A steel pipe rolling method and system for rotary drilling rig drill rod

Through interactive acquisition of drilling correlation information and analyzing the drill pipe material performance, a steel pipe length analysis network was pre-built, which solved the problem of inaccurate calculation of thread length changes and torsional force limits for drill pipes for rotary drilling rigs, and realized thread connection Improved stability and production safety.

CN118536233BActive Publication Date: 2024-11-12XUZHOU SAIWEI MASCH MFG TECH CO LTD
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410702980.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-06-03
Publication Date
2024-11-12
Estimated Expiration
2044-06-03

AI Technical Summary

Technical Problem

The length change of the thread connection threads used for existing rotary drilling rigs and the calculation accuracy of the torsional force limits is low, which causes the drilling rod to be unable to withstand high pressure and torsional force, resulting in the drilling rod breaking or damage underground, affecting equipment and production safety. .

Method used

Through interaction, drilling correlation information is obtained, including geological environment, depth interval and diameter requirements, drill pipe material performance constraints, pre-construct performance fitness function and steel plate thickness analysis network, determine target raw material information and steel pipe length, and realize threaded connection stability.

Benefits of technology

It improves the stability of threaded connections, enhances production safety, and ensures that the drill rod can operate normally under actual working conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118536233B_ABST
    Figure CN118536233B_ABST
Patent Text Reader

Abstract

The present application provides a method and system for rolling steel pipes for drill rods of rotary drilling rigs, and relates to the technical field of steel pipe rolling. The method includes: obtaining drilling-related information; analyzing and obtaining drill rod material performance constraints; traversing the pre-called drill rod material information library to obtain target raw material information; synchronizing the drill rod hardness performance constraints, drilling depth intervals and drilling diameter requirements to the steel plate thickness analysis network to obtain the target steel plate thickness; pre-constructing the steel pipe length analysis network; synchronizing the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the steel pipe length analysis network to obtain the target monomer length; performing steel plate production to obtain the target rolling raw material; performing steel pipe rolling processing to obtain the target steel pipe monomer. The present application can solve the technical problem in the prior art that the drill rod connection thread may be broken or damaged underground, and achieve the technical effect of improving the stability of the threaded steel pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of steel pipe rolling, and in particular to a method and system for rolling steel pipes for rotary drilling rig drill rods. Background Art

[0002] The steel pipe for the drill rod of the rotary drilling rig is a consumable part of the rotary drilling rig. It has geometric dimensions such as outer diameter, wall thickness, ovality and straightness, as well as surface corrosion resistance. The steel pipe is connected by threads to form an integral drill rod system to meet different drilling depth and diameter requirements.

[0003] At present, when multiple existing steel pipes are connected by threads, the accuracy of determining the length change of the threaded steel pipes and the limit of the high pressure and torsional force that the threads can withstand during the operation is low, which may cause the drill pipe to break or be damaged underground. Therefore, a method is needed to solve the above problem.

[0004] To sum up, there are technical problems in the prior art due to the low calculation accuracy of the steel pipe length limit and thread torque limit of the steel pipe connecting thread of the drill pipe of the rotary drilling rig, which may result in the drill pipe being unable to withstand the actual high pressure and torque force, causing the drill pipe to break or be damaged underground, further affecting the drilling rig equipment and production safety. Summary of the invention

[0005] The purpose of the present application is to provide a method and system for rolling steel pipes for drill pipes of rotary drilling rigs, so as to solve the technical problem in the prior art that the calculation accuracy of the steel pipe length limit and the thread torque limit of the steel pipe connecting thread for the drill pipe of the rotary drilling rig is low, resulting in the drill pipe being unable to withstand the actual high pressure and torque force, causing the drill pipe to break or be damaged underground, further affecting the drilling rig equipment and production safety.

[0006] In view of the above problems, the present application provides a method and system for rolling steel pipes for drill rods of rotary drilling rigs.

[0007] In a first aspect, the present application provides a method for rolling steel pipes for drill pipes of rotary drilling rigs, the method being implemented by a steel pipe rolling system for drill pipes of rotary drilling rigs, wherein the method comprises: interactively obtaining drilling-related information of pre-production drill pipes, wherein the drilling-related information comprises drilling geological environment, drilling depth interval and drilling diameter requirements; performing parameter call on the drilling geological environment with the drilling depth interval, and obtaining drill pipe material performance constraints based on parameter call result analysis, wherein the drill pipe material performance constraints comprise drill pipe hardness performance constraints and drill pipe corrosion performance constraints; pre-constructing a drill pipe performance fitness function, and using the drill pipe performance fitness function and the drill pipe material performance constraints to traverse a pre-called drill pipe material information library to obtain target raw material information; pre-constructing a steel plate thickness analysis network, and synchronizing the drill pipe hardness performance constraints, the drilling depth interval and the drilling diameter requirements to the The steel plate thickness analysis network is constructed to obtain the target steel plate thickness; a steel pipe length analysis network is pre-constructed, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; the drilling pressure limit, the drilling torsion force limit and the drilling depth limit are obtained by fitting according to the drilling association information, and the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain the target monomer length; steel plates are produced according to the target raw material information and the target steel plate thickness to obtain the target rolled raw material; steel pipe rolling is performed with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer.

[0008] In a second aspect, the present application further provides a steel pipe rolling system for a rotary drilling rig drill pipe, which is used to execute a steel pipe rolling method for a rotary drilling rig drill pipe as described in the first aspect, wherein the system comprises: a drilling-related information acquisition module, the drilling-related information acquisition module is used to interactively obtain drilling-related information of pre-production drill pipes, wherein the drilling-related information includes drilling geological environment, drilling depth interval and drilling diameter requirements; a drill pipe material performance constraint acquisition module, the drill pipe material performance constraint acquisition module is used to perform parameter call on the drilling geological environment with the drilling depth interval, and based on the parameter call The drill rod material performance constraint is obtained by result analysis, wherein the drill rod material performance constraint includes a drill rod hardness performance constraint and a drill rod corrosion performance constraint; a target raw material information acquisition module, the target raw material information acquisition module is used to pre-build a drill rod performance fitness function, and the drill rod performance fitness function and the drill rod material performance constraint are used to traverse the pre-called drill rod material information library to obtain the target raw material information; a target steel plate thickness acquisition module, the target steel plate thickness acquisition module is used to pre-build a steel plate thickness analysis network, and the drill rod hardness performance constraint, the drilling depth interval and the drilling diameter requirement are synchronized. Step to the steel plate thickness analysis network to obtain the target steel plate thickness; a steel pipe length analysis network construction module, the steel pipe length analysis network construction module is used to pre-construct a steel pipe length analysis network, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; a target monomer length acquisition module, the target monomer length acquisition module is used to obtain the drilling according to the drilling association information fitting. Hole pressure limit, drilling torque limit and drilling depth limit, synchronize the drilling pressure limit, drilling torque limit, drilling depth limit and target steel plate thickness to the steel pipe length analysis network to obtain the target monomer length; target rolling raw material acquisition module, the target rolling raw material acquisition module is used to produce steel plates according to the target raw material information and the target steel plate thickness to obtain the target rolling raw material; target steel pipe monomer acquisition module, the target steel pipe monomer acquisition module is used to perform steel pipe rolling processing with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer.

[0009] One or more technical solutions provided in this application have at least the following technical effects or advantages:

[0010] The drilling-related information of the pre-production drill pipe is obtained through interaction, wherein the drilling-related information includes the drilling geological environment, the drilling depth interval and the drilling diameter requirement; the drilling geological environment is parameter-called with the drilling depth interval, and the drill pipe material performance constraint is obtained based on the parameter calling result analysis, wherein the drill pipe material performance constraint includes the drill pipe hardness performance constraint and the drill pipe corrosion performance constraint; the drill pipe performance fitness function is pre-constructed, and the drill pipe performance fitness function and the drill pipe material performance constraint are used to traverse the pre-called drill pipe material information library to obtain the target raw material information; the steel plate thickness analysis network is pre-constructed, and the drill pipe hardness performance constraint, the drilling depth interval and the drilling diameter requirement are synchronized to the steel plate thickness analysis network to obtain the target steel plate thickness; the steel pipe length analysis network is pre-constructed, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length analysis branch. long calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; the drilling pressure limit, the drilling torsion force limit and the drilling depth limit are obtained according to the drilling association information fitting, and the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain the target monomer length; steel plates are produced according to the target raw material information and the target steel plate thickness to obtain the target rolled raw material; steel pipe rolling processing is performed with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer, that is, by determining the length variation range of the steel pipe that can be achieved based on splicing, determining the length of the steel pipe thread, etc., finally achieving the technical goal of the stability of the threaded steel pipe and achieving the technical effect of improving production safety.

[0011] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented according to the contents of the specification, and in order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are specifically cited below. It should be understood that the content described in this section is not intended to identify the key or important features of the embodiments of the present application, nor is it intended to limit the scope of the present application. Other features of the present application will become easy to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0012] In order to more clearly illustrate the technical solutions in the present application or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only exemplary, and for ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying any creative work.

[0013] Figure 1 The present invention is a schematic flow chart of a method for rolling a steel pipe for a drill rod of a rotary drilling rig.

[0014] Figure 2 This is a structural schematic diagram of a steel pipe rolling system for a drill rod of a rotary drilling rig in the present application.

[0015] Description of reference numerals:

[0016] Drilling related information acquisition module 11, drill rod material performance constraint acquisition module 12, target raw material information acquisition module 13, target steel plate thickness acquisition module 14, steel pipe length analysis network construction module 15, target monomer length acquisition module 16, target rolling raw material acquisition module 17, target steel pipe monomer acquisition module 18. DETAILED DESCRIPTION

[0017] This application provides a method and system for rolling steel pipes for rotary drilling rig drill pipes, which solves the technical problem in the prior art that the drill pipes may not be able to withstand the actual high pressure and torsional force due to the low calculation accuracy of the steel pipe length limit and thread torsional force limit of the steel pipe connection thread for rotary drilling rig drill pipes, resulting in the drill pipes breaking or being damaged underground, further affecting the drilling rig equipment and production safety. The technical goal of achieving the stability of the threaded steel pipe is achieved, and the technical effect of improving production safety is achieved.

[0018] Below, the technical solutions in the present application will be clearly and completely described with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments of the present application. It should be understood that the present application is not limited to the example embodiments described herein. Based on the embodiments of the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application. It should also be noted that, for the convenience of description, only the parts related to the present application are shown in the accompanying drawings, rather than all of them.

[0019] Embodiment 1

[0020] Please see attached Figure 1 The present application provides a method for rolling a steel pipe for a rotary drilling rig drill pipe, wherein the method is applied to a steel pipe rolling system for a rotary drilling rig drill pipe, and the method specifically comprises the following steps:

[0021] Step 1: interactively obtain drilling related information of the pre-production drill pipe, wherein the drilling related information includes drilling geological environment, drilling depth range and drilling diameter requirements;

[0022] Specifically, the pre-production drill pipe refers to the drill pipe in the preparatory stage before production, which only has the design concept of the use environment of the drill pipe and the drilling depth range of the drill pipe, and there is no specific information such as the geometric design parameters of the drill pipe and the production materials. Further, data interaction is performed with the control module of the rotary drilling rig drill pipe to obtain the drilling-related information of the pre-production drill pipe. Among them, the drilling-related information includes the drilling geological environment, the drilling depth range and the drilling diameter requirements. Further, the drilling geological environment refers to querying relevant geological environment information such as rock layer distribution, soil type, groundwater conditions, etc. according to the geographical location of the borehole. The drilling geological environment can be obtained through geological survey reports, geographic information systems or related databases. The drilling depth range refers to determining the appropriate drilling depth range based on the drilling geological environment, engineering requirements and drill pipe performance. The drilling depth range is obtained through factors such as the hardness and stability of the rock layer and the bearing capacity of the drill pipe. The drilling diameter requirement refers to determining the diameter requirement of the borehole based on the engineering requirements and the drill pipe specifications. The drilling diameter requirements include the minimum diameter, the maximum diameter and the allowable deviation range.

[0023] Step 2: performing parameter call on the borehole geological environment according to the borehole depth interval, and obtaining drill pipe material performance constraints based on parameter call result analysis, wherein the drill pipe material performance constraints include drill pipe hardness performance constraints and drill pipe corrosion performance constraints;

[0024] Specifically, within the borehole depth interval, the local hardness sequence, local chemical water sequence, local geothermal sequence and local geopressure sequence of the borehole geological environment are extracted to obtain parameter call results, which are used to reflect the geological environment characteristics within the borehole depth interval. The hardness extreme value of the local hardness sequence is extracted. Based on the hardness extreme value, the hardness performance constraint of the drill pipe is determined. The corrosion extreme environment is fitted for the local chemical water sequence, local geothermal sequence and local geopressure sequence to simulate the most severe corrosion environment that the drill pipe may face and obtain the corrosion performance constraint of the drill pipe.

[0025] Step 3: pre-constructing a drill rod performance fitness function, and using the drill rod performance fitness function and the drill rod material performance constraint to traverse the pre-called drill rod material information library to obtain target raw material information;

[0026] Specifically, the drill rod performance fitness function includes a mixed cost constraint item, a performance adaptation constraint item, and a scheduling cost constraint item. Multiple sample formula information, multiple sample mixed cost records, and multiple sample raw material performance records of sample raw materials are obtained. Multiple sample formula information, multiple sample mixed cost records, and multiple sample raw material performance records are associated and stored to build a drill rod material information library. Multiple sample scheduling costs of multiple sample raw materials are obtained. Based on multiple sample scheduling costs and multiple sample formula information, multiple sample formula scheduling information of multiple sample raw materials is obtained. Multiple sample formula scheduling information is associated and stored in the drill rod material information library. Using the drill rod performance fitness function and the drill rod material performance constraint, the updated drill rod material information library is accessed in turn. By comparing the performance fitness of different raw material formulas, the raw material formula that meets the performance requirements and optimizes the cost is screened out, thereby determining the target raw material information.

[0027] Step 4: pre-constructing a steel plate thickness analysis network, and synchronizing the drill rod hardness performance constraint, the drilling depth interval and the drilling diameter requirement to the steel plate thickness analysis network to obtain a target steel plate thickness;

[0028] Specifically, the steel plate thickness analysis network is a pre-trained model that can predict or analyze the thickness of the steel plate based on the input features. For example, the steel plate thickness analysis network is a neural network model, such as a convolutional neural network. The drill rod hardness performance constraints, drilling depth range and drilling diameter requirements are synchronized to the steel plate thickness analysis network, and the steel plate thickness analysis network is trained to learn the mapping relationship from the input features to the steel plate thickness. The target steel plate thickness is obtained by inputting corresponding features into the steel plate thickness analysis network, such as the material of the steel plate, the heat treatment state, etc.

[0029] Step 5: pre-constructing a steel pipe length analysis network, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer;

[0030] Specifically, a steel pipe length analysis network is constructed based on a convolutional neural network. The steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch, and a full length calculation layer. The effective length analysis branch and the thread length analysis branch are connected in parallel. The output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer, and the output data of the effective length analysis branch and the thread length analysis branch are input into the full length calculation layer for data integration.

[0031] Step 6: According to the drilling association information, the drilling pressure limit, the drilling torsion force limit and the drilling depth limit are obtained by fitting, and the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain the target monomer length;

[0032] Specifically, multiple measured drilling parameter sets are collected through data interaction. Using the measured drilling parameter set for training, extreme value calls are made according to the drilling depth interval to obtain the drilling depth limit. The drilling depth limit, drill rod hardness performance constraints and drilling diameter requirements are trained to calculate the limits of drilling pressure and drilling torque, and obtain the limits of drilling pressure and drilling torque. The calculated drilling pressure limit, drilling torque limit, drilling depth limit and target steel plate thickness are synchronized to the effective length analysis branch of the steel pipe length analysis network for length analysis to calculate the effective length of the steel pipe. The drilling pressure limit, drilling torque limit, drilling depth limit and target steel plate thickness are synchronized to the thread length analysis branch of the steel pipe length analysis network to analyze the thread length and obtain the thread reserved length. The effective steel pipe length and the thread reserved length are received through the full-length calculation layer and added to obtain the target monomer length.

[0033] Step 7: Produce steel plates according to the target raw material information and the target steel plate thickness to obtain the target rolled raw material;

[0034] Specifically, through pretreatment, equipment inspection and adjustment, preheating of the production line and other production preparations, steel plates are produced according to the target raw material information and target steel plate thickness. After the rolling process, the target rolled raw materials, that is, steel plates that meet the target steel plate thickness requirements, are obtained for subsequent processing and applications.

[0035] Step 8: Perform steel pipe rolling processing based on the target single body length and the drilling diameter requirement to obtain the target steel pipe single body.

[0036] Specifically, before rolling the steel pipe, the constraints in the process are clearly defined. This includes the calculated target single-unit length and drilling diameter requirements. The target single-unit length determines the final length of the steel pipe, and the drilling diameter requirement determines the size of the hole inside the steel pipe. The constraints directly affect the parameter setting and operation mode during the steel pipe rolling process. After the steel pipe is rolled, the target steel pipe unit is obtained.

[0037] The method for rolling a steel pipe for a rotary drilling rig drill rod is applied to a steel pipe rolling system for a rotary drilling rig drill rod, which can achieve the technical goal of stability of threaded steel pipes and achieve the technical effect of improving production safety.

[0038] Furthermore, the present application also includes the following steps:

[0039] The borehole geological environment includes a rock hardness sequence, a chemical water composition sequence, a geothermal sequence and a geopressure sequence;

[0040] Performing parameter call on the borehole geological environment in the borehole depth interval to obtain the parameter call result, wherein the parameter call result includes a local hardness sequence, a local chemical water sequence, a local geothermal sequence, and a local geopressure sequence;

[0041] Calling the hardness extreme value of the local hardness sequence to obtain the drill pipe hardness performance constraint;

[0042] The local chemical water sequence, the local geothermal sequence and the local geopressure sequence are subjected to corrosion extreme environment fitting to obtain the drill pipe corrosion performance constraint, wherein the drill pipe corrosion performance constraint includes pH value corrosion limit, temperature corrosion limit and pressure corrosion limit.

[0043] Specifically, the borehole geological environment includes rock hardness sequence, chemical water composition sequence, geothermal sequence and geopressure sequence. Furthermore, the hardness of rock is determined by many factors, including its mineral composition, particle size, structure, etc. For example, the Mohs hardness scale is used to evaluate hardness, with a scale from 1 to 10, indicating the relative hardness of different rocks and minerals. For example, talc is the softest mineral with a Mohs hardness of 1, while diamond is the hardest with a Mohs hardness of 10. Other rocks and minerals are assigned corresponding Mohs hardness values ​​according to their performance in scratch tests. Among them, the hardness of rock formations does not change as it gets closer to the crust. Furthermore, the chemical water composition sequence is achieved by focusing on the types and concentrations of chemical substances in groundwater. Chemical water may include dissolved minerals, gases and other organic or inorganic compounds. The chemical composition of chemical water is affected by many factors, including the dissolution of rocks, atmospheric precipitation, biological activities, etc. Furthermore, the geothermal sequence refers to the temperature distribution at different depths below the earth's surface. Ground temperature is affected by many factors, including latitude, topography, the properties of underground rocks and fluids, and geothermal activity. Furthermore, the geopressure sequence refers to the distribution of pressure at different depths inside the earth. Underground rocks are subjected to pressure generated by factors such as the weight of overlying rocks and geothermal activity. The size and distribution of ground pressure have an impact on rock deformation, fracture, and the stability of underground engineering.

[0044] Then, the borehole geological environment parameters are called according to the borehole depth interval, that is, within the borehole depth interval, the local hardness sequence, local chemical water sequence, local geothermal sequence and local ground pressure sequence are extracted to obtain the parameter calling results, which are used to reflect the geological environment characteristics within the borehole depth interval.

[0045] Next, the hardness extremes of the local hardness sequence are extracted. The hardness extremes represent the maximum and minimum hardness of the rock within the drilling depth range. Based on the hardness extremes, the hardness performance constraints of the drill pipe are determined. The hardness of the drill pipe is high enough to cope with the rock layer, and at the same time, the hardness of the drill pipe maintains sufficient toughness to adapt to the changes in rocks of different hardness.

[0046] Next, the local chemical water sequence, local geothermal sequence and local geopressure sequence are fitted with the extreme corrosion environment to simulate the most severe corrosion environment that the drill pipe may face and obtain the corrosion performance constraints of the drill pipe. Furthermore, by analyzing the local chemical water sequence, the types and concentrations of chemical substances in the chemical water are determined, and then the possible pH corrosion limits are deduced. The drill pipe material can maintain stability within the pH corrosion limit without serious corrosion. According to the local geothermal sequence, the temperature corrosion limit within the borehole depth range is determined. The drill pipe material can withstand corrosion such as thermal expansion, contraction and possible high-temperature oxidation within the temperature corrosion limit. The pressure corrosion limit within the borehole depth range is obtained through the local geopressure sequence. The drill pipe material can prevent material deformation or accelerated corrosion caused by pressure within the pressure corrosion limit.

[0047] By obtaining the extreme corrosion environment, the corrosion performance constraints of the drill pipe are determined to ensure that the drill pipe can still maintain sufficient durability and stability in extreme corrosion environments.

[0048] Furthermore, the present application also includes the following steps:

[0049] The drill pipe performance fitness function includes a mixed cost constraint term, a performance adaptation constraint term and a scheduling cost constraint term;

[0050] Interactively obtain multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records of multiple sample raw materials, and associate and store the multiple sample raw materials, multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records based on the knowledge graph to obtain the drill rod material information library;

[0051] Aggregating the raw materials of the plurality of sample recipe information to obtain a plurality of sample raw materials, and interactively obtaining a plurality of sample scheduling costs of the plurality of sample raw materials;

[0052] Obtaining multiple sample formula scheduling information of the multiple sample raw materials according to the multiple sample scheduling costs and the multiple sample formula information, and associating and storing the multiple sample formula scheduling information in the drill rod material information library to complete the update of the drill rod material information library;

[0053] The drill rod material information library is traversed using the drill rod performance fitness function and the drill rod material performance constraint to obtain the target raw material information.

[0054] Specifically, the drill pipe performance fitness function includes mixed cost constraints, performance adaptation constraints, and scheduling cost constraints. Among them, the mixed cost constraint refers to the time-consuming and economic cost of the raw material melting and mixing process, which is to mix and melt into molten steel and pour it into a mold of a certain thickness to obtain a steel plate. The performance adaptation constraint refers to the evaluation of whether the raw material formula can meet specific performance requirements based on the drill pipe hardness performance constraint and corrosion performance constraint. The scheduling cost constraint refers to the economic cost and time cost of transporting raw materials from different locations due to different raw material storage locations.

[0055] Then, data is interacted with the control module of the rotary drilling rig drill rod to obtain the raw materials of the rotary drilling rig drill rod at multiple historical times as sample raw materials. Multiple sample formula information, multiple sample mixing cost records, and multiple sample raw material performance records of the sample raw materials are obtained. Using knowledge graph technology, multiple sample formula information, multiple sample mixing cost records, and multiple sample raw material performance records are associated and stored to build a drill rod material information database, which provides data support for subsequent raw material formula selection and optimization.

[0056] Next, the raw materials of multiple sample formula information are aggregated, that is, raw materials with similar performance or cost are classified to form multiple sample raw materials. Through data interaction, multiple sample scheduling costs of multiple sample raw materials are obtained. The sample scheduling cost includes the unit mass price of the raw material and the transportation price of the unit mass of the raw material.

[0057] Next, based on the multiple sample scheduling costs and the multiple sample formula information, multiple sample formula scheduling information of multiple sample raw materials is obtained. The sample formula scheduling information refers to the required quantity of multiple steel raw materials when producing unit mass steel - the unit mass raw material scheduling cost identifier. The multiple sample formula scheduling information is associated and stored in the drill rod material information library, thereby completing the update of the information library. Therefore, the drill rod material information library not only contains the performance and cost information of the raw materials, but also the scheduling cost, making the subsequent optimization process more comprehensive and accurate.

[0058] In addition, the drill rod performance fitness function and drill rod material performance constraints are used to access the updated drill rod material information library in sequence. By comparing the performance fitness of different raw material formulas, the raw material formula that meets the performance requirements and optimizes the cost is screened out, thereby determining the target raw material information. Ensure that the target raw material information can achieve effective cost control while meeting the performance requirements.

[0059] Through data collection, knowledge graph construction, cost analysis, and performance evaluation, the optimal selection of drill pipe raw material formula can be effectively achieved, and the performance and economic benefits of drill pipe can be improved.

[0060] Furthermore, the present application also includes the following steps:

[0061] Obtaining a first sample mixed cost record, a first sample raw material performance record and a first sample formula scheduling information of a first sample raw material based on the drill rod material information library scheduling;

[0062] Calling to obtain the first sample mixing time and the first sample mixing energy consumption according to the first sample mixing cost record;

[0063] Preset a mixing time weight and a mixing energy consumption weight, and perform weighted calculation on the normalized first sample mixing time and the first sample mixing energy consumption based on the mixing time weight and the mixing energy consumption weight to obtain a first mixing cost evaluation value;

[0064] Obtaining the similarity between the first sample raw material performance record and the drill pipe material performance constraint based on Euclidean distance calculation, and obtaining a first performance adaptation evaluation value;

[0065] Obtaining a first sample scheduling time and a first sample raw material cost according to the first sample recipe scheduling information;

[0066] Preset a scheduling time weight and a raw material cost weight, and perform weighted calculation on the normalized first sample scheduling time and the first sample raw material cost based on the scheduling time weight and the raw material cost weight to obtain a first scheduling cost evaluation value;

[0067] Adding the first mixed cost evaluation value, the first performance adaptation evaluation value and the first scheduling cost evaluation value to obtain a first sample fitness;

[0068] By analogy, multiple sample fitness of the multiple sample raw materials in the drill rod material information library is obtained, the multiple sample fitness are serialized and extreme value calls are performed, and the target raw material information is obtained.

[0069] Specifically, random scheduling extraction is performed based on the drill pipe material information library to obtain the first sample mixed cost record of the first sample raw material, the first sample raw material performance record and the first sample formula scheduling information.

[0070] Then, the first sample mixing time and the first sample mixing energy consumption of the first sample raw material are obtained according to the corresponding call of the first sample mixing cost record. Further, the first sample mixing time refers to the time required to mix the first sample raw material with other ingredients to a uniform state. The first sample mixing energy consumption refers to the energy consumed in the mixing process, such as measured in the form of electricity or fuel.

[0071] Next, by presetting the mixing time weight and the mixing energy consumption weight, the importance of the mixing time and the mixing energy consumption in the mixing cost is indicated. The mixing time weight and the mixing energy consumption weight are obtained by custom settings by those skilled in the art according to actual conditions. Furthermore, the first sample mixing time and the first sample mixing energy consumption are normalized to eliminate the dimension difference so that the first sample mixing time and the first sample mixing energy consumption are compared on the same scale. Based on the mixing time weight and the mixing energy consumption weight, the normalized first sample mixing time and the first sample mixing energy consumption are weightedly calculated to obtain the first mixing cost evaluation value.

[0072] Next, the similarity between the first sample raw material performance record and the drill rod material performance constraint is obtained based on the Euclidean distance calculation as a first performance adaptation evaluation value, which is used to reflect the matching degree between the first sample raw material and the drill rod performance requirement.

[0073] Then, the first sample scheduling time and the first sample raw material cost of the first sample raw material are obtained according to the first sample recipe scheduling information.

[0074] Next, by presetting the scheduling time weight and the raw material cost weight, the importance of the scheduling time and the raw material cost in the scheduling cost is indicated. The scheduling time weight and the raw material cost weight are obtained by a technician in this field according to the actual situation. Furthermore, the first sample scheduling time and the first sample raw material cost are normalized to eliminate the dimension difference, so that the first sample scheduling time and the first sample raw material cost are compared on the same scale. Based on the scheduling time weight and the raw material cost weight, the normalized first sample scheduling time and the first sample raw material cost are weighted and calculated to obtain the first scheduling cost evaluation value.

[0075] Next, the first mixed cost evaluation value, the first performance adaptation evaluation value and the first scheduling cost evaluation value are added to obtain the first sample fitness, which is used to reflect the comprehensive performance of the first sample raw material in terms of mixed cost, performance adaptation and scheduling cost.

[0076] In addition, according to the above steps, multiple sample fitness of multiple sample raw materials in the drill rod material information library are calculated in sequence. Multiple sample fitness are serialized and extreme value calls are performed, that is, the sample raw material with the highest fitness is found as the target raw material, and then the target raw material information is obtained for subsequent drill rod production.

[0077] By evaluating the drill pipe material information, it is ensured that the selected raw materials have lower mixing and scheduling costs while meeting the performance requirements, thereby improving the efficiency and economy of drill pipe production.

[0078] Furthermore, the present application also includes the following steps:

[0079] Interactively obtain multiple sample drill rod parameter information, wherein each sample drill rod parameter information includes sample drilling pressure, sample drilling torsion force, sample drilling depth, sample drill rod thickness, sample effective length and sample thread length;

[0080] Splitting the multiple sample drill rod parameter information to obtain multiple groups of sample drilling parameters, multiple sample effective lengths and multiple sample thread lengths, wherein each group of sample drilling parameters includes sample drilling pressure, sample drilling torsion force, sample drilling depth and sample drill rod thickness;

[0081] Inputting the multiple groups of sample drilling parameters into a drilling parameter convolution training layer, wherein the drilling parameter convolution training layer includes a multi-layer drilling parameter kernel function, which is used to extract features of the multiple groups of sample drilling parameters to obtain multi-layer drilling parameter output samples;

[0082] Inputting the multiple sample effective lengths and the multiple sample thread lengths into a connection length convolution training layer, wherein the connection length convolution training layer includes a connection length kernel function, which is used to perform feature extraction on the multiple sample effective lengths and the multiple sample thread lengths to obtain multiple effective length output samples and multiple thread length output samples;

[0083] The multi-layer drilling parameter output samples and the multiple effective length output samples are used to perform fitting function construction training to obtain an effective length fitting function, and the multi-layer drilling parameter output samples and the multiple thread length output samples are used to perform fitting function construction training to obtain a thread length fitting function, wherein the thread length fitting function and the effective length fitting function meet a preset convergence condition;

[0084] The thread length fitting function and the effective length fitting function are mapped and synchronized to the effective length analysis branch and the thread length analysis branch to complete the construction of the steel pipe length analysis network.

[0085] Specifically, drill pipe parameter information of historical time is collected through data interaction as multiple sample drill pipe parameter information. Among them, each sample drill pipe parameter information contains sample drilling pressure, sample drilling torsion, sample drilling depth, sample drill pipe thickness, sample effective length and sample thread length for subsequent analysis. Among them, the sample effective length refers to the actual sample drill pipe length after removing the sample thread length. Furthermore, different drilling pressure-torsion-length-thickness correspond to different length constraints and thread connection constraints, and the length constraint of a single steel pipe and the thread reservation constraint of the thread connection are calculated and determined. Among them, the total height of the drill pipe is formed by threading multiple steel pipes, and the length of each steel pipe is a part of the total height of the drill pipe.

[0086] Then, the collected multiple sample drill rod parameter information is split, and different parameter types are separated for different processing and analysis. After splitting, multiple groups of sample drilling parameters and multiple sample effective lengths and multiple sample thread lengths are obtained. Among them, each group of sample drilling parameters includes sample drilling pressure, sample drilling torsion force, sample drilling depth, and sample drill rod thickness.

[0087] Next, the drilling parameter convolution training layer is a neural network layer that processes drilling parameters. Using the principle of convolutional neural network, the input drilling parameters are feature extracted through multi-layer drilling parameter kernel functions, i.e., convolution kernels. The local features in the input multiple sets of sample drilling parameters are captured through multi-layer drilling parameter kernel functions. Each layer of kernel functions extracts higher-level features from the output of the previous layer. The weighted sum of the features obtained through the multi-layer drilling parameter kernel functions is calculated to obtain the characteristics and laws of the drilling process. After the convolution operation of the multi-layer drilling parameter kernel functions, the multi-layer drilling parameter output samples are obtained for the subsequent fitting function construction.

[0088] Next, the connection length convolution training layer is a neural network layer that processes the effective length and thread length. Using the principle of convolutional neural network, the connection length kernel function, that is, the convolution kernel, is used to extract features from multiple input sample effective lengths and multiple sample thread lengths. The connection length kernel function is used to capture local features in multiple input sample effective lengths and multiple sample thread lengths. Each layer of kernel function extracts higher-level features from the output of the previous layer. The weighted sum of the features obtained by the connection length kernel function is calculated to obtain multiple effective length output samples and multiple thread length output samples for subsequent fitting function construction.

[0089] Then, the fitting function is constructed and trained using multiple layers of drilling parameter output samples and multiple effective length output samples, and then the relationship between the drilling parameters and the effective length is associated to obtain the effective length fitting function. Similarly, the fitting function is constructed and trained using multiple layers of drilling parameter output samples and multiple thread length output samples, and then the relationship between the drilling parameters and the thread length is associated to obtain the thread length fitting function. Furthermore, the construction process of the thread length fitting function and the effective length fitting function meets the preset convergence conditions to ensure the accuracy and stability of the function. Among them, the preset convergence conditions can be set according to factors such as the change of the loss function and the number of iterations during the training process to ensure the stability and generalization ability of the fitting function.

[0090] Next, the trained thread length fitting function mapping is synchronized to the thread length analysis branch, and the trained effective length fitting function mapping is synchronized to the effective length analysis branch. When the new drilling parameters are input into the steel pipe length analysis network, the corresponding thread length and effective length are calculated through the thread length analysis branch and the effective length analysis branch, thereby completing the construction of the steel pipe length analysis network.

[0091] By constructing a steel pipe length analysis network, the accuracy of output data obtained through the steel pipe length analysis network is improved.

[0092] Furthermore, the present application also includes the following steps:

[0093] Interactively obtain multiple measured drilling parameter sets, wherein each measured drilling parameter set includes a measured drilling force and a measured drilling condition, the measured drilling force includes a drilling pressure and a measured drilling torsion force, and the measured drilling condition includes a measured drilling depth, a measured drilling diameter, and a measured drilling hardness;

[0094] Using the plurality of measured drilling parameter sets as training data, training a drilling parameter fitting network pre-constructed based on a BP neural network is performed until the output accuracy of the drilling parameter fitting network meets a preset value;

[0095] Perform extreme value calling based on the drilling depth interval to obtain a drilling depth limit;

[0096] The drilling depth limit, drill rod hardness performance constraint and drilling diameter requirement are synchronized to the drilling parameter fitting network to obtain the drilling pressure limit and drilling torsional force limit.

[0097] Specifically, multiple measured drilling parameter sets are collected through data interaction. Each measured drilling parameter set includes measured data of actual drilling operations. The measured data of actual drilling operations include measured drilling forces and measured drilling conditions, which are used to reflect the conditions and requirements in the actual drilling process and are the basis for subsequent analysis and fitting. The measured drilling forces include drilling pressure and measured drilling torsional force. The measured drilling conditions include measured drilling depth, measured drilling diameter, and measured drilling hardness.

[0098] Then, multiple measured drilling parameter sets are used as training data to train the drilling parameter fitting network pre-built based on the BP neural network. During the training process, the weights and parameters of the network are adjusted iteratively until the output accuracy of the drilling parameter fitting network meets the preset value. The preset value is set according to the actual application requirements and represents the acceptable error range of the network output.

[0099] Next, the extreme value is called according to the drilling depth range to obtain the drilling depth limit, which is used as a constraint condition for subsequent analysis to ensure that the drilling operation is carried out within a safe range.

[0100] Next, the obtained drilling depth limit, drill rod hardness performance constraint and drilling diameter requirement are synchronized to the trained drilling parameter fitting network. The drilling depth limit, drill rod hardness performance constraint and drilling diameter requirement are used as the input of the network. The drilling pressure and drilling torque limit are calculated based on the drilling parameter fitting network to obtain the drilling pressure limit and drilling torque limit. On the premise of meeting all constraints, the maximum or minimum value of the drilling pressure and torque is predicted, and then the appropriate drilling parameters are determined to ensure the safety and efficiency of the drilling process.

[0101] Ensure data accuracy and completeness by collecting measured borehole parameter sets.

[0102] Furthermore, the present application also includes the following steps:

[0103] Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the effective length analysis branch of the steel pipe length analysis network to obtain an effective steel pipe length;

[0104] Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the thread length analysis branch of the steel pipe length analysis network to obtain the thread reserved length;

[0105] The full-length calculation layer adds the effective steel pipe length and the thread reserved length to obtain a conceptual monomer length, and optimizes the conceptual monomer length based on the processing error pre-stored in the full-length calculation layer to obtain the target monomer length.

[0106] Specifically, the calculated drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness are synchronized to the effective length analysis branch of the steel pipe length analysis network for length analysis to calculate the effective length of the steel pipe.

[0107] Then, the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness are synchronized to the thread length analysis branch of the steel pipe length analysis network to analyze the thread length and obtain the thread reserved length for steel pipe connection and fixation.

[0108] Next, the full-length calculation layer receives the effective steel pipe length from the effective length analysis branch and the thread reserved length from the thread length analysis branch, and adds the effective steel pipe length and the thread reserved length to obtain the conceptual monomer length. The total height of the drill pipe is formed by multiple steel pipe threads, and the length of each steel pipe, that is, the conceptual monomer length, is part of the total height of the drill pipe. The conceptual monomer length can be regarded as the theoretical overall length of the steel pipe, including the effective length and the thread length used for connection. Furthermore, the full-length calculation layer pre-stores the processing error data. In the actual production process, due to various factors such as equipment accuracy, material properties, etc., the actual processing of the steel pipe length may deviate. Therefore, based on the pre-stored processing error data, the full-length calculation layer will optimize and adjust the conceptual monomer length to obtain a target monomer length that is closer to the actual production situation, thereby improving the accuracy of the steel pipe length and production efficiency.

[0109] By obtaining the target single-unit length, the accuracy of steel pipe length and production efficiency can be improved.

[0110] In summary, the method for rolling a steel pipe for a rotary drilling rig drill rod provided in the present application has the following technical effects:

[0111] The drilling-related information of the pre-production drill pipe is obtained through interaction, wherein the drilling-related information includes the drilling geological environment, the drilling depth interval and the drilling diameter requirement; the drilling geological environment is parameter-called with the drilling depth interval, and the drill pipe material performance constraint is obtained based on the parameter calling result analysis, wherein the drill pipe material performance constraint includes the drill pipe hardness performance constraint and the drill pipe corrosion performance constraint; the drill pipe performance fitness function is pre-constructed, and the drill pipe performance fitness function and the drill pipe material performance constraint are used to traverse the pre-called drill pipe material information library to obtain the target raw material information; the steel plate thickness analysis network is pre-constructed, and the drill pipe hardness performance constraint, the drilling depth interval and the drilling diameter requirement are synchronized to the steel plate thickness analysis network to obtain the target steel plate thickness; the steel pipe length analysis network is pre-constructed, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length analysis branch. long calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; the drilling pressure limit, the drilling torsion force limit and the drilling depth limit are obtained according to the drilling association information fitting, and the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain the target monomer length; steel plates are produced according to the target raw material information and the target steel plate thickness to obtain the target rolled raw material; steel pipe rolling processing is performed with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer, that is, by determining the length variation range of the steel pipe that can be achieved based on splicing, determining the length of the steel pipe thread, etc., finally achieving the technical goal of the stability of the threaded steel pipe and achieving the technical effect of improving production safety.

[0112] Embodiment 2

[0113] Based on the same inventive concept as the steel pipe rolling method for a rotary drilling rig drill rod in the aforementioned embodiment, the present application also provides a steel pipe rolling system for a rotary drilling rig drill rod, please refer to the attached Figure 2 , the system comprising:

[0114] A drilling-related information acquisition module 11, wherein the drilling-related information acquisition module 11 is used to interactively obtain drilling-related information of pre-production drill pipes, wherein the drilling-related information includes drilling geological environment, drilling depth interval and drilling diameter requirements;

[0115] A drill pipe material performance constraint obtaining module 12, the drill pipe material performance constraint obtaining module 12 is used to perform parameter call on the borehole geological environment in the borehole depth interval, and obtain drill pipe material performance constraints based on parameter call result analysis, wherein the drill pipe material performance constraints include drill pipe hardness performance constraints and drill pipe corrosion performance constraints;

[0116] A target raw material information obtaining module 13, wherein the target raw material information obtaining module 13 is used to pre-build a drill rod performance fitness function, and use the drill rod performance fitness function and the drill rod material performance constraint to traverse a pre-called drill rod material information library to obtain target raw material information;

[0117] A target steel plate thickness obtaining module 14, wherein the target steel plate thickness obtaining module 14 is used to pre-build a steel plate thickness analysis network, and synchronize the drill rod hardness performance constraint, the drilling depth interval and the drilling diameter requirement to the steel plate thickness analysis network to obtain a target steel plate thickness;

[0118] A steel pipe length analysis network construction module 15, wherein the steel pipe length analysis network construction module 15 is used to pre-construct a steel pipe length analysis network, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, wherein the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer;

[0119] A target monomer length obtaining module 16, wherein the target monomer length obtaining module 16 is used to obtain a drilling pressure limit value, a drilling torsion force limit value and a drilling depth limit value according to the drilling association information, and synchronize the drilling pressure limit value, the drilling torsion force limit value, the drilling depth limit value and the target steel plate thickness to the steel pipe length analysis network to obtain a target monomer length;

[0120] A target rolling raw material acquisition module 17, wherein the target rolling raw material acquisition module 17 is used to produce steel plates according to the target raw material information and the target steel plate thickness to obtain the target rolling raw material;

[0121] The target steel pipe monomer obtaining module 18 is used to perform steel pipe rolling processing with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer.

[0122] Further, the drill pipe material performance constraint acquisition module in the system

[0123] 12 is also used for:

[0124] The borehole geological environment includes a rock hardness sequence, a chemical water composition sequence, a geothermal sequence and a geopressure sequence;

[0125] Performing parameter call on the borehole geological environment in the borehole depth interval to obtain the parameter call result, wherein the parameter call result includes a local hardness sequence, a local chemical water sequence, a local geothermal sequence, and a local geopressure sequence;

[0126] Calling the hardness extreme value of the local hardness sequence to obtain the drill pipe hardness performance constraint;

[0127] The local chemical water sequence, the local geothermal sequence and the local geopressure sequence are subjected to corrosion extreme environment fitting to obtain the drill pipe corrosion performance constraint, wherein the drill pipe corrosion performance constraint includes pH value corrosion limit, temperature corrosion limit and pressure corrosion limit.

[0128] Furthermore, the target raw material information obtaining module 13 in the system is also used for:

[0129] The drill pipe performance fitness function includes a mixed cost constraint term, a performance adaptation constraint term and a scheduling cost constraint term;

[0130] Interactively obtain multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records of multiple sample raw materials, and associate and store the multiple sample raw materials, multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records based on the knowledge graph to obtain the drill rod material information library;

[0131] Aggregating the raw materials of the plurality of sample recipe information to obtain a plurality of sample raw materials, and interactively obtaining a plurality of sample scheduling costs of the plurality of sample raw materials;

[0132] Obtaining multiple sample formula scheduling information of the multiple sample raw materials according to the multiple sample scheduling costs and the multiple sample formula information, and associating and storing the multiple sample formula scheduling information in the drill rod material information library to complete the update of the drill rod material information library;

[0133] The drill rod material information library is traversed using the drill rod performance fitness function and the drill rod material performance constraint to obtain the target raw material information.

[0134] Furthermore, the target raw material information obtaining module 13 in the system is also used for:

[0135] Obtaining a first sample mixed cost record, a first sample raw material performance record and a first sample formula scheduling information of a first sample raw material based on the drill rod material information library scheduling;

[0136] Calling to obtain the first sample mixing time and the first sample mixing energy consumption according to the first sample mixing cost record;

[0137] Preset a mixing time weight and a mixing energy consumption weight, and perform weighted calculation on the normalized first sample mixing time and the first sample mixing energy consumption based on the mixing time weight and the mixing energy consumption weight to obtain a first mixing cost evaluation value;

[0138] Obtaining the similarity between the first sample raw material performance record and the drill pipe material performance constraint based on Euclidean distance calculation, and obtaining a first performance adaptation evaluation value;

[0139] Obtaining a first sample scheduling time and a first sample raw material cost according to the first sample recipe scheduling information;

[0140] Preset a scheduling time weight and a raw material cost weight, and perform weighted calculation on the normalized first sample scheduling time and the first sample raw material cost based on the scheduling time weight and the raw material cost weight to obtain a first scheduling cost evaluation value;

[0141] Adding the first mixed cost evaluation value, the first performance adaptation evaluation value and the first scheduling cost evaluation value to obtain a first sample fitness;

[0142] By analogy, multiple sample fitness of the multiple sample raw materials in the drill rod material information library is obtained, the multiple sample fitness are serialized and extreme value calls are performed, and the target raw material information is obtained.

[0143] Further, the steel pipe length analysis network construction module 15 in the system is also used for:

[0144] Interactively obtain multiple sample drill rod parameter information, wherein each sample drill rod parameter information includes sample drilling pressure, sample drilling torsion force, sample drilling depth, sample drill rod thickness, sample effective length and sample thread length;

[0145] Splitting the multiple sample drill rod parameter information to obtain multiple groups of sample drilling parameters, multiple sample effective lengths and multiple sample thread lengths, wherein each group of sample drilling parameters includes sample drilling pressure, sample drilling torsion force, sample drilling depth and sample drill rod thickness;

[0146] Inputting the multiple groups of sample drilling parameters into a drilling parameter convolution training layer, wherein the drilling parameter convolution training layer includes a multi-layer drilling parameter kernel function, which is used to extract features of the multiple groups of sample drilling parameters to obtain multi-layer drilling parameter output samples;

[0147] Inputting the multiple sample effective lengths and the multiple sample thread lengths into a connection length convolution training layer, wherein the connection length convolution training layer includes a connection length kernel function, which is used to perform feature extraction on the multiple sample effective lengths and the multiple sample thread lengths to obtain multiple effective length output samples and multiple thread length output samples;

[0148] The multi-layer drilling parameter output samples and the multiple effective length output samples are used to perform fitting function construction training to obtain an effective length fitting function, and the multi-layer drilling parameter output samples and the multiple thread length output samples are used to perform fitting function construction training to obtain a thread length fitting function, wherein the thread length fitting function and the effective length fitting function meet a preset convergence condition;

[0149] The thread length fitting function and the effective length fitting function are mapped and synchronized to the effective length analysis branch and the thread length analysis branch to complete the construction of the steel pipe length analysis network.

[0150] Furthermore, the target monomer length obtaining module 16 in the system is also used for:

[0151] Interactively obtain multiple measured drilling parameter sets, wherein each measured drilling parameter set includes a measured drilling force and a measured drilling condition, the measured drilling force includes a drilling pressure and a measured drilling torsion force, and the measured drilling condition includes a measured drilling depth, a measured drilling diameter, and a measured drilling hardness;

[0152] Using the plurality of measured drilling parameter sets as training data, training a drilling parameter fitting network pre-constructed based on a BP neural network is performed until the output accuracy of the drilling parameter fitting network meets a preset value;

[0153] Perform extreme value calling based on the drilling depth interval to obtain a drilling depth limit;

[0154] The drilling depth limit, drill rod hardness performance constraint and drilling diameter requirement are synchronized to the drilling parameter fitting network to obtain the drilling pressure limit and drilling torsional force limit.

[0155] Furthermore, the target monomer length obtaining module 16 in the system is also used for:

[0156] Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the effective length analysis branch of the steel pipe length analysis network to obtain an effective steel pipe length;

[0157] Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the thread length analysis branch of the steel pipe length analysis network to obtain the thread reserved length;

[0158] The full-length calculation layer adds the effective steel pipe length and the thread reserved length to obtain a conceptual monomer length, and optimizes the conceptual monomer length based on the processing error pre-stored in the full-length calculation layer to obtain the target monomer length.

[0159] Each embodiment in this specification is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The steel pipe rolling method for a rotary drilling rig drill rod and the specific examples in the aforementioned embodiment 1 are also applicable to a steel pipe rolling system for a rotary drilling rig drill rod in this embodiment. Through the aforementioned detailed description of the steel pipe rolling method for a rotary drilling rig drill rod, those skilled in the art can clearly know the steel pipe rolling system for a rotary drilling rig drill rod in this embodiment, so for the sake of brevity of the specification, it will not be described in detail here. For the system disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part description.

[0160] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

[0161] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application belong to the scope of the present application and its equivalent technology, the present application is also intended to include these modifications and variations.

Claims

1. A method for rolling a steel pipe for a rotary drilling rig drill rod, characterized in that: The method comprises: Interactively obtain drilling related information of the pre-production drill pipe, wherein the drilling related information includes drilling geological environment, drilling depth range and drilling diameter requirements; The drilling geological environment is parameterized according to the drilling depth interval, and drill pipe material performance constraints are obtained based on the parameter calling result analysis, wherein the drill pipe material performance constraints include drill pipe hardness performance constraints and drill pipe corrosion performance constraints; Pre-constructing a drill rod performance fitness function, and using the drill rod performance fitness function and the drill rod material performance constraint to traverse a pre-called drill rod material information library to obtain target raw material information; Pre-constructing a steel plate thickness analysis network, and synchronizing the drill rod hardness performance constraint, the drilling depth interval and the drilling diameter requirement to the steel plate thickness analysis network to obtain a target steel plate thickness; Pre-constructing a steel pipe length analysis network, wherein the steel pipe length analysis network comprises an effective length analysis branch, a thread length analysis branch and a full length calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; According to the drilling association information, a drilling pressure limit, a drilling torsion force limit and a drilling depth limit are obtained by fitting, and the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain a target monomer length; Producing steel plates according to the target raw material information and the target steel plate thickness to obtain target rolled raw materials; Performing steel pipe rolling processing with the target single body length and the drilling diameter requirement as constraints to obtain a target steel pipe single body; The drilling geological environment is parameterized according to the drilling depth interval, and drill pipe material performance constraints are obtained based on the parameter calling result analysis, wherein the drill pipe material performance constraints include drill pipe hardness performance constraints and drill pipe corrosion performance constraints, and the method further includes: The borehole geological environment includes a rock hardness sequence, a chemical water composition sequence, a geothermal sequence and a geopressure sequence; Performing parameter call on the borehole geological environment in the borehole depth interval to obtain the parameter call result, wherein the parameter call result includes a local hardness sequence, a local chemical water sequence, a local geothermal sequence, and a local geopressure sequence; Calling the hardness extreme value of the local hardness sequence to obtain the drill pipe hardness performance constraint; The local chemical water sequence, the local geothermal sequence and the local geopressure sequence are subjected to corrosion extreme environment fitting to obtain the drill pipe corrosion performance constraint, wherein the drill pipe corrosion performance constraint includes pH value corrosion limit, temperature corrosion limit and pressure corrosion limit.

2. The method according to claim 1, characterized in that Pre-constructing a drill rod performance fitness function, using the drill rod performance fitness function and the drill rod material performance constraint to traverse a pre-called drill rod material information library to obtain target raw material information, the method further comprising: The drill pipe performance fitness function includes a mixed cost constraint term, a performance adaptation constraint term and a scheduling cost constraint term; Interactively obtain multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records of multiple sample raw materials, and associate and store the multiple sample raw materials, multiple sample formula information, multiple sample mixing cost records and multiple sample raw material performance records based on the knowledge graph to obtain the drill rod material information library; Aggregating the raw materials of the plurality of sample recipe information to obtain a plurality of sample raw materials, and interactively obtaining a plurality of sample scheduling costs of the plurality of sample raw materials; Obtaining multiple sample formula scheduling information of the multiple sample raw materials according to the multiple sample scheduling costs and the multiple sample formula information, and associating and storing the multiple sample formula scheduling information in the drill rod material information library to complete the update of the drill rod material information library; The drill rod material information library is traversed using the drill rod performance fitness function and the drill rod material performance constraint to obtain the target raw material information.

3. The method according to claim 2, characterized in that Pre-constructing a drill rod performance fitness function, using the drill rod performance fitness function and the drill rod material performance constraint to traverse a pre-called drill rod material information library to obtain target raw material information, the method further comprising: Obtaining a first sample mixed cost record, a first sample raw material performance record and a first sample formula scheduling information of a first sample raw material based on the drill pipe material information library scheduling; Calling the first sample mixing cost record to obtain the first sample mixing time and the first sample mixing energy consumption; Preset a mixing time weight and a mixing energy consumption weight, and perform weighted calculation on the normalized first sample mixing time and the first sample mixing energy consumption based on the mixing time weight and the mixing energy consumption weight to obtain a first mixing cost evaluation value; Obtaining the similarity between the first sample raw material performance record and the drill pipe material performance constraint based on Euclidean distance calculation, and obtaining a first performance adaptation evaluation value; Obtaining a first sample scheduling time and a first sample raw material cost according to the first sample recipe scheduling information; Preset a scheduling time weight and a raw material cost weight, and perform weighted calculation on the normalized first sample scheduling time and the first sample raw material cost based on the scheduling time weight and the raw material cost weight to obtain a first scheduling cost evaluation value; Adding the first mixed cost evaluation value, the first performance adaptation evaluation value and the first scheduling cost evaluation value to obtain a first sample fitness; By analogy, multiple sample fitness of the multiple sample raw materials in the drill rod material information library is obtained, the multiple sample fitness are serialized and extreme value calls are performed, and the target raw material information is obtained.

4. The method according to claim 1, characterized in that Pre-constructing a steel pipe length analysis network, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer, and the method further includes: Interactively obtain multiple sample drill rod parameter information, wherein each sample drill rod parameter information includes sample drilling pressure, sample drilling torsion force, sample drilling depth, sample drill rod thickness, sample effective length and sample thread length; Splitting the multiple sample drill rod parameter information to obtain multiple groups of sample drilling parameters, multiple sample effective lengths and multiple sample thread lengths, wherein each group of sample drilling parameters includes sample drilling pressure, sample drilling torsion force, sample drilling depth and sample drill rod thickness; Inputting the multiple groups of sample drilling parameters into a drilling parameter convolution training layer, wherein the drilling parameter convolution training layer includes a multi-layer drilling parameter kernel function, which is used to extract features of the multiple groups of sample drilling parameters to obtain multi-layer drilling parameter output samples; Inputting the multiple sample effective lengths and the multiple sample thread lengths into a connection length convolution training layer, wherein the connection length convolution training layer includes a connection length kernel function, which is used to perform feature extraction on the multiple sample effective lengths and the multiple sample thread lengths to obtain multiple effective length output samples and multiple thread length output samples; The multi-layer drilling parameter output samples and the multiple effective length output samples are used to perform fitting function construction training to obtain an effective length fitting function, and the multi-layer drilling parameter output samples and the multiple thread length output samples are used to perform fitting function construction training to obtain a thread length fitting function, wherein the thread length fitting function and the effective length fitting function meet a preset convergence condition; The thread length fitting function and the effective length fitting function are mapped and synchronized to the effective length analysis branch and the thread length analysis branch to complete the construction of the steel pipe length analysis network.

5. The method according to claim 4, wherein the drilling pressure limit, the drilling torsion force limit and the drilling depth limit are obtained by fitting the drilling associated information, and the method further comprises: Interactively obtain multiple measured drilling parameter sets, wherein each measured drilling parameter set includes a measured drilling force and a measured drilling condition, the measured drilling force includes a drilling pressure and a measured drilling torsion force, and the measured drilling condition includes a measured drilling depth, a measured drilling diameter, and a measured drilling hardness; Using the plurality of measured drilling parameter sets as training data, training a drilling parameter fitting network pre-constructed based on a BP neural network is performed until the output accuracy of the drilling parameter fitting network meets a preset value; Perform extreme value calling based on the drilling depth interval to obtain a drilling depth limit; The drilling depth limit, drill rod hardness performance constraint and drilling diameter requirement are synchronized to the drilling parameter fitting network to obtain the drilling pressure limit and drilling torsional force limit.

6. The method according to claim 5, wherein the drilling pressure limit, the drilling torsion force limit, the drilling depth limit and the target steel plate thickness are synchronized to the steel pipe length analysis network to obtain a target monomer length, and the method further comprises: Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the effective length analysis branch of the steel pipe length analysis network to obtain an effective steel pipe length; Synchronize the drilling pressure limit, drilling torsion force limit, drilling depth limit and target steel plate thickness to the thread length analysis branch of the steel pipe length analysis network to obtain the thread reserved length; The full-length calculation layer adds the effective steel pipe length and the thread reserved length to obtain a conceptual monomer length, and optimizes the conceptual monomer length based on the processing error pre-stored in the full-length calculation layer to obtain the target monomer length.

7. A steel pipe rolling system for rotary drilling rig drill pipe, characterized in that: For implementing the steps of the method according to any one of claims 1 to 6, the system comprises: A drilling-related information acquisition module, wherein the drilling-related information acquisition module is used to interactively obtain drilling-related information of pre-production drill pipes, wherein the drilling-related information includes drilling geological environment, drilling depth interval and drilling diameter requirements; A drill pipe material performance constraint obtaining module, the drill pipe material performance constraint obtaining module is used to perform parameter call on the borehole geological environment in the borehole depth interval, and obtain drill pipe material performance constraints based on parameter call result analysis, wherein the drill pipe material performance constraints include drill pipe hardness performance constraints and drill pipe corrosion performance constraints; A target raw material information acquisition module, wherein the target raw material information acquisition module is used to pre-build a drill rod performance fitness function, and use the drill rod performance fitness function and the drill rod material performance constraint to traverse a pre-called drill rod material information library to obtain target raw material information; A target steel plate thickness acquisition module, wherein the target steel plate thickness acquisition module is used to pre-build a steel plate thickness analysis network, and synchronize the drill rod hardness performance constraint, the drilling depth interval and the drilling diameter requirement to the steel plate thickness analysis network to obtain a target steel plate thickness; A steel pipe length analysis network construction module, wherein the steel pipe length analysis network construction module is used to pre-construct a steel pipe length analysis network, wherein the steel pipe length analysis network includes an effective length analysis branch, a thread length analysis branch and a full length calculation layer, wherein the effective length analysis branch and the thread length analysis branch are connected in parallel, and the output ends of the effective length analysis branch and the thread length analysis branch are connected to the input end of the full length calculation layer; A target monomer length acquisition module, the target monomer length acquisition module is used to obtain a drilling pressure limit value, a drilling torsion force limit value and a drilling depth limit value according to the drilling association information, synchronize the drilling pressure limit value, the drilling torsion force limit value, the drilling depth limit value and the target steel plate thickness to the steel pipe length analysis network, and obtain a target monomer length; A target rolling raw material acquisition module, wherein the target rolling raw material acquisition module is used to produce steel plates according to the target raw material information and the target steel plate thickness to obtain the target rolling raw material; A target steel pipe monomer acquisition module is used to perform steel pipe rolling processing with the target monomer length and the drilling diameter requirement as constraints to obtain the target steel pipe monomer.

Citation Information

Patent Citations

  • Double-power low spiral auger and its processing method

    CN101509357A

  • Drill pipe made of 165ksi steel grade for low temperature resistance up to -20℃ and its manufacturing method

    CN102268614A

  • A test method for the load-bearing capacity of an oil derrick

    CN102288401A

  • Production method of hot-rolled steel strip for drill rod of rotary drilling rig

    CN112375968A

  • Titanium alloy drill rod and production method

    CN112680631A