Digital twin method and system for multivariate data of sluice gates

Through the multi-data digital twin method of water gates, multi-source data are integrated to build a three-dimensional model and intelligent control system, which solves the problems of information isolation and lack of intelligent control in traditional water gate management, and realizes intelligent and efficient management of water gates.

CN118551582BActive Publication Date: 2024-10-22HUNAN BESTALL DREDGING +1
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411009551.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-26
Publication Date
2024-10-22
Estimated Expiration
2044-07-26

AI Technical Summary

Technical Problem

Traditional sluice management methods are difficult to integrate multi-source data, resulting in isolated information, insufficient real-time monitoring and early warning capabilities, lack of intelligent sluice control means, and the inability to effectively integrate and utilize multi-source data for comprehensive sluice control management.

Method used

The multi-dimensional data digital twin method of the water gate is used to collect multi-dimensional data of the flood storage project analysis area through the Internet of Things monitoring equipment. GIS technology is used to build a three-dimensional model of the flood storage terrain. Combined with the water gate structural parameters and PLC control transmission interface, a three-dimensional simulation model of the water gate is constructed to form a flood storage gate. Digital model, conduct digital preview and boundary-aware preview feature analysis, build an adaptive control decision tree model and intelligent control engine, and realize intelligent and adaptive sluice control.

Benefits of technology

It realizes the integration and real-time monitoring of multi-source data, improves the intelligent level of water gate management, can timely detect and prevent potential operational risks, optimize control strategies, and ensure efficient operation, safety and stability of water gates.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118551582B_ABST
    Figure CN118551582B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of data analysis technology, and in particular to a digital twin method and system for multivariate data of a sluice. The method comprises the following steps: obtaining data of a flood storage project analysis area; performing a global flood storage environment multivariate data analysis on the data of the flood storage project analysis area to generate global flood storage environment multivariate data; constructing a three-dimensional model of flood storage terrain based on the data of the flood storage project analysis area; mapping the global flood storage environment multivariate data to the three-dimensional model of flood storage terrain to perform digital twin modeling processing of the flood storage project to construct a digital model of the flood storage project; obtaining sluice structure parameters; constructing a three-dimensional simulation model of the sluice based on the sluice structure parameters; mapping the three-dimensional simulation model of the sluice to the digital model of the flood storage project to perform digital twin modeling processing of the flood storage sluice to construct a digital model of the flood storage sluice; the present invention realizes a high-precision and intelligent digital twin simulation technology for multivariate data of sluices.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data analysis technology, and in particular to a sluice multivariate data digital twin method and system. Background Art

[0002] The digital twin technology is used to process the multivariate data of the sluice gate by introducing emerging technologies such as the Internet of Things, artificial intelligence, big data and big models, integrating and optimizing the management process, realizing real-time data collection, analysis and application, thereby improving the management decision-making efficiency and emergency response capabilities. As an important part of water conservancy projects, the operation and maintenance of sluice gates are crucial to flood control, irrigation and other aspects. However, traditional sluice gate management methods often make it difficult to integrate and analyze data, resulting in information isolation and inability to fully reflect the actual situation. In addition, the real-time monitoring and early warning capabilities are insufficient, and there is a lack of intelligent sluice gate control methods, which makes it impossible to effectively integrate and utilize multi-source data for comprehensive sluice gate control management. Summary of the invention

[0003] Based on this, the present invention provides a sluice multivariate data digital twin method and system to solve at least one of the above-mentioned technical problems.

[0004] To achieve the above purpose, a sluice multivariate data digital twin method comprises the following steps:

[0005] Step S1: acquiring data of the flood storage project analysis area; collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; performing global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate global flood storage environment multivariate data;

[0006] Step S2: using GIS technology to collect flood storage terrain DEM data for flood storage project analysis area data to generate flood storage project DEM data; performing flood storage terrain panoramic image analysis based on flood storage project analysis area data to generate flood storage terrain panoramic image data; constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the flood storage terrain panoramic image data;

[0007] Step S3: Mapping the global flood storage environment multivariate data to the flood storage terrain three-dimensional model to perform digital twin modeling of the flood storage project to construct a digital model of the flood storage project;

[0008] Step S4: obtaining the sluice structure parameters and the sluice PLC control transmission interface; collecting the sluice interactive control parameters according to the sluice PLC control transmission interface to generate the sluice interactive control parameters; constructing a sluice three-dimensional simulation model based on the sluice structure parameters and the sluice interactive control parameters; mapping the sluice three-dimensional simulation model to the digital model of the flood storage project to perform digital twin modeling of the flood storage sluice, so as to construct a digital model of the flood storage sluice;

[0009] Step S5: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate to generate digital preview data of the flood storage gate; performing boundary perception preview feature analysis of the flood storage gate based on the digital preview data of the flood storage gate to generate boundary perception preview feature data of the flood storage gate;

[0010] Step S6: Analyze the flood storage gate boundary perception abnormality data according to the flood storage gate boundary perception preview feature data to generate the flood storage gate boundary perception abnormality data; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the flood storage gate boundary perception abnormality data to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the flood storage gate boundary perception abnormality data and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the flood storage gate intelligent control operation on the flood storage gate digital model through the sluice gate intelligent control engine.

[0011] The present invention collects local flood storage environment multivariate data on flood storage project analysis area data based on the Internet of Things monitoring equipment, realizes the integration of multi-source data, effectively overcomes the problem of information isolation, ensures the comprehensiveness and accuracy of data, improves the real-time monitoring capability of the flood storage environment, and can timely obtain and analyze various environmental data of the flood storage area. Based on the local flood storage environment multivariate data, global flood storage environment multivariate data analysis is performed, and global data is gradually generated from the evolution analysis of the local flood storage environment multivariate data, providing hydrological information of the flood storage environment and global characteristics of external information, providing a solid data foundation for subsequent modeling. The three-dimensional model of flood storage terrain is constructed using GIS technology to intuitively display the terrain characteristics of the flood storage area, improve the grasp and understanding of terrain information, and the establishment of the three-dimensional model of flood storage terrain is conducive to the refined management and analysis of the flood storage area, providing a scientific basis for optimizing flood storage measures. High-precision terrain data and panoramic image data can support more accurate decision-making and improve the effectiveness of flood control and irrigation management. Combining multi-source environmental data and terrain models to create a comprehensive and dynamic digital model of flood storage projects will help to fully understand the status of the flood storage area, realize dynamic monitoring and simulation of flood storage projects, and timely reflect the actual situation, conduct early warning and risk assessment. The digital model provides a visual and operational platform for optimizing and improving flood storage projects and improving management efficiency and effectiveness. By obtaining detailed structural parameters and control interfaces, the precise control and simulation of the sluice gates can be achieved, which improves the accuracy of operation. The construction of a three-dimensional simulation model can be used for virtual testing and simulation, which improves the scientificity and effectiveness of the control strategy. The three-dimensional simulation model of the sluice gate is integrated with the digital model of the flood storage project to realize digital simulation control of sluice management and improve overall management efficiency. According to the digital model of the flood storage gate, the digital preview data of the flood storage gate is collected. Through digital preview, the operation of the flood storage gate is simulated and predicted in advance, potential problems are identified, and the control strategy is optimized. Based on the digital preview data of the flood storage gate, the boundary perception preview feature analysis of the flood storage gate is carried out, which improves the adaptability and recognition ability to complex environments, provides data support for subsequent abnormal detection and control, thereby timely discovering potential operation risks and problems, and improving the safety and reliability of the system. According to the flood storage gate boundary perception preview feature data, the flood storage gate boundary perception abnormal data analysis is carried out to timely discover and identify abnormal situations, ensure the safety and stability of the sluice operation, and build an adaptive control decision tree model to realize intelligent and adaptive sluice control and improve the system's responsiveness to complex environments. Through the intelligent control engine to perform intelligent control operations, the digital machine intelligent management and control level of the sluice is improved to ensure the efficient operation of the flood storage project.

[0012] This specification provides a sluice multivariate data digital twin system for executing the sluice multivariate data digital twin method as described above. The sluice multivariate data digital twin system includes:

[0013] The flood storage environment multivariate data analysis module is used to obtain the data of the flood storage project analysis area; collect the local flood storage environment multivariate data of the flood storage project analysis area according to the Internet of Things monitoring equipment to generate the local flood storage environment multivariate data; perform global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate the global flood storage environment multivariate data;

[0014] The flood storage terrain three-dimensional model construction module is used to collect flood storage terrain DEM data from the flood storage project analysis area data using GIS technology to generate flood storage project DEM data; perform flood storage terrain panoramic image analysis based on the flood storage project analysis area data to generate flood storage terrain panoramic image data; and construct a flood storage terrain three-dimensional model based on the flood storage project DEM data and flood storage terrain panoramic image data;

[0015] The digital model building module of flood storage project is used to map the global flood storage environment multivariate data to the three-dimensional model of flood storage terrain to carry out digital twin modeling of flood storage project, so as to build the digital model of flood storage project;

[0016] The digital model construction module of the flood storage gate is used to obtain the structural parameters of the flood gate and the PLC control transmission interface of the flood gate; collect the interactive control parameters of the flood gate according to the PLC control transmission interface of the flood gate to generate the interactive control parameters of the flood gate; build a three-dimensional simulation model of the flood gate based on the structural parameters of the flood gate and the interactive control parameters of the flood gate; map the three-dimensional simulation model of the flood gate to the digital model of the flood storage project to perform digital twin modeling of the flood storage gate, so as to build a digital model of the flood storage gate;

[0017] The flood storage gate boundary perception preview feature analysis module is used to collect the digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generate the digital preview data of the flood storage gate; based on the digital preview data of the flood storage gate, the flood storage gate boundary perception preview feature analysis is performed to generate the flood storage gate boundary perception preview feature data;

[0018] The intelligent control module of the flood storage gate is used to analyze the abnormal data of the flood storage gate boundary perception according to the preview characteristic data of the flood storage gate boundary perception, and generate the abnormal data of the flood storage gate boundary perception; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the abnormal data of the flood storage gate boundary perception, so as to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the abnormal data of the flood storage gate boundary perception and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the intelligent control operation of the flood storage gate on the digital model of the flood storage gate through the sluice gate intelligent control engine.

[0019] The beneficial effect of the present application is that the multivariate data digital twin method of the sluice of the present invention collects multivariate data of the flood storage project analysis area through the Internet of Things monitoring equipment, realizes the comprehensive data integration of the local and global flood storage environment, and overcomes the problem that multi-source data is difficult to integrate in the traditional method. GIS technology is used to collect DEM data of flood storage terrain and panoramic image analysis, and a three-dimensional model of flood storage terrain is constructed. Combined with the multivariate data of the global flood storage environment, real-time monitoring and all-round analysis of the flood storage environment are realized. By obtaining the sluice structure parameters and the sluice PLC control transmission interface, a three-dimensional simulation model of the sluice is constructed, and it is mapped to the digital model of the flood storage project to form a complete digital twin model of the flood storage sluice. Based on the digital twin model of the flood storage sluice, digital rehearsal and boundary perception rehearsal feature analysis are performed, which can timely discover and prevent potential operation risks, thereby performing intelligent and adaptive sluice control. By constructing an adaptive control decision tree model and an intelligent control engine, the intelligent control operation of the sluice is realized for the complex and changeable flood storage environment, which effectively improves the intelligent level of sluice management and solves the problem of single sluice control mode and lack of intelligent and adaptive control means in the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the steps of a sluice multivariate data digital twin method of the present invention;

[0021] Figure 2 for Figure 1 Detailed implementation steps of step S5;

[0022] Figure 3 for Figure 1 Detailed implementation steps of step S6 in FIG.

[0023] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0024] The technical method of the present invention is described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the present invention.

[0025] In addition, the accompanying drawings are only schematic illustrations of the present invention and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. The functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor methods and / or microcontroller methods.

[0026] It should be understood that, although the terms "first", "second", etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are used only to distinguish one unit from another unit. For example, without departing from the scope of the exemplary embodiments, the first unit may be referred to as the second unit, and similarly the second unit may be referred to as the first unit. The term "and / or" used herein includes any and all combinations of one or more of the listed associated items.

[0027] To achieve this, please refer to Figures 1 to 3 The present invention provides a sluice multivariate data digital twin method, comprising the following steps:

[0028] Step S1: acquiring data of the flood storage project analysis area; collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; performing global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate global flood storage environment multivariate data;

[0029] Step S2: using GIS technology to collect flood storage terrain DEM data for flood storage project analysis area data to generate flood storage project DEM data; performing flood storage terrain panoramic image analysis based on flood storage project analysis area data to generate flood storage terrain panoramic image data; constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the flood storage terrain panoramic image data;

[0030] Step S3: Mapping the global flood storage environment multivariate data to the flood storage terrain three-dimensional model to perform digital twin modeling of the flood storage project to construct a digital model of the flood storage project;

[0031] Step S4: obtaining the sluice structure parameters and the sluice PLC control transmission interface; collecting the sluice interactive control parameters according to the sluice PLC control transmission interface to generate the sluice interactive control parameters; constructing a sluice three-dimensional simulation model based on the sluice structure parameters and the sluice interactive control parameters; mapping the sluice three-dimensional simulation model to the digital model of the flood storage project to perform digital twin modeling of the flood storage sluice, so as to construct a digital model of the flood storage sluice;

[0032] Step S5: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate to generate digital preview data of the flood storage gate; performing boundary perception preview feature analysis of the flood storage gate based on the digital preview data of the flood storage gate to generate boundary perception preview feature data of the flood storage gate;

[0033] Step S6: Analyze the flood storage gate boundary perception abnormality data according to the flood storage gate boundary perception preview feature data to generate the flood storage gate boundary perception abnormality data; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the flood storage gate boundary perception abnormality data to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the flood storage gate boundary perception abnormality data and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the flood storage gate intelligent control operation on the flood storage gate digital model through the sluice gate intelligent control engine.

[0034] The present invention collects local flood storage environment multivariate data on flood storage project analysis area data based on the Internet of Things monitoring equipment, realizes the integration of multi-source data, effectively overcomes the problem of information isolation, ensures the comprehensiveness and accuracy of data, improves the real-time monitoring capability of the flood storage environment, and can timely obtain and analyze various environmental data of the flood storage area. Based on the local flood storage environment multivariate data, global flood storage environment multivariate data analysis is performed, and global data is gradually generated from the evolution analysis of the local flood storage environment multivariate data, providing hydrological information of the flood storage environment and global characteristics of external information, providing a solid data foundation for subsequent modeling. The three-dimensional model of flood storage terrain is constructed using GIS technology to intuitively display the terrain characteristics of the flood storage area, improve the grasp and understanding of terrain information, and the establishment of the three-dimensional model of flood storage terrain is conducive to the refined management and analysis of the flood storage area, providing a scientific basis for optimizing flood storage measures. High-precision terrain data and panoramic image data can support more accurate decision-making and improve the effectiveness of flood control and irrigation management. Combining multi-source environmental data and terrain models to create a comprehensive and dynamic digital model of flood storage projects will help to fully understand the status of the flood storage area, realize dynamic monitoring and simulation of flood storage projects, and timely reflect the actual situation, conduct early warning and risk assessment. The digital model provides a visual and operational platform for optimizing and improving flood storage projects and improving management efficiency and effectiveness. By obtaining detailed structural parameters and control interfaces, the precise control and simulation of the sluice gates can be achieved, which improves the accuracy of operation. The construction of a three-dimensional simulation model can be used for virtual testing and simulation, which improves the scientificity and effectiveness of the control strategy. The three-dimensional simulation model of the sluice gate is integrated with the digital model of the flood storage project to realize digital simulation control of sluice management and improve overall management efficiency. According to the digital model of the flood storage gate, the digital preview data of the flood storage gate is collected. Through digital preview, the operation of the flood storage gate is simulated and predicted in advance, potential problems are identified, and the control strategy is optimized. Based on the digital preview data of the flood storage gate, the boundary perception preview feature analysis of the flood storage gate is carried out, which improves the adaptability and recognition ability to complex environments, provides data support for subsequent abnormal detection and control, thereby timely discovering potential operation risks and problems, and improving the safety and reliability of the system. According to the flood storage gate boundary perception preview feature data, the flood storage gate boundary perception abnormal data analysis is carried out to timely discover and identify abnormal situations, ensure the safety and stability of the sluice operation, and build an adaptive control decision tree model to realize intelligent and adaptive sluice control and improve the system's responsiveness to complex environments. Through the intelligent control engine to perform intelligent control operations, the digital machine intelligent management and control level of the sluice is improved to ensure the efficient operation of the flood storage project.

[0035] As an embodiment of the present invention, refer to Figure 1The above is a schematic diagram of the steps of a digital twin method for multivariate data of a sluice according to the present invention. In this embodiment, the digital twin method for multivariate data of a sluice comprises the following steps:

[0036] Step S1: acquiring data of the flood storage project analysis area; collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; performing global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate global flood storage environment multivariate data;

[0037] In an embodiment of the present invention, the flood storage project analysis area is predetermined based on expert analysis, and the corresponding longitude and latitude data are obtained to obtain the flood storage project analysis area data. A variety of Internet of Things monitoring devices, such as meteorological sensors, water level sensors, flow meters, etc., are arranged in the flood storage project analysis area. These sensors are used to collect local flood storage environment data in real time, including rainfall, water level changes, flow changes, temperature, humidity, etc. The collected local data are preprocessed, including data cleaning, data format conversion, data normalization, etc., to generate a local flood storage environment multivariate data set. The spatial characteristics of the flood storage environment multivariate data are analyzed based on the local flood storage environment multivariate data. For example, the global flood storage environment multivariate data analysis is performed through machine learning and statistical analysis methods to identify the overall environmental characteristics and change trends of the flood storage project area. Generate global flood storage environment multivariate data.

[0038] Step S2: using GIS technology to collect flood storage terrain DEM data for flood storage project analysis area data to generate flood storage project DEM data; performing flood storage terrain panoramic image analysis based on flood storage project analysis area data to generate flood storage terrain panoramic image data; constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the flood storage terrain panoramic image data;

[0039] In an embodiment of the present invention, GIS software is used to collect digital elevation model (DEM) data of the flood storage area. The GIS software is used to obtain elevation data in advance using remote sensing technology, satellite data or aerial images, and the data is processed to generate DEM data of the flood storage project, including information such as terrain undulation and slope. Panoramic image analysis of the flood storage terrain is performed based on the data of the flood storage project analysis area, and a panoramic image of the flood storage project area is obtained using an unmanned aerial vehicle or satellite remote sensing equipment. The image data is processed by image processing software (such as ENVI, ERDAS) to generate panoramic image data of the flood storage terrain, and the panoramic image is corrected, spliced ​​and enhanced to ensure the integrity and accuracy of the image data. A three-dimensional model of the flood storage terrain is constructed based on the DEM data of the flood storage project and the panoramic image data of the flood storage terrain: the DEM data and the panoramic image data are imported into the three-dimensional modeling software (such as SketchUp, 3ds Max), and the DEM data is converted into a three-dimensional terrain model in the three-dimensional modeling software, and the panoramic image data is fitted to ensure the realism of the model, and the three-dimensional model is adjusted and optimized in detail to generate an accurate three-dimensional model of the flood storage terrain.

[0040] Step S3: Mapping the global flood storage environment multivariate data to the flood storage terrain three-dimensional model to perform digital twin modeling of the flood storage project to construct a digital model of the flood storage project;

[0041] In the embodiment of the present invention, the global flood storage environment multivariate data is imported into the three-dimensional modeling environment, the environmental data is associated with the corresponding position in the terrain model, and the environmental data is visualized in the three-dimensional model using data visualization tools (such as Tableau, Power BI), such as water level changes, rainfall, etc. The digital twin technology is used to integrate the three-dimensional terrain model and environmental data, build a dynamic digital twin model of the flood storage project, integrate real-time monitoring data in the digital twin model, realize dynamic update of the model and real-time reflection of the actual situation, simulate and analyze through the digital twin model, and evaluate the flood storage effect and risk under different environmental conditions. The digital twin model is verified and calibrated to ensure its accuracy and reliability, and the digital model is used to optimize the design and management of the flood storage project, provide scientific decision-making support, and apply the digital model to the operation monitoring, emergency response and maintenance management of the flood storage project to improve the intelligence level and management efficiency of the project.

[0042] Step S4: obtaining the sluice structure parameters and the sluice PLC control transmission interface; collecting the sluice interactive control parameters according to the sluice PLC control transmission interface to generate the sluice interactive control parameters; constructing a sluice three-dimensional simulation model based on the sluice structure parameters and the sluice interactive control parameters; mapping the sluice three-dimensional simulation model to the digital model of the flood storage project to perform digital twin modeling of the flood storage sluice, so as to construct a digital model of the flood storage sluice;

[0043] In the embodiment of the present invention, the design drawings and technical specifications of the sluice are obtained, including structural dimensions, material properties, operating mechanisms (such as lifts, gate types), etc., to obtain the structural parameters of the sluice. The control transmission interface specifications of the PLC (programmable logic controller) are identified and recorded, including communication protocols (such as Modbus, Profibus), interface types (such as serial ports, Ethernet), data formats, and transmission rates, to obtain the PLC control transmission interface of the sluice. The interactive control parameters of the sluice are collected according to the PLC control transmission interface of the sluice, and the control system of the sluice is connected through the PLC interface to read and record actual operating parameters, such as valve opening, flow setting, operating commands, etc., to generate interactive control parameters of the sluice. A three-dimensional simulation model of the sluice is constructed based on the structural parameters of the sluice and the interactive control parameters of the sluice. A three-dimensional model is created according to the structural parameters of the sluice using three-dimensional modeling software (such as SolidWorks, AutodeskRevit), including the physical structure, components, motion mechanism, etc. of the sluice, and the collected interactive control parameters are integrated into the three-dimensional model to simulate the actual operation process and control characteristics of the sluice. Different operating conditions are set in the simulation environment to simulate the behavior of the sluice under different working conditions. The constructed three-dimensional simulation model of the sluice gate is connected with the digital model of the flood storage project to ensure the accurate match between the sluice gate model and the flood storage terrain and environmental data. The environmental data in the digital model of the flood storage project and the three-dimensional simulation model of the sluice gate are combined to carry out digital twin modeling and create a complete digital model of the flood storage sluice gate.

[0044] Step S5: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate to generate digital preview data of the flood storage gate; performing boundary perception preview feature analysis of the flood storage gate based on the digital preview data of the flood storage gate to generate boundary perception preview feature data of the flood storage gate;

[0045] In the embodiment of the present invention, a rehearsal scenario is set in the digital model, including different water flow, rainfall, operating conditions, etc., and the simulation program is run to collect the operating data of the sluice under the rehearsal conditions, such as water level changes, gate actions, flow changes, etc. The collected rehearsal data is stored as a digital rehearsal data set for flood storage sluice for further analysis. The rehearsal data is analyzed using data analysis tools (such as Python and MATLAB), key features under boundary conditions are identified, and feature data related to sluice boundary perception are extracted, such as extreme water levels, operating boundary conditions, etc. The rehearsal feature data for flood storage sluice boundary perception is generated according to the analysis results, providing basic data for subsequent anomaly detection.

[0046] Step S6: Analyze the flood storage gate boundary perception abnormality data according to the flood storage gate boundary perception preview feature data to generate the flood storage gate boundary perception abnormality data; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the flood storage gate boundary perception abnormality data to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the flood storage gate boundary perception abnormality data and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the flood storage gate intelligent control operation on the flood storage gate digital model through the sluice gate intelligent control engine.

[0047] In the embodiment of the present invention, statistical analysis and machine learning algorithms (such as anomaly detection algorithms and cluster analysis) are used to analyze the boundary perception preview feature data, identify and mark abnormal patterns or abnormal situations in the preview data, and generate flood storage gate boundary perception abnormal data. According to the flood storage gate boundary perception abnormal data, the sluice gate adjustment control parameter analysis when the flood storage gate boundary perception is abnormal is performed, the sluice gate operating conditions under the abnormal data are analyzed, the adjustment control parameters under abnormal conditions are identified, and the corresponding sluice gate adjustment control parameters are generated, including adjustment strategies, control commands, etc., to ensure that the sluice gate can effectively respond under abnormal conditions. A decision tree model is used to construct a sluice gate adaptive control decision tree model, and abnormal data and control parameters are used as training samples to train the decision tree model so that it can generate corresponding control strategies according to different abnormal conditions. An intelligent control engine is developed based on the sluice gate adaptive control decision tree model, and the decision rules and control logic of the model are integrated. The digital model of the flood storage gate is monitored and controlled in real time through the intelligent control engine to ensure that the sluice gate can be intelligently adjusted according to actual conditions. The intelligent control engine monitors water level flow, hydrological conditions, and the operating status of the sluice gate in real time, automatically adjusts the operating parameters of the sluice gate, and automatically executes preset adjustment strategies in abnormal situations to ensure the safety and stability of the flood storage project.

[0048] Preferably, step S1 comprises the following steps:

[0049] Step S11: Acquire flood storage project analysis area data;

[0050] Step S12: collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data;

[0051] Step S13: extracting local monitoring area data according to the local flood storage environment multivariate data to generate local monitoring area data;

[0052] Step S14: performing a multivariate deviation analysis of the local flood storage environment in the monitoring area on the local multivariate data according to the local monitoring area data, and generating multivariate deviation data of the local flood storage environment;

[0053] Step S15: performing time series characteristic analysis on the local flood storage environment multivariate deviation data to generate local multivariate deviation time series characteristic data;

[0054] Step S16: performing a global flood storage environment multivariate deviation fluctuation analysis based on the local multivariate deviation time series characteristic data to generate global flood storage environment multivariate deviation fluctuation data;

[0055] Step S17: Performing global flood storage environment multivariate data analysis through global flood storage environment multivariate deviation fluctuation data to generate global flood storage environment multivariate data.

[0056] The acquisition of flood storage project analysis area data by the present invention is the basis for subsequent data collection and analysis, and provides the initial regional scope and basic information for the entire digital twin model, ensuring that subsequent steps can be carried out in the correct geographical and engineering context, and increasing the accuracy and relevance of the data. The use of Internet of Things monitoring equipment for data collection can realize real-time, comprehensive and accurate environmental data collection, and the generated local flood storage environment multivariate data can reflect the current state of the flood storage environment, providing reliable data support for subsequent analysis. The local monitoring area data extraction effectively classifies and organizes a large amount of environmental data, which is convenient for further analysis and processing, improves the efficiency of data processing, and ensures the pertinence and accuracy of data analysis. According to the local monitoring area data, the local multivariate data is analyzed for the local flood storage environment multivariate deviation of the monitoring area, and anomalies or change trends in the local environmental data are found, and potential flood storage risks or environmental changes are discovered in time. The local flood storage environment multivariate deviation data is analyzed for time series characteristics, and the time series characteristic analysis can reveal the change law of local environmental data in the time dimension, which is helpful to predict the future environmental state and trend. The generated local multivariate deviation time series characteristic data is used to dynamically adjust and optimize the flood storage strategy. The global flood storage environment multivariate deviation fluctuation analysis is performed based on the local multivariate deviation time series characteristic data. The global flood storage environment multivariate deviation fluctuation analysis can extend the time series changes of local data to the global scope and identify the fluctuations and trends of the overall environment. This is crucial for formulating a more comprehensive and effective flood storage management strategy. The global flood storage environment multivariate data analysis is performed through the global flood storage environment multivariate deviation fluctuation data. The global data analysis can integrate various environmental data and their fluctuation trends to generate a multivariate data that comprehensively reflects the environmental status of the flood storage project, providing comprehensive data support for the construction and optimization of the digital twin model, ensuring the accuracy and reliability of the model.

[0057] In the embodiment of the present invention, the specific analysis area of ​​the flood storage project is determined by expert analysis, the geographical scope and related geographical information are clarified by consulting the engineering design drawings and related documents, and the basic geographical data of the area, including topographic maps, land use maps, hydrological maps, etc., are obtained from the existing database. If the existing data is insufficient, it is necessary to conduct on-site surveys, use GPS equipment, drones or satellite images, etc. to collect detailed geographical information, import the collected data into GIS software for integration and processing, and generate complete flood storage project analysis area data. Various Internet of Things monitoring devices, such as rain gauges, water level sensors, temperature and humidity sensors, flow meters, etc., are deployed in the flood storage project analysis area, and the location and number of monitoring points are determined to ensure that the monitoring points are reasonably distributed and can fully cover the analysis area. The collection frequency and transmission mode of the Internet of Things devices are set to ensure that data can be collected and transmitted in real time. The collected data is transmitted to the central database through the Internet of Things gateway, and preliminary data cleaning and processing are performed to generate local flood storage environment multivariate data. Extract the required local flood storage environment multivariate data from the central database, use data analysis software (such as Python, MATLAB) to process and filter the data, extract the key data of the specific monitoring area, and generate local monitoring area data, including the rainfall, water level, flow, temperature and humidity in the area. Use statistical analysis tools to analyze the local monitoring area data, identify the differences between normal environmental data and abnormal data, apply deviation analysis algorithms (such as standard deviation, mean difference, etc.) to calculate the deviation of the local monitoring area data, integrate the analysis results, and generate local flood storage environment multivariate deviation data. Steps Perform time series feature analysis on the local flood storage environment multivariate deviation data, use time series analysis tools (such as ARIMA model, time series decomposition method) to analyze the local flood storage environment multivariate deviation data, identify the periodicity, trend and randomness characteristics in the data, extract time series features, and generate local multivariate deviation time series feature data, including deviation change trends and characteristics in different time periods. Conduct global flood storage environment multivariate deviation fluctuation analysis based on local multivariate deviation time series feature data. Aggregate local multivariate deviation time series feature data, integrate global data, use fluctuation analysis methods (such as volatility calculation, moving average method) to analyze the deviation fluctuation of global data, identify the fluctuation patterns and laws in global data, extract key fluctuation features, generate global flood storage environment multivariate deviation fluctuation data, and record the deviation fluctuation situation in the global scope. Use data analysis and modeling tools to conduct a comprehensive analysis of the global flood storage environment multivariate deviation fluctuation data, apply machine learning algorithms such as cluster analysis and regression analysis, extract key features and patterns in global data, integrate analysis results, and generate comprehensive global flood storage environment multivariate data, including global rainfall data, global water level and flow data, etc.

[0058] Preferably, step S2 comprises the following steps:

[0059] Step S21: using GIS technology to collect flood storage topography DEM data for flood storage project analysis area data to generate flood storage project DEM data;

[0060] Step S22: using laser radar monitoring equipment to collect orthophotos of flood storage terrain for the flood storage project analysis area data, and generating orthophotos of flood storage terrain data;

[0061] Step S23: using laser radar monitoring equipment to collect flood storage terrain oblique images of the flood storage project analysis area data to generate flood storage terrain oblique image data;

[0062] Step S24: performing panoramic image fusion on the flood storage terrain orthophoto image data and the flood storage terrain oblique image data to generate flood storage terrain panoramic image data;

[0063] Step S25: constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the panoramic image data of the flood storage terrain.

[0064] The present invention uses GIS technology to collect DEM data of flood storage terrain in the flood storage project analysis area data, obtains accurate terrain elevation data, and can describe the terrain characteristics of the flood storage project area in detail, providing a basis for subsequent three-dimensional modeling and environmental analysis, and ensuring the accuracy of the model's terrain height. The laser radar monitoring equipment is used to collect orthophotos of flood storage terrain in the flood storage project analysis area data. The orthophoto data collected by the laser radar monitoring equipment has high resolution and accuracy, can provide accurate surface images, help identify terrain features and physical structures, and provide detailed image support for further terrain analysis and modeling. The laser radar monitoring equipment is used to collect oblique images of flood storage terrain in the flood storage project analysis area data. Oblique image collection provides terrain image data at different angles, which can more comprehensively describe terrain features. When used in combination with orthophotos, three-dimensional modeling and terrain feature identification can be more accurately performed, improving the fidelity and accuracy of the model. The orthophoto image data of the flood storage terrain and the oblique image data of the flood storage terrain are panoramically fused. Panoramic image fusion can integrate image data of different angles and resolutions to generate complete and continuous panoramic images, making the terrain data more intuitive and easy to analyze, which helps to improve the integrity and coherence of the three-dimensional model. The three-dimensional model of the flood storage terrain is constructed based on the DEM data of the flood storage project and the panoramic image data of the flood storage terrain. The three-dimensional model of the flood storage terrain is constructed by combining the DEM data and the panoramic image data to generate a high-precision and realistic terrain model. This model can fully reflect the terrain characteristics of the flood storage area, providing a solid foundation for the construction of the digital twin system and ensuring the accuracy and reliability of the model.

[0065] In an embodiment of the present invention, GIS software is used to collect digital elevation model (DEM) data for flood storage project analysis area data. The GIS software is used to obtain elevation data in advance using remote sensing technology, satellite data or aerial images, and the data is processed to generate flood storage project DEM data, including information such as terrain undulation and slope. A laser radar monitoring device installed on a drone or helicopter is used to collect detailed orthophoto images of the flood storage project analysis area data. The laser radar technology can penetrate vegetation and obtain high-precision three-dimensional coordinate data of the surface. Through data processing, orthophoto data of the area are generated. These image data have no geometric distortion and can intuitively display the terrain and land features. While collecting orthophoto images, the laser radar monitoring device will also collect oblique image data of the area. Oblique image collection is to shoot the terrain from multiple angles to generate image data at different angles. These data can better display the three-dimensional structure of the terrain and provide richer perspective information for building a three-dimensional model. The orthophoto data and the oblique image data are processed by panoramic image fusion. Through image fusion technology, the image data from multiple angles and multiple sources are spliced ​​and corrected to generate a seamless panoramic image data, eliminate the gaps and distortions between the images, generate high-quality panoramic images, and provide accurate image references for subsequent 3D modeling. A 3D model of flood storage terrain is constructed based on the DEM data of the flood storage project and the panoramic image data of the flood storage terrain. By using the DEM data as the terrain basis and the elevation information as the height basis of the model, and then mapping the panoramic image data to the surface of the 3D model, a 3D model of flood storage terrain with strong sense of reality and rich details is generated. It can not only show the height fluctuations of the terrain, but also show the information such as objects and vegetation in detail, providing important support for the analysis and decision-making of flood storage projects.

[0066] Preferably, step S25 comprises the following steps:

[0067] Step S251: performing elevation gradient analysis on the flood storage project DEM data to generate flood storage project DEM gradient data, and performing gradient feature node selection on the flood storage project DEM data according to the flood storage project DEM gradient data to generate flood storage project DEM gradient feature node data;

[0068] Step S252: performing image sharpening processing on the panoramic image data of the flood storage terrain to generate panoramic sharpened image data of the flood storage terrain; and performing sharpening feature node selection on the panoramic sharpened image data of the flood storage terrain based on the panoramic sharpened image data of the flood storage terrain to generate panoramic sharpened feature node data of the flood storage terrain;

[0069] Step S253: Perform terrain fusion matching feature analysis on the flood storage project DEM gradient feature node data and the flood storage terrain panoramic sharpening feature node data to generate terrain fusion matching feature data;

[0070] Step S254: performing flood storage terrain point cloud data fusion processing on the flood storage project DEM data and the flood storage terrain panoramic image data according to the terrain fusion matching feature data to obtain flood storage terrain fusion data, and constructing a flood storage terrain three-dimensional model based on the flood storage terrain fusion data.

[0071] The present invention performs elevation gradient analysis on the DEM data of the flood storage project, and selects gradient feature nodes for the DEM data of the flood storage project according to the DEM gradient data of the flood storage project. The elevation gradient analysis can reveal the undulation of the terrain, identify key terrain feature nodes, and the selected gradient feature node data provides an important reference for further three-dimensional modeling and terrain feature analysis, ensuring that the model can accurately reflect the terrain characteristics and changes. Image sharpening is performed according to the panoramic image data of the flood storage terrain, and sharpening feature nodes are selected for the panoramic sharpened image data of the flood storage terrain according to the panoramic sharpened image data of the flood storage terrain. Image sharpening can enhance the details of the panoramic image, make the terrain features clearer, and significantly improve the resolution and contrast of the image data, which is helpful to accurately identify the terrain feature nodes. The sharpened feature node data provides high-quality reference points for subsequent terrain matching and fusion, and improves the accuracy of three-dimensional modeling. The terrain fusion matching feature analysis is performed on the DEM gradient feature node data of the flood storage project and the panoramic sharpened feature node data of the flood storage terrain. The fusion matching feature analysis effectively matches and integrates the DEM gradient feature node data with the sharpened image feature node data, accurately aligns the terrain data, and ensures the continuity and consistency of the terrain model. The generated fusion matching feature data lays the foundation for further data fusion and three-dimensional modeling, and improves the accuracy of the model. Based on the terrain fusion matching feature data, the flood storage project DEM data and the flood storage terrain panoramic image data are fused with the flood storage terrain point cloud data, and a three-dimensional model of the flood storage terrain is constructed based on the flood storage terrain fusion data. Point cloud data fusion processing can integrate terrain data from different sources and types (such as DEM data and panoramic image data) to generate high-precision terrain fusion data. The three-dimensional model constructed based on terrain fusion data can fully reflect the terrain characteristics of the flood storage area, provide high-precision and high-resolution terrain representation, and provide a reliable foundation for the construction of the digital twin system to ensure the accuracy and realism of the model.

[0072] In an embodiment of the present invention, GIS software is used to perform elevation gradient analysis on the acquired DEM data of the flood storage project, and the elevation gradient data is generated by calculating the elevation change rate of each point in the DEM data, and the steep terrain area and the relatively gentle area are identified. According to the generated elevation gradient data, the characteristic nodes with significant gradient changes are identified and selected. These characteristic nodes are usually located in the key parts of the terrain, such as ridges, valley bottoms, etc., and can represent the main features of the terrain. The selected characteristic node data are saved to generate the DEM gradient characteristic node data of the flood storage project. The acquired panoramic image data of the flood storage terrain are sharpened. Sharpening can enhance the details of the image and make the edges of the objects clearer. Commonly used sharpening methods include Laplace sharpening, Unsharp Masking, etc. According to the sharpened image data, nodes with significant terrain features are selected. These nodes are usually located at the edges of important objects in the image or in areas with drastic changes. The selected characteristic node data are saved to generate panoramic sharpened characteristic node data of the flood storage terrain. The DEM gradient feature node data is matched and analyzed with the panoramic sharpening feature node data. By calculating the spatial relationship between the two data sets, common feature points are identified. For example, feature matching algorithms such as SIFT (Scale-Invariant Feature Transform) or SURF (Speeded Up Robust Features) are used to generate terrain fusion matching feature data based on the matching results. These data can describe the spatial correspondence between DEM and panoramic images. The DEM data of the flood storage project and the panoramic image data of the flood storage terrain are fused using the terrain fusion matching feature data. By combining the elevation information of the DEM with the visual information of the panoramic image, more complete and detailed terrain point cloud data is generated. Based on the fused point cloud data, a three-dimensional model of the flood storage terrain is constructed using three-dimensional modeling software (such as ArcGIS, AutoCAD Civil 3D, etc.). The three-dimensional model not only contains the height information of the terrain, but also can display detailed features of the surface, such as vegetation, water bodies, buildings, etc.

[0073] Preferably, step S4 comprises the following steps:

[0074] Step S41: obtaining the structural parameters of the sluice gate;

[0075] Step S42: using BIM modeling technology to model the sluice structure parameters into a sluice three-dimensional model framework, thereby generating a sluice three-dimensional model framework;

[0076] Step S43: Obtain the water gate PLC control transmission interface;

[0077] Step S44: collecting interactive control parameters of the water gate according to the water gate PLC control transmission interface to generate interactive control parameters of the water gate;

[0078] Step S45: performing a water gate interactive control parameter characteristic analysis according to the water gate interactive control parameter to generate a water gate interactive control characteristic parameter;

[0079] Step S46: marking the model structure interaction attributes of the sluice three-dimensional model framework according to the sluice interactive control characteristic parameters to construct a sluice three-dimensional simulation model;

[0080] Step S47: Analyze the geographical features of flood storage gate mapping based on the three-dimensional flood storage terrain model to generate geographical feature data of flood storage gate mapping;

[0081] Step S48: Map the geographic feature data through the flood storage gate, map the three-dimensional simulation model of the sluice to the digital model of the flood storage project to perform digital twin modeling of the flood storage gate, so as to construct a digital model of the flood storage gate.

[0082] The invention obtains the structural parameters of the sluice gate, which is the basis for constructing the three-dimensional model of the sluice gate. It provides detailed structural information of the sluice gate, ensures that the model can accurately reflect the actual physical characteristics and structural features of the sluice gate, and provides necessary data support for subsequent modeling and simulation. The sluice gate structural parameters are modeled and processed by BIM modeling technology. BIM (Building Information Modeling) technology can efficiently convert structural parameters into a three-dimensional model. The generated three-dimensional model architecture not only intuitively and accurately reflects the physical structure of the sluice gate, but also integrates various sluice gate structure-related information, providing comprehensive data support for subsequent simulation and analysis. The PLC (Programmable Logic Controller) control transmission interface information is obtained to provide necessary interface data for the automatic control of the sluice gate, ensure that the interactive control parameters of the sluice gate can be accurately collected and analyzed, and help to realize the intelligent control of the sluice gate. The beneficial effect of collecting the interactive control parameters of the sluice gate according to the PLC control transmission interface of the sluice gate is that the interactive control parameters of the sluice gate are collected, which can provide real-time data of the running status and control requirements of the sluice gate, provide an important basis for subsequent feature analysis and simulation modeling, and ensure that the model can reflect the actual control situation and operation requirements. According to the interactive control parameters of the sluice, the interactive control parameters of the sluice are analyzed. The key features and patterns in the control parameters can be identified by analyzing the interactive control parameters, providing data support for the interactive attribute identification of the model, and improving the accuracy and operability of the simulation model. According to the interactive control characteristic parameters of the sluice, the interactive attribute of the model structure of the sluice three-dimensional model architecture is identified, so that the model has the ability to simulate actual operation and control. The constructed three-dimensional simulation model not only has static structural information, but also has dynamic interactive attributes, which provides comprehensive support for the simulation and analysis of the digital twin model. According to the three-dimensional model of flood storage terrain, the geographical feature analysis of the flood storage sluice mapping is carried out. By analyzing the geographical features in the three-dimensional model of flood storage terrain, the position of the sluice in the terrain of the three-dimensional model of flood storage terrain is identified. These mapped geographical feature data ensure that the sluice model can accurately reflect its position and function in the three-dimensional model of flood storage terrain, providing support for the integrity and accuracy of the digital twin model. By mapping the geographic feature data of the flood storage gate and mapping the three-dimensional simulation model of the gate to the digital model of the flood storage project for digital twin modeling of the flood storage gate, a comprehensive digital twin model of the flood storage gate can be constructed. This model not only includes the structure and control information of the gate, but also combines actual geographical and environmental data, providing comprehensive digital support for the management, monitoring and optimization of flood storage projects.

[0083] In the embodiment of the present invention, the structural parameters of the sluice gate are obtained through on-site survey, design drawings and related technical documents, including the size, material, structural characteristics, mechanical equipment layout, connection method, etc. of the sluice gate. Using BIM modeling software, such as Revit, ArchiCAD, etc., according to the structural parameters of the sluice gate, a three-dimensional model architecture of the sluice gate is created in the BIM modeling software, and detailed modeling includes structural parts such as foundation, gate, hoist, control room, etc., and the model is improved in detail to ensure that each structural part is accurate and consistent with the actual situation. Generate a three-dimensional model architecture of the sluice gate. According to the requirements of the sluice control system, select the PLC (Programmable Logic Controller) control transmission interface, including Modbus, Profibus, Ethernet / IP, etc., install the selected PLC hardware equipment in the sluice control system, and ensure that it is connected to the sluice control equipment (such as motors, sensors, etc.) normally. Use PLC programming software (such as Siemens TIA Portal, Rockwell Studio 5000, etc.) to configure the PLC control transmission interface to ensure that the interface can normally receive and send control signals. For example, choose to use Siemens' S7-1500 PLC control system, and the interface uses Profibus. Install the PLC hardware equipment in the sluice control room, and connect it to the motor and sensor through the Profibus interface. Use TIA Portal software to configure the PLC to ensure that the interface can work normally and prepare for the next step of data collection. Write a PLC program, use the configured control transmission interface to collect the interactive control parameters of the sluice, including the open / closed state, opening, flow, pressure, etc. of the sluice, run the PLC program, collect the interactive control parameters of the sluice control system in real time, store the collected data in the PLC memory or external storage device, and transmit the collected interactive control parameters of the sluice to the central control system or database through the network for subsequent analysis and processing. For example, use TIA Portal software to write a PLC program to collect the opening, flow and pressure data of the sluice. After the program runs, the data is collected in real time and stored in the PLC memory. The interactive control parameters of the sluice are transmitted to the database of the central control system through the Profibus interface and Ethernet. Preprocess the interactive control parameters of the sluice, including data cleaning, denoising, smoothing, etc., to ensure the quality and accuracy of the data. Statistical analysis and machine learning algorithms are used to extract features from the preprocessed data using principal component analysis (PCA). Based on the results of feature extraction, the interactive control characteristic parameters of the sluice are generated. These parameters describe the operating status and performance of the sluice control system and provide basic data for the subsequent construction of a three-dimensional simulation model.For example, Python is used to write data processing scripts to pre-process the opening, flow and pressure data collected from the PLC, and then the PCA method is used to extract the main features of the data to generate the opening characteristic parameters, flow characteristic parameters and pressure characteristic parameters of the sluice. These characteristic parameters reflect the operating status and performance of the sluice. Using BIM (Building Information Modeling) software (such as Autodesk Revit, Bentley Systems, etc.), a three-dimensional model architecture of the sluice is constructed based on the structural parameters and geometric data of the sluice. According to the generated interactive control characteristic parameters of the sluice, the interactive attributes of the three-dimensional model architecture are identified, including identifying the opening, flow, pressure and other attributes of each control node in the model, so that the model can reflect the actual control parameters, and the three-dimensional model architecture with interactive attributes identified is imported into the simulation software (such as ANSYS, Simulink, etc.) to build a three-dimensional simulation model of the sluice. The model can simulate the actual operation of the sluice and perform dynamic simulation analysis. For example, using Autodesk Revit software, based on the structural design drawings of the sluice, the three-dimensional model architecture of the sluice is constructed, and the properties of each control node are identified in the Revit model according to the extracted opening, flow and pressure characteristic parameters. The completed three-dimensional model architecture is imported into ANSYS software to construct a three-dimensional simulation model of the sluice, which can simulate the opening, closing and adjustment process of the sluice. Based on the three-dimensional model of the flood storage terrain, the geographical feature data of the sluice in the model is extracted, including the elevation, slope, water flow path, soil type, etc. of the terrain, and GIS software (such as ArcGIS, QGIS) is used for geographical feature analysis and data extraction. The extracted geographical feature data is associated with the location and structural parameters of the sluice to determine the precise location of the sluice in the three-dimensional model and the terrain features around it, and the geographical feature data containing the mapping of the flood storage sluice is generated, which should include the geographical coordinates of the sluice in the three-dimensional model of the flood storage terrain, elevation data, surrounding terrain features, and the relationship with the water flow path. Based on the geographical feature data mapped by the flood storage gate, that is, the position of the gate in the three-dimensional model of the flood storage terrain, the three-dimensional simulation model of the gate is mapped to the digital model of the flood storage project for digital twin modeling of the flood storage gate to build a digital model of the flood storage gate. The digital model of the flood storage gate can be dynamically simulated using the digital twin modeling platform to simulate the performance of the gate under different flood storage conditions. The model is optimized to ensure that it can accurately reflect the operating status in the real world.

[0084] Preferably, step S5 comprises the following steps:

[0085] Step S51: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generating digital preview data of the flood storage gate;

[0086] Step S52: performing preview type characteristic analysis on the digital preview data of the flood storage gate to generate digital preview characteristic data of the flood storage gate;

[0087] Step S53: performing a water gate boundary perception area division process on the digital preview data of the flood storage gate to generate water gate boundary perception area data;

[0088] Step S54: performing a flood storage gate boundary perception preview feature analysis on the flood storage gate digital preview feature data based on the flood storage gate boundary perception area data to generate flood storage gate boundary perception preview feature data.

[0089] The present invention collects digital preview data of the flood storage gate based on the digital model of the flood storage gate, collects and simulates the operation of the flood gate under different conditions, and generates preview data, which helps to understand the performance of the flood gate under various environmental and operating conditions, and provides basic data support for further analysis and optimization. The digital preview data of the flood storage gate is processed by preview type feature analysis. The preview type feature analysis identifies key features and patterns in the preview data, helps to identify and predict the behavior and reaction of the flood gate in different operating scenarios, and provides a basis for optimizing control strategies and improving the operation efficiency of the flood gate. The digital preview data of the flood storage gate is processed by gate boundary perception area division. The boundary perception area division can classify and organize the preview data according to different areas, and more finely analyze the operation and boundary conditions of the flood gate in different areas, providing detailed data support for the optimization and management of specific areas. Based on the sluice boundary perception area data, the digital preview feature data of the flood storage sluice is analyzed for the boundary perception preview feature of the flood storage sluice. The boundary perception preview feature analysis can deeply analyze the characteristics and behaviors of the sluice under different boundary conditions, generate specific preview feature data, help identify potential risks and abnormal situations, and provide an important reference for the optimization control and risk management of the sluice.

[0090] As an embodiment of the present invention, refer to Figure 2 As shown, Figure 1 FIG. 5 is a flow chart of detailed implementation steps of step S5, in this embodiment, step S5 includes:

[0091] Step S51: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generating digital preview data of the flood storage gate;

[0092] In the embodiment of the present invention, the rehearsal parameters are set according to the digital model of the flood storage gate. Including control parameters such as the gate opening angle, flow rate, and water level, the simulation tool in the digital twin model is used to set the rehearsal conditions, and the simulation model is run to simulate the operation of the gate under different rehearsal conditions. The rehearsal data at different time points and different states, including flow rate, pressure, opening, water level, etc., are collected to generate digital rehearsal data of the flood storage gate.

[0093] Step S52: performing preview type characteristic analysis on the digital preview data of the flood storage gate to generate digital preview characteristic data of the flood storage gate;

[0094] In the embodiment of the present invention, the digital preview data of the flood storage gate is preprocessed, including data cleaning, denoising, outlier processing, etc., to ensure the accuracy and integrity of the data. The digital preview data of the flood storage gate is extracted for preview type features under different conditions using a clustering algorithm, and characteristic parameters under each preview type are extracted, such as flow fluctuation characteristics, pressure change characteristics, etc. Preview characteristic data of the flood storage gate is generated based on the feature extraction results. These data include key indicators and change trends under various preview conditions.

[0095] Step S53: performing a water gate boundary perception area division process on the digital preview data of the flood storage gate to generate water gate boundary perception area data;

[0096] In the embodiment of the present invention, according to the structure and geographical location of the flood storage gate, the boundary conditions of the flood storage gate boundary perception area are set, including the physical boundary of the flood storage gate, the influence range, the hydrological characteristics, etc., and the preview data is divided into regions according to the boundary conditions by using GIS and simulation software to generate the flood storage gate boundary perception area data, which can reflect the operation of the flood storage gate in different regions. For example, using ArcGIS software, according to the physical boundary and geographical location of the flood storage gate, the operation range of the flood storage gate is divided into multiple perception areas.

[0097] Step S54: performing a flood storage gate boundary perception preview feature analysis on the flood storage gate digital preview feature data based on the flood storage gate boundary perception area data to generate flood storage gate boundary perception preview feature data.

[0098] In an embodiment of the present invention, statistical analysis and data mining techniques are used to perform flood storage gate boundary perception preview feature analysis on digital preview feature data of flood storage gates based on sluice boundary perception area data, collect digital preview feature data of flood storage gates corresponding to different gate boundary perception area data, compare and analyze data from different areas, identify feature differences and mutual relationships between areas, and generate flood storage gate boundary perception preview feature data, i.e., digital preview feature data of various types of flood storage gates in the sluice boundary perception area data.

[0099] Preferably, step S52 includes the following steps:

[0100] Perform a preview cluster feature analysis on the digital preview data of the flood storage gate to generate preview cluster feature data; perform a preview type feature analysis on the digital preview data of the flood storage gate based on the preview cluster feature data to generate digital preview feature data of the flood storage gate.

[0101] The present invention performs a preview cluster feature analysis on the digital preview data of the flood storage gate, and can classify and cluster a large amount of preview data according to its characteristics. Through cluster analysis, similar patterns and features in the data are found, and operating scenarios with similar behaviors or features are identified. The generated preview cluster feature data helps to simplify complex data sets, highlight key features and patterns, and improve the efficiency and accuracy of data analysis. Preview type feature analysis is performed on the digital preview data of the flood storage gate based on the preview cluster feature data to further explore the specific type features in each cluster, and the unique features and patterns of various types of preview data can be identified, and detailed preview type feature data are generated. It helps to more accurately predict the performance of the sluice under different operating conditions, and provides a detailed and reliable basis for optimizing control strategies and improving the operating efficiency of the sluice.

[0102] In the embodiment of the present invention, clustering algorithms such as K-means clustering, hierarchical clustering and DBSCAN are used to perform preview clustering feature analysis on the digital preview data of the flood storage gate, so as to identify the preview clustering feature data corresponding to the digital preview data of the flood storage gate, that is, to reflect the different types of digital preview data of the flood storage gate. For example, appropriate clustering parameters (such as the K value in K-means) are set to run the algorithm, and the effect and rationality of clustering are judged by using the silhouette coefficient (Silhouette Coefficient) or other evaluation indicators. According to the results of clustering analysis, the digital preview data of the flood storage gate are grouped, and preview clustering feature data are generated. Each cluster group represents a feature mode or operating state in the digital preview data of the flood storage gate. Detailed feature extraction is performed on the digital preview data of the flood storage gate of each cluster group, and statistical analysis methods such as mean, variance, maximum value, minimum value, etc. are used to extract the main features of the digital preview data of the flood storage gate in each cluster group, and preview type feature analysis is performed according to the extracted feature data. The characteristic distribution and changing trend in each cluster group are analyzed, the characteristic differences of different rehearsal types are identified, and the characteristic analysis results of each cluster group are integrated to generate digital rehearsal characteristic data of flood storage gates, which reflects the operating status and characteristics of the flood storage gates under different rehearsal conditions.

[0103] Preferably, step S6 comprises the following steps:

[0104] Step S61: analyzing flood storage gate boundary perception abnormal data according to flood storage gate boundary perception preview feature data to generate flood storage gate boundary perception abnormal data;

[0105] Step S62: analyzing the sluice gate regulation control parameters when the flood storage gate boundary sensing is abnormal according to the flood storage gate boundary sensing abnormality data to obtain the sluice gate regulation control parameters;

[0106] Step S63: designing a water gate adaptive control training sample based on the water gate digital control parameters and the abnormal data of flood storage gate boundary perception;

[0107] Step S64: establishing a sluice adaptive control decision node based on the abnormal data sensed at the flood storage sluice boundary, and performing decision node integration processing on the sluice adaptive control decision node to construct an initial sluice adaptive control decision tree model;

[0108] Step S65: using the sluice adaptive control training samples to perform model training processing on the initial sluice adaptive control decision tree model to obtain the sluice adaptive control decision tree model;

[0109] Step S66: construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform flood storage gate intelligent control operations on the flood storage gate digital model through the sluice gate intelligent control engine.

[0110] The present invention analyzes the abnormal data of flood gate boundary perception according to the flood gate boundary perception preview feature data, analyzes the abnormal data through the boundary perception preview feature data, and timely discovers the abnormal situation in the operation of the flood gate. These abnormal data can reflect the problems that may occur in the flood gate under different conditions, provide early warning information, and help to take preventive measures to reduce potential risks. According to the abnormal data of flood gate boundary perception, the adjustment control parameters of the flood gate when the flood gate boundary perception is abnormal are analyzed. By analyzing the abnormal data of flood gate boundary perception, the adjustment control parameters required for the flood gate under abnormal conditions can be identified, which provides a scientific basis for adjusting the operation of the flood gate, ensuring that the flood gate can effectively respond and adjust under abnormal conditions, and ensuring the safety and stable operation of the flood storage project. The adaptive control training samples of the flood gate are designed by the digital control parameters of the flood gate and the abnormal data of flood gate boundary perception. The adaptive control training samples can provide rich actual data for model training, combine the control parameters with the abnormal data, more accurately simulate the behavior of the flood gate under various conditions, and improve the accuracy and effectiveness of the adaptive control model. Based on the abnormal data perceived by the flood storage gate boundary, the adaptive control decision nodes of the flood gate are established, and the decision nodes of the adaptive control decision nodes of the flood gate are integrated to construct the initial adaptive control decision tree model of the flood gate. The decision nodes are established and integrated to construct the initial decision tree mathematical model of the adaptive control of the flood gate, which can provide decision-making solutions for different abnormal situations, improve the flexibility and adaptability of the flood gate control, and provide a basis for subsequent model optimization and training. The initial adaptive control decision tree model of the flood gate is trained using the adaptive control training samples of the flood gate. The initial model is trained through the training samples, and the model parameters are optimized and adjusted to make it more accurately reflect the actual situation. The trained decision tree model has higher prediction accuracy and adaptability, and provides reliable decision support for the intelligent control of the flood gate. According to the adaptive control decision tree model of the flood gate, the intelligent control engine of the flood gate is constructed, and the intelligent control operation of the flood storage gate is performed on the digital model of the flood storage gate through the intelligent control engine of the flood gate. An intelligent control engine for sluice gates is constructed and applied to the digital model of the sluice gates to realize intelligent control of the sluice gates. The intelligent control engine for the sluice gates can be dynamically adjusted according to real-time data and prediction models to improve the efficiency and safety of sluice gate operation and ensure that the flood storage project can maintain the best condition under various circumstances.

[0111] As an embodiment of the present invention, refer to Figure 3 As shown, Figure 1 FIG. 5 is a flow chart of detailed implementation steps of step S6 in FIG. 5 . In this embodiment, step S6 includes:

[0112] Step S61: analyzing flood storage gate boundary perception abnormal data according to flood storage gate boundary perception preview feature data to generate flood storage gate boundary perception abnormal data;

[0113] In the embodiment of the present invention, the flood storage gate boundary perception preview feature data is used to analyze the abnormal situation during the operation of the flood gate. Time series analysis and anomaly detection technology, such as ARIMA model combined with local anomaly factors, are used to identify and analyze the abnormal patterns in the feature data. By calculating the abnormal values, abnormal frequency and abnormal degree of the flow characteristics, hydrological characteristics and structural characteristics of the flood storage gate boundary perception preview feature data, the flood storage gate boundary perception abnormal data is generated to reflect the abnormal situation of the flood gate during the preview process, and provide a basis for the subsequent control parameter analysis.

[0114] Step S62: analyzing the sluice gate regulation control parameters when the flood storage gate boundary sensing is abnormal according to the flood storage gate boundary sensing abnormality data to obtain the sluice gate regulation control parameters;

[0115] In the embodiment of the present invention, the analysis of the sluice gate adjustment control parameters is performed based on the abnormal data sensed at the flood storage gate boundary. Regression analysis, correlation analysis and optimization algorithms (such as linear regression and Bayesian optimization) are used to evaluate the impact of abnormal conditions on the sluice gate adjustment parameters. By analyzing the relationship between abnormal data and adjustment parameters, the control parameters that need to be adjusted for the sluice gate are analyzed, such as the specific sluice gate opening degree, adjustment frequency, etc., and a set of sluice gate adjustment control parameters are generated to guide the adjustment and control operation of the sluice gate under abnormal conditions.

[0116] Step S63: designing a water gate adaptive control training sample based on the water gate digital control parameters and the abnormal data of flood storage gate boundary perception;

[0117] In an embodiment of the present invention, the digital control parameters of the sluice are combined with the boundary-aware abnormal data to design training samples for training the adaptive control model, and data association is performed based on data labels or data indexes to design sluice adaptive control training samples, including a training set, a validation set, and a test set.

[0118] Step S64: establishing a sluice adaptive control decision node based on the abnormal data sensed at the flood storage sluice boundary, and performing decision node integration processing on the sluice adaptive control decision node to construct an initial sluice adaptive control decision tree model;

[0119] In the embodiment of the present invention, the abnormal data of flood storage gate boundary perception is used to establish the decision node of adaptive control, and the model parameters are designed, including learning parameters, loss function, etc., and the decision tree algorithm (such as CART algorithm, ID3 algorithm) is used to classify and process the abnormal data, establish various control decision nodes, and integrate the decision nodes through integration processing, and use the integrated learning method (such as random forest, Adaboost) to combine multiple decision nodes to construct the initial decision tree model of adaptive control of flood gate. This model can make corresponding control decisions for different abnormal situations.

[0120] Step S65: using the sluice adaptive control training samples to perform model training processing on the initial sluice adaptive control decision tree model to obtain the sluice adaptive control decision tree model;

[0121] In the embodiment of the present invention, the initial sluice adaptive control decision tree model is trained using the sluice adaptive control training sample, and the supervised learning method is used to train and optimize the model using the training data. Through repeated training and verification, the model parameters are continuously adjusted to improve the prediction accuracy and response speed of the model, and the sluice adaptive control decision tree model is obtained. The model can automatically adjust the control parameters according to the input abnormal data to realize the intelligent regulation of the sluice.

[0122] Step S66: construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform flood storage gate intelligent control operations on the flood storage gate digital model through the sluice gate intelligent control engine.

[0123] In the embodiment of the present invention, a sluice intelligent control engine is constructed based on the trained sluice adaptive control decision tree model. The control model is embedded into the intelligent control engine by using real-time data acquisition and processing technology (such as Internet of Things technology, real-time data stream processing). The sluice intelligent control engine can receive and process abnormal data of simulation operation in the digital model of flood storage sluice in real time, and automatically perform corresponding control operations according to the prediction results of the decision tree model. By intelligently controlling the digital model of flood storage sluice, dynamic adjustment and intelligent control of the actual sluice are realized, ensuring the safety and efficiency of the flood storage process.

[0124] Preferably, step S61 includes the following steps:

[0125] Step S611: According to the boundary condition calibration processing of the flood storage gate boundary perception preview characteristic data, boundary perception flow preview characteristic data, boundary perception hydrological preview characteristic data and boundary perception structure preview characteristic data are obtained respectively;

[0126] Step S612: performing boundary-aware traffic preview anomaly analysis according to boundary-aware traffic preview feature data to generate boundary-aware traffic preview anomaly data;

[0127] Step S613: analyzing the hydrological preview influencing parameters based on the boundary-sensing flow preview abnormality data to generate the hydrological preview influencing parameters;

[0128] Step S614: performing boundary-aware hydrological preview feature adjustment processing on the boundary-aware hydrological preview feature data according to the hydrological preview influencing parameters to generate adjusted boundary-aware hydrological preview feature data;

[0129] Step S615: performing boundary-aware hydrological preview anomaly analysis according to the adjusted boundary-aware hydrological preview feature data to generate boundary-aware hydrological preview anomaly data;

[0130] Step S616: Analyze the influencing parameters of the sluice structure according to the boundary-sensing hydrological preview abnormal data, and generate the influencing parameters of the sluice structure preview;

[0131] Step S617: performing boundary perception structure preview feature adjustment processing on the boundary perception structure preview feature data according to the sluice structure preview influence parameter to generate adjusted boundary perception structure preview feature data;

[0132] Step S618: performing boundary perception structure preview abnormality analysis according to the adjusted boundary perception structure preview feature data to generate boundary perception structure preview abnormality data;

[0133] Step S619: Integrate the boundary-aware flow preview anomaly data, boundary-aware hydrological preview anomaly data, and boundary-aware structural preview anomaly data to generate flood storage gate boundary-aware anomaly data.

[0134] The present invention performs boundary condition calibration processing based on the boundary perception preview feature data of the flood storage gate. The boundary condition calibration processing divides the preview feature data into different categories, such as flow, hydrological and structural feature data. This classification processing helps to refine the analysis of different types of boundary perception features, and provides a clear data basis for subsequent abnormal analysis and adjustment processing, thereby improving the accuracy and pertinence of the analysis. Boundary perception flow preview anomaly analysis is performed based on the boundary perception flow preview feature data. The flow preview anomaly analysis can identify abnormal conditions in the flow data. The boundary perception flow preview anomaly data reflects the changes and potential problems of the flow under different conditions, and provides an important basis for timely discovery and processing of flow anomalies, thereby improving the safety and stability of the operation of the sluice gate. Hydrological preview influencing parameter analysis is performed based on the boundary perception flow preview anomaly data, and key parameters affecting the hydrological preview results are identified. The hydrological preview influencing parameters help to understand the impact of abnormal flow on the hydrological environment, provide a scientific basis for subsequent adjustment processing, and ensure the accuracy and reliability of the hydrological preview. According to the hydrological preview influencing parameters, the boundary-aware hydrological preview feature data is adjusted and processed to make it more accurately reflect the actual hydrological conditions. The generated adjusted boundary-aware hydrological preview feature data provides more accurate and reliable data for subsequent anomaly analysis, improving the accuracy and effectiveness of hydrological preview. According to the adjusted boundary-aware hydrological preview feature data, the boundary-aware hydrological preview anomaly analysis is performed. Further hydrological preview anomaly analysis can identify and locate anomalies in hydrological data. The boundary-aware hydrological preview anomaly data provides early warning information, which helps to take timely response measures to reduce the impact of hydrological anomalies on flood storage projects and ensure the safe operation of the project. According to the boundary-aware hydrological preview anomaly data, the sluice structure influencing parameter analysis is performed. The structural influencing parameter analysis can identify the potential impact of hydrological anomalies on the sluice structure. The sluice structure preview influencing parameters provide an important reference for understanding the performance of the sluice structure under different hydrological conditions, which helps to optimize and adjust the sluice structure design and operation strategy to ensure the safety and stability of the structure. According to the influencing parameters of the sluice structure preview, the boundary perception structure preview feature data is adjusted and processed, the boundary perception structure preview feature data is adjusted and processed, the structure preview features are optimized and adjusted to more accurately reflect the actual structural conditions, and the adjustment of the boundary perception structure preview feature data provides reliable data support for further structural anomaly analysis, improving the accuracy and effectiveness of the structure preview. According to the adjustment of the boundary perception structure preview feature data, the boundary perception structure preview anomaly analysis is performed, and further boundary perception structure preview anomaly analysis can identify and locate abnormal conditions in the structural data, provide early warning information, help to take timely response measures, reduce the impact of structural anomalies on flood storage projects, and ensure the safe operation of the project.The boundary-aware flow preview anomaly data, boundary-aware hydrological preview anomaly data and boundary-aware structural preview anomaly data are integrated to generate flood storage gate boundary-aware anomaly data. Different types of anomaly data are integrated to provide comprehensive anomaly analysis results, which can reflect the comprehensive abnormal conditions of the flood storage gate under different conditions, and provide comprehensive data support for subsequent adaptive control and optimization management, ensuring the safety and efficiency of the gate operation.

[0135] In the embodiment of the present invention, the boundary conditions of the sluice gate are calibrated according to the boundary-aware preview feature data generated in the digital model of the flood storage gate, and different preview feature data are classified and sorted to obtain boundary-aware flow preview feature data, boundary-aware hydrological preview feature data, and boundary-aware structural preview feature data, respectively. These feature data correspond to different operating states and environmental conditions, respectively, and provide basic data for subsequent abnormal analysis and adjustment processing. The abnormal analysis of flow preview is performed using boundary-aware flow preview feature data, and statistical analysis and abnormal detection techniques, such as time series analysis and abnormal detection algorithms, such as Isolation Forest or LOF, are used to identify abnormal values ​​or abnormal patterns in the flow data. The generated boundary-aware flow preview abnormal data can reflect the abnormal flow conditions that occur during the preview process, and provide a basis for subsequent hydrological impact analysis. The analysis of the hydrological preview influencing parameters is based on the boundary-aware flow preview abnormal data. The boundary-aware flow preview abnormal data is not in the interval state of the simulation operation. Therefore, it is necessary to analyze the impact of abnormal flow characteristics on the water level height and other characteristics of the hydrological data, which involves the use of statistical methods such as regression analysis and correlation analysis to evaluate the impact of flow abnormalities on hydrological conditions. The analysis results will generate a set of hydrological preview influencing parameters. These parameters describe the specific impact of abnormal flow on hydrological characteristics such as water level and water flow velocity, and provide data support for regulation. According to the hydrological preview influencing parameters, the boundary-aware hydrological preview characteristic data is adjusted, including the use of numerical simulation and optimization algorithms, such as finite element analysis (FEA) and particle swarm optimization (PSO), to adjust the hydrological characteristic data to reflect the impact of abnormal flow, and generate adjusted boundary-aware hydrological preview characteristic data. These adjusted data can more accurately simulate the hydrological state of the sluice under various conditions, providing a more reliable basis for subsequent decision-making and control. The adjusted boundary-aware hydrological preview feature data is used to perform hydrological preview anomaly analysis. Statistical analysis and anomaly detection techniques, such as time series anomaly detection algorithms, such as ARIMA models or LSTM neural networks, are used to identify abnormal patterns or abnormal values ​​in the adjusted data. The generated boundary-aware hydrological preview anomaly data will reflect the abnormal conditions in the adjusted hydrological characteristics, providing a basis for subsequent structural impact analysis. The analysis of the influencing parameters of the sluice structure is based on the boundary-aware hydrological preview anomaly data. The boundary-aware hydrological preview anomaly data is not in the interval state of the simulation operation. Therefore, it is necessary to analyze the impact of abnormal hydrological characteristics on the characteristics of the sluice structure. Finite element analysis (FEA) and structural dynamics analysis techniques are used to evaluate the impact of hydrological anomalies on the sluice structure. Through simulation and analysis, the preview influencing parameters of the sluice structure are generated, which can quantify the impact of abnormal hydrological conditions on the stress, deformation, etc. of the sluice structure, and provide data support for the adjustment of structural characteristics.According to the influencing parameters of the sluice structure preview, the boundary-aware structural preview characteristic data is adjusted and processed, and the structural characteristic data is adjusted to reflect the impact of hydrological anomalies using structural optimization algorithms and numerical simulation techniques (such as finite element optimization and genetic algorithms), and the adjusted boundary-aware structural preview characteristic data is generated. The adjusted boundary-aware structural preview characteristic data more accurately simulates the structural state of the sluice under abnormal hydrological conditions, providing a basis for subsequent abnormal analysis. The structural preview abnormality analysis is performed using the adjusted boundary-aware structural preview characteristic data. Using structural health monitoring (SHM) technology and anomaly detection algorithms (such as PCA and SVM), structural anomalies in the adjustment data, such as abnormal sluice pressure, are identified. The generated boundary-aware structural preview abnormal data will reflect the abnormal state of the sluice structure under abnormal hydrological conditions, providing input for the overall abnormal data integration. The boundary-aware flow preview anomaly data, boundary-aware hydrological preview anomaly data and boundary-aware structural preview anomaly data are integrated, and data fusion technology and comprehensive analysis methods, such as Bayesian networks, are used to conduct a comprehensive sluice boundary-aware anomaly assessment on various types of anomaly data to generate comprehensive flood storage sluice boundary-aware anomaly data, which can comprehensively reflect the overall status of the sluice under different abnormal conditions and provide comprehensive support for final control and decision-making.

[0136] This specification provides a sluice multivariate data digital twin system for executing the sluice multivariate data digital twin method as described above. The sluice multivariate data digital twin system includes:

[0137] The flood storage environment multivariate data analysis module is used to obtain the data of the flood storage project analysis area; collect the local flood storage environment multivariate data of the flood storage project analysis area according to the Internet of Things monitoring equipment to generate the local flood storage environment multivariate data; perform global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate the global flood storage environment multivariate data;

[0138] The flood storage terrain three-dimensional model construction module is used to collect flood storage terrain DEM data from the flood storage project analysis area data using GIS technology to generate flood storage project DEM data; perform flood storage terrain panoramic image analysis based on the flood storage project analysis area data to generate flood storage terrain panoramic image data; and construct a flood storage terrain three-dimensional model based on the flood storage project DEM data and flood storage terrain panoramic image data;

[0139] The digital model building module of flood storage project is used to map the global flood storage environment multivariate data to the three-dimensional model of flood storage terrain to carry out digital twin modeling of flood storage project, so as to build the digital model of flood storage project;

[0140] The digital model construction module of the flood storage gate is used to obtain the structural parameters of the flood gate and the PLC control transmission interface of the flood gate; collect the interactive control parameters of the flood gate according to the PLC control transmission interface of the flood gate to generate the interactive control parameters of the flood gate; build a three-dimensional simulation model of the flood gate based on the structural parameters of the flood gate and the interactive control parameters of the flood gate; map the three-dimensional simulation model of the flood gate to the digital model of the flood storage project to perform digital twin modeling of the flood storage gate, so as to build a digital model of the flood storage gate;

[0141] The flood storage gate boundary perception preview feature analysis module is used to collect the digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generate the digital preview data of the flood storage gate; based on the digital preview data of the flood storage gate, the flood storage gate boundary perception preview feature analysis is performed to generate the flood storage gate boundary perception preview feature data;

[0142] The intelligent control module of the flood storage gate is used to analyze the abnormal data of the flood storage gate boundary perception according to the preview characteristic data of the flood storage gate boundary perception, and generate the abnormal data of the flood storage gate boundary perception; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the abnormal data of the flood storage gate boundary perception, so as to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the abnormal data of the flood storage gate boundary perception and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the intelligent control operation of the flood storage gate on the digital model of the flood storage gate through the sluice gate intelligent control engine.

[0143] The beneficial effect of the present application is that the multivariate data digital twin method of the sluice of the present invention collects multivariate data of the flood storage project analysis area through the Internet of Things monitoring equipment, realizes the comprehensive data integration of the local and global flood storage environment, and overcomes the problem that multi-source data is difficult to integrate in the traditional method. GIS technology is used to collect DEM data of flood storage terrain and panoramic image analysis, and a three-dimensional model of flood storage terrain is constructed. Combined with the multivariate data of the global flood storage environment, real-time monitoring and all-round analysis of the flood storage environment are realized. By obtaining the sluice structure parameters and the sluice PLC control transmission interface, a three-dimensional simulation model of the sluice is constructed, and it is mapped to the digital model of the flood storage project to form a complete digital twin model of the flood storage sluice. Based on the digital twin model of the flood storage sluice, digital rehearsal and boundary perception rehearsal feature analysis are performed, which can timely discover and prevent potential operation risks, thereby performing intelligent and adaptive sluice control. By constructing an adaptive control decision tree model and an intelligent control engine, the intelligent control operation of the sluice is realized for the complex and changeable flood storage environment, which effectively improves the intelligent level of sluice management and solves the problem of single sluice control mode and lack of intelligent and adaptive control means in the prior art.

[0144] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.

[0145] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.

Claims

1. A digital twin method for multivariate data of a sluice gate, characterized in that: The following steps are involved: Step S1: acquiring data of the flood storage project analysis area; collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; performing global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate global flood storage environment multivariate data; Wherein, step S1 comprises the following steps: Step S11: Acquire flood storage project analysis area data; Step S12: collecting local flood storage environment multivariate data on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; Step S13: extracting local monitoring area data according to the local flood storage environment multivariate data to generate local monitoring area data; Step S14: performing a multivariate deviation analysis of the local flood storage environment in the monitoring area on the local multivariate data according to the local monitoring area data, and generating multivariate deviation data of the local flood storage environment; Step S15: performing time series characteristic analysis on the local flood storage environment multivariate deviation data to generate local multivariate deviation time series characteristic data; Step S16: performing a global flood storage environment multivariate deviation fluctuation analysis based on the local multivariate deviation time series characteristic data to generate global flood storage environment multivariate deviation fluctuation data; Step S17: performing global flood storage environment multivariate data analysis through global flood storage environment multivariate deviation fluctuation data to generate global flood storage environment multivariate data; Step S2: using GIS technology to collect flood storage terrain DEM data for flood storage project analysis area data to generate flood storage project DEM data; performing flood storage terrain panoramic image analysis based on flood storage project analysis area data to generate flood storage terrain panoramic image data; constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the flood storage terrain panoramic image data; Step S3: Mapping the global flood storage environment multivariate data to the flood storage terrain three-dimensional model to perform digital twin modeling of the flood storage project to construct a digital model of the flood storage project; Step S4: obtaining the sluice structure parameters and the sluice PLC control transmission interface; collecting the sluice interactive control parameters according to the sluice PLC control transmission interface to generate the sluice interactive control parameters; constructing a sluice three-dimensional simulation model based on the sluice structure parameters and the sluice interactive control parameters; mapping the sluice three-dimensional simulation model to the digital model of the flood storage project to perform digital twin modeling of the flood storage sluice, so as to construct a digital model of the flood storage sluice; Step S5: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate to generate digital preview data of the flood storage gate; performing boundary perception preview feature analysis of the flood storage gate based on the digital preview data of the flood storage gate to generate boundary perception preview feature data of the flood storage gate; Step S6: Analyze the flood storage gate boundary perception abnormality data according to the flood storage gate boundary perception preview feature data to generate the flood storage gate boundary perception abnormality data; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the flood storage gate boundary perception abnormality data to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the flood storage gate boundary perception abnormality data and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the flood storage gate intelligent control operation on the flood storage gate digital model through the sluice gate intelligent control engine.

2. The sluice multivariate data digital twin method according to claim 1 is characterized in that: Step S2 includes the following steps: Step S21: using GIS technology to collect flood storage topography DEM data for flood storage project analysis area data to generate flood storage project DEM data; Step S22: using laser radar monitoring equipment to collect orthophotos of flood storage terrain for the flood storage project analysis area data, and generating orthophotos of flood storage terrain data; Step S23: using laser radar monitoring equipment to collect flood storage terrain oblique images of the flood storage project analysis area data to generate flood storage terrain oblique image data; Step S24: performing panoramic image fusion on the flood storage terrain orthophoto image data and the flood storage terrain oblique image data to generate flood storage terrain panoramic image data; Step S25: constructing a three-dimensional model of flood storage terrain based on the flood storage project DEM data and the panoramic image data of the flood storage terrain.

3. The sluice multivariate data digital twin method according to claim 2 is characterized in that: Step S25 includes the following steps: Step S251: performing elevation gradient analysis on the flood storage project DEM data to generate flood storage project DEM gradient data, and performing gradient feature node selection on the flood storage project DEM data according to the flood storage project DEM gradient data to generate flood storage project DEM gradient feature node data; Step S252: performing image sharpening processing on the panoramic image data of the flood storage terrain to generate panoramic sharpened image data of the flood storage terrain; and performing sharpening feature node selection on the panoramic sharpened image data of the flood storage terrain based on the panoramic sharpened image data of the flood storage terrain to generate panoramic sharpened feature node data of the flood storage terrain; Step S253: Perform terrain fusion matching feature analysis on the flood storage project DEM gradient feature node data and the flood storage terrain panoramic sharpening feature node data to generate terrain fusion matching feature data; Step S254: performing flood storage terrain point cloud data fusion processing on the flood storage project DEM data and the flood storage terrain panoramic image data according to the terrain fusion matching feature data to obtain flood storage terrain fusion data, and constructing a flood storage terrain three-dimensional model based on the flood storage terrain fusion data.

4. The sluice multivariate data digital twin method according to claim 1 is characterized in that: Step S4 includes the following steps: Step S41: obtaining the structural parameters of the sluice gate; Step S42: using BIM modeling technology to model the sluice structure parameters into a sluice three-dimensional model framework, thereby generating a sluice three-dimensional model framework; Step S43: Obtain the water gate PLC control transmission interface; Step S44: collecting interactive control parameters of the water gate according to the water gate PLC control transmission interface to generate interactive control parameters of the water gate; Step S45: performing a water gate interactive control parameter characteristic analysis according to the water gate interactive control parameter to generate a water gate interactive control characteristic parameter; Step S46: marking the model structure interaction attributes of the sluice three-dimensional model framework according to the sluice interactive control characteristic parameters to construct a sluice three-dimensional simulation model; Step S47: Analyze the geographical features of flood storage gate mapping based on the three-dimensional flood storage terrain model to generate geographical feature data of flood storage gate mapping; Step S48: By mapping the geographic feature data of the flood storage gate, the three-dimensional simulation model of the gate is mapped to the digital model of the flood storage project to perform digital twin modeling of the flood storage gate, so as to construct a digital model of the flood storage gate.

5. The sluice multivariate data digital twin method according to claim 1 is characterized in that: Step S5 includes the following steps: Step S51: collecting digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generating digital preview data of the flood storage gate; Step S52: performing preview type characteristic analysis on the digital preview data of the flood storage gate to generate digital preview characteristic data of the flood storage gate; Step S53: performing a water gate boundary perception area division process on the digital preview data of the flood storage gate to generate water gate boundary perception area data; Step S54: performing a flood storage gate boundary perception preview feature analysis on the flood storage gate digital preview feature data based on the flood storage gate boundary perception area data to generate flood storage gate boundary perception preview feature data.

6. The sluice multivariate data digital twin method according to claim 5, characterized in that: Step S52 includes the following steps: Perform a preview cluster feature analysis on the digital preview data of the flood storage gate to generate preview cluster feature data; perform a preview type feature analysis on the digital preview data of the flood storage gate based on the preview cluster feature data to generate digital preview feature data of the flood storage gate.

7. The sluice multivariate data digital twin method according to claim 1 is characterized in that: Step S6 includes the following steps: Step S61: analyzing flood storage gate boundary perception abnormal data according to flood storage gate boundary perception preview feature data to generate flood storage gate boundary perception abnormal data; Step S62: analyzing the sluice gate regulation control parameters when the flood storage gate boundary sensing is abnormal according to the flood storage gate boundary sensing abnormality data to obtain the sluice gate regulation control parameters; Step S63: designing a water gate adaptive control training sample based on the water gate digital control parameters and the abnormal data of flood storage gate boundary perception; Step S64: establishing a sluice adaptive control decision node based on the abnormal data sensed at the flood storage sluice boundary, and performing decision node integration processing on the sluice adaptive control decision node to construct an initial sluice adaptive control decision tree model; Step S65: using the sluice adaptive control training samples to perform model training processing on the initial sluice adaptive control decision tree model to obtain the sluice adaptive control decision tree model; Step S66: construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform flood storage gate intelligent control operations on the flood storage gate digital model through the sluice gate intelligent control engine.

8. The sluice multivariate data digital twin method according to claim 7, characterized in that: Step S61 includes the following steps: Step S611: According to the boundary condition calibration processing of the flood storage gate boundary perception preview characteristic data, boundary perception flow preview characteristic data, boundary perception hydrological preview characteristic data and boundary perception structure preview characteristic data are obtained respectively; Step S612: performing boundary-aware traffic preview anomaly analysis according to boundary-aware traffic preview feature data to generate boundary-aware traffic preview anomaly data; Step S613: analyzing the hydrological preview influencing parameters based on the boundary-sensing flow preview abnormality data to generate the hydrological preview influencing parameters; Step S614: performing boundary-aware hydrological preview feature adjustment processing on the boundary-aware hydrological preview feature data according to the hydrological preview influencing parameters to generate adjusted boundary-aware hydrological preview feature data; Step S615: performing boundary-aware hydrological preview anomaly analysis according to the adjusted boundary-aware hydrological preview feature data to generate boundary-aware hydrological preview anomaly data; Step S616: Analyze the influencing parameters of the sluice structure according to the boundary-sensing hydrological preview abnormal data, and generate the influencing parameters of the sluice structure preview; Step S617: performing boundary perception structure preview feature adjustment processing on the boundary perception structure preview feature data according to the sluice structure preview influence parameter to generate adjusted boundary perception structure preview feature data; Step S618: performing boundary perception structure preview abnormality analysis according to the adjusted boundary perception structure preview feature data to generate boundary perception structure preview abnormality data; Step S619: Integrate the boundary-aware flow preview anomaly data, boundary-aware hydrological preview anomaly data, and boundary-aware structural preview anomaly data to generate flood storage gate boundary-aware anomaly data.

9. A sluice multivariate data digital twin system, characterized in that: Used to execute the sluice multivariate data digital twin method as claimed in claim 1, the sluice multivariate data digital twin system comprises: The flood storage environment multivariate data analysis module is used to obtain the flood storage project analysis area data; perform local flood storage environment multivariate data collection on the flood storage project analysis area data according to the Internet of Things monitoring equipment to generate local flood storage environment multivariate data; perform global flood storage environment multivariate data analysis based on the local flood storage environment multivariate data to generate global flood storage environment multivariate data; wherein, the flood storage environment multivariate data analysis module includes the following steps: ... Extract local monitoring area data based on multivariate data of the environment to generate local monitoring area data; perform multivariate deviation analysis of the local flood storage environment in the monitoring area on the local multivariate data based on the local monitoring area data to generate local flood storage environment multivariate deviation data; perform time series feature analysis on the local flood storage environment multivariate deviation data to generate local multivariate deviation time series feature data; perform global flood storage environment multivariate deviation fluctuation analysis based on the local multivariate deviation time series feature data to generate global flood storage environment multivariate deviation fluctuation data; perform global flood storage environment multivariate data analysis based on the global flood storage environment multivariate deviation fluctuation data to generate global flood storage environment multivariate data; The flood storage terrain three-dimensional model construction module is used to collect flood storage terrain DEM data from the flood storage project analysis area data using GIS technology to generate flood storage project DEM data; perform flood storage terrain panoramic image analysis based on the flood storage project analysis area data to generate flood storage terrain panoramic image data; and construct a flood storage terrain three-dimensional model based on the flood storage project DEM data and flood storage terrain panoramic image data; The digital model building module of flood storage project is used to map the global flood storage environment multivariate data to the three-dimensional model of flood storage terrain to carry out digital twin modeling of flood storage project, so as to build the digital model of flood storage project; The digital model construction module of the flood storage gate is used to obtain the structural parameters of the flood gate and the PLC control transmission interface of the flood gate; collect the interactive control parameters of the flood gate according to the PLC control transmission interface of the flood gate to generate the interactive control parameters of the flood gate; build a three-dimensional simulation model of the flood gate based on the structural parameters of the flood gate and the interactive control parameters of the flood gate; map the three-dimensional simulation model of the flood gate to the digital model of the flood storage project to perform digital twin modeling of the flood storage gate, so as to build a digital model of the flood storage gate; The flood storage gate boundary perception preview feature analysis module is used to collect the digital preview data of the flood storage gate according to the digital model of the flood storage gate, and generate the digital preview data of the flood storage gate; based on the digital preview data of the flood storage gate, the flood storage gate boundary perception preview feature analysis is performed to generate the flood storage gate boundary perception preview feature data; The intelligent control module of the flood storage gate is used to analyze the abnormal data of the flood storage gate boundary perception according to the preview characteristic data of the flood storage gate boundary perception, and generate the abnormal data of the flood storage gate boundary perception; analyze the sluice gate regulation control parameters when the flood storage gate boundary perception is abnormal according to the abnormal data of the flood storage gate boundary perception, so as to obtain the sluice gate regulation control parameters; construct a sluice gate adaptive control decision tree model based on the abnormal data of the flood storage gate boundary perception and the sluice gate regulation control parameters; construct a sluice gate intelligent control engine according to the sluice gate adaptive control decision tree model, and perform the intelligent control operation of the flood storage gate on the digital model of the flood storage gate through the sluice gate intelligent control engine.

Citation Information

Patent Citations

  • Water gate scheduling optimization method based on water conservancy professional model

    CN117521371A

  • Sluice informatization system construction method based on digital twin technology

    CN118332832A

  • KR20220126917A

  • KR20240041795A