A lifting platform for tunnel construction

By designing a tunnel construction lifting platform during tunnel construction, using a combination of lifting frames and lifting components, the synchronous movement and independent descent of the inner and outer platforms are realized, which solves the problems of unstable center of gravity and low efficiency when the lift moves in the existing technology. problem, improving the stability and mobile efficiency of the platform.

CN118545651BActive Publication Date: 2024-10-01CHENGDU JIANGONG ROAD & BRIDGE CONSTR
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411026414.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-10-01
Estimated Expiration
2044-07-30

Smart Images

  • Figure CN118545651B_ABST
    Figure CN118545651B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of lifting platforms, and specifically to a tunnel construction lifting platform, comprising a base, a first lifting mechanism and a second lifting mechanism, wherein the first lifting mechanism comprises a lifting assembly and an outer platform, the lifting assembly is mounted on the base, and the outer platform is located at one end of the lifting assembly away from the base in a first direction, and the second lifting mechanism comprises a lifting frame and an inner platform, the lifting frame is mounted on the base, and the inner platform is located at one end of the lifting frame away from the base in the first direction. When the position of the tunnel construction lifting platform needs to be moved, the tunnel construction lifting platform of the present invention can improve the overall adjustment speed, and adopts a method of combining the lifting frame and the lifting assembly to make the entire tunnel construction lifting platform more stable, safe and reliable during the lifting process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of lifting platforms, and in particular to a lifting platform for tunnel construction. Background Art

[0002] During the construction of a tunnel, it is necessary to inspect the quality of the tunnel construction. Inspectors usually use a lift to drive it up and down, thereby achieving a comprehensive inspection of the tunnel. In actual operation, inspectors usually need to move from one inspection position to another on the lift. If the lift moves directly, the center of gravity of the inspectors and the entire lifting platform at a high altitude will be unstable, causing unnecessary trouble. In order to avoid the problems that may be caused by moving the lift directly, the current operation method is: first lower the lifting platform of the lift to a specified height to ensure the stability of the overall center of gravity, then move the lift to the next position, and raise the lifting platform of the lift after the move.

[0003] At present, the commonly used lifts mainly include scissor lifts and rack lifts. The scissor lift has better stability, but its ascent and descent speed is slower than that of the rack lift. Therefore, when using the scissor lift for inspection, when it is necessary to ascend and descend, the overall efficiency of the scissor lift is relatively low. When using the rack lift for inspection, although it is faster and more efficient than the scissor lift when ascending and descending, the rack lift cannot be extended and retracted, and the space occupied is too large, the overall use is limited, and the use effect is not ideal. Summary of the invention

[0004] The invention provides a tunnel construction lifting platform to solve the problem that the conventional lift has poor use effect when the existing lift needs to be moved.

[0005] A tunnel construction lifting platform of the present invention adopts the following technical scheme: a tunnel construction lifting platform includes a base, a first lifting mechanism and a second lifting mechanism, the base can move on the ground; the first lifting mechanism includes a lifting assembly and an outer platform, the lifting assembly is installed on the base, the outer platform is located at one end of the lifting assembly away from the base in a first direction, the first direction is a vertical direction, and the lifting assembly can drive the outer platform to move in the first direction; the second lifting mechanism includes a lifting frame and an inner platform, the lifting frame is installed on the base, the inner platform is located at one end of the lifting frame away from the base in the first direction, and the lifting frame can drive the inner platform to move in the first direction; the inner platform is embedded in the outer platform, and the movement of the inner platform in the first direction can drive the outer platform to move synchronously, the outer platform can move relative to the inner platform in the first direction, and the speed of the outer platform moving in the first direction is greater than the speed of the inner platform moving in the first direction.

[0006] Furthermore, the lifting frame includes multiple groups of scissor rods, which are rotatably connected in sequence in the first direction, and two groups of scissor rods at both ends in the first direction are rotatably connected to the inner platform and the base respectively, and the multiple groups of scissor rods can be extended or shortened in the first direction and drive the inner platform to move in the first direction; each group of scissor rods includes two hinged rods, which cross each other and are rotatably connected through a hinge shaft.

[0007] Furthermore, the lifting assembly includes a plurality of lifting racks and two gear groups, the plurality of lifting racks are arranged in one-to-one correspondence with the plurality of scissor rods, and each lifting rack can move synchronously with a group of scissor rods corresponding thereto; the plurality of lifting racks are arranged sequentially in the first direction, and two lifting racks adjacently arranged in the first direction can approach or move away from each other in the first direction; a first rack channel and a second rack channel are defined between the plurality of lifting racks arranged sequentially in the first direction, the first rack channel and the second rack channel are both arranged along the first direction, the two gear groups are both installed on the outer platform, and one of the gear groups is meshed with the first rack channel, and the other gear group is meshed with the second rack channel, so that the two gear groups can move back and forth in the first direction and prompt the outer platform to move in the first direction.

[0008] Furthermore, the lifting rack includes a rotating shaft, a first rack condition and a second rack condition, the rotating shaft is coaxially arranged with the hinge shaft and fixedly connected; the first rack condition includes a first rack and a second rack, the first rack and the second rack are connected through a first rotating ring, the axial direction of the hinge shaft is called the second direction, the second direction is a horizontal direction, and the first rack is located on the side of the second rack away from the hinge shaft in the second direction; the first rack and the second rack are respectively located on both sides of the first rotating ring in the third direction, and the third direction is perpendicular to the first direction and the second direction respectively; the second rack condition includes a third rack and a fourth rack, the third rack and the fourth rack are sequentially arranged in the first direction and connected through the second rotating ring, and the third rack is located at the fourth The rack is on the side away from the hinge axis in the second direction; the third rack and the fourth rack are respectively located on both sides of the second swivel in the third direction; the first swivel and the second swivel are connected by a first elastic member, and both the first swivel and the second swivel can rotate around the second direction on the rotating shaft; and the first rack can be connected to the third rack in the third direction, and the second rack can be connected to the fourth rack in the third direction, and the first rack channel is defined by a plurality of third racks and a plurality of second racks that are located on the same side in the third direction and are arranged in sequence in the first direction; the second rack channel is defined by a plurality of first racks and a plurality of fourth racks that are located on the same side in the third direction and are arranged in sequence in the first direction.

[0009] Furthermore, the first rack and the second rack are both provided with a wedge block at one end away from the first rotating ring in the first direction, and the third rack and the fourth rack are both provided with a wedge block at one end away from the second rotating ring in the first direction, and when the first rack is butted against the third rack in the third direction, the wedge block on the first rack and the wedge block on the third rack form a first notch, and the cross-section of the first notch perpendicular to the first direction is a triangle; when the second rack is buttted against the fourth rack in the third direction, the wedge block on the second rack and the wedge block on the fourth rack form a second notch, and the cross-section of the second notch perpendicular to the first direction is a triangle.

[0010] Furthermore, a drive box is provided on the outer platform, and two gear sets are installed on the drive box. The two gear sets are respectively a first gear set and a second gear set. The first gear set includes two first gear members, and the two first gear members are arranged in parallel in the first direction. The first gear member includes a first main shaft, a first gear and a second gear. The first main shaft can be arranged to rotate around the second direction. The first gear and the second gear are arranged in sequence on the first main shaft along the second direction. The first gear is located on the side of the second gear away from the hinge shaft in the second direction. The first gear can mesh with the third rack, and the second gear can mesh with the second rack. The first gear and the second gear are both unidirectionally transmitted with the first main shaft, so that the first gear and the second gear The gear train is configured to be configured to be coupled to the second gear and to have a pair of second gears, wherein the second gear train is configured to be coupled to the second gear train and to have a pair of second gears respectively. The gear train is configured to be coupled to the second gear train and to have a pair of second gears respectively. The gear train is configured to be coupled to the second gear train and to have a pair of second gears respectively.

[0011] Furthermore, the first gear member and the second gear member can both be extended and retracted in the drive box, and in an initial state, the first gear member and the second gear member are both retracted into the drive box.

[0012] Furthermore, the inner platform and the outer platform are locked by a locking mechanism, and the locking mechanism has a locked state and an unlocked state. When in the locked state, the inner platform and the outer platform can move synchronously, and when in the unlocked state, the inner platform and the outer platform can move relative to each other; in the initial state, the locking mechanism is in a locked state.

[0013] Further, the weight of the second rack is greater than the weight of the first rack, the weight of the first rack is the same as the weight of the third rack, and the weight of the second rack is the same as the weight of the fourth rack.

[0014] Furthermore, a limiting assembly is arranged between two lifting racks adjacent to each other in the first direction, the limiting assembly includes a slider and a sliding groove, the slider is arranged on the first rack and the third rack, and is located on the side of the first rack and the third rack close to the hinge axis in the second direction, the sliding groove is opened on the second rack and the fourth rack, and is located on the side of the second rack and the fourth rack away from the hinge axis in the second direction, the slider and the sliding groove are arranged in a one-to-one correspondence, the sliding groove includes a first groove section and a second groove section, the first groove section is inclined, the second groove section is arranged along the first direction, the first groove section is connected to the second groove section, and the first groove section is located on the side of the second groove section close to the first rack in the first direction; the slider can slide in the first groove section and the second groove section.

[0015] The beneficial effects of the present invention are as follows: a tunnel construction lifting platform of the present invention is provided with a base, a first lifting mechanism and a second lifting mechanism. When in use, the operator first stands on the inner platform, and then drives the inner platform to move in the first direction through the lifting frame. When the inner platform moves, it can drive the outer platform to move synchronously. After reaching the height required for detection in the tunnel, the lifting frame stops and starts detection. After the detection is completed, before it is required to move to the next position, the operator stands on the outer platform, and then drives the outer platform to move through the lifting assembly, so that the outer platform drops relative to the inner platform, and the center of gravity of the second lifting mechanism is quickly lowered to prevent the center of gravity from being unstable when the tunnel construction lifting platform is directly moved. Then the base is driven to move to the next position. After reaching the next position, the outer platform is driven to move through the lifting assembly until the inner platform is at the same height as the outer platform again. And if the height of the inner platform also wants to be changed, the lifting frame can be started at the same time, so that the inner platform drives the outer platform to move synchronously, and the outer platform can move relative to the inner platform in the first direction until the inner platform is at the same height as the outer platform again. That is, when it is necessary to move the position of the tunnel construction lifting platform, it is only necessary to lower the outer platform alone, and because the speed of the outer platform moving in the first direction is greater than the speed of the inner platform moving in the first direction, when it is necessary to move the position of the tunnel construction lifting platform, the overall adjustment speed can be increased, and the lifting frame and the lifting assembly are combined to make the entire tunnel construction lifting platform more stable, safe and reliable during the lifting process. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1A schematic diagram of an initial state of the overall structure of an embodiment of a tunnel construction lifting platform of the present invention;

[0018] Figure 2 A schematic diagram of a rising state of the overall structure of an embodiment of a tunnel construction lifting platform of the present invention;

[0019] Figure 3 It is a schematic diagram of the state when the lifting assembly of an embodiment of a tunnel construction lifting platform of the present invention moves relative to the lifting frame;

[0020] Figure 4 It is a schematic structural diagram of a lifting rack of an embodiment of a tunnel construction lifting platform of the present invention;

[0021] Figure 5 It is a structural schematic diagram of a first gear condition of an embodiment of a tunnel construction lifting platform of the present invention;

[0022] Figure 6 It is a structural schematic diagram of a second tooth condition of an embodiment of a tunnel construction lifting platform of the present invention;

[0023] Figure 7 It is a structural schematic diagram of a lifting rack of an embodiment of a tunnel construction lifting platform of the present invention from another perspective;

[0024] Figure 8 It is a structural schematic diagram of a drive box and two gear sets of an embodiment of a tunnel construction lifting platform of the present invention;

[0025] Fig. 9 It is a schematic structural diagram of a first gear component of an embodiment of a tunnel construction lifting platform of the present invention.

[0026] In the figure: 100, base; 101, roller; 200, lifting assembly; 210, lifting rack; 211, rotating shaft; 212, first rack; 213, second rack; 214, first swivel; 215, third rack; 216, fourth rack; 217, second swivel; 218, first elastic member; 219, rotating space; 220, first notch; 221, second notch; 222, slider; 223, first slot section; 224, second slot section; 300, outer platform; 310, drive box; 320, first gear member; 321, first main shaft; 322, first gear; 323, second gear; 330, second gear member; 400, lifting frame; 410, scissors rod; 420, hinge shaft; 500, inner platform. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] An embodiment of a tunnel construction lifting platform of the present invention is as follows Figures 1 to 9 shown.

[0029] A tunnel construction lifting platform includes a base 100, a first lifting mechanism and a second lifting mechanism. A plurality of rollers 101 are provided at the bottom of the base 100 so that the base 100 can move on the ground. The first lifting mechanism includes a lifting assembly 200 and an outer platform 300. The lifting assembly 200 is installed on the base 100. A protective frame is provided on the outer platform 300 to protect the operator. The outer platform 300 is located at one end of the lifting assembly 200 away from the base 100 in the first direction, the first direction is a vertical direction, and the lifting assembly 200 can drive the outer platform 300 to move in the first direction; the second lifting mechanism includes a lifting frame 400 and an inner platform 500, the lifting frame 400 is installed on the base 100, and the inner platform 500 is located at one end of the lifting frame 400 away from the base 100 in the first direction, and the lifting frame 400 can drive the inner platform 500 to move in the first direction; the inner platform 500 is embedded in the outer platform 300, and when the inner platform 500 and the outer platform 300 are in the same plane, the inner platform 500 can be spliced ​​with the outer platform 300 to form a rectangle. The movement of the inner platform 500 in the first direction can drive the outer platform 300 to move synchronously, the outer platform 300 can move in the first direction relative to the inner platform 500, and the speed of the outer platform 300 moving in the first direction is greater than the speed of the inner platform 500 moving in the first direction.

[0030] In this embodiment, a base 100, a first lifting mechanism and a second lifting mechanism are provided. The state of the tunnel construction lifting platform in the initial state is shown in FIG. Figure 1 shown.

[0031] When in use, the operator first stands on the inner platform 500, and then drives the inner platform 500 to move in the first direction through the lifting frame 400. When the inner platform 500 moves, it can drive the outer platform 300 to move synchronously. After reaching the height required for detection in the tunnel, the lifting frame 400 stops and starts detection. At this time, the state of the tunnel construction lifting platform is shown in the attached figure. Figure 2 shown.

[0032] After the inspection is completed, when it is necessary to move to the next position, the operator stands on the outer platform 300, and then the lifting assembly 200 drives the outer platform 300 to move, so that the outer platform 300 drops relative to the inner platform 500, and the center of gravity of the second lifting mechanism is quickly lowered to prevent the center of gravity of the directly moving tunnel construction lifting platform from being unstable, causing the operator to tip over. At this time, the state of the tunnel construction lifting platform is shown in the attached figure. Figure 3 shown.

[0033] Then the base 100 is driven to move to the next position. After reaching the next position, the outer platform 300 is driven to move by the lifting assembly 200 until the inner platform 500 is at the same height as the outer platform 300 again. If the height of the inner platform 500 is also to be changed, the lifting frame 400 can be started at the same time, so that the inner platform 500 drives the outer platform 300 to move synchronously, and the outer platform 300 can move relative to the inner platform 500 in the first direction until the inner platform 500 is at the same height as the outer platform 300 again. That is, when the position of the tunnel construction lifting platform needs to be moved, it is only necessary to lower the outer platform 300 alone, and because the speed of the outer platform 300 moving in the first direction is greater than the speed of the inner platform 500 moving in the first direction, when the position of the tunnel construction lifting platform needs to be moved, the overall adjustment speed can be increased, and the lifting frame 400 and the lifting assembly 200 are combined with each other, so that the entire tunnel construction lifting platform will be more stable, safe and reliable during the lifting process.

[0034] In this embodiment, the lifting frame 400 includes a plurality of scissor rods 410, which are sequentially connected to rotate in the first direction, and two scissor rods 410 at both ends in the first direction are respectively connected to rotate with the inner platform 500 and the base 100. The plurality of scissor rods 410 can be extended or shortened in the first direction and drive the inner platform 500 to move in the first direction. Each set of scissor rods 410 includes two hinged rods, which cross each other and are connected to rotate through a hinge shaft 420.

[0035] A driving mechanism is disposed on the base 100 , and the driving mechanism is used to drive the lifting frame 400 to extend or shorten in a first direction. The driving mechanism is a prior art, and specifically can be hydraulically driven, which will not be described in detail herein.

[0036] In this embodiment, the lifting assembly 200 includes a plurality of lifting racks 210 and two gear sets. The plurality of lifting racks 210 are arranged one by one with the plurality of scissor rods 410, and each lifting rack 210 can move synchronously with a corresponding group of scissor rods 410. The plurality of lifting racks 210 are arranged sequentially in the first direction, and two lifting racks 210 arranged adjacent to each other in the first direction can approach each other or move away from each other in the first direction. A first rack channel and a second rack channel are defined between the plurality of lifting racks 210 arranged sequentially in the first direction, and the first rack channel and the second rack channel are both arranged along the first direction. Both gear sets are mounted on the outer platform 300, and one of the gear sets is meshed with the first rack channel, and the other gear set is meshed with the second rack channel, and the two gear sets can reciprocate in the first direction and cause the outer platform 300 to move in the first direction.

[0037] In this embodiment, the lifting rack 210 includes a rotating shaft 211, a first rack member and a second rack member. The rotating shaft 211 is coaxially arranged with the hinge shaft 420 and fixedly connected. The first rack member includes a first rack 212 and a second rack 213. The first rack 212 and the second rack 213 are connected through a first rotating ring 214. The axial direction of the hinge shaft 420 is referred to as the second direction. The second direction is a horizontal direction. The first rack 212 is located on the side of the second rack 213 away from the hinge shaft 420 in the second direction. The first rack 212 and the second rack 213 are respectively located on both sides of the first rotating ring 214 in the third direction, and the third direction is perpendicular to the first direction and the second direction respectively. The second rack member includes a third rack 215 and a fourth rack 216. The third rack 215 and the fourth rack 216 are sequentially arranged in the first direction and connected through a second rotating ring 217. The third rack 215 is located on the side of the fourth rack 216 away from the hinge shaft 420 in the second direction. The third rack gear 215 and the fourth rack gear 216 are respectively located on two sides of the second rotating ring 217 in the third direction.

[0038] The first rotating ring 214 and the second rotating ring 217 are connected by the first elastic member 218, and both the first rotating ring 214 and the second rotating ring 217 can rotate around the second direction on the rotating shaft 211, and the first elastic member 218 is a coil spring. The first rack 212 can be connected to the third rack 215 in the third direction, and the second rack 213 can be connected to the fourth rack 216 in the third direction. The first rack channel is defined by a plurality of third racks 215 and a plurality of second racks 213 located on the same side in the third direction and arranged in sequence in the first direction. The second rack channel is defined by a plurality of first racks 212 and a plurality of fourth racks 216 located on the same side in the third direction and arranged in sequence in the first direction.

[0039] Specifically, the first rotating ring 214 includes two connecting rings, which are arranged in sequence in the second direction and fixedly connected. A rotating space 219 is defined between the two connecting rings. The second rotating ring 217 is rotatably installed in the rotating space 219. One end of the first elastic member 218 is fixed in the rotating space 219, and the other end is fixedly connected to the second rotating ring 217.

[0040] Furthermore, the first rack 212 and the second rack 213 are both provided with a wedge block at one end away from the first rotating ring 214 in the first direction, and the third rack 215 and the fourth rack 216 are both provided with a wedge block at one end away from the second rotating ring 217 in the first direction, and when the first rack 212 and the third rack 215 are butted against each other in the third direction, the wedge block on the first rack 212 and the wedge block on the third rack 215 form a first notch 220, and the cross section of the first notch 220 perpendicular to the first direction is a triangle. When the second rack 213 and the fourth rack 216 are butted against each other in the third direction, the wedge block on the second rack 213 and the wedge block on the fourth rack 216 form a second notch 221, and the cross section of the second notch 221 perpendicular to the first direction is a triangle.

[0041] Furthermore, two lifting frames 400 and two lifting assemblies 200 are provided, and the two lifting frames 400 are arranged in parallel in the second direction. The two lifting assemblies 200 and the two lifting frames 400 are arranged in one-to-one correspondence to improve the stability of supporting the inner platform 500 and the outer platform 300.

[0042] By setting the rotating shaft 211, the first rack member and the second rack member, in use, when the multiple articulated shafts 420 on the lifting frame 400 move upward in the first direction, they can drive the rotating shaft 211 to rise synchronously, and make the two lifting racks 210 arranged in sequence in the first direction move away from each other; when the multiple articulated shafts 420 on the lifting frame 400 move downward in the first direction, they can drive the rotating shaft 211 to fall synchronously, and make the two lifting racks 210 arranged in sequence in the first direction move closer to each other; when the rotating shaft 211 is moved downward in the first direction, the multiple articulated shafts 420 on the lifting frame 400 move downward in the first direction, and make the two lifting racks 210 arranged in sequence in the first direction move closer to each other. After the first rotating ring 214 and the second rotating ring 217 are driven to descend to abut against the first notch 220 or the second notch 221, as the hinge shaft 420 drives the rotating shaft 211 to continue to move downward, the rotating shaft 211 will drive the first rotating ring 214 and the second rotating ring 217 to press against the first notch 220 or the second notch 221, thereby causing the first rack 212 and the third rack 215 connected thereto to rotate and separate in the second direction, and the second rack 213 and the fourth rack 216 connected thereto to rotate and separate in the second direction, thereby saving occupied space.

[0043] In this embodiment, a driving box 310 is provided on the outer platform 300, and two gear sets are installed on the driving box 310. The two gear sets are respectively a first gear set and a second gear set. The first gear set includes two first gear members 320, and the two first gear members 320 are arranged in parallel in the first direction. The first gear member 320 includes a first main shaft 321, a first gear 322 and a second gear 323. The first main shaft 321 can be arranged to rotate around the second direction. The first gear 322 and the second gear 323 are arranged in sequence on the first main shaft 321 along the second direction. The first gear 322 is located on the side of the second gear 323 away from the hinge shaft 420 in the second direction. The first gear 322 can mesh with the third rack 215, and the second gear 323 can mesh with the second rack 213. The first gear 322 and the second gear 323 are both unidirectionally transmitted with the first main shaft 321, so that the first gear 322 and the second gear 323 can rotate synchronously with the first main shaft 321 and can rotate relative to the first main shaft 321.

[0044] The second gear set includes two second gear members 330, and the two second gear members 330 are arranged in parallel in the first direction. The second gear member 330 includes a second main shaft, a third gear and a fourth gear. The second main shaft can be arranged to rotate around the second direction. The third gear and the fourth gear are arranged in sequence on the second main shaft along the second direction. The third gear is located on the side of the fourth gear away from the hinge shaft 420 in the second direction. The third gear can be meshed with the first rack 212, the second gear 323 can be meshed with the fourth rack 216, and the third gear and the fourth gear are both unidirectionally transmitted with the second main shaft, so that the third gear and the fourth gear can rotate synchronously with the second main shaft and can rotate relative to the second main shaft.

[0045] In this embodiment, a driving motor is provided in the driving box 310, and a first driving gear is fixedly installed on the output shaft of the driving motor. The two first main shafts 321 extend into the driving box 310, and the two first main shafts 321 are fixedly connected to the first driven gear, and the first driving gear is respectively meshed with the two first driven gears. A second driving gear is rotatably provided in the driving box 310, and the second driving gear is meshed with the first driving gear. The two second main shafts extend into the driving box 310, and the two second main shafts are fixedly connected to the second driven gear, and the second driving gear is respectively meshed with the two second driven gears.

[0046] In this embodiment, the first gear member 320 and the second gear member 330 can both be extended and retracted in the driving box 310 , and in an initial state, the first gear member 320 and the second gear member 330 are both retracted in the driving box 310 .

[0047] Specifically, the first main shaft 321 includes a first shaft section and a second shaft section, the first driven gear is fixedly mounted on the first shaft section, the first shaft section and the second shaft section keyway match, and the first shaft section and the second shaft section are connected by a first driving member, the first driving member can drive the second shaft section to extend and retract in a second direction relative to the first shaft section, and the first driving member is a hydraulic telescopic cylinder. The second main shaft has the same structure as the first main shaft 321.

[0048] Furthermore, the inner platform 500 and the outer platform 300 are locked by a locking mechanism, and the locking mechanism has a locked state and an unlocked state. When in the locked state, the inner platform 500 and the outer platform 300 can move synchronously, and when in the unlocked state, the inner platform 500 and the outer platform 300 can move relative to each other. In the initial state, the locking mechanism is in a locked state.

[0049] The locking mechanism includes a magnet and an electromagnet. The electromagnet is arranged on the outer peripheral wall surface of the inner platform 500, and the magnet is arranged on the inner peripheral wall surface of the outer platform 300. When the electromagnet is energized, the inner platform 500 and the outer platform 300 can be locked, and the inner platform 500 and the outer platform 300 can move synchronously. When the electromagnet is de-energized, the inner platform 500 and the outer platform 300 can be unlocked, and the inner platform 500 and the outer platform 300 can move relative to each other.

[0050] By setting a driving motor in this embodiment, the driving motor can be used to drive the first driving gear to rotate when in use. The rotation of the first driving gear will mesh with the two first driven gears, driving the two first driven gears to rotate, and the rotation of the first driving gear will mesh with the second driving gear, driving the second driving gear to rotate, and the second driving gear will mesh with the two second driven gears, driving the two second driven gears to rotate.

[0051] Furthermore, by retracting the first gear member 320 and the second gear member 330 into the drive box 310 in the initial state, the first gear member 320 and the second gear member 330 can be prevented from interfering with the rise of the lifting rack 210. Also, because in the initial state, the locking mechanism locks the inner platform 500 and the outer platform 300, even if the first gear member 320 and the second gear member 330 are retracted into the drive box 310 at this time, when the lifting frame 400 drives the inner platform 500 to move upward, the inner platform 500 will drive the outer platform 300 to move upward synchronously, and the lifting frame 400 will also drive multiple lifting racks 210 to move upward. Similarly, after use, when the lifting frame 400 is needed to drive the lifting rack 210 to descend, the first gear member 320 and the second gear member 330 are first retracted into the driving box 310, and then the inner platform 500 and the outer platform 300 are locked by the locking mechanism. In this way, the lifting frame 400 can drive the inner platform 500 and the outer platform 300 to descend synchronously, and the lifting frame 400 can also drive multiple lifting racks 210 to descend, and the first gear member 320 and the second gear member 330 can be prevented from interfering with the descent of the lifting rack 210.

[0052] In this embodiment, the weight of the second rack 213 is greater than that of the first rack 212 , the weight of the first rack 212 is the same as that of the third rack 215 , and the weight of the second rack 213 is the same as that of the fourth rack 216 .

[0053] Further, a limit assembly is provided between two adjacent lifting racks 210 in the first direction, and the limit assembly includes a slider 222 and a slide groove. The slider 222 is provided on the first rack 212 and the third rack 215, and is located on the side of the first rack 212 and the third rack 215 close to the hinge shaft 420 in the second direction. The slide groove is provided on the second rack 213 and the fourth rack 216, and is located on the side of the second rack 213 and the fourth rack 216 away from the hinge shaft 420 in the second direction. The slider 222 is provided in a one-to-one correspondence with the slide groove, and the slide groove includes a first slot section 223 and a second slot section 224. The first slot section 223 is provided obliquely, and the second slot section 224 is provided along the first direction. The first slot section 223 is connected with the second slot section 224, and the first slot section 223 is located on the side of the second slot section 224 on the first rack 212 in the first direction. The slider 222 can slide in the first slot section 223 and the second slot section 224.

[0054] In this embodiment, by setting the weight of the second rack 213 to be greater than the weight of the first rack 212, the weight of the first rack 212 is the same as the weight of the third rack 215, and the weight of the second rack 213 is the same as the weight of the fourth rack 216, the first rack and the second rack are prevented from swinging around the second direction.

[0055] By further setting a limiting component, in the initial state, when the lifting frame 400 drives the rotating shaft 211 to move upward synchronously through the hinge shaft 420, the two lifting racks 210 will rotate around the second direction under the torsion of the corresponding first elastic member 218, so that the first rack 212 and the third rack 215 gradually approach and dock with each other in the third direction, and the second rack 213 and the fourth rack 216 gradually approach and dock with each other in the third direction, and in this process, the slider 222 will slide from the first slot section 223 to the second slot section 224, and the two lifting racks 210 adjacent to each other in the first direction are limited by the cooperation of the slider 222 and the second slot section 224.

[0056] When the lifting frame 400 drives the rotating shaft 211 to move downward synchronously through the hinge shaft 420, the two lifting racks 210 arranged in sequence in the first direction approach each other, and when the rotating shaft 211 drives the first rotating ring 214 and the second rotating ring 217 to descend to abut against the first notch 220 or the second notch 221, the slider 222 will slide to the transition point between the first groove section 223 and the second groove section 224, and in the process of the rotating shaft 211 driving the first rotating ring 214 and the second rotating ring 217 to press the first notch 220 or the second notch 221, the slide groove will slide out of the first groove section 223, which will not affect the first rack 212 and the third rack 215 connected thereto to rotate and separate in the second direction, and the second rack 213 and the fourth rack 216 connected thereto to rotate and separate in the second direction.

[0057] By setting a limiting component, after the lifting frame 400 drives the lifting rack 210 to move upward synchronously through the hinge shaft 420, the two lifting racks 210 adjacent to each other in the first direction can be limited by cooperating with the slider 222 and the second groove section 224, so that the entire lifting component 200 can be kept vertical in the first direction, and when the first gear member 320 and the second gear member 330 pass by, the two lifting racks 210 adjacent to each other in the first direction are prevented from deflecting.

[0058] In combination with the above embodiments, the specific working process is as follows:

[0059] During use, when the inner platform 500 and the outer platform 300 need to move synchronously in the first direction, that is, during the process of starting to use and finally retracting, it is not necessary to drive the first gear set and the second gear set to rotate, and the articulated shaft 420 of the lifting frame 400 can be used to drive the lifting rack 210 of the lifting assembly 200 corresponding thereto to rise and fall. In this process, the two lifting racks 210 adjacently arranged in the first direction will approach or move away from each other.

[0060] When the outer platform 300 needs to move in the first direction relative to the inner platform 500, that is, before the position of the entire tunnel construction lifting platform needs to be moved, the first gear set and the second gear set are driven to extend out of the drive box 310 and mesh with the first rack channel and the second rack channel respectively. At this time, the lifting frame 400 does not move, and the drive motor is started to drive the first driving gear to rotate. The first driving gear will mesh with the two first driven gears when it rotates, driving the two first driven gears to rotate, and the first driving gear will mesh with the second driving gear when it rotates, driving the second driving gear to rotate, and the second driving gear will mesh with the two second driven gears, driving the two second driven gears to rotate, so that the two first driven gears and the two second driven gears rotate in the first direction while rotating around the second direction, and the outer platform 300 is driven to move synchronously through the drive box 310, quickly lowering the center of gravity of the outer platform 300, and preventing the center of gravity from being unstable when the tunnel construction lifting platform is directly moved, and then the base 100 is driven to move to the next position. After moving to the next position, the outer platform 300 is raised relative to the inner platform 500 to the same height as the inner platform 500.

[0061] If the height of the inner platform 500 is also to be increased, the lifting frame 400 can be started at the same time, so that the lifting frame 400 drives the lifting assembly 200 to move synchronously through the hinge shaft 420, while the first gear set and the second gear set move along the first rack channel and the second rack channel in the first direction, so that the inner platform 500 and the outer platform 300 move relative to each other in the first direction. In this process, the two lifting racks 210 adjacent to each other in the first direction will move away from each other, and the two gear sets will also rise along the first rack channel and the second rack channel respectively.

[0062] Taking a first gear member 320 of the first gear group as an example, when the first gear member 320 passes through a position where the third rack 215 of a lifting rack 210 and the second rack 213 of another lifting rack 210 adjacent to the lifting rack 210 in the first direction overlap and are misaligned in the second direction, the third rack 215 will move away from the second rack 213 in the first direction. Assuming that the first main shaft 321 at this time refers to the attached Fig. 9The first gear 322 rotates clockwise in the direction shown, and in the process of rotation, the first gear 322 and the second gear 323 are driven to rotate synchronously, so that the first gear 322 rises along the third rack 215, and the second gear 323 rises along the second rack 213. At this time, the third rack 215 and the second rack 213 will move away from each other in the first direction, and the first gear 322 will rotate rapidly around the first main shaft 321 relative to the second gear 323, that is, at this time, the speed of the first gear 322 rotating clockwise around the second direction is greater than the speed of the second gear 323 rotating clockwise around the second direction. The second gear 323 rotates at the same speed as the first main shaft 321, so that the movement of the lifting frame 400 will not interfere with the movement of the lifting rack 210. The movement principle of the second gear member 330 of the second gear group is the same as that of the first gear member 320 of the first gear group, which will not be repeated here.

[0063] That is, this embodiment cooperates with the scissor-type lifting and rack-type lifting. In the process of starting to use and finally retracting, the lifting frame 400 is used to drive the inner platform 500 and the outer platform 300 to rise and fall, thereby improving the stability of the tunnel construction lifting platform when in use, and the multiple lifting racks 210 can move and retract synchronously with the scissor rods 410 in the first direction, thereby reducing the space occupied and increasing the scope of use. Even if the inner platform 500 and the outer platform 300 need to move relative to each other, there will be no interference between the gear set and the lifting rack 210, thereby improving the overall moving efficiency when the position of the tunnel construction lifting platform needs to be moved.

[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A tunnel construction lifting platform, characterized by: The lifting mechanism comprises a base, a first lifting mechanism and a second lifting mechanism, the base can move on the ground; the first lifting mechanism comprises a lifting assembly and an outer platform, the lifting assembly is installed on the base, the outer platform is located at one end of the lifting assembly away from the base in the first direction, the first direction is a vertical direction, and the lifting assembly can drive the outer platform to move in the first direction; the second lifting mechanism comprises a lifting frame and an inner platform, the lifting frame is installed on the base, the inner platform is located at one end of the lifting frame away from the base in the first direction, and the lifting frame can drive the inner platform to move in the first direction; the inner platform is embedded in the outer platform, and the movement of the inner platform in the first direction can drive the outer platform to move synchronously, the outer platform can move relative to the inner platform in the first direction, and the speed of the outer platform moving in the first direction is greater than the speed of the inner platform moving in the first direction; the lifting frame comprises a plurality of groups of scissor rods, the plurality of groups of scissor rods are rotatably connected in sequence in the first direction, the two groups of scissor rods at both ends in the first direction are rotatably connected with the inner platform and the base respectively, and the plurality of groups of scissor rods are The fork rod can extend or shorten in the first direction and drive the inner platform to move in the first direction; each group of scissor rods includes two hinged rods, which cross each other and are rotatably connected through a hinge shaft; the lifting assembly includes multiple lifting racks and two gear sets, and the multiple lifting racks are arranged in a one-to-one correspondence with the multiple groups of scissor rods, and each lifting rack can move synchronously with a group of scissor rods corresponding to it; the multiple lifting racks are arranged in sequence in the first direction, and the two lifting racks adjacent to each other in the first direction can approach or move away from each other in the first direction; the first rack channel and the second rack channel are defined between the multiple lifting racks arranged in sequence in the first direction, and the first rack channel and the second rack channel are both arranged along the first direction, and the two gear sets are both installed on the outer platform, and one of the gear sets is meshed with the first rack channel, and the other gear set is meshed with the second rack channel, so that the two gear sets can reciprocate in the first direction and prompt the outer platform to move in the first direction.

2. A tunnel construction lifting platform according to claim 1, characterized in that: The lifting rack includes a rotating shaft, a first rack member and a second rack member, the rotating shaft is coaxially arranged with the hinge shaft and fixedly connected; the first rack member includes a first rack and a second rack, the first rack and the second rack are connected through a first rotating ring, the axial direction of the hinge shaft is called the second direction, the second direction is a horizontal direction, and the first rack is located on the side of the second rack away from the hinge shaft in the second direction; the first rack and the second rack are respectively located on both sides of the first rotating ring in the third direction, and the third direction is perpendicular to the first direction and the second direction respectively; the second rack member includes a third rack and a fourth rack, the third rack and the fourth rack are sequentially arranged in the first direction and connected through the second rotating ring, and the third rack is located on the fourth rack On the side away from the hinge axis in the second direction; the third rack and the fourth rack are respectively located on both sides of the second swivel in the third direction; the first swivel and the second swivel are connected by a first elastic member, and both the first swivel and the second swivel can rotate around the second direction on the rotating shaft; and the first rack can be connected with the third rack in the third direction, and the second rack can be connected with the fourth rack in the third direction, and the first rack channel is defined by a plurality of third racks and a plurality of second racks that are located on the same side in the third direction and are arranged in sequence in the first direction; the second rack channel is defined by a plurality of first racks and a plurality of fourth racks that are located on the same side in the third direction and are arranged in sequence in the first direction.

3. A tunnel construction lifting platform according to claim 2, characterized in that: The first rack and the second rack are both provided with a wedge block at one end away from the first rotating ring in the first direction, and the third rack and the fourth rack are both provided with a wedge block at one end away from the second rotating ring in the first direction, and when the first rack is butted against the third rack in the third direction, the wedge block on the first rack and the wedge block on the third rack form a first notch, and the cross-section of the first notch perpendicular to the first direction is a triangle; when the second rack is buttted against the fourth rack in the third direction, the wedge block on the second rack and the wedge block on the fourth rack form a second notch, and the cross-section of the second notch perpendicular to the first direction is a triangle.

4. A tunnel construction lifting platform according to claim 3, characterized in that: A drive box is arranged on the outer platform, and two gear sets are installed on the drive box. The two gear sets are respectively a first gear set and a second gear set. The first gear set includes two first gear members, and the two first gear members are arranged in parallel in the first direction. The first gear member includes a first main shaft, a first gear and a second gear. The first main shaft can be arranged to rotate around the second direction. The first gear and the second gear are arranged in sequence on the first main shaft along the second direction. The first gear is located on the side of the second gear away from the hinge shaft in the second direction. The first gear can mesh with the third rack, and the second gear can mesh with the second rack. The first gear and the second gear are both unidirectionally transmitted with the first main shaft, so that the first gear and the second gear can rotate synchronously with the first main shaft and can rotate relative to the first main shaft. The second gear set includes two second gear members, and the two second gear members are arranged in parallel in the first direction. The second gear member includes a second main shaft, a third gear and a fourth gear. The second main shaft can be arranged to rotate around the second direction. The third gear and the fourth gear are arranged in sequence on the second main shaft along the second direction. The third gear is located on the side of the fourth gear away from the hinge axis in the second direction. The third gear can mesh with the first rack, and the second gear can mesh with the fourth rack. The third gear and the fourth gear are both unidirectionally transmitted with the second main shaft, so that the third gear and the fourth gear can rotate synchronously with the second main shaft and can rotate relative to the second main shaft.

5. A tunnel construction lifting platform according to claim 4, characterized in that: The first gear member and the second gear member can both be extended and retracted in the driving box, and in an initial state, the first gear member and the second gear member are both retracted in the driving box.

6. A tunnel construction lifting platform according to claim 1, characterized in that: The inner platform and the outer platform are locked by a locking mechanism, which has a locked state and an unlocked state. When in the locked state, the inner platform and the outer platform can move synchronously, and when in the unlocked state, the inner platform and the outer platform can move relative to each other. In the initial state, the locking mechanism is in a locked state.

7. A tunnel construction lifting platform according to claim 2, characterized in that: The weight of the second rack is greater than that of the first rack, the weight of the first rack is the same as that of the third rack, and the weight of the second rack is the same as that of the fourth rack.

8. A tunnel construction lifting platform according to claim 2, characterized in that: A limit assembly is arranged between two lifting racks adjacent to each other in the first direction, the limit assembly includes a slider and a slide groove, the slider is arranged on the first rack and the third rack, and is located on the side of the first rack and the third rack close to the hinge axis in the second direction, the slide groove is opened on the second rack and the fourth rack, and is located on the side of the second rack and the fourth rack away from the hinge axis in the second direction, the slider and the slide groove are arranged in a one-to-one correspondence, the slide groove includes a first groove section and a second groove section, the first groove section is inclined, the second groove section is arranged along the first direction, the first groove section is connected with the second groove section, and the first groove section is located on the side of the second groove section close to the first rack in the first direction; the slider can slide in the first groove section and the second groove section.