Geotechnical test sample preparation device and sample preparation
By designing geotest sample makers, using motor drive and magnetic force and other technical means, the problems of soil samples preparation and demolding fracture in the existing technology are solved, and efficient and stable soil samples preparation and slitting are achieved, which improves the Test the quality and efficiency of soil blocks.
Patent Information
- Application Number
- CN202411025713.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2044-07-30
AI Technical Summary
The existing geotechnical test sample preparation technology cannot prepare annular soil samples of different thicknesses at the same time, and it is easy to cause the sample to break during the demolding process, with low efficiency and poor quality.
A geotest sample preparation device was designed, including a fixing frame, lifting frame, positioning tube, semicircle plate, segmentation assembly and extrusion airbag. Soil sample sampling and slitting are performed through the motor drive positioning tube and drive rod, and the use of magnetic force and transmission The plate adjusts the thickness and number of blocks to ensure the stability and efficiency of the sample preparation process.
An efficient and stable sample preparation process is achieved, the sample breakage is avoided, the quality and efficiency of soil sample preparation is improved, and the thickness and number of blocks can be adjusted according to requirements.
Smart Images

Figure CN118549216B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of geotechnical test sample preparation devices, in particular to a geotechnical test sample preparation device and a sample preparation method thereof. Background Art
[0002] Ring shear test is a kind of soil mechanics indoor test. Since the specimen is ring-shaped and the shear rotates along the circumferential direction, the total area of the shear surface remains unchanged and the shear displacement is not restricted. It is suitable for measuring the residual strength or ultimate strength of soil under large deformation. This type of shear test is also often used to study the shear characteristics of the contact surface between different materials to determine the strength and deformation parameters of the contact surface, such as: to study the contact surface characteristics between soil and concrete or steel, soil and geosynthetics, and different soil materials.
[0003] For the remolded soil samples taken from the site, in order to study the residual strength or ultimate strength of the soil, the soil samples need to be prepared into a ring with a thickness of 2 cm; when studying the characteristics of the contact surface between the soil and different materials, the soil samples need to be prepared into a ring with a thickness of 1 cm; the existing sample preparation technology cannot use the same device to complete the preparation of the above-mentioned remolded soil ring samples of different thicknesses, and the existing technology can easily cause the ring sample to break during the demolding process, thereby causing sample preparation failure. Secondly, the sampling and sample preparation steps are separate, which is not only inefficient but also of poor quality. Summary of the invention
[0004] In view of the above-mentioned shortcomings of the prior art, the present invention provides a geotechnical test sample preparation device and a sample preparation method thereof, which can effectively solve the problems in the prior art.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions:
[0006] The present invention provides a geotechnical test sample preparation device and a sample preparation method thereof, comprising a fixing frame and further comprising:
[0007] A lifting frame is slidably arranged above the fixed frame, a positioning tube is rotatably mounted on the lifting frame, and a first motor for driving the positioning tube to rotate is arranged on the lifting frame, two semicircular plates are inserted in the positioning tube, and a drill bit is commonly arranged at the bottom ends of the two semicircular plates;
[0008] The splitting assembly comprises a splitting tube movably inserted between two semicircular plates, a plurality of protrusions are rotatably installed in the splitting tube, a splitting rod is slidably installed on the side wall of the protrusion, a plurality of splitting holes are provided on the splitting tube, and the splitting rod is movably inserted in the splitting hole, a plug hole is provided on the protrusion, a transmission groove is provided on the side wall of the plug hole, a driving rod is movably inserted in the plug hole, a plurality of adjustment holes are provided on the driving rod, and a transmission plate is movably inserted in the adjustment hole.
[0009] Furthermore, a guide rod is fixedly mounted on the lifting frame, and a guide hole matched with the guide rod is opened on the lifting frame.
[0010] Furthermore, a threaded hole is provided on the semicircular plate, and a positioning bolt matched with the threaded hole is movably inserted into the drill bit.
[0011] Furthermore, a positioning ring is commonly sleeved on the two semicircular plates, a slider is provided on the inner wall of the positioning ring, a sliding groove matching the slider is opened on the two semicircular plates, a first magnetic ring is provided on the inner wall of the positioning ring, a cleaning ring is movably provided between the inner walls of the two semicircular plates, and a second magnetic ring is provided on the outer wall of the cleaning ring.
[0012] Furthermore, a movable block is installed on the filter screen at the bottom of the split tube, a first sleeve is elastically installed at one end of the movable block located inside the split tube, the drive rod is movably inserted in the first sleeve, and a conical block is provided at the bottom of the movable block.
[0013] Furthermore, a second motor for driving the driving rod to rotate is provided in the positioning tube, a second sleeve adapted to the driving rod is fixedly installed on the output end of the second motor, a limiting strip is provided on the inner wall of the second sleeve, and a limiting groove adapted to the limiting strip is provided on the top end of the driving rod.
[0014] Furthermore, an extrusion airbag is provided in the positioning tube, and an extrusion ring is fixedly installed at the bottom end of the extrusion airbag. A piston tube is fixedly installed on the bottom wall of the lifting frame, a piston rod is movably inserted at the bottom end of the piston tube, a pressure plate is fixedly installed at the bottom end of the piston rod, and a connecting tube is connected between the piston tube and the extrusion airbag.
[0015] Furthermore, a threaded tube is fixedly inserted into the fixing frame, a threaded rod is threadedly installed in the threaded tube, a conical block is provided at the bottom end of the threaded rod, and a positioning plate is provided on the threaded tube.
[0016] The sample preparation method of the geotechnical test sample preparation device comprises the following steps:
[0017] S1: insert two semicircular plates into two positioning tubes respectively, set the cleaning ring between the two semicircular plates, and then set the positioning ring on the outer walls of the two semicircular plates, slide the positioning ring upward, and the cleaning ring moves upward with the magnetic force, and finally install the drill bit at the bottom end of the two semicircular plates through the positioning bolts;
[0018] S2: Insert the transmission plate into the adjustment hole. According to the test requirements, the spacing between adjacent adjustment holes is 1 cm. According to the position adjustment of the transmission plate, a test soil block with a thickness of an integer multiple of 1 cm can be obtained. After the insertion is completed, insert the entire driving rod into the split tube, and seal the bottom end of the split tube with a movable block, and then insert the split tube between the two semicircular plates, so that the top end of the driving rod is inserted into the second sleeve;
[0019] S3: After adjusting the horizontality of the fixed frame, the first motor drives the positioning tube and the two semicircular plates and the drill bit to rotate, the lifting frame is pressed down to move downward, the drill bit and the two semicircular plates are drilled into the soil together, and the test soil enters between the two semicircular plates. At the same time, the pressure plate moves up to squeeze the gas in the piston tube, so that the squeezing airbag expands, the squeezing ring moves down, and squeezes the test soil in the semicircular plate, and then the lifting frame is pulled up to make the semicircular plate component leave the soil layer;
[0020] S4: Start the second motor, the second motor drives the driving rod to rotate, the position where the transmission plate is inserted can drive the corresponding protrusion to rotate, the protrusion squeezes the dividing rod to extend out of the dividing hole, after the protrusion squeezes the dividing rod to extend out of the dividing hole and reaches the longest, the protrusion squeezes the baffle, at this time the protrusion will not rotate, but drive the dividing tube to rotate, during the rotation process the soil block is cut into a preset thickness, and then the drill bit is driven to take out the two semicircular plates at the same time, and then the positioning ring is moved down, and the cleaning ring is driven down by magnetic force to separate the soil block from the inner wall of the semicircular plate, so as to facilitate the subsequent removal of the soil block, and then separate the two semicircular plates to obtain the test soil block.
[0021] Compared with the known prior art, the technical solution provided by the present invention has the following beneficial effects:
[0022] During the sampling process, the extrusion airbag is used to push the extrusion ring to compact the collected test soil, and then the driving rod is used to drive the dividing rod to extend out of the dividing tube, so that the dividing rod is inserted into the test soil. Then, when the dividing tube rotates, the test soil is cut, and the number and thickness of the cut pieces can be controlled according to the placement position and number of the transmission plates, thereby improving the efficiency and quality of sample preparation. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0024] Figure 1 It is an overall schematic diagram of the present invention;
[0025] Figure 2It is a schematic structural diagram of the semicircular plate portion of the front view angle in the present invention;
[0026] Figure 3 It is a schematic diagram of the structure of the semicircular plate part of the upward viewing angle in the present invention;
[0027] Figure 4 It is a structural schematic diagram of the positioning tube part in the present invention;
[0028] Figure 5 It is a schematic diagram of the structure of the driving rod and the protrusion part in the present invention;
[0029] Figure 6 It is a schematic structural diagram of the split tube part in the present invention.
[0030] The numbers in the figure represent respectively: 1. fixing frame; 2. guide rod; 3. lifting frame; 4. positioning tube; 5. semicircular plate; 6. positioning ring; 7. drill bit; 8. slide groove; 9. slider; 10. positioning bolt; 11. dividing tube; 12. extrusion airbag; 13. extrusion ring; 14. bump; 15. dividing rod; 16. driving rod; 17. adjusting hole; 18. transmission groove; 19. second motor; 20. movable block; 21. cleaning ring; 22. threaded tube; 23. threaded rod; 24. positioning plate; 25. piston tube; 26. piston rod; 27. pressure plate; 28. connecting tube. DETAILED DESCRIPTION
[0031] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0032] The present invention will be further described below in conjunction with the embodiments.
[0033] Example: Reference Figure 1-Figure 6 The geotechnical test sample preparation device and the sample preparation method thereof include a fixing frame 1, a threaded tube 22 is fixedly inserted on the fixing frame 1, a threaded rod 23 is threadedly installed in the threaded tube 22, a conical block is provided at the bottom end of the threaded rod 23, a positioning plate 24 is provided on the threaded tube 22, and a level is provided on the fixing frame 1. The distance between the four threaded rods 23 and the ground is adjusted by thread transmission, so that the fixing frame 1 is in a horizontal state. Of course, it can also be adjusted according to the collection requirements.
[0034] refer to Figure 1-Figure 6, and further comprises a lifting frame 3, which is slidably arranged above the fixed frame 1, on which a guide rod 2 is fixedly installed, and a guide hole adapted to the guide rod 2 is opened on the lifting frame 3, a positioning tube 4 is rotatably installed on the lifting frame 3, and a first motor for driving the positioning tube 4 to rotate is provided on the lifting frame 3, and two semicircular plates 5 are inserted in the positioning tube 4 (the connection method of the two semicircular plates 5 and the positioning tube 4 is the same as the connection method of the drill bit 7, and of course other connection methods can also be used to ensure stable connection), two semicircular plates 5 are inserted in the positioning tube 4, and the two semicircular plates 5 are inserted in the positioning tube 4. A drill bit 7 is commonly provided at the bottom end of the circular plate 5, a threaded hole is opened on the semicircular plate 5, a positioning bolt 10 matched with the threaded hole is movably inserted into the drill bit 7, an extrusion airbag 12 is provided in the positioning tube 4, an extrusion airbag 12, an extrusion ring 13 is fixedly installed at the bottom end of the extrusion airbag 12, a piston tube 25 is fixedly installed on the bottom wall of the lifting frame 3, a piston rod 26 is movably inserted at the bottom end of the piston tube 25, a pressure plate 27 is fixedly installed at the bottom end of the piston rod 26, and a connecting tube 28 is connected between the piston tube 25 and the extrusion airbag 12.
[0035] The first motor drives the positioning tube 4 to rotate, and the positioning tube 4 drives the two semicircular plates 5 and the drill bit 7 to rotate, and then the lifting frame 3 moves downward to make the drill bit 7 drill through the ground below to complete soil extraction.
[0036] When the lifting frame 3 moves downward, it will drive the fixing frame 1 to press the pressing plate 27, and the pressing plate 27 will drive the piston rod 26 to move upward. The piston rod 26 squeezes the air in the piston tube 25, and the air in the piston tube 25 enters the squeezing airbag 12 through the connecting tube 28. At this time, the test soil has been collected between the two semicircular plates 5, and the squeezing airbag 12 drives the squeezing ring 13 to move downward. At this time, the test soil is still in the soil, so the squeezing ring 13 can squeeze the test soil and compact it, which is convenient for subsequent sample preparation.
[0037] It is worth noting that the connecting tube 28 can be disconnected as needed, so that the air in the piston tube 25 does not enter the extrusion airbag 12, that is, it does not need to be compacted.
[0038] refer to Figure 1-Figure 6The splitting assembly comprises a splitting tube 11 movably inserted between two semicircular plates 5, a plurality of protrusions 14 are rotatably installed in the splitting tube 11, a splitting rod 15 is slidably installed on the side wall of the protrusion 14, a plurality of splitting holes are opened on the splitting tube 11, and the splitting rod 15 is movably inserted in the splitting hole, a plug hole is opened on the protrusion 14, a transmission groove 18 is opened on the side wall of the plug hole, a driving rod 16 is movably inserted in the plug hole, a plurality of adjustment holes 17 are opened on the driving rod 16, and a transmission groove 18 is movably inserted in the adjustment hole 17. The movable block 20 is installed on the filter screen at the bottom of the dividing tube 11, and a first sleeve is elastically installed at one end of the movable block 20 located inside the dividing tube 11. The driving rod 16 is movably inserted in the first sleeve, and a conical block is provided at the bottom of the movable block 20. A second motor 19 for driving the driving rod 16 to rotate is provided in the positioning tube 4, and a second sleeve matched with the driving rod 16 is fixedly installed at the output end of the second motor 19. A limit strip is provided on the inner wall of the second sleeve, and a limit groove matched with the limit strip is provided at the top of the driving rod 16.
[0039] By setting a rotatable dividing pipe 11 between the semicircular plates 5, as Figure 2 and Figure 3 As shown, the dividing tube 11 will not affect normal sampling in its initial state. After the above-mentioned sampling and compaction processes are completed, the driving rod 16 is driven to rotate by the second motor 19. The position where the transmission plate is placed in the adjusting hole 17 on the driving rod 16 will drive the corresponding protrusion 14 to rotate through the clamping transmission groove 18. When the protrusion 14 rotates, the dividing rod 15 slides along the side wall of the protrusion 14, and the dividing rod 15 is squeezed out of the dividing hole. It is worth noting that a baffle is provided at the position of the dividing hole. After the protrusion 14 squeezes the dividing rod 15 out of the dividing hole and reaches its longest length, the protrusion 14 squeezes the baffle. At this time, the protrusion 14 will no longer rotate, but will drive the dividing tube 11 to rotate. When the dividing rod 15 rotates with the dividing tube 11, it will rotate to cut the test soil.
[0040] After the cutting is completed, the second motor 19 is reversed, and the protrusion 14 is reversed, so that the segmentation rod 15 slides along the protrusion 14 again, so that the segmentation rod 15 is retracted into the segmentation tube 11 .
[0041] refer to Figure 1-Figure 6 A positioning ring 6 is commonly sleeved on the two semicircular plates 5, a slider 9 is provided on the inner wall of the positioning ring 6, and a sliding groove 8 adapted to the slider 9 is opened on the two semicircular plates 5. A first magnetic ring is provided on the inner wall of the positioning ring 6, a cleaning ring 21 is movably provided between the inner walls of the two semicircular plates 5, and a second magnetic ring is provided on the outer wall of the cleaning ring 21.
[0042] After the cutting is completed, the positioning ring 6 is moved downward, and the positioning ring 6 drives the cleaning ring 21 to move downward through the magnetic force, and the cleaning ring 21 separates the test soil from the semicircular plate 5 to prevent them from adhering to each other.
[0043] The sample preparation method of the geotechnical test sample preparation device comprises the following steps:
[0044] S1: insert two semicircular plates 5 into two positioning tubes 4 respectively, sleeve the cleaning ring 21 between the two semicircular plates 5, and then sleeve the positioning ring 6 on the outer walls of the two semicircular plates 5, slide the positioning ring 6 upward, and the cleaning ring 21 moves upward with it under the action of magnetic force, and finally install the drill bit at the bottom end of the two semicircular plates 5 through the positioning bolts 10;
[0045] S2: Insert the transmission plate into the adjustment hole 17. According to the test requirements, the spacing between adjacent adjustment holes 17 is 1 cm. According to the position adjustment of the transmission plate, a test soil block with a thickness of an integer multiple of 1 cm can be obtained. After the insertion is completed, the entire driving rod 16 is inserted into the dividing tube 11, and the bottom end of the dividing tube 11 is sealed with a movable block 20, and then the dividing tube 11 is inserted between the two semicircular plates 5, so that the top end of the driving rod 16 is inserted into the second sleeve;
[0046] S3: After adjusting the horizontality of the fixing frame 1, the first motor drives the positioning tube 4 and the two semicircular plates 5 and the drill bit 7 to rotate, and the lifting frame 3 is pressed down to move downward. The drill bit 7 drills into the soil with the two semicircular plates 5, and the test soil enters between the two semicircular plates 5. At the same time, the pressing plate 27 moves upward to squeeze the gas in the piston tube 25, so that the squeezing airbag 12 expands, and the squeezing ring 13 moves downward to squeeze the test soil in the semicircular plate 5, and then the lifting frame 3 is pulled up to make the semicircular plate 5 components leave the soil layer;
[0047] S4: Start the second motor 19, the second motor 19 drives the driving rod 16 to rotate, the position where the transmission plate is inserted can drive the corresponding protrusion 14 to rotate, the protrusion 14 squeezes the dividing rod 15 to extend out of the dividing hole, and uses the dividing rod 15 to squeeze the inner wall of the dividing hole to drive the entire dividing tube 11 to rotate. During the rotation, the soil block is cut into pieces with a preset thickness, and then the drill bit 7 is driven to take out the two semicircular plates 5 at the same time, and then the positioning ring 6 is moved downward, and the cleaning ring 21 is driven downward by magnetic force to separate the soil block from the inner wall of the semicircular plate 5, so as to facilitate the subsequent removal of the soil block, and then the two semicircular plates 5 are separated to obtain the test soil block.
[0048] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements will not cause the essence of the corresponding technical solutions to deviate from the protection scope of the technical solutions of the embodiments of the present invention.
Claims
1. A geotechnical test sample preparation device, comprising a fixing frame (1), characterized in that: Also includes: A lifting frame (3) is slidably arranged above the fixed frame (1); a positioning tube (4) is rotatably mounted on the lifting frame (3); and a first motor for driving the positioning tube (4) to rotate is provided on the lifting frame (3); two semicircular plates (5) are inserted into the positioning tube (4); and a drill bit (7) is commonly provided at the bottom ends of the two semicircular plates (5); A splitting assembly comprises a splitting tube (11) movably inserted between two semicircular plates (5), a plurality of protrusions (14) being rotatably mounted in the splitting tube (11), a splitting rod (15) being slidably mounted on the side wall of the protrusion (14), a plurality of splitting holes being formed on the splitting tube (11), and the splitting rod (15) being movably inserted in the splitting holes, a plug hole being formed on the protrusion (14), a transmission groove (18) being formed on the side wall of the plug hole, a driving rod (16) being movably inserted in the plug hole, a plurality of adjustment holes (17) being formed on the driving rod (16), and a transmission plate being movably inserted in the adjustment hole (17); The positioning tube (4) is provided with a second motor (19) for driving the driving rod (16) to rotate, and a second sleeve matched with the driving rod (16) is fixedly mounted on the output end of the second motor (19), a limiting strip is provided on the inner wall of the second sleeve, and a limiting groove matched with the limiting strip is provided at the top end of the driving rod (16), and a baffle is provided at the position of the dividing hole.
2. The geotechnical test sample preparation device according to claim 1, characterized in that: A guide rod (2) is fixedly mounted on the lifting frame (3), and a guide hole matching the guide rod (2) is provided on the lifting frame (3).
3. The geotechnical test sample preparation device according to claim 2, characterized in that: The semicircular plate (5) is provided with a threaded hole, and the drill bit (7) is movably inserted with a positioning bolt (10) that matches the threaded hole.
4. The geotechnical test sample preparation device according to claim 3, characterized in that: A positioning ring (6) is sleeved on the two semicircular plates (5), a slider (9) is provided on the inner wall of the positioning ring (6), a slide groove (8) adapted to the slider (9) is provided on the two semicircular plates (5), a first magnetic ring is provided on the inner wall of the positioning ring (6), a cleaning ring (21) is movably provided between the inner walls of the two semicircular plates (5), and a second magnetic ring is provided on the outer wall of the cleaning ring (21).
5. The geotechnical test sample preparation device according to claim 4, characterized in that: A movable block (20) is installed on the filter screen at the bottom end of the split tube (11); a first sleeve is elastically installed on one end of the movable block (20) located inside the split tube (11); the drive rod (16) is movably inserted in the first sleeve; and a conical block is provided at the bottom end of the movable block (20).
6. The geotechnical test sample preparation device according to claim 5, characterized in that: The positioning tube (4) is provided with an extrusion airbag (12), the bottom end of which is fixedly mounted an extrusion ring (13), a piston tube (25) is fixedly mounted on the bottom wall of the lifting frame (3), a piston rod (26) is movably inserted at the bottom end of the piston tube (25), a pressing plate (27) is fixedly mounted at the bottom end of the piston rod (26), and a connecting tube (28) is connected between the piston tube (25) and the extrusion airbag (12).
7. The geotechnical test sample preparation device according to claim 6, characterized in that: A threaded tube (22) is fixedly inserted into the fixing frame (1), a threaded rod (23) is threadedly installed in the threaded tube (22), a conical block is provided at the bottom end of the threaded rod (23), and a positioning plate (24) is provided on the threaded tube (22).
8. A sample preparation method applicable to the geotechnical test sample preparation device according to claim 7, characterized in that: The following steps are involved: S1: insert the two semicircular plates (5) into the two positioning tubes (4) respectively, sleeve the cleaning ring (21) between the two semicircular plates (5), and then sleeve the positioning ring (6) on the outer walls of the two semicircular plates (5), slide the positioning ring (6) upward, and the cleaning ring (21) moves upward with it under the action of magnetic force, and finally install the drill bit at the bottom end of the two semicircular plates (5) through the positioning bolt (10); S2: inserting the transmission plate into the adjustment hole (17). According to the test requirements, the spacing between adjacent adjustment holes (17) is 1 cm. According to the position adjustment of the transmission plate, a test soil block with a thickness of an integer multiple of 1 cm can be obtained. After the insertion is completed, the entire driving rod (16) is inserted into the dividing tube (11), and the bottom end of the dividing tube (11) is sealed with a movable block (20). Then, the dividing tube (11) is inserted between the two semicircular plates (5), and the top end of the driving rod (16) is inserted into the second sleeve; S3: After the horizontality of the fixed frame (1) is adjusted, the first motor drives the positioning tube (4) and the two semicircular plates (5) and the drill bit (7) below to rotate, and the lifting frame (3) is pressed downward to move downward. The drill bit (7) and the two semicircular plates (5) are drilled into the soil together, and the test soil enters between the two semicircular plates (5). At the same time, the pressure plate (27) moves upward to squeeze the gas in the piston tube (25), so that the squeezing airbag (12) expands, and the squeezing ring (13) moves downward to squeeze the test soil in the semicircular plate (5), and then the lifting frame (3) is pulled upward to make the semicircular plate (5) component leave the soil layer; S4: starting the second motor (19), the second motor (19) drives the driving rod (16) to rotate, the position where the transmission plate is inserted can drive the corresponding protrusion (14) to rotate, the protrusion (14) squeezes the dividing rod (15) to extend out of the dividing hole, after the protrusion (14) squeezes the dividing rod (15) to extend out of the dividing hole and reaches the longest, the protrusion (14) squeezes the baffle plate, at this time the protrusion (14) will not rotate, but drives the dividing tube (11) to rotate, during the rotation process the soil block is cut into pieces of a preset thickness, and then the drill bit (7) is driven to first take out the two semicircular plates (5) at the same time, then move the positioning ring (6) downward, and drive the cleaning ring (21) downward by magnetic force, so that the soil block is separated from the inner wall of the semicircular plate (5), which is convenient for the subsequent removal of the soil block, and then separate the two semicircular plates (5) to obtain the test soil block.
Citation Information
Patent Citations
Soil sample preparation apparatus and method for ring shear test
CN106940265A
Annular remodeled water sample preparation device for geotechnical ring shear test and sample preparation method
CN107515146A
Soil body sampling device and method suitable for fully-weathered stratum
CN111795853A
Soil sample collection equipment
CN116818405A
Sampling device and sampling method for detecting soil ecotoxicity
CN117091877A
