, it is determined that the staff has intersection with the risk gas during the evacuation process; The exhausting according to the optimal exhaust path includes: Extracting the fan control parameters corresponding to the optimal exhaust path during the mine twin model simulation process; wherein the fan control parameters include rotation direction and fan speed; The fans in the mine are controlled according to the fan control parameters so that the risky gases are discharged along the optimal exhaust path.
2. A fan start-stop and early warning control system based on mine gas detection according to claim 1, characterized in that: The mine twin model is built based on basic data and digital twin technology, including: Extracting the mine layout map and environmental data and equipment data from the basic data; the equipment data includes the location of the data acquisition equipment and fan data, and the fan data includes fan displacement and fan position; Based on the mine layout map, environmental data and equipment data, a digital twin model of the mine is obtained based on digital twin technology and marked as a mine twin model.
3. A fan start-stop and early warning control system based on mine gas detection according to claim 1, characterized in that: The obtaining of a plurality of original exhaust paths comprises: Update the mine twin model based on environmental data and extract fan displacement from fan data; According to the fan displacement and the updated mine twin model, several original exhaust paths for risky gases are planned; among them, several original exhaust paths are planned and obtained under the normal working condition of the fan.
