A coordinated primary frequency modulation system and method for a water storage integrated power station
By setting up a central primary frequency regulation device in the water-storage integrated power station, the frequency regulation resources of the hydropower unit are coordinated, and the energy storage unit is used for collaborative adjustment when the frequency regulation capability of the hydropower unit is insufficient. This solves the problems of poor regulation consistency of the hydropower unit and short energy storage life. , realizing efficient coordinated primary frequency regulation of integrated water storage power stations.
Patent Information
- Application Number
- CN202410986760.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-23
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2044-07-23
AI Technical Summary
In the existing technology, the primary frequency regulation capabilities of hydropower units are uneven, resulting in poor regulation consistency and affecting the overall regulation effect. Moreover, when energy storage independently participates in primary frequency regulation, the service life is rapidly reduced but the benefits are low.
By setting up a central primary frequency regulation device in the water storage integrated power station, the frequency regulation resources of each hydropower unit are coordinated, and the energy storage unit converter is used to coordinate frequency regulation with the hydropower unit. It only participates in regulation when the frequency regulation capability of the unit is insufficient, extending the service life of energy storage. .
It realizes the overall coordination of regulating resources among hydropower units, improves the overall primary frequency regulation performance, reduces energy storage calls, and maximizes the service life of energy storage.
Smart Images

Figure CN118523357B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of grid-connected frequency regulation, and in particular to a coordinated primary frequency regulation system and method for a water-storage integrated power station. Background Art
[0002] With the acceleration of global energy transformation, the rapid growth of clean energy such as wind power and photovoltaics has increased the requirements for grid stability and regulation capabilities. How to use the existing conventional power sources to reasonably configure energy storage, coordinate the planning, design, construction, and operation of various power sources, give priority to the development of new energy, actively implement the improvement of the existing "wind, solar, water, fire, and storage integration", and steadily promote the incremental "wind, solar, water (storage) integration" has become a new challenge. Water-storage integrated power stations will play an increasingly important role in participating in the primary frequency regulation of the power grid and actively supporting the construction of new power systems.
[0003] In the related technology, each hydropower unit participates in the primary frequency regulation independently. However, the primary frequency regulation capabilities of each hydropower unit vary. For example, different water heads and powers lead to large differences in regulation time. If the hydropower unit group is not coordinated, each unit will independently collect and respond to the primary frequency regulation target. This may lead to problems such as poor regulation consistency between the hydropower units and reduced regulation effect, affecting the overall regulation effect. Energy storage has short regulation time and excellent regulation performance, and has gradually participated in the primary frequency regulation process. However, energy storage participating in primary frequency regulation independently faces the situation of rapid depreciation of service life but low benefits.
[0004] Therefore, there is an urgent need for a method that can coordinate the primary frequency regulation resources of hydropower units and apply hydropower units and energy storage together to primary frequency regulation. On the premise of ensuring that the overall regulation performance of hydropower units and energy storage meets the requirements, it is necessary to minimize the call of energy storage and maximize the service life of energy storage, so as to realize the coordinated primary frequency regulation of integrated water and storage power stations. Summary of the invention
[0005] In view of this, the present invention provides a water storage integrated power station coordinated primary frequency regulation system and method to solve the problem that the related technology does not coordinate the primary frequency regulation resources of the hydropower units, and the power station energy storage excessively participates in the primary frequency regulation, affecting the service life, and the water storage integrated power station cannot realize the coordinated primary frequency regulation.
[0006] In a first aspect, the present invention provides a coordinated primary frequency regulation system for a water storage integrated power station, the system comprising:
[0007] The central primary frequency regulation device is used to obtain the frequency of the power station grid connection point and determine whether the frequency of the power station grid connection point meets the preset frequency difference condition; when the frequency of the power station grid connection point meets the preset frequency difference condition, an adjustment instruction is generated and the corresponding frequency regulation instruction is allocated according to the received primary frequency regulation capability data of each hydropower unit and issued to each local primary frequency regulation unit respectively;
[0008] A plurality of hydroelectric generating units, each of which is equipped with a local primary frequency modulation unit and an energy storage unit; the energy storage unit is equipped with an energy storage unit converter; each local primary frequency modulation unit is connected to the central primary frequency modulation device via an optical fiber parallel port communication, for collecting the primary frequency modulation capability data of the hydroelectric generating unit and sending it to the central primary frequency modulation device, and controlling the frequency modulation operation of the hydroelectric generating unit and the energy storage unit converter according to the received frequency modulation instructions.
[0009] In an optional embodiment, the system further comprises a power station AGC device, which is used to receive the superior active power dispatching instruction and forward it to the central primary frequency regulation device and each local control unit; the local control unit is used to control the peak load operation of the hydropower unit according to the superior active power dispatching instruction;
[0010] When the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device is also used to send a locking instruction to the power station AGC device, and generate corresponding frequency regulation instructions according to the superior active dispatching instruction and the received primary frequency regulation capability data of each hydropower unit, and send them to each local primary frequency regulation unit respectively;
[0011] After receiving the blocking instruction, the power station AGC device stops forwarding the superior active power dispatching instruction to each local control unit.
[0012] In an optional embodiment, the on-site primary frequency regulation unit is also used to determine whether the independent regulation time of the hydropower unit is less than the preset regulation time, and when the independent regulation time of the hydropower unit is greater than the preset regulation time, the energy storage unit converter is started.
[0013] In a second aspect, the present invention provides a method for coordinated primary frequency regulation of a water storage integrated power station, the method being applied to a central primary frequency regulation device in a coordinated primary frequency regulation system of a water storage integrated power station, the method comprising:
[0014] Obtain the frequency of the power station's grid connection point;
[0015] Determine whether the frequency of the power station's grid connection point meets the preset frequency difference condition; when the frequency of the power station's grid connection point meets the preset frequency difference condition, generate an adjustment instruction and allocate the corresponding frequency regulation instruction according to the received primary frequency regulation capability data of each hydropower unit, and send it to each local primary frequency regulation unit respectively, so that each local primary frequency regulation unit can control the frequency regulation operation of the hydropower unit and the energy storage unit converter according to the received frequency regulation instruction.
[0016] In an optional embodiment, the method further includes:
[0017] When the frequency of the power station grid connection point meets the preset frequency difference condition, a blocking instruction is sent to the power station AGC device, so that the power station AGC device stops forwarding the superior active dispatching instruction to each local control unit;
[0018] The superior active power dispatching instruction is obtained, and corresponding frequency regulation instructions are generated according to the superior active power dispatching instruction, the adjustment instruction and the received primary frequency regulation capability data of each hydropower unit, and are respectively issued to each local primary frequency regulation unit.
[0019] In an optional implementation, the generating corresponding frequency regulation instruction according to the superior active power dispatch instruction and the received primary frequency regulation capability data of each hydropower unit includes:
[0020] Generate adjustment instructions according to the frequency-power droop curve;
[0021] Superimposing the adjustment instruction with the superior active power dispatch instruction to generate a total frequency modulation instruction;
[0022] Based on the primary frequency regulation capability data of each hydropower unit, the total frequency regulation instruction is respectively issued to each local primary frequency regulation unit.
[0023] In a third aspect, the present invention provides a coordinated primary frequency regulation device for a water storage integrated power station, the device comprising:
[0024] Frequency acquisition module, used to obtain the frequency of the power station grid connection point;
[0025] The frequency modulation module is used to determine whether the frequency of the power station grid connection point meets the preset frequency difference condition; when the frequency of the power station grid connection point meets the preset frequency difference condition, an adjustment instruction is generated and the corresponding frequency modulation instruction is allocated according to the received primary frequency modulation capability data of each hydropower unit, and then sent to each local primary frequency modulation unit respectively, so that each local primary frequency modulation unit can control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instruction.
[0026] In a fourth aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the computer instructions to execute the coordinated primary frequency modulation method of the integrated water storage power station of the first aspect or any corresponding embodiment thereof.
[0027] In a fifth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the method for coordinated primary frequency regulation of a water-storage integrated power station according to the first aspect or any corresponding embodiment thereof.
[0028] In a sixth aspect, the present invention provides a computer program product, comprising computer instructions for causing a computer to execute the method for coordinated primary frequency regulation of an integrated water storage power station according to the first aspect or any corresponding embodiment thereof.
[0029] The technical solution provided by this application may have the following beneficial effects:
[0030] The coordinated primary frequency regulation system of the integrated hydropower station provided in the present application determines whether the frequency of the power station grid connection point meets the preset frequency difference conditions through the central primary frequency regulation device. When the frequency of the power station grid connection point meets the preset frequency difference conditions, the corresponding frequency regulation instructions are generated according to the primary frequency regulation capability data of each unit and sent to each local primary frequency regulation unit respectively, so as to coordinate the regulation resources of each hydropower unit, eliminate the inconsistency of regulation between hydropower units, and improve the overall primary frequency regulation performance of the hydropower unit. Then, the local primary frequency regulation unit controls the frequency regulation operation of the hydropower unit and the energy storage unit converter according to the frequency regulation instruction, so that the energy storage unit only participates in the regulation when the primary frequency regulation capacity of the hydropower unit is insufficient, and reduces the energy storage call as much as possible while ensuring that the coordinated regulation performance of the hydropower unit and the energy storage unit meets the requirements, and maximizes the service life of the energy storage unit, so as to realize the coordinated primary frequency regulation of the integrated hydropower station. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0032] Figure 1 is a structural schematic diagram of a coordinated primary frequency regulation system of a water storage integrated power station according to an embodiment of the present invention;
[0033] Figure 2 It is a schematic flow chart of a method for coordinated primary frequency regulation of a water storage integrated power station according to an embodiment of the present invention;
[0034] Figure 3 is a flow chart of another method for coordinated primary frequency regulation of a water storage integrated power station according to an embodiment of the present invention;
[0035] Figure 4 is a structural block diagram of a coordinated primary frequency regulation device for a water storage integrated power station according to an embodiment of the present invention;
[0036] Figure 5 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.
[0038] With the acceleration of global energy transformation, the rapid growth of clean energy such as wind power and photovoltaics has increased the requirements for grid stability and regulation capabilities. How to use existing conventional power sources to reasonably configure energy storage, coordinate the planning, design, construction, and operation of various types of power sources, give priority to the development of new energy, actively implement the improvement of existing "wind, solar, water, fire, and storage integration", and steadily promote the incremental "wind, solar, water (storage) integration" has become a new challenge. Primary frequency regulation refers to the automatic control process in which the control system of the unit in the power grid automatically controls the increase or decrease of the unit's active power once the frequency of the power grid deviates from the rated value, limits the change of the power grid frequency, and maintains a stable power grid frequency. The integrated water and storage power station will play an increasingly important role in participating in the primary frequency regulation of the power grid and actively supporting the construction of a new power system.
[0039] In the related art, each hydropower unit participates in the primary frequency regulation separately. However, the primary frequency regulation capabilities of each hydropower unit are uneven. For example, different water heads and powers lead to large differences in regulation time. If the hydropower unit group is not coordinated, each unit collects and responds to the primary frequency regulation target alone, which may lead to problems such as poor regulation consistency between each hydropower unit and reduced regulation effect, affecting the overall regulation effect. Energy storage has excellent regulation performance due to its short regulation time, and gradually participates in the primary frequency regulation process. However, energy storage independently participates in primary frequency regulation and faces the situation of rapid depreciation of service life but low benefits. Therefore, the embodiment of the present invention provides a method for coordinated primary frequency regulation of a water storage integrated power station, by setting a central primary frequency regulation device to generate corresponding frequency regulation instructions according to the primary frequency regulation capabilities of each hydropower unit when the preset conditions are met, so as to coordinate the regulation resources between the hydropower units, and apply the hydropower units and energy storage together to the primary frequency regulation, and on the premise of ensuring that the overall regulation performance of the hydropower units and energy storage meets the requirements, reduce the energy storage call as much as possible, and maximize the effect of extending the service life of the energy storage.
[0040] In this embodiment, a water storage integrated power station coordinated primary frequency regulation system is provided. Figure 1 is a schematic diagram of the structure of a water storage integrated power station coordinated primary frequency regulation system according to an embodiment of the present invention, such as Figure 1 As shown, the system includes:
[0041] The central primary frequency regulation device is used to obtain the frequency of the power station grid connection point and determine whether the frequency of the power station grid connection point meets the preset frequency difference condition. When the frequency of the power station grid connection point meets the preset frequency difference condition, it generates an adjustment instruction and allocates the corresponding frequency regulation instruction according to the received primary frequency regulation capability data of each hydropower unit and sends it to each local primary frequency regulation unit respectively.
[0042] Several hydropower units, each of which is equipped with a local primary frequency modulation unit and an energy storage unit. The energy storage unit is equipped with an energy storage unit converter. Each local primary frequency modulation unit is connected to the central primary frequency modulation device through an optical fiber parallel port communication, and is used to collect the primary frequency modulation capability data of the hydropower unit and send it to the central primary frequency modulation device, and control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instructions.
[0043] The central primary frequency regulation device can be set in the control center of the integrated water storage power station, and connected with each local primary frequency regulation unit through optical fiber parallel communication, with fast transmission speed and good timeliness of data transmission. The local primary frequency regulation device can collect the primary frequency regulation capability data of the hydropower unit, which changes with the change of water head and active output. The water head refers to the vertical height from the horizontal plane of the upstream water storage to the turbine inlet. The water head represents the potential energy (potential energy) of the water. The higher the water head, the greater the potential energy, and the stronger the power generation capacity under the same flow rate. In other words, the higher the water head, the better the primary frequency regulation capability of the hydropower unit. The energy storage unit converter (PCS, Power Conversion System) is used to control the primary frequency regulation response speed and primary frequency regulation response power of the energy storage unit according to the control instructions of the local primary frequency regulation device, so as to participate in the primary frequency regulation when the primary frequency regulation capability of the hydropower unit is insufficient.
[0044] In actual application scenarios, it is necessary to ensure that the power generation output and system load of the power system are balanced. When the power generation output of the power system is unbalanced with the system load, the frequency of the power station grid connection point will change accordingly. Therefore, the frequency of the power station grid connection point can directly reflect the active power balance operation of the power system. The frequency of the power station grid connection point can be collected and a frequency adjustment is performed according to the frequency of the power station grid connection point. Specifically, the central primary frequency modulation device obtains the frequency of the power station grid connection point in real time. For example, a device capable of measuring the frequency of the power station grid connection point in real time is set, and the device can send the measurement results to the central primary frequency modulation device in real time. The central primary frequency modulation device compares the obtained power station grid connection point frequency with the preset frequency difference condition. The preset frequency difference condition can be set according to actual requirements, such as setting a frequency target value, comparing the obtained power station grid connection point frequency with the frequency target value, and if it exceeds the preset threshold, it is determined to meet the preset frequency difference condition. For example, the frequency target value is 50Hz (Hertz).
[0045] When the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device can generate an adjustment instruction according to the frequency of the power station grid connection point, and distribute the adjustment instruction according to the received primary frequency regulation capability data of each hydropower unit, generate a frequency regulation instruction corresponding to the primary frequency regulation capability data of each hydropower unit, and send it to the local primary frequency regulation unit corresponding to each hydropower unit. After receiving the frequency regulation instruction, the local primary frequency regulation unit determines whether the primary frequency regulation capability of the hydropower unit is sufficient according to the primary frequency regulation capability data of the hydropower unit. If it is not sufficient, the working state of the energy storage unit converter is controlled so that the energy storage unit cooperates with the hydropower unit to perform primary frequency regulation.
[0046] In an optional embodiment, the system also includes a power station AGC (Automatic Generation Control) device, which is used to receive the superior active dispatching instructions and forward them to the central primary frequency regulation device and each local control unit. When the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device is also used to send a locking instruction to the power station AGC device, and generate corresponding frequency regulation instructions based on the superior active dispatching instructions and the received primary frequency regulation capability data of each hydropower unit, and send them to each local primary frequency regulation unit respectively. After receiving the locking instruction, the power station AGC device stops forwarding the superior active dispatching instructions to each local control unit.
[0047] The local control unit (LCU) is used to control the peak-shaving operation of the hydropower unit according to the superior active dispatching instruction. Each hydropower unit is also provided with a local control unit. The function of the AGC device of the power station in normal working state is to forward the superior active dispatching instruction to each local control unit, and each local control unit controls the corresponding hydropower unit to participate in peak-shaving according to the superior active dispatching instruction. Peak-shaving refers to the process in which the power generation department adjusts the output of the generator to meet the power demand according to the change of the power grid load. Peak-shaving mainly deals with the daily peak-to-valley difference of the power grid load, that is, the fluctuation of the peak and trough of the load of the power grid during the day. Its purpose is to maintain the balance of active power and keep the system stable. Frequency regulation refers to the process of keeping the frequency of the power grid within a specified range by adjusting the output of the generator set. The priority of primary frequency regulation is higher than peak-shaving. This application obtains the frequency of the power station grid connection point in real time through the central primary frequency regulation device. When the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device sends a locking instruction to the AGC device of the power station, and the peak-shaving stops and enters the primary frequency regulation state. The central primary frequency regulation device generates an adjustment instruction based on the received power station grid connection point frequency. The central primary frequency regulation device is also connected to the power plant AGC device for communication, and continuously obtains the superior active power dispatching instructions forwarded by the power plant AGC device. The superior active power dispatching instructions are issued at a low frequency, for example, once every 15 minutes. When the power plant grid connection point frequency meets the preset frequency difference conditions, if the superior active power dispatching instructions are obtained, the superior active power dispatching instructions are immediately superimposed on the regulation instructions.
[0048] In an optional embodiment, the on-site primary frequency regulation unit is also used to determine whether the independent regulation time of the hydropower unit is less than the preset regulation time. When the independent regulation time of the hydropower unit is greater than the preset regulation time, the energy storage unit converter is started.
[0049] The coordinated primary frequency regulation system of the integrated hydropower station provided in this embodiment determines whether the frequency of the power station grid connection point meets the preset frequency difference condition through the central primary frequency regulation device. When the frequency of the power station grid connection point meets the preset frequency difference condition, the corresponding frequency regulation instructions are generated according to the primary frequency regulation capability data of each unit and sent to each local primary frequency regulation unit respectively, so as to coordinate the regulation resources of each hydropower unit, eliminate the inconsistency of regulation between hydropower units, and improve the overall primary frequency regulation performance of the hydropower unit. Then, the local primary frequency regulation unit controls the frequency regulation operation of the hydropower unit and the energy storage unit converter according to the frequency regulation instruction, so that the energy storage unit only participates in the regulation when the primary frequency regulation capacity of the hydropower unit is insufficient, and reduces the energy storage call as much as possible while ensuring that the coordinated regulation performance of the hydropower unit and the energy storage unit meets the requirements, and maximizes the service life of the energy storage unit, so as to realize the coordinated primary frequency regulation of the integrated hydropower station.
[0050] According to an embodiment of the present invention, an embodiment of a method for coordinated primary frequency regulation of a water-storage integrated power station is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described may be executed in an order different from that shown here.
[0051] In this embodiment, a method for coordinated primary frequency regulation of a water storage integrated power station is provided, which is applied to a central primary frequency regulation device in a coordinated primary frequency regulation system of a water storage integrated power station. Figure 2 is a flow chart of a method for coordinating primary frequency regulation of a water storage integrated power station according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:
[0052] Step S201, obtaining the frequency of the power station grid connection point.
[0053] Exemplarily, a device capable of real-time measurement of the frequency of the power station grid connection point is provided, and the device can send the measurement result to the central primary frequency modulation device in real time.
[0054] Step S202, determine whether the frequency of the power station's grid connection point meets the preset frequency difference condition. When the frequency of the power station's grid connection point meets the preset frequency difference condition, generate an adjustment instruction and generate corresponding frequency modulation instructions based on the received primary frequency modulation capability data of each hydropower unit, and send them to each local primary frequency modulation unit respectively, so that each local primary frequency modulation unit can control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instructions.
[0055] In actual application scenarios, it is necessary to ensure that the power generation output and system load of the power system are balanced. When the power generation output and system load of the power system are unbalanced, the frequency of the power station grid connection point will change accordingly. Therefore, the frequency of the power station grid connection point can directly reflect the active power balance operation of the power system. The frequency of the power station grid connection point can be collected and a frequency adjustment can be performed according to the frequency of the power station grid connection point. Specifically, the central primary frequency regulation device obtains the frequency of the power station grid connection point in real time, compares the obtained frequency of the power station grid connection point with the preset frequency difference condition, and when the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device can generate an adjustment instruction according to the frequency of the power station grid connection point, and distribute the adjustment instruction according to the received primary frequency regulation capability data of each hydropower unit, generate frequency regulation instructions corresponding to the primary frequency regulation capability data of each hydropower unit, and send them to the local primary frequency regulation units corresponding to each hydropower unit. After receiving the frequency regulation instruction, the local primary frequency regulation unit determines whether the primary frequency regulation capacity of the hydropower unit is sufficient based on the primary frequency regulation capacity data of the hydropower unit. If it is not sufficient, the working state of the energy storage unit converter is controlled so that the energy storage unit cooperates with the hydropower unit to perform primary frequency regulation.
[0056] The coordinated primary frequency regulation method of the integrated water and storage power station provided in this embodiment determines whether the frequency of the power station grid connection point meets the preset frequency difference condition through the central primary frequency regulation device. When the frequency of the power station grid connection point meets the preset frequency difference condition, the corresponding frequency regulation instructions are generated according to the primary frequency regulation capability data of each unit and sent to each local primary frequency regulation unit respectively, so as to coordinate the regulation resources of each hydropower unit, eliminate the inconsistency of regulation between hydropower units, and improve the overall primary frequency regulation performance of the hydropower unit. Then, the local primary frequency regulation unit controls the frequency regulation operation of the hydropower unit and the energy storage unit converter according to the frequency regulation instruction, so that the energy storage unit only participates in the regulation when the primary frequency regulation capacity of the hydropower unit is insufficient, and reduces the energy storage call as much as possible while ensuring that the coordinated regulation performance of the hydropower unit and the energy storage unit meets the requirements, and maximizes the service life of the energy storage unit, so as to realize the coordinated primary frequency regulation of the integrated water and storage power station.
[0057] In this embodiment, a method for coordinated primary frequency regulation of a water storage integrated power station is provided, which is applied to a central primary frequency regulation device in a coordinated primary frequency regulation system of a water storage integrated power station. Figure 3 is a flow chart of a method for coordinating primary frequency regulation of a water storage integrated power station according to an embodiment of the present invention. Figure 3 As shown, the process includes the following steps:
[0058] Step S301, obtaining a primary frequency modulation response speed curve of a hydroelectric unit under different water heads and powers.
[0059] Optionally, the primary frequency modulation response speed curve of the hydropower unit at different water heads and powers can be set by relevant technical personnel according to the design data or actual measurement results of the hydropower unit. In other words, the primary frequency modulation response speed curve of the hydropower unit at different water heads and powers is fixed.
[0060] Step S302, obtaining a primary frequency modulation response speed curve and a primary frequency modulation response power curve of the energy storage unit.
[0061] Optionally, each hydropower unit is equipped with a distributed energy storage unit to rationally configure the energy storage capacity and minimize the cost of use. The duration of energy storage configuration is determined according to the characteristics of the power grid in the area where the power station is located, and generally does not exceed 30 minutes. According to the requirements, the hydropower unit responds to the primary frequency regulation depth of 10% of the rated capacity of the hydropower unit, that is, 10% above and below. The energy storage capacity needs to be set to at least 20% of the rated capacity of the hydropower unit. Because the safety control boundary of lithium iron phosphate electrochemical energy storage is 5%~95%, that is, 10% of the capacity cannot be actually used. Therefore, considering the primary frequency regulation requirements and the safety control boundary of electrochemical energy storage, 20%÷(1-10%) of the rated capacity of the hydropower unit is used as the minimum value of the energy storage capacity, and then 8% of the margin is reserved. Finally, the energy storage capacity is determined to be configured between 23% and 30% of the rated capacity of the hydropower unit.
[0062] Further, the maximum response speed of the primary frequency regulation of the energy storage unit is set, which can be set according to actual needs. In the present application, the role of the energy storage unit is to participate in the frequency regulation when the primary frequency regulation capacity of the hydropower unit is insufficient, and gradually withdraw during the regulation process, that is, when performing the primary frequency regulation, the energy storage unit controls its own power ramp rate by speed change, and cooperates with the hydropower unit for regulation. The energy storage unit and the hydropower unit are a regulation process of mutual growth and decline, and the entire regulation process needs to gradually reduce the degree of participation of the energy storage unit and increase the degree of participation of the hydropower unit under the premise of meeting the overall regulation performance requirements, so as to reduce the call of the energy storage unit as much as possible and maximize the service life of the energy storage. Specifically, the primary frequency regulation response speed curve of the energy storage unit is obtained according to the difference between the maximum response speed of the primary frequency regulation of the energy storage unit and the primary frequency regulation response speed curve of the corresponding hydropower unit under different heads and powers. The primary frequency regulation response power curve of the energy storage unit is obtained according to the frequency-power droop curve and the power curve of the corresponding hydropower unit under different heads. The minimum adjustment step of the energy storage unit is unified as the minimum adjustment step of the hydropower unit. Among them, the frequency-power droop curve, that is, the corresponding relationship curve between frequency and power, can be obtained by querying relevant standards.
[0063] Step S303, obtaining the power station grid connection point frequency.
[0064] For details, please see Figure 2 Step S201 of the illustrated embodiment will not be described in detail here.
[0065] Step S304, determining whether the frequency of the power station grid connection point meets the preset frequency difference condition. When the frequency of the power station grid connection point meets the preset frequency difference condition, sending a blocking instruction to the power station AGC device so that the power station AGC device stops forwarding the superior active scheduling instruction to each local control unit.
[0066] That is to say, when the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device sends a blocking command to the power station AGC device, the peak regulation stops, and the primary frequency regulation state is entered. At this time, the power station AGC device still has the function of receiving the upper-level active power dispatching command, but it cannot send the upper-level active power dispatching command to each local control unit.
[0067] Step S305: Generate a regulation instruction and distribute the corresponding frequency regulation instruction according to the received primary frequency regulation capability data of each hydropower unit.
[0068] The primary frequency regulation capability data of a hydropower unit can be the difference between the maximum power of the hydropower unit under the current water head and the limited operating power. Each local primary frequency regulation unit uploads the primary frequency regulation capability data of the corresponding hydropower unit once every fixed time period (for example, 1 second), and the central primary frequency regulation device generates adjustment instructions at fixed time periods, and distributes the adjustment instructions to the frequency regulation instructions corresponding to each hydropower unit according to the latest primary frequency regulation capability data of each hydropower unit received. It should be noted that when the frequency of the power station grid connection point does not reach the preset frequency difference condition, the central primary frequency regulation device still receives the primary frequency regulation capability data of each hydropower unit and generates frequency regulation instructions corresponding to the frequency regulation capability of each hydropower unit, but does not issue the instructions.
[0069] Optionally, the superior active dispatching instruction is obtained, and the corresponding frequency modulation instructions are distributed according to the superior active dispatching instruction, the adjustment instruction and the received primary frequency modulation capability data of each hydropower unit and respectively issued to each local primary frequency modulation unit. The superior active dispatching instruction is issued less frequently, and when the superior active dispatching instruction is obtained, the superior active dispatching instruction is immediately superimposed on the adjustment instruction.
[0070] Specifically, first, an adjustment instruction is generated according to the frequency-power droop curve. Then, the adjustment instruction is superimposed with the superior active dispatch instruction to generate a total frequency regulation instruction. For example, addition is performed in the same direction and subtraction is performed in the opposite direction. Finally, the total frequency regulation instruction is distributed according to the primary frequency regulation capability data of each hydropower unit to obtain the frequency regulation instruction corresponding to each hydropower unit, and the frequency regulation instructions are respectively issued to each local primary frequency regulation unit.
[0071] Optionally, when allocating the adjustment instruction / total frequency regulation instruction to each local primary frequency regulation unit, the primary frequency regulation target value can be allocated in a proportional allocation mode or a parameter allocation mode. In the proportional allocation mode, the primary frequency regulation target value is allocated according to the ratio of the primary frequency regulation capability data of each hydropower unit. For example, if the ratio of the primary frequency regulation capability data of hydropower unit A and hydropower unit B is 2:3, then the allocated primary frequency regulation target value ratio is 2:3. The parameter allocation mode is a manual mode. In actual application scenarios, there may be hydropower unit maintenance or fixed operating requirements, which may cause the hydropower unit to participate in frequency regulation according to its primary frequency regulation capability data. Therefore, the parameter allocation mode is set to allow the power station operation and maintenance personnel to manually set the hydropower units participating in the primary frequency regulation and their adjustment depth.
[0072] Step S306: The frequency modulation instructions are respectively issued to each local primary frequency modulation unit, so that each local primary frequency modulation unit controls the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instructions.
[0073] After receiving the frequency regulation instruction, the local primary frequency regulation unit obtains the independent regulation time of the hydropower unit according to the regulation time specified by the national standard, industry standard or regional power grid enterprise, and refers to the primary frequency regulation response speed curve of the hydropower unit under different water heads and powers. When the independent regulation time of the hydropower unit does not exceed the regulation time specified by the national standard, industry standard or regional power grid enterprise, the local primary frequency regulation unit enters the monotonic mode, at which time only the primary frequency regulation task is completed by the hydropower unit, and the energy storage unit does not participate in the regulation. When the independent regulation time of the hydropower unit is greater than the regulation time specified by the national standard, industry standard or regional power grid enterprise, the local primary frequency regulation unit enters the joint regulation mode and starts the energy storage unit to cooperate in the primary frequency regulation. The local primary frequency regulation unit refers to the primary frequency regulation response speed curve of the hydropower unit under different water heads and powers and the primary frequency regulation response speed curve of the energy storage unit. During the initial period, the required regulation amount is sent to the hydropower unit and the energy storage unit converter for execution. The energy storage unit converter adjusts in real time according to the primary frequency regulation response speed curve and the primary frequency regulation response power curve of the energy storage unit until the hydropower unit power reaches the target value and exits. In other words, the energy storage unit will only participate in the regulation when the independent regulation time of the hydropower unit does not meet the standard, and will gradually withdraw from the regulation process. Through the above coordinated regulation process of mutual increase and decrease, while ensuring that the overall regulation performance of the hydropower unit and the energy storage unit meets the requirements, the call of the energy storage unit can be reduced as much as possible, thereby extending the service life of the energy storage unit to the greatest extent.
[0074] Step S307, when it is detected that the frequency of the power station grid connection point does not meet the preset frequency difference condition, a start instruction is sent to the power station AGC device, so that the power station AGC device re-forwards the superior active power dispatching instruction to each local control unit after receiving the start instruction.
[0075] That is to say, when the frequency of the power station's grid-connected point returns to normal, the central primary frequency regulation device stops performing primary frequency regulation, and this primary frequency regulation ends. The central primary frequency regulation device releases the lock of the power station's AGC device by sending a start-up command to the power station's AGC device, and the power station's AGC device re-enters normal working state to perform peak regulation.
[0076] The coordinated primary frequency regulation method of the integrated water and storage power station provided in this embodiment determines whether the frequency of the power station grid connection point meets the preset frequency difference condition through the central primary frequency regulation device. When the frequency of the power station grid connection point meets the preset frequency difference condition, the corresponding frequency regulation instructions are generated according to the primary frequency regulation capability data of each unit and sent to each local primary frequency regulation unit respectively, so as to coordinate the regulation resources of each hydropower unit, eliminate the inconsistency of regulation between hydropower units, and improve the overall primary frequency regulation performance of the hydropower unit. Then, the local primary frequency regulation unit controls the frequency regulation operation of the hydropower unit and the energy storage unit converter according to the frequency regulation instruction, so that the energy storage unit only participates in the regulation when the primary frequency regulation capacity of the hydropower unit is insufficient, and reduces the energy storage call as much as possible while ensuring that the coordinated regulation performance of the hydropower unit and the energy storage unit meets the requirements, and maximizes the service life of the energy storage unit, so as to realize the coordinated primary frequency regulation of the integrated water and storage power station.
[0077] In this embodiment, a water storage integrated power station coordinated primary frequency regulation device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and will not be repeated hereafter. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.
[0078] This embodiment provides a water storage integrated power station coordinated primary frequency regulation device, such as Figure 4 As shown, including:
[0079] The frequency acquisition module 401 is used to acquire the frequency of the power station grid connection point;
[0080] The frequency modulation module 402 is used to determine whether the frequency of the power station's grid connection point meets the preset frequency difference condition; when the frequency of the power station's grid connection point meets the preset frequency difference condition, an adjustment instruction is generated and the corresponding frequency modulation instruction is allocated according to the received primary frequency modulation capability data of each hydropower unit and sent to each local primary frequency modulation unit respectively, so that each local primary frequency modulation unit can control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instruction.
[0081] In an optional embodiment, the frequency regulation module is also used to: when the frequency of the power station's grid-connected point meets the preset frequency difference condition, send a locking instruction to the power station AGC device to cause the power station AGC device to stop forwarding the superior active power dispatching instruction to each local control unit; obtain the superior active power dispatching instruction, and generate corresponding frequency regulation instructions based on the superior active power dispatching instruction, adjustment instruction and the received primary frequency regulation capability data of each hydropower unit, and send them to each local primary frequency regulation unit respectively.
[0082] In an optional embodiment, the frequency regulation module is also used to: generate an adjustment instruction based on the frequency-power droop curve; superimpose the adjustment instruction with the superior active scheduling instruction to generate a total frequency regulation instruction; and issue the total frequency regulation instruction to each on-site primary frequency regulation unit based on the primary frequency regulation capability data of each hydropower unit.
[0083] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.
[0084] In this embodiment, the integrated water storage power station and the coordinated primary frequency regulation device are presented in the form of functional units, where the units refer to ASIC (Application Specific Integrated Circuit) circuits, processors and memories that execute one or more software or fixed programs, and / or other devices that can provide the above functions.
[0085] The embodiment of the present invention also provides a computer device having the above Figure 4 The integrated water storage power station shown is coordinated with a primary frequency regulation device.
[0086] See also Figure 5 , Figure 5 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 5 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 5 A processor 10 is taken as an example.
[0087] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.
[0088] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.
[0089] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0090] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.
[0091] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.
[0092] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.
[0093] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.
[0094] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.
Claims
1. A method for coordinated primary frequency modulation of a water storage integrated power station, characterized in that: The method is applied to a central primary frequency regulation device in a coordinated primary frequency regulation system of a water storage integrated power station, and the method comprises: Obtaining the frequency of the power station grid connection point; the frequency of the power station grid connection point directly reflects the active power balance operation status of the power system; Determine whether the frequency of the power station grid connection point meets the preset frequency difference condition; when the frequency of the power station grid connection point meets the preset frequency difference condition, send a blocking instruction to the power station AGC device so that the power station AGC device stops forwarding the superior active dispatching instruction to each local control unit; Generate adjustment instructions; Obtain the superior active power dispatching instruction, and generate corresponding frequency modulation instructions according to the superior active power dispatching instruction, adjustment instruction and the received primary frequency modulation capability data of each hydropower unit, and send them to each local primary frequency modulation unit respectively, so that each local primary frequency modulation unit can control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instruction; wherein, a distributed energy storage unit is configured for each hydropower unit to reasonably configure the energy storage capacity; When it is detected that the frequency of the power station grid connection point does not meet the preset frequency difference condition, a start command is sent to the power station AGC device, so that the power station AGC device re-forwards the superior active power dispatching command to each local control unit after receiving the start command; The generating corresponding frequency regulation instructions according to the superior active power dispatching instructions and the received primary frequency regulation capability data of each hydropower unit comprises: Generate adjustment instructions according to the frequency-power droop curve; Superimposing the adjustment instruction with the superior active power dispatch instruction to generate a total frequency modulation instruction; Based on the primary frequency regulation capability data of each hydropower unit, the total frequency regulation instruction is respectively issued to each local primary frequency regulation unit.
2. A water storage integrated power station coordinated primary frequency modulation system, characterized in that: For executing the method according to claim 1; the system comprises: The central primary frequency regulation device is used to obtain the frequency of the power station grid connection point and determine whether the frequency of the power station grid connection point meets the preset frequency difference condition; when the frequency of the power station grid connection point meets the preset frequency difference condition, an adjustment instruction is generated and the corresponding frequency regulation instruction is allocated according to the received primary frequency regulation capability data of each hydropower unit and sent to each local primary frequency regulation unit respectively; the frequency of the power station grid connection point directly reflects the active power balance operation of the power system; A plurality of hydroelectric generating units, each of which is equipped with a local primary frequency modulation unit and an energy storage unit; the energy storage unit is equipped with an energy storage unit converter; each local primary frequency modulation unit is connected to the central primary frequency modulation device via an optical fiber parallel port communication, for collecting the primary frequency modulation capability data of the hydroelectric generating unit and sending it to the central primary frequency modulation device, and controlling the frequency modulation operation of the hydroelectric generating unit and the energy storage unit converter according to the received frequency modulation instructions.
3. The system according to claim 2, characterized in that The system also includes a power station AGC device, which is used to receive the upper-level active power dispatching instructions and forward them to the central primary frequency regulation device and each local control unit; the local control unit is used to control the peak load operation of the hydropower unit according to the upper-level active power dispatching instructions; When the frequency of the power station grid connection point meets the preset frequency difference condition, the central primary frequency regulation device is also used to send a locking instruction to the power station AGC device, and generate corresponding frequency regulation instructions according to the superior active dispatching instruction and the received primary frequency regulation capability data of each hydropower unit, and send them to each local primary frequency regulation unit respectively; After receiving the blocking instruction, the power station AGC device stops forwarding the superior active power dispatching instruction to each local control unit.
4. The system according to claim 2 or 3, characterized in that: The on-site primary frequency regulation unit is also used to determine whether the independent regulation time of the hydropower unit is less than the preset regulation time. When the independent regulation time of the hydropower unit is greater than the preset regulation time, the energy storage unit converter is started.
5. A water storage integrated power station coordinated primary frequency modulation device, characterized in that: The device is applied to the central primary frequency regulation device in the coordinated primary frequency regulation system of the water storage integrated power station, and the device comprises: A frequency acquisition module is used to acquire the frequency of the power station grid connection point; the frequency of the power station grid connection point directly reflects the active power balance operation status of the power system; The frequency modulation module is used to determine whether the frequency of the power station grid connection point meets the preset frequency difference condition; when the frequency of the power station grid connection point meets the preset frequency difference condition, send a locking instruction to the power station AGC device to make the power station AGC device stop forwarding the superior active dispatching instruction to each local control unit; generate an adjustment instruction; obtain the superior active dispatching instruction, and generate corresponding frequency modulation instructions according to the superior active dispatching instruction, the adjustment instruction and the received primary frequency modulation capability data of each hydropower unit, and send them to each local primary frequency modulation unit respectively, so that each local primary frequency modulation unit can control the frequency modulation operation of the hydropower unit and the energy storage unit converter according to the received frequency modulation instruction; wherein, a distributed energy storage unit is configured for each hydropower unit to reasonably configure the energy storage capacity; when it is detected that the frequency of the power station grid connection point does not meet the preset frequency difference condition, send a start instruction to the power station AGC device to enable the power station AGC device to re-forward the superior active dispatching instruction to each local control unit after receiving the start instruction; The frequency modulation module is also used for: Generate adjustment instructions according to the frequency-power droop curve; Superimposing the adjustment instruction with the superior active power dispatch instruction to generate a total frequency modulation instruction; Based on the primary frequency regulation capability data of each hydropower unit, the total frequency regulation instruction is respectively issued to each local primary frequency regulation unit.
6. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the coordinated primary frequency modulation method of the integrated water storage power station as described in claim 1 by executing the computer instructions.
7. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the coordinated primary frequency modulation method of the integrated water storage power station described in claim 1.
8. A computer program product, characterized in that It includes computer instructions, and the computer instructions are used to enable a computer to execute the coordinated primary frequency modulation method of the water-storage integrated power station as described in claim 1.
Citation Information
Patent Citations
Primary frequency modulation method and system for hydropower station generator monitoring system
CN111668857A
Energy storage system and peak regulation and frequency modulation system
CN113162068A