A simulation verification method for the type change of dispatching master station

By exporting and editing graphics and point table files, using simulation tools and transmission control tools for offline verification, the problem of difficulty in remote control information transmission verification in scheduling main station system replacement is solved, efficient simulation transmission verification is achieved, and manual labor is reduced Participation and power outage risks.

CN118536323BActive Publication Date: 2024-11-05DONGFANG ELECTRONICS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411008252.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-11-05
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

During the replacement of the main station system, remote control information transmission verification cannot be effectively carried out, resulting in possible remote control error operation power outage, affecting the power supply quality of the power grid. The existing technology requires manual configuration, which is easy to introduce errors.

Method used

A simulation verification method for dispatching the main station replacement is proposed. By exporting and editing graphics and point table files, using simulation tools and transmission control tools for offline verification, generating and recording operation sequence information, ensuring that the remote control transmission information of new and old systems is consistent. avoid human participation.

Benefits of technology

In the absence of power outage, simulation transmission verification of the dispatching main station system is realized, manual participation is reduced, verification efficiency and automation level are improved, and power outage risks caused by remote control transmission verification are avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118536323B_ABST
    Figure CN118536323B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of power system automation, and specifically relates to a method for simulating and verifying the type change of a dispatching master station. The present invention does not expand the functions of the dispatching master station system, does not deploy any software program on the dispatching master station system in an intrusive manner, and carries out simulation transmission verification of the type change of the dispatching master station on the premise that the substation that has been put into operation does not stop power supply, which better solves the problem of difficulty in remote control information transmission verification before the type change of the dispatching master station system at this stage, and can effectively improve the efficiency and automation level of the type change verification work of the dispatching master station system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of power system automation, and in particular relates to a simulation verification method for type change of a dispatching master station. Background Art

[0002] The power grid dispatching automation master station system (referred to as the dispatching master station system) is used to collect, monitor, store, analyze, and alarm the power grid operation information, as well as to safely handle power grid failures, thereby providing dispatching personnel with means of daily monitoring and operation and maintenance to ensure the safe and stable operation of the power grid. With the continuous development of power system automation technology and computer technology, the dispatching master station system will inevitably need to be upgraded.

[0003] At present, the dispatching master station system is undergoing a model change and upgrade. During the process of model change and upgrade, in order to improve work efficiency, the new dispatching master station system usually develops a customized parameter information conversion function, which imports the graphics, models, database records and other parameter information of the original dispatching master station system, and generates its own parameter information through automatic parsing and conversion technology. For parameter information that cannot be completely converted, manual configuration is required. Since the customized parameter information conversion function has functional defects and applicability risks, it is impossible to guarantee the consistency of the new and old graphics, models, database record information, graphic related information and other contents of the new dispatching master station system and the original dispatching master station system. In addition, manual configuration work is very easy to introduce erroneous content. It is very necessary to verify various parameter information of the new dispatching master station system before it is put into use, and the most important of them is the transmission verification of remote control information.

[0004] In addition, since all substations under the dispatching master station system are in energized operation, gateways and other equipment in the substations cannot effectively cooperate to complete the remote control transmission verification work. Once the new dispatching master station system has incorrect remote control parameter information, it will directly cause a power outage due to remote control misoperation, seriously affecting the power supply quality of the power grid. Summary of the invention

[0005] In order to overcome the problems in the prior art, the present invention proposes a scheduling master station replacement simulation verification method.

[0006] The technical solution of the present invention to solve the above technical problems is as follows:

[0007] The present invention provides a scheduling master station type change simulation verification method, comprising the following steps:

[0008] S1: The original dispatching master station system exports the substation graphic files and the master-substation interaction point table files;

[0009] S2: The new dispatching master station system edits graphics and point table configurations, and exports the graphics files of each substation and the interactive point table files of the master and substation;

[0010] S3: Offline verification is performed on the substation graphic files and master-substation interaction point table files exported by the original dispatching master station system and the new dispatching master station system. If the verification fails, step S2 is repeated until the verification passes.

[0011] S4: Based on the graphic files exported by the original dispatching master station system and the master-substation interaction point table file, parse and extract the configuration parameters of the substation simulation tool;

[0012] S5: Based on the graphic files of the original dispatching master station system and the new dispatching master station system, parse, extract and generate the configuration parameters of the transmission control tool;

[0013] S6: Simulate batch substations based on the configuration parameters of the substation simulation tool, and establish communication connections with the original dispatching master station system and the new dispatching master station system at the same time;

[0014] S7: The transmission control tool is connected to the original dispatching master station system and the new dispatching master station system at the same time;

[0015] S8: Use the transmission control tool to open the graphic files of the substation to be driven in the original dispatching master station system and the new dispatching master station system respectively, and locate the graphic elements to be remotely controlled in the graphic files in sequence, so as to generate and save the positioning information of all graphic elements;

[0016] S9: Use the transmission control tool to perform remote control transmission operations on the first located graphic element in the graphic files of the original dispatching master station system and the new dispatching master station system respectively, and record the entire operation process to form operation sequence information;

[0017] S10: The transmission control tool generates an operation sequence information list of all the graphics elements based on the positioning information of all the graphics elements and the operation sequence information of the first positioned graphics element;

[0018] S11: The transmission control tool controls the original dispatching master station system and the new dispatching master station system to operate each transmission element to be remotely controlled in turn based on the operation sequence information list of all the elements;

[0019] S12: The original dispatching master station system and the new dispatching master station system respectively send the remote control transmission information to the substation simulation tool;

[0020] S13: The substation simulation tool makes a judgment based on the remote control transmission information received from the original dispatching master station system and the new dispatching master station system, and generates a comparison result of the remote control transmission of the corresponding graphic files; if all graphic files are verified, the entire verification process is completed, otherwise, S8 is repeated until all graphic files are verified.

[0021] Furthermore, S2 specifically includes: the new dispatching master station system edits its own graphics and point table configuration parameters based on the graphics and point table files of the original dispatching master station system, and then uses its inherent configuration export function to export the graphic files of each substation under the new dispatching master station system and the point table files for interaction with the main substations of each substation in a standard format.

[0022] Furthermore, S3 specifically includes: file format standardization verification of each substation graphic file and master-substation interaction point table file exported by the original dispatching master station system and the new dispatching master station system, as well as information consistency verification of the same substation graphic files exported by the two master station systems and information consistency verification of the same substation master-substation interaction point table files; if the verification fails, the graphics and point table configurations are re-modified and exported in the new dispatching master station system until the verification passes.

[0023] Furthermore, S4 specifically includes: based on the graphic file exported from the original dispatching master station system, parsing and extracting the remote control and reverse verification telesignaling parameters corresponding to each graphic element therein; based on the master-substation interaction point table file, parsing and extracting all the remote control and telesignaling parameters therein; based on the remote control and reverse verification telesignaling parameters corresponding to each graphic element extracted from the graphic file, and all the remote control and telesignaling parameters extracted from the master-substation interaction point table file, generating the configuration parameters of the substation simulation tool.

[0024] Furthermore, S5 specifically includes: based on the graphic files exported by the original dispatching master station system and the new dispatching master station system, extracting the horizontal and vertical relative coordinate parameters corresponding to each graphic element in the graphic file, and generating the configuration parameters of the transmission control tool.

[0025] Furthermore, S6 specifically includes: using the substation simulation tool to simulate batch substations according to the configuration parameters of its own substation simulation tool, including the simulation of gateway machines and the simulation of protection devices and measurement and control devices, and at the same time establishing communication connections between all simulated virtual gateway machines and the virtual protection and measurement and control devices downward, and establishing communication connections with the original dispatching master station system and the new dispatching master station system upward.

[0026] Furthermore, S7 specifically includes: using the transmission control tool to connect to the original dispatching master station system and the new dispatching master station system through the USB interface at the same time, and at the same time, the transmission control tool converts the mouse and keyboard operations of the computer device where it is located into external output commands and transmits them to the original dispatching master station system and the new dispatching master station system through the USB interface, indirectly controlling the mouse and keyboard of the computer devices of the original dispatching master station system and the new dispatching master station system.

[0027] Furthermore, S10 specifically includes: the transmission control tool calculates the relative positions of other graphics elements according to the relative horizontal and vertical coordinates between each graphics element based on the positioning information of all graphics elements of the original scheduling master station system and the new scheduling master station system, and the operation sequence information of the first positioned graphics element, and automatically generates an operation sequence information list of all graphics elements of the original scheduling master station system and the new scheduling master station system.

[0028] Furthermore, S12 specifically includes: the original dispatching master station system sends the remote control transmission command of the graphic element in the wiring diagram to the virtual gateway machine of the substation simulation tool, the virtual gateway machine determines the reverse calibration telesignal corresponding to the remote control transmission, links the virtual protection device and the measurement and control device to trigger the corresponding reverse calibration telesignal change, and sends the corresponding telesignal change response message to the original dispatching master station system through the virtual gateway machine to complete the entire remote control transmission process of the graphic element.

[0029] Furthermore, S13 specifically includes: the substation simulation tool records the remote control transmission information received from the original dispatching master station system and the new dispatching master station system in sequence, compares the remote control transmission information issued in the same order by the original dispatching master station system and the new dispatching master station system, and generates a comparison result of the remote control transmission of the corresponding graphic file; if all graphic files are verified, the entire verification process is completed, otherwise the next substation to be transmitted is verified.

[0030] Compared with the prior art, the present invention has the following technical effects:

[0031] The present invention can carry out simulation transmission verification of the dispatching master station model change without expanding the functions of the dispatching master station system and deploying any software program on the dispatching master station system in an intrusive manner. Under the premise that the substations that have been put into operation do not shut down, the application and promotion of this technology can solve the problem of the difficulty of remote control information transmission verification before the dispatching master station model change at this stage, avoid the need for a large number of substation power outages caused by remote control transmission verification, and the need for program changes or deployment of external programs brought about by the dispatching master station system, and can minimize the degree of manual participation in the verification process, and can effectively improve the efficiency and automation level of the dispatching master station model change verification work. At the same time, the verification method and design ideas can also be applied to the upgrading and transformation of the centralized control station monitoring system and the substation monitoring system, and have good application prospects and engineering practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions and advantages in the embodiments of the present invention or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 A pre-debugging operation network architecture diagram of a scheduling master station replacement simulation verification method of the present invention;

[0034] Figure 2 A debugging network architecture diagram of a scheduling master station replacement simulation verification method of the present invention;

[0035] Figure 3 The present invention is a flow chart of a scheduling master station replacement simulation verification method. DETAILED DESCRIPTION

[0036] In order to further explain the technical means and effects taken by the present invention to achieve the predetermined invention purpose, the specific implementation methods, structures, features and effects of the technical solutions proposed by the present invention are described in detail below in conjunction with the accompanying drawings and preferred embodiments. The specific features, structures or characteristics in one or more embodiments may be combined in any suitable form. Unless otherwise defined, all technical and scientific terms used in the present invention have the same meaning as those commonly understood by technicians in the technical field of the present invention.

[0037] Figure 1 This is a pre-debugging operation network architecture diagram of the scheduling master station replacement simulation verification method. Figure 1 As shown, the original dispatching master station system A and the original dispatching master station system B respectively establish master-substation communication interactions with the gateway machines of each substation, and the gateway machines in each substation respectively communicate with the protection devices and measurement and control devices through the station control layer network. The new dispatching master station system to be replaced has not established master-substation communication interactions with the gateway machines of any substation.

[0038] Figure 2 This is a debugging network architecture diagram for the scheduling master station replacement simulation verification method. Figure 2 As shown, a debugging area network is built and ensured to be completely isolated from the operating area network. The original dispatching master station system B is disconnected from the operating area network and connected to the debugging area network. The original dispatching master station system A maintains communication interaction with the gateway machines of each substation. The new dispatching master station system is connected to the debugging area network. The substation simulation tool batch simulates the gateway machine devices and protection and measurement and control devices of each substation. Each virtual gateway machine establishes master-substation communication interaction with the original dispatching master station system and the new dispatching master station system at the same time, and establishes station communication interaction with the virtual protection device and measurement and control device in the virtual substation at the bottom; the transmission control tool includes computer equipment, mouse, and keyboard, which are connected to the original dispatching master station system and the new dispatching master station system at the same time through the USB interface. The mouse and keyboard operations of the computer equipment where it is located can be converted into external output commands and transmitted to the original dispatching master station system and the new dispatching master station system through the USB interface, and the mouse and keyboard of the computer equipment of the original dispatching master station system and the new dispatching master station system can be indirectly controlled.

[0039] Figure 3 The following is a flow chart of a method for simulating and verifying the type change of a dispatching master station. Figure 3 As shown, a scheduling master station replacement simulation verification method includes the following steps:

[0040] S1: The original dispatching master station system exports the graphic files of each substation and the master-substation interaction point table files.

[0041] The original dispatching master station system uses its inherent configuration export function to export the graphic files of each substation under its jurisdiction into standard CIMG format files, and exports the main substation interaction point table files of each substation into standard RCD format files.

[0042] S2: The new dispatching master station system edits graphics and point table configurations, and exports the graphics files of each substation and the interactive point table files of the master and substation.

[0043] The new dispatching master station system generates some configuration parameters of the new dispatching master station system itself based on the substation graphic files and master-substation interaction point table files of the original dispatching master station system, and manually supplements the configuration of the parameters that cannot be automatically converted. Then, the new dispatching master station system's inherent configuration export function is used to export the graphic files of each substation under the new dispatching master station system into standard CIMG format files, and export the master-substation interaction point table files of each substation into standard RCD format files.

[0044] S3: Offline verification is performed on the substation graphic files and master-substation interaction point table files exported by the original dispatching master station system and the new dispatching master station system. If the verification fails, repeat step S2 until the verification passes.

[0045] The format standards of graphic files and the format standards of the master-substation interaction point table files are predefined in the verification tool. The format standards of graphic files include verification of the legality of the XML format, verification of its syntax and semantics (legality of labels and content), verification of the relevance of its related node content, etc. The format standards of the master-substation interaction point table files include verification of the legality of the CIM-E format, verification of the legality of its title and content, etc.

[0046] Verify the substation graphic files exported by the original dispatching master station system and the new dispatching master station system using the format standard of graphic files; verify the master-substation interaction point table files exported by the original dispatching master station system and the new dispatching master station system using the format standard of master-substation interaction point table files. At the same time, verify the information consistency of the same substation graphic files exported by the two master station systems and the information consistency of the master-substation interaction point table files of the same substation. If the verification fails, re-modify the graphics and master-substation interaction point table configuration in the new dispatching master station system and export them until the verification passes.

[0047] S4: Based on the graphic files exported by the original dispatching master station system and the master-substation interaction point table file, parse and extract the configuration parameters of the substation simulation tool.

[0048] Use the substation simulation tool to import the graphic files exported by the original dispatching master station system. Based on the graphic files exported by the original dispatching master station system, parse and extract the remote control and reverse verification telesignaling parameters corresponding to each graphic element, including point number, description, public body address and information body address;

[0049] Use the substation simulation tool to import the master-substation interaction point table file, and parse and extract all remote control and telesignaling parameters based on the master-substation interaction point table file, including the number of remote control, number of telesignaling, point number, description, public body address, and information body address;

[0050] The configuration parameters of the substation simulation tool are generated based on the remote control and reverse verification telesignaling parameters corresponding to each graphic element extracted from the graphic file and all the remote control and telesignaling parameters extracted from the master-substation interaction point table file.

[0051] S5: Based on the graphic files of the original dispatching master station system and the new dispatching master station system, parse, extract and generate the configuration parameters of the transmission control tool.

[0052] The transmission control tool is used to import the graphic files exported by the original dispatching master station system and the new dispatching master station system. Based on the graphic files of the original dispatching master station system and the new dispatching master station system, the horizontal and vertical relative coordinate parameter configurations corresponding to each graphic element in the graphic files are extracted to generate the configuration parameters of the transmission control tool.

[0053] S6: Simulate batch substations based on the configuration parameters of the substation simulation tool, and establish communication connections with the original dispatching master station system and the new dispatching master station system at the same time.

[0054] Use the substation simulation tool to simulate batch substations according to the configuration parameters of its own substation simulation tool, including the simulation of gateway machines and the simulation of protection devices and measurement and control devices. At the same time, all simulated virtual gateway machines establish MMS or 103 communication connections with the virtual protection and measurement and control devices respectively, and establish 104 communication connections with the original dispatching master station system and the new dispatching master station system respectively.

[0055] S7: The transmission control tool is connected to the original dispatching master station system and the new dispatching master station system respectively, so that the mouse and keyboard operations on the transmission control tool are converted into operations on the dispatching master station system.

[0056] The transmission control tool is used to connect to the original dispatching master station system and the new dispatching master station system through the USB interface at the same time, and is recognized by the original dispatching master station system and the new dispatching master station system in the form of plug-and-play USB mouse and keyboard devices. At the same time, the transmission control tool converts the mouse and keyboard operations of its own computer device into external output commands and transmits them to the two dispatching master station systems through the USB interface, so as to achieve the effect of indirectly controlling the mouse and keyboard operations of the computers of the two dispatching master station systems.

[0057] S8: Use the transmission control tool to open the graphic files of the substation to be driven in the original dispatching master station system and the new dispatching master station system respectively, and locate the graphic elements to be remotely controlled in the graphic files one by one, so as to generate and save the positioning information of all graphic elements.

[0058] Use the mouse and keyboard of the computer where the transmission control tool is located to control the original dispatching master station system to open the graphic file of the substation to be transmitted, position the graphic elements, and position the first graphic element to be remotely controlled and the second graphic element to be remotely controlled based on the upper left corner of the figure in turn, so as to automatically calculate and generate the positioning information of all graphic elements in combination with its own configuration parameters and save it. Then, the same operation can be completed in the new dispatching master station system in the same way.

[0059] S9: Use the transmission control tool to perform remote control transmission operations on the first located graphic element in the graphic files of the original dispatching master station system and the new dispatching master station system respectively, and record the entire operation process to form operation sequence information.

[0060] Use the mouse and keyboard of the computer where the transmission control tool is located to turn on the operation process recording function, and control the original dispatching master station system to perform a series of operations on the remote control transmission of the first positioned graphic element based on the upper left corner of the graphic file, including mouse clicks, right-click menu operations, clicking the input box of the remote control operation interface, entering the user name and password, clicking remote control presets, clicking remote control execution, closing the remote control operation interface, and the interval time of each operation, etc., and record the entire operation process to form operation sequence information, and then complete the same operation in the new dispatching master station system in the same way.

[0061] Remote control transmission refers to the whole process of clicking on the graphic element to call up the remote control operation window, entering the user name and password with remote control authority, issuing the remote control operation, transmitting the remote control command from the main station system to the substation, and the substation making the corresponding action and then returning the action result to the main station. The main station determines that the remote control operation is successful and closes the remote control operation window.

[0062] S10: using a transmission control tool to automatically generate an operation sequence information list of all graphics elements according to the positioning information of all graphics elements and the operation sequence information of the first positioned graphics element.

[0063] The transmission control tool takes the first positioned element in the upper left corner as the starting position based on the positioning information of all the elements of the original and new scheduling master station systems, as well as the operation sequence information of the first positioned element. It calculates the relative positions of other elements with the elements based on the relative horizontal and vertical coordinates between the elements, thereby determining the relative starting position of the mouse operation for each element, and automatically generating a list of operation sequence information for all the elements of the original and new scheduling master station systems.

[0064] S11: Use the transmission control tool to control the original dispatching master station system and the new dispatching master station system in turn to operate each transmission element to be remotely controlled in turn by USB information input according to the operation sequence information list of all the elements.

[0065] The transmission control tool controls the original dispatching master station system to operate each transmission element to be remotely controlled in turn based on the operation sequence information list of all the elements of the original dispatching master station system by USB information input, and then completes the same operation in the new dispatching master station system in the same way.

[0066] S12: The original dispatching master station system and the new dispatching master station system respectively send the remote control transmission command to the virtual gateway machine of the substation simulation tool, and the virtual gateway machine links the virtual protection and measurement and control to send the corresponding remote signal change response.

[0067] The original dispatching master station system sends the remote control transmission command of the graphic element in the graphic file to the virtual gateway machine of the substation simulation tool. The virtual gateway machine determines the reverse calibration telesignal corresponding to the remote control transmission, links the virtual protection device and the measurement and control device to trigger the corresponding reverse calibration telesignal change, and sends the corresponding telesignal change response message to the original dispatching master station system through the virtual gateway machine to complete the entire remote control transmission process of the graphic element. The remote control transmission process of each graphic element is the same as the remote control transmission process of each graphic element in the wiring diagram of the new dispatching master station system.

[0068] S13: The substation simulation tool determines and generates a comparison result of the remote control transmission of the corresponding graphic files based on the remote control transmission information received from the original dispatching master station system and the new dispatching master station system. If all graphic files are verified, the entire verification process is completed. Otherwise, repeat step S8 until all graphic files are verified.

[0069] The substation simulation tool records the remote control transmission information received from the original dispatching master station system and the new dispatching master station system in sequence, compares the remote control transmission information issued in the same order by the original dispatching master station system and the new dispatching master station system, including the remote control point number, public body address, information body address, etc., and generates a comparison result of the remote control transmission of the corresponding graphic file; if all graphic files are verified, the entire verification process is completed, otherwise the next substation to be transmitted is verified.

[0070] In this embodiment, the system and method shown can be implemented in other ways. For example, a customized USB device is used to replace the transmission control tool for operation, or other plug-and-play interfaces are used to replace the USB interface to achieve non-intrusive operation, or a customized simulation test instrument is used to replace the substation simulation tool to simulate the substation and related equipment, or the method of clicking and locating all the graphics elements to be transmitted is used instead of the method of calculating the location information of all graphics elements after clicking and locating the first and second graphics elements, etc.

[0071] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be included in the protection scope of the present invention.

Claims

1. A scheduling master station changeover simulation verification method, characterized in that: The following steps are involved: S1: The original dispatching master station system exports the substation graphic files and the master-substation interaction point table files; S2: The new dispatching master station system edits graphics and point table configurations, and exports the graphics files of each substation and the interactive point table files of the master and substation; S3: Offline verification is performed on the substation graphic files and master-substation interaction point table files exported by the original dispatching master station system and the new dispatching master station system. If the verification fails, step S2 is repeated until the verification passes. S4: Based on the graphic files exported by the original dispatching master station system and the master-substation interaction point table file, parse and extract the configuration parameters of the substation simulation tool; S5: Based on the graphic files of the original dispatching master station system and the new dispatching master station system, parse, extract and generate the configuration parameters of the transmission control tool; S6: Simulate batch substations based on the configuration parameters of the substation simulation tool, and establish communication connections with the original dispatching master station system and the new dispatching master station system at the same time; S7: The transmission control tool is connected to the original dispatching master station system and the new dispatching master station system at the same time; S8: Use the transmission control tool to open the graphic files of the substation to be driven in the original dispatching master station system and the new dispatching master station system respectively, and locate the graphic elements to be remotely controlled in the graphic files in sequence, so as to generate and save the positioning information of all graphic elements; S9: Use the transmission control tool to perform remote control transmission operations on the first located graphic element in the graphic files of the original dispatching master station system and the new dispatching master station system respectively, and record the entire operation process to form operation sequence information; S10: The transmission control tool generates an operation sequence information list of all the graphics elements based on the positioning information of all the graphics elements and the operation sequence information of the first positioned graphics element; S11: The transmission control tool controls the original dispatching master station system and the new dispatching master station system to operate each transmission element to be remotely controlled in turn based on the operation sequence information list of all the elements; S12: The original dispatching master station system and the new dispatching master station system respectively send the remote control transmission information to the substation simulation tool; S13: The substation simulation tool makes a determination based on the remote control transmission information received from the original dispatching master station system and the new dispatching master station system in sequence, and generates a comparison result of the remote control transmission of the corresponding graphic file; If all the graphic files are verified, the entire verification process ends. Otherwise, S8 is repeated until all the graphic files are verified. S4 specifically includes: based on the graphic file exported from the original dispatching master station system, parsing and extracting the remote control and reverse verification telesignaling parameters corresponding to each graphic element therein; based on the master-substation interaction point table file, parsing and extracting all the remote control and telesignaling parameters therein; based on the remote control and reverse verification telesignaling parameters corresponding to each graphic element extracted from the graphic file, and all the remote control and telesignaling parameters extracted from the master-substation interaction point table file, generating the configuration parameters of the substation simulation tool; S5 specifically includes: based on the graphic files exported by the original dispatching master station system and the new dispatching master station system, extracting the horizontal and vertical relative coordinate parameters corresponding to each graphic element in the graphic file, and generating the configuration parameters of the transmission control tool.

2. A scheduling master station changeover simulation verification method according to claim 1, characterized in that: S2 specifically includes: the new dispatching master station system edits its own graphics and point table configuration parameters based on the graphics and point table files of the original dispatching master station system, and then uses its inherent configuration export function to export the graphics files of each substation under the new dispatching master station system, as well as the point table files interacting with the main substations of each substation in a standard format.

3. A scheduling master station changeover simulation verification method according to claim 1, characterized in that: S3 specifically includes: file format standardization verification of each substation graphic file and master-substation interaction point table file exported by the original dispatching master station system and the new dispatching master station system, as well as information consistency verification of the same substation graphic files exported by the two master station systems and information consistency verification of the same substation master-substation interaction point table files; if the verification fails, the graphics and point table configurations are re-modified and exported in the new dispatching master station system until the verification passes.

4. A scheduling master station changeover simulation verification method according to claim 1, characterized in that: S6 specifically includes: using the substation simulation tool to simulate batch substations according to the configuration parameters of its own substation simulation tool, including the simulation of gateway machines and the simulation of protection devices and measurement and control devices, and at the same time establishing communication connections between all simulated virtual gateway machines and virtual protection and measurement and control devices downward, and establishing communication connections with the original dispatching master station system and the new dispatching master station system upward.

5. A scheduling master station changeover simulation verification method according to claim 4, characterized in that: S7 specifically includes: using the transmission control tool to connect to the original dispatching master station system and the new dispatching master station system through the USB interface at the same time, and at the same time, the transmission control tool converts the mouse and keyboard operations of the computer device where it is located into external output commands and transmits them to the original dispatching master station system and the new dispatching master station system through the USB interface, indirectly controlling the mouse and keyboard of the computer devices of the original dispatching master station system and the new dispatching master station system.

6. The method for simulation verification of the type change of the dispatching master station according to claim 1 is characterized in that: S10 specifically includes: the transmission control tool calculates the relative positions of other graphics elements according to the relative horizontal and vertical coordinates between each graphics element based on the positioning information of all graphics elements of the original scheduling master station system and the new scheduling master station system, as well as the operation sequence information of the first positioned graphics element, and automatically generates an operation sequence information list of all graphics elements of the original scheduling master station system and the new scheduling master station system.

7. The method for simulation verification of the type change of the dispatching master station according to claim 1 is characterized in that: S12 specifically includes: the original dispatching master station system sends the remote control transmission command of the graphic element in the wiring diagram to the virtual gateway machine of the substation simulation tool, the virtual gateway machine determines the reverse calibration telesignal corresponding to the remote control transmission, links the virtual protection device and the measurement and control device to trigger the corresponding reverse calibration telesignal change, and sends the corresponding telesignal change response message to the original dispatching master station system through the virtual gateway machine to complete the entire remote control transmission process of the graphic element.

8. The method for simulation verification of the type change of the dispatching master station according to claim 1 is characterized in that: S13 specifically includes: the substation simulation tool records the remote control transmission information received from the original dispatching master station system and the new dispatching master station system in sequence, compares the remote control transmission information issued in the same order by the original dispatching master station system and the new dispatching master station system, and generates a comparison result of the remote control transmission of the corresponding graphic file; if all graphic files are verified, the entire verification process is completed, otherwise the next substation to be transmitted is verified.